PROVINCE OF AKLAN
S C H E D U L E O F MUNICIPALITY OF KALIBO
SCHEDULE OF BEAMS C O L U M N OFFICE OF THE BUILDING OFFICIAL
CONSTRUCTION NOTES: C. CAMBER REQUIREMENTS
SECTION
OF BEAM
R E I N F O R C E M E N T S
MARK C1
MARK BEAM
AT SUPPORT AT MIDSPAN STIRRUPS
1. UNLESS OTHERWISE NOTED ON THE PLANS OR SPECIFICATIONS CAMBER ALL R.C. BEAMS
A. GENERAL AT LEAST 10mm FOR EVERY 4000mm OF CLEAR SPAN EXCEPT CANTILEVERS WHICH B D DIAGRAM REBARS DIAGRAM REBARS
1. CONSTRUCTION NOTES AND TYPICAL DETAILS APPLY TO ALL DRAWINGS UNLESS SHALL BE 50mm FOR EVERY 3000mm OF CLEAR SPAN.
OTHERWISE SHOWN OR NOTED. MODIFY TYPICAL DETAILS AS DIRECTED TO MEET 2. UNLESS OTHERWISE NOTED ON THE PLANS OR SPECIFICATIONS, CAMBER ALL R.C. SLABS TOP; 5-16MMØ COLUMN STRUCTURAL
DIAGRAM
SPECIAL CONDITIONS. 8mm PER 3000mm OF SHORTER SPAN AND 14mm FOR EVERY 2000mm OF CANTILEVER
CB/RB3 0.25 MTS 0.40 MTS FROM SUPPORT TO END
2. SHOP DRAWINGS WITH ERECTION AND PLACING DIAGRAMS OF ALL STRUCTURAL STEEL, SPAN.
MISCELLANEOUS IRON, PRE-CAST CONCRETE ETC. SHALL BE SUBMITTED FOR BOT; 2-16MMØ
FOOTING (D)
BEAM STIRRUPS AND COLUMN TIES ----------------------------- 1 1/2 IN. ( 38 MM. )
1. ALL NON-LOAD BEARING TYPE CONCRETE BLOCKS SHALL HAVE A UNIT WEIGHT NOT TO VERTICAL BARS
WHERE CONCRETE IS EXPOSED TO EARTH EXCEED 80 PCF. FOR LOAD BEARING TYPE CONCRETE BLOCKS, A MINIMUM .602 .600 .600 .600 .600 .600 .600 .600
.600 .600 .600 .600 .600 .600 .600
BUT POURED AGAINST FORMS ------------------------------------- 2 IN. ( 50 MM. ) COMPRESSIVE STRENGTH OF 6.90 MPA. (1,000 PSI) SHALL BE DEVELOPED. .600 .600.134 2" X 3" C-PURLINS
.253
WHERE CONCRETE IS DEPOSITED 2. PROVIDE 1-Ø16 EXTRA VERTICAL BARS AT CORNERS, INTERSECTIONS, END OF WALLS, BAR X
.600
FOOTING (H)
AND EACH SIDE OF OPENINGS AS SHOWN.
.347
BAR Y PARAPET WALL
DIRECTLY AGAINST EARTH ------------------------------------------- 3 IN. ( 75 MM. ) 3. LINTEL BEAMS OR LINTEL BLOCKS SHALL BEAR AT LEAST 8 INCHES (200 MM.) ON EACH
SIDE OF MASONRY WALL OPENING. ROOF BEAM
6. SPLICES SHALL BE SECURELY WIRED TOGETHER AND SHALL LAP OR EXTEND IN 4. WALL REINFORCEMENTS SHALL BE AS FOLLOWS:
FOOTING (W)
ACCORDANCE WITH TABLE 1 (TABLE OF LAP SPLICE AND ANCHORAGE LENGTH) UNLESS
WALL THICKNESS VERTICAL REINFORCEMENT HORIZONTAL REINFORCEMENT COLUMN (W) TRUSS DETAIL 2
OTHERWISE SHOWN ON DRAWINGS, SPLICES SHALL BE STAGGERED WHENEVER 8 IN. (200 MM.) Ø12 @ 400 MM. Ø 10 @ 600 MM. 2" X 6" C-PURLINS RAFTER
POSSIBLE. 6 IN. (150 MM.) Ø10 @ 400 MM. Ø 10 @ 600 MM. BAR Y
7. ALL ANCHOR BOLTS, DOWELS, AND OTHER INSERTS, SHALL BE PROPERLY POSITIONED 4 IN, (100 MM.) Ø10 @ 400 MM. Ø 10 @ 600 MM. 9.350
FOOTING (L)
COLUMN (L)
LATERAL TIES
AND SECURED IN PLACE PRIOR TO PLACING OF CONCRETE. 5. BLOCK WALL REINFORCING BARS SHALL BE LAPPED A MINIMUM OF 30 BAR DIAMETERS .594 .600
VERTICAL BARS .600 .600
8. CONTRACTOR SHALL NOTE AND PROVIDE ALL MISCELLANEOUS CURBS, SILLS, STOOLS, WHERE SPLICED, HORIZONTAL/VERTICAL DOWELS FROM FOOTINGS, COLUMNS/WALLS .600 .600
OR SLABS SHALL EXTEND INTO THE BLOCK WALL A MINIMUM OF 30 BAR DIAMETERS OR A .600 .600
EQUIPMENTS, AND MECHANICAL BASES THAT ARE REQUIRED BY THE ARCHITECTURAL, .600 .600
MINIMUM OF 400 mm. WHICHEVER IS LONGER AND DOWELS TO MATCH VERTICAL .600 .600
ELECTRICAL, AND MECHANICAL DRAWINGS. .600 .600
REINFORCEMENTS OF WALL. BAR X .600 .600
9. ALL CONCRETE SHALL BE KEPT MOIST FOR A MINIMUM OF SEVEN (7) CONSECUTIVE DAYS 6. ALL CELLS CONTAINING REINFORCING BARS OR INSERTS SHALL BE SOLIDLY FILLED WITH .600.235
.273 .800
1.200
2" X 3" C-PURLINS SPACED @ .60 MTS
1.073
IMMEDIATELY AFTER POURING BY THE USE OF WET BURLAP, FOG SPRAYING, CURING CONCRETE GROUT. (REFER TO SPECIFICATIONS) .800
C O L U M N F O O T I N G
COMPOUNDS OR OTHER APPROVED METHODS.
10. STRIPPING OF FORMS AND SHORES:
STIRRUPS / HOOPS ROOF BEAM
COLUMN
FOOTING (W)
TOP CONTINUOUS BARS BEAM (W)
COLUMN
BENT BARS
FOUNDATION --------------------------------------------------------------- 24 HRS. BAR Y
FINISH FLOOR LINE
TRUSS DETAIL 1
BEAM (D)
3 LAYERS B.W.
BEAM (L) L
BEAMS ------------------------------------------------------------------------ 14 DAYS C.H.B W/ 10MM Ø
BOTTOM CONTINUOUS BARS VER. BARS @
FOOTING (H)
W A L L F O O T I N G
CIVIL ENGINEER: PRC REG : PROJECT TITLE: QWNER: REVISION: DATE: SHEET CONTENT : SHEET NO.
S 1
PTR. NO. : DESIGNED: CONSTRUCTION NOTES
SCHEDULE OF BEAMS, FOOTING,
DATE : TWO - STOREY 4 BEDROOMS JOE VICENTE B. PONSARAN
CHECKED: & COLUMN
BLOOD COMPACT WALL FOOTING
Engineering Services
RESIDENTIAL BUILDING
2
PLACE : CADD : SECTION OF BEAM
COLUMN FOOTING
JEREOS STREET, LAPAZ, ILOILO CITY T.I.N : LOCATION : BRGY. TIGAYON, KALIBO, AKLAN ADDRESS : DATE : TRUSS DETAIL 1,2