GOVERNMENT OF TRIPURA
DIRECTORATE OF URBAN DEVELOPMENT
" FLOOR OF U.D. BHAWAN, SHAKUNTALA ROAD gf oe] YW
AGARTALA, TRIPURA (W)
"June “2022
pwasextyfasonte Dated, Agartala, the _¢
To
The Chief Executive officer/ Executive officer
Municipal Council/ Nagar Panchayat
Sabroom /Belonia /Santirbazar/Udaipur/Amarpur/Melaghar/Sonamura/
Bishalghar/Ranir /dirania/ Khowai/Ambassa/Kamalpur/Kumarghat /
Kailashahar/ Papier /Dharmanager.
Subject :-Sending of detailed model Estimate for “Setting up of Electric
cremation furnace at Municipal Council / Nagar Panchayat area.”
Sir
Enclosing here with a detailed model estimate for “Setting up of
Electric cremation furnace at Municipal Council / Nagar Panchayat area.”
under your jurisdiction for an amount of Rs.1,09,09,551.00 for arranging the
tender process at an early date. The necessary fand will be placed from this
end shortly.
This is for your information & necessary action.
Yours Sihcerely
gy
Enclo :- One copy detailed Estimate ar
fer, TCS, 53
Director.
Directorate Urban Development
Government of Tripura
(Dr. Tamal MajuyGOVERNMENT OF TRIPURA.
OFFICE OF THE CHIEF ENGINEER
URBAN DEVELOPMENT DEPARTMENT
U.D BHAWAN (4" Floor) SHAKUNTALA ROAD
STATE: TRIPURA, BRANCH: UDD
NAME OF WORK:- Setting up of Electric cremation furnace at Different Muni
of Tripura including Civil & Mehanical Works.
FUND:
LMAJOR HEAD:
2.MINOR HEAD:~
3.DETAILED HEAD:-
REPORT
The detailed estimate has been framed by the Executive Engineer, Urban Deveklopment
Department ,Engineering wing of the probable cost of Rs. Rs.1,09,09,551.00 (Rupees One Crore Nine
lakhs Nine thousand five hundred fifty one) only including 3% contingencies which includes civil
Mehanical Works.
HISTORY
The detailed estimate has been framed by the Executive Engineer, Urban Development
Department , Engineering wing as per direction of the Director ,UDD, Agartala accordingly the
preliminary estimate has been prepared based on SOR 2020 along with relevant cost index model type
drawing prepared by the Executive Engineer planning DIVISION, Agartala Municipal Corporation.
Provision has been kept civil and Mechanical items of works.
Hence Necessary administrative approval and technical sanction is required from the
competent authority.
1.Cost:- Rs.1,09,09,551.00
2.Rate : SOR 2020 & approved Rate
(TS NO:53/T.5/S.E-II/PWD (R&B) Dated 31.01.2022)
3.Method: By contract
4,Time Allowed :- 09 Months
5.7 & P will be arranged by the agency.
pal Council / A! * po|
| NAME OF WORK:: Setting up of Electric cremation furnace at Different Municipal
Council of Tripura including Civil& Mehanical Works.
|
ABSTRACT OF COST
} fs] Particulars Total Cost
No
1 Construction part of Civil works Rs.28 63,693.00
tr Construction part of Mechanical works Rs.77,27,904.00
Totali#i= | _Rs.1,05,91,797.00
4 ‘Add 3% Contingency | _Rs.3,17,754.00
i Total: |_Rs.1,09,09,551.00
I (Rupees One Grore Nine lakhs Nine thousand five hundred fifty one)
only
ec
as
7
BAe V
Junior Engineer Assistant Engineer ExecutivaEngineer
UDD, Agartala UDD, Agartala UDD, Agartala
5 asl a
‘%
a
cunlocns Engineer
UDD, Agartala
Chief Ehgineer
UDD, Agartala* NAME OF WORK:- Setting up of Electric cremat
ion furnace at Different Municipal Council of
Tripura including Civil & Mehanical Works.
Item Description ‘Qnty
[SH:-2.13/Earth work in excavation by mechanical means (Hydraulic
| [excavator) / manual means in foundation trenches or
\drains (not exceeding 1.5 m in width or 10 sqm on plan)
including deessing of sides and ramming of bottoms, lift
lupto 1.5 m, including getting out the excavated soil and
disposal of surplus excavated soil as directed, within a lead
Units] Rate [Amount
i Tw fv vi
[of 50 m,
[column ‘1xGx1 8x1 8xd.18=22,939]
Lxdy2.192 1nd. 18=20,815
drains
‘xdx42x.82x0,45=15.498|
59.252) 59.252 | cum} 169.5 | 10043
2. {Supplying and filing in plinth, under floor, foundations etc,
with sand (fine) from local quarry with all lifts including
spreading in horizontal layers, watering, grading to
required slope, ramming, consolidating and compacting
leach layer by using plate compactor or by any suitable
method complete.
[column 1x6xd.Bx1.8x0.10=1,944]
[drain Dxdx42x.8210.102
32.252 | cum| 997.5 | 28624
3 [Providing and laying dry flat brick flooring in required
pattern complete.
flooring 1x1x6 0x1. 80%1.80=19,440]
| Lx Ox2.10%2.10=17.640]
Ded O0x4297.
121.08 | sqm} _654.7 | 79271
specified grade excluding the cost of centring and]
shuttering -
-All work upto plinth level
4.13
:3:6 (1 Cement: 3 fine sand : 6 graded well burnt
brick aggregate 20 mm nominal size)
|_| [Providing and laying in position cement concrete of
[column Tx6x1 8x1. 80.101.
LeGx2.12.150.10=1.
[féoring x1x7.0x12,0x0.4:
[plinth DAT. 5x12.5x0.1
drain DeIx42x.8230.1
24.927| 24.927 [cum _|8,686.10| 216518
First class brick work in foundation and plinth
5 including cost of all materials as required completeCy
- = \
Fe |
| Tar class brisk wark in superstocture obove pn level usta 7]
Fir oe evel nchuding cost a! al mater 2s required complete
apn coment mortar 14 (1 coment a fine €2nd) Sv|Gum | 1086 40) wsTEOE
[CRE ko os I Taos
7 Tid am cement plaster of mix —
pincemert mortar 1:4 (Fcement 4 fine 63n6) 736.00|Sam ato} a16024
ite ee ase
| ape te fo eS fe [400 [126-40 ¥
joe ee fee 070 fs 8 g
i ater eo fe RO fe [oso [126 :
1 raaa4 fi
sequen te JOS Jeo fe _ (ESP [tO foe A
}238.00 1:
Neal cement punnin “i709 sam io) _ 2767 |
Neat com te | ee tee |
| san ee eee ee |
' ae ee
| - 77.00
| [pm Pramemmentser of SOHO cam | ERO] _ TS
| Te eo oe roa
Fosao| 29816.44
e ra aan Ta a Tara mma! | TES
ee
oR PaO pe [400 [182
| wall Te Tt
Pat pepe oe Bao
| L ro
| LL pranarig ai avioa in pon specied rads of 7einforced cement
| Pr ang te cost of ening stn, sing and
renforeement-
| re awork upto plinth Level: :
i
i TASCA omen TH re seas ates cone aggregate 20mm | 28255 Guraeo) S06 82
| Inominal size) 7
{ Lr a0 oes
| Pte fo ee ee be
| joo re ee ee 020 |a088
| ae fe |e | Kos [4558
L —a
i
Tee
fala lel
5 esiced cement conencte work in walle (ny Thies, wn
rosters, butresses, pli ai shrting cowset, a
ences piers, pres, abutments, posts and struts ete to loo ive e
eon melnding cost of ecnting, shuttenng,fnsing ane reinforcement
aera Tapreale OTM] BABYS | TITET HO] TAT a]
Tatas (4 Cement 1% fine sand:
nominal size)
oo] 328}
r—jooummp FF Ps fas x
fe fa fe Oa «(aS fx [400 | 9:24
f eas
‘Suspended foots, 01S
‘coment concrete work in beams,
inge, balconies, shelves, chajas, lintels,
nd spiral ste cases Upto 00°
‘shuttering, finishing and
7 [Reinforced
having stope upto 15° land
bands, plain window sil, staircases a
| Tee eve excluding the cost of eenting
| frentorcoment A
ana (coven ee isqm | 12108-70 Tae80
ea Pp Pee
seam OR Ose fe fos | 8? ey ~|
ate f2 fx ‘7-00 |x a5 jx joao] 1.96 =
rena ROP JO fe [PO | O87 -
| paar J EOS fe fee | Ot
| : wat
clog sraignonng, ev,
| [74a 7 Reinforcement for R.C.C. wor
peeling, placing in poston and binding al complete UPI plinth
cae of grade Fe-500D or more | 7776.30)k9 720) 608108.66
| Wy Thenmo-Mechanigally Treated
| £ i
|| —pomarerrone [| ai
i oe pears [my em | [(E
| Lt ertaieene [eprom [| Pe
| : 7776.3
LL erage Nae aT
75] Centering shutterin:
(of form wark for:
aecle Tormass concrete | 40.47)/Sam 75.90) 1088238
| ay Faurdaton,Telings, bases for coun
| ‘with timber plank.
j ee eet
I ak tee F Pe [Te
I pt se PET
eae eS Oe | 887iy Suspended f
ors, r05IS, landings.
Jnatn +2 mm thick shuttering PY
|
ic Ee sor Jew] 1 |
le IR Tame | ya |
tte fo |S jar | 3 |
Se ee
I a 074
|_1 |_| 1
Lemos ani earevers
a |
rk OP? ate | 14
}- | i | |_| __+
aT ef ots | 494
eee | | tal
776.34)
a arene” |
6 |Proviaing and laying -gurociaved aerated amant becks masonry with
50mmvzzornm/soonn thick AAC blocks in isuper-structure 2DOve:
plinth level UPL oor V level with RCC end at il Hevel and intel level
sith approved block IeVind polymer modified ‘adhesive mortar all
Vcompiete as per direction of Engineerin-Charse, (The payment of
inforcement still BE ‘rade for seperately)
|__4 \_
a Lintels, bears.
with wooden plank
zk |
cc band and rel
wal
—
Deduation
for door &
window
Finth bears, gi6er
oR emo PP ae
[700 fe [O48 252
e700 fe 080 e4
ke lots
zl
rrnc cuing. mou! ic edgess to
give high gloss finish etc complete at all level - 16mm thick Rejni
Plein while metble er equivalent duly approved - Aree of siab upto |
| 080sqn
Floor [i fet pe [i20]X roo 4 a
i on seo x los ar jl
j ae ft fe fs8 fx [800 | 908 |
7002
|
| |e Stet tes ardjriee mecnonea wherever mud :
| [edie ter angie clummm crap beading tor arg arting
| [etebraeatamest stot sews, aleamplte a per etches i
| eecpe and te arccson of Engeern-rage” (Gi end ;
_ iru a dna fastener oe poe septate) -
Teaeag | aa) era
7s
Providing end (wing alumintum work for doors, windows,
ventilators and partitions with extruded built up standard tubular
sections! appropriate Z sections and other sections of approved
Jmiake conforming to 1S: 733 and 1S 1285, fing with dash fasteners of
required dia and size, Including necessary filing up of gaps et
Junctions, ie. et top, bottom and sides with required EPDM
ubberincoprene gasket-etc. Aluminium sections shall be smooth, rust
If) For fwed portion of approved auliy=
anodised aluminium (enodised ensparent or dyed to required
anodic coating of grade AC
16),
moored ROY 2 @ [700 [9528
ak 2 x (20 | 21 @ [roo] S88
anda] fe fe fe its | 12 @ [700] 756
: 76888
AGO) 94294752
8
(a of doors, windows & veniiators including providing and|
pang hinges [pivots end making provision for xing tings wherever
Macred including the cost of EPDM rubber / neoprene geskel required
(Fitings shall be paid for separately )~
(Frjoaised aluminium (enodised transparent or dyed to required
chode socording to 1S: 1868, Minimum anodic coating of grade AC
Gi) For shut
7a.72|Ko-
15)
ear ee OY Te poe to?
ik ape [20 fe | 27 @ [500 | 252
wma Tt fee tS [EO] 42 @ [800] 924
72.72
ial brick masonry with fil class Bricks in superstructure upto floor
five evel including cost of ell materials as requlred completeSr
land the direction
dows,
rnegprene gasket e!
nd toang glazing of ap
tilator, sh
eck te compe a per architectur
‘ol Engineer-in-charge (Gost of snap beading shall be
pa in basic item) = on
etc. win EPDM
crewing
witters and partti
=a
13.50 kg / sqm)
[a wa fot glass panes of
55m
=m thickness (weight nolless han
7 60|Sam 7266 20]
Seat
Boor te OF
aOR [200 x [2t0] 168
Window [7 |e [1 fe
iso Ke iso fe [rao | 108
a6
leaving 10°mm
E_ |Prowaing and tong on wall fa
Prowse ce (wottng pressure 4 kg cm) conforming 1018 1355?
Hiype A including joint
lig. with
‘gap for thermal
Ge unplasticised Rigid PVC sol,
‘eal ring conforming 10 1S : 9362
1) expansion:
Ia) Single socketed pipe -
Fi0mm OD
Paola) 26850]
aa3d
a it
oR i200 fx [Aso] 54
a
tne Manutacture
[Finishing walls with premiu
La aeryie smooth exterior paint wih Silicon
Fie cr requiree shade of approved brand one ‘manufacture |
Payment sha bo made ater suoission fst Certificate issued by
“I New work (two or moro coats apple Qt 43
Mert0 sqm over and incising ping cot of exte2" ‘primer applied
|@ 2.20 kg/10 sam)
qarse|Sam | 1790
92T28
wall i
ram
Toe [8800 |x JA00 | 152
Fe [x Js500 fx foso| 19
Bedduct
eax [reo eto | 848
Ft. 55
346 55|5am. F380]
FB1d608
two oF more coat
water thinable priming cos!
ade after submission oft
Dsteperting with dry distemper
7. etrequied shade on new work ove! SP including
te give an even shade | Payment shal be
ae Gerate Issued bythe Manufacture?
STapproved brand and manufactre (
[wal a
x |"
oR [5000 pe [400] 182
ox] 15.00 fe fo.00 | 104
Deadvedt
aoe 150 [20] 948rificate sued by th
oatbare es
yen shal he rieue ce
108
|prowing and ti
hycraulic door closer with doub
h necessary accessones and screw etc. Complete
ded secon body
ble saced
hk Joo] 6
Providing and fixing aluminium hanging Toor
‘required colour and shade with necessary
doar slopperisi marked
‘as per!S: 1868)
x io] 6
yom tower bolis IST marke
[providing and foi
ian grade AC 10 8s per IS
(anodic coating not less th
required colour and shade wit
Tanadised
1968)
thnecessary
ke 2m] 8
providing Bnd fixing aluminiors handles ISt
‘than grade-AC10.as per!S
Gyed to required colour and shade wi necessary Sorws ec
arked encased (anodic
‘transparent or
wre
ke 20] 8
[providing and fo
ing not less than
door bOnsIS| marked anodised
grade AC 10 as per IS
‘colour and shade with necessary
72885
x Joo] 5
recast chequered cemer
providing and fxing
;Omm thick bed of cement
thick, laid in foot
1: 4'(4 cement : 4 fine sand ) jo
rubbing and cleaning complete 2s Pet
A eonefate tes 18mm
‘mortar
at cement slury including
jon of th
3 Ehgineer-in
78828.8
x [300 | 2t
x oso | 12
33
providing and foing M.S o
‘or round bars etc.
Jopening! wooden frames with waw plugs-screus.6,
iis of required pattern in frames of windows
‘All complete. Fixed 10
maTe 8
72ers 6233
Hom Devalption
a Wee —
Fit, available excavated carth (excludiy: rock) ln tench pli
sides of foundation ete fn layers nat exceeding, 20cm In dept
consolidating ach deposited Layer by ratunatiy, and watering, lead]
upto 50m and IK uptop 1.5 9
anty
o3_|_ cu |
Vino
1203 |_1578
Providing structural st
«(bolted or welded tn built up]
sections ,teusses and framed work ,including cutting , holsting.,
fixing in position and applying a priming coat of approved steel
primer all complete as required.
34.
TXIXLOXIG@5, 1281.5]
21.6 | ke
91.2 {7441.92
[Aluminium Composite Panels of 3rnm total thickness with
Top coil ~0.25mm AA3O03 Grace manufactured as per IS-
737 1986, FR Grade Class 81 with 2.50mm Mineral Core
with minimum 70-72% inorganic content (Aluminium
Hydroxide and Magnestum Hydroxide) 28-30% Organic
Jcontent (LDPE) conforming to ASTM E-119-16,18 and EN
13502 - 1 class 61 and Bottom coil - 0.50mm AA3003
|Grade manufactured as per iS-737 1986 with minimum 25
Imicrons lead free PVDF Coating conforming to AAMA26OS
lon top coil and Service coating on Back Coil (4 -6 microns)
having minimum panel weight of 5.25 Kg/m2
35,
fbxLxd.Ox5x1.5=7.5
7.5 | sam
3403 | 25521
[amm Retro reflective sheet including letterini
36
x11. Ox5x1.50=7.5
7.5 | sam
5190 | 38921.3
Rs.28,63,893.00|
aoESTIiM
(MECH AAC AL #
ATE
i Particulars of ttem Unit | ary. Rate Ammount
i | 2 3 {4 a 6
+09 | Providing & Fitting fixing of furnace casing, double
' type fabricated from finest steel, duly painted
| j\with heat resistant aluminium paint or powder
coating etc 75 mm Ms Channel or square tube in| job_|3 Job] _767000.00 | %767000.00
|doublé wall frame and SS 304 decorative sheet)
|complete as per direction of the Engineer in Charge.
2.00
Rates are included labour charge, Approved rate of
Mechanical Division, Agartala Municipal corporation
{infe 18% GST)
Providing & Fitting fixing of Refractory & insulation
Hor furnace lining with necessary cement ceramic
{fibre insulation and calcium silicate board for
insulation of furnace &te. (Refractory with 42% to
163% high aluminahigh seal block for insulation,
ceramic Blanket, hot & cold phase bricks and bider
complete as per direction of the Engineer in
Charge.
Job |1 Job] %706230.00
=7)6230.00
Mechanical Division, Agartala Municipal corporation
infc 18% GST)
3.00
Providing & Fitting fixing of Motorised Door made of|
MS with internal insulation with ceramic Blanket, &
allied eqipment Motorised Door drive arrangement
lincluding 0.5 HP motor, gearbox, chain, sprocket,
counterweight, limit swich & clutch arrangement &
larrangemnt of mannual operation etc. complete, as
per direction of the Engineer in Charge.
job }1Job] %236000.00
%236000.00
Rates are Inclided labour charge. Approved rate of
Mechanical Division, Agartala Municipal corporation
(infe 18% GST)
4.00
Providing & Fitting fixing of stailess steel vertical]
lwet scrubber along with water recirculation
pump water tank duly lined with FRP piping,
(ventury scrubber to control air pollution with
capacity 150 mg/hr, 3mm thickness AISI SS304
plate, sparay nozzle, mist separator and damper|
letc. complete as per_direction-ofthe-Engineer—|
Job }1 Job] %590000.00
%590000.00
Rates are inclutied labour charge. Approved rate of,
Mechanical Division, Agartala Municipal corporation
(ine 18% Gst)
SubTotal
%2299230,00j
Gv} Rate
Amount
a
2
6
Providing & Fitting fixing
Br
%2289230.00
talless steel ducting
'ece to scrubber and scrubber to chimney
OF SS 304 of dia 300/322 min with necessary
|Gempers and SS hardware ete, complete
direction of the Engineer in Charge.
from furn
flanges
as per
Job
1Job} %448400.09
448400.00
6.00
Rates are included labour charge, Approved rate of
‘Mechanical Division, Agartala Municipal corporation
(infe 18% GsT)
Providing & Fitting fixing of fresh air arrangement
including Blower centrifugal type with minimum 1
HHP motor, 600 CFM dischage capacity ,Distribution
|chamber, necessary Valves etc. complete as per
direction of the Engineer in Charge.
each
1 Job]. %84370.00
%84370.00
Rates are included labour charge. Approved rate of
Mechanical Division, Agartala Municipal corporati
(afc 18% 6st)
77.00
Providing & Fitting fixing of trolley with electro
mechanical operation along with facility of
jautomatic UP down and reverse 7 forward for
smooth charging of body inside furnace along with
its rails and accessories etc. complete as per
direction of the Engineer in Charge.
Job
1 Job} %271400.00
¥271400.00
Rates are included labour charge. Approved rate of
Mechanical Division, Agartala Municipal corporation
inte 4836 GST.
8.00
Providing & Fitting fixing of Vertical heaters bundled
lwith rod type made of 80-20 NI-Cr/ Cr wire with
protected by APM Radient Tube etc. complete as
per direction of the Engineer in Charge. t
Job
1job] %914500.00
%914500.00
Rates are included labour charge. Approved rate of
‘Mechanical Division, Agartala Municipal corporation
(infe18% GST)
‘9.00
Providing & Fitting fixing of Electrical control
Panel with 14 swg sheet metal enclosure
painted with anti corrosive paint in/c thuster
power regulator with PID temperature
[controller with contactor with change over
|swich and also necessary cables, Electrical
Idivices etc. complete as per direction of the
Engineer in Charge.
job
1 Job] -%324500.00
%324500.00
Rates are included labour charge. Approved rate of
Mechanical Division, Agartala Municipal corporation
{infe18% 6ST)
Sub Total
¥4342400.00ad
Atnount
cn Ss 6
_ *4342400.00
TSG GAINS aye S
tovlcing & FiWing fixing of Cables fram source
{control Panel & Control panel to furs
and others motors, Earthing with all earthing Job }1 Job %153400.00;
materials etc. complete as per direction of the °
Engineer in Charge.
Rates ore included labour charge
Mechanical Division, Agartala neg
linfe 18% GST)
roviding & Fitting fixing of MS fabricated Water
pace '
‘Approved rate of
cipal corporation
7.00 [Pi
| [tees ete. complete as per direction of the #0) Jae) 35400.00 = 00.20
Rates are inclided lab
our charge. Approved rate of
Mechanical Division,
Agartala Municipal, ‘corporation !
infe 18% cst)
00 {Proving & Fitting fixing of Foot mounted exhaust ’
blower in $s 304 with 19 Hp motor inje damper, i
entrfugal type 1200 CFM eischoge capacity ce,
Fompleteas per rection ofthe Engineer in Chorge
ae?
fob /1 Job) %135700.00 %135700.00
Rates are included labour charge. Approved rate oF
‘Mechanical Divisién, Agartala Municipal corporation
Linde 1px csr) 2
-00 [Providing & Fitting fixing of 2 HP slag Pump
(Crompton Kiloskar make) with necessary pipe,
Pipe fittings, flange etc. complete as per direction | J |1Job] %59000,00 %59000.00
lof the Engineer in Charge,
Rates are included labour charge. Approved talc af
‘Mechanical Diviston, Agartala Municipal corporation
4.00 [Providing & Fitting fixing of 30 mir self. supporting
chimney along with ladder & platform upto
[sampling point, Aviation lamp, and lightning
erestor, Chimney should Include earthing provision | job | Job 910960.00
nd foundation bolts nut of adequate size etc, *
Jcomplete as per direction of the Engineer in Charge,
%910960.00
Rates are included labour charge, Approvedrate of
‘Mechanical Division, Agartala Municipal corporation
(ln/e 18% GST)
00 |Constuction of Chimney foundation 3600 mim x
2600 mm x 200mm, R-25 grade RCC TMT 10 to 16
‘rim dia inf fitting fixing of stud bolts of chimney
ees at arate measureinent as per manufacurer-—J°® 42J0b] %963200.00 | 963200.00
| [eesign & drawing coniplete as por direction of the
\_lenigineer in charge,
pact ate of Vision Enterprises, A, Sunshine Residency]
| "New Sangui, Pune- 411027 (infe 12% GST on constuethn” Sub Total |. %6600060.00
ul work)
ryParticulars of item
unit T Qnty
Rate ‘Amount
ierovding Installation & commissioning of
425 KVA Generator with diesel. driven
lengine kirloskar/ cummins make complete|
las per direction of the Engineer in charge
Job__| 1J0b
aizveaa | an278ag
lOffer rate of GAVHANE,Sr. No 282/1_,
lpattanagar , Baner, Pune 411045 (in/c 18%]
|GsT on supply work)
Sub Total=
RS.7727904.00
Bene»