Professional Documents
Culture Documents
CALCULATION SHEET
Interinsco, Tbk
(ASME Sec. VIII Div.1 2013 Ed. & API 510 9th Ed. Errata 2009) Asset 2 Limau Field
TAG NO : 13806
SERIAL NO : -
SUBJECT : Two Phase Vertical Separator
LOCATION : SP X
CALCULATION
Minimum Thickness
tprev tact
CR = 2.877 mm/year
year act year prev
tact treq
RL shell = 1.25 years
CR
tact treq
RL head = -0.88 years
CR
Conclusion
Base on above calculation, Remaining life of pressure vessel is = -0.88 years
PT Radiant Utama
CALCULATION SHEET
Interinsco, Tbk
(ASME Sec. VIII Div.1 2013 Ed. & API 510 9th Ed. Errata 2009) Asset 2 Limau Field
TAG NO : 13806
SERIAL NO : -
SUBJECT : Two Phase Vertical Separator
LOCATION : SP X
VISUAL INSPECTION REPORT (PRESSURE VESSEL)
Inspected by,
PT Radiant Utama Interinsco, Tbk
Tri Avianto
PERTAMINA EP
UNIT BISNIS PERTAMINA EP (Limau)
CALCULATION SHEET
(STOOM KETELS - 1952 EDITION & API 510 LATEST EDITION)
ITEM NO : BJ13801 Sheet No. : 1 of 2
SUBJECT : Separator
LOCATION : SP X
Minimum Thickness
Plate Thickness (S)
PDV 10 x 910.3 x 5
S = + CA = + 0 = 30.981 mm
2 TB Q 2 x 1266.50 x 0.58
Corrosion Rate
Sp - Sa 11.5 - 7.1
CR = = = 0.489 mm/year
years between Sp and Sa 9
Not calculated
Maximum Allowable Working Pressure (MAWP)
2 (Sa - (2 CR T)) Q TB
MAWP =
DV
= 1.345 Kg/cm2
Conclusion
MAWP used = 1.900 Kg/cm2 ( Derating )
PERTAMINA EP
UNIT BISNIS PERTAMINA EP (Limau)
CALCULATION SHEET
(STOOM KETELS - 1952 EDITION & API 510 LATEST EDITION)
ITEM NO : BJ13801 Sheet No. : 2 of 2
SUBJECT : Separator
LOCATION : SP X
PERTAMINA EP
Minimum Thickness after Derating
UNIT BISNIS PERTAMINA EP (Limau)
Plate Thickness (S)
Conclusion
Base on above calculation, Remaining life of pressure vessel is = 2.48 years