You are on page 1of 30
KICHON NORDEX A/S faring mest preduktion af behol- generoibesparendesedier, sarnten dygtig og professionel ingerior-atab, mad over 108'6 orfaring | vindmallo-pranchon, vat arsagan #) st NORDEX kunne udvikle eavanlig vindrralle, der lig melletyper. bade hvad an- ftssikkethed og design 10.000 m? faoriksareal tl ri- ighed p2 virksomheden lige uden for Brande.og besidder et modeme og etfex produ at tl udviking, Dyg- ring 9g atprevning at matierre, NORDEX A/S experience with the produktion ofall uindeofeterage-tanksand srergy. stems, togel wih a staff ient ard arafessional engineers with more than 10 years expe- rience in the wingturbine-industry, gave NORDEX the ability 10 produce 2 unsque torbint zhead of all other ring efficiency, re- vail 20 mot preductionarea ywhich issiuatedrie- 3, NORDEX hasa mad production epparatus fo 1" producton end testing of ne ture Styringen ‘ved udiikingen af styrngen, erder isa ‘iad lagl veeg! pA disikkemmed og vervagning Siledes er der! eks tompe overvagning at ale lojer malien. Sr > fnindstiler hele fidan starhinden {or konstant at have den rgtige sarin shasighed [over detickan cerallesesover 100 lor unieane, Dason molen skule en fl, ringer styringen au ‘mats tl NOFDEX og forte en com juter, rad dererivejen, 09 stake et NOROEX'S eriarne servicelok pave, The controller siovotcienten io hon abity ane the safety ayaterm Eg. 3 # the tuibine should stop b: error, the controller a on ther way immediately Integreret opbygning NORDEX-mallernes orb gorende sig sali Hele erheden stir droite a8 t Genoraxor, gaa" 09 30 2 novedl flangat sanmien, -her suselige med corotn Sele lost Krojning af NORO: via et ryt special-udvik cer epoke- bevirker at mollehatte cerved sliges a 2krojegear Integrated construction ‘orsbudtion of the NORDEX turbines introduces anew e ‘Tre whole unt ie toner ~ The generater, gear nctthe 2 main bea ringsare flanged togetrer.~ By this. he tly on the troubles withiinin ntparts are solves, Yawingof the NO: byanew special de tem, which has atiracied among experts. Ar = NORDEX turvires nav niece ist asaroaultine? ten. Dette beviker at ne er wosiyrel med hy: virker som dillsbrerse 33 hun il paikerings- the NORDEX turbines Gitter- eller rortarn [NOADEX:rrolleme teveres enten med 9a: variseretgiteritin, eles hvidmalet rena. Lattice- or tubular tower The NORDEX turbinos are delve: with 9 galvanized lattice tomer, 0 whirepairted tubular tower. Stajsvag ‘Motekatinen er gurmiopnaenat og be- adi med \yasulerence placer Ver indsugring og udaizsring 2 keleut- enhal NORDEX-malleine hustuser. Heived oplyiéer NORDEXmetlerne fuldk ud de nyeste milekay om sto Minimum of noise The rrilleabin is mi solated ith sou Atmeintake andl the NORDEX tu ers. This ensures a minimum af unwanted nak Fundament Fundamentet er natutligs oge8 en vat ‘del ved an viedmolie, ogee or har NOR- BEX ikke overlagt nogot tl ifcodighosor. ne. Fundarentet er. igesom resten al mellen dimonconsret ti atoveriove on storm mec ‘indhastighed op {57 m/s Vi aver gerne tibud pa epferelse affundamentat, og i t- feslde a alDe selv vzeger at st‘ oyage: fiet, ucliner NORDEX specielle stabefor- shalninger GRATIS. Foundation “he founcation is of course an important perl of windlurbine too, so NORDEX has friade the foundation, ke the restof the tur bine able toresstastorm vithawindspeed upto 57 mis. Snyd ikke dem selv Gar De mes tanker om at starte et vindmallelaug, eller atinves- tere i Deresegen malle, bor De ikke snyde Dem selv for at se og here om NORDEX-mollerne. NORDEX har udvikiet en mol- letype med en reekke nyheder der har gjort mollerne til de mest driftssikre p& markedet. For your own sake Ityouare looking for wind turbi- nes, - do nat miss the opportu- rity to hear about the NORDEX turbines, NORDEX has developed a tur- bine with @ lot of novelties, which have made the turbines to the most reliable on the mar- ket today. NORDEX A/S Svindbsek . DK-7323 Give Tit. 05 73.44 00 . Fax 05 73 41 47 int ti, +445 5 73 44 00 Int fax +445 5 73.41 47 Svindbeek . DK-7323 Give. Tit. 05 73 44 00. Fax 05 73 41 47 Int Uf. +445 5 73.44 00. Int, fax ++45 5 73.41 47 NORDEX N29/250 _ Technical Description ner : Zeey echnical es | = ss \ \ 2 se Ik NORDEX MG 4s AIS GENERAL: The design of the N29/250 is based on the extensive expe- rience gained with the N27 windturbine since 1987. The N27 has been, and still is, a very successful windtur- bine all pver the world, and the integrated design of this size of windturbine has proven to be the right choice. Therefore we chose to construct the N29/250 in the same way and only with a few changes The N29/250 has a rotor di- ameter of 29.7 m., anew yaw system and a further noise-improved gearhox-de- sign The large rowor diameter en- sures 2 significant increase in the annual production of the turbine, which again makes this turbine @%- tremely profitable DESIGN: The N29/250 is made as an integrated unit with the gear- box as the main component of the windturbine. Ail other parts of the windturbine are mounted 6n the gearbox, and_as such there is no ma- chine bed. This ensures that everything is constantly in line. Almost all parts of the windturbine are made of Guctile east-iron The N29/250 is a very robust machine, in which there has been no »just-to-the limit solutions during construc- tion ROTOR: 2 The NORDEX N29/250 windturbine has a three bladed rotor, mounted up- wind of the tower. The power limitation is done by stall-regulation. Stall-regulation hay the ad- vantages over pitch-regula- tion thar the power peaks and dynamic loads in high winds are smaller. Especially in high windregimes with moderate or high turbu- e 4 : AS aegodynamic brakes, The é lence, a stall regulated tur- ee =| ee blade tips are activated hy- ; bine has significantly smaller Hy Ee Et atten svete draulically, and hydrautic f ( f pressure is required to keep the 4p in uie operational po- sition. During rotation of the rotor, the sum of the cen- trifugal force @p the tip and the spring forge will try to move the tip|axially to the ac The N29250 is supplied with 3 blades, which bas many advantages if com- pared to turbines with 1 or2 ‘igher, fatigue loading is sO dasa aad enipies det) teaseokthe Bycraulle’ ‘namic bebaviour of a tee- Desopure cet intention (<2 ally by the control s te¢ed hub is avoided. at fs A unintentionally by failure of =the hydraulic system, will cause the‘tips to deploy and BLADES: the turbine to shut down, such, the aerodynamic Drakes of the turbine are of a truly failsafe design stem OF The blades are made from fi- breglass reinforced poly ter, and are manufactured ~ 2 by LM Glasfiber A/S in Den- mark. / HUB: ‘The blade tips are pivotable Deine ee The hub is made of ductile grees respectively to the Z Ee iron, The ae is ess € main blade, thereby acting OBOE POR Nees The gearhox is. custom- * ~ built thfee-stage helical di sign. The gearbox is built as an integrated Unit with sus- pension of main shaft and generator, ahd as such every- thing is flanged together The x€arbox is standing éctly on the yawbearing. els are sump fa ters, The gear wheels are specially grinded 10 mit mize noise emission. The main Shaft is connected to the gearshaft through a helical gear-coupling, to avoid hendings from the r- tor to enter the gearwheel mesh; Temperitire sensors are “> mounted atthe main shalt. — ~GENERAT on the high:dpeed shaft bear- ingscafid in the oil sump. ‘These tempetature sensors will shut down the turbine in case of temperatures in- creasing above acceptable limits. —— ‘The generator Tings (6/8 poles), and is an asynchronous 230/45 kW f generator. The Hrge gener ator (6-poled, 250 kW) is used for power generation in higher windsp¢eds, while the small generator (8- poled, 45. kW) istsed for power generation in fower i windspeeds. The ae generator is wound gives maximum elficiendyat half load. , ne ‘The generator is Nariged di- rectly on the-pear-unit. which excludes the need for LEE It Zi 7 The cooling air forthe gener- ator is taken directly from the outside to obtain the best possible cooling cficct. “arreléctrical fan (not a me- chanital) is used for colin; gcneratoré Inthisavays——| in is onbyin operation — when cooling of the gener- ator is needed, and the an- nual production of the \ windturbine is increased. air-intake is insulated: i ered cassie iter-a heating element is byilt into-the genemter = pu “The mechanicabbrake is fit ted tothe high speed shaft and has vd hyclnjulic cali- bers. — i __-tnvofmaal operation, dé me- —— chanical brake is used only “a8 & parking braked when the aerodynamic brakes have de- creased thé rpm ont the to- tor-shaft ere ae However, in Gise an emer- _ gency braking of the i windturbine is neerle mechanical braked-adti- cs aa Gpable ofbririging the wi -bine toa complete stand- © brake should fail: _ YAW SYSTEM: ~~, Ses of the win Pine is. controlled by ancelee tronte wind vane and Sequred against cable hydraulic driven worm re: duction gears which engage ring is flanged | directly onto Mhe-tower Ve nw systefn is fired 3 ee adtivated ¥ brakes, based on a disgipos tie ealiber system: When’ - the nacelle isyawing, the — /. Yew brakes snioothen the” 2 yawing due to light preload of the yay Brakes, When ~ there is no-yaw Operation; © the-yav: brakes are fixing the nacelle securely 10 the tower. yated simyfaneously if —aerodyndmic brakes, hale The mechanical brakeiswell | aise installed in the towe ‘still, even if the aerodynamic ‘| TOWER: ‘The N29/250 windturbines can be supplied with either tubular or lattice-towers of 30. 40 and 50 m. heights. ‘The tubular tower is a conic-shape tower which di- mension decreases all the way up. A ladder and safety wire are installed in the tower, as well as platforms. ‘The tubular tower is sand- blasted and painted white ac- cofding to ISO 12944, Class 5: The lattice tower is made of V-ironin the 4 corners with LENP-iron as lattice. A ad ladder and safery-4ine are The lattice tower is hor, galvanized. CONTROLLER; The controller is supplied nea complete with switchgear, in- = y The windtitbine is supplied: coming MCB (Main Circuit ; g with a micropfocessorbaséd Breaker), protection devices, d controller mith aselftiag- étc., and has a keyboard for we nosing system, which4e~ display and easy readout of f curepthe windturbines more than 200 functions unattended operation under The keyboard can also be iB > all conditions, used for changing the opera f tional parameters of the in case the windturbine is windturbine i supplied witha tubular | tower_the controller is Startup windspeed of the tur- placed in/thie bottom af the bine is adjusted automat Is towes/For/a lattice xOwer, & ically from memory of separate house isSupplied earlier operation, to maxi-// for the controliér. mize the production of thy windturbinc to the diffgént, weather-conditions. REMOTE MONITORING: All NORDEX|windturbines are iéepgted for renote mopftoying and conifol. A : teJéphOne-cdnnecrfon isl shavis needed! for this sys Tem to be functional, Re- mote communica done via anormal IBY -com patibel computer, where - "J more than 200 diffs | cy ent functions car/Be read from theturbine. ‘The software is int cluded in the delivery by NORDEX tid is: In caye-of an etroy, the Contfoller aurofati- cally reports this error, and data in the contol fer is »frtozens so that it is possible to see what happened just before, andl when. theérror occured /, | Examples of séreent ictures from the monitoring system ee OPERATION AND ~- SAFETY LOGICS: pix ‘The NORDEX windurbjrles, thy 1. shortly aficr to be as yacontactor. | alower windspeeds, the ey findturbine will then opér- where the grid is not always. ate on the small generator, optimal but will change to the large generator when the produc- As the blade tips form the tion increases above a prede- main braking-system, this terminé@Setpoint. If the will secure a very smooth ue average windspeed shut down of the windtur gktécds 25 misce., the bine. The blade tips are hy- -*-swindturbine is shut down draulically rewacted and are through deployment of the deployed at the release of acrodynginie brakes and ap- the hydraulic pressure. Thi plication of the mechanical release system is fail-safe pipe: at Jower rpm. to bring, and includes more indé / the wushing te-rstandseitt pendent systems. These in- SHES clude monitoring of the In case Of an erfor, the tur- rotor- and generatorspeed bine is shut down in a simi- and pressure relief valve. far way / The pressure relief valve se- D cures that the hydraulic pres- However, by sure is reléased in case of an emergency braking is re- overspeed on the rotor. ‘ \ quired. and in these cases | both braking systems are ac- tivated simultaneously. longer period of time, where Z Kc system is not Ce ised emergency brak- due 1 lack of E whith purs alot of mex = _ to the hydraulic In casé of grid-drops over a chanical stress on the 4) purrs, the pressure is kept flurbine) at grid-drops, a UPS- * the ust Of accumulators. sy: is installed as stand- hese accumulators will me- ard in all turbines. By the ‘chanjéally build up hydraulic _ | use of thik battery-backup ‘pressure immediately as the functionit/s possible turbine sfaits to rotate, / makea belt braking jxchereafter the mechanical the turbi 4 Fakes and yaw brake will be aa locations “| / Gy TECHNICAL DATA NORDEX N29/250 Operational data: Startup wind speed... - ‘Curoutwind speed oes Nominal output achieved at - Design survival windspeed - Calculated lifetime of turbine» Rotor: Rowor diameter. > Swept area - Fonerregulation «..---- Synclironous motor speed, 250 KW generator... =.= Synchronous rotor speed. 45 KW generator. Max, guest eoeional speed Hub, ype-. ee eneee Hub, manufacturer Weigntofhiub Weight of rotor (hub + blades). Hub heights... eene Blades: Manufacturer... - Blade length Type Material. Length of blade up. Weight per blade 5 Fa Generator: Manufacturer... ae Type a cnet) ce ae Weight Boles a5 cele acureaaat wees Nominal power ..-..5.-0 + synchronous speed St Current... on Voltage (other voltage on request) Frequency (other frequency oa request) Insulation Claspification : Protection classification... ‘Thermal protection .....-.-.. ; Bearing protection... .- Phase compensatio Installed reactive ourput Resulting Cos Phi (at half power) Resulting current (at full load)... = Stall 2313 Sa 405m. 1M Glasfiber AS :134m, Self supporting facjusted automatically) = Three-biaded, horizontal asis = Upwind = Clockwise, Seen from font 13 2297 m, = 603 m? 505 m Fibreglass ecinforeed polyester :090 mm. = 1006/1207 spm 424.4. 1S VAC 50 /60 Tz F 21P55 PI 100ithemmistor £PT 100 (2 off.) 8 poles KW 757 (908 epm BA. 415 VAC 50/60 Hy F PY 1oothermistor 25 KVAr 092 FO Gear: Manufacturer Type Rat : Nominal effect... ‘Quantity of oll in gearbox ‘Diameter of main shaft ‘Diameter of output shaft...» Weight 0 0.te.c22-s4 Controller: Manufacturer... 2.2 Nacelle cover: Manufacturer . Material... Corrosion protection -. Colour Hydraulic system: Mantsfacrurer Quantity of hydraulic oil - Max. system pressure. Mo Hydraulic motor: Manufacturer. -<.+. Speed... Nominal effect... ‘Thermal protection Yawing system: Type i Yaw control. 8 Yaw rite -ovoc eo 5 ‘Yyawing gear, manufcrurer é Yawing gear. typ ‘Yawing gear, ratio Yawing motor, manufacturer, Yassing motor, pe ‘Yawing motor, protection... ...-. Braking systems: AERODYNAMIC BRAKE: Type ‘Activation... =. MECHANICAL BRAKE: Type Manufacturer. Location, Dise material... Dise diameter... Dise thickness... 22.c.csce Manufacturer of brake calihers Number of brake calibers, .....- Time (© bring rotor 1 rest from max rpm + Flender 3-stage helical gearbox uct cast iron . £1:25,422 fierm Elektro A/S. : Microprocessor based. Included Thiim A'S sores A/S Sweel Sandblasted, 250 my epoxy-paint {White / Gray-white Nordex A/S | Bérendsen PMC AS. 301 110 bar. Brook, : 1500 pm 3kW, Active yawing Windvane 0.57 per second, Rost ‘orm reduction gears 132 & 1:25 Danfoss / Char-lyan = OMM 12,5 130.0022-001 Safery valve, 100 bar Potable blade up x +: Hydraulic. Passive activation by centrifugal force at overspeed, Hydraulic dise brake Nordex AS ‘On the high speed shaft Duetile cast iron 530mm. 16 mm. Brembo, or similar : App. 5 sec. Power Curve for NORDEX N29/250: Windspeed, ms Electrical (athub height) Power (kW) 3 2 4 12 5 2a 6 35 zi 38 3 95 9 128) 10 161 un 190) 2 213 B 225) i 234 6 245 16 254 7 261 18 265 19 or 20 207 21 263 2 259 zB 255 24 248 25 25 Towers: LATTICE TOWERS: Manufacurer Heights Material Corrosion protection Weights TUBULAR TOWERS: Manufaccurer 50... Type Heights Material Comosion protection Accessories Weights Lightning protectio Nacelle Controller Remore monitoring equipment Earthing Estimated annual produktion : AVERAGE WINDSPFED AT 20 Mt HEIGHT - KWH Windturbine type N29.250- 30 m. tower N2 0-40 m, tower Smisec 364.000 416.000 465.000 m. tower 40 6 misec 534.000 589.000 639.000 711.000 760.000 803.000 Nordex A/S 30, 40 or 50 m ST372 Hor dip galvanized 30m. 12.58 40m: 17,04 50 ms 28,0 Nordex 4S) Cone-shaped. 39, 40.01 50m. st 372 Sandblasted and painted with 250 my epoxy-paint Platforms and lights are installed 30 ms 15,0 40 m5 23,5t 50m: 35,08 ‘Made ofiron. Extra lightning arrestor can be mounted on top of nacelle Varistor Lightning conductor installed Copper-wire from nacelle to ground Bmisec. 9 mise 887.000 1.045.000 924,000 1.078.000 956,000 1,106,000 The power-curve and estimated anual productions abore are based on Aiedensiny: 1 5 ky/m’, Airtemperatuce: 15°C ‘Due 10 continuous developmentand improvement of our products Nordex AS reserves the sight to change specificazions without notice , MAIN COMPONENTS Hub (ductile cast iron) Blades Hydraulic station Yaw gears Yaw wheels Main gearbox Disk brake Generator coupling Generator Vibration sensor . Anemometer 12. Wind vane 13. Nacelle, buttom 14. Nacelle, cover 15. Yaw ball bearing 16. Yaw brakedisk 17. Yaw brake calibres 18. Cable relief 19. Tower SaOSNanAWNS aa aS) windturbines. 4 Since 1986 we have deseloped, produced stalled and maintained windturbines all. ove the world. ‘The Quality Assurance System certified according to ISO. 908Tby Bureau Veri- tas Quality International = ee él, NORDEX A/S AAs Sere m 7328 Give, Denmark 5715/73 44 00, Fax. +45 75 73.41 47 Grorvex Energieantagen GmbH N-27/29 Die wincirattantagen NORDEX 27 une 28 bieten eine groBe vom Fllgel Oberstrichene Fiche und hohe Masten. Des gewahrle'stet eine optimale Ausnutzung des Windes auchin Regionen mit weniger hohen Durchschritts- windgeschwindligkeiten Der Generator, das Getriebe und die beiden Hauptiager sind fest aneinander gefianscht, wocureh Probleme beim Zusammenspiel der Teile verhindert werden. Die Hauptwelle filhrt nicht direkt ins Getriebe, sondern in eine groB dimensionierte Zahn- kupplung, die alle vor Rotor ausgelosten Biegernomente sicherabfedert. Die Zahnréder und Lager werden so moglichst wenig belastet. Die Temperaluren aller Hauptlager der Wind- krattanlage werden standig kontralliert, Feht- funktionen lascen sich so sehr schnell erkennen, noch bevor ernsthafte Schaden auftreten konnen Hauptlager und Getriebe sind druckumlaul- geschmiert. Die Blatter verfligen ber eine hydraulise Biattepitzenverstellung. Diese wirkt als H: bremse. Die eingebauie Scheibonbramse wirkt nurals Feststellbremse oder zu Notbremsung. hnlich der Handoremse bel Autcmotilen Im Maschinenbau setzen wir soweit wie maglich auf den Einsatz von Guftellen. Der weilgehende Verzicht auf geschweifte Telle hit, Materialermidungsprobleme zu verre: den Die Austiihrung der Maschinengondel aus Eisen stati aus Kunststoff gewahrleistet einen putz, Uber 100 verschiedene aktuelle Datenkénnen die Betraiber unserer Anlagen und das Wartungspersonal jederzeit am Bedienput oder Uber telefonische Datenferniiberwachung abfragen. Im Stérfall meldet die Aniage Uber diese Lsitung selbsttatigdie Storung, soistein reibungsloser und schonender Betrieb d Anlage gewahrieistet. it eh pa Meehan ieneuer scene Pe are elied Ca) Renee Lv [elunuecciateastes retary Ce eae Nese eres eta basa en tent) Dera eee eet eto Weer ea Coro tonto a} Mee aceite Reet ee ote Dee eee ne sae ad eee 7 aT Retest eee eT Gree ee eee cena Deere ene pence Ure eee a etka Rees Reece tua) ees ae Reena tesls Tere auc) Bee eee ead Fee acento eee et nated eee Taeseceuuet laser Repent Pete el oe noo Pee ene i a Q Sea” Recah tel) CQrrorvex er Weg N oncexarisist sine der erolgreichsten Wind kraftanlagen aut dem Markt. im Jahre 1987, dem ersten Fertigungsiahr, war ciese Anlage die gro Serienmaschine der Welt. Das solide Konzept dieser Maschine schafite ihr schnell viele Freunde. Seitdem produzieren mehr als 550 NORDEX 27/29 Anlagen an den unterschiedlichsten Orten der Welt dauerhaft, zuverlassig und schadstoftfrei elektri- sche Energe. Damit ist diese Aniage eine der meistgebauten Windkraftanlagen der Welt. Mit der Zaitist diese Windkraftaniage zu einem echten ,Arbeitspferd geworden. Trotz einer kontinuierichen Weiterent wicklung hat sich nie etwas am NORDEX-Konzept geandert. Detalis, die neute auch bel anderen Maschinen auf dem Markt langsam zur Selbstver- stndlichkett werden, wie zum Beispial die integrierts Bauar, das GuBgetriehegehause, der polumschaltbare Generator, die hohen Masten, die hydraulische Fidgelspitzenbremse oder die serien- maBige Datenternuberwachung, waren immer schon fest mit dem Namen NORDEX verbunden. NORDEXN27 Rotor Anzahl der Fig 3 Umdiehungseahl 2236 Uimin Retontuchmese: 27m ‘Ubersrchene Fhe $72.m* Leistungarezelung stall Startwind, autor, Einstell. ab 3 mis Stoppwind 25mis ISDKW Lebtung bel 115 mis UOberiebenswindgeschw, 60:mis TipBremse hhydraulsch, mechanisch Intgriest Gewihtmit Fugel 5280 kg Gerrieve 1p ‘Integers, dreistuiges Simradgetibe bersecaingsveralnts 1:28 Gewicht 3500 kg Ghnenge 1801 Olwectset Jilidae Kontolle, Wests nach Bedasé Lager Hauptwele deuchutnlauigactanir, © 280 mm Flaged Flagellzege 128m Hersteller iM Material Gx Gewicht 13601g Profit NACA fx Generator Lestung 2010 EW. ‘Dp agmndion, potumschaltbar 6/ 8 Drehzahl 780 (1090 U/min Schutrhbisse IPSsF Kondenswasseschutz Vonirmung mit 150 Ww Kupplung rote, gummigepufferte Kiuenhupplung Hiekivitit 5.95 Sobel Tellaserie, Gewicht « 1s10kg mux. Leitung 185 .W mux. Stom 218.4 ‘max, Anlauftiom 2004 os phi comp, O87 ‘Scntupt 0,80 % Windrichungsnachfahrung sie ‘ellon gekapsett Bree Rontsslz, der zum verteten Inydeslsch gst wied Antiieb el Hydeauih-Cetrsbemotoven Dechiahl O55 Neteaufschakune Ubewachunysumfing ‘Auteecheung bromse Auseging etuetsbrsnse Festtlbreme Farm sthrungen Nabenihe & worvex Windkraftaniagen Produktion: ‘Mescheadorfer Weg 18230 Osteeobad Rerik Plenung und Vertrieb: fer St. 25 149328 Melle Telefon: (054 27) 94 24-0 ‘Telefan: (0.54 27) 94 24-10 uviche Thyrstorkepplun Ternbberwactnung aller wichtigen Daten: 11 fempeaturmetsteten ‘ BremsdiuckKontoliunktionen 6 Dretual-Kontrallfunicionen 7 Winerichtungs-/ Windgeschwindighees Kontrolfunktionen 1S dk. Generator Net Kortrsthinksonen Ablauteitkontolle Tefassung von 220 Warten ‘a cen letzten 10 min, Gesimidatenerfssung aller ‘wichtigen Komponenten ‘wel yetrennte Bremsysteme tn sfllsafe” Ausfurung sechis untershiedliche Biemsablalfelgen 100% ctfektive Mugelopitzenbremaung rit remsrctkentolle Schaibenbremse doppeit eponydhanbeschicitete Stahirchematten, fouerverzinkie Gitermasien 40m end Sim (aasitaich wabiweise auch 30 m, 36 mund 70m) Leistungskemnlinie NORDEX W-27 / 150 kW Wingsechvinligitt in) Lestung tn kW) ep] 4p mA ons 496 153 3s 59s wa ose 21.05, 481 0392 808 707 380 900 232 0364 ne ase 0343 1098 1367 0294 igs 1592 0.64 295 1661 oat ‘Vermessen durch DEWI uni 199%) NORDEX 4-29 Rotor Anahider Fogel 3 Umdrchunewahl 30/40 U/min Rotordurchimeser 29,7 Gesticene Fiche 698m! ekcungsegeling all ‘Searing autom. Entel ob 3 mis Soppwind amis 20kW Leising tel 15,5m/s Oneicberswindgesche, Oimis ipsam lygkauisch, mechanic inept ‘Gemcht mit gel #150 bg Getriebe oo Integers, crasutigsSarmadgeiche Cbesccangschatnis 125 ‘Gewicht $500k toenge 1801 Sirs! Itch Koowlle, Weak nah Bede Lage Haut euchutaufschaiet, 0250: Figel igang: 13am - Hentaler mM ater on Geviche 750 x Prof NACA strax Generator testung 45/2508 ip ssyncior, polumschalbar 6/3 Dretaahi 7307 1000 Uin Schutatlase PSF Kondeasrasenchutz « Yorsirmang mit 160 W Kuppling sofe, gumrigepufferte Kiauenkuppling fetiiat 395 9¢ bel Tallstetib, Gewicht 1820 ig sax Lestong zoKw max Strom BAA max Anlaustrom = 308 os piucomp. 097 Supe 80% su resis Bremse 45 schatenbremsen fated > Hydmulk Gerieemoteren Deeb ass ‘Stexerung ‘Netaufichaltang ‘Audzeichnung (8) & NORDEX Windkrattaniagen Produktion: Meschendorfer Weg 18230 Ostsecbad Rerik Planung und Verte: Seblingéorfer St. 25 49328 Melle Telefon: (0 $427) 94 24-0 Telefax: (0 54.27) 94 24-10 YS dat Cenreratr- Net Kortofunonen Ablastritkontrale Exfassung you 220 Weren in den letten 10 min. (Gesamtdatenerfasung allt ‘wichtigen Komponenten Bremse Austegung Beeridnbeernse Festellocemse ‘el yewennte Bremssysemne i pfallsale" Ausubrung sechs unterschiedliche Beemablautioges 100% elfehtive Figelspiuenbremsang sit Bremsacitkontroile Séhaibenivense Ture Ausfohnangen Nabenhohe

You might also like