You are on page 1of 3
Py ooet TALELA DE TUBOS Cowie Qin SCHEDULE 40 € 80 roma a8 [rev : NOTA: TUBOS GALVANIZADOS ACRESCENTAR 7% LJ NO PESO DOS TUBOS PRETOS — ae EX. DE ESPECIE DE UM TUBO SCHEDULE ie 7 40 C/p NOM. 2" E COMPR, 500mm. = \ TUBO SCH. 40 8 NOM.2"x'500mm ee SCHEDULE 40 =| |) petal ee [ae [sseefecco[ s |v Jw]. To et) reac mm mm [Korn | om? | om® | om] om] on? om ox Wa] 13.7 2,24 | a63_[o.809 | 0138 | a201 | 0413 | 0.276 | 0.400 an ve | in2 2.31 | 085 | (08 [0306 [0.356 | os33 | o6i2 Tori _ v2_ as 2m_| 27 {160 | a704 [ace _Pases | nar] 132 em —| [ap ar 2e7r {468 | eid [isa] vis] oaas | soe] 23 1 [ase s3e_['2.50 | "320 [365 | 219_| uo? [230] 437 — tue 42.2. 3.56 3.36, 4.31 812 3.85. 137 162 7.69 oat te | 48,3 3.68 _| 405 | s.i8_|13.0 [537 _[ 1.58 | 260 ] 10.7 cod 2 60,3 3.91 5.43 691 27.6 a6 200 S52 18.3, ned 2a] 73.0 ace {71.0 |63.5_| 24] 2.41] | sap F aid 3 88,9 1.28 14.4 126 28,3 2.96 252 B66 ES Sua fione 13.36 [123 [200 [38,3 3.39] 309] 7a6 4 fuss 16.08 | 204 [7300] #28 | 3.83] coo] 10s = 3 [tas 276 | 277 | 631 | 69.3 | 477] 1260 | 179 ”) | iee.3 [2a2s [360 [iro] 139] 5.70] saa} ore a” 3 _feior 42.49 | $43 [3030 | 276 _| 248 | 6080] 352 ” io} 273.0 60.23 | 76.6 | 667 | 409 | 0.33 300] ore =) _| scHEoULE 80 asi [oass ares | 0,844 165 | 1.56 be 12,3 [10200 3.13 | 20400] 1500 U = S/ 1 cae fae tess i 103] 679] 5.27 ea | [ae iss aae [ae] ive 154 32,7 36 —= 2 195 72.3 24,0 | faa 238] 160 | aa —@ | 3 7.62 | 18.25 | 19.4 [162 | 304 | 2.09 | 324 | 728 @ || [au 08 | tase | 230 | 262 | se] ase] ses | 03 | < 856 [22.29 | zas_| 00 | ca9_| 3.75] 709 | 140 = | Ss 335 |62_| 122 |"a.67_| 1720] 244 58 [1680 | 200_|s.sa_| 3370 | 400 | =| 82,3 | 4400 | «02 | 31 _] 8800 | eoa | = => xe ry > Py bet TABELA DE TUBOS oreresarane toe DIN 2440 € 2441 TUBOS GALVANIZADOS ACRESCENTAR 7% NO PESO DOS TUBOS PRETOS. EX. P/ESPECIE DE UM TUBO. DIN 2440 C/a NOMINAL 1/2" x COMP 250mm TUBO DIN 2440 g NOM. 1/2" x 250mm @ [ss [27 | 29 Jores [osss [ous [o2e [osea | azz [oase z wo [2 [a [29] ioe | i30_[asar [oss [asis | o.css | a8cs : is [ans [4a [325 [145 | 10a [or7s foree [acae | uss [tas 20 | a [aoa | a2 [ico | eai_| ute | we [oes [saa | 2.86 L | 2 oie eee pat Td se] wea [sas | 0s [asa | ase | aor | azo | 136 | 11 | 0.56 40_| 403 [saz | 405 [ass [ses [3.9 [ars | s7 [ee [1s 2 | so | eas | sis | 45 | 67 | 709 | sas | 02 | we | ene | 205 zve_|_65_| 761 | 671] 4,5 | 190 | 01 | es: | mt | esa | 130 | 34.2 fs [- 20 [eas [792 [405 [or | es zer_| 8.1 4_ | 0 _|uias [oss [sa [we [5 s49_| 96.1 5. ws | i397 [izes [54 |e | 228 1030 _| 47 js S| 150 [6s [eas [sa | a2 | 2c 1720__| 209 spss pass apse ats a0 [ase SHPISIFISSSSSCVLCVESCSSSIIIVSIIIIIFIIITIIS Gr AGINA 16/85 [IDENTIFICACAO DO PADRAOT CSN _DSA_ET-500127 REV.0 Dik 7 Diwue TABELA | - Espagamento entre supone Didmetro nominal do tubo" Espagamento maximo entre os DN suportes (mm) 15 (1/2") 3100 20 3/4") 3700 25 (1") € 32 ( -4300 40 (1-1/2 5200 50 (2”) € 65 (2-1/2") 5200 80 (3") e 100 (4”) 6400 150 (6") 8800 200 (8”) 10 000 250 (10") 11300 300 (12") 11900 350 (14”) e maiores 12200 5.7 Ramais de Purgacio Ramais de purgagio devem ser instalados em todas as linhas que necessitem de drenagem, 57.2 Ramais de purgagio devem incluir 0 conjunto completo de todos os acessorios requeridos rere me ceeranto a necessiria precisio de descarga dos fuidos dremdet Once Iccessério, devem incluir purgadores, vilvulas, visores, tubulagdo de eontome (by-pass”), tanques de condensado, conexdes 208 esgotos e separadores, Purgador para remogdo de condensado ¢ u imidade das linhas deve ser mostrado em desenho, Sempre que possivel deve ser instalado prot tegido contra danos. Nota: © purgador nio necesita de isolamento térmico, exceto quando para protegio de pessoas e/ou equipamentos. -7.5 Quando necessério, todos os ramai s de purga de linha de vapor e purga de linhas de gis devem conter Pote de condensado. Notas: Pessoas e/ou equipamentos, 3) Os potes de condensado de Purga de linhas de gas de coqueria, gas de alto-forno, e gis | de aciaria sio padronizados e devem ser solicitaios 4 Con quando necessério durante 0 | Projeto, Drenos 1 Em todos o, denivacio co; ne a ee ae . 2 bt ee m antes baixos de qualquer tubulagso deve haver sempre uma pequena ™ valvula para a drenagem dos tubos

You might also like