FINAL PROJECT HANDOVER NOTES:
Project Name: Construction des complexes entrepdts a KAMURONZA, BUHUMBA, RUGARI, au Nord-Kivu.
Start Date: OY panne” LofG Original End Date: 16 Max 204 9
‘ActualEnd Date 40 O¢zaure L049 | Handover date: 20 Avril 2020
Original Project Cost: 293759, 6S F | Actual Project Cost
Project Location” Wyre! — Kyu Groupement Kamuronza, Buhumba et Rugari
Based on the inspection conducted on 30 Avril 2020 can be confirmed the project condition as below:
NO | PROJECTNAME | LOCATION FINAL NOTE
T | warehouse ~Kamuronce
Bunumza len a signler
ugar
2 Dyingarea ~Kamuronza