You are on page 1of 3

RESUME

G. SHASHANK SHEKHAR
Qr. No. 12/B, Street no.-22
Sctor -2, Bhilai
Durg CG
E-mail: shekhar160173gmail.com
Mb: 9348055707

Objective
To have a good opportunity in a best organization where my knowledge and skills can best be
implemented.

Professional Profile
A competent Electrical Engineer with more than 26 years of experience in the areas of Project
Execution,Erection testing Commissioning, Maintenances & Operations in industrial automation
sector. Expertise in erection, testing & commissioning of electrical control system and PLC
system. Experienced in maintenance / operation of wide range of equipments &
components .Adopt at preventive and breakdown maintenance of various machineries.

Academia:

 ITI in Electrician passed in Year 1994 with 69% of marks from Gramin Kalyan Industrial Training
Institute, Aheri, Durg, CG
 Diploma in Electrical pass out in the year 2004.
 1 year DCA (From April 2000 to April 2001) from AIIMP Hyderabad (A.P).
Computer skills: Ms Office, Windows 98/2000/xp, C, C++, Desk Top Publication

Work Experience:

Worked in different steel plants in India & Abroad through “Bhilai Engineering Corporation Ltd.”
Holding the designation as a Jr. Executive and working in BEC from 1994. To 2015.
Presently working in JSW Sambhalpur from 2016 to till now

Maintenance and Trouble Shooting

o Planning & effecting preventive & predictive maintenance / overhauling / repair schedules of all
various machines & instruments to increase the up time and long term reliability.
o Proactively identifying areas of obstruction/breakdowns and taking corrective measures/steps to
rectify the equipments through application of trouble shooting tools.
o Ensuring all the machines work efficiently by conducting timely checks & measures.

Jobs done:

ALL SYSTEM WAS BASED IN RELAY LOGIC.

 Drawing & designing of electrical circuits & equipments in Autocad-2004/2007


 Involved in drawing & designing of Coke oven machineries like Coke pusher car, Coal charging
car, Coke guide car for Coke oven Battery no #1 of Rourkela steel plant (RSP)COB#1
Rebuilding Project
 Involved in drawing & designing of Electric Loco & Quenching car for Battery no #1 of
Rourkela steel plant COB#1 Rebuilding Project.
 Involved in drawing & designing ,Erection testing ,commissioning of Coke oven Battery electrics
like Telpher with grab bucket , Skip hoist, Door lowering rack , Spillage coke belt conveyor,
chain conveyor & Coke Quenching system for Coke oven Battery no #1 of Rourkela steel
plant COB#1 Rebuilding Project.
 Erection testing & commissioning of Lubrication system for all the machines of COB # 1 (RSP)
 Testing & commissioning of Electric Loco for Coke oven Battery no #5 of Bokaro steel plant
COB#5 Rebuilding Project.
All SYSTEM BASED IN PLC LOGIC.

 Successfully commissioning the COB 1 charging car in Durgapur steel plant


 Successfully commissioned Coke oven battery machines and CDQ 1, 2, 3, 4 of COB 11 BSP
Bhilai.
 Successfully commissioned Coke oven battery machines of COB 10 IISCO(4.5 mtr) and in
COB 11 IISCO 7 mtr tall battery and erected all oven machines, Coke dry cooling plant
(CDCP) and Coke bucket lifter and tested for commissioning.
 Erection, Testing, Commissioning and Maintenance of Coke oven machines as above for
Nilanchal Ispat Nigam Ltd. COB#1.
 Testing & Commissioning of Reversing Winch based on PLC & Hydraulic system.
 Involved in drawing & designing of Coke oven machines like Coke pusher car, Coal charging
car, Coke guide car for Coke oven Battery no #5 of Bokaro steel plant COB#5 Rebuilding
Project.Erection ,Testing ,Commissioning and Maintenance of Coke oven machines as above
for BSL COB#5.
 Erection, Testing, Commissioning and Maintenance of Coke oven machines as above for Arcelor
Mittal South Africa COB#4.
 Successfully co ltd commissioned Battery Machines and Lifters of COB#4 in Vizag Steel Plant
with PLC based machines
 Worked with ABB VVVF Drives(Ac drives) of capacity 55KW,180KW,30KW, 45 KW, 54 KW, 160
KW, 22 KW.
 Maintenance of Hydraulic pumps & Air Compressors.
 Maintenance of AC motors of different capacity like 22KW, 37KW, 132KW, 160kw, 45KW etc
 Little knowledge of PLC programming of Siemens plc Simatic Manager Step7 version 5.3.
 Commissioned Coke oven battery machines, battery (MRSS, PCC, reversing winch,
process hydraulic1&2 and SOPRECO system), Quenching Tower, Coal tower and
maintenance of all eguipments of battery 1 & 2 running plant of CO 2 JSW Sambhalpur,
Odisha

DUTIES AND RESPONSIBILITIES


Working as Engineer in Coke Oven Electrical and instrument maintenence in JSW Sambhalpur
Recovery type Stamp Charged 5.5 m tall two battery of total 102 Ovens.

1. Execute Electrical and instruement Maintenance tasks to ensure quality and timely
completion and as per planing
2. Adequate understanding of the Industrial Standards, Health and Safety Norms (HSE
guidelines) while maintenance always adhere to company norms and regulation while
maintenance the Equipment.
3. Identifying critical issues related to site activities and insures timely resolution of queries
so as to ascertain uninterrupted maintenance work.
4. Preventive, predictive, Condition monitoring and daily maintenance of Equipment’s.
5. Shutdown maintenance and maintaining daily reports in logbook.
6. IMS implementation.
7. Carryout 5S, TPM, & KAIZEN activity.
8. Following the SOP, SMP, HIRA, PEPTALK and complying with the safety rules.
9. Prepare audit related documents. Organizing routine Maintenance schedules.
10. jobs execution as per schedule· Ensure risk assessment and tool box talk prior to job
execution.
11. Provide field supervision for shutdown.
12. 100 % compliance to work permit system.
13. Maintaining all safety parameters and safety interlocks to avoid injuries and machine
breakdown.
14. Conduct a toolbox meeting of co-workers and planning of jobs before starting of works.
15. Strictly impose properly housekeeping and securing tools before leave or work finish.
16. Secure of approve work permit before starting of work or jobs.
17. Maintenance of battery machines like pusher cum stamp charging car, Gas
transfor car, Coke transfor car, quenching and bucket car) .
Key Project Executed

Successfully executed the testing & commissioning of PLC operated Coke Making Plant at :

 NINL, Odisha
 Mittal Steel ( Newcastle South Africa).
 Raurkela Steel Plant (Raurkela Odisha)
 Bokaro Steel Plant (Bokaro JH)
 Vizag Steel (Visakhapatnam AP)
 IISCO (Burnpur, W.B.)
 Durgapur Steel Plant (Durgapur W.B.)
 Bhilai Steel Plant (Bhilai CG)
 JSW Sambhalpur, Odisha

Significant Achievement :

o Fore fronted all operations for the erection and commissioning of PLC systems at various sites.
o Successfully execution the testing & commissioning of PLC operated Coke Oven Battery
Machines.
o Significantly augmented the productivity by revamping the programming of PLC resulting
improved machine operations.
o Entrusted with the responsibility of preparing technical proposals & implementing preventive
maintenance schedule for HT and LT line, Drives, Programmable logic control & relay logic.
o Received appreciation letter from top management for showing exemplary performance. On
successful complete previous projects

Personal Dossier

Date of Birth : 28th December 1971


Father’s Name : Shri. G. Sreeramulu
Marital Status : Married.
Languages Known : Hindi, English and Telugu.
Nationality : Indian
Passport no. : F3765013

PLACE:
DATE:

(G. SHASHANK SHEKHAR)

You might also like