ir aed Programe SavING harneienineno cies nana ey tives FINAL PROJECT HANDOVER NOTES: Project Name: Construction des complexes entrepdts a KAMURONZA, BUHUMBA, RUGARI, au Nord-Kivu. Start Date: OY panne” LofG Original End Date: 16 Max 204 9 ‘ActualEnd Date 40 O¢zaure L049 | Handover date: 20 Avril 2020 Original Project Cost: 293759, 6S F | Actual Project Cost Project Location” Wyre! — Kyu Groupement Kamuronza, Buhumba et Rugari Based on the inspection conducted on 30 Avril 2020 can be confirmed the project condition as below: NO | PROJECTNAME | LOCATION FINAL NOTE T | warehouse ~Kamuronce Bunumza len a signler ugar 2 Dyingarea ~Kamuronza