You are on page 1of 1
Pa Dat Sin Greater Noida Industrial Development Authority 169,Chinan Tae Setor- Gams, Gener Nos Gautam Rath Nagar, 201506 cnr) ABTS [22 et eee CONDITIONAL, wih wpe pon se aSnbaded 17 visetovis notification 60(A) dated 27- Sn anaemia Ws Neo Sia nots Lt Sine ad ota dad Te 006 Stel y Minny of Eicon ee a Forest and point no. 18 vis-devis ‘Karol Bagh , New Delhi uidelines dt18.112012 0 CG.W.A, With reference to your application no- SPP. dated. 22-2-22!5 or grant of Sanction f LT, Building ‘on Plot novTZ0l Secor TECH ZONE I have to ior sou tin he eton fe hein rane by te Autry ith the flowing ons co |. This sanction is ting granted under the provision of "The Grester Noi Insti Development Ares Building Regoltion 2010, “The vali of is sanction up t-S Years In cas allotment is eanclleiese in determine fr whatsoever reson by funtonl department, forest set stl astm fe demed to have bon win 4 Drng this periods afer the completion of eorsiraston tr nesesary to apply for oceupancy crise ‘Time extension charge shale payable as applicable, 5. If demanded by the Autry. Vou shall be Table to pay chages forthe provision of any father Slt developmenvimprnemet 6. copy ofthe sanction davig shall alway be kot at sie and shal be made valle to ay offer of the ‘ator on demas 7 No adliionftraton i permite in he sanctioned dawings. Fr any changes prior permision form the Autor euired. You sal be responsible for caning out the workin assordance wit the requiements of Greater Noide {oestial Develpment Buing Regulation 210, And detons made frm tine to tne 9. rir pemision is requied beer ging an under proud bore el 10. No atv oer han as speed in ease eed shall be permit in the premises 1. Prior permision is permission fom the Authority x requir for eporay suse lo ik abou hts & sieoftce 12. Gate shal open on tthe serv era only. Diet ass othe main caring shal ot be provides. 13, Series, ram wate harvestg shal be a sper approval ot Author. 14. Nopuskeg of any kind shal fe peste one fone 15, Pejometer shal have tobe ins as er detonated by Author 16, Complying with all the reqieent for obaining NOC from various departments price to submission of "ppation for occupancy shal be the responsibly of allots iespetive ofthe propos sanevoned By Nia. Before starting contruction, the NOC is requir from Ministry of Envronme ietionno-0(4) dated 37-1198 cd 14-09-2006 which ever i apaleabl. The copy of shall be subrated tothe Authority constrcton started before obtaining the NOC, the sation shall be treated a canceled. 1%, Before stating construction, the NOC i required from Central Ground Water Authority under ‘otiiation dated 18.11.2012 The copy of NO. trots C.G.W-A, salle submited tothe Authority TE ‘onstruction is started before obtaining the NOC. the sanction stall be treated a ane 2 3 2013 LoeNUSANGAL GM.(Pingtareh) Copy of ation rings) yo (Eng) rn td,

You might also like