You are on page 1of 1

7.

0M GATE NORTH

°
.00
123
MAKKAH

TO
SE
OUTF
ALL
10.00

PARTITION WALL

PARTITION WALL
FE FE FE

13
TOILETS ROOM ROOM ROOM

PARTITION WALL PARTITION WALL PARTITION WALL

THIS DRAWING

3.1
1 2 3 4 5 6 TEA
ROOM
ARE
ROOM
RE
ROOM

7 8 9 10 11 12 14
3.1 RC
MEETING
ROOM
KEYPLAN
NOTES

CRANE
1 10.00

50 TON LEGEND / ABBREVIATION

TRAILER TRUCK

4.0M GATE
PARKING AREA PARKING AREA PARKING AREA REVIEW STATUS
1 WORK MAY PROCEED 3 REVISE AND RESUBMIT, WORK
SHALL NOT PROCEED

2 REVISE AND RESUBMIT, WORK MAY 4 REVIEW NOT REQUIRED WORK

LIFTING LAYOUT PROCEDD SUBJECT TO INCORPORATION


OF CHANGES INDICATED MAY PROCEED
MAY NOT PROCEED
DISTRIBUTION REQUIRED YES

IMPORTANT: PERMISSION TO PROCEED DOWS NOT CONSTITUTE ACCEPTANCE OR APRROVAL OF DESIGN


DETAILS, CALCULATIONS, ANALYSIS, TEST METHODS, MATERIALS DEVELOP, OR SELECTED BY SUPPLIER,
IT DOES NOT RELIEVE THE CONTRACT FROM HIS CONTRACTUAL OBLIGATIONS.
4-SLIING BELT
CAP. 4 TONS 6 METERS
RC PROJECT FIELD ENGR.

Name & Signature


Date:
RUBBER
PAD CABIN
I-BEAM STEEL
CHASSIS SHOP DRAWING
REFERENCE DRAWING

SPREADER BEAM 10 TONS D-SHACKLE


CAP. 8.5 TONS
0M

4-SLIING BELT
.0

CAP. 4 TONS 6 METERS


31

CRANE
(CAP. 50 TONS)

ED

ED
D
D

ED

WE
NE

ITT

OV
N

K
SIG
AW

VIE

BM
EC

PR
REV.No. DATE ISSUED FOR

DR

CH

RE

SU
DE

AP
HOOK POINT DETAILS Drawing ISSUED FOR REVIEW
SEE HOOK POINT PORTA CABIN Status

DETAILS 10mX3.1m (4.6 TONS)

4-SLIING BELT
CAP. 4 TONS 6 METERS
JOB No. 027-T10 ‫م‬10‫ د‬-027 ‫قر ما ادو‬
3.10

SITE PREPARATION FOR


‫ملا ع معا ةراما قدرمل عقومعا دعدعإ‬
D-SHACKLE INDUSTRIAL WASTE
‫عاع عادو‬
MANAGEMENT FACILITY (IWMF)
CAP. 8.5 TONS
2.00

3.00 4.00 3.00


LIFTING PLAN FOR ‫ـلومعاقداماخ‬
OFFICE AREA ‫قإنمعا لرو‬

FACILITY No. 1-10-12E ‫خ‬212 -10-1 ‫قر معا مقوم‬

10.00 10.00
D-SHACKLE DETAILS CONTRACT No.

SCALE:
12E-C01

DRAWING No.
01 ‫ا‬2‫خ‬212 ‫مقر معاار‬

REV.
LIFTING DETAILS NTS 12E-035-22UP-SD-CE-007 A

You might also like