You are on page 1of 6
A S==. MARANA AZ DEVELOPMENT SERVICES Plan Review Commentary/ Permit #B2309-122 CUSTOM HOME - BHASKAR RESIDENCE at 15367 N BRILLIANT SKY PL Date: October 17, 2023 Contact: William Bhaskar Status: " Review CC: Permit File CODE STANDARDS The folowing standards are adopted and enforced by the Town of Marana Building Safety Department + Intemational Bulding Code (2018) + Intemational Swimming Pool and Spa Code < Intemational Residential Code (2018) (2018) + Informational Mechanical Code (2018) + National Electrical Code (2017) + Intemational Plumbing Code (2018) + Town of Marana Outdoor Lighting Code * International Fire Code (2018) (2021) * Intemational Fuel Gas Code (2018) + ICC.A117.112017 Accessiblity Code Intemational Energy Conservation Code (2018) Permit staff shall provide the applicant with an Administrative Item Check that must be completed prior to issuance of the building permit. All correspondence regarding these items shall be administered through our permitting staff. Plan Review Commentary GENERAL 1. Please provide a response letter that addresses all plan review comments upon resubmittal of the corrected plans. 2. Allreview comments can be viewed on the annotated plans in our online eTRAKIT portal under permit #B2309-122. Here is a link to the portal. httos:/imaranaegov.com/ETRAKIT/Searchiproject. aspx ‘The Town of Marana Building Safety Department is requesting a full set of the revised construction documents and supplemental information be supplied to permits@maranaaz.gov. Should you have any questions, please do not hesitate to contact me at (520) 382-2614. Respectfully Submitted, Olivia Trouard Plans Examiner (620) 382-2614 olrouard@maranaaz gov 15367 North Brilliant Sky Place Marana, AZ 85658 CONSTRUCTION SET COVER PAGE AND SHEET INDEX All pages to be scaled at 24” high and 36” wide. 0.0 cot c1.0 C20 3.0 C4 cs Ca cé c7 ca co cto cit C12 C13 S0-S6 SITE PLAN SITE PLAN SITE PLAN SITE PLAN SITE PLAN FLOOR PLAN ELEVATIONS WINDOW SCHEDULE ROOF PLAN ROOF WALL STRUCTURAL DETAIL ELECTRICAL PLAN HVAC FINAL, HVAC NOTES PLUMBING H&C WATER PLUMBING DW AND ISO PLUMBING ADDENDUM STRUCTURAL DRAWINGS General Plan Review Commentary: Please provide a full set of building construction document with consistent formating of sheet size, and of sufficient clarity, drawn to appropriate scale - to be made available for inspections and record retention upon the issuance of abuilding permit. R106 Project cover sheet to include the following: Current code adoption, httpsvivww.maranaaz.govibuil ding-safety-codes Project information, vicinity map, sheet index, legal description/APN, floor area calculation. Please list required special inspections, and deferred submittals (shop drawings) on cover sheet Please provide a designated blank block in the same location on every sheet of plan set for compliance stamp. Here is a link to our new digital submittal guidelines. https:/istatict squarespace.co mistatic/54cc191ce4b01886147 62582/1/6087411021d78e3e5ed b817b/1619476985698/Electro nic+Submittals.paf 200-112ZZ1L :YSE8WAN LOBPOYd isnul NS ¥Od G3uVdaud NVi1d ONIGVYS ANV ALIS FONAGISSAY LSNYL NS 8 WH nasal SARL GE ROT COGS CS TT TST SIT SST CARCSP ER TT GBT

You might also like