Progress Report of Renewable Energy Program up to September-2023 in REB (a) S ‘olar Panel Installation Capacity under REB System: |(30Wp X 3030; S0Wp X 1650; 75Wp X 1037) Sh Installation Max. Peak |Description of the Solar System No id ea (Nos.) __ | Capacity (MWp) | [installation of Solar Home System under OF-Grid Area aa an Rooftop Solar System at Consumer end for new Connection under On-Grid| > [Area but not connected with net metering 20786 Rooftop Solar system at different PBS under On-Grid Area but not > |connected with net metering a casas [Rooftop Solar system at Upazila Complex (30kWp each) under On-Grid 4 |Area but not connected with net metering 1s oe «Sola irrigation Pump (SHP each) wo oe IKOICA (5.16 kWp X20) & CCTF (6.72 kWp X20) 6_ [Solar Charging Station ( 01 no 30 kWp & 13 nos each 21 KWp) 14 0308 Emergency Assistance Project for Displaced Myanmar National at Street light-2000 \Con'sbazar. Solar Mini Grid- 7 |Street light stand alone 2000 nos. each eapacity-120Wp, 50 1.032 [Solar Mini Grid SOnos. Each exapacity-0.960kWp for 2000 street light | Solar Nano Grid- Solar Nano Grid 100n0s eacg capacity 5.94 kWp 100 [Solar system at REB H/Q Training academy building with , ae !Net metering System under DESCO Solar system at REB Executive Office building with 2° |Netmetering System under DESCO ! 0045 Total (Solar System Capacity)| 29.1165 (b) Net metering System at PBS & Consumer end: Sl. ; Installed Max. Peak Ni, [Description ofthe System aed Cee ae 1 [On grid rooftop solar system at different PBS H/Q building on 2_[Net Metering system at consumer end till June-2023 365 9.1595, 3. [Net Metering system at consumer end at FY 2023-2024 19 (Target-55)_| 7.017 (Target-9.0) ‘Total Achievement up to September-2023| 395 36.286 (C) On-going Project: Solar Photovoltaic Pumping for Agricultural Irrigation by ADB Fund. Ai Target Installed up to September-2023 Ny, |Peseription No |eapasity 7 ‘Capacity wp) wp) 1_|Solar Irrigation Pump 2000 193 264 2.448 (a) Solar Mini-Grid (On grid) SL [Description FST Trane Capacity WD) 0 [Solar Mini-Grid (On grid System) OTHE Grand Total up to August-2023 (a+brerd) = 88.59 MWp ’ & ye 26 09] io). on Subrata’ “i Shuvo, —— Assistant Engineer Sr rea aicety ‘enewabie E Director AVE, ORCA. oTaT BREB, Dhaka Renewable Energy ‘BREB, Dhaka

You might also like