RENCANA ANGGARAN BIAYA ( RAB )

NAMA KEGIATAN : PEMBANGUNAN SARANA DAN PRASARANA LOKAL KELURAHAN

NAMA PEKERJAAN : PERENCANAAN KONSTRUKSI REHABILITASI BANGUNAN GEDUNG (MUSRENBANG)

LOKASI : KELURAHAN WATES - KOTA MOJOKERTO

HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT SATUAN HARGA
Rp. Rp.
1 2 3 4 5 6
A PEKERJAAN PENDAHULUAN
I Uitzet 1.00 Ls 500,000.00 500,000.00
Sub Jumlah 500,000.00
II PEKERJAAN K3
1 Biaya K3
Sosialisasi, Promosi dan Pelatihan
a Induksi K3 (Safety Induction) 25.00 Org 5,000.00 125,000.00
b P3K 5.00 Org 500,000.00 2,500,000.00
c Papan Informasi K3 5.00 Bh 100,000.00 500,000.00
Alat Pelindung Kerja (APK) dan Alat Pelindung Diri (APD)
a Topi Pelindung (Safety Helmet) 25.00 Bh 50,000.00 1,250,000.00
b Sarung Tangan (Safety Gloves) 25.00 Psg 15,000.00 375,000.00
c Sepatu Keselamatan Kerja (Safety Shoes) 25.00 Psg 150,000.00 3,750,000.00
d Rompi Keselamatan (Safety Vest) 25.00 Bh 35,000.00 875,000.00
Personil K3 Konstruksi
a Rambu Peringatan 10.00 Bh 100,000.00 1,000,000.00
b Safety Line 1.00 Ls 250,000.00 250,000.00
c Papan Nama Proyek 5.00 Ls 250,000.00 1,250,000.00
Sub Jumlah 11,875,000.00
JUMLAH 12,375,000.00
B RENOVASI BALAI RW 01 WELIRANG PERUMAHAN TENGAH
I PEKERJAAN PERSIAPAN
1 Pekerjaan Pembersihan Awal dan Akhir 1.00 ls 500,000.00 500,000.00
2 Pekerjaan Pembongkaran Atap Lama 1.00 ls 2,000,000.00 2,000,000.00
Sub Jumlah 2,500,000.00
II PEKERJAAN BETON
1 Pekerjaan Ring Balk 10x15cm -
a Pekerjaan Beton K250 0.75 m3 1,142,831.42 861,409.18
b Pekerjaan Pembesian 235.28 kg 17,185.88 4,043,426.13
c Pekerjaan Begesting 10.05 m2 289,143.75 2,905,894.69
Sub Jumlah 7,810,729.99
III PEKERJAAN PASANGAN
1 Pekerjaan Pasangan Bata 1PC : 5 PS 23.20 m2 123,764.55 2,871,337.56
2 Pekerjaan Plesteran 1PC : 5PS 46.40 m2 74,218.41 3,443,734.22
3 Pekerjaan Acian 46.40 m2 45,648.75 2,118,102.00
Sub Jumlah 8,433,173.78
IV PEKERJAAN ATAP
1 Pekerjaan Rangka Atap Galvalum 126.88 m2 293,202.63 37,200,083.68
2 Pekerjaan Pentutup Atap Genteng Karang Pilang 47.20 m2 187,766.25 8,862,567.00
3 Pekerjaan Bubungan Karang Pilang 24.00 m2 170,562.00 4,093,488.00
4 Pekerjaan Kalsiplank 2x30 30.00 m1 64,575.00 1,937,250.00
5 Pekerjaan Pasang Genteng lama 333.43 m2 28,825.00 9,610,975.63
Sub Jumlah 61,704,364.31
JUMLAH 80,448,268.08
C REHAB BALAI RW 05 LINGKUNGAN PERUMAHAN TENGAH
I PEKERJAAN PERSIAPAN
1 Pekerjaan Pembersihan Awal dan Akhir 1.00 ls 500,000.00 500,000.00
2 Pengukuran & Pemasangan Bowplank 1.00 ls 500,000.00 500,000.00
Sub Jumlah 1,000,000.00
II PEKERJAAN TANAH
1 Pekerjaan Galian 11.52 m3 98,437.50 1,134,000.00
2 Pekerjaan Urug Kembali 3.80 m3 32,812.50 124,740.00
3 Pekerjaan Urug Sirtu Leveling 2.52 m3 291,375.00 734,265.00
4 Pekerjaan Urug Pasir Bawah Pondasi 1.15 m3 285,075.00 328,406.40
Sub Jumlah 2,321,411.40
III PEKERJAAN PONDASI
1 Pekerjaan Aanstamping 2.30 m3 534,318.75 1,231,070.40
2 Pekerjaan Pondasi Batu Kali 1PC : 4PS 5.18 m3 931,323.75 4,827,982.32
Sub Jumlah 6,059,052.72
IV PEKERJAAN BETON
1 Pekerjaan Sloof S1 15x20 -
a Pekerjaan Beton K250 0.43 m3 1,142,831.42 493,703.17
b Pekerjaan Pembesian 73.48 kg 17,185.88 1,262,867.15
c Pekerjaan Begesting 5.76 m2 132,772.50 764,769.60

2 Pekerjaan Kolom K1 15x15 -


a Pekerjaan Beton K250 0.54 m3 1,142,831.42 617,128.97
b Pekerjaan Pembesian Ø12 begel Ø8 118.68 kg 17,185.88 2,039,682.34
c Pekerjaan Begesting 14.40 m2 233,310.00 3,359,664.00

3 Pekerjaan Balok Latei 10x12 -


a Pekerjaan Beton K250 0.26 m3 1,142,831.42 296,221.90
b Pekerjaan Pembesian Ø12 begel Ø8 33.71 kg 17,185.88 579,356.58
c Pekerjaan Begesting 1.44 m2 289,143.75 416,367.00

4 Pekerjaan Kanopy Plat 5x40 -


a Pekerjaan Beton 0.03 m3 1,142,831.42 34,284.94
b Pekerjaan Pembesian Ø12 3.55 kg 17,185.88 61,027.73
c Pekerjaan Begesting 0.72 m2 289,143.75 206,737.78

5 Pekerjaan Ring Balk 10x12 -


a Pekerjaan Beton K250 0.22 m3 1,142,831.42 246,851.59
b Pekerjaan Pembesian Ø12 begel Ø8 67.42 kg 17,185.88 1,158,713.16
c Pekerjaan Begesting 2.88 m2 289,143.75 832,734.00

6 Pekerjaan Ring Gewel 10x15


a Pekerjaan Beton K250 0.17 m3 1,142,831.42 188,567.18
b Pekerjaan Pembesian Ø12 begel Ø8 51.50 kg 17,185.88 885,128.11
c Pekerjaan Begesting 1.10 m2 289,143.75 318,058.13
Sub Jumlah 13,761,863.32
V PEKERJAAN PASANGAN
1 Pekerjaan Pasangan Trasram 1PC : 3PC 5.44 m2 124,801.95 678,922.61
2 Pekerjaan Pasangan Bata 1PC : 5 PS 34.88 m2 123,764.55 4,316,907.50
3 Pekerjaan Plesteran 1PC : 5PS 80.64 m2 74,218.41 5,984,972.58
4 Pekerjaan Acian 80.64 m2 45,648.75 3,681,115.20
Sub Jumlah 14,661,917.89
VI PEKERJAAN ATAP
1 Pekerjaan Rangka Atap Galvalum 28.00 m2 293,202.63 8,209,673.64
2 Pekerjaan Penutup Atap Geteng Karang Pilang 28.00 m2 187,766.25 5,257,455.00
3 Pekerjaan Bubungan Karang pilang 4.00 m1 170,562.00 682,248.00
4 Pekerjaan Kalsiplank 2/30 11.50 m1 64,575.00 742,612.50
Sub Jumlah 14,891,989.14
VII PEKERJAAN PLAFON
1 Pekerjaan Rangka Plafon Hollow 4x4 Modul 2x4 22.80 m2 309,986.25 7,067,686.50
2 Pekekerjaan Plafon Kalsiboard 22.80 m2 51,863.91 1,182,497.15
Sub Jumlah 8,250,183.65
VIII PEKERJAAN KERAMIK
1 Pekerjaan Rabat Lantai 5cm 0.63 m3 957,586.25 603,279.34
2 Pekerjaan Keramik 40x40 Polos 12.60 m2 210,960.75 2,658,105.45
Sub Jumlah 3,261,384.79
IX PEKERJAAN PENGECATAN
1 Pekerjaan Pengecatan Dinding 80.64 m2 52,749.38 4,253,709.60
Sub Jumlah 4,253,709.60
X PEKERJAAN PINTU JENDELA
1 Pekerjaan P4 1.00 unit 1,963,676.57 1,963,676.57
2 Pekerjaan J2 1.00 unit 1,570,007.69 1,570,007.69
3 Pekerjaan J3 1.00 unit 1,163,195.24 1,163,195.24
Sub Jumlah 4,696,879.51
XI PEKERJAAN ELEKTRIKAL
1 Pekerjaan Instalasi Titik Lampu dan Stop Kontak 2.00 titik 117,285.00 234,570.00
2 Pekerjaan Lampu SL 20 Watt 1.00 titik 68,932.50 68,932.50
3 Pekerjaan Stop Kontak 1.00 titik 62,212.50 62,212.50
4 Pekerjaan Saklar Tunggal 1.00 titik 62,212.50 62,212.50
Sub Jumlah 427,927.50
JUMLAH 73,586,319.52
D PEMBUATAN POS KEAMANAN JALAN BROMO RAYA
I PEKERJAAN PERSIAPAN
1 Pekerjaan Pembersihan Awal dan Akhir 1.00 ls 300,000.00 300,000.00
2 Pengukuran & Pemasangan Bowplank 1.00 ls 500,000.00 500,000.00
Sub Jumlah 800,000.00
II PEKERJAAN TANAH
1 Pekerjaan Galian 8.80 m3 98,437.50 866,250.00
2 Pekerjaan Urug Pasir Bawah Pondasi 0.44 m3 285,075.00 125,433.00
Sub Jumlah 991,683.00
III PEKERJAAN PONDASI
1 Pekerjaan Aanstamping 1.76 m3 534,318.75 940,401.00
2 Pekerjaan Pondasi Batu Kali 1PC : 4PS 3.96 m3 931,323.75 3,688,042.05
Sub Jumlah 4,628,443.05
IV PEKERJAAN BETON
1 Pekerjaan Sloof S1 15x20 -
a Pekerjaan Beton K250 0.33 m3 1,142,831.42 377,134.37
b Pekerjaan Pembesian 56.13 kg 17,185.88 964,690.18
c Pekerjaan Begesting 4.40 m2 132,772.50 584,199.00

2 Pekerjaan Kolom K1 15x15 -


a Pekerjaan Beton K250 0.37 m3 1,142,831.42 424,276.16
b Pekerjaan Pembesian 81.60 kg 17,185.88 1,402,281.61
c Pekerjaan Begesting 9.90 m2 233,310.00 2,309,769.00

3 Pekerjaan Balok Latei 10x12 -


a Pekerjaan Beton K250 0.05 m3 1,142,831.42 54,855.91
b Pekerjaan Pembesian 18.73 kg 17,185.88 321,864.77
c Pekerjaan Begesting 0.80 m2 289,143.75 231,315.00

5 Pekerjaan Ring Balk 10x15 -


a Pekerjaan Beton K250 0.19 m3 1,142,831.42 214,280.89
b Pekerjaan Pembesian 58.53 kg 17,185.88 1,005,827.39
c Pekerjaan Begesting 2.50 m2 289,143.75 722,859.38
Sub Jumlah 8,613,353.66

V PEKERJAAN PASANGAN
1 Pekerjaan Pasangan Trasram 1PC : 3PC 4.08 m2 124,801.95 509,191.96
2 Pekerjaan Pasangan Bata 1PC : 5 PS 29.34 m2 123,764.55 3,631,251.90
3 Pekerjaan Plesteran 1PC : 5PS 66.84 m2 74,218.41 4,960,758.52
4 Pekerjaan Acian 66.84 m2 45,648.75 3,051,162.45
Sub Jumlah 12,152,364.83
VI PEKERJAAN ATAP
1 Pekerjaan Rangka Atap Galvalum 9.00 m2 293,202.63 2,638,823.67
2 Pekerjaan Penutup Atap Seng Galvalum 9.00 m2 125,580.00 1,130,220.00
Sub Jumlah 3,769,043.67
VII PEKERJAAN PLAFON
1 Pekerjaan Rangka Plafon Hollow 4x4 Modul 2x4 6.08 m2 309,986.25 1,883,166.47
2 Pekekerjaan Plafon Kalsiboard 6.08 m2 51,863.91 315,073.25
Sub Jumlah 2,198,239.72
VIII PEKERJAAN KERAMIK
1 Pekerjaan Rabat Lantai 5cm 0.30 m3 957,586.25 290,866.82
2 Pekerjaan Keramik 40x40 Polos 6.08 m2 210,960.75 1,281,586.56
Sub Jumlah 1,572,453.38
IX PEKERJAAN PINTU JENDELA
1 Pekerjaan P4 1.00 unit 1,963,676.57 1,963,676.57
2 Pekerjaan J3 2.00 unit 1,163,195.24 2,326,390.48
Sub Jumlah 4,290,067.05
X PEKERJAAN ELEKTRIKAL
1 Pekerjaan Instalasi Titik Lampu dan Stop Kontak 3.00 titik 117,285.00 351,855.00
2 Pekerjaan Lampu SL 20 Watt 2.00 titik 68,932.50 137,865.00
3 Pekerjaan Stop Kontak 1.00 titik 62,212.50 62,212.50
4 Pekerjaan Saklar Tunggal 1.00 titik 62,212.50 62,212.50
Sub Jumlah 614,145.00
JUMLAH 39,629,793.36
E REHAB ATAP KROPOS BALAI RW PANDERMAN BARAT (BELAKANG TAMSIS) ,PANDERMAN 8
I PEKERJAAN PERSIAPAN
1 Pekerjaan Pembersihan Awal dan Akhir 1.00 ls 500,000.00 500,000.00
2 Pekerjaan Pembongkaran Meja Dapur Lama 1.00 ls 150,000.00 150,000.00
3 Pekerjaan Pembongkaran Atap Lama 1.00 ls 1,600,000.00 1,600,000.00
4 Pekerjaan Pembongkaran Aksesoris Kamar Mandi - ls 250,000.00 -
Sub Jumlah 2,250,000.00
II PEKERJAAN BETON
1 Pekerjaan Pembuatan Meja Dapur -
a Pekerjaan Beton 0.18 m3 1,142,831.42 205,709.66
b Pekerjaan Pembesian Ø10 1.85 kg 17,185.88 31,785.28
c Pekerjaan Begesting 3.62 m2 289,143.75 1,046,700.38

2 Pekerjaan Kolom K1 15x15 -


a Pekerjaan Beton K250 0.54 m3 1,142,831.42 617,128.97
b Pekerjaan Pembesian 118.68 kg 17,185.88 2,039,682.34
c Pekerjaan Begesting 14.40 m2 233,310.00 3,359,664.00

3 Pekerjaan Ring Balk 10x15 -


a Pekerjaan Beton K250 0.29 m3 1,142,831.42 329,992.57
b Pekerjaan Pembesian 90.13 kg 17,185.88 1,548,974.19
c Pekerjaan Begesting 3.85 m2 289,143.75 1,113,203.44
Sub Jumlah 10,292,840.81

III PEKERJAAN PASANGAN


1 Pekerjaan Pasangan Bata 1PC : 5 PS 17.30 m2 123,764.55 2,141,126.72
2 Pekerjaan Plesteran 1PC : 5PS 34.60 m2 74,218.41 2,567,956.99
3 Pekerjaan Acian 34.60 m2 45,648.75 1,579,446.75
Sub Jumlah 6,288,530.45
IV PEKERJAAN ATAP
1 Pekerjaan Rangka Atap Galvalum 79.22 m2 293,202.63 23,227,512.35
2 Pekerjaan Penutup Atap Seng Galvalum 79.22 m2 125,580.00 9,948,447.60
Sub Jumlah 33,175,959.95
PEKERJAAN PLAFON
1 Pekerjaan Rangka Plafon Hollow 4x4 Modul 2x4 59.32 m2 309,986.25 18,388,384.35
2 Pekekerjaan Plafon Kalsiboard 59.32 m2 51,863.91 3,076,567.14
Sub Jumlah 21,464,951.49
V PEKERJAAN KERAMIK
2 Pekerjaan Keramik 25x25 Polos KM 3.45 m2 210,960.75 726,759.78
3 Pekerjaan Keramik Dinding 25x40 15.52 m2 157,195.50 2,439,674.16
4 Pekerjaan Keramik Meja Dapur 60x60 4.00 m2 224,348.25 897,393.00
Sub Jumlah 4,063,826.94
VI PEKERJAAN PENGECATAN
1 Pekerjaan Pengecatan Dinding 65.45 m2 52,749.38 3,452,446.59
Sub Jumlah 3,452,446.59
VII PEKERJAAN PINTU JENDELA
1 Pekejaan Pintu KM 2.00 unit 500,000.00 1,000,000.00
3 Pekerjaan BV 1 5.00 unit 327,136.77 1,635,683.85
Sub Jumlah 2,635,683.85
VIII PEKERJAAN SANITAIR
1 Pekerjaan Pipa 3/4' 15.00 m1 33,915.00 508,725.00
2 Pekerjaan Pasang Kloset duuk 1.00 titik 1,965,206.25 1,965,206.25
3 Pekerjaan Pasang Kran 2.00 titik 33,915.00 67,830.00
4 Pekerjaan Sink 1.00 titik 230,028.75 230,028.75
5 Pekerjaan Pasang Floor Drain 2.00 titik 31,185.00 62,370.00
Sub Jumlah 2,834,160.00
IX PEKERJAAN ELEKTRIKAL
1 Pekerjaan Instalasi Titik Lampu dan Stop Kontak 8.00 titik 117,285.00 938,280.00
2 Pekerjaan Lampu SL 20 Watt 6.00 titik 68,932.50 413,595.00
3 Pekerjaan Stop Kontak 2.00 titik 62,212.50 124,425.00
4 Pekerjaan Saklar Tunggal 2.00 titik 62,212.50 124,425.00
5 Pekerjaan Saklar Ganda 1.00 titik 62,212.50 62,212.50
Sub Jumlah 1,662,937.50
JUMLAH 88,121,337.58
F PEMBANGUNAN GUDANG BALAI RW 07 JALAN RAJEKWESI XIV
I PEKERJAAN PERSIAPAN
1 Pekerjaan Pembersihan Awal dan Akhir 1.00 ls 500,000.00 500,000.00
2 Pembongkaran Kusen Lama 1.00 ls 500,000.00 500,000.00
3 Pengukuran & Pemasangan Bowplank 1.00 ls 500,000.00 500,000.00
Sub Jumlah 1,500,000.00
II PEKERJAAN TANAH
1 Pekerjaan Galian 19.00 m3 98,437.50 1,870,312.50
2 Pekerjaan Urug Kembali 6.33 m3 32,812.50 207,604.69
3 Pekerjaan Urug Sirtu Leveling 3.60 m3 291,375.00 1,048,950.00
4 Pekerjaan Urug Pasir Bawah Pondasi 1.80 m3 285,075.00 513,135.00
Sub Jumlah 3,640,002.19
III PEKERJAAN PONDASI
1 Pekerjaan Anstamping 2.88 m3 534,318.75 1,538,838.00
2 Pekerjaan Pondasi Batu Kali 1PC : 4PS 7.92 m3 931,323.75 7,376,084.10
Sub Jumlah 8,914,922.10
IV PEKERJAAN BETON
1 Pekerjaan Sloof S1 15x20 -
a Pekerjaan Beton K250 0.54 m3 1,142,831.42 617,128.97
b Pekerjaan Pembesian 91.85 kg 17,185.88 1,578,583.94
c Pekerjaan Begesting 7.20 m2 132,772.50 955,962.00

2 Pekerjaan Kolom K1 15x15 -


a Pekerjaan Beton K250 0.45 m3 1,142,831.42 509,131.40
b Pekerjaan Pembesian 91.85 kg 17,185.88 1,578,583.94
c Pekerjaan Begesting 7.20 m2 233,310.00 1,679,832.00

3 Pekerjaan Balok Latei 10x12 -


a Pekerjaan Beton K250 0.02 m3 1,142,831.42 27,427.95
b Pekerjaan Pembesian 9.36 kg 17,185.88 160,932.38
c Pekerjaan Begesting 0.48 m2 289,143.75 138,789.00

4 Pekerjaan Kanopy Plat 5x40 -


a Pekerjaan Beton 0.04 m3 1,142,831.42 45,713.26
b Pekerjaan Pembesian 4.73 kg 17,185.88 81,370.31
c Pekerjaan Begesting 0.80 m2 289,143.75 231,315.00

5 Pekerjaan Ring Balk 10x15 -


a Pekerjaan Beton K250 0.27 m3 1,142,831.42 308,564.48
b Pekerjaan Pembesian 84.28 kg 17,185.88 1,448,391.45
c Pekerjaan Begesting 5.40 m2 289,143.75 1,561,376.25
Sub Jumlah 10,923,102.32
V PEKERJAAN PASANGAN
1 Pekerjaan Pasangan Trasram 1PC : 3PC 6.84 m2 130,180.05 890,431.54
2 Pekerjaan Pasangan Bata 1PC : 5 PS 50.44 m2 123,764.55 6,242,683.90
3 Pekerjaan Plesteran 1PC : 5PS 114.56 m2 74,218.41 8,502,461.05
Sub Jumlah 15,635,576.49
VI PEKERJAAN ATAP
1 Pekerjaan Rangka Atap Galvalum 23.76 m2 293,202.63 6,966,494.49
2 Pekerjaan Penutup Atap Galvalum 23.76 m2 125,580.00 2,983,780.80
3 Pekerjaan Kalsiplank 2/30 18.00 m1 64,575.00 1,162,350.00
Sub Jumlah 11,112,625.29
VII PEKERJAAN LANTAI
1 Pekerjaan Rabat Lantai 5cm 0.90 m3 957,586.25 861,827.63
Sub Jumlah 861,827.63
VIII PEKERJAAN PINTU JENDELA
1 Pekerjaan PJ1 1.00 unit 2,849,209.70 2,849,209.70
2 Pekerjaan P4 2.00 unit 1,963,676.57 3,927,353.15
3 Pekerjaan BV 1 2.00 unit 327,136.77 654,273.54
Sub Jumlah 7,430,836.39
IX PEKERJAAN ELEKTRIKAL
1 Pekerjaan Instalasi Titik Lampu dan Stop Kontak 3.00 titik 117,285.00 351,855.00
2 Pekerjaan Lampu SL 20 Watt 2.00 titik 68,932.50 137,865.00
3 Pekerjaan Stop Kontak 1.00 titik 62,212.50 62,212.50
4 Pekerjaan Saklar Tunggal 2.00 titik 62,212.50 124,425.00
Sub Jumlah 676,357.50
JUMLAH 60,695,249.90
326.000 Kg Semen portland @ Rp. 1,300.00 = Rp 423,800.00
0.543 m3 Pasir beton @ Rp. 250,000.00 = Rp 135,714.29
0.762 m3 Kerikil ( Maksimum 30 mm ) @ Rp. 258,000.00 = Rp 196,653.33
215.000 Liter Air @ Rp. 100.00 = Rp 21,500.00
Total Bahan = Rp 777,667.62
Upah An. SNI 2008 6.5
1.650 Oh Pekerja @ Rp. 120,000.00 = Rp 198,000.00
0.275 Oh Tukang batu @ Rp. 115,000.00 = Rp 31,625.00
0.028 Oh Kepala tukang @ Rp. 125,000.00 = Rp 3,500.00
0.083 Oh Mandor @ Rp. 150,000.00 = Rp 12,450.00
= Rp 245,575.00
Total harga = Rp 1,023,242.62
Overhead + Provit 5 % = Rp 51,162.13
Harga satuan pekerjaan = Rp 1,074,404.75

۞ 1 m3 Membuat Beton mutu F'c = 19.3 Mpa ( K 225 ), Slump ( 12 ± 2 ) Cm, w/c = 0.58
Bahan An. SNI 2008 6.7
371.000 Kg Semen portland @ Rp. 1,300.00 = Rp 482,300.00
0.499 m3 Pasir beton @ Rp. 250,000.00 = Rp 124,750.00
0.776 m3 Kerikil ( Maksimum 30 mm ) @ Rp. 258,000.00 = Rp 200,208.00
215.000 Liter Air @ Rp. 100.00 = Rp 21,500.00
Total Bahan = Rp 828,758.00
Upah An. SNI 2008 6.7
1.650 Oh Pekerja @ Rp. 120,000.00 = Rp 198,000.00
0.275 Oh Tukang batu @ Rp. 115,000.00 = Rp 31,625.00
0.028 Oh Kepala tukang @ Rp. 125,000.00 = Rp 3,500.00
0.083 Oh Mandor @ Rp. 150,000.00 = Rp 12,450.00
= Rp 245,575.00
Total harga = Rp 1,074,333.00
Overhead + Provit 5 % = Rp 53,716.65
Harga satuan pekerjaan = Rp 1,128,049.65

۞ 1 m3 Membuat beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56
Bahan ( SNI 7394:2008 ) 6.8
384.000 Kg Semen portland @ Rp. 1,300.00 = Rp 499,200.00
0.494 m3 Pasir beton @ Rp. 250,000.00 = Rp 123,571.43
0.770 m3 Kerikil ( Maksimum 30 mm ) @ Rp. 258,000.00 = Rp 198,564.44
215.000 Liter Air @ Rp. 100.00 = Rp 21,500.00
Total Bahan = Rp 842,835.87
Upah ( SNI 7394:2008 ) 6.8
1.650 Oh Pekerja @ Rp. 120,000.00 = Rp 198,000.00
0.275 Oh Tukang batu @ Rp. 115,000.00 = Rp 31,625.00
0.028 Oh Kepala tukang @ Rp. 125,000.00 = Rp 3,500.00
0.083 Oh Mandor @ Rp. 150,000.00 = Rp 12,450.00
= Rp 245,575.00
Total harga = Rp 1,088,410.87
Overhead + Provit 5 % = Rp 54,420.54
Harga satuan pekerjaan = Rp 1,142,831.42

۞ 1 m3 Membuat beton mutu K-300


Bahan ( SNI 7394:2008 ) 6.8
531.000 Kg Semen portland @ Rp. 1,300.00 = Rp 690,300.00
0.486 m3 Pasir beton @ Rp. 250,000.00 = Rp 121,600.00
0.756 m3 Kerikil ( Maksimum 30 mm ) @ Rp. 258,000.00 = Rp 195,125.40
215.000 Liter Air @ Rp. 100.00 = Rp 21,500.00
Total Bahan = Rp 1,028,525.40
Upah ( SNI 7394:2008 ) 6.8
1.650 Oh Pekerja @ Rp. 120,000.00 = Rp 198,000.00
0.275 Oh Tukang batu @ Rp. 115,000.00 = Rp 31,625.00
0.028 Oh Kepala tukang @ Rp. 125,000.00 = Rp 3,500.00
0.083 Oh Mandor @ Rp. 150,000.00 = Rp 12,450.00
= Rp 245,575.00
Total harga = Rp 1,274,100.40
Overhead + Provit 5 % = Rp 63,705.02
Harga satuan pekerjaan = Rp 1,337,805.42

۞ 1 m2 Memasang Plastik Polythene


Bahan
1.050 Kg Plastik Polythene @ Rp. 1,300.00 = Rp 1,365.00
Total Bahan = Rp 1,365.00
Upah
0.010 Oh Pekerja @ Rp. 120,000.00 = Rp 1,200.00
0.002 Oh Mandor @ Rp. 150,000.00 = Rp 300.00
= Rp 1,500.00
Total harga = Rp 2,865.00
Overhead + Provit 5 % = Rp 143.25
Harga satuan pekerjaan = Rp 3,008.25

۞ 1 m3 Membuat beton Strous ∅ 30 K-250


An. SNI 6.7 + An. SNI 6.17 + An. SNI 6.20
92.355 Kg Besi beton @ Rp. 17,185.88 = Rp 1,587,201.30
1.000 m3 Spesi beton K-225 @ Rp. 1,142,831.42 = Rp 1,142,831.42
Total harga = Rp 2,730,032.72
1 m3 Membuat Pondasi Plat beton (100x100x25) K-250
An. SNI 6.7 + An. SNI 6.17 + An. SNI 6.20
162.027 Kg Besi beton @ Rp. 17,185.88 = Rp 2,784,570.04
1.000 m3 Spesi beton K-250 @ Rp. 1,142,831.42 = Rp 1,142,831.42
10.00 m2 Cetakan bekisting @ Rp. 177,397.50 = Rp 1,773,975.00
Total harga = Rp 5,701,376.46
۞ 1 m3 Membuat beton sloof 20/30 K-250
An. SNI 6.7 + An. SNI 6.17 + An. SNI 6.21
142.427 Kg Besi beton @ Rp. 17,185.88 = Rp 2,447,726.89
1.000 m3 Spesi beton K-250 @ Rp. 1,142,831.42 = Rp 1,142,831.42
13.33 m2 Cetakan bekisting @ Rp. 132,772.50 = Rp 1,770,300.00
Total harga = Rp 5,360,858.31

۞ 1 m3 Membuat beton sloof 20/30 K-250


An. SNI 6.7 + An. SNI 6.17 + An. SNI 6.21
107.685 Kg Besi beton @ Rp. 17,185.88 = Rp 1,850,654.34
1.000 m3 Spesi beton K-250 @ Rp. 1,142,831.42 = Rp 1,142,831.42
13.333 m2 Cetakan bekisting @ Rp. 132,772.50 = Rp 1,770,300.00
Total harga = Rp 4,763,785.76

۞ 1 m3 Membuat beton balok 30/65 K-250


An. SNI 6.7 + An. SNI 6.17 + An. SNI 6.23
107.685 Kg Besi beton @ Rp. 17,185.88 = Rp 1,850,654.34
1.000 m3 Spesi beton K-250 @ Rp. 1,142,831.42 = Rp 1,142,831.42
6.67 m2 Cetakan bekisting @ Rp. 289,143.75 = Rp 1,927,625.00
Total harga = Rp 4,921,110.76
۞ 1 m3 Membuat beton balok 25/45 K-250
An. SNI 6.7 + An. SNI 6.17 + An. SNI 6.23
92.127 Kg Besi beton @ Rp. 17,185.88 = Rp 1,583,285.02
1.000 m3 Spesi beton K-250 @ Rp. 1,142,831.42 = Rp 1,142,831.42
8.00 m2 Cetakan bekisting @ Rp. 289,143.75 = Rp 2,313,150.00
Total harga = Rp 5,039,266.43
۞ 1 m3 Membuat balok 20/40 K-250
An. SNI 6.7 + An. SNI 6.17 + An. SNI 6.23
129.554 Kg Besi beton @ Rp. 17,185.88 = Rp 2,226,494.55
1.000 m3 Spesi beton K-250 @ Rp. 1,142,831.42 = Rp 1,142,831.42
10.00 m2 Cetakan bekisting @ Rp. 289,143.75 = Rp 2,891,437.50
Total harga = Rp 6,260,763.47

۞ 1 m3 Membuat beton balok 20/35 K-250


An. SNI 6.7 + An. SNI 6.17 + An. SNI 6.23
144.121 Kg Besi beton @ Rp. 17,185.88 = Rp 2,476,852.86
1.000 m3 Spesi beton K-250 @ Rp. 1,142,831.42 = Rp 1,142,831.42
10.00 m2 Cetakan bekisting @ Rp. 289,143.75 = Rp 2,891,437.50
Total harga = Rp 6,511,121.77

۞ 1 m3 Membuat beton Ring balok 15/15 K-250


An. SNI 6.7 + An. SNI 6.17 + An. SNI 6.23
203.486 Kg Besi beton @ Rp. 17,185.88 = Rp 3,497,086.87
1.000 m3 Spesi beton K-250 @ Rp. 1,142,831.42 = Rp 1,142,831.42
6.67 m2 Cetakan bekisting @ Rp. 289,143.75 = Rp 1,927,625.00
Total harga = Rp 6,567,543.29

۞ 1 m3 Membuat beton Ring balok 15/20 K-250


An. SNI 6.7 + An. SNI 6.17 + An. SNI 6.23
137.084 Kg Besi beton @ Rp. 17,185.88 = Rp 2,355,916.13
1.000 m3 Spesi beton K-250 @ Rp. 1,142,831.42 = Rp 1,142,831.42
5.83 m2 Cetakan bekisting @ Rp. 289,143.75 = Rp 1,686,671.88
Total harga = Rp 5,185,419.42
۞ 1 m3 Membuat beton balok 20/50 K-250
An. SNI 6.7 + An. SNI 6.17 + An. SNI 6.23
Err:509 Kg Besi beton @ Rp. 17,185.88 = Rp Err:509
1.000 m3 Spesi beton K-250 @ Rp. 1,142,831.42 = Rp 1,142,831.42
10.000 m2 Cetakan bekisting @ Rp. 289,143.75 = Rp 2,891,437.50
Total harga = Rp Err:509

۞ 1 m3 Membuat kolom 15/15 K-250


An. SNI 6.7 + An. SNI 6.17 + An. SNI 6.22
227.033 Kg Besi beton @ Rp. 17,185.88 = Rp 3,901,758.85
1.000 m3 Spesi beton K-250 @ Rp. 1,142,831.42 = Rp 1,142,831.42
13.333 m2 Cetakan bekisting @ Rp. 233,310.00 = Rp 3,110,800.00
Total harga = Rp 8,155,390.27

۞ 1 m3 Membuat beton kolom 40/40 K-250


An. SNI 6.7 + An. SNI 6.17 + An. SNI 6.22
142.154 Kg Besi beton @ Rp. 17,185.88 = Rp 2,443,043.74
1.000 m3 Spesi beton K-250 @ Rp. 1,128,049.65 = Rp 1,128,049.65
10.000 m2 Cetakan bekisting @ Rp. 233,310.00 = Rp 2,333,100.00
Total harga = Rp
۞ 1 m3 Membuat kolom 30/30 K-250
An. SNI 6.7 + An. SNI 6.17 + An. SNI 6.22
150.127 Kg Besi beton @ Rp. 17,185.88 = Rp 2,580,065.77
1.000 m3 Spesi beton K-250 @ Rp. 1,142,831.42 = Rp 1,142,831.42
6.667 m2 Cetakan bekisting @ Rp. 233,310.00 = Rp 1,555,400.00
Total harga = Rp 5,278,297.18

۞ 1 m3 Membuat Dinding Beton 30/50 K-250


An. SNI 6.7 + An. SNI 6.17 + An. SNI 6.22
90.347 Kg Besi beton @ Rp. 17,185.88 = Rp 1,552,686.52
1.000 m3 Spesi beton K-250 @ Rp. 1,142,831.42 = Rp 1,142,831.42
2.963 m2 Cetakan bekisting @ Rp. 233,310.00 = Rp 691,288.89
Total harga = Rp 3,386,806.83
JL.RAJEKWESI XIV GUDANG
BACK UP VOLUME
NO URAIAN PEKERJAAN Koef/ SATUAN Ket.
Panjang Lebar Tinggi Jumlah Luas Sub Vol Volume
Berat
1 2 3 4 5 6 7 8 9 10 11 12
I PEKERJAAN PERSIAPAN
1 Pekerjaan Pembersihan Awal dan Akhir 1.00 #REF!
2 Pembongkaran Kusen Lama 1.00 #REF!
3 Pengukuran & Pemasangan Bowplank 3.00 6.00 1.00 #REF!

II PEKERJAAN TANAH
1 Pekerjaan Galian 18.00 1.00 1.00 19.00 #REF!
2 Pekerjaan Urug Kembali 0.33 19.00 6.33 #REF!
3 Pekerjaan Urug Sirtu Leveling 3.00 6.00 0.20 3.60 #REF!
4 Pekerjaan Urug Pasir Bawah Pondasi 3.00 6.00 0.10 1.80 #REF!

III Pekerjaan Pondasi Batu Kali 1PC : 4PS


1 Pekerjaan Anstamping 18.00 0.80 0.20 2.88 #REF!
2 Pekerjaan Pondasi Batu Kali 1PC : 4PS 18.00 0.55 0.80 7.92 #REF!

V PEKERJAAN BETON
1 Pekerjaan Sloof S1 15x20 18.00 0.15 0.20 0.54 #REF!
a. Pekerjaan Beton K250 18.00 0.15 0.20 0.54 m3
b. Pekerjaan Pembesian berat jenis
Tulangan Pokok Ø12 18.00 0.89 4.00 63.92 91.85 kg
Begel Ø8 18.00 0.39 0.59 27.93
c. Pekerjaan Bekisting 18.00 0.20 2.00 7.20 m2

2 Pekerjaan Kolom K1 15x15 0.15 0.15 3.30 6.00 0.45 #REF!


a. Pekerjaan Berton K250 0.15 0.15 3.30 0.07 m3
b. Pekerjaan Pembesian
Tulangan Pokok Ø12 3.30 0.89 24.00 70.31 97.91 kg
Begel Ø8 19.80 0.39 0.53 27.60
c. Pekerjaan Bekisting 0.15 3.30 24.00 11.88 m2

3 Pekerjaan Balok Latei 10x12 2.00 0.10 0.12 0.02 #REF!


a. Pekerjaan Beton K250
b. Pekerjaan Pembesian
Tulangan Pokok Ø12 2.00 0.89 4.00 7.10 9.36 kg
Begel Ø8 2.00 0.39 0.43 2.26
c. Pekerjaan Bekisting 2.00 0.12 2.00 0.48 m2

4 Pekerjaan Kanopy Plat 5x40 2.00 0.40 0.05 0.04 #REF!


a. Pekerjaan Berton K250
b. Pekerjaan Pembesian
Tulangan Pokok Ø12 2.00 0.40 0.89 4.73 kg
c. Pekerjaan Bekisting 2.00 0.40 0.80 m2

5 Pekerjaan Ring Balk 10x15 0.54 #REF!


a. Pekerjaan Berton K250 18.00 0.15 0.10 0.27
b. Pekerjaan Pembesian
Tulangan Pokok Ø12 18.00 0.89 4.00 63.92 84.28 kg
Begel Ø8 18.00 0.39 0.43 20.36
c. Pekerjaan Bekisting 18.00 0.15 2.00 5.40 m2

VI PEKERJAAN PASANGAN
1 Pekerjaan Pasangan Trasram 1PC : 3PC 18.00 0.40 7.20 6.84 #REF!
pengurangan kusen 0.90 0.40 0.36
2 Pekerjaan Pasangan Bata 1PC : 5 PS 18.00 2.90 52.20 50.44 #REF!
pengurangan kusen
pintu 0.90 1.60 1.44
boven 0.40 0.40 2.00 0.32
3 Pekerjaan Plesteran 1PC : 5PS 2.00 57.28 114.56 #REF!

VII PEKERJAAN ATAP


1 Pekerjaan Rangka Atap Galvalum 3.60 6.60 23.76 #REF!
2 Pekerjaan Penutup Atap Galvalum 23.76 #REF!
3 Pekerjaan Kalsiplank 2/30 18.00 m1

VIII PEKERJAAN LANTAI


1 Pekerjaan Rabat Lantai 5cm 3.00 6.00 0.05 18.00 18.80 0.90 #REF!
teras 1.00 0.80 0.80

IX PEKERJAAN PINTU JENDELA


1 Pekerjaan PJ1 1.00 #REF!
2 Pekerjaan P4 2.00 #REF!
3 Pekerjaan BV 1 2.00 #REF!

X PEKERJAAN ELEKTRIKAL
1 Pekerjaan Instalasi Titik Lampu dan Stop Kontak 3.00 #REF!
2 Pekerjaan Lampu SL 20 Watt 2.00 #REF!
3 Pekerjaan Stop Kontak 1.00 #REF!
4 Pekerjaan Saklar Tunggal 2.00 #REF!
BALAI RW 8 PANDERMAN BARAT
BACK UP VOLUME
NO URAIAN PEKERJAAN Koef/ SATUAN Ket.
Panjang Lebar Tinggi Jumlah Luas Sub Vol Volume
Berat
1 2 3 4 5 6 7 8 9 10 11 12
I PEKERJAAN PERSIAPAN
1 Pekerjaan Pembersihan Awal dan Akhir 1.00 #REF!
2 Pekerjaan Pembongkaran Meja Dapur Lama 1.00 #REF!
3 Pekerjaan Pembongkaran Atap Lama 1.00 #REF!
4 Pekerjaan Pembongkaran Aksesoris Kamar Mandi 1.00 #REF!

II PEKERJAAN BETON
1 Pekerjaan Pembuatan Meja Dapur 5.00 0.60 0.06 0.18 #REF!
a. Pekerjaan Berton K250 5.00 0.60 0.06 0.18
b. Pekerjaan Pembesian
Tulangan Pokok Ø10 5.00 0.60 0.62 1.85 kg
c. Pekerjaan Bekisting 6.20 0.10 0.62 3.62 m2
5.00 0.60 3.00

2 Pekerjaan Kolom K1 15x15 0.15 0.15 4.00 6.00 0.54 #REF!


a. Pekerjaan Berton K250
b. Pekerjaan Pembesian 118.68 kg
Tulangan Pokok Ø12 4.00 0.89 24.00 85.22
Begel Ø8 24.00 0.39 0.53 33.46
c. Pekerjaan Bekisting 0.15 4.00 24.00 14.40 m2

3 Pekerjaan Ring Balk 10x15 19.25 0.15 0.10 0.29 #REF!


a. Pekerjaan Berton K250
b. Pekerjaan Pembesian 90.13 kg
Tulangan Pokok Ø12 19.25 0.89 4.00 68.36
Begel Ø8 19.25 0.39 0.43 21.77
c. Pekerjaan Bekisting 19.25 0.10 2.00 3.85 m2

III PEKERJAAN PASANGAN


1 Pekerjaan Pasangan Bata 1PC : 5 PS 19.25 0.40 7.70 17.30 #REF!
2 bekas bongkaran kolom 0.50 3.20 6.00 9.60
3 Pekerjaan Plesteran 1PC : 5PS 2.00 17.30 34.60 #REF!
4 Pekerjaan Acian 34.60 #REF!

IV PEKERJAAN ATAP
1 Pekerjaan Rangka Atap Galvalum 13.30 4.18 55.53 79.22 #REF!
km 2.65 1.30 3.45
gudang 4.45 4.55 20.25
2 Pekerjaan Penutup Atap Seng Galvalum 79.22 #REF!

V PEKERJAAN PLAFON
1 Pekerjaan Rangka Plafon Hollow 4x4 Modul 2x4 12.50 3.38 42.19 59.32 #REF!
km 2.65 1.30 3.45
gudang 3.65 3.75 13.69
2 Pekekerjaan Plafon Kalsiboard 59.32 #REF!

VI PEKERJAAN KERAMIK
1 Pekerjaan Keramik 25x25 Polos KM 3.45 #REF!
2 Pekerjaan Keramik Dinding 25x40 10.50 1.60 16.80 15.52 #REF!
pengurangan KM 0.80 1.60 1.28
3 Pekerjaan Keramik Meja Dapur 60x60 5.00 0.80 4.00 #REF!

VII PEKERJAAN PENGECATAN


1 Pekerjaan Pengecatan Dinding 19.25 3.40 65.45 #REF!

VIII PEKERJAAN PINTU JENDELA


1 Pekejaan Pintu KM 2.00 #REF!
2 Pekerjaan BV 1 5.00 #REF!

IX PEKERJAAN SANITAIR
1 Pekerjaan Pipa 3/4' 15.00 #REF!
2 Pekerjaan Pasang Kloset duuk 1.00 #REF!
3 Pekerjaan Pasang Kran 2.00 #REF!
4 Pekerjaan Sink 1.00 #REF!
5 Pekerjaan Pasang Floor Drain 2.00 #REF!

X PEKERJAAN ELEKTRIKAL
1 Pekerjaan Instalasi Titik Lampu dan Stop Kontak 8.00 #REF!
2 Pekerjaan Lampu SL 20 Watt 6.00 #REF!
3 Pekerjaan Stop Kontak 2.00 #REF!
4 Pekerjaan Saklar Tunggal 2.00 #REF!
5 Pekerjaan Saklar Ganda 1.00 #REF!
BALAI RW 1 WELIRANG
BACK UP VOLUME
NO URAIAN PEKERJAAN Koef/ SATUAN Ket.
Panjang Lebar Tinggi Jumlah Luas Sub Vol Volume
Berat
1 2 3 4 5 6 7 8 9 10 11 12

I PEKERJAAN PERSIAPAN
1 Pekerjaan Pembersihan Awal dan Akhir 1.00 #REF!
2 Pekerjaan Pembongkaran Atap Lama 1.00 #REF!

II PEKERJAAN BETON
1 Pekerjaan Ring Balok 15x10 50.25 0.15 0.10 0.75 #REF!
a. Pekerjaan Beton K250
b. Pekerjaan Pembesian 235.28 kg
Tulangan Pokok Ø12 50.25 0.89 4.00 178.44
Begel Ø8 50.25 0.39 0.43 56.84
c. Pekerjaan Bekisting 50.25 0.10 2.00 10.05 m2

III PEKERJAAN PASANGAN


1 Pekerjaan Pasangan Bata 1PC : 5 PS 23.20 1.00 23.20 #REF!
2 Pekerjaan Plesteran 1PC : 5PS 2.00 23.20 46.40 #REF!
3 Pekerjaan Acian 46.40 #REF!

IV PEKERJAAN ATAP
1 Pekerjaan Rangka Atap Galvalum 126.88 #REF!
pendopo 10.00 0.50 6.00 4.00 120.00
kantor 10.00 2.75 0.25 6.88
2 Pekerjaan Pentutup Atap Genteng Karang Pilang 47.20 #REF! tambal sulam
pendopo 10.00 0.50 6.00 32% 4.00 38.40
kantor 10.00 2.75 32% 8.80
3 Pekerjaan Bubungan Karang Pilang 6.00 4.00 24.00 #REF!
4 Pekerjaan Kalsiplank 2x30 10.00 3.00 30.00 #REF!
5 Pekerjaan Pasang Genteng lama 10.00 3.00 380.63 #REF!
pendopo 3.00 120.00 360.00 333.43 m2
kantor 3.00 6.88 20.63
BALAI RW 5 KELUD
BACK UP VOLUME
NO URAIAN PEKERJAAN Koef/ SATUAN Ket.
Panjang Lebar Tinggi Jumlah Luas Sub Vol Volume
Berat
1 2 3 4 5 6 7 8 9 10 11 12

I PEKERJAAN PERSIAPAN
1 Pekerjaan Pembersihan Awal dan Akhir 1.00 #REF!
2 Pengukuran & Pemasangan Bowplank 14.40 1.00 #REF!

II PEKERJAAN TANAH
1 Pekerjaan Galian 14.40 0.80 1.00 11.52 #REF!
2 Pekerjaan Urug Kembali 0.33 11.52 3.80 #REF!
3 Pekerjaan Urug Sirtu Leveling 4.20 3.00 0.20 2.52 #REF!
4 Pekerjaan Urug Pasir Bawah Pondasi 14.40 0.80 0.10 1.15 #REF!

III PEKERJAAN PONDASI


1 Pekerjaan Aanstamping 14.40 0.80 0.20 2.30 #REF!
2 Pekerjaan Pondasi Batu Kali 1PC : 4PS 14.40 0.45 0.80 5.18 #REF!

V PEKERJAAN BETON
1 Pekerjaan Sloof S1 15x20 14.40 0.15 0.20 0.43 #REF!
a. Pekerjaan Berton K250 14.40 0.15 0.20
b. Pembesian 73.48 kg
tulangan utama Ø12 14.40 0.89 4.00 51.13
begel Ø8 14.40 0.39 0.59 22.35
c. Bekisting 14.40 0.20 2.00 5.76
2 Pekerjaan Kolom K1 15x15 0.15 0.15 4.00 6.00 0.54 #REF!
a. Pekerjaan Berton K250 0.15 0.15 4.00 6.00 0.54
b. Pekerjaan Pembesian 118.68 kg
Tulangan Pokok Ø12 4.00 0.89 24.00 85.22
Begel Ø8 24.00 0.39 0.53 33.46
c. Pekerjaan Bekisting 0.15 4.00 24.00 14.40 m2

3 Pekerjaan Balok Latei 10x12 3.00


a. Pekerjaan Berton K250 7.20 0.12 0.10 0.26 m3
b. Pekerjaan Pembesian 33.71
Tulangan Pokok Ø12 7.20 0.89 4.00 25.57
Begel Ø8 7.20 0.39 0.43 8.14
c. Pekerjaan Bekisting 7.20 0.10 2.00 1.44

4 Pekerjaan Kanopy Plat 5x40 1.50 0.40 0.05 0.03 #REF!


a. Pekerjaan Berton K250
b. Pekerjaan Pembesian 3.55 kg
Tulangan Pokok Ø12 1.50 0.40 0.89 3.55

c. Pekerjaan Bekisting 2.30 0.05 0.11 0.72 m2


1.50 0.40 0.60

5 Pekerjaan Ring Balk 10x12 14.40 0.15 0.10 0.22 0.22 #REF!
a. Pekerjaan Berton K250
b. Pekerjaan Pembesian 67.42 kg
Tulangan Pokok Ø12 14.40 0.89 4.00 51.13
Begel Ø8 14.40 0.39 0.43 16.29
c. Pekerjaan Bekisting 14.40 0.10 2.00 2.88 m2

Pekerjaan Ring Gewel 10x15 11.00 0.15 0.10 0.17 0.17 m3


a. Pekerjaan Berton K250
b. Pekerjaan Pembesian 51.50 kg
Tulangan Pokok Ø12 11.00 0.89 4.00 39.06
Begel Ø8 11.00 0.39 0.43 12.44
c. Pekerjaan Bekisting 11.00 0.10 1.10 m2

VI PEKERJAAN PASANGAN
1 Pekerjaan Pasangan Trasram 1PC : 3PC 14.40 0.40 5.76 5.44 #REF!
Pengurangan 0.80 0.40 0.32
Kusen Pintu
2 Pekerjaan Pasangan Bata 1PC : 5 PS 14.40 2.60 37.44 34.88 #REF!
gewel 4.20 2.00 0.50 2.00 8.40
Pengurangan
Kusen Pintu 0.80 1.70 1.36
Kusen Jendela 0.60 1.00 2.00 1.20
3 Pekerjaan Plesteran 1PC : 5PS 2.00 40.32 80.64 #REF!
4 Pekerjaan Acian 80.64 #REF!

VII PEKERJAAN ATAP


1 Pekerjaan Rangka Atap Galvalum 3.50 4.00 2.00 28.00 #REF!
2 Pekerjaan Penutup Atap Geteng Karang Pilang 28.00 #REF!
3 Pekerjaan Bubungan Karang pilang 4.00 #REF!
4 Pekerjaan Kalsiplank 2/30 11.50 #REF!

VIII PEKERJAAN PLAFON


1 Pekerjaan Rangka Plafon Hollow 4x4 Modul 2x4 5.70 4.00 22.80 #REF!
2 Pekekerjaan Plafon Kalsiboard 22.80 #REF!

IX PEKERJAAN KERAMIK
1 Pekerjaan Rabat Lantai 5cm 4.20 3.00 0.05 0.63 #REF!
2 Pekerjaan Keramik 40x40 Polos 4.20 3.00 12.60 #REF!

X PEKERJAAN PENGECATAN
1 Pekerjaan Pengecatan Dinding 80.64 #REF!
gedung baru 80.64

XI PEKERJAAN PINTU JENDELA


1 Pekerjaan P4 1.00 #REF!
2 Pekerjaan J2 1.00 #REF!
3 Pekerjaan J3 1.00 #REF!

XII PEKERJAAN ELEKTRIKAL


1 Pekerjaan Instalasi Titik Lampu dan Stop Kontak 2.00 #REF!
2 Pekerjaan Lampu SL 20 Watt 1.00 #REF!
3 Pekerjaan Stop Kontak 1.00 #REF!
4 Pekerjaan Saklar Tunggal 1.00 #REF!
BANCANG GANG IV
BACK UP VOLUME
NO URAIAN PEKERJAAN Koef/ SATUAN Ket.
Panjang Lebar Tinggi Jumlah Luas Sub Vol Volume
Berat
1 2 3 4 5 6 7 8 9 10 11 12

I PEKERJAAN PERSIAPAN
1 Pekerjaan Pembersihan Awal dan Akhir 1.00 #REF!
2 Pekerjaan Pembongkaran Gedung Lama 1.00 #REF!
3 Pengukuran & Pemasangan Bowplank 8.80 4.70 1.00 #REF!

II PEKERJAAN TANAH
1 Pekerjaan Galian 22.40 #REF!
Gedung A 8.60 0.80 1.00 6.88
Gedung B 19.40 0.80 1.00 15.52
2 Pekerjaan Urug Kembali 0.33 22.40 7.46 #REF!
3 Pekerjaan Urug Sirtu Leveling areacad 6.93 #REF!
Gedung A 3.00 2.80 0.20 1.68
Gedung B 5.00 4.70 0.20 4.70
Teras 0.15 16.39 0.55
4 Pekerjaan Urug Pasir Bawah Pondasi 1.12 #REF!
Gedung A 8.60 0.80 0.05 0.34
Gedung B 19.40 0.80 0.05 0.78

III PEKERJAAN PONDASI


1 Pekerjaan Aanstamping 4.48 #REF!
Gedung A 8.60 0.80 0.20 1.38
Gedung B 19.40 0.80 0.20 3.10
2 Pekerjaan Pondasi Batu Kali 1PC : 4PS 10.08 #REF!
Gedung A 8.60 0.45 0.80 3.10
Gedung B 19.40 0.45 0.80 6.98
3 Pekerjaan Pasangan Bata Teras 1PC : 5 PS 11.40 0.40 4.56 #REF!

IV PEKERJAAN BETON
1 Pekerjaan Sloof S1 15x20 0.84 #REF!
Gedung A 8.60 0.15 0.20 0.26
a. Pekerjaan Berton K250
b. Pekerjaan Pembesian 142.88 kg
Tulangan Pokok Ø12 8.60 0.89 4.00 30.54
Begel Ø8 8.60 0.39 0.59 13.35
c. Pekerjaan Bekisting 8.60 0.20 2.00 3.44 11.20 m2
Gedung B 19.40 0.15 0.20 0.58
a. Pekerjaan Beton K250
b. Pekerjaan Pembesian
Tulangan Pokok Ø12 19.40 0.89 4.00 68.89
Begel Ø8 19.40 0.39 0.59 30.11
c. Pekerjaan Bekisting 19.40 0.20 2.00 7.76

2 Pekerjaan Kolom K1 15x15 1.08 #REF!


Gedung A 0.15 0.15 4.00 4.00 0.36
a. Pekerjaan Beton K250
b. Pekerjaan Pembesian 237.37 kg
Tulangan Pokok Ø12 4.00 0.89 16.00 56.82
Begel Ø8 16.00 0.39 0.53 22.31
c. Pekerjaan Bekisting 0.15 4.00 2.00 1.20 20.40 m2

Gedung B 0.15 0.15 4.00 8.00 0.72


a. Pekerjaan Beton K250
b. Pekerjaan Pembesian
Tulangan Pokok Ø12 4.00 0.89 32.00 113.63
Begel Ø8 32.00 0.39 0.53 44.61
c. Pekerjaan Bekisting 0.15 4.00 32.00 19.20

3 Balok Latei 12x10 0.05 #REF!


Gedung A 1.50 0.12 0.10 0.02
a. Pekerjaan Berton K250
b. Pekerjaan Pembesian 21.07 kg
Tulangan Pokok Ø12 1.50 0.89 4.00 5.33
Begel Ø8 1.50 0.39 0.43 1.70
c. Pekerjaan Bekisting 1.50 0.10 2.00 0.30 0.90 m2

Gedung B 3.00 0.12 0.10 0.04


a. Pekerjaan Berton K250
b. Pekerjaan Pembesian
Tulangan Pokok Ø12 3.00 0.89 4.00 10.65
Begel Ø8 3.00 0.39 0.43 3.39
c. Pekerjaan Bekisting 3.00 0.10 2.00 0.60

4 kanopy plat tebal 5cm 0.09 #REF!


Gedung A 1.50 0.40 0.05 0.03
a. Pekerjaan Berton K250
b. Pekerjaan Pembesian
Tulangan Pokok Ø12 1.50 0.40 0.89 3.55 10.65 kg

c. Pekerjaan Bekisting 1.50 0.40 0.60 2.11 m2


2.30 0.05 0.11

Gedung B 3.00 0.40 0.05 0.06


a. Pekerjaan Berton K250
b. Pekerjaan Pembesian
Tulangan Pokok Ø12 3.00 0.40 0.89 7.10

c. Pekerjaan Bekisting 3.00 0.40 1.20


3.80 0.05 0.19

5 Ring Balok 15x10 0.42 #REF!


Gedung A 8.60 0.15 0.10 0.13
a. Pekerjaan Berton K250
b. Pekerjaan Pembesian
Tulangan Pokok Ø12 8.60 0.89 4.00 30.54 131.10 kg
Begel Ø8 8.60 0.39 0.43 9.73
c. Pekerjaan Bekisting 8.60 0.10 2.00 1.72 5.60 m2

Gedung B 19.40 0.15 0.10 0.29


a. Pekerjaan Berton K250
b. Pekerjaan Pembesian
Tulangan Pokok Ø12 19.40 0.89 4.00 68.89
Begel Ø8 19.40 0.39 0.43 21.94
c. Pekerjaan Bekisting 19.40 0.10 2.00 3.88

V PEKERJAAN PASANGAN
1 Pekerjaan Pasangan Bata 1PC : 5 PS 9.84 #REF!
Gedung A 8.60 0.40 3.44
Gedung B 19.40 0.40 7.76
pengurangan kusen
P1 1.30 0.40 2.00 1.04
P2 0.80 0.40 1.00 0.32
2 Pekerjaan Pasangan Bata 1PC : 5 PS 75.04 #REF!
Gedung A 8.60 2.90 24.94
Gedung B 19.40 2.90 56.26
pengurangan kusen
P1 1.30 1.60 2.00 4.16
P2 0.80 1.60 1.00 1.28
J1 0.60 1.20 1.00 0.72
3 Pekerjaan Plesteran 1PC : 5PS 2.00 75.04 150.08 #REF!
4 Pekerjaan Acian 150.08 #REF!
5 Pekerjaan Benangan 3.30 8.00 26.40 #REF!

VI PEKERJAAN ATAP
1 Pekerjaan Rangka Atap Galvalum 8.80 6.50 57.20 #REF!
2 Pekerjaan Penutup Atap Geteng Karang Pilang 57.20 #REF!
3 Pekerjaan Bubungan Karang pilang 8.80 #REF!
4 Pekerjaan Kalsiplank 2/30 8.80 2.00 17.60 #REF!
5 Pekerjaan Talang PVC + Pipa 2'' 12.80 12.80 #REF!

VII PEKERJAAN PLAFON


1 Pekerjaan Rangka Plafon Hollow 4x4 Modul 2x4 45.21 #REF!
Gedung A 2.85 2.85 8.12
Gedung B 4.55 4.55 20.70
Teras 16.39 16.39
2 Pekerjaan Keramik 40x40 Polos 45.21 #REF!

VIII PEKERJAAN KERAMIK


1 Pekerjaan Rabat Lantai 5cm 0.05 45.21 2.26 #REF!
2 Pekerjaan Keramik 40x40 Polos 45.21 #REF!

IX PEKERJAAN PENGECATAN
1 Pekerjaan Pengecatan Dinding 150.08 #REF!
2 Pekerjaan Pengecatan Plafon 45.21 #REF!

X PEKERJAAN PINTU JENDELA


1 Pekerjaan PJ1 1.00 #REF!
2 Pekerjaan PJ2 1.00 #REF!
3 Pekerjaan J2 1.00 #REF!

XI PEKERJAAN ELEKTRIKAL
1 Pekerjaan Instalasi Titik Lampu dan Stop Kontak 8.00 #REF!
2 Pekerjaan Lampu SL 20 Watt 6.00 #REF!
3 Pekerjaan Stop Kontak 2.00 #REF!
4 Pekerjaan Saklar Tunggal 3.00 #REF!
BALAI RW TENGGER RAYA
BACK UP VOLUME
NO URAIAN PEKERJAAN Koef/ SATUAN Ket.
Panjang Lebar Tinggi Jumlah Luas Sub Vol Volume
Berat
1 2 3 4 5 6 7 8 9 10 11 12

I PEKERJAAN PERSIAPAN
1 Pekerjaan Pembersihan Awal dan Akhir 1.00 ls

II PEKERJAAN PASANGAN
1 Pekerjaan Pasangan Bata 1PC : 5 PS 40.95 0.13 5.32 m2
2 Pekerjaan Plesteran 1PC : 5PS 2.00 60.37 120.74 m2
3 Pekerjaan Acian 120.74 m2
4 Pekerjaan Benangan 60.37 2.00 120.74 m1

III PEKERJAAN PENGECATAN


1 Pekerjaan Pengecatan Dinding
91.40 3.00 2.00 548.40 548.40 m2

IV PEKERJAAN ROSTER
1 Pekerjaan Pintu Harmonika 1.00 unit
2 Pekerjaan Pintu Besi Finish Cat 1.00 unit
3 Pekerjaan Roster 46.25 0.20 0.20 40.95 1156.25 1024.00 unit pembulatan
POS KEAMANAN BROMO
BACK UP VOLUME
NO URAIAN PEKERJAAN Koef/ SATUAN Ket.
Panjang Lebar Tinggi Jumlah Luas Sub Vol Volume
Berat
1 2 3 4 5 6 7 8 9 10 11 12

I PEMBUATAN POS KEAMANAN JALAN BROMO RAYA


1 Pekerjaan Pembersihan Awal dan Akhir 1.00 #REF!
2 Pengukuran & Pemasangan Bowplank 4.00 1.50 1.00 #REF!

II PEKERJAAN TANAH
1 Pekerjaan Galian 11.00 0.80 1.00 8.80 #REF!
2 Pekerjaan Urug Pasir Bawah Pondasi 11.00 0.80 0.05 0.44 #REF!

III PEKERJAAN PONDASI


1 Pekerjaan Aanstamping 11.00 0.80 0.20 1.76 #REF!
2 Pekerjaan Pondasi Batu Kali 1PC : 4PS 11.00 0.45 0.80 3.96 #REF!

IV PEKERJAAN BETON
1 Pekerjaan Sloof S1 15x20 11.00 0.15 0.20 0.33 #REF!
a. Pekerjaan Berton K250
b. Pekerjaan Pembesian 56.13
Tulangan Pokok Ø12 11.00 0.89 4.00 39.06
Begel Ø8 11.00 0.39 0.59 17.07
c. Pekerjaan Bekisting 11.00 0.20 2.00 4.40

2 Pekerjaan Kolom K1 15x15 0.15 0.15 3.30 5.00 0.37 #REF!


a. Pekerjaan Berton K250
b. Pekerjaan Pembesian 81.60 kg
Tulangan Pokok Ø12 3.30 0.89 20.00 58.59
Begel Ø8 16.50 0.39 0.53 23.00
c. Pekerjaan Bekisting 0.15 3.30 20.00 9.90 m2

3 Balok Latei 12x10 4.00 0.12 0.10 0.05 #REF!


a. Pekerjaan Berton K250
b. Pekerjaan Pembesian 18.73 kg
Tulangan Pokok Ø12 4.00 0.89 4.00 14.20
Begel Ø8 4.00 0.39 0.43 4.52
c. Pekerjaan Bekisting 4.00 0.10 2.00 0.80 m2

4 Ring Balok 10x15 12.50 0.15 0.10 0.19 #REF!


a. Pekerjaan Beton K250
b. Pekerjaan Pembesian 58.53 kg
Tulangan Pokok Ø12 12.50 0.89 4.00 44.39
Begel Ø8 12.50 0.39 0.43 14.14
c. Pekerjaan Bekisting 12.50 0.10 2.00 2.50 2.50 m2

5 Pekerjaan Plat Lantai t12 cm


a. Pekerjaan Berton K250 4.00 1.46 0.12 0.70 m3
b. Pekerjaan Pembesian 58.57 kg
Tulangan Pokok Ø12 4.00 1.46 0.89 34.56
tulangan pembagi Ø10 4.00 1.46 0.62 24.00
c. Pekerjaan Bekisting 4.00 1.46 5.84 7.15 m2
10.92 0.12 1.31
V PEKERJAAN PASANGAN
1 Pekerjaan Pasangan Trasram 1PC : 3PC 11.00 0.40 4.40 4.08 #REF!
pengurangan kusen
pintu 0.80 0.40 1.00 0.32
2 Pekerjaan Pasangan Bata 1PC : 5 PS 11.00 2.90 31.90 29.34 #REF!
pengurangan kusen
pintu 0.80 1.70 1.00 1.36
jendela 0.60 1.00 2.00 1.20
3 Pekerjaan Plesteran 1PC : 5PS 2.00 33.42 66.84 #REF!
4 Pekerjaan Acian 66.84 #REF!

VI PEKERJAAN ATAP
1 Pekerjaan Rangka Atap Galvalum 4.50 2.00 9.00 #REF!
2 Pekerjaan Penutup Atap Seng Galvalum 9.00 #REF!

VII PEKERJAAN PLAFON


1 Pekerjaan Rangka Plafon Hollow 4x4 Modul 2x4 4.50 1.35 6.08 #REF!
2 Pekekerjaan Plafon Kalsiboard 6.08 #REF!

VIII PEKERJAAN KERAMIK


1 Pekerjaan Rabat Lantai 5cm 0.05 6.08 0.30 #REF!
2 Pekerjaan Keramik 40x40 Polos 6.08 #REF!

IX PEKERJAAN PINTU JENDELA


1 Pekerjaan P4 1.00 #REF!
2 Pekerjaan J3 2.00 #REF!

X PEKERJAAN ELEKTRIKAL
1 Pekerjaan Instalasi Titik Lampu dan Stop Kontak 3.00 #REF!
2 Pekerjaan Lampu SL 20 Watt 2.00 #REF!
3 Pekerjaan Stop Kontak 1.00 #REF!
4 Pekerjaan Saklar Tunggal 1.00 #REF!
GEDUNG SERBAGUNA (PENDOPO)
BACK UP VOLUME
NO URAIAN PEKERJAAN Koef/ SATUAN Ket.
Panjang Lebar Tinggi Jumlah Luas Sub Vol Volume
Berat
1 2 3 4 5 6 7 8 9 10 11 12
I PEKERJAAN PERSIAPAN
1 Pekerjaan Pembersihan Awal dan Akhir 1.00 #REF!
2 Pengukuran & Pemasangan Bowplank 8.00 8.00 1.00 #REF!

II PEKERJAAN TANAH
1 Pekerjaan Bor Strouss Diameter 25 cm 3.00 14.00 42.00 #REF!
2 Pekerjaan Galian Pile Cap 0.60 0.60 1.00 14.00 5.04 #REF!
3 Pekerjaan Urug Kembali 3.78 #REF!
4 Pekerjaan Urug Sirtu Leveling 8.00 8.00 0.40 25.60 28.43 #REF!
2.66 2.66 0.40 2.83

III PEKERJAAN PONDASI


1 Pekerjaan Rabat 5cm 0.60 0.60 0.05 14.00 0.25 #REF!
2 Pekerjaan Cor Strouss 0.25 3.00 14.00 2.06 #REF!
beton 0.25 3.00 14.00 2.06 m3
tulangan utama Ø12 3.00 0.89 70.00 186.43 210.84 kg
spiral Ø6 3.00 0.22 14.00 0.39 24.41
3 Pekerjaan Pile Cap 60x60x20cm 0.60 0.60 0.20 14.00 1.01 #REF!
beton K250
tulangan utama Ø12 0.60 0.89 14.00 1.45 72.09 144.17 kg
tulangan pembagi Ø12 0.60 0.89 14.00 1.45 72.09
bekisting 0.60 0.20 56.00 6.72 6.72 m2
4 Pekerjaan Pasangan Bata 1PC : 5 PS 11.92 #REF!
39.72 0.30 11.92

IV PEKERJAAN BETON
1 Pekerjaan Sloof S1 15x20 39.72 0.15 0.20 1.19 #REF!
a. Pekerjaan Berton K250
b. Pekerjaan Pembesian 202.69 kg
Tulangan Pokok Ø12 39.72 0.89 4.00 141.05
Begel Ø8 39.72 0.39 0.59 61.64
c. Pekerjaan Bekisting 39.72 0.20 2.00 15.89

2 Pekerjaan Kolom K1 25x25 0.25 0.25 4.00 14.00 3.50 #REF!


a. Pekerjaan Berton K250
b. Pekerjaan Pembesian 329.22
Tulangan Pokok Ø12 4.00 0.89 56.00 198.86
Begel Ø8 56.00 0.39 0.89 130.36
c. Pekerjaan Bekisting 0.25 4.00 56.00 56.00 56.00 m2

3 Ring Balok B1 15X20 68.55 0.15 0.20 2.06 #REF!


a. Pekerjaan Berton K250
b. Pekerjaan Pembesian 341.51 kg
Tulangan Pokok Ø12 68.55 0.89 4.00 243.42
Begel Ø8 68.55 0.39 0.54 98.09
c. Pekerjaan Bekisting 68.55 0.20 2.00 27.42 27.42 m2

4 Ring Balok B2 20X25 74.12


a. Pekerjaan Berton K250 74.12 0.20 0.25 3.71 m3
b. Pekerjaan Pembesian 397.73 kg
Tulangan Pokok Ø12 74.12 0.89 4.00 263.20
Begel Ø8 74.12 0.39 0.69 134.53
c. Pekerjaan Bekisting 74.12 0.25 2.00 37.06 37.06 m2

#REF! PEKERJAAN ATAP


#REF! Pekerjaan Gording Canal C 75x45x15x2.3 114.64 3.25 372.58 #REF!
#REF! Pekerjaan Plat Dudukan Gording 50.00 #REF!
#REF! Pekerjaan Ikatan angin 10mm 1.00 0.62 30.00 18.50 #REF!
#REF! Pekerjaan Trekstang 12mm 7.00 0.89 8.00 49.93 #REF!
area cad
#REF! Pekerjaan Reng Usuk Galvalum 107.90 107.90 #REF!
#REF! Pekerjaan Penutup Atap Geteng Karang Pilang 107.90 #REF!
#REF! Pekerjaan Bubungan Karang Pilang 36.00 #REF!
#REF! Pekerjaan Talang Seng BJLS 12.00 0.40 12.00 #REF!

#REF! PEKERJAAN KERAMIK


#REF! Pekerjaan Rabat Lantai 5cm 107.90 0.05 5.40 #REF!
REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB)

NAMA KEGIATAN : PEMBANGUNAN SARANA DAN PRASARANA LOKAL KELURAHAN

NAMA PERKERJAAN : PERENCANAAN KONSTRUKSI REHABILITASI BANGUNAN GEDUNG (POKIR)

LOKASI : KELURAHAN WATES - KOTA MOJOKERTO

No Uraian Pekerjaan Jumlah Harga Ket

1 2 3 4
A PEKERJAAN PENDAHULUAN Rp 5,725,000.00

B PEKERJAAN RENOVASI BALAI RW TENGGER RAYA WATES Rp 71,156,662.55

C GEDUNG PERTEMUAN BANCANG GG V RT.02 RW.03 Rp 149,059,563.77

D RUANG SERBAGUNA LAPANGAN BALAI RW 02 Rp 160,335,991.41

JUMLAH Rp. Rp 386,277,217.73


PPN 10% Rp 38,627,721.77
JUMLAH TOTAL Rp 424,904,939.51
DIBULATKAN Rp 424,904,000.00

Terbilang :

Mengetahui :
Mengetahui : Jombang, 2020
Mengetahui / Menyetujui Dibuat Oleh:
LURAH WATES Konsultan Perencana
SELAKU CV. BAGUS BASKARA CONSULTANT
PEJABAT PEMBUAT KOMITMEN

AMANULLAH WIDI PB.,SH. EDY PRAYITNO, ST


Penata Direktur
NIP : 19791012 199901 1 001
RENCANA ANGGARAN BIAYA ( RAB )
NAMA KEGIATAN : PEMBANGUNAN SARANA DAN PRASARANA LOKAL KELURAHAN

NAMA PEKERJAAN : PERENCANAAN KONSTRUKSI REHABILITASI BANGUNAN GEDUNG (POKIR)

LOKASI : KELURAHAN WATES - KOTA MOJOKERTO

HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT SATUAN BARU HARGA BARU
Rp. Rp.
A PEKERJAAN PENDAHULUAN
I Pekerjaan Uitzet 1.00 Ls 500,000.00 500,000.00
Sub Jumlah 500,000.00
II PEKERJAAN K3
1 Biaya K3
Sosialisasi, Promosi dan Pelatihan
a Induksi K3 (Safety Induction) 15.00 Org 5,000.00 75,000.00
b P3K 1.00 Org 500,000.00 500,000.00
c Papan Informasi K3 1.00 Bh 100,000.00 100,000.00
Alat Pelindung Kerja (APK) dan Alat Pelindung Diri (APD)
a Topi Pelindung (Safety Helmet) 15.00 Bh 50,000.00 750,000.00
b Sarung Tangan (Safety Gloves) 15.00 Psg 15,000.00 225,000.00
c Sepatu Keselamatan Kerja (Safety Shoes) 15.00 Psg 150,000.00 2,250,000.00
d Rompi Keselamatan (Safety Vest) 15.00 Bh 35,000.00 525,000.00
Rambu Rambu Yang Diperlukan
a Rambu Peringatan 3.00 Bh 100,000.00 300,000.00
b Safety Line 1.00 Ls 250,000.00 250,000.00
c Papan Nama Proyek 3.00 Ls 250,000.00 750,000.00
Sub Jumlah 5,725,000.00
JUMLAH 6,225,000.00
B PEKERJAAN RENOVASI BALAI RW TENGGER RAYA WATES
I PEKERJAAN PERSIAPAN
1 Pekerjaan Pembersihan Awal dan Akhir 1.00 ls 500,000.00 500,000.00
Sub Jumlah 500,000.00
II PEKERJAAN PASANGAN
1 Pekerjaan Pasangan Bata 1PC : 5 PS 5.32 m2 123,764.55 658,860.58
2 Pekerjaan Plesteran 1PC : 5PS 120.74 m2 74,218.41 8,960,906.68
3 Pekerjaan Acian 120.74 m2 45,648.75 5,511,492.22
4 Pekerjaan Benangan 120.74 m1 20,574.75 2,484,133.18
Sub Jumlah 17,615,392.66
III PEKERJAAN PENGECATAN
1 Pekerjaan Pengecatan Dinding 548.40 m2 52,749.38 28,927,757.25
Sub Jumlah 28,927,757.25
IV PEKERJAAN ROSTER
1 Pekerjaan Pintu Harmonika 1.00 unit 5,845,000.00 5,845,000.00
2 Pekerjaan Pintu Besi Finish Cat 1.00 unit 4,950,000.00 4,950,000.00
3 Pekerjaan Roster 1,024.00 unit 13,006.36 13,318,512.64
Sub Jumlah 24,113,512.64
JUMLAH 71,156,662.55
C GEDUNG PERTEMUAN BANCANG GG V RT.02 RW.03
I PEKERJAAN PERSIAPAN
1 Pekerjaan Pembersihan Awal dan Akhir 1.00 ls 500,000.00 500,000.00
2 Pekerjaan Pembongkaran Gedung Lama 1.00 ls 500,000.00 500,000.00
3 Pengukuran & Pemasangan Bowplank 1.00 ls 500,000.00 500,000.00
Sub Jumlah 1,500,000.00
II PEKERJAAN TANAH
1 Pekerjaan Galian 22.40 m3 98,437.50 2,205,000.00
2 Pekerjaan Urug Kembali 7.46 m3 32,812.50 244,755.00
3 Pekerjaan Urug Sirtu Leveling 6.93 m3 291,375.00 2,019,228.75
4 Pekerjaan Urug Pasir Bawah Pondasi 1.12 m3 285,075.00 319,284.00
Sub Jumlah 4,788,267.75
III PEKERJAAN PONDASI
1 Pekerjaan Aanstamping 4.48 m3 534,318.75 2,393,748.00
2 Pekerjaan Pondasi Batu Kali 1PC : 4PS 10.08 m3 931,323.75 9,387,743.40
3 Pekerjaan Pasangan Bata Teras 1PC : 5 PS 4.56 m2 123,764.55 564,366.35
Sub Jumlah 12,345,857.75
IV PEKERJAAN BETON
1 Pekerjaan Sloof S1 15x20 -
a Pekerjaan Beton K250 0.84 m3 1,142,831.42 959,978.39
b Pekerjaan Pembesian 142.88 kg 17,185.88 2,455,575.01
c Pekerjaan Begesting 11.20 m2 132,772.50 1,487,052.00

2 Pekerjaan Kolom K1 15x15 -


a Pekerjaan Beton K250 1.08 m3 1,142,831.42 1,234,257.93
b Pekerjaan Pembesian 237.37 kg 17,185.88 4,079,364.68
c Pekerjaan Begesting 20.40 m2 233,310.00 4,759,524.00

3 Pekerjaan Balok Latei 10x12 -


a Pekerjaan Beton K250 0.05 m3 1,142,831.42 61,712.90
b Pekerjaan Pembesian 21.07 kg 17,185.88 362,097.86
c Pekerjaan Begesting 0.90 m2 289,143.75 260,229.38

4 Pekerjaan Kanopy Plat 5x40 -


a Pekerjaan Beton K250 0.09 m3 1,142,831.42 102,854.83
b Pekerjaan Pembesian 10.65 kg 17,185.88 183,083.19
c Pekerjaan Begesting 2.11 m2 289,143.75 608,647.59

5 Pekerjaan Ring Balk 10x15 -


a Pekerjaan Beton K250 0.42 m3 1,142,831.42 479,989.19
b Pekerjaan Pembesian 131.10 kg 17,185.88 2,253,053.36
c Pekerjaan Begesting 5.60 m2 289,143.75 1,619,205.00
Sub Jumlah 20,906,625.32
V PEKERJAAN PASANGAN
1 Pekerjaan Pasangan Trasram 1PC : 3PC 9.84 m2 130,180.05 1,280,971.69
2 Pekerjaan Pasangan Bata 1PC : 5 PS 75.04 m2 123,764.55 9,287,291.83
3 Pekerjaan Plesteran 1PC : 5PS 150.08 m2 74,218.41 11,138,698.97
4 Pekerjaan Acian 150.08 m2 45,648.75 6,850,964.40
5 Pekerjaan Benangan 26.40 m1 20,574.75 543,173.40
Sub Jumlah 29,101,100.30
VI PEKERJAAN ATAP
1 Pekerjaan Rangka Atap Galvalum 57.20 m2 293,202.63 16,771,190.44
2 Pekerjaan Penutup Atap Geteng Karang Pilang 57.20 m2 187,766.25 10,740,229.50
3 Pekerjaan Bubungan Karang pilang 8.80 m1 170,562.00 1,500,945.60
4 Pekerjaan Kalsiplank 2/30 17.60 m1 64,575.00 1,136,520.00
5 Pekerjaan Talang PVC + Pipa 2'' 12.80 m1 54,076.05 692,173.44
Sub Jumlah 30,841,058.98
VII PEKERJAAN PLAFON
1 Pekerjaan Rangka Plafon Hollow 4x4 Modul 2x4 45.21 m2 309,986.25 14,016,028.29
2 Pekekerjaan Plafon Kalsiboard 45.21 m2 51,863.91 2,345,026.69
Sub Jumlah 16,361,054.98
VIII PEKERJAAN KERAMIK
1 Pekerjaan Rabat Lantai 5cm 2.26 m3 957,586.25 2,164,863.11
2 Pekerjaan Keramik 40x40 Polos 45.21 m2 210,960.75 9,538,590.31
Sub Jumlah 11,703,453.43
IX PEKERJAAN PENGECATAN
1 Pekerjaan Pengecatan Dinding 150.08 m2 52,749.38 7,916,626.20
2 Pekerjaan Pengecatan Plafon 45.21 m2 52,749.38 2,385,062.99
Sub Jumlah 10,301,689.19
X PEKERJAAN PINTU JENDELA
1 Pekerjaan PJ1 1.00 unit 2,326,496.77 2,326,496.77
2 Pekerjaan PJ2 1.00 unit 2,161,428.40 2,161,428.40
3 Pekerjaan J3 3.00 unit 1,163,195.24 3,489,585.72
Sub Jumlah 9,547,518.58
XI PEKERJAAN ELEKTRIKAL
1 Pekerjaan Instalasi Titik Lampu dan Stop Kontak 8.00 titik 117,285.00 938,280.00
2 Pekerjaan Lampu SL 20 Watt 6.00 titik 68,932.50 413,595.00
3 Pekerjaan Stop Kontak 2.00 titik 62,212.50 124,425.00
4 Pekerjaan Saklar Tunggal 3.00 titik 62,212.50 186,637.50
Sub Jumlah 1,662,937.50
JUMLAH 149,059,563.77
D RUANG SERBAGUNA LAPANGAN BALAI RW 02
II PEKERJAAN PERSIAPAN
1 Pekerjaan Pembersihan Awal dan Akhir 1.00 Ls 500,000.00 500,000.00
2 Pengukuran & Pemasangan Bowplank 1.00 Ls 500,000.00 500,000.00
Sub Jumlah 1,000,000.00
III PEKERJAAN TANAH
1 Pekerjaan Bor Strouss Diameter 25 cm 42.00 m3 35,700.00 1,499,400.00
2 Pekerjaan Galian Pile Cap 5.04 m3 98,437.50 496,125.00
3 Pekerjaan Urug Kembali 3.78 m3 32,812.50 124,031.25
4 Pekerjaan Urug Sirtu Leveling 28.43 m3 291,375.00 8,283,861.18
Sub Jumlah 10,403,417.43
IV PEKERJAAN PONDASI
1 Pekerjaan Rabat 5cm 0.25 m3 957,586.25 241,311.74
2 Pekerjaan Cor Strouss -
a Beton 2.06 m3 1,142,831.42 2,354,946.99
b Pembesian 210.84 kg 17,185.88 3,623,521.44
3 Pekerjaan Pile Cap 60x60x20cm -
a Beton 1.01 m3 1,142,831.42 1,151,974.07
b Pembesian 144.17 kg 17,185.88 2,477,725.82
c Bekisting 6.72 m2 177,397.50 1,192,111.20
4 Pekerjaan Pasangan Bata 1PC : 5 PS 11.92 m2 123,764.55 1,474,778.38
Sub Jumlah 12,516,369.63
V PEKERJAAN BETON
1 Pekerjaan Sloof S1 15x20 -
a Pekerjaan Beton K250 1.19 m3 1,142,831.42 1,361,797.92
b Pekerjaan Pembesian 202.69 kg 17,185.88 3,483,408.56
c Pekerjaan Begesting 15.89 m2 132,772.50 2,109,489.48

2 Pekerjaan Kolom K1 25x25 -


a Pekerjaan Beton K250 3.50 m3 1,142,831.42 3,999,909.96
b Pekerjaan Pembesian 329.22 kg 17,185.88 5,657,948.62
c Pekerjaan Begesting 56.00 m2 233,310.00 13,065,360.00

3 Pekerjaan Ring Balk 15x20 -


a Pekerjaan Beton K250 2.06 m3 1,142,831.42 2,350,232.81
b Pekerjaan Pembesian 341.51 kg 17,185.88 5,869,226.62
c Pekerjaan Begesting 27.42 m2 289,143.75 7,928,321.63
Sub Jumlah 45,825,695.58
VI PEKERJAAN ATAP
1 Pekerjaan Gording Canal C 75x45x15x2.3 372.58 Kg 33,962.25 12,653,655.10
2 Pekerjaan Plat Dudukan Gording 50.00 Bh 5,000.00 250,000.00
3 Pekerjaan Ikatan angin 10mm 18.50 Kg 33,962.25 628,301.63
4 Pekerjaan Trekstang 12mm 49.93 Kg 33,962.25 1,695,848.35
5 Pekerjaan Reng Usuk Galvalum 107.90 m2 400,295.00 43,191,830.50
6 Pekerjaan Penutup Atap Geteng Karang Pilang 107.90 m2 187,766.25 20,259,978.38
7 Pekerjaan Bubungan Karang Pilang 36.00 m1 170,562.00 6,140,232.00
8 Pekerjaan Talang Seng BJLS 12.00 m2 50,373.75 604,485.00
Sub Jumlah 85,424,330.96
VII PEKERJAAN KERAMIK
1 Pekerjaan Rabat Lantai 5cm 5.40 m2 957,586.25 5,166,177.82
Sub Jumlah 5,166,177.82
JUMLAH 160,335,991.41
PEKERJAAN PASANGAN

۞ 1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 5 Ps


Bahan An. SNI 2008 6.11
70.000 Bh Bata merah 5 x 11 x 22 cm @ Rp. 650.00 = Rp 45,500.00
8.320 kg Semen portland @ Rp. 1,300.00 = Rp 10,816.00
0.049 m3 Pasir pasang @ Rp. 195,000.00 = Rp 9,555.00
= Rp 65,871.00
Upah An. SNI 2008 6.11
0.300 Oh Pekerja @ Rp. 120,000.00 = Rp 36,000.00
0.100 Oh Tukang batu @ Rp. 125,000.00 = Rp 12,500.00
0.010 Oh Kepala tukang @ Rp. 125,000.00 = Rp 1,250.00
0.015 Oh Mandor @ Rp. 150,000.00 = Rp 2,250.00
= Rp 52,000.00
Total harga = Rp 117,871.00
Overhead + Provit 5 % = Rp 5,893.55
Harga satuan pekerjaan = Rp 123,764.55

۞ 1 m2 Membuat acian
Bahan ( SNI 2837:2008 ) 6.27
3.250 kg Semen portland @ Rp. 1,300.00 = Rp. 4,225.00
Total bahan = Rp. 4,225.00

Upah ( SNI 2837:2008 ) 6.27


0.200 oh Pekerja @ Rp. 120,000.00 = Rp. 24,000.00
0.100 oh Tukang batu @ Rp. 125,000.00 = Rp. 12,500.00
0.010 oh Kepala tukang @ Rp. 125,000.00 = Rp. 1,250.00
0.010 oh mandor @ Rp. 150,000.00 = Rp. 1,500.00
Total upah = Rp. 39,250.00
Total harga = Rp. 43,475.00
Overhead + Provit 5 % = Rp 2,173.75
Total bahan dan upah = Rp. 45,648.75

۞ 1 m' Benangan sudut, alur kusen, kol plint


Bahan Membuat (An. 2008 SNI 6.20)
0.500 kg Portland semen @ Rp. 1,300.00 = Rp 650.00
0.013 m3 Pasir @ Rp. 195,000.00 = Rp 2,535.00
= Rp 3,185.00

Upah Membuat (An. SNI 2008 6.20)


0.080 Pekerja @ Rp. 120,000.00 = Rp 9,600.00
0.400 Tukang Batu @ Rp. 125,000.00 = Rp 50,000.00
0.040 Kepala Tukang @ Rp. 125,000.00 = Rp 5,000.00
0.004 Mandor @ Rp. 150,000.00 = Rp 600.00
= Rp 55,600.00

Total harga = Rp 19,595.00


Overhead + Provit 5 % = Rp 979.75
Harga satuan pekerjaan = Rp 20,574.75
Jenis Pekerjaan : Pemasangan 1 m2 plesteran 1SP : 5Pasir Pasang tebal 15 mm
Satuan Pembayaran : 1 m2
Referensi : A.4.4.2. Analisa Harga Satuan Pekerjaan AHSP PM PUPR 28 2016
No Uraian Kode Satuan Koefisien Harga Jumlah
A TENAGA Satuan Harga
Pekerja L.01 OH 0.3 120,000 36,000
Tukang Batu L.03 OH 0.15 125,000 18,750
Kepala Tukang L.03 OH 0.015 125,000 1,875
Mandor L.04 OH 0.015 150,000 2,250
JUMLAH TENAGA KERJA 58,875
B BAHAN
Semen Portland Kg 5.184 1,300 6,739
Pasir pasang m3 0.026 195,000 5,070
JUMLAH HARGA BAHAN 11,809
C PERALATAN
BACK UP VOLUME

Keterangan Perhitungan Volume

A. PEKERJAAN PERSIAPAN
1. Pembersihan Lapangan dan Bongkaran Gedung Existing 1.00 Ls 1.00 Ls
2. Pemasangan Jembatan Sementara ( box culvert 150.150.100) 10.00 bh 10.00 bh
3. Pengukuran & Pemasangan Bowplank 26.66 M 26.66 M
4. Papan Nama Proyek 1.00 Bh 1.00 Bh

B. PEKERJAAN STRUKTUR
I PEKERJAAN TANAH DAN URUGAN
Û Pondasi Setempat P1 = 1.40 x 1.20 x 1.10
= 1.85 x 17 Bh
= 31.42 m3

P2 = 1.20 x 0.60 x 1.10


= 0.79 x 33 Bh
= 26.14 m3

P3 = 0.80 x 0.80 x 1.00


= 0.64 x 4.00 Bh
= 2.56 m3
= 60.11 m3 60.11 m3
1. Galian tanah
Û Pondasi batu kali P1 = 21.00 x 1.00 x 1.60
= 33.60 m3

P2 = 260.50 x 1.00 x 1.60


= 416.80 m3

P3 = 118.85 x 0.75 x 0.8


71.31 m3

S Pondasi batu kali


= 521.71 m3 521.71 m3

Û Pondasi Rollag P = 56.00 x 0.3 x 0.7


= 11.76 m3 11.76 m3

Û Pondasi Strous Ø 30 P1 = 17.00 x 3.00 = 51.00 ttk


P2 = 33.00 x 2.00 = 66.00 ttk
P3 = 4.00 x 1.00 = 4.00 ttk
121.00 ttk 121.00 ttk

Urugan Sirtu Halaman depan V1 = 0.50 x 43.12 x 14.00 = 301.84 m3


V2 = 0.50 x 14.40 x 8.50 = 61.2 m3
( Tinggi 120 cm ) Gedung V1 = 0.90 x 40.00 x 21.20 = 763.2 m3
V2 = 0.90 x 12.00 x 11.00 = 118.8 m3

Total = 1245.04 m3 1245.04 m3

Urugan Tanah Kembali Podasi Setempat V = 0.35 x 60.11


= 21.04 m3 21.04 m3

Urugan Tanah Kembali Pondasi Batu Kali V = 0.25 x 521.71


= 130.43 m3 130.43 m3
Urugan Pasir
Û Bawah Pondasi Batu kali t : 5 cm V = ( 0.05 x 1.00 )
= 0.05 x 400.35 m1
= 20.02 m3 20.02 m3

Û Bawah Pondasi Rollag t : 5 cm V = ( 0.05 x 0.30 x 56.00 )


= 0.84 m3 0.84 m3

Urug pasir bawah lantai t : 10 cm V1 = 21.00 x 20.50 x 0.05


= 21.53 m3
V2 = 11.0 x 11.00 x 0.05
= 6.05 m3
Ʃ = 21.5 + 6.05
= 27.58 m3 27.58 m3
II PEKERJAAN PONDASI
Pas. Pondasi batu kali 1Pc : 6Ps 0.30 + 0.80
VP1 = x 1.30 x 21.00
2.00
= 15.02 m3
Keterangan Perhitungan Volume

Bagian bawah = 21.00 x 1.00 x 0.30


= 6.30 m3
Total VP1 = 21.32 m3

0.30 + 0.80
VP2 = x 1.30 x 260.50
2.00
= 186.26 m3
Bagian bawah = 260.50 x 1.00 x 0.30
= 78.15 m3
Total VP2 = 264.41 m3

0.30 + 0.65
VP3 = x 0.65 x 118.85
2.00
= 36.69 m3
Bagian bawah = 118.85 x 0.75 x 0.15
= 13.37 m3
Total VP3 = 50.07 m3

S Pondasi Batu Kali


= VP1 + VP2 + VP3
= 21.32 + 264.41 + 50.07
= 326.99 m3 326.99 m3

Pas . Foot Plat FP1 ( 140 x 120 x 60 ) V1 = 1.40 x 1.20 x 0.60 x 17.00 Bh
= 17.14 m3 17.14 m3

Pas . Foot Plat FP2 ( 120 x 60 x 50 ) V1 = 1.40 x 1.20 x 0.60 x 33.00 Bh


= 33.26 m3 33.26 m3

Pas . Foot Plat FP3 ( 80 x 80 x 25 ) V1 = 0.80 x 0.80 x 0.25 x 4.00 Bh


= 0.64 m3 0.64 m3

Pas. Pondasi Rollag 1Pc : 4Ps V = ( 0.70 x 0.30 x 56.00 )


= 11.76 m3 11.76 m3

Lantai Kerja Pondasi Setempat t : 5 cm VP1 = ( 0.05 x 1.40 x 1.20 )


= 0.08 x 17 Bh
= 1.43 m3

VP 2 = ( 0.05 x 1.20 x 0.60 )


= 0.04 x 33.00 Bh
= 1.19 m3

VP3 = ( 0.05 x 0.80 x 0.80 )


= 0.03 x 4.00 Bh
= 0.13 m3
Total = 2.74 m3 2.74 m3
III PEKERJAAN STRUKTUR
LANTAI - Bawah ( Basement) dan LANTAI 1
Plat Beton
Û Plat Lantai bawah (basement) t =15 cm
V = 393.53 x 0.15
= 59.03 m3 59.03 m3
Pas . Sloof
Sloof (S1) 20/40 = 294.15 x 0.20 x 0.40
Ʃ = 23.53 m3 23.53 m3

Sloof (S2) 20/30 = 50.50 x 0.20 x 0.30


Ʃ = 3.03 m3 3.03 m3

Sloof (S3) 15/20 = 140.00 x 0.15 x 0.20


Ʃ = 4.20 m3 4.20 m3

Kolom ( Foot Plat ) K1 (45 x 45) V1 = 0.45 x 0.45 x 2.00


= 0.41 x 4.00 Bh
= 1.62 m3 1.62 m3

Pas. Kolom 45 x 45 ( K1 )
Û Lantai 1 P = 0.45 x 0.45 x 4.00 x 6 Bh
= 4.86 m3 4.86 m3

Kolom ( Foot Plat ) K2 (40 x 40) V2 = 0.40 x 0.40 x 2.00


= 0.32 x 14.00 Bh
= 4.48 m3 4.48 m3
Keterangan Perhitungan Volume

Pas. Kolom 40 x 40 ( K2 )
Û Lantai 1 P = 0.40 x 0.40 x 4.00 x 14 Bh
= 8.96 m3 8.96 m3

Kolom ( Foot Plat ) K3 (30 x 30) V1 = 0.30 x 0.30 x 2.00


= 0.18 x 47.00 Bh
= 8.46 m3 8.46 m3

Pasang Pondasi Strous Ø 30 P = 2 Bh


V = 3.14 x 0.15 x 0.15 x 121.00
= 8.55 x 2 Bh
= 17.10 m3 17.10 m3

Pas. Kolom 30 x 30 ( K3 )
Û Lantai 1 P = 0.30 x 0.30 x 4.00 x 33 Bh
= 11.88 m3 11.88 m3

Pas. Kolom 15 x 15 ( K5 )
Û Lantai 1 P = 0.15 x 0.15 x 4.00 x 88 Bh
= 7.92 m3 7.92 m3

Pas . Balok
Lantai 1
Û Balok (B1) 30 x 65 P = 0.30 x 0.65 x 87.5 m1
= 17.06 m3 17.06 m3

Balok (B2) 25 x 45 P = 0.25 x 0.45 x 115.00 m1


= 12.94 m3 12.94 m3

Balok (B3) 20 x 40 P = 0.20 x 0.4 x 16.00 m1


= 1.28 m3 1.28 m3

Balok (B4) 20 x 35 P = 0.20 x 0.35 x 42.50 m1


= 2.97 m3 2.97 m3

Plat Canopi
Û Canopi Lantai 1 t : 5 cm = 1.50 x 0.40 x 0.05 x 9 Bh
= 1.40 x 0.40 x 0.05 x 1 Bh
= 3.15 x 0.40 x 0.05 x 2 Bh
= 2.30 x 0.40 x 0.05 x 1 Bh
= 2.55 x 0.40 x 0.05 x 1 Bh
= 1.90 x 0.40 x 0.05 x 1 Bh

= 0.27 + 0.03 + 0.126 + 0.046


= 0.05 + 0.04
S = 0.56 m3 0.56 m3

Û Plat Lantai 1 (atas basement) t =12 cm


V = 393.53 x 0.12
= 47.22 m3 47.22 m3

Û Plat Tangga t : 12cm V1 = 8.76 x 1.45 x 0.12


= 1.52 m3 1.52 m3

Û Bordes t : 12 cm V1 = 1.45 x 1.45 x 0.12


= 0.25 m3 0.25 m3

Pas . Tangga beton


Û Pas . Anak Tangga T1 = 0.50 x 0.30 x 0.15 x 1.45
= 0.03 m²
S Pas . Anak Tangga
= 0.03 x 25.00 Bh
= 0.82 m3 0.82 m3

Û Balok Tangga 20 / 40 P = 5.00 m'


V = 5.00 x 0.20 x 0.40
= 0.40 m3 0.40 m3

Û Kolom tangga 15 / 15 P = 1.95 m'


V = 1.95 x 0.15 x 0.15
= 0.04 m3 0.04 m3

LANTAI - 2
Keterangan Perhitungan Volume

Û Lantai 2 P = 0.45 x 0.45 x 4.00 x 12.00 Bh


= 9.72 m3
Total = 14.58 m3 14.58 m3

Û Lantai 2 P = 0.40 x 0.40 x 4.00 x 13.00 Bh


= 8.32 m3
Total = 17.28 m3 17.28 m3

Pas. Kolom 20 x 30 ( K4 )
Û Lantai 2 P = 0.20 x 0.30 x 4.00 x 3.00 Bh
= 0.72 m3 0.72 m3

Lantai 2
Û Balok (B1) 30 x 65 P = 0.30 x 0.65 x 103 m1
= 20.09 m3 20.09 m3

Û Balok (B2) 25 x 45 P = 0.25 x 0.45 x 154.80 m1


= 17.42 m3 17.42 m3

Û Balok (B3) 20 x 40 P = 0.20 x 0.4 x 164.00 m1


= 13.12 m3 13.12 m3

Û Balok (B4) 20 x 35 P = 0.20 x 0.35 x 156.00 m1


= 10.92 m3 10.92 m3

Û Balok (B5) 20 x 30 P = 0.20 x 0.3 x 51.00 m1


= 3.06 m3 3.06 m3

Û Balok latei 15 x 20 P = 0.15 x 0.2 x 143.37 m1


= 4.30 m3 4.30 m3

Û Plat Lantai 2 t =15 cm


V = 673.65 x 0.12
= 80.84 - 27.87
= 52.97 m3 52.97 m3

Û Plat Atap t =12 cm V = 79.04 x 0.12


= 9.48 - 0.532
= 5.05 m3 5.05 m3
ATAP
Û Ring Balok (B3) 20 x 40 PV = 119.00 m'
V = 119.00 x 0.20 x 0.40
= 9.52 m3 9.52 m3

Û Ring Balok (B5) 20 x 30 PV = 97.00 m'


V = 97.00 x 0.20 x 0.30
= 5.82 m3 5.82 m3

C. PEKERJAAN ARSITEKTUR
1 PEKERJAAN DINDING
LANTAI - 1
Pas. Dinding 1/2 bata 1 Pc : 5 Ps
Û Ruangan Lantai 1
Lantai 1

L1 = 469.68 x 3.60 = 1690.848 m²


Lubang Kusen
Pintu PG 1 P = 1.80 x 2.15 x 2.00 = 7.74 m²
Pintu PG 2 P = 0.60 x 2.15 x 2.00 = 2.58 m²
Pintu PG 3 P = 1.50 x 2.15 x 7.00 = 22.57 m²
Pintu PG 4 P = 0.80 x 2.15 x 1.00 = 1.72 m²
Pintu P1 P = 0.60 x 2.15 x 5.00 = 6.45 m²
Pintu P2 P = 1.20 x 2.15 x 1.00 = 2.58 m²
Pintu P3 P = 0.80 x 2.15 x 14.00 = 24.08 m²
Pintu P4 P = 0.60 x 2.15 x 17.00 = 21.93 m²
Pintu PK P = 0.80 x 2.15 x 1.00 = 1.72 m²
Pintu PJ 1 P = 0.88 x 2.15 x 2.00 = 3.78 m²
= 0.66 x 1.55 x 2.00 = 2.05 m²
J1 L = 1.90 x 3.45 x 1.00 = 6.56 m²
J2 L = 1.60 x 3.69 x 2.00 = 11.81 m²
J3 L = 2.74 x 3.10 x 1.00 = 8.49 m²
J4 L = 3.80 x 6.25 x 1.00 = 23.75 m²
J 4.1 L = 3.40 x 6.25 x 1.00 = 21.25 m²
J5 L = 1.34 x 1.47 x 26.00 = 51.21 m²
J6 L = 2.08 x 1.47 x 4.00 = 12.23 m²
Keterangan Perhitungan Volume

J7 L = 0.71 x 1.47 x 1.00 = 1.04 m²


BV L = 0.68 x 0.40 x 1.00 = 0.27 m²
J 17 L = 2.30 x 1.47 x 1.00 = 3.38 m²
237.20 m²

S Ruangan Lantai 1
= L. dinding - L. Lubang Kusen
= 1690.85 - 237.20 m²
= 1453.64 m2 1453.64 m2

Pas. Trasram 1/2 bata 1 Pc : 3 Ps t : 30 cm


Ruangan ( t : 0,3 cm )
Û Lantai 1
L1 = 469.68 - 31.4
= 438.28 x 0.4 dikurangi kolom
= 175.312 m²
Lubang Kusen
Pintu PG 1 P = 1.80 x 0.4 x 2 = 1.44 m²
Pintu PG 2 P = 0.60 x 0.4 x 2 = 0.48 m²
Pintu PG 3 P = 1.50 x 0.4 x 7 = 4.2 m²
Pintu PG 4 P = 0.80 x 0.4 x 1 = 0.32 m²
Pintu P1 P = 0.60 x 0.4 x 5 = 1.2 m²
Pintu P2 P = 1.20 x 0.4 x 1 = 0.48 m²
Pintu P3 P = 0.80 x 0.4 x 14 = 4.48 m²
Pintu P4 P = 0.60 x 0.4 x 17 = 4.08 m²
Pintu PK P = 0.80 x 0.4 x 1 = 0.32 m²
Pintu PJ 1 P = 0.80 x 0.4 x 2 = 0.64 m²
17.64 m²
S Pas. Trasram 1/2 bata 1 Pc : 3 Ps t : 30 cm
= 175.312 - 17.64 m²
= 157.672 m2 157.672 m²

Pas. Plester 1Pc : 6 Ps


Û Lantai 1 L = Luas Pas. Dinding x 2
= 1453.64 x 2
= 2907.29 m2
S Pas. Plesteran 1 Pc : 6 Ps
= 2907.29 m2 2907.29 m2
Pas. Plester 1Pc : 3 Ps
Û Lantai 1 t : 30 cm L = Luas Trasram x 2
= 157.67 x 2 - 1.75
= 313.59 m2 313.59 m2

Pas. Benangan Sudut


Û Lantai 1
Vertikal Kolom P = 6.00 x 4 x 3.7 = 88.80 m²
Sudut P = 15.00 x 4 = 60.00 m²
Canopi P = 15.50 = 15.50 m²
Jendela P = 135.76 = 135.76 m²
S Pas. Benangan Sudut
= 300.06 m² 300.06 m'

LANTAI - 2
Pas. Dinding 1/2 bata 1 Pc : 5 Ps
Û Ruangan Lantai 2
Lantai 2

L2 = 126.50 - 9.45
= 115.30 x 3.60
= 415.08 m2

Gewel B L = 0.50 x 1.40


= 0.70 x 35.00 =
= 24.50 x 2.00 = 49.00 m²
Gewel C L = 0.50 x 2.50
= 1.25 x 16.50
= 20.63 x 2.00 = 41.25 m²

Pas . Bata Atap Atas P = 32.80 x 2.50 = 82.00 m²


= 32.80 x 0.50 = 16.40 m²
P = 19.50 x 1.40 = 27.30 m²
= 19.50 x 0.50 = 9.75 m²
640.78 m²

Lubang Kusen
Keterangan Perhitungan Volume

Pintu PG 4 P = 1.58 x 2.55 x 1.00 = 4.03 m²


Pintu PG 5 P = 1.58 x 2.55 x 1.00 = 4.03 m²
Pintu P1 P = 1.58 x 2.55 x 4.00 = 16.12 m²
Pintu P3 P = 0.88 x 2.55 x 2.00 = 4.49 m²
Pintu P4 P = 0.68 x 2.07 x 5.00 = 7.04 m²
Pintu PJG 1 P = 0.88 x 2.55 x 12.00 = 26.93 m²
= 1.28 x 1.30 12.00 = 19.97 m²
J8 P = 0.71 x 1.47 x 21.00 = 21.92 m²
J9 P = 1.34 x 1.47 x 6.00 = 11.82 m²
J 10 P = 2.75 x 2.60 x 1.00 = 7.15 m²
J 11 P = 4.00 x 2.60 x 1.00 = 10.40 m²
J 12 P = 4.00 x 2.60 x 1.00 = 10.40 m²
J 13 P = x x = 0.00 m²
J 14 P = 3.70 x 3.70 x 2.00 = 27.38 m²
J 15 P = 1.71 x 2.60 x 1.00 = 4.45 m²
J 16 P = 2.29 x 1.47 x 8.00 = 26.93 m²
BV P = 0.68 x 0.40 x 2.00 = 0.54 m²
r P = 0.30 x 0.30 x 1.00 = 0.09 m²
203.67 m²

S Ruangan Lantai 2
= L. dinding - L. Lubang Kusen
= 640.78 - 203.67 m²
= 437.11 m2 437.11 m2

Û Lantai 2 L = Luas Pas. Dinding x 2


= 437.11 x 2
= 874.21 m2
S Pas. Plesteran 1 Pc : 6 Ps
= 874.21 m2 874.21 m2

Lantai 2
Vertikal Kolom P = 10.00 x 4 x 3.7 = 148.00 m'
Sudut P = 15.00 x 4 = 60.00 m'
Canopi P = 15.50 = 15.50 m'
Jendela P = 133.14 = m'
S Pas. Benangan Sudut
= 223.50 m' 223.50 m'
2 PEKERJAAN ATAP
Pas . Rangka Atap WF 200.100.5,5.8
Panjang kuda kuda (B) P = 90.75 m' = 90.75 m'
Panjang kuda kuda (C) P = 86.25 m' = 86.25 m'
Panjang kolom kuda kuda (B) P = 10.25 m' = 10.25 m'
Panjang kolom kuda kuda (C) P = 15.75 m' = 15.75 m'
203.00 m'

= 203.00 / 12.00 m'


= 16.92 x 256.00 kg
= 4330.67 kg 4330.67 kg

2. Pas. Gording CNP 150.65.20.3,2


Panjang gording (B) P = 441.00 m' = 441.00 m'
Panjang gording (C) P = 420.00 m' = 420.00 m'
861.00 m'

= 861.00 / 6.00 m'


= 143.50 x 40.60 kg
= 5826.10 kg 5826.10 kg

3. Pas. Base plat t : 12 mm


P = 0.25 m'
L = 0.25 m'
S = 20.00 bh
= 0.25 x 0.25 x 7850
= 490.63 x 0.012
= 5.89 x 20.00 bh
= 117.75 kg 117.75 kg

4. Pas. Angker baut Ø 16 (pjg 40 mm) V = 4.00 per base plate


S = 20.00 bh
= 80.00 bh 80.00 bh

5. Pas. Baut 16 x 8 cm
Panjang kuda kuda (B) S = 60.00 bh = 60.00 bh
Panjang kuda kuda (C) S = 60.00 bh = 60.00 bh
Keterangan Perhitungan Volume

120.00 bh 120.00 bh

6. Pas. Dudukan gording plat T : 6 mm


+ (baut 2 Ø 10) S = 210.00 bh = 210.00 bh
S = 200.00 bh = 200.00 bh
410.00 bh 410.00 bh

7. Pas. Penggantung gording Ø 10 S = 90.00 m'


= 90.00 / 12.00 m'
= 7.50 x 7.40 kg
= 55.50 kg 55.50 kg

8. Pas. Ikatan angin Ø 12 S = 291.20 m'


= 291.20 / 12.00 m'
= 24.27 x 0.88 kg
= 21.35 kg 21.35 kg

9. Pas. Jarum keras Ø 12 S = 8.00 x 4.00 bh


= 32.00 bh 32.00 bh
10. Pas. Plat steffiener t : 8 mm

Kuda kuda (B) S = 7.20 m' = 7.20 m'


Kuda kuda (C) S = 7.20 m' = 7.20 m'
14.40 m' 14.40 m'

= 14.40 x 0.20 lebar


= 2.88 / 6.00 m'
= 0.48 x 73.20 kg
= 35.14 kg 35.14 kg

11. Pas. Lisplank kalsiplank 1/30 P = 31.00 m' 31.00 m'

12. Pas. Atap bitumen sheet


Atap (B) P = 21.00 x 18.15 = 381.15 m²
Atap (C) P = 21.00 x 17.25 = 362.25 m²
743.40 m² 743.40 m²
3 PEKERJAAN KUSEN, PINTU & JENDELA
LANTAI - 1
PK1 (Pintu Kupu Tarung) S = 2.00 unit 2.00 unit
P 1 (Pintu Kupu Tarung) S = 5.00 unit 5.00 unit
P 2 (Pintu Kupu Tarung) S = 1.00 unit 1.00 unit
P 3 (Pintu) S = 13.00 unit 13.00 unit
P 4 (Pintu KM) S = 16.00 unit 16.00 unit
P B 1 (Pintu Besi) S = 1.00 unit 1.00 unit
P B 2 (Pintu Besi) S = 1.00 unit 1.00 unit
PG 1 (Pintu Geser) S = 2.00 unit 2.00 unit
PG 2 (Pintu Geser) S = 7.00 unit 7.00 unit
J 1 (Jendela Kaca Mati) S = 1.00 unit 1.00 unit
J 2 (Jendela 2 Daun) S = 2.00 unit 2.00 unit
J 3 ( Jendela 3 Daun) S = 1.00 unit 1.00 unit
J 4 ( Jendela 4 Daun) S = 1.00 unit 1.00 unit
J 4.1 ( Jendela 4 Daun Kaca Mati) S = 1.00 unit 1.00 unit
J 5 ( Jendela 2 Daun, Kaca Geser BV) S = 4.00 unit 4.00 unit
J 6 (Jendela Kaca Mati) S = 4.00 unit 4.00 unit
J 7 (Jendela Kaca Buka) S = 1.00 unit 1.00 unit
J 8 (Jendela 2 Daun) S = 10.00 unit 10.00 unit
J 9 (Jendela 1 Daun, Kaca Geser) S = 13.00 unit 13.00 unit
J 10 ( Jendela 4 daun) S = - unit - unit
J 11 (Jendela 4 Daun) S = - unit - unit
J 15( Jendela 2 Daun) S = - unit - unit
J 16 (Jendela 1 Daun) S = - unit - unit
J L (Jendela Kaca Mati Loket) S = 1.00 unit 1.00 unit
BV (Bouvenlist) S = 11.00 unit 11.00 unit
R 1 (Roster) S = - unit - unit
PJG 1 ( Pintu Jendela, Kaca Geser) S = - unit - unit
LANTAI - 2
P 4 (Pintu KM) S = 1.00 unit 1 unit
J 4 ( Jendela 4 Daun) S = 2.00 unit 2.00 unit
J 8 (Jendela 2 Daun) S = 16.00 unit 16 unit
J 10 ( Jendela 4 daun) S = 1.00 unit 1 unit
J 11 (Jendela 4 Daun) S = 1.00 unit 1.00 unit
J 15( Jendela 2 Daun) S = 1.00 unit 1 unit
BV (Bouvenlist) S = 4.00 unit 4.00 unit
R 1 (Roster) S = 3.00 unit 3 unit
Keterangan Perhitungan Volume

4 PEKERJAAN LANTAI
LANTAI - 1
1. Pas. Keramik lantai 40 x 40 polos
Lantai 1 R. Peracikan L = 2.40 x 4.50 = 10.80 m²
Gudang obat L = 4.50 x 7.00 = 31.50 m²
R. Tindakan L = 3.90 x 4.40 = 17.16 m²
R. Pemeriksaan L = 3.90 x 2.15 = 8.39 m²
R. Konseling L = 3.90 x 2.15 = 8.39 m²
R. Asi L = 2.65 x 3.40 = 9.01 m²
R. Kes anak dan imunisasi L = 3.65 x 3.40 = 12.41 m²
R. Gigi dan mulut L = 3.40 x 3.40 = 11.56 m²
R. P2 L = 2.90 x 2.90 = 8.41 m²
R. VCT L = 2.90 x 1.90 = 5.51 m²
R. Lab dan speciesmen L = 1.50 x 1.40 = 2.10 m²
L = 5.40 x 3.00 = 16.20 m²
R. Cuci linen L = 2.70 x 4.75 = 12.83 m²
L = 1.20 x 2.90 = 3.48 m²
R. Sterilisasi L = 3.90 x 2.95 = 11.51 m²
Musholla L = 3.00 x 4.00 = 12.00 m²
R. Jaga poned L = 5.40 x 2.90 = 15.66 m²
L = 3.50 x 1.50 = 5.25 m²
Keterangan Perhitungan Volume

R. Rawat inap anak L = 3.90 x 3.90 = 15.21 m²


R. Rawat inap anak L = 3.90 x 3.90 = 15.21 m²
R. Tunggu L = 4.00 x 2.40 = 9.60 m²
R. Tunggu L = 11.90 x 4.90 = 58.31 m²
R. Tengah L = 9.90 x 7.90 = 78.21 m²
L = 3.40 x 1.40 = 4.76 m²
L = 10.40 x 7.40 = 76.96 m²
L = 7.20 x 1.75 = 12.60 m²
L = 1.90 x 4.90 = 9.31 m²
R. Kes ibu dan KB L = 9.40 x 3.90 = 36.66 m²
R. Rawat inap wanita L = 7.40 x 3.90 = 28.86 m²
R. Jaga L = 4.40 x 2.90 = 12.76 m²
R. Rawat inap pria L = 3.90 x 6.90 = 26.91 m²
R. Rekam medis L = 7.90 x 3.90 = 30.81 m²
R. Persalinan L = 3.40 x 7.40 = 25.16 m²
L = 1.50 x 5.40 = 8.10 m²
L = 4.50 x 1.90 = 8.55 m²
R. Pasca persalinan L = 1.50 x 5.40 = 8.10 m²
L = 4.00 x 7.40 = 29.60 m²
Lorong L = 1.90 x 26.95 = 51.21 m²
L = 4.10 x 1.90 = 7.79 m²
L = 2.00 x 3.90 = 7.80 m²
R. Observasi L = 7.40 x 11.90 = 88.06 m²
852.69 m² 852.69 m²

2. Pas. Keramik lantai 40 x 40 kasar


Anak tangga L = 1.45 x 0.30
= 0.44 x 25.00 Anak tangga
= 10.88 m²
Bordes L = 1.45 x 1.45
= 2.10 m²
S = 12.98 m² 12.98 m²

Pas. Step nossing 8/40 L = 1.45 x 25.00 Anak tangga


= 36.25 m' 36.25 m'

Pas. Keramik lantai 25 x 25 motif kasar


Kamar mandi lantai 1
R. Kamar mandi 1 L = 1.90 x 1.90 = 3.61 m²
L = 1.90 x 1.90 = 3.61 m²
L = 1.90 x 1.90 = 3.61 m²
R. Kamar mandi 2 L = 1.50 x 1.90 = 2.85 m²
R. Kamar mandi 3 L = 1.40 x 1.90 = 2.66 m²
R. Kamar mandi 4 L = 1.40 x 1.90 = 2.66 m²
R. Kamar mandi 5 L = 1.40 x 1.90 = 2.66 m²
L = 1.40 x 1.90 = 2.66 m²
L = 1.40 x 1.90 = 2.66 m²
R. Kamar mandi 6 L = 1.40 x 1.40 = 1.96 m²
R. Kamar mandi 7 L = 1.30 x 1.55 = 2.02 m²
L = 1.30 x 1.55 = 2.02 m²
R. Kamar mandi 8 L = 1.40 x 1.40 = 1.96 m²
R. Kamar mandi 9 L = 1.40 x 1.90 = 2.66 m²
L = 1.40 x 1.90 = 2.66 m²
40.25 m² 40.25 m²

3. Pas. Keramik dinding 25 x 40 motif


Kamar mandi lantai 1
R. Kamar mandi 1 L = 1.90 + 1.90 x 1.50 x 2.00 = 11.40 m²
L = 1.90 + 1.90 x 1.50 x 2.00 = 11.40 m²
L = 1.90 + 1.90 x 1.50 x 2.00 = 11.40 m²
R. Kamar mandi 2 L = 1.50 + 1.90 x 1.50 x 2.00 = 10.20 m²
R. Kamar mandi 3 L = 1.40 + 1.90 x 1.50 x 2.00 = 9.90 m²
R. Kamar mandi 4 L = 1.40 + 1.90 x 1.50 x 2.00 = 9.90 m²
R. Kamar mandi 5 L = 1.40 + 1.90 x 1.50 x 2.00 = 9.90 m²
L = 1.40 + 1.90 x 1.50 x 2.00 = 9.90 m²
L = 1.40 + 1.90 x 1.50 x 2.00 = 9.90 m²
R. Kamar mandi 6 L = 1.40 + 1.40 x 1.50 x 2.00 = 8.40 m²
R. Kamar mandi 7 L = 1.30 + 1.55 x 1.50 x 2.00 = 8.55 m²
L = 1.30 + 1.55 x 1.50 x 2.00 = 8.55 m²
R. Kamar mandi 8 L = 1.40 + 1.40 x 1.50 x 2.00 = 8.40 m²
R. Kamar mandi 9 L = 1.40 + 1.90 x 1.50 x 2.00 = 9.90 m²
L = 1.40 + 1.90 x 1.50 x 2.00 = 9.90 m²
147.60 m²
Dikurangi kusen pintu L = 1.50 x 0.68 x 10.00
= 10.20 m²
Keterangan Perhitungan Volume

S = 147.60 - 10.20 luas kusen


= 137.40 m² 137.40 m²

LANTAI - 2
R. 1 L = 4.95 x 10.95 = 54.20 m²
R. 2 L = 3.00 x 1.35 = 4.05 m²
R. 3 L = 11.95 x 3.45 = 41.23 m²
R. 4 L = 3.95 x 9.50 = 37.53 m²
R. 5 L = 5.95 x 17.45 = 103.83 m²
R. 6 L = 7.00 x 5.45 = 38.15 m²
R. 7 L = 4.95 x 6.95 = 34.40 m²
R. 8 L = 4.95 x 7.45 = 36.88 m²
R. 9 L = 4.95 x 4.90 = 24.26 m²
R. 10 L = 4.95 x 4.90 = 24.26 m²
R. 11 L = 2.95 x 5.45 = 16.08 m²
R. 12 L = 9.95 x 29.00 = 288.55 m²
R. 13 L = 2.00 x 9.50 = 19.00 m²
R. 14 L = 6.00 x 7.45 = 44.70 m²
R. 15 L = 4.00 x 1.40 = 5.60 m²
R. 16 L = 10.95 x 10.90 = 119.35 m²
892.06 m²
Pengurangan Area Barat = 387.50 m2

L = 892.06 - 387.50 = 504.55 m2 504.55 m2

Kamar mandi lantai 2


R. Kamar mandi 1 L = 1.90 x 1.90 = m²
L = 1.90 x 1.90 = m²
R. Kamar mandi 2 L = 1.90 x 1.40 = 2.66 m²
R. Kamar mandi 3 L = 1.15 x 1.90 = m²
L = 1.15 x 1.90 = m²
2.66 m² 2.66 m²

Kamar mandi lantai 2


R. Kamar mandi 1 L = 1.90 + 1.90 x 1.50 x 2.00 = m²
L = 1.90 + 1.90 x 1.50 x 2.00 = m²
R. Kamar mandi 2 L = 1.90 + 1.40 x 1.50 x 2.00 = 9.90 m²
R. Kamar mandi 3 L = 1.15 + 1.90 x 1.50 x 2.00 = m²
L = 1.15 + 1.90 x 1.50 x 2.00 = m²
9.90 m²

Dikurangi kusen pintu L = 1.50 x 0.68 x 1.00


= 1.02 m²
S = 9.90 - 1.02 luas kusen
= 8.88 m² 8.88 m²
5. PEKERJAAN RAILLING TANGGA
1. Û Pas. Railling tangga
Tangga P = 4.30 x 1.00
= 4.30 x 2.00 bagian
= 8.60 m2
P = 6.60 x 1.00
= 6.60 m2
P = 2.00 x 1.00
= 2.00 m2
S = 17.20 m2 17.20 m2

6. PEKERJAAN PLAFOND
LANTAI - 1
1. Pas. Plafond gypsum
R. Peracikan L = 2.40 x 4.50 = 10.80 m²
Gudang obat L = 4.50 x 7.00 = 31.50 m²
R. Tindakan L = 3.90 x 4.40 = 17.16 m²
R. Pemeriksaan L = 3.90 x 2.15 = 8.39 m²
R. Konseling L = 3.90 x 2.15 = 8.39 m²
R. Asi L = 2.65 x 3.40 = 9.01 m²
R. Kes anak dan imunisasi L = 3.65 x 3.40 = 12.41 m²
R. Gigi dan mulut L = 3.40 x 3.40 = 11.56 m²
R. P2 L = 2.90 x 2.90 = 8.41 m²
R. VCT L = 2.90 x 1.90 = 5.51 m²
R. Lab dan speciesmen L = 1.50 x 1.40 = 2.10 m²
L = 5.40 x 3.00 = 16.20 m²
R. Cuci linen L = 2.70 x 4.75 = 12.83 m²
L = 1.20 x 2.90 = 3.48 m²
Keterangan Perhitungan Volume

R. Sterilisasi L = 3.90 x 2.95 = 11.51 m²


Musholla L = 3.00 x 4.00 = 12.00 m²
R. Jaga poned L = 5.40 x 2.90 = 15.66 m²
L = 3.50 x 1.50 = 5.25 m²
R. Rawat inap anak L = 3.90 x 3.90 = 15.21 m²
R. Rawat inap anak L = 3.90 x 3.90 = 15.21 m²
R. Tunggu L = 4.00 x 2.40 = 9.60 m²
R. Tunggu L = 11.90 x 4.90 = 58.31 m²
R. Tengah L = 9.90 x 7.90 = 78.21 m²
L = 3.40 x 1.40 = 4.76 m²
L = 10.40 x 7.40 = 76.96 m²
R. Rawat inap wanita L = 7.40 x 3.90 = 28.86 m²
R. Jaga L = 4.40 x 2.90 = 12.76 m²
R. Rawat inap pria L = 3.90 x 6.90 = 26.91 m²
R. Rekam medis L = 7.90 x 3.90 = 30.81 m²
R. Persalinan L = 3.40 x 7.40 = 25.16 m²
L = 1.50 x 5.40 = 8.10 m²
L = 4.50 x 1.90 = 8.55 m²
R. Pasca persalinan L = 1.50 x 5.40 = 8.10 m²
L = 4.00 x 7.40 = 29.60 m²
Lorong L = 1.90 x 26.95 = 51.21 m²
L = 4.10 x 1.90 = 7.79 m²
L = 2.00 x 3.90 = 7.80 m²
R. Observasi L = 7.40 x 11.90 = 88.06 m²
794.12 m² 794.12 m²

Pas. Plafond gypsum


Kamar mandi lantai 1
R. Kamar mandi 1 L = 1.90 x 1.90 = 3.61 m²
L = 1.90 x 1.90 = 3.61 m²
L = 1.90 x 1.90 = 3.61 m²
R. Kamar mandi 2 L = 1.50 x 1.90 = 2.85 m²
R. Kamar mandi 3 L = 1.40 x 1.90 = 2.66 m²
R. Kamar mandi 4 L = 1.40 x 1.90 = 2.66 m²
R. Kamar mandi 5 L = 1.40 x 1.90 = 2.66 m²
L = 1.40 x 1.90 = 2.66 m²
L = 1.40 x 1.90 = 2.66 m²
R. Kamar mandi 6 L = 1.40 x 1.40 = 1.96 m²
R. Kamar mandi 7 L = 1.30 x 1.55 = 2.02 m²
L = 1.30 x 1.55 = 2.02 m²
R. Kamar mandi 8 L = 1.40 x 1.40 = 1.96 m²
R. Kamar mandi 9 L = 1.40 x 1.90 = 2.66 m²
L = 1.40 x 1.90 = 2.66 m²
40.25 m² 40.25 m²
Pas. List plafond gypsum
R. Peracikan L = 2.40 + 4.50 x 2.00 = 13.80 m'
Gudang obat L = 4.50 + 7.00 x 2.00 = 23.00 m'
R. Tindakan L = 3.90 + 4.40 x 2.00 = 16.60 m'
R. Pemeriksaan L = 3.90 + 2.15 x 2.00 = 12.10 m'
R. Konseling L = 3.90 + 2.15 x 2.00 = 12.10 m'
R. Asi L = 2.65 + 3.40 x 2.00 = 12.10 m'
R. Kes anak dan imunisasi L = 3.65 + 3.40 x 2.00 = 14.10 m'
R. Gigi dan mulut L = 3.40 + 3.40 x 2.00 = 13.60 m'
R. P2 L = 2.90 + 2.90 x 2.00 = 11.60 m'
R. VCT L = 2.90 + 1.90 x 2.00 = 9.60 m'
R. Lab dan speciesmen L = 1.50 + 1.40 x 2.00 = 5.80 m'
L = 5.40 + 3.00 x 2.00 = 16.80 m'
R. Cuci linen L = 2.70 + 4.75 x 2.00 = 14.90 m'
L = 1.20 + 2.90 x 2.00 = 8.20 m'
R. Sterilisasi L = 3.90 + 2.95 x 2.00 = 13.70 m'
Musholla L = 3.00 + 4.00 x 2.00 = 14.00 m'
R. Jaga poned L = 5.40 + 2.90 x 2.00 = 16.60 m'
L = 3.50 + 1.50 x 2.00 = 10.00 m'
R. Rawat inap anak L = 3.90 + 3.90 x 2.00 = 15.60 m'
R. Rawat inap anak L = 3.90 + 3.90 x 2.00 = 15.60 m'
R. Tunggu L = 4.00 + 2.40 x 2.00 = 12.80 m'
R. Tunggu L = 11.90 + 4.90 x 2.00 = 33.60 m'
R. Tengah L = 9.90 + 7.90 x 2.00 = 35.60 m'
L = 3.40 + 1.40 x 2.00 = 9.60 m'
L = 10.40 + 7.40 x 2.00 = 35.60 m'
L = 7.20 + 1.75 x 2.00 = 17.90 m'
L = 1.90 + 4.90 x 2.00 = 13.60 m'
R. Kes ibu dan KB L = 9.40 + 3.90 x 2.00 = 26.60 m'
R. Rawat inap wanita L = 7.40 + 3.90 x 2.00 = 22.60 m'
R. Jaga L = 4.40 + 2.90 x 2.00 = 14.60 m'
Keterangan Perhitungan Volume

R. Rawat inap pria L = 3.90 + 6.90 x 2.00 = 21.60 m'


R. Rekam medis L = 7.90 + 3.90 x 2.00 = 23.60 m'
R. Persalinan L = 3.40 + 7.40 x 2.00 = 21.60 m'
L = 1.50 + 5.40 x 2.00 = 13.80 m'
L = 4.50 + 1.90 x 2.00 = 12.80 m'
R. Pasca persalinan L = 1.50 + 5.40 x 2.00 = 13.80 m'
L = 4.00 + 7.40 x 2.00 = 22.80 m'
Lorong L = 1.90 + 26.95 x 2.00 = 57.70 m'
L = 4.10 + 1.90 x 2.00 = 12.00 m'
L = 2.00 + 3.90 x 2.00 = 11.80 m'
R. Observasi L = 7.40 + 11.90 x 2.00 = 38.60 m'
742.40 m' 742.40 m'
Kamar mandi lantai 1
R. Kamar mandi 1 L = 1.90 + 1.90 x 2.00 = 7.60 m'
L = 1.90 + 1.90 x 2.00 = 7.60 m'
L = 1.90 + 1.90 x 2.00 = 7.60 m'
R. Kamar mandi 2 L = 1.50 + 1.90 x 2.00 = 6.80 m'
R. Kamar mandi 3 L = 1.40 + 1.90 x 2.00 = 6.60 m'
R. Kamar mandi 4 L = 1.40 + 1.90 x 2.00 = 6.60 m'
R. Kamar mandi 5 L = 1.40 + 1.90 x 2.00 = 6.60 m'
L = 1.40 + 1.90 x 2.00 = 6.60 m'
L = 1.40 + 1.90 x 2.00 = 6.60 m'
R. Kamar mandi 6 L = 1.40 + 1.40 x 2.00 = 5.60 m'
R. Kamar mandi 7 L = 1.30 + 1.55 x 2.00 = 5.70 m'
L = 1.30 + 1.55 x 2.00 = 5.70 m'
R. Kamar mandi 8 L = 1.40 + 1.40 x 2.00 = 5.60 m'
R. Kamar mandi 9 L = 1.40 + 1.90 x 2.00 = 6.60 m'
L = 1.40 + 1.90 x 2.00 = 6.60 m'
98.40 m' 98.40 m'
LANTAI - 2
Pas. Plafond gypsum
R. 1 L = 4.95 x 10.95 = 54.20 m²
R. 2 L = 3.00 x 1.35 = 4.05 m²
R. 3 L = 11.95 x 3.45 = 41.23 m²
R. 4 L = 3.95 x 9.50 = 37.53 m²
R. 5 L = 5.95 x 17.45 = 103.83 m²
R. 6 L = 7.00 x 5.45 = 38.15 m²
R. 7 L = 4.95 x 6.95 = 34.40 m²
R. 8 L = 4.95 x 7.45 = 36.88 m²
R. 9 L = 4.95 x 4.90 = 24.26 m²
R. 10 L = 4.95 x 4.90 = 24.26 m²
R. 11 L = 2.95 x 5.45 = 16.08 m²
R. 12 L = 9.95 x 29.00 = 288.55 m²
R. 13 L = 2.00 x 9.50 = 19.00 m²
R. 14 L = 6.00 x 7.45 = 44.70 m²
R. 15 L = 4.00 x 1.40 = 5.60 m²
R. 16 L = 10.95 x 10.90 = 119.35 m²
892.06 m² 892.06 m²

Kamar mandi lantai 2


R. Kamar mandi 1 L = 1.90 x 1.90 = 3.61 m²
L = 1.90 x 1.90 = 3.61 m²
R. Kamar mandi 2 L = 1.90 x 1.40 = 2.66 m²
R. Kamar mandi 3 L = 1.15 x 1.90 = 2.18 m²
L = 1.15 x 1.90 = 2.18 m²
14.25 m² 14.25 m²

List plafond gypsum


Lantai 2 R. 1 L = 4.95 + 10.95 x 2.00 = 31.80 m'
R. 2 L = 3.00 + 1.35 x 2.00 = 8.70 m'
R. 3 L = 11.95 + 3.45 x 2.00 = 30.80 m'
R. 4 L = 3.95 + 9.50 x 2.00 = 26.90 m'
R. 5 L = 5.95 + 17.45 x 2.00 = 46.80 m'
R. 6 L = 7.00 + 5.45 x 2.00 = 24.90 m'
R. 7 L = 4.95 + 6.95 x 2.00 = 23.80 m'
R. 8 L = 4.95 + 7.45 x 2.00 = 24.80 m'
R. 9 L = 4.95 + 4.90 x 2.00 = 19.70 m'
R. 10 L = 4.95 + 4.90 x 2.00 = 19.70 m'
R. 11 L = 2.95 + 5.45 x 2.00 = 16.80 m'
R. 12 L = 9.95 + 29.00 x 2.00 = 77.90 m'
R. 13 L = 2.00 + 9.50 x 2.00 = 23.00 m'
R. 14 L = 6.00 + 7.45 x 2.00 = 26.90 m'
R. 15 L = 4.00 + 1.40 x 2.00 = 10.80 m'
R. 16 L = 10.95 + 10.90 x 2.00 = 43.70 m'
457.00 m' 457.00 m'
Keterangan Perhitungan Volume

Kamar mandi lantai 2


R. Kamar mandi 1 L = 1.90 + 1.90 x 2.00 = 7.60 m'
L = 1.90 + 1.90 x 2.00 = 7.60 m'
R. Kamar mandi 2 L = 1.90 + 1.40 x 2.00 = 6.60 m'
R. Kamar mandi 3 L = 1.15 + 1.90 x 2.00 = 6.10 m'
L = 1.15 + 1.90 x 2.00 = 6.10 m'
34.00 m' 34.00 m'

7. PEKERJAAN PENGECATAN
1 Pengecatan Dinding
Lantai 1 L = Plester dinding
= 2907.29 m2
= 2907.29 m2 2907.29 m2
Keterangan Perhitungan Volume

Lantai 2 L = Plester dinding


= 874.21 m2
= 874.21 m2 874.21 m2

Pengecatan Plafond L = Plafond


Lantai 1 = 834.37 m2
= 834.37 m2 834.37 m2

Lantai 2 L = Plafond
= 906.31 m2
= 906.31 m2 906.31 m2

8. PEKERJAAN FASADE
1 Pekerjaan Pasang ACP L1 = 12.25 x 11.85
+ rangka hollow 4x4x1 mm = 145.16 m2

L2 = 21.55 x 4.8
= 103.44 m2

L3 = 2.55 x 1.46
= 3.72 m2

L4 = 3.05 x 2.6
= 7.93 m2
S = 260.26 m2 260.26 m2

2 Pasang Nama Logo & tulisan Puskesmas Acrilic Mirror


L = 19.00 bh 19.00 bh

3 Pas. Batu Alam = 6.75 x 2.10 = 14.18 m²


= 1.75 x 5.60 = 9.80 m²
23.98 m² 23.98 m²

D. PEKERJAAN MEKANICAL ELEKTRICAL


1. PEKERJAAN SANITAIR
Lantai - 1
1. Pas . Septitank + Resapan = 4.00 Ls 4.00 Ls
2. Closet duduk ex = 15.00 Bh 15.00 Bh
3. Pas . Jet Washer ex = 15.00 Bh 15.00 Bh
4. Washtafel ex = 20.00 unit 20.00 unit
5. Kran air = 21.00 Bh 21.00 Bh
6. Pas . Krain Air ( Wastafel ) = 25.00 Bh 25.00 Bh
7. Floor drain = 18.00 Bh 18.00 Bh
8. Pipa PVC 1 1/5 " = 80.00 m' 80.00 m'
9. Pipa PVC 4 " = 40.00 m' 40.00 m'
10. Pipa PVC 8 " ( Pipa Air Hujan ) = 85.00 m' 85.00 m'
11. Tandon Air Kapasitas 1100 L + Ascessories = 2.00 Bh 2.00 Bh
12. Pengeboran Sumur Kedalaman ± 50 m = 1.00 Ls 1.00 Ls
13. Pompa Air Hisap Dan Dorong + 10 m = 1.00 Bh 1.00 Bh

Lantai - 2
1. Closet duduk ex = 2.00 Bh 2.00 Bh
2. Pas . Jet Washer ex = 2.00 Bh 2.00 Bh
3. Washtafel ex = - unit 0.00 unit
4. Kran air = 2.00 Bh 2.00 Bh
5. Pas . Krain Air ( Wastafel ) = Bh 0.00 Bh
6. Floor drain = 2.00 Bh 2.00 Bh
7. Pipa PVC 1 1/5 " = 25.00 m' 25.00 m'
8. Pipa PVC 4 " = 55.00 m' 55.00 m'
9. Pipa PVC 8 " ( Pipa Air Hujan ) = 50.00 m' 50.00 m'

2. PEKERJAAN LISTRIK
LANTAI - 1
1. Panel Box = 2.00 bh 2.00 bh
2. Pas. Instalasi titik lampu = 140.00 ttk 140.00 ttk
3. Pas. Instalasi Stop Kontak = 115.00 ttk 115.00 ttk
4. Pas Lampu Downlight LED 12 W = 110.00 bh 110.00 bh
5. Pas Lampu LED 13 W = 15.00 bh 15.00 bh
6. Pas. Lampu LED 5 W = 15.00 bh 15.00 bh
7. Pas. Stop kontak "Broco" = 115.00 bh 115.00 bh
8. Pas. Stop kontak AC "Broco" = 24.00 bh 24.00 bh
9. Pas. Saklar Ganda "Broco" = 49.00 bh 49.00 bh
10. Pas. Saklar Tunggal "Broco" = 22.00 bh 22.00 bh
11. Pemindahan Listrik = 1.00 bh 1.00 bh
Keterangan Perhitungan Volume

LANTAI - 2
1. Pas. Instalasi titik lampu = 2.00 ttk 2.00 ttk
2. Pas. Instalasi Stop Kontak = 0.00 ttk 0.00 ttk
3. Pas Lampu Downlight LED 12 W = 0.00 bh 0.00 bh
4. Pas Lampu LED 13 W = 0.00 bh 0.00 bh
5. Pas. Lampu LED 5 W = 2.00 bh 2.00 bh
6. Pas. Stop kontak "Broco" = 0.00 bh 0.00 bh
7. Pas. Stop kontak AC "Broco" = 0.00 bh 0.00 bh
8. Pas. Saklar Ganda "Broco" = 1.00 bh 1.00 bh
9. Pas. Saklar Tunggal "Broco" = 0.00 bh 0.00 bh

AREA PARKIR
1. Pas. Instalasi titik lampu = 13.00 ttk 13.00 ttk
2. Pas Lampu LED 13 W = 13.00 bh 13.00 bh
3. Pas. Stop kontak "Broco" = 1.00 bh 1.00 bh
4. Pas. Saklar Ganda "Broco" = 2.00 bh 2.00 bh
5. Pas. Saklar Tunggal "Broco" = 2.00 bh 2.00 bh

E. PEKERJAAN PENDUKUNG
1. PEKERJAAN PASANG PAVING
Û Urug Pasir bawah Paving 5 cm L = 28.65 x 7.5
Paving Depan = 214.88 x 0.05
= 10.74 m3 10.74 m3

Û Pasangan Blok Beton


6/10/20 cm abu-abu K 300
Û Lantai 1 L = 28.65 x 7.5
= 214.88 m2 214.88 m2

2 PEKERJAAN DROP ZONE


I PEKERJAAN TANAH DAN PONDASI
Galian tanah
Û Pondasi Setempat V = 1.20 x 0.60 x 1.10
= 0.79 x 22 Bh
= 17.42 m3 17.42 m3

Û Urugan tanah kembali V = 0.25 x 17.42

= 4.36 m3 4.36 m3

II PEKERJAAN BETON
Lantai Kerja Pondasi Setempat t : 5 cm V = 1.20 x 0.60 x 0.05

= 0.04 x 22.00 bh

= 0.79 m3 0.79 m3

Pas . Foot Plat FP2 ( 120 x 60 x 50 ) V = 1.20 x 0.60 x 0.50

= 0.36 x 22.00 Bh

= 7.92 m3 7.92 m3

Pas. Kolom 30 x 30 ( K3 )
Û Lantai 1 V = 0.30 x 0.30 x 3.50 x 6.00 Bh
= 1.89 m3

V = 0.30 x 0.30 x 2.95 x 4.00 Bh


= 1.06 m3

V = 0.30 x 0.30 x 2.30 x 6.00 Bh


= 1.24 m3

V = 0.30 x 0.30 x 2.30 x 4.00 Bh


= 0.83 m3
S = 5.02 m3 5.02 m3

Pas. Balok
Û Balok (B1) 30 x 65 P = 0.30 x 0.65 x 38.73 m1
= 7.55 m3 7.55 m3

Û Balok (B2) 25 x 45 P = 0.25 x 0.45 x 41.44 m1


= 4.66 m3 4.66 m3
Keterangan Perhitungan Volume

Û Balok (B3) 20 x 40 P = 0.20 x 0.4 x 46.96 m1


= 3.76 m3 3.76 m3

Û Balok (B4) 20 x 35 P = 0.20 x 0.35 x 26.35 m1


= 1.84 m3 1.84 m3

Plat Beton
Û Plat drop zone t : 15 cm V1 = 9.40 x 5.9 x 0.15
= 8.32 m3
V2 = 6.62 + 4.48
= 11.10 / 2
= 5.55 x 5.59 x 0.15
= 4.65 m3
V3 = 4.72 x 5.07 x 0.15
= 3.59 m3
V4 = 4.10 + 7.14
= 11.24 / 2
= 5.62 x 9.13 x 0.15
= 7.70 m3
V5 = 12.90 x 5.3 x 0.15
= 10.26 m3
S = 34.51 - 5.50 dikurangi luas balok
= 29.02 m3 29.02 m3

III PEKERJAAN RAILLING TANGGA DROPZONE L = 8.67 x 1.00


= 8.67 m2 8.67 m2

3 PEKERJAAN TANGGA DARURAT


I PEKERJAAN TANAH DAN PONDASI
1. Galian tanah V = 1.00 x 1.00 x 1.00
= 1.00 x 4 ttk
= 4.00 m3 4.00 m3

2. Urugan tanah kembali V = 0.25 x 4.00


= 1.00 m3 1.00 m3

II PEKERJAAN BETON
1. Lantai Kerja Pondasi Setempat t : 5 cm V = 0.80 x 0.8 x 0.05
= 0.03 x 4.00
= 0.13 m3 0.13 m3

2. Pas . Foot Plat FP3 ( 80 x 80 x 25 ) V = 0.80 x 0.8 x 0.25


= 0.16 x 4 ttk
= 0.64 m3 0.64 m3

3. Kolom ( Foot Plat ) K3 (30 x 30) V = 0.30 x 0.3 x 1.25


= 0.11 x 4 ttk
= 0.45 m3 0.45 m3

III PEKERJAAN RANGKA BAJA


4. Pas . Rangka WF 150.75.5.8 P = 11.75
Kolom P = 11.65
= 23.40 / 12
= 1.95 x 14 kg
= 27.30 kg 27.30 kg

5. Pas . Rangka WF 100.50.5.7 P = 4.20 / 12 m'


= 0.35 x 9.33 kg
= 3.27 kg 3.27 kg
6. Pas . Plat bordes t : 2 mm
Anak tangga P = 1.20 m'
L = 0.30 m'
S = 19.00 bh
= 1.20 x 0.30 x 7850
= 2826.00 x 0.002
= 5.65 x 19.00 bh
= 107.39 kg 107.39 kg

Bordes L = 1.20 x 1.3 m'


= 1.56 x 7850
= 12246.00 x 0.002
= 24.49 kg
S = 107.39 + 24.49
Keterangan Perhitungan Volume

= 131.88 kg 131.88 kg

7. Pas. Besi siku 5x5x5 mm P = 3.00 x 20 bh


= 60.00 / 6 m'
= 10.00 x 3.78 kg
= 37.80 kg 37.80 kg

8. Pas. Baut Ø 12 S = 12.00 x 6 bh


= 72.00 bh 72.00 bh

9. Pas. Angker baut Ø 16 (pjg 40 mm) S = 6.00 x 4.00


= 24.00 bh 24.00 bh

4 PEKERJAAN DRAINASE
I PEKERJAAN TANAH DAN PONDASI
Galian tanah
Saluran drainase V = 103.12 x 0.55 x 0.55
= 31.19 m3 31.19 m3

Bak kontrol V = 0.70 x 0.70 x 0.80


= 0.39 x 10 bh
= 3.92 m3 3.92 m3

II PEKERJAAN PASANGAN & PLESTERAN


Pas. Dinding 1/2 bata 1 Pc : 5 Ps
Saluran drainase V = 103.12 x 0.5
= 51.56 x 3 sisi
= 154.68 m2 154.68 m2

Pas. Dinding 1/2 bata 1 Pc : 5 Ps


Bak kontrol V = 2.80 x 0.8
= 2.24 x 10 bh
= 22.40 m2 22.40 m2
Pas. Plester 1Pc : 6 Ps
Û L = Luas Pas. Dinding x 2
= 154.68 x 2
= 309.36 m2
S Pas. Plesteran 1 Pc : 6 Ps
= 309.36 m2 309.36 m2

Û L = Luas Pas. Dinding x 2


= 22.40 x 2
= 44.80 m2
S Pas. Plesteran 1 Pc : 6 Ps
= 44.80 m2 44.80 m2

Pas. Benangan Sudut


Û P = 103.12 x 2 sisi
= 206.24 m' 206.24 m'

Û Bak kontrol P = 0.80 x 4 sisi


= 3.20 m' 3.20 m'
III PEKERJAAN PENUTUP GRILL
Pas. Penutup saluran grill P = 24.00
Û = 120.00
S = 144.00 / 6
= 24.00 x 3.08
= 74.00 kg 74.00 kg

Û Bak kontrol P = 3.00


= 7.00
S = 10.00 / 6
= 1.67 x 3.08
= 5.14 kg 5.14 kg
IV PEKERJAAN PENGECATAN
Pengecatan penutup grill L = 144.00 x 0.2
= 28.80 m2 28.80 m2

5 PEKERJAAN PEMBUATAN KANOPI


Memasang kanopi rangka 4x8 dan 4x4 L1 = 4.00 x 5.00
Atap polycarbonat = 20.00 m2
L2 = 10.00 x 5.00
= 50.00 m2
S = 70.00 m2 70.00 m2
RENCANA ANGGARAN BIAYA

KEGIATAN : PEMBANGUNAN SEPTICTANK + RESAPAN


LOKASI : KECAMATAN PLOSO
TAHUN ANGGARAN : 2016

Harga Sat Sub Total


No Uraian Pekerjaan Volume Sat
Pekerjaan (Rp) (Rp)

I PEKERJAAN TANAH DAN PONDASI


1 Galian Tanah 25.23 m3 98,437.50 2,483,223.75
2 Urugan Pasir 0.04 m3 285,075.00 10,965.41
Sub total 2,494,189.16
II PEKERJAAN STRUKTUR BETON
1 Pas. Plat Beton t = 10 cm 0.42 m3 6,101,292.82 2,584,416.12
Sub total 2,584,416.12
III PEKERJAAN PASANGAN
1 Pas. Bata kosong 8.29 m2 192,442.00 1,595,267.20
Sub total 1,595,267.20
IV PEKERJAAN SANITASI
1. Pas. Pipa PVC 4" 4.00 m' 132,149.06 528,596.25
2. Pas. Pipa PVC 3" 5.00 m' 212,018.63 1,060,093.13
3. Pas. Pipa T 4 " 2.00 bh 10,500.00 21,000.00
4. Pas. Pipa Keni 4 " 1.00 bh 10,500.00 10,500.00
Sub Jumlah 1,620,189.38

JUMLAH 8,294,061.86
ANALISA SNI 2008
I PEKERJAAN PERSIAPAN

1 1 m' Pekerjaan Pengukuran dan Pas. Bowplank


Bahan :
0.0070 m3 Kayu Meranti (Papan 2/20) @ Rp. 3,250,000.00 = Rp. 22,750.00
0.0120 m3 Kayu Meranti (Usuk 5/7) @ Rp. 3,250,000.00 = Rp. 39,000.00
0.0200 Kg Paku biasa 2" - 5" @ Rp. 20,000.00 = Rp. 400.00
Total Bahan = Rp. 62,150.00

Upah 0.100 Oh Pekerja @ Rp. 100,000.00 = Rp. 10,000.00


0.100 Oh Tukang Kayu @ Rp. 115,000.00 = Rp. 11,500.00
0.010 Oh Kepala Tukang @ Rp. 125,000.00 = Rp. 1,250.00
0.005 Oh Mandor @ Rp. 150,000.00 = Rp. 750.00
= Rp. 23,500.00
Total Harga = Rp. 85,650.00
Overhead + Provit 5 % = Rp. 4,282.50
Total Upah dan Bahan = Rp. 89,932.50
PEKERJAAN TANAH
۞ 1 m3 Galian Untuk Tanah Biasa sedalam 1 m
Upah An. SNI 2008 6.1
0.750 Oh Pekerja @ Rp. 120,000.00 = Rp. 90,000.00
0.025 Oh Mandor @ Rp. 150,000.00 = Rp. 3,750.00
Total Harga = Rp. 93,750.00
Overhead + Provit 5 % = Rp. 4,687.50
Harga satuan pekerjaan = Rp. 98,437.50

۞ 1 m3 Urugan Pasir Pasang


Bahan An. SNI ( Revisi ) 6.11.1
1.200 m3 Pasir Pasang @ Rp. 195,000.00 = Rp. 234,000.00
= Rp. 234,000.00
Upah An. SNI ( Revisi ) 6.11.2
0.300 Oh Pekerja @ Rp. 120,000.00 = Rp. 36,000.00
0.010 Oh Mandor @ Rp. 150,000.00 = Rp. 1,500.00
= Rp. 37,500.00
Total Harga = Rp. 271,500.00
Overhead + Provit 5 % = Rp. 13,575.00
Harga satuan pekerjaan = Rp. 285,075.00

۞ 1 m3 Mengurug kembali tanah galian


Upah ( SNI 2835:2008 ) 6.9
0.250 oh Pekerja @ Rp. 120,000.00 = Rp. 30,000.00
0.008 oh Mandor @ Rp. 150,000.00 = Rp. 1,250.00
Total Harga = Rp. 31,250.00
Overhead + Provit 5 % = Rp. 1,562.50
Harga satuan pekerjaan = Rp. 32,812.50

۞ 1 m3 Urugan Sirtu
Bahan
1.200 m3 Urug Sirtu @ Rp. 175,000.00 = Rp. 210,000.00
= Rp. 210,000.00
Upah
0.250 Oh Pekerja @ Rp. 120,000.00 = Rp. 30,000.00
0.250 Oh Mandor @ Rp. 150,000.00 = Rp. 37,500.00
= Rp. 67,500.00
Total Harga = Rp. 277,500.00
Overhead + Provit 5 % = Rp. 13,875.00
Harga satuan pekerjaan = Rp. 291,375.00
۞ 1 m' Galian Tanah Strous Ø30 cm
Alat
0.200 m3 Sewa bor strous Ø30 @ Rp. 17,000.00 = Rp. 3,400.00
= Rp. 3,400.00
Upah
0.240 Oh Pekerja @ Rp. 120,000.00 = Rp. 28,800.00
0.012 Oh Mandor @ Rp. 150,000.00 = Rp. 1,800.00
= Rp. 30,600.00
Total Harga = Rp. 34,000.00
Overhead + Provit 5 % = Rp. 1,700.00
Harga satuan pekerjaan = Rp. 35,700.00
PEKERJAAN PONDASI
۞ 1 m3 Pasang pondasi batu kosong
Bahan An. SNI 6.14.1
1.200 m3 Batu belah ( 15/20 ) @ Rp. 264,000.00 = Rp 316,800.00
0.300 m3 Pasir pasang @ Rp. 195,000.00 = Rp 58,500.00
Total Bahan = Rp 375,300.00
Upah An. SNI 6.14.1
0.780 Oh Pekerja @ Rp. 100,000.00 = Rp 78,000.00
0.390 Oh Tukang batu @ Rp. 115,000.00 = Rp 44,850.00
0.039 Oh Kepala tukang @ Rp. 125,000.00 = Rp 4,875.00
0.039 Oh Mandor @ Rp. 150,000.00 = Rp 5,850.00
= Rp 133,575.00
Total harga = Rp 508,875.00
Overhead + Provit 5 % = Rp 25,443.75
Harga satuan pekerjaan = Rp 534,318.75

۞ 1 m3 Memasang pondasi batu belah, campuran 1 PC : 4 PP


Bahan ( SNI 2836:2008 ) 6.2 `
1.200 m3 Batu belah ( 15/20 ) @ Rp. 264,000.00 = Rp 316,800.00
163.000 Kg Semen porland @ Rp. 1,300.00 = Rp 211,900.00
0.520 m3 Pasir pasang @ Rp. 195,000.00 = Rp 101,400.00
Total Bahan = Rp 630,100.00
upah ( SNI 2836:2008 ) 6.2
1.500 Oh Pekerja @ Rp. 100,000.00 = Rp 150,000.00
0.750 Oh Tukang batu @ Rp. 115,000.00 = Rp 86,250.00
0.075 Oh Kepala tukang @ Rp. 125,000.00 = Rp 9,375.00
0.075 Oh Mandor @ Rp. 150,000.00 = Rp 11,250.00
= Rp 256,875.00
Total harga = Rp 886,975.00
Overhead + Provit 5 % = Rp 44,348.75
Harga satuan pekerjaan = Rp 931,323.75
PEKERJAAN ELEKTRIKAL

TTK Pas . Instalasi Stop Kontak


6.000 m Kabel NYM 3 X 2,5 mm2 10,400.00 = Rp 62,400.00
0.500 bh Isolasi 15,000.00 = Rp 7,500.00
3.000 bh Klem 2,000.00 = Rp 6,000.00
0.050 org/hr Pekerja 120,000.00 = Rp 6,000.00
0.020 org/hr Tukang Listrik 115,000.00 = Rp 2,300.00
0.100 org/hr Kepala tukang Listrik 125,000.00 = Rp 12,500.00
0.100 org/hr Mandor 150,000.00 = Rp 15,000.00
Total harga = Rp 111,700.00
Overhead + Provit 5% = Rp 5,585.00
Harga satuan pekerjaan = Rp 117,285.00

BH Pas . Saklar Engkel


1.000 m Saklar Tunggal 15,000.00 = Rp 15,000.00
1.000 bh Mangkok Listrik 7,000.00 = Rp 7,000.00
0.250 bh Isolasi 15,000.00 = Rp 3,750.00
0.100 org/hr Pekerja 120,000.00 = Rp 12,000.00
0.100 org/hr Tukang Listrik 115,000.00 = Rp 11,500.00
0.050 org/hr Kepala tukang Listrik 125,000.00 = Rp 6,250.00
0.025 org/hr Mandor 150,000.00 = Rp 3,750.00
Total harga = Rp 59,250.00
Overhead + Provit 5% = Rp 2,962.50
Harga satuan pekerjaan = Rp 62,212.50

BH Pas . Saklar Double


1.000 m Saklar Ganda 15,000.00 = Rp 15,000.00
1.000 bh Mangkok Listrik 7,000.00 = Rp 7,000.00
0.250 bh Isolasi 15,000.00 = Rp 3,750.00
0.100 org/hr Pekerja 120,000.00 = Rp 12,000.00
0.100 org/hr Tukang Listrik 115,000.00 = Rp 11,500.00
0.050 org/hr Kepala tukang Listrik 125,000.00 = Rp 6,250.00
0.025 org/hr Mandor 150,000.00 = Rp 3,750.00
Total harga = Rp 59,250.00
Overhead + Provit 5% = Rp 2,962.50
Harga satuan pekerjaan = Rp 62,212.50

BH Pas . Stop Kontak


1.000 m Stop Kontak 15,000.00 = Rp 15,000.00
1.000 bh Mangkok Listrik 7,000.00 = Rp 7,000.00
0.250 bh Isolasi 15,000.00 = Rp 3,750.00
0.100 org/hr Pekerja 120,000.00 = Rp 12,000.00
0.100 org/hr Tukang Listrik 115,000.00 = Rp 11,500.00
0.050 org/hr Kepala tukang Listrik 125,000.00 = Rp 6,250.00
0.025 org/hr Mandor 150,000.00 = Rp 3,750.00
Total harga = Rp 59,250.00
Overhead + Provit 5% = Rp 2,962.50
Harga satuan pekerjaan = Rp 62,212.50
BH Pas . Lampu LED 20 W
1.000 m Lampu LED 20 W 28,400.00 = Rp 28,400.00
0.250 bh Isolasi 15,000.00 = Rp 3,750.000
0.100 org/hr Pekerja 120,000.00 = Rp 12,000.000
0.100 org/hr Tukang Listrik 115,000.00 = Rp 11,500.000
0.050 org/hr Kepala tukang Listrik 125,000.00 = Rp 6,250.000
0.025 org/hr Mandor 150,000.00 = Rp 3,750.000
Total harga = Rp 65,650.00
Overhead + Provit 5% = Rp 3,282.50
Harga satuan pekerjaan = Rp 68,932.50
PEKERJAAN SANITAIR
1. Memasang 1 buah kloset duduk/monoblok
Bahan An. SNI ( Revisi ) 6.1.1
1.000 Bh Kloset duduk/monoblok @ Rp. 1,250,000.00 = Rp 1,250,000.00
6% harga kloset = Perlengkapan @ Rp. 75,000.00 = Rp 75,000.00
Total Bahan = Rp 1,325,000.00
Upah An. SNI ( Revisi ) 6.1.2
3.300 Oh Pekerja @ Rp. 120,000.00 = Rp 396,000.00
1.100 Oh Tukang batu @ Rp. 115,000.00 = Rp 126,500.00
0.001 Oh Kepala tukang @ Rp. 125,000.00 = Rp 125.00
0.1600 Oh Mandor @ Rp. 150,000.00 = Rp 24,000.00
= Rp 546,625.00
Total harga = Rp 1,871,625.00
Overhead + Provit 5 % = Rp 93,581.25
Total harga = Rp 1,965,206.25
۞ Memasang 1 buah floor drain
Bahan An. SNI ( Revisi ) 6.36.1
1.000 Bh Floor drain @ Rp. 15,000.00 = Rp 15,000.00
= Rp 15,000.00
Upah An. SNI ( Revisi ) 6.36.2
0.010 Oh Pekerja @ Rp. 120,000.00 = Rp 1,200.00
0.100 Oh Tukang batu @ Rp. 115,000.00 = Rp 11,500.00
0.010 Oh Kepala tukang @ Rp. 125,000.00 = Rp 1,250.00
0.005 Oh Mandor @ Rp. 150,000.00 = Rp 750.00
= Rp 14,700.00
Total harga = Rp 29,700.00
Overhead + Provit 5 % = Rp 1,485.00
Total harga = Rp 31,185.00
۞ Memasang 1 buah kran ø 3/4" atau 1/2"
Bahan An. SNI ( Revisi ) 6.35.1
1.000 Bh Kran air @ Rp. 17,500.00 Rp 17,500.00
0.025 Bh Seal tape @ Rp. 4,000.00 Rp 100.00
Total Bahan = Rp 17,600.00

Upah An. SNI ( Revisi ) 6.35.2


0.010 Oh Pekerja @ Rp. 120,000.00 Rp 1,200.00
0.100 Oh Tukang batu @ Rp. 115,000.00 Rp 11,500.00
0.010 Oh Kepala tukang @ Rp. 125,000.00 Rp 1,250.00
0.005 Oh Mandor @ Rp. 150,000.00 Rp 750.00
Total Upah Rp 14,700.00
Total Upah dan Bahan = Rp 32,300.00
Overhead 5 % = Rp 1,615.00
Jumlah Total = Rp 33,915.00
۞ Memasang 1 m' pipa PVC tipe AW ø 2"
Bahan An. SNI ( Revisi ) 6.29.1
1.2 m' Pipa PVC @ Rp. 28,450.00 = Rp 34,140.00
35% harga pipa = Perlengkapan @ Rp. 5,121.00 = Rp 5,121.00
Total Bahan = Rp 39,261.00
Upah An. SNI ( Revisi ) 6.29.2
0.036 Oh Pekerja @ Rp. 120,000.00 = Rp 4,320.00
0.06 Oh Tukang batu @ Rp. 115,000.00 = Rp 6,900.00
0.006 Oh Kepala tukang @ Rp. 125,000.00 = Rp 750.00
0.0018 Oh Mandor @ Rp. 150,000.00 = Rp 270.00
Rp 12,240.00
Total Upah dan Bahan = Rp 51,501.00
Overhead 5 % = Rp 2,575.05
Jumlah Total = Rp 54,076.05
33. Memasang 1 buah bak cuci piring stainless steel
Bahan An. SNI ( Revisi ) 6.33.1
1 Bh Bak cuci stainless steel @ Rp. 150,000.00 = Rp 150,000.00
1 set Water drain + assesories @ Rp. 27,000.00 = Rp 27,000.00
Total Bahan = Rp 177,000.00
Upah An. SNI ( Revisi ) 6.33.2
0.03 Oh Pekerja @ Rp. 120,000.00 = Rp 3,600.00
0.3 Oh Tukang batu @ Rp. 115,000.00 = Rp 34,500.00
0.03 Oh Kepala tukang @ Rp. 125,000.00 = Rp 3,750.00
0.0015 Oh Mandor @ Rp. 150,000.00 = Rp 225.00
Rp 42,075.00
Total Upah dan Bahan = Rp 219,075.00
Overhead 5 % = Rp 10,953.75
Jumlah Total = Rp 230,028.75
27. Memasang 1 m' pipa PVC tipe AW ø 3/4"
Bahan An. SNI ( Revisi ) 6.27.1
1.2 m' Pipa PVC @ Rp. 8,250.00 = Rp 9,900.00
35% harga pipa = Perlengkapan @ Rp. 1,485.00 = Rp 1,485.00
Total Bahan = Rp 11,385.00
Upah An. SNI ( Revisi ) 6.27.2
0.036 Oh Pekerja @ Rp. 120,000.00 = Rp 4,320.00
0.06 Oh Tukang batu @ Rp. 115,000.00 = Rp 6,900.00
0.006 Oh Kepala tukang @ Rp. 125,000.00 = Rp 750.00
0.0018 Oh Mandor @ Rp. 150,000.00 = Rp 270.00
Rp 12,240.00
Total Upah dan Bahan = Rp 23,625.00
Overhead 5 % = Rp 1,181.25
Jumlah Total = Rp 24,806.25
HITUNGAN VOLUME PEMBESIAN
PONDASI BETON
1 PLAT PONDASI 60X60X20
Persegi 0.600 X 0.600 X 0.300 = 0.108 m3
Besi : 4.000
Tulangan horizontal D 13 mm 2.450 X 4.000 bh 0.893 = 8.749 kg
Tulangan Vertikal D 13 mm 2.450 X 4.000 bh 0.893 = 8.749 kg
Jumlah = 17.499 kg
Volume pondasi = 0.108 m3
Jumlah besi tiap 1 m3 beton = 162.027 kg

3 STROUS Φ 25
Persegi 3.140 X 0.023 X 1.000 = 0.071 m3
Besi :
Tulangan ø 12 mm ( polos ) 1.000 X 6.000 x 0.893 = 5.357 kg
Begel ø 6 mm ( polos ) 0.785 X 6.667 x 0.223 = 1.168 kg
Jumlah = 6.525 kg
Volume pondasi = 0.071 m3
Jumlah besi tiap 1 m3 beton = 92.355 kg

KOLOM
1 KOLOM praktis 15/15
Beton 0.150 X 0.150 X 1.000 = 0.023 m3
Besi :
Tulangan ø 12 mm ( polos ) 1.000 X 4.000 bh 0.887 = 3.548 kg
Begel ø 8 mm ( polos ) 0.660 X 6.000 x 0.394 = 1.560 kg
Jumlah besi 5.108 kg
Volume beton 0.023 m3
Jumlah besi tiap 1 m3 beton 227.033 kg
BALOK
7 BALOK 15/25
Beton 0.150 X 0.250 X 1.000 = 0.038 m3
Besi :
Tulangan Ø 10 mm ( ulir ) 1.000 X 6.000 bh 0.616 = 3.696 kg
Begel ø 8 mm ( polos ) 0.550 X 6.667 x 0.394 = 1.445 kg
Jumlah besi 5.141 kg
Volume beton 0.038 m3
Jumlah besi tiap 1 m3 beton 137.084 kg

9 Sloof 15/20
Beton 0.150 X 0.200 X 1.000 = 0.030 m3
Besi :
Tulangan Ø 12 mm ( ulir ) 1.000 X 4.000 bh 0.887 = 3.548 kg
Begel ø 8 mm ( polos ) 0.550 X 7.000 x 0.394 = 1.517 kg
Jumlah besi 6.667 5.065 kg
Volume beton 0.030 m3
Jumlah besi tiap 1 m3 beton 168.830 kg
PLAT BETON
1 PLAT BETON T= 12 CM
Volume beton 0.120 X 1.000 X 1.000 = 0.120 m3

Tulangan ø 10 mm ( polos ) 1.100 X 6.000 X 0.616 X 2.00 = 8.131 kg


Tulangan ø 10 mm ( polos ) 1.100 X 6.000 X 0.616 X 2.00 = 8.131 kg
Jumlah besi 16.262 kg
Volume beton 0.120 m3
Jumlah besi tiap 1 m3 beton 135.520 kg

2 PLAT BETON T= 15 CM
Volume beton 0.150 X 1.000 X 1.000 = 0.150 m3
6.667
Tulangan ø 8 mm ( polos ) 1.100 X 7.000 X 0.394 X 2.00 = 6.068 kg
Tulangan ø 8 mm ( polos ) 1.100 X 7.000 X 0.394 X 2.00 = 6.068 kg
Jumlah besi 12.135 kg
Volume beton 0.150 m3
Jumlah besi tiap 1 m3 beton 80.901 kg

2 PLAT BETON T= 5 CM
Volume beton 0.050 X 1.000 X 1.000 = 0.050 m3
6.667
Tulangan ø 8 mm ( polos ) 1.100 X 7.000 X 0.397 X 1.00 = 3.055 kg
Tulangan ø 8 mm ( polos ) 1.100 X 7.000 X 0.397 X 1.00 = 3.055 kg
Jumlah besi 6.111 kg
Volume beton 0.050 m3
Jumlah besi tiap 1 m3 beton 122.214 kg

3 PLAT BETON T= 7 CM
Volume beton 0.070 X 1.000 X 1.000 = 0.070 m3
6.667
Tulangan ø 8 mm ( polos ) 2.100 X 7.000 X 0.620 X 1.00 = 9.114 kg
Tulangan ø 8 mm ( polos ) 2.100 X 7.000 X 0.620 X 1.00 = 9.114 kg
Jumlah besi 18.228 kg
Volume beton 0.070 m3
Jumlah besi tiap 1 m3 beton 260.400 kg

4 PLAT BETON T= 10 CM
Volume beton 0.100 X 1.000 X 1.000 = 0.100 m3
6.667
Tulangan ø 8 mm ( polos ) 1.100 X 7.000 X 0.620 X 1.00 = 4.774 kg
Tulangan ø 8 mm ( polos ) 1.100 X 7.000 X 0.620 X 1.00 = 4.774 kg
Jumlah besi 9.548 kg
Volume beton 0.100 m3
Jumlah besi tiap 1 m3 beton 95.480 kg
PEKERJAAN KERAMIK
۞ 1 m2 Pasang Lantai keramaik Ukuran (40 x 40) cm
Bahan ( SNI 7395:2008 ) 6.9
1.000 m2 Keramik 40 x 40 @ Rp. 112,000.00 = Rp 112,000.00
9.800 kg Semen portland @ Rp. 1,300.00 = Rp 12,740.00
0.045 m3 Pasir pasang @ Rp. 195,000.00 = Rp 8,775.00
1.300 kg Semen warna @ Rp. 14,000.00 = Rp 18,200.00
= Rp 151,715.00
Upah ( SNI 7395:2008 ) 6.9
0.250 oh Pekerja @ Rp. 120,000.00 = Rp 30,000.00
0.125 oh Tukang batu @ Rp. 125,000.00 = Rp 15,625.00
0.013 oh Kepala tukang @ Rp. 125,000.00 = Rp 1,625.00
0.013 oh Mandor @ Rp. 150,000.00 = Rp 1,950.00
= Rp 49,200.00
Total harga = Rp 200,915.00
Overhead + Provit 5 % = Rp 10,045.75
Harga satuan pekerjaan = Rp 210,960.75

۞ 1 m2 Pasang Lantai keramik Ukuran 60 x 60 cm


Bahan ( SNI 7395:2008 ) 6.9
1.000 m2 Keramik 60 x 60 @ Rp. 126,000.00 = Rp 126,000.00
9.800 kg Semen portland @ Rp. 1,300.00 = Rp 12,740.00
0.045 m3 Pasir pasang @ Rp. 195,000.00 = Rp 8,775.00
1.300 kg Semen warna @ Rp. 14,000.00 = Rp 18,200.00
= Rp 165,715.00
Upah ( SNI 7395:2008 ) 6.9
0.250 oh Pekerja @ Rp. 120,000.00 = Rp 30,000.00
0.125 oh Tukang batu @ Rp. 115,000.00 = Rp 14,375.00
0.013 oh Kepala tukang @ Rp. 125,000.00 = Rp 1,625.00
0.013 oh Mandor @ Rp. 150,000.00 = Rp 1,950.00
= Rp 47,950.00
Total harga = Rp 213,665.00
Overhead + Provit 5 % = Rp 10,683.25
Harga satuan pekerjaan = Rp 224,348.25

۞ 1 m2 Memasang lantai keramik ukuran (25 x 25) cm


Bahan ( SNI 7395:2008 ) 6.36
1.000 m2 Ubin keramik @ Rp. 60,000.00 = Rp 60,000.00
10.400 kg Semen portland @ Rp. 1,300.00 = Rp 13,520.00
0.045 m3 Pasir pasang @ Rp. 195,000.00 = Rp 8,775.00
1.620 kg Semen warna @ Rp. 14,000.00 = Rp 22,680.00
= Rp 104,975.00
Upah ( SNI 7395:2008 ) 6.35
0.250 oh Pekerja @ Rp. 120,000.00 = Rp 30,000.00
0.125 oh Tukang batu @ Rp. 115,000.00 = Rp 14,375.00
0.013 oh Kepala tukang @ Rp. 125,000.00 = Rp 1,625.00
0.013 oh Mandor @ Rp. 150,000.00 = Rp 1,950.00
= Rp 47,950.00
Total harga = Rp 152,925.00
Overhead + Provit 5 % = Rp 7,646.25
Harga satuan pekerjaan = Rp 160,571.25

۞ 1 m2 Memasang dinding keramik ukuran (25 x 40) cm


Bahan ( SNI 7395:2008 ) 6.54
1.000 m2 Ubin keramik @ Rp. 59,000.00 = Rp 59,000.00
9.300 kg Semen portland @ Rp. 1,300.00 = Rp 12,090.00
0.018 m3 Pasir pasang @ Rp. 195,000.00 = Rp 3,510.00
1.940 kg Semen warna @ Rp. 14,000.00 = Rp 27,160.00
= Rp 101,760.00
Upah ( SNI 7395:2008 ) 6.35
0.250 oh Pekerja @ Rp. 120,000.00 = Rp 30,000.00
0.125 oh Tukang batu @ Rp. 115,000.00 = Rp 14,375.00
0.013 oh Kepala tukang @ Rp. 125,000.00 = Rp 1,625.00
0.013 oh Mandor @ Rp. 150,000.00 = Rp 1,950.00
= Rp 47,950.00
Total harga = Rp 149,710.00
Overhead + Provit 5% = Rp 7,485.50
Harga satuan pekerjaan = Rp 157,195.50
Analisa Pas . Kusen dan Jendela
1 Memasang 1 m Kusen Alluminium
Bahan :
1.100 m Profil Alluminium @ Rp. 118,000.00 = Rp. 129,800.00
2.000 Buah Skrup Fixer @ Rp. 200.00 = Rp. 400.00
0.066 Tube Sealant @ Rp. 40,000.00 = Rp. 2,640.00
Total Bahan = Rp. 132,840.00

Upah : 0.043 Oh Pekerja @ Rp. 120,000.00 = Rp. 5,160.00


0.043 Oh Tukang Khusus Allluminium @ Rp. 125,000.00 = Rp. 5,375.00
0.0043 Oh Kepala Tukang @ Rp. 125,000.00 = Rp. 537.50
0.0021 Oh Mandor @ Rp. 150,000.00 = Rp. 315.00
= Rp. 11,387.50
Total Harga = 144,227.50
Overhead + Provit 5 % = 7,211.38
Total dan Bahan = Rp. 151,438.88

3 Memasang 1 m2 Pintu Kaca Rangka Alluminium


Bahan :
1.100 m' Pintu Alluminium @ Rp. 118,000.00 = Rp. 129,800.00
1.100 m2 Kaca @ Rp. 80,000.00 = Rp. 88,000.00
0.270 Tube Sealant @ Rp. 40,000.00 = Rp. 10,800.00
Total Bahan = Rp. 228,600.00

Upah : 0.085 Oh Pekerja @ Rp. 120,000.00 = Rp. 10,200.00


0.085 Oh Tukang Khusus Allluminium @ Rp. 125,000.00 = Rp. 10,625.00
0.009 Oh Kepala Tukang @ Rp. 125,000.00 = Rp. 1,125.00
0.005 Oh Mandor @ Rp. 150,000.00 = Rp. 750.00
= Rp. 22,700.00
Total Harga = 251,300.00
Overhead + Provit 5 % = 12,565.00
Total dan Bahan = Rp. 263,865.00

4 Memasang 1 m2 Kaca t : 5 mm
Bahan :
1.100 m2 Kaca t : 5 mm @ Rp. 80,000.00 = Rp. 88,000.00
Total Bahan = Rp. 88,000.00

Upah : 0.015 Oh Pekerja @ Rp. 120,000.00 = Rp. 1,800.00


0.150 Oh Tukang @ Rp. 125,000.00 = Rp. 18,750.00
0.015 Oh Kepala Tukang @ Rp. 125,000.00 = Rp. 1,875.00
0.001 Oh Mandor @ Rp. 150,000.00 = Rp. 112.50
= Rp. 22,537.50
Total Harga = 110,537.50
Overhead + Provit 5 % = 5,526.88
Total dan Bahan = Rp. 116,064.38
Memasang 1 m2 Daun Jendela Kaca Rangka Allumunium
Bahan :

1.100 m' Daun Jendela @ Rp. 118,000.00 = Rp. 129,800.00


1.100 m2 Kaca @ Rp. 80,000.00 = Rp. 88,000.00
0.270 tube Sealant @ Rp. 40,000.00 = Rp. 10,800.00
Total Bahan = Rp. 228,600.00

Upah : 0.0165 Oh Pekerja @ Rp. 120,000.00 = Rp. 1,980.00


0.165 Oh Tukang @ Rp. 125,000.00 = Rp. 20,625.00
0.0165 Oh Kepala Tukang @ Rp. 125,000.00 = Rp. 2,062.50
0.00080 Oh Mandor @ Rp. 150,000.00 = Rp. 120.00
= Rp. 24,787.50
Total Harga = 253,387.50
Overhead + Provit 5 % = 12,669.38
Total dan Bahan = Rp. 266,056.88

Memasang 1 m2 Jendela Kaca Rangka Allumunium


Bahan :

1.000 m2 Jendela Allumunium @ Rp. 118,000.00 = Rp. 118,000.00


1.100 m2 Kaca @ Rp. 80,000.00 = Rp. 88,000.00
0.270 tube Sealant @ Rp. 40,000.00 = Rp. 10,800.00
Total Bahan = Rp. 216,800.00

Upah : 0.0165 Oh Pekerja @ Rp. 120,000.00 = Rp. 1,980.00


0.165 Oh Tukang @ Rp. 125,000.00 = Rp. 20,625.00
0.0165 Oh Kepala Tukang @ Rp. 125,000.00 = Rp. 2,062.50
0.00080 Oh Mandor @ Rp. 150,000.00 = Rp. 120.00
= Rp. 24,787.50
Total Harga = 241,587.50
Overhead + Provit 5 % = 12,079.38
Total dan Bahan = Rp. 253,666.88

1 Memasang 1 m Kusen Alluminium


Bahan :
1.000 m' Sponeng @ Rp. 100,000.00 = Rp. 100,000.00
Total Bahan = Rp. 100,000.00

Upah : 0.043 Oh Pekerja @ Rp. 120,000.00 = Rp. 5,160.00


0.043 Oh Tukang Khusus Allluminium @ Rp. 125,000.00 = Rp. 5,375.00
0.0043 Oh Kepala Tukang @ Rp. 125,000.00 = Rp. 537.50
0.0021 Oh Mandor @ Rp. 150,000.00 = Rp. 315.00
= Rp. 11,387.50
Total Harga = 111,387.50
Overhead + Provit 5 % = 5,569.38
Total dan Bahan = Rp. 116,956.88
Pasang Pintu dan Jendela

۞ Tipe P.1 kusen alumunium 5/10 cm, pintu aluminium + kaca polos + accessories
- Kusen Aluminium 4" tebal 1.2mm (Putih ) 8.660 m1 Rp 151,439 Rp 1,311,461
- Daun Pintu Kaca rangka aluminium 3.075 m 2
Rp 263,865 Rp 811,385
Accessories :
- Engsel pintu 4.000 bh Rp 48,339 Rp 193,358
- Kunci Tanam 1.000 set Rp 152,985 Rp 152,985
- Handle 2.000 Psg Rp 96,731 Rp 193,463
- Door stop 2.000 bh Rp 25,226 Rp 50,453
- Sealent 2.235 tube Rp 40,000 Rp 89,387
- Kaca Bouven 0.584 m2 Rp 80,000 Rp 46,720
Jumlah Total 1.000 unit Rp 2,849,210

۞ Tipe P.4 kusen alumunium 5/10 cm, pintu aluminium + kaca polos + accessories
- Kusen Aluminium 4" tebal 1.2mm (Putih ) 6.860 m1 Rp 151,439 Rp 1,038,871
- Daun Pintu Kaca rangka aluminium 1.640 m2 Rp 263,865 Rp 432,739
Accessories :
- Engsel pintu 3.000 bh Rp 48,339 Rp 145,018
- Kunci Tana 1.000 set Rp 152,985 Rp 152,985
- Handle 1.000 Psg Rp 96,731 Rp 96,731
- Door stop 1.000 bh Rp 25,226 Rp 25,226
- Sealent 1.163 tube Rp 40,000 Rp 46,507
- Kaca Bouven 0.320 m Rp 80,000 Rp 25,600
Jumlah Total 1.000 unit Rp 1,963,677

۞ Tipe J.5 kusen alumunium 4", pintu aluminium + kaca polos + accessories
- Kusen Aluminium 4" tebal 1.2mm 7.160 m1 Rp 151,439 Rp 1,084,302
- Memasang 1 m2 Daun Jendela Kaca Rangka Allumunium 1.155 m 2
Rp 266,057 Rp 307,296
Accessories :
- Kunci tanam kecil 1.000 set Rp 37,853 Rp 37,853
- Handle 1.000 Psg Rp 96,731 Rp 96,731
- Relling Jendela 2.000 Set Rp - Rp -
Boven
- Memasang 1 m2 Kaca mati 0.378 m2 Rp 116,064 Rp 43,826
Jumlah Total 1.000 unit Rp 1,570,008

۞ Tipe J.7 kusen alumunium 4", pintu aluminium + kaca polos + accessories
- Kusen Aluminium 4" tebal 1.2mm (Putih ) 4.380 m1 Rp 151,439 Rp 663,302
- Memasang 1 m2 Daun Jendela Kaca Rangka Allumunium 0.706 m 2
Rp 253,667 Rp 178,987
Accessories :
- Engsel Jendela 2.000 bh Rp 45,203 Rp 90,405
- Grendel 1.000 Psg Rp 42,053 Rp 42,053
- Sponeng 1.411 m' Rp 116,957 Rp 165,050
Boven
- Memasang 1 m2 Kaca mati 0.202 m2 Rp 116,064 Rp 23,399
Jumlah Total 1.000 unit Rp 1,163,195

۞ Tipe BV (Bouvenlist) kusen alumunium 4", jendela aluminium + kaca polos + accessories
- Kusen Aluminium 4" tebal 1.2mm (Putih ) 2.160 m1 Rp 151,439 Rp 327,108
- Kaca polos t=5mm 0.240 m2 Rp 120 Rp 29
Jumlah Total 1.000 unit Rp 327,137
۞ Tipe PJ1 kusen alumunium 4", pintu aluminium + kaca polos + accessories
- Kusen Aluminium 4" tebal 1.2mm 8.940 m1 Rp 151,439 Rp 1,353,864
- Memasang 1 m2 Pintu Kaca Rangka Allumunium 1.720 m2 Rp 263,865 Rp 453,848
Accessories :
- Handle 1.000 Psg Rp 96,731 Rp 96,731
- Kunci Tanam 1.000 set Rp 152,985 Rp 152,985
- Handle pintu 0.456 m2 Rp 96,731 Rp 44,080
- Door stop 1.597 m 2
Rp - Rp -
Accessories :
- Relling Jendela 1.000 Set Rp - Rp -
- Handle Tanam Slide 1.000 Psg Rp 96,731 Rp 96,731
- Kunci Selot 1.000 Psg Rp 37,853 Rp 37,853
- Engsel 2.000 bh Rp 45,203 Rp 90,405
Jumlah Total 1.000 unit Rp 2,326,497

۞ Tipe PJ2 kusen alumunium 4", pintu aluminium + kaca polos + accessories
- Kusen Aluminium 4" tebal 1.2mm 7.850 m1 Rp 151,439 Rp 1,188,795
- Memasang 1 m2 Pintu Kaca Rangka Allumunium 1.720 m 2
Rp 263,865 Rp 453,848
Accessories :
- Handle 1.000 Psg Rp 96,731 Rp 96,731
- Kunci Tanam 1.000 set Rp 152,985 Rp 152,985
- Handle pintu 0.456 m2 Rp 96,731 Rp 44,080
- Door stop 1.597 m2 Rp - Rp -
Accessories :
- Relling Jendela 1.000 Set Rp - Rp -
- Handle Tanam Slide 1.000 Psg Rp 96,731 Rp 96,731
- Kunci Selot 1.000 Psg Rp 37,853 Rp 37,853
- Engsel 2.000 bh Rp 45,203 Rp 90,405
Jumlah Total 1.000 unit Rp 2,161,428
۞ Tipe Roster Beton
- Roster 1.000 bh Rp 10,000 Rp 10,000
- Semen 1.800 kg Rp 1,300 Rp 2,340
Jumlah 1.000 unit Rp 12,340
- Profit 5% Rp 666
Jumlah Total 1.000 unit Rp 13,006
PEKERJAAN PENGGANTUNG , PENGUNCI , DAN KACA

۞ 1 buah pasang kunci tanam besar 2 x putar


Bahan An. SNI 6.2.1
1.000 Bh Kunci tanam besar 2 x putar @ Rp. 85,000.00 = Rp 85,000.00
= Rp 85,000.00
Upah An. SNI 6.2.2
0.010 Oh Pekerja @ Rp. 120,000.00 = Rp 1,200.00
0.500 Oh Tukang kayu @ Rp. 115,000.00 = Rp 57,500.00
0.010 Oh Kepala tukang @ Rp. 125,000.00 = Rp 1,250.00
0.005 Oh Mandor @ Rp. 150,000.00 = Rp 750.00
= Rp 60,700.00
Total Harga = 145,700.00
Overhead + Provit 5 % = 7,285.00
Total dan Bahan = Rp. 152,985.00

۞ 1 buah pasang engsel pintu


Bahan An. SNI 6.5.1
1.000 Bh Engsel pintu @ Rp. 25,000.00 = Rp 25,000.00
= Rp 25,000.00
Upah An. SNI 6.5.2
0.015 Oh Pekerja @ Rp. 120,000.00 = Rp 1,800.00
0.150 Oh Tukang kayu @ Rp. 115,000.00 = Rp 17,250.00
0.015 Oh Kepala tukang @ Rp. 125,000.00 = Rp 1,875.00
0.00075 Oh Mandor @ Rp. 150,000.00 = Rp 112.50
= Rp 21,037.50
Total Harga = 46,037.50
Overhead + Provit 5 % = 2,301.88
Total dan Bahan = Rp. 48,339.38

۞ 1 set pasang rell jendela


Bahan An. SNI 6.11.1
1.000 Bh Kunci selot @ Rp. 8,000.00 = Rp 8,000.00
= Rp 8,000.00
Upah An. SNI 6.11.2
0.020 Oh Pekerja @ Rp. 120,000.00 = Rp 2,400.00
0.200 Oh Tukang kayu @ Rp. 115,000.00 = Rp 23,000.00
0.020 Oh Kepala tukang @ Rp. 125,000.00 = Rp 2,500.00
0.001 Oh Mandor @ Rp. 150,000.00 = Rp 150.00
= Rp 28,050.00
Total Harga = 36,050.00
Overhead + Provit 5 % = 1,802.50
Total dan Bahan = Rp. 37,852.50

۞ 1 buah pasang engsel jendela


Bahan An. SNI 6.11.1
1.000 Bh Engsel Jendela @ Rp. 15,000.00 = Rp 15,000.00
= Rp 15,000.00
Upah An. SNI 6.11.2
0.020 Oh Pekerja @ Rp. 120,000.00 = Rp 2,400.00
0.200 Oh Tukang kayu @ Rp. 115,000.00 = Rp 23,000.00
0.020 Oh Kepala tukang @ Rp. 125,000.00 = Rp 2,500.00
0.001 Oh Mandor @ Rp. 150,000.00 = Rp 150.00
= Rp 28,050.00
Total Harga = 43,050.00
Overhead + Provit 5 % = 2,152.50
Total dan Bahan = Rp. 45,202.50
1 buah pasang grendel jendela
Bahan An. SNI 6.11.1
1.000 Bh Grendel Jendela @ Rp. 12,000.00 = Rp 12,000.00
= Rp 12,000.00
Upah An. SNI ) 6.11.2
0.020 Oh Pekerja @ Rp. 120,000.00 = Rp 2,400.00
0.200 Oh Tukang kayu @ Rp. 115,000.00 = Rp 23,000.00
0.020 Oh Kepala tukang @ Rp. 125,000.00 = Rp 2,500.00
0.001 Oh Mandor @ Rp. 150,000.00 = Rp 150.00
= Rp 28,050.00
Total Harga = 40,050.00
Overhead + Provit 5% = 2,002.50
Total dan Bahan = Rp. 42,052.50
۞ 1 buah pasang door stop
Bahan An. SNI ( Revisi ) 6.13.1
1 bh Door stop @ Rp. 10,000.00 = Rp 10000.00
= Rp 10000.00
Upah An. SNI ( Revisi ) 6.13.2
0.01 Oh Pekerja @ Rp. 120,000.00 = Rp 1200.00
0.1 Oh Tukang kayu @ Rp. 115,000.00 = Rp 11500.00
0.01 Oh Kepala tukang @ Rp. 125,000.00 = Rp 1250.00
0.0005 Oh Mandor @ Rp. 150,000.00 = Rp 75.00
= Rp 14025.00
Total Harga = 24,025.00
Overhead + Provit 5 % = 1,201.25
Total dan Bahan = Rp. 25,226.25
۞ 1 buah pasang pegangan pintu/door holder
Bahan An. SNI 6.12.1
1 Bh Door holder @ Rp. 22,000.00 = Rp 22,000.00
= Rp 22,000.00
Upah An. SNI 6.12.2
0.050 Oh Pekerja @ Rp. 120,000.00 = Rp 6,000.00
0.500 Oh Tukang kayu @ Rp. 115,000.00 = Rp 57,500.00
0.050 Oh Kepala tukang @ Rp. 125,000.00 = Rp 6,250.00
0.00250 Oh Mandor @ Rp. 150,000.00 = Rp 375.00
= Rp 70,125.00
Total Harga = 92,125.00
Overhead + Provit 5 % = 4,606.25
Total dan Bahan = Rp. 96,731.25
PEKERJAAN ATAP
1 m2 Pasang atap genteng karang pilang
Bahan An. SNI ( Revisi ) 6.1.1
25.000 m2 Genteng Karang Pilang @ Rp. 6,000.00 = Rp 150,000.00
= Rp 150,000.00
Upah An. SNI ( Revisi ) 6.1.2
0.150 Oh Pekerja @ Rp. 120,000.00 = Rp 18,000.00
0.075 Oh Tukang kayu @ Rp. 115,000.00 = Rp 8,625.00
0.008 Oh Kepala tukang @ Rp. 125,000.00 = Rp 1,000.00
0.008 Oh Mandor @ Rp. 150,000.00 = Rp 1,200.00
= Rp 28,825.00
Total = 178,825.00
Overhead + Provit 5 %= Rp 8,941.25
Total harga = Rp 187,766.25

1 m' Pasang genteng bubung karang pilang


Bahan An. SNI ( Revisi ) 6.4.1
3.500 Bh Genteng bubung karang pilang @ Rp. 20,000.00 = Rp 70,000.00
8.000 Kg Semen portland @ Rp. 1,300.00 = Rp 10,400.00
0.032 m3 Pasir pasang @ Rp. 195,000.00 = Rp 6,240.00
= Rp 86,640.00
Upah An. SNI ( Revisi ) 6.4.2
0.400 Oh Pekerja @ Rp. 120,000.00 = Rp 48,000.00
0.200 Oh Tukang kayu @ Rp. 125,000.00 = Rp 25,000.00
0.020 Oh Kepala tukang @ Rp. 125,000.00 = Rp 2,500.00
0.002 Oh Mandor @ Rp. 150,000.00 = Rp 300.00
= Rp 75,800.00
Total = 162,440.00
Overhead + Provit 5 %= Rp 8,122.00
Total harga = Rp 170,562.00

۞ 1 m' Memasang Kalsiplank ukuran (2 x 30) cm


Bahan ( SNI 3434:2008 ) 6.21
1.00 m' Kalsiplank @ Rp. 19,250.00 = Rp 19,250.00
0.10 kg Paku 5 cm - 7 cm @ Rp. 20,000.00 = Rp 2,000.00
= Rp 21,250.00
Upah ( SNI 3434:2008 ) 6.21
0.10 oh Pekerja 120,000.00 = Rp 12,000.00
0.20 oh Tukang kayu 125,000.00 = Rp 25,000.00
0.02 oh Kepala tukang 125,000.00 = Rp 2,500.00
0.01 oh Mandor 150,000.00 = Rp 750.00
= Rp 40,250.00
Total harga = Rp 61,500.00
Overhead + Provit 5%= Rp 3,075.00
Harga satuan pekerjaan= Rp 64,575.00

۞ 1 m2 Pasang atap alluminium


Bahan An. SNI 6.40.1
1.05 m2 Atap alluminium glmbg tbl 0.55 @ Rp. 135,000.00 = Rp 141,750.00
0.02 Kg Paku hak panjang 15 cm @ Rp. 40,000.00 = Rp 800.00
= Rp
Upah An. SNI 6.40.2
0.15 Oh Pekerja @ Rp. 120,000.00 = Rp 18,000.00
0.75 Oh Tukang kayu @ Rp. 115,000.00 = Rp 86,250.00
0.008 Oh Kepala tukang @ Rp. 125,000.00 = Rp 1,000.00
0.006 Oh Mandor @ Rp. 150,000.00 = Rp 900.00
= Rp 106,150.00
Total harga = Rp 106,150.00
Overhead + Provit 10 = Rp 10,615.00
Harga satuan pekerjaan= Rp 116,765.00
۞ 1 m2 Pasang atap polycarbonat
Bahan An. SNI 6.40.1
1.05 m2 Polycarbonat 6mm @ Rp. 100,887.81 = Rp 105,932.20
0.02 Kg Paku hak panjang 15 cm @ Rp. 5,000.00 = Rp 100.00
= Rp 106,032.20
Upah An. SNI 6.40.2
0.150 Oh Pekerja @ Rp. 120,000.00 = Rp 18,000.00
0.075 Oh Tukang kayu @ Rp. 115,000.00 = Rp 8,625.00
0.008 Oh Kepala tukang @ Rp. 125,000.00 = Rp 1,000.00
0.008 Oh Mandor @ Rp. 150,000.00 = Rp 1,200.00
= Rp 28,825.00
Total harga = Rp 134,857.20
Overhead + Provit 10 = Rp 13,485.72
Harga satuan pekerjaan= Rp 148,342.92

1 m' Memasang’ talang datar/ jurai seng bjls 28 lebar 60 cm


Bahan ( SNI 7393:2008 ) 6.18
1.050 m' Seng plat 127,000.00 = Rp 133,350.000
0.015 kg Paku 1 - 2.5 cm 20,000.00 = Rp 300.000
0.019 m3 Papan kayu kelas II / III ### = Rp 61,750.000
= Rp 195,400.000
Upah ( SNI 7393:2008 ) 6.18
0.200 oh Pekerja 120,000.00 = Rp 24,000.000
0.400 oh Tukang 115,000.00 = Rp 46,000.000
0.025 oh Kepala tukang 125,000.00 = Rp 3,125.000
0.010 oh Mandor 150,000.00 = Rp 1,500.000
= Rp 74,625.00
Total harga = Rp 270,025.00
Overhead + Provit 5%= Rp 13,501.25
Harga satuan pekerjaan= Rp 283,526.25

1 m2Memasang atap seng galvalum


Bahan ( SNI 7393:2008 ) 6.18.1
0.700 m' seng galvalum 127,000.00 = Rp 88,900.000
0.020 kg Paku seng 20,000.00 = Rp 400.000
= Rp 89,300.000
Upah ( SNI 7393:2008 ) 6.18.1
0.120 oh Pekerja 120,000.00 = Rp 14,400.000
0.060 oh Tukang 125,000.00 = Rp 7,500.000
0.060 oh Kepala tukang 125,000.00 = Rp 7,500.000
0.006 oh Mandor 150,000.00 = Rp 900.000
= Rp 30,300.00
Total harga = Rp 119,600.00
Overhead + Provit 5%= Rp 5,980.00
Harga satuan pekerjaan= Rp 125,580.00
PEKERJAAN BAJA

۞ Memasang 1 kg rangka atap ( WF, Canal C )


Bahan An. SNI ( Revisi ) 6.11.1
1.150 Kg Baja profil WF @ Rp. 14,300.00 = Rp. 16,445.00
= Rp. 16,445.00
Upah An. SNI ( Revisi ) 6.14.2
0.06 Oh Pekerja @ Rp. 120,000.00 = Rp. 7,200.00
0.06 Oh Tukang cat @ Rp. 125,000.00 = Rp. 7,500.00
0.01 Oh Kepala tukang @ Rp. 125,000.00 = Rp. 750.00
0.00 Oh Mandor @ Rp. 150,000.00 = Rp. 450.00
. = Rp. 15,900.00
Total harga = Rp. 32,345.00
Overhead + Provit 5 % = Rp. 1,617.25
Harga satuan pekerjaan = Rp. 33,962.25
PEKERJAAN KUSEN PLAFOND
۞ 1 M2 Pasang Langit -langit rangka besi hollow 40.40.2,modul 60 x 60 cm
Bahan Membuat ( An . SNI 6.9 )
4.0000 M' Rangka metal hollow 40.40.20 Rp 47,333.33 = Rp 189,333.33
1.0000 Ls Assesories ( Perkuatan , Las , dll ) Rp 16,566.67 = Rp 16,566.67
Total bahan = Rp. 205,900.00

Upah Membuat ( An . SNI 6.9 )


0.3500 Oh Pekerja Rp 120,000.00 = Rp 42,000.00
0.3500 Oh Tukang Kayu Rp 115,000.00 = Rp 40,250.00
0.0350 Oh Kepala Tukang Rp 125,000.00 = Rp 4,375.00
0.018 Oh Mandor Rp 150,000.00 = Rp 2,700.00
Total upah = Rp. 89,325.00

Total Harga = Rp. 295,225.00

Overhead + Provit 5 % = Rp 14,761.25


Total bahan dan upah = Rp. 309,986.25

۞ 1 M2 Pasang Langit -langit kalsi board tebal : 4 mm


Bahan Membuat ( An . SNI 6.7 )
0.364 Lbr kalsi board ( 120 x 240 x 12 mm ) Rp 83,000.00 = Rp 30,212.00
0.110 Ls Paku Sekrup Rp 520.00 = Rp 57.20
Total bahan = Rp. 30,269.20

Upah Membuat ( An . SNI 6.7 )


0.100 Oh Pekerja Rp 120,000.00 = Rp 12,000.00
0.050 Oh Tukang Kayu Rp 115,000.00 = Rp 5,750.00
0.005 Oh Kepala Tukang Rp 125,000.00 = Rp 625.00
0.005 Oh Mandor Rp 150,000.00 = Rp 750.00
Total upah = Rp. 19,125.00

Total Harga = Rp. 49,394.20

Overhead + Provit 5 % = Rp 2,469.71


Total bahan dan upah = Rp. 51,863.91
PEKERJAAN PENGECATAN
۞ 1 m2 Pengecatan tembok baru ( 1x plamir , 1x cat dasar, 2x cat penutup )
Bahan An. SNI 6.14.1
0.100 Kg Plamir @ Rp. 10,000.00 = Rp 1,000.00
0.100 Kg Cat dasar @ Rp. 105,000.00 = Rp 10,500.00
0.260 Kg Cat penutup 2x @ Rp. 105,000.00 = Rp 27,300.00
= Rp 38,800.00
Upah An. SNI ( Revisi ) 6.14.2
0.020 Oh Pekerja @ Rp. 120,000.00 = Rp 2,400.00
0.063 Oh Tukang cat @ Rp. 125,000.00 = Rp 7,875.00
0.0063 Oh Kepala tukang @ Rp. 125,000.00 = Rp 787.50
0.0025 Oh Mandor @ Rp. 150,000.00 = Rp 375.00
. = Rp 11,437.50
Total harga = Rp 50,237.50
Overhead + Provit 5 % = Rp 2,511.88
Harga satuan pekerjaan = Rp 52,749.38
DAFTAR HARGA BAHAN BANGUNAN DAN UPAH KERJA

NO. NAMA / JENIS BAHAN SATUAN HARGA


SATUAN BAHAN
1 2 3 4 5
A. BAHAN TAMBANG & BATU
1 Pasir Urug / Tanah katel. m3 Rp. 108,000.00
2 Pasir Pasang m3 Rp. 158,000.00
3 Pasir Cor m3 Rp. 158,000.00
4 Sirtu urug m3 Rp. 100,000.00
5 Tanah Urug m3 Rp. 75,000.00
6 Batu Kali Pecah 15/20 Gunung m3 Rp. 181,000.00
7 Batu Kali m3 Rp. 138,000.00
8 Batu Kali Pecah 2/3 ( mesin ) m3 Rp. 195,000.00
9 Batu bata bh Rp. 650.00
10 Batu Alur/ GRC m2 Rp. 85,000.00
11 Batu gilang/tempel m2 Rp. 70,000.00
12 Semen 40 kg zak Rp. 61,000.00
13 Semen 1kg 1Kg Rp. 1,525.00
14 Semen warna 1Kg Rp. 10,000.00
15 Semen putih ( Azano / Tiga Roda ) zak Rp. 96,500.00
16 Roster bh Rp. 24,000.00

B BAHAN LANTAI.
1 Granit tile 60x60 cm Motif (KW 1) m2 Rp. 155,000.00
2 Tegel keramik 30x30 cm Motif ( KW I ) m2 Rp. 50,000.00
3 Dinding GRC m2 Rp. 110,000.00
4 Keramik dinding 30x60 cm ( KW I ) m2 Rp. 90,000.00
5 Buis Beton U 20 bh Rp. 27,500.00

C BAHAN KAYU.
1 Kayu dolken galam btg Rp. 25,000.00
2 Papan begesting (MC) m3 Rp. 4,000,000.00
3 Kayu Papan klas II m3 Rp. 9,000,000.00
4 Kayu Papan Kelas III m3 Rp. 5,200,000.00
5 Kayu balok klas II m3 Rp. 8,300,000.00
6 Kayu balok Kelas III m3 Rp. 5,600,000.00

D. BAHAN TRIPLEKS / KAYU LAPIS.


1 Playwood 120.240. x 9 mm lbr Rp. 134,500.00
2 Triplek 120.240. x 9 mm lbr Rp. 113,000.00
3 Triplek 120.240. x 4 mm lbr Rp. 66,000.00
4 Woodplank 2 x 20 cm m' Rp. 15,000.00
5 Eternit Super rata 100 x 100 cm m2 Rp. 17,500.00
6 Tepung Gypsum kg Rp. 12,000.00
7 List Gypsum m' Rp. 13,700.00

E. BAHAN ALUMINIUM
1 Profil Aluminium 4 " m' Rp. 110,000.00
2 Skrup fixer bh Rp. 10,000.00
3 sealant Tube Rp. 10,000.00
4 Kaca m2 Rp. 85,000.00
5 Aluminium Strip m2 Rp. 20,000.00

F BAHAN BESI..
1 Besi beton polos. kg Rp. 9,800.00
2 Kawat bendrat kg Rp. 15,000.00
3 Paku reng kg Rp. 14,000.00
4 Paku usuk kg Rp. 13,500.00
5 Paku asbes kg Rp. 20,000.00
6 Paku sekrup bh Rp. 1,300.00
7 Mur Baut bh Rp. 2,500.00

G BAHAN PENUTUP ATAP


1 Bubungan Asbes Gelombang besar lbr Rp. 43,500.00
2 Bubungan Asbes Gelombang kecil lbr Rp. 30,000.00
3 Asbes Gelombang Besar 3,05 x 1,05 tebal 5 mm lbr Rp. 106,500.00
4 Asbes Gelombang Kecil 3,05 x 1,05 tebal 5 mm lbr Rp. 86,000.00

H BAHAN PIPA P.V.C..


1 Pipa PVC AW Ø 3/4" 4m m' Rp. 6,500.00
2 Pipa PVC D Ø 3" 4 m m' Rp. 12,375.00
3 Pipa PVC D Ø 4" 4m m' Rp. 17,250.00
4 Pipa PVC T Ø 3" bh Rp. 12,500.00
5 Pas. Kran Air 3/4 bh Rp. 24,500.00
I BAHAN PENGECATAN + POLITUR..
1 Kertas gosok lbr Rp. 3,500.00
2 Plamur tembok/ kayu kg Rp. 18,000.00
3 Cat tembok "Decolit/ Setara" kg Rp. 19,000.00
4 Cat Waterproof kg Rp. 40,000.00
5 Cat kayu Emco/ sejenis kg Rp. 49,000.00
6 Cat meni kg Rp. 23,000.00
7 Lem putih " RAJAWALI " kg Rp. 10,000.00
8 Lem kayu kg Rp. 11,000.00
9 Kuas Bh Rp. 8,000.00
10 Minyak Begesting Ltr Rp. 5,000.00
J BAHAN ELEKTRIKAL.
1 Lampu SL 20 w + Fitting bh Rp. 50,000.00
2 Lampu SL 10 w + Fitting bh Rp. 37,500.00
3 Stop Kontak "BROCO" bh Rp. 25,000.00
4 Saklar tunggal "BROCO" bh Rp. 15,000.00
5 Sakla ganda " BROCO " bh Rp. 23,500.00
6 Kabel NYA 1 X 2.5 mm m' Rp. 4,600.00
7 Pipa paralon 5/8 Ljr Rp. 2,000.00
8 Isolator bh Rp. 2,500.00
9 Las doof bh Rp. 1,000.00
10 Fitting Plafond bh Rp. 5,000.00
11 T dos PVC bh Rp. 1,300.00

DAFTAR UPAH KERJA ORANG per HARI

NO. URAIAN TENAGA KERJA SATUAN UPAH PERHARI

1 2 3 4

1 MANDOR Org / hr Rp. 80,000.00


2 KEPALA TUKANG Org / hr Rp. 75,000.00
3 TUKANG BATU Org / hr Rp. 70,000.00
4 TUKANG KAYU Org / hr Rp. 70,000.00
5 TUKANG BESI Org / hr Rp. 70,000.00
6 TUKANG CAT Org / hr Rp. 70,000.00
7 TUKANG LISTRIK Org / hr Rp. 70,000.00
8 PEKERJA Org / hr Rp. 60,000.00
PEKERJAAN PAVING

۞ Memasang 1 m2 paving k - 300 (tb. 6 cm)


Bahan An. SNI ( Revisi ) 6.11.1
1.000 m2 Paving blok k - 300 @ Rp. 65,000.00 = Rp. 65,000.00
= Rp. 65,000.00
Upah An. SNI ( Revisi ) 6.14.2
0.160 Oh Pekerja @ Rp. 120,000.00 = Rp. 19,200.00
0.160 Oh Tukang cat @ Rp. 115,000.00 = Rp. 18,400.00
0.016 Oh Kepala tukang @ Rp. 125,000.00 = Rp. 2,000.00
0.008 Oh Mandor @ Rp. 150,000.00 = Rp. 1,200.00
. = Rp. 40,800.00
Total harga = Rp. 105,800.00
Overhead + Provit 5 % = Rp. 5,290.00
Harga satuan pekerjaan = Rp. 111,090.00

۞ Memasang 1 m1 Uskup Paving


Bahan An. SNI ( Revisi ) 6.11.1
3.300 m1 uskup @ Rp. 4,000.00 = Rp. 13,200.00
= Rp. 13,200.00
Upah An. SNI ( Revisi ) 6.14.2
0.160 Oh Pekerja @ Rp. 120,000.00 = Rp. 19,200.00
0.160 Oh Tukang cat @ Rp. 115,000.00 = Rp. 18,400.00
0.016 Oh Kepala tukang @ Rp. 125,000.00 = Rp. 2,000.00
0.008 Oh Mandor @ Rp. 150,000.00 = Rp. 1,200.00
. = Rp. 40,800.00
Total harga = Rp. 54,000.00
Overhead + Provit 5 % = Rp. 2,700.00
Harga satuan pekerjaan = Rp. 56,700.00
HARGA DASAR SATUAN UPAH
HARGA HARGA
No. KODE SATUAN YG DIGUNAKAN SATUAN KETERANGAN
( Rp.) ( Rp.)
1. Pekerja (L01) Jam 14,936.51 100,000.00
2. Tukang (L02) Jam 17,079.37 115,000.00
3. Mandor (L03) Jam 22,079.37 150,000.00
4. Operator (L04) Jam 18,507.94 125,000.00
5. Pembantu Operator (L05) Jam 14,936.51 100,000.00
6. Sopir / Driver (L06) Jam 18,507.94 125,000.00
7. Pembantu Sopir / Driver (L07) Jam 14,936.51 100,000.00
8. Mekanik (L08) Jam 14,936.51 100,000.00
9. Pembantu Mekanik (L09) Jam 14,936.51 100,000.00
10. Kepala Tukang (L10) Jam 18,507.94 125,000.00

DAFTAR
HARGA DASAR SATUAN BAHAN

HARGA
No. KODE SATUAN SATUAN KETERANGAN
( Rp.)

1 Pasir Pasang (Sedang) M01b M3 200,000.00


2 Pasir Beton (Kasar) M01a M3 250,000.00
3 Pasir Urug (ada unsur lempung) M01d M3 137,800.00
4 Batu Kali M02 M3 350,000.00
5 Semen M05 Kg 1,300.00
6 Semen / PC (40kg) M12 Zak 52,000.00
7Sirtu M16 M3 175,000.00
8 Tanah urug m3 100,000.00
9 Agregat Pecah Mesin 5-10 & 10-20 mm M92 M3 188,573.63
10 Air liter 100.00
11 U Ditch uk. 30x30x1200 (g = 5 ton) unit 289,000.00
12 U Ditch uk. 30x40x1200 (g = 5 ton) unit 372,000.00
13 U Ditch uk. 30x50x1200 (g = 5 ton) unit 423,000.00
14 U Ditch uk. 40x40x1200 (g = 5 ton) unit 419,000.00
15 U Ditch uk. 40x50x1200 (g = 5 ton) unit 481,000.00
16 U Ditch uk. 40x60x1200 (g = 5 ton) unit 518,000.00
17 U Ditch uk. 40x60x1200 (g = 10 ton) unit 523,000.00
18 U Ditch uk. 50x50x1200 (g = 5 ton) unit 573,000.00
19 U Ditch uk. 50x60x1200 (g = 5 ton) unit 625,000.00
20 U Ditch uk. 50x70x1200 (g = 5 ton) unit 692,000.00
21 U Ditch uk. 60x60x1200 (g = 5 ton) unit 696,000.00
22 U Ditch uk. 60x70x1200 (g = 5 ton) unit 775,000.00
23 U Ditch uk. 60x80x1200 (g = 5 ton) unit 850,000.00
24 U Ditch uk. 80x80x1200 (g = 5 ton) unit 912,000.00
25 U Ditch uk. 80x90x1200 (g = 5 ton) unit 982,000.00
26 U Ditch uk. 80x100x1200 (g = 5 ton) unit 1,067,000.00
27 U Ditch uk. 80x80x1200 (g = 10 ton) unit 1,532,000.00
28 U Ditch uk. 80x100x1200 (g = 10 ton) unit 1,292,000.00
29 U Ditch uk. 100x100x1200 (g = 5 ton) unit 1,738,000.00
30 Cover U Ditch CU 30 Uk. 30.6.60 (g = 5 ton) unit 140,000.00
31 Cover U Ditch CU 40 Uk. 40.6.60 (g = 5 ton) unit 169,000.00
32 Cover U Ditch CU 50 Uk. 50.8.60 (g = 5 ton) unit 213,000.00
33 Cover U Ditch CU 60 Uk. 60.8.60 (g = 5 ton) unit 266,000.00
34 Cover U Ditch CU 80 (g = 5 ton) unit 472,000.00
35 Cover U Ditch CU 40 (g = 10 ton) unit 225,000.00
36 Cover U Ditch CU 80 (g = 10 ton) unit 510,000.00
37 Buis Beton U 20 cm buah 35,000.00
38 Buis Beton U 30 cm buah 45,000.00
39 Buis Beton U 40 cm buah 65,000.00
40 Buis Beton U 50 cm buah 75,000.00
41 Besi Beton Dia 12mm, 12 m Lonjor 110,000.00
42 Besi Beton Dia 10mm, 12 m Lonjor 70,000.00
43 Besi Beton Dia 8mm, 12 m Lonjor 48,000.00
44 Besi Beton Dia 6mm, 12 m Lonjor 35,000.00
45 Besi Siku 50.50.5, panjang 6 m Lonjor 160,000.00
46 Besi Siku 40.40.4, panjang 6 m Lonjor 90,000.00
47 Besi Siku 30.30.3, panjang 6 m Lonjor 62,000.00
48 Besi Wire Mesh M5 Lembar 342,000.00
49 Besi Wire Mesh M8 Lembar 775,000.00
50 Besi Wire Mesh M10 Lembar 1,167,500.00
51 Cat Besi Kg 75,000.00
52 Cat Meni Kg 38,000.00
53 Thinner liter 27,500.00
54 Plamur Besi Kg 30,000.00
55 kawat las listrik Kg 20,000.00
56 kawat ikat beton Kg 22,000.00
57 Pipa PVC type AW dia 1" m1 12,000.00
58 Pipa PVC type AW dia 3" m1 27,500.00
59 Pipa PVC type AW dia 4" m1 63,425.00
60 Plastik Polythene t = 150 mikron m2 2,500.00
61 Kayu Balok Kelas III m3 3,500,000.00
62 Paku 5cm - 10cm kg 20,000.00
63 Minyak Begisting liter 30000

DAFTAR
HARGA SEWA ALAT

HARGA
No. KODE SATUAN SATUAN KETERANGAN
( Rp.)
1 Stamper jam 150,000.00
2 Jack Hammer jam 187,500.00
3 Dump Truck 3,5 ton jam 450,000.00
4 Crane jam 950,000.00
5 Excavator PC 75 jam 175,000.00
6 Forklift jam 150,000.00
7 Gerobak jam 10,000.00
8 Pompa Air jam 13,000.00
9 sewa alat pengelasan jam 150,000.00
10 Sewa Alat Bantu jam 18,000.00
Lampiran I : Keputusan Pengguna Anggaran
: Nomor : 188.4/ 15 / 417.501 / 2020
: Tanggal : 03 April 2020

No. JENIS BAHAN Sat. HARGA

1 2 3 4
JENIS BAHAN BANGUNAN BAHAN
PENUTUP ATAP & PLAFON
1 Asbes datar tebal 4 mm (60x180) Lbr Rp 50,000.00
2 Asbes datar tebal 5 mm (60x180) Lbr Rp 63,000.00
3 Asbes datar tebal 6 mm (40x180) Lbr Rp 78,000.00
4 Asbes gelombang besar tebal 5 mm (2,50 x 0,92 m) Lbr Rp 125,000.00
5 Asbes gelombang kecil tebal 5 mm (2,25 x 0,92 m) Lbr Rp 85,000.00
6 Asbes gelombang kecil tebal 5 mm (2,00 x 0,92 m) Lbr Rp 78,000.00
7 Asbes wuwung stel gelombang 0,92 mm set Rp 45,000.00
8 Genteng Karang Pilang / wisma bj Rp 6,000.00
9 Genteng wuwung jawa / lokal bj Rp 15,000.00
10 Genteng wuwung karang pilang / wisma bj Rp 20,000.00
11 Genteng bubung kodok bj Rp 5,500.00
12 Genteng Beton bj Rp 4,500.00
13 Genteng kodok bj Rp 4,000.00
14 Nok Genteng Beton bj Rp 7,000.00
15 Seng Gelombang 3" x 6" Lbr Rp 127,000.00
16 Seng Plat 3" x 6" BJLS Lbr Rp 401,000.00
17 Teakwood tebal 4 mm (1,22 x 2,44) Lbr Rp 165,000.00
18 Plywood tebal 4 mm (1,22 x 2,44) Rp 97,500.00
19 Triplek tebal 4 mm (1,20 x 2,40) lbr Rp 70,000.00
20 Triplek tebal 4 mm (0,90 x 2,00) lbr Rp 52,000.00
21 Triplek tebal 4 mm (1,22 x 2,44) lbr Rp 75,000.00
22 Multiplek 120.240.9 mm lbr Rp 167,000.00
23 Gypsum board (120X240X9mm) lbr Rp 83,000.00
24 Profil alluminium "T" m Rp 110,000.00
25 Aluminium strip m Rp 38,500.00
26 Kanal C 0,75 btg Rp 65,550.00
27 Reng Galvalum btg Rp 27,550.00
28 Skrup Kanal C dus Rp 135,550.00
29 Aluminium Foil Rol Rp 250,550.00
30 Roof light fibreglass m2 Rp 159,000.00
31 Tepung Gypsum kg Rp 5,000.00
32 Ramset bh Rp 42,500.00
BAHAN MENGGUNAKAN KAYU
1 Dolken kayu Ø 8-10/400 cm bh Rp 28,000.00
2 Kayu meranti (balok) 8/12, 6/12 m3 Rp 3,500,000.00
3 Kayu meranti (papan)2/20 x 2 m, 3/30 x 3 m m3 Rp 3,250,000.00
4 Kayu meranti (usuk) 5/7, 4/6, 3/5 Lonjor Rp 39,000.00
5 Kayu meranti (begesting) m3 Rp 3,375,000.00
6 List Kayu 1/5 Lonjor Rp 16,900.00
7 List Kayu 2/4 Lonjor Rp 16,900.00
8 Perancah m3 Rp 3,980,000.00
9 Kayu terentang m3 Rp 4,900,000.00
10 Tali ijuk kg Rp 32,000.00
11 Ijuk kg Rp 30,000.00
12 Kaso 5/7 m3 Rp 6,000,000.00
13 Kayu papan tebal 9 mm lbr Rp 112,000.00
14 Bambu Ø6 - 10 / 600 cm btg Rp 25,000.00
15 Tali Rafia roll Rp 22,500.00
BAHAN MENGGUNAKAN BATU/PASIR & SEMEN
1 Batu Bata merah kelas 1 bh Rp 650.00
2 Bata ekspose ex MRH bh Rp 700.00
3 Bata ekspose ex tuban bh Rp 1,650.00
4 Bata Ringan bh Rp 545,000.00
5 Batu kali pecah 15/20 m3 Rp 264,000.00
6 Batu tempel m2 Rp 70,000.00
7 Batu kerikil beton m3 Rp 258,000.00
8 Pasir beton m3 Rp 234,000.00
9 Pasir Pasang m3 Rp 195,000.00
10 Pasir urug m3 Rp 137,800.00
11 Semen berwarna Yiyitan kg Rp 14,000.00
12 Semen PC (Portland Cement)/Semen Gresik ( 40 Kg) zak Rp 52,000.00
13 Semen Tiga Roda (40 Kg) zak Rp 50,000.00
14 Semen Putih kg Rp 3,000.00
15 Kapur Pasang kg Rp 3,400.00
16 Tanah Urug m3 Rp 100,000.00
17 Sirtu m3 Rp 175,000.00
18 Semen nat kg Rp 20,100.00
BAHAN MENGGUNAKAN BESI/LOGAM
1 Besi begel/ baut kg Rp 25,000.00
2 Besi beton polos kg Rp 12,100.00
3 Besi beton (polos/ ulir) kg Rp 12,100.00
4 Besi beton diameter 16 mm, 12 m ljr Rp 189,000.00
5 Besi beton diameter 12 mm, 12 m ljr Rp 110,000.00
6 Besi beton diameter 10 mm, 12 m ljr Rp 70,000.00
7 Besi beton diameter 8 mm, 12 m ljr Rp 48,000.00
8 Besi beton diameter 6 mm, 12 m ljr Rp 35,000.00
11 Besi pipa galvanis medium 1 1/2, 6m ljr Rp 235,000.00
12 Besi pipa galvanis medium 1 1/4, 6m ljr Rp 178,000.00
13 Besi pipa galvanis medium 1 , 6m ljr Rp 148,000.00
14 Besi pipa galvanis medium 1/2, 6m ljr Rp 85,000.00
15 Besi pipa galvanis medium 2 1/2, 6m ljr Rp 320,000.00
16 Besi pipa galvanis medium 2, 6m ljr Rp 198,000.00
17 Besi pipa galvanis medium 3, 6m ljr Rp 457,000.00
18 Besi pipa galvanis medium 4, 6m ljr Rp 589,000.00
19 Besi pipa galvanis medium 5, 6m ljr Rp 657,000.00
20 Besi pipa galvanis medium 6, 6m ljr Rp 752,000.00
21 Besi pipa galvanis medium 3/4, 6m ljr Rp 114,000.00
22 Besi Siku 50.50.5, panjang 6 m ljr Rp 160,000.00
23 Besi Siku 40.40.4, panjang 6 m ljr Rp 90,000.00
24 Besi Siku 30.30.3, panjang 6 m ljr Rp 62,000.00
25 Besi Wire Mesh M5 lmbr Rp 342,000.00
26 Besi Wire Mesh M8 lmbr Rp 775,000.00
27 Besi Wire Mesh M10 lmbr Rp 1,167,500.00
28 Besi hollow 0.05x0.05x0.002,3x600 btg Rp 364,000.00
29 Besi hollow 0.04x0.04x0.002,3x600 btg Rp 284,000.00
30 Kawat ikat beton kg Rp 22,000.00
31 Kawat nyamuk kasa aluminium m2 Rp 40,000.00
32 Kawat harmonika m Rp 27,000.00
33 Kawat las listrik kg Rp 20,000.00
BAHAN UNTUK LANTAI
1 Paving stone persegi abu-abu tebal 6 cm kasar m2 Rp 65,000.00
2 Paving stone persegi abu-abu tebal 8 cm kasar m2 Rp 80,000.00
3 Kanstin uk. 10x20x40 cm bh Rp 13,000.00
4 Stopper / Uskup t = 6 cm bh Rp 4,000.00
5 Tegel keramik 30 x 30 cm bh Rp 87,000.00
6 Tegel keramik 33 x 33 cm bh Rp 97,000.00
7 Tegel keramik 40 x 40 cm bh Rp 112,000.00
8 Tegel keramik dinding (20 x 25) cm bh Rp 85,000.00
BAHAN UNTUK CAT
1 Cat (besi/kayu) Emco kg Rp 75,000.00
2 Cat meni (besi/kayu) cap Pedang kg Rp 38,000.00
3 Meni A kg Rp 28,000.00
4 Meni B kg Rp 14,000.00
5 Cat tembok Vinilek, Aviapaint (sejenis) kg Rp 105,000.00
6 Cat tembok Decolith dan yg setara kg Rp 210,000.00
7 Cat minyak dhoof klg Rp 75,000.00
8 Cat clear dhoof klg Rp 85,000.00
9 Cat Couting Natural klg Rp 85,000.00
10 Minyak pelumas ltr Rp 25,500.00
11 Minyak begisting ltr Rp 30,000.00
12 Plitur jadi kg Rp 75,000.00
13 Kertas gosok/ Ampelas lbr Rp 4,000.00
14 Plamur tembok kg Rp 10,000.00
15 Plamur kayu kg Rp 28,000.00
16 Plamur Besi kg Rp 30,000.00
17 Spiritus liter Rp 20,000.00
18 Lem kayu kg Rp 13,500.00
19 Thinner B / minyak cat liter Rp 27,500.00
20 Soda api kg Rp 30,000.00
21 Kuas 3" bh Rp 10,500.00
22 Kuas 4" bh Rp 25,000.00
23 Kalkarium kg Rp 12,500.00
24 Water Proff kg Rp 50,000.00
BAHAN PENGGANTUNG DAN PENGUNCI
1 Engsel H stl Rp 18,000.00
2 Engsel Kuningan arch asli stl Rp 20,000.00
3 Engsel jendela bh Rp 15,000.00
4 Engsel angin bh Rp 22,500.00
5 Engsel pintu bh Rp 25,000.00
6 Engsel pintu viper dan yg setara bh Rp 45,000.00
7 Espanyolet stl Rp 110,000.00
8 Grendel bj Rp 12,000.00
9 Grendel biasa (besar) bh Rp 15,000.00
10 Grendel biasa (kecil) bh Rp 10,000.00
11 Grendel Tanam bh Rp 55,000.00
12 Kunci tanam antik bj Rp 169,000.00
13 Kunci tanam besar kuda terbang 2 x putar bj Rp 85,000.00
14 Kunci tanam kamar mandi bh Rp 50,000.00
15 Kunci silinder bh Rp 35,000.00
16 Spring knip bh Rp 20,000.00
17 Door closer bh Rp 125,000.00
18 Door stop bh Rp 10,000.00
19 Door holder bh Rp 22,000.00
20 Kunci selot bh Rp 8,000.00
21 Hak angin bj Rp 18,000.00
22 Hak angin 4 mm (lurus) bj Rp 20,000.00
23 Kait angin bh Rp 13,500.00
24 Pegangan pintu pj 20 bh Rp 180,000.00
25 Pintu aluminium m Rp 240,000.00
26 Pintu HPL bh Rp 385,000.00
27 Kusen Aluminium m Rp 118,000.00
28 Kunci tanam biasa bh Rp 95,000.00
BAHAN UNTUK KM/WC/URINOIR
1 Pipa / slang spiral m Rp 35,000.00
2 Closet duduk putih porselin komplit single blok bh Rp 1,250,000.00
3 Closet jongkok porselin warna putih bh Rp 170,000.00
4 Closet jongkok teraso bh Rp 75,000.00
5 Bak teraso bh Rp 1,488,000.00
6 Bak cuci stainless steel bh Rp 150,000.00
7 Seal tape bh Rp 4,000.00
8 Wastafel bh Rp 400,000.00
9 Kran air bh Rp 17,500.00
10 Sumur peresap unit Rp 235,000.00
11 Water drain + Assesories set Rp 28,000.00
12 Urinoir bh Rp 875,000.00
13 Floor drain bh Rp 15,000.00
14 Roof Drain bh Rp 12,750.00
15 Bak fibreglass bh Rp 400,000.00
16 Air ltr Rp 100.00
BAHAN JENIS KACA
1 Kaca polos tb. 3 mm m2 Rp 50,000.00
2 Kaca polos tb. 5 mm m2 Rp 80,000.00
3 Kaca polos tb. 8 mm m2 Rp 200,000.00
4 Kaca rayban tb 5 mm m2 Rp 90,000.00
5 krepyak kaca nako + kerangka lbr Rp 14,000.00
6 Profil kaca m Rp 85,000.00
7 Sealant bh Rp 40,000.00
BAHAN PLASTIK PIPA PVC
1 Keni PVC 1/2" bh Rp 3,000.00
2 Keni PVC 3/4" bh Rp 3,000.00
3 Keni PVC 2" bh Rp 5,000.00
4 Keni PVC 3" bh Rp 8,000.00
5 Keni PVC 4" bh Rp 20,000.00
6 Keni PVC 5" bh Rp 24,000.00
7 Klem PVC bh Rp 2,000.00
8 Pipa PVC 1" tipe D panjang 4.00 mt ljr Rp 36,600.00
9 Pipa PVC 1 1/2" tipe D panjang 4.00 mt ljr Rp 41,600.00
10 Pipa PVC 2" tipe D panjang 4.00 mt ljr Rp 54,300.00
11 Pipa PVC 2 1/2" tipe D panjang 4.00 mt ljr Rp 80,500.00
12 Pipa PVC 3" tipe D panjang 4.00 mt ljr Rp 116,800.00
13 Pipa PVC 4" tipe D panjang 4.00 mt ljr Rp 164,200.00
14 Pipa PVC 5" tipe D panjang 4.00 mt ljr Rp 268,200.00
15 Pipa PVC 3/4" tipe AW panjang 4.00 mt ljr Rp 33,000.00
16 Pipa PVC 1/2" tipe AW panjang 4.00 mt ljr Rp 27,000.00
17 Pipa PVC 1" tipe AW panjang 4.00 mt ljr Rp 48,000.00
18 Pipa PVC 1 1/2" tipe AW panjang 4.00 mt ljr Rp 76,600.00
19 Pipa PVC 2" tipe AW panjang 4.00 mt ljr Rp 113,800.00
20 Pipa PVC 2 1/2" tipe AW panjang 4.00 mt ljr Rp 146,200.00
21 Pipa PVC 3" tipe AW panjang 4.00 mt ljr Rp 172,000.00
22 Pipa PVC 4" tipe AW panjang 4.00 mt ljr Rp 253,700.00
23 Pipa PVC 5" tipe AW panjang 4.00 mt ljr Rp 479,300.00
24 Pipa PVC 3/4" tipe AW panjang 6.00 mt ljr Rp 49,500.00
25 Pipa PVC 1/2" tipe AW panjang 6.00 mt ljr Rp 40,600.00
26 Pipa PVC 1" tipe AW panjang 6.00 mt ljr Rp 72,000.00
27 Pipa PVC 1 1/2" tipe AW panjang 6.00 mt ljr Rp 115,000.00
28 Pipa PVC 2" tipe AW panjang 6.00 mt ljr Rp 170,000.00
29 Pipa PVC 2 1/2" tipe AW panjang 6.00 mt ljr Rp 219,300.00
30 Pipa PVC 3" tipe AW panjang 6.00 mt ljr Rp 258,000.00
31 Pipa PVC 4" tipe AW panjang 6.00 mt ljr Rp 380,550.00
32 Pipa PVC 5" tipe AW panjang 6.00 mt ljr Rp 719,000.00
33 Lem PVC bh Rp 6,250.00
BAHAN JENIS PAKU
1 Paku asbes kg Rp 45,000.00
2 Paku reng kg Rp 20,000.00
3 Paku triplek kg Rp 22,000.00
4 Paku usuk kg Rp 20,000.00
5 Paku sekrup 2" bj Rp 19,500.00
6 Dinaboult BJ Rp 4,000.00
BAHAN PERALATAN LISTRIK
1 Stop kontak (Broco/Setara) bh Rp 15,000.00
2 Skakelar (Broco/Setara) bh Rp 15,000.00
3 Skakelar / hendel bh Rp 16,000.00
4 Zekering lengkap bh Rp 20,000.00
5 Panel box 25cm x 35cm x 12cm bh Rp 263,000.00
6 Panel box 30cm x 40cm x 15cm bh Rp 319,000.00
7 Panel box 40cm x 50cm x 20cm bh Rp 454,000.00
8 Pitingan bh Rp 7,000.00
9 Kabel NYA 1 x 1,5 100m rol Rp 185,000.00
10 Kabel NYA 1 x 2,5 100m rol Rp 300,000.00
11 Kabel NYM 2 x 1,5 50m rol Rp 280,000.00
12 Kabel NYM 2 x 2,5 50m rol Rp 400,000.00
13 Kabel NYM 3 x 1,5 50m rol Rp 360,000.00
14 Kabel NYM 3 x 2,5 50m rol Rp 520,000.00
15 Kabel NYM 4 x 2,5 50m rol Rp 1,400,000.00
16 Kabel NYY 2 x 1,5 mm2 m Rp 25,000.00
17 Kabel NYY 2 x 2,5 mm2 m Rp 29,000.00
18 Kabel NYY 2 x 4 mm2 m Rp 37,000.00
19 Lampu TL 20 W / 220 Komplit Balas, Kaca bh Rp 45,000.00
20 Lampu TL 40 W / 220 Komplit Balas, Kaca bh Rp 54,500.00
21 Lampu LED 20 W bh Rp 28,400.00
22 Lampu LED 25 W / 220 Komplit Balas, Kaca bh Rp 69,000.00
BAHAN PRACETAK
1 U Ditch uk. 30x30x1200 (g = 5 ton) unit Rp 289,000.00
2 U Ditch uk. 30x40x1200 (g = 5 ton) unit Rp 372,000.00
3 U Ditch uk. 30x50x1200 (g = 5 ton) unit Rp 423,000.00
4 U Ditch uk. 40x40x1200 (g = 5 ton) unit Rp 419,000.00
5 U Ditch uk. 40x50x1200 (g = 5 ton) unit Rp 481,000.00
6 U Ditch uk. 40x60x1200 (g = 5 ton) unit Rp 518,000.00
7 U Ditch uk. 40x60x1200 (g = 10 ton) unit Rp 523,000.00
8 U Ditch uk. 50x50x1200 (g = 5 ton) unit Rp 573,000.00
9 U Ditch uk. 50x60x1200 (g = 5 ton) unit Rp 625,000.00
10 U Ditch uk. 50x70x1200 (g = 5 ton) unit Rp 692,000.00
11 U Ditch uk. 60x60x1200 (g = 5 ton) unit Rp 696,000.00
12 U Ditch uk. 60x70x1200 (g = 5 ton) unit Rp 775,000.00
13 U Ditch uk. 60x80x1200 (g = 5 ton) unit Rp 850,000.00
14 U Ditch uk. 80x80x1200 (g = 5 ton) unit Rp 912,000.00
15 U Ditch uk. 80x90x1200 (g = 5 ton) unit Rp 982,000.00
16 U Ditch uk. 80x100x1200 (g = 5 ton) unit Rp 1,067,000.00
17 U Ditch uk. 80x80x1200 (g = 10 ton) unit Rp 1,532,000.00
18 U Ditch uk. 80x100x1200 (g = 10 ton) unit Rp 1,292,000.00
19 U Ditch uk. 100x100x1200 (g = 5 ton) unit Rp 1,738,000.00
20 Cover U Ditch CU 30 (g = 5 ton) unit Rp 140,000.00
21 Cover U Ditch CU 40 (g = 5 ton) unit Rp 169,000.00
22 Cover U Ditch CU 50 (g = 5 ton) unit Rp 213,000.00
23 Cover U Ditch CU 60 (g = 5 ton) unit Rp 266,000.00
24 Cover U Ditch CU 80 (g = 5 ton) unit Rp 472,000.00
25 Cover U Ditch CU 40 (g = 10 ton) unit Rp 225,000.00
26 Cover U Ditch CU 80 (g = 10 ton) unit Rp 510,000.00
27 Buis Beton Diameter 15 cm buah Rp 35,000.00
28 Buis Beton Diameter 20 cm buah Rp 60,000.00
29 Buis Beton Diameter 30 cm buah Rp 80,000.00
30 Buis Beton Diameter 40 cm buah Rp 100,000.00
31 Buis Beton Diameter 50 cm buah Rp 115,000.00
32 Buis Beton U 20 cm buah Rp 35,000.00
33 Buis Beton U 30 cm buah Rp 45,000.00
34 Buis Beton U 40 cm buah Rp 65,000.00
35 Buis Beton U 50 cm buah Rp 75,000.00
BAHAN ASPAL
1 Aspal Curah kg Rp 10,500.00
2 Agr.Base Kelas A m3 Rp 130,000.00
3 Agregat Pecah Kasar m3 Rp 254,387.78
4 Agg. Halus LP A m3 Rp 213,531.24
5 Agregat Lolos # 1 " m3 Rp 280,850.38
6 Lolos screen1 ukuran ( 0 - 5) m3 Rp 213,531.24
7 Lolos screen2 ukuran ( 5 - 9,5) m3 Rp 280,850.38
8 Kerosen / Minyak Tanah ltr Rp 12,500.00
9 Pasir Halus (untuk HRS) m3 Rp 234,000.00
SEWA PERALATAN
1 Asp. Distributor jam Rp 400,000.00
2 Asphalt Finisher jam Rp 400,000.00
3 Asphalt Sprayer jam Rp 350,000.00
4 Buldozzer jam Rp 400,000.00
5 Concrete Vibrator jam Rp 657,000.00
6 Compressor jam Rp 200,000.00
7 excavator jam Rp 350,000.00
8 Jack Hammer jam Rp 187,500.00
9 Wheel Loader jam Rp 340,000.00
10 AMP jam Rp 4,000,000.00
11 Genset jam Rp 400,000.00
12 Dump Truck 3,5 ton jam Rp 300,000.00
13 Asphalt Finisher jam Rp 400,000.00
14 Tandem Roller jam Rp 540,000.00
15 P. Tyre Roller jam Rp 552,000.00
16 Crane jam Rp 950,000.00
17 Stone Crusher jam Rp 3,000,000.00
18 Excavator jam Rp 350,000.00
19 Blending Equipment jam Rp 350,000.00
20 Baby Roller jam Rp 187,000.00
21 P. Tyre Roller jam Rp 552,000.00
22 Vibrator Roller jam Rp 400,000.00
23 Water Tanker jam Rp 300,000.00
24 Motor Grader jam Rp 400,000.00
25 Sewa Alat Bantu jam Rp 18,000.00
26 Sewa Alat Bantu Strouss Pile jam Rp 15,625.00
UPAH TENAGA KERJA
1 Mandor org/hari Rp 150,000.00
2 Kepala Tukang org/hari Rp 125,000.00
3 Tukang org/hari Rp 115,000.00
4 Pekerja org/hari Rp 100,000.00
5 Operator org/hari Rp 125,000.00
6 Pembantu Operator org/hari Rp 100,000.00
7 Sopir / Driver org/hari Rp 125,000.00
8 Pembantu Sopir / Driver org/hari Rp 100,000.00
9 Mekanik org/hari Rp 100,000.00
10 Pembantu Mekanik org/hari Rp 100,000.00

CAMAT MAGERSARI
Selaku
PENGGUNA ANGGARAN
BAMBANG MUJIONO, SH. MH.
Pembina Tingkat I
NIP. 19660316 198910 1 001
DAFTAR HARGA SATUAN BAHAN & UPAH TENAGA KERJA

KEGIATAN : PEMBANGUNAN PUSKESMAS PETERONGAN


LOKASI : KECAMATAN PETERONGAN

Harga
No. Jenis Bahan Satuan
Satuan
1 2 3 4

A Bahan Pasir dan Tanah


1 Pasir Pasang m3 200,000.00
2 Pasir Cor / Beton m3 250,000.00
3 Pasir Urug m3 137,800.00
4 Tanah Urug m3 125,000.00
5 Sirtu m3 175,000.00
B Bahan Batu
1 Batu Kali Pecah 2/3 ( mesin ) m3 258,000.00
2 Batu Bata merah ( kelas I ) bh 650.00
3 Batu Belah 15/20 m3 264,000.00
4 Paving stone K.300 tebal 8 cm m2 70,000.00
5 Kanstin 10×20×40× K. 175 m' 115,000.00
6 Rooster bata 20 × 20 bh 10,000.00
C Bahan Semen
1 Semen Warna kg 14,000.00
2 Semen PC SNI 40 kg zak 52,000.00
3 Semen PC SNI 40 kg kg 1,300.00
D. Bahan kapur
1 Kapur Padam m3 400,000.00
E. Bahan Lantai
1 Lantai Keramik 60x60 cm m2 126,000.00
2 Lantai keramik 40x40 cm m2 112,000.00
3 Lantai keramik 40x40 cm ( Kasar ) m2 64,000.00
4 Lantai keramik 25x40cm m2 59,000.00
5 Lantai keramik 25x25 cm m2 60,000.00
6 Lantai keramik Motif 30x30 cm m2 70,000.00
7 Lantai keramik motif 20x20 cm m2 54,000.00
7 Step Nossing m2 50,000.00
8 Dinding keramik motif 30x60 cm m2 106,000.00
9 Plint Lantai keramik 80x80 cm bh 110,000.00
10 Batu Sikat Kg 5,000.00
11 Batu Candi m2 70,000.00
12 Paving Blok 20/10 t : 6 cm K 300 m2 65,000.00
13 Kanstin bh 115,000.00
14 Uskup bh 4,000.00
F Bahan Kayu
1 Kayu Kamfer balok 6/15 m3 9,000,000.00
2 Kayu kamfer papan 3/30/300 m3 10,000,000.00
3 Kayu kruing balok 8/12,6/12 m3 7,000,000.00
4 Kayu meranti / berneo balok 8/12, 6/15 m3 3,250,000.00
5 Papan begesting kayu randu m3 1,000,000.00
6 Kayu kruing usuk 5/7 m3 7,000,000.00
7 Triplek 120,240,8 mm lbr 112,000.00
8 Plywood 122.244 9 mm lbr 95,000.00
9 List kayu profil 0,5cm-1cm m' 20,000.00
10 Bambu bongkotan btg 25,000.00
10 Kayu Papan lbr 250,000.00
11 Woodplank m' 19,250.00

G Bahan Besi
1 Besi beton Polos / ulir kg 13,500.00
2 Baja konstruksi kg 14,300.00
3 Besi siku L 60,60,6 kg 12,750.00
4 Kawat bendrat kg 22,000.00
5 Paku 2" - 5" kg 20,000.00
6 Profil alluminium m' -
7 Alluminium strip m' -
8 Profil alluminium Hollow m' 15,500.00
9 Metal stat m' 40,000.00
10 Paku Pancing/Paku Sekrup/ramset bh 520.00
11 Paku Sekrup kg 40,000.00
12 Talang plat BJLS 28 m2 45,000.00
13 Kawat Penggantung Kg -
Harga
No. Jenis Bahan Satuan
Satuan
1 2 3 4
14 Kawat las Kg 20,000.00
15 Besi Hollow 5x5x2 m1 44,000.00
16 Besi Hollow 2x4x1.12 m1 22,000.00
17 Polycarbonat m2 100,887.81
18 Besi Wire Mesh M8 Uk. 5,4 x 2,1 m lbr 66,137.57
Harga
No. Jenis Bahan Satuan
Satuan
1 2 3 4
H. Bahan Penutup
1 seng lbr 127,000.00
2 Bubungan bitumen sheet bh 5,000.00
3 Asbes Eternit lbr -
4 Zenk Galvalum t :55 cm lbr 135,000.00
5 Plafon Superrata t = 3 mm ( 100 x 100 ) lbr -
6 List gypsum 15 cm m' 5,000.00
7 Tepung gypsum kg 5,000.00
8 Talang Seng BJLS L : 60 cm m' #REF!
9 Usuk Canal C. 75.0.8 m' 23,000.00
10 Reng Purlin R.36.055 m' 15,000.00
11 Baut bh 10,000.00

I Bahan Cat
1 Plamur tembok kg 10,000.00
2 Plamur kayu " PEDANG " kg 40,000.00
3 Cat kayu / besi EMCO/setara kg 70,000.00
4 Cat tembok "Catylac/Setara" kg 210,000.00
5 Cat meni "PEDANG" kg 38,000.00
6 Dempul kayu kg -
7 Minyak cat / thiner B ltr -
8 Lem kayu Kg 33,000.00
9 Residu / Ter ltr -
10 Minyak Begisting ltr 30,000.00
11 Ampelas / kertas gosok lbr 3,500.00
12 Kuas cat bh 14,000.00
13 Waterproofing Coating ex. Sika Rain Tile ( 3 kali lapis ) Kg 50,000.00
14 Sika top 107 Seal ( Untuk toilet, balkon & area basah ) Kg -
15 Pre treatment/cleaning m² -
16 Curbing sudut m' -
17 Solar ltr 9,800.00
18 Minyak pelumas ltr 25,500.00

J. Bahan Kaca dan aluminium


1. Kaca bening 5 mm m2 -
2 Profil Aluminium kusen m' 110,000.00
3 Skrup fixer bh 200.00
4 Sealant tube 40,000.00
5 kaca tempered t= 12mm m2 750,000.00
6 Sponeng m' 100,000.00
7 "U" Channel Stenliss Steel Uk 2x2cm (dudukan Kaca) m' 400,000.00
8 Engsel pintu Tanam bawah lantai set 100,000.00
9 Door Stop magnet bh 10,000.00
10 Door Closer bh 300,000.00
11 Cover Stainless Steel Kaca tempered m' 250,000.00
12 Spoons m' 5,000.00
13 Kanal Galvalum C 80 x 75 mm - 6m btg 98,700.00
14 Kanal Galvalum 0,75 mm btg 92,900.00
15 Baut Screw Driver bh 1,400.00
16 Dynabolt bh 4,000.00
17 Reng Galvalum 35 x 40 mm - 6m btg 27,550.00
18 Talang Galvalum 90, Tebal 0,3 m' 40,650.00

K. Bahan Accecoris Kusen


1 Rell pintu geser set 350,000.00
2 Rell jendela set 350,000.00
3 Kunci tanam bh 85,000.00
4 Engsel pintu bh 25,000.00
5 Engsel jendela bh 15,000.00
6 Grendel pintu / jendela bh 8,000.00
7 Kait / hak angin bh 10,000.00
8 Gypsum board, tebal 9 mm lbr 83,000.00
9 Roster bh 21,000.00
10 Roster Exterior bh 24,000.00
11 Pintu Alumunium -
12 Alluminium Strip bh 38,500.00
13 Sealant Tube 40,000.00
14 Kaca m2 80,000.00
15 Skrup Fixer Bh -
16 Daun Pintu rangka aluminium m2 -
Harga
No. Jenis Bahan Satuan
Satuan
1 2 3 4
17 Kaca polos t = 5mm m2 80,000.00
18 Kaca polos t = 8 mm m2 180,000.000
19 Friction stay jendela set -
20 Grendel Psg 73,000.000
Harga
No. Jenis Bahan Satuan
Satuan
1 2 3 4
L. Bahan Instalasi Air
1 Pipa air PVC 8" m' 112,500.00
2 Pipa air PVC 4" m' 63,425.00
3 Pipa air PVC 3" m' 27,500.00
4 Pipa air PVC 2" m' 28,450.00
5 Pipa air PVC 3/4" m' 8,250.00
6 Knee PVC 3/4" Bh 3,500.00
7 Pipa air PVC 1" m' 47,000.00
8 Knee PVC 3" Bh 10,000.00
9 Knee PVC 2" Bh 6,000.00
10 Knee PVC 4" Bh 22,000.00
11 Kran Air 3/4" bh 33,000.00
12 Kran Air Panjang bh 700,000.00
13 Jet Washer Kloset duduk bh 13,500.00
14 Floor Drain bh 15,000.00
15 Water drain/Avour bh 75,000.00
16 Wastafel bh 1,500,000.00
17 Kloset Jongkok bh 300,000.00
18 Closed Duduk ex. Ina bh 1,250,000.00
19 Seal Tape bh 4,000.00
20 Buis beton U Ø 30 m' -
21 Pas. Buis beton Ø 100 bh -
22 Pas. Bak Mandi fiberglass bh -
23 Bak Air bh -
24 U - Dith 300 x 300 x 1200 Bj -
25 U - Dith 400 x 600 x 1200 Bj 561,000.00
26 cover uditch gandar 5 ton Bj 286,000.00
27 pipa galvanis m' 120,000.00

M. Bahan lampu dan instalasi listrik


1 Pasang Instalasi Listrik + Ongkos Pasang ttk -
2 Pasang lampu downlight LED 12 W lengkap (lampu+accesoris) bh 100,000.00
3 Lampu LED 13 W bh 28,400.00
4 Lampu LED 5 W bh 35,000.00
5 Stop Kontak AC "BROCO" + Ongkos Pasang bh 63,000.00
6 Stop Kontak "BROCO" + Ongkos Pasang bh 15,000.00
7 Saklar tunggal "BROCO" + Ongkos Pasang bh 15,000.00
8 Saklar ganda " BROCO " + Ongkos Pasang bh 15,000.00
9 Sekering ganda "LN" bh -
10 Kabel NYM 3 X 2,5 mm2 m' 25,000.00
11 Panel MCB unit -
12 MCB 10 A bh 200,000.00
13 MCB 25 A bh 225,000.00
14 Box Panel Bh 3,500,000.00
15 Isolasi Bh 15,000.00
16 Mangkok Listrik Bh 7,000.00
17 Klem Bh 2,000.00

N Harga upah tenaga kerja


1 Mandor Org/hr 150,000.00
2 Kepala Tukang Org/hr 125,000.00
3 Tukang Batu Org/hr 115,000.00
4 Tukang Kayu Org/hr 115,000.00
5 Tukang Cat Org/hr 115,000.00
6 Tukang Besi Org/hr 125,000.00
8 Tukang Listrik Org/hr 115,000.00
9 Pekerja Org/hr 120,000.00
HARGA BAHAN

No. JENIS BAHAN SATUAN HARGA KETERANGAN

1 2 3 4 5
1 Genteng Karang Pilang / wisma bj Rp 6,000.00
2 Genteng wuwung karang pilang / wisma bj Rp 20,000.00
3 Seng Gelombang 3" x 6" Lbr Rp 127,000.00
4 Seng Plat 3" x 6" BJLS Lbr Rp 401,000.00
5 Gypsum board (120X240X9mm) lbr Rp 83,000.00
6 Aluminium strip m Rp 38,500.00
7 Kanal C 80 btg Rp 98,700.00
8 Kanal C 0,76 btg Rp 65,550.00
8 Reng Galvalum btg Rp 27,550.00
9 Skrup Kanal C dus Rp 135,550.00
10 Ramset bh Rp 42,500.00
11 Kayu meranti (papan)2/20 x 2 m, 3/30 x 3 m m3 Rp 3,250,000.00
12 Kayu meranti (begesting) m3 Rp 1,000,000.00
13 Kayu Teretang m12 Rp 3,375,000.00
13 Bambu Ø6 - 10 / 600 cm btg Rp 25,000.00
14 Tali Rafia roll Rp 22,500.00
15 Batu Bata merah kelas 1 bh Rp 650.00
16 Roaster 20x20 bh Rp 10,000.00
17 Batu kali pecah 15/20 m3 Rp 264,000.00
18 Batu kerikil beton m3 Rp 258,000.00
19 Pasir beton m3 Rp 234,000.00
20 Pasir Pasang m3 Rp 195,000.00
21 Pasir urug m3 Rp 137,800.00
22 Semen berwarna Yiyitan kg Rp 14,000.00
53 Semen PC (Portland Cement)/Semen Gresik ( 40 Kg) zak Rp 1,300.00
57 Tanah Urug m3 Rp 100,000.00
58 Sirtu m3 Rp 175,000.00
59 Besi beton (polos/ ulir) kg Rp 12,100.00
60 Besi hollow 0.04x0.04x0.002,3x600 btg Rp 284,000.00
61 Kawat ikat beton kg Rp 22,000.00
64 Kawat las listrik kg Rp 20,000.00
65 Paving stone persegi abu-abu tebal 6 cm kasar m2 Rp 65,000.00
66 Stopper / Uskup t = 6 cm bh Rp 4,000.00
67 Tegel keramik 25 x 25 cm m2 Rp 60,000.00
68 Tegel keramik 25 x 40 cm m2 59,000.00
70 Tegel keramik 30 x 30 cm m2 Rp 87,000.00
71 Tegel keramik 40 x 40 cm m2 Rp 112,000.00
72 Tegel keramik 60 x 60 cm m2 Rp 126,000.00
73 Cat meni (besi/kayu) cap Pedang kg Rp 38,000.00
74 Meni A kg Rp 28,000.00
75 Meni B kg Rp 14,000.00
76 Cat tembok Vinilek, Aviapaint (sejenis) kg Rp 105,000.00
77 Cat tembok Decolith dan yg setara kg Rp 210,000.00
78 Minyak begisting ltr Rp 30,000.00
79 Kertas gosok/ Ampelas lbr Rp 4,000.00
80 Plamur tembok kg Rp 10,000.00
81 Plamur kayu kg Rp 28,000.00
82 Kalsiplank 2/30 m' Rp 19,250.00
83 Lem kayu kg Rp 13,500.00
84 Engsel H stl Rp 18,000.00
85 Engsel jendela bh Rp 15,000.00
86 Engsel pintu bh Rp 25,000.00
87 Grendel bj Rp 12,000.00
88 Grendel Tanam bh Rp 55,000.00
89 Kunci tanam besar kuda terbang 2 x putar bj Rp 85,000.00
90 Door closer bh Rp 125,000.00
91 Door stop bh Rp 10,000.00
92 Door holder bh Rp 22,000.00
93 Kunci selot bh Rp 8,000.00
94 Hak angin bj Rp 18,000.00
95 Pintu aluminium m Rp 240,000.00
96 Pintu HPL bh Rp 385,000.00
97 Kusen Aluminium m Rp 118,000.00
98 Skrup Fixer bh Rp 250.00
99 Closet duduk putih porselin komplit single blok bh Rp 1,250,000.00
100 Bak teraso bh Rp 1,488,000.00
101 Bak cuci stainless steel bh Rp 150,000.00
102 Seal tape bh Rp 4,000.00
103 Kran air bh Rp 17,500.00
104 Floor drain bh Rp 15,000.00
105 Air ltr Rp 100.00
106 Kaca polos tb. 5 mm m2 Rp 80,000.00
107 Sealant bh Rp 40,000.00
108 Klem PVC bh Rp 2,000.00
109 Pipa PVC 3/4" tipe AW panjang 4.00 mt ljr Rp 33,000.00
110 Pipa PVC 2" tipe AW panjang 4.00 mt ljr Rp 113,800.00
111 Lem PVC bh Rp 6,250.00
112 Paku reng kg Rp 20,000.00
113 Paku triplek kg Rp 22,000.00
114 Paku usuk kg Rp 20,000.00
115 Paku sekrup 2" bj Rp 19,500.00
116 Dinaboult BJ Rp 4,000.00
117 Stop kontak (Broco/Setara) bh Rp 15,000.00
118 Skakelar (Broco/Setara) bh Rp 15,000.00
119 Skakelar Ganda(Broco/Setara) bh Rp 15,000.00
120 Isolasi bh Rp 15,000.00
121 Mangkok Listrik bh Rp 7,000.00
122 Pitingan bh Rp 7,000.00
123 Kabel NYM 3 x 2,5 50m rol Rp 520,000.00
124 Lampu LED 20 W bh Rp 28,400.00
125 Asphalt Sprayer jam Rp 350,000.00
126 Buldozzer jam Rp 400,000.00
127 Concrete Vibrator jam Rp 657,000.00
128 excavator jam Rp 350,000.00
129 Jack Hammer jam Rp 187,500.00
130 Genset jam Rp 400,000.00
131 Dump Truck 3,5 ton jam Rp 300,000.00
132 Crane jam Rp 950,000.00
133 Sewa Alat Bantu Strouss Pile jam Rp 15,625.00
UPAH TENAGA KERJA
1 Mandor org/hari Rp 150,000.00
2 Kepala Tukang org/hari Rp 125,000.00
3 Tukang org/hari Rp 115,000.00
4 Pekerja org/hari Rp 100,000.00
5 Operator org/hari Rp 125,000.00
6 Pembantu Operator org/hari Rp 100,000.00
7 Sopir / Driver org/hari Rp 125,000.00
8 Pembantu Sopir / Driver org/hari Rp 100,000.00
9 Mekanik org/hari Rp 100,000.00
10 Pembantu Mekanik org/hari Rp 100,000.00
PEKERJAAN BETON
CATATAN :
Bobot isi pasir = 1400 Kg/m3, Bobot isi kerikil = 1350 Kg/m3, Bukling factor pasir = 20 %
۞ 1 Kg Pembesian dengan besi polos atau ulir
Bahan An. SNI 2008 6.17
1.050 Kg Besi beton ( polos/ulir ) @ Rp. 13,500.00 = Rp 14,175.00
0.015 Kg Kawat beton @ Rp. 22,000.00 = Rp 330.00
Total Bahan = Rp 14,505.00
Upah An. SNI 2008 6.17
0.007 Oh Pekerja @ Rp. 120,000.00 = Rp 840.00
0.007 Oh Tukang besi @ Rp. 125,000.00 = Rp 875.00
0.0007 Oh Kepala tukang @ Rp. 125,000.00 = Rp 87.50
0.0004 Oh Mandor @ Rp. 150,000.00 = Rp 60.00
= Rp 1,862.50
Total harga = Rp 16,367.50
Overhead + Provit 5 % = Rp 818.38
Harga satuan pekerjaan = Rp 17,185.88
۞ 1 m2 Pasang bekisting untuk pondasi
Bahan An. SNI 2008 6.20
0.040 m3 Kayu terentang @ Rp. 3,250,000.00 = Rp 130,000.00
0.300 Kg Paku biasa 2" - 5" @ Rp. 20,000.00 = Rp 6,000.00
0.100 Ltr Minyak bekisting @ Rp. 30,000.00 = Rp 3,000.00
Total Bahan = Rp 139,000.00
Upah An. SNI 2008 6.20
0.520 Oh Pekerja @ Rp. 120,000.00 = Rp 62,400.00
0.260 Oh Tukang kayu @ Rp. 115,000.00 = Rp 29,900.00
0.026 Oh Kepala tukang @ Rp. 125,000.00 = Rp 3,250.00
0.026 Oh Mandor @ Rp. 150,000.00 = Rp 3,900.00
= Rp 99,450.00
Total harga = Rp 238,450.00
Bahan pakai 3x = Rp
Bahan pakai 2x = Rp 168,950.00
Overhead + Provit 5 % = Rp 8,447.50
Harga satuan pekerjaan = Rp 177,397.50

۞ 1 m2 Pasang bekisting untuk balok


Bahan An. SNI 2008 6.23
0.040 m3 Kayu terentang @ Rp. 3,250,000.00 = Rp 130,000.00
0.400 Kg Paku biasa 2" - 5" @ Rp. 20,000.00 = Rp 8,000.00
0.200 Ltr Minyak bekisting @ Rp. 30,000.00 = Rp 6,000.00
0.018 m3 Balok kayu meranti @ Rp. 3,250,000.00 = Rp 58,500.00
0.350 Lbr Tripleks tebal 9 mm @ Rp. 112,000.00 = Rp 39,200.00
2.000 Btg Bambu @ Rp. 25,000.00 = Rp 50,000.00
Total Bahan = Rp 291,700.00
Upah An. SNI 2008 6.23
0.660 Oh Pekerja @ Rp. 120,000.00 = Rp 79,200.00
0.330 Oh Tukang kayu @ Rp. 125,000.00 = Rp 41,250.00
0.033 Oh Kepala tukang @ Rp. 125,000.00 = Rp 4,125.00
0.033 Oh Mandor @ Rp. 150,000.00 = Rp 4,950.00
= Rp 129,525.00
Total harga = Rp 421,225.00
Bahan pakai 2x = Rp 275,375.00
Overhead + Provit 5 % = Rp 13,768.75
Harga satuan pekerjaan = Rp 289,143.75
۞ 1 m2 Pasang bekisting untuk sloof
Bahan An. SNI 2008 6.21
0.045 m3 Kayu terentang @ Rp. 1,000,000.00 = Rp 45,000.00
0.300 Kg Paku biasa 2" - 5" @ Rp. 20,000.00 = Rp 6,000.00
0.100 Ltr Minyak bekisting @ Rp. 30,000.00 = Rp 3,000.00
Total Bahan = Rp 54,000.00
Upah An. SNI 2008 6.21
0.520 Oh Pekerja @ Rp. 120,000.00 = Rp 62,400.00
0.260 Oh Tukang kayu @ Rp. 115,000.00 = Rp 29,900.00
0.026 Oh Kepala tukang @ Rp. 125,000.00 = Rp 3,250.00
0.026 Oh Mandor @ Rp. 150,000.00 = Rp 3,900.00
= Rp 99,450.00
Total harga = Rp 153,450.00
Bahan pakai 2x = Rp 126,450.00
Overhead + Provit 5 % = Rp 6,322.50
Harga satuan pekerjaan = Rp 132,772.50

۞ 1 m2 Pasang bekisting untuk kolom


Bahan An. SNI 2008 6.22
0.040 m3 Kayu terentang @ Rp. 1,000,000.00 = Rp 40,000.00
0.400 Kg Paku biasa 2" - 5" @ Rp. 20,000.00 = Rp 8,000.00
0.200 Ltr Minyak bekisting @ Rp. 30,000.00 = Rp 6,000.00
0.015 m3 Balok kayu meranti @ Rp. 3,250,000.00 = Rp 48,750.00
0.350 Lbr Tripleks tebal 9 mm @ Rp. 112,000.00 = Rp 39,200.00
2.000 Btg Bambu @ Rp. 25,000.00 = Rp 50,000.00
Total Bahan = Rp 191,950.00
Upah An. SNI 2008 6.22
0.660 Oh Pekerja @ Rp. 120,000.00 = Rp 79,200.00
0.330 Oh Tukang kayu @ Rp. 115,000.00 = Rp 37,950.00
0.033 Oh Kepala tukang @ Rp. 125,000.00 = Rp 4,125.00
0.033 Oh Mandor @ Rp. 150,000.00 = Rp 4,950.00
= Rp 126,225.00
Total harga = Rp 318,175.00
Bahan pakai 3x = Rp 222,200.00
Overhead + Provit 5 % = Rp 11,110.00
Bahan pakai 2x = Rp 233,310.00

۞ 1 m3 Membuat lantai kerja beton mutu F'c = 7,4 Mpa ( K 100 ), Slump ( 12 ± 2 ) Cm, w/c = 0.87
Bahan An. SNI 2008 6.4
230.000 Kg Semen portland @ Rp. 1,300.00 = Rp 299,000.00
0.638 m3 Pasir beton @ Rp. 234,000.00 = Rp 149,258.57
0.762 m3 Kerikil ( Maksimum 30 mm ) @ Rp. 258,000.00 = Rp 196,653.33
215.000 Liter Air @ Rp. 100.00 = Rp 21,500.00
Total Bahan = Rp 666,411.90
Upah An. SNI 2008 6.4
1.650 Oh Pekerja @ Rp. 120,000.00 = Rp 198,000.00
0.275 Oh Tukang batu @ Rp. 115,000.00 = Rp 31,625.00
0.028 Oh Kepala tukang @ Rp. 125,000.00 = Rp 3,500.00
0.083 Oh Mandor @ Rp. 150,000.00 = Rp 12,450.00
= Rp 245,575.00
Total harga = Rp 911,986.90
Overhead + Provit 5 % = Rp 45,599.35
Harga satuan pekerjaan = Rp 957,586.25
۞ 1 m3 Membuat beton Strous ∅ 25 K-250
An. SNI 6.7 + An. SNI 6.17 + An. SNI 6.20
92.355 Kg Besi beton @ Rp. 17,185.88 = Rp 1,587,201.30
1.000 m3 Spesi beton K-225 @ Rp. 1,142,831.42 = Rp 1,142,831.42
Total harga = Rp 2,730,032.72
1 m3 Membuat Pondasi Plat beton (60x60x20) K-250
An. SNI 6.7 + An. SNI 6.17 + An. SNI 6.20
162.027 Kg Besi beton @ Rp. 17,185.88 = Rp 2,784,570.04
1.000 m3 Spesi beton K-250 @ Rp. 1,142,831.42 = Rp 1,142,831.42
10.00 m2 Cetakan bekisting @ Rp. 177,397.50 = Rp 1,773,975.00
Total harga = Rp 5,701,376.46
۞ 1 m3 Membuat beton sloof 15/20 K-250
An. SNI 6.7 + An. SNI 6.17 + An. SNI 6.21
142.427 Kg Besi beton @ Rp. 17,185.88 = Rp 2,447,726.89
1.000 m3 Spesi beton K-250 @ Rp. 1,142,831.42 = Rp 1,142,831.42
13.33 m2 Cetakan bekisting @ Rp. 132,772.50 = Rp 1,770,300.00
Total harga = Rp 5,360,858.31

۞ 1 m3 Membuat beton Ring balok 15/20 K-250


An. SNI 6.7 + An. SNI 6.17 + An. SNI 6.23
137.084 Kg Besi beton @ Rp. 17,185.88 = Rp 2,355,916.13
1.000 m3 Spesi beton K-250 @ Rp. 1,142,831.42 = Rp 1,142,831.42
5.83 m2 Cetakan bekisting @ Rp. 289,143.75 = Rp 1,686,671.88
Total harga = Rp 5,185,419.42
۞ 1 m3 Membuat kolom 15/15 K-250
An. SNI 6.7 + An. SNI 6.17 + An. SNI 6.22
227.033 Kg Besi beton @ Rp. 17,185.88 = Rp 3,901,758.85
1.000 m3 Spesi beton K-250 @ Rp. 1,142,831.42 = Rp 1,142,831.42
13.333 m2 Cetakan bekisting @ Rp. 233,310.00 = Rp 3,110,800.00
Total harga = Rp 8,155,390.27
۞ 1 m3 Membuat beton plat, t=15 cm K-250 tanpa begesting
An. SNI 6.7 + An. SNI 6.17 + An. SNI 6.23
80.901 Kg Besi beton @ Rp. 17,185.88 = Rp 1,390,360.20
1.000 m3 Spesi beton K-250 @ Rp. 1,142,831.42 = Rp 1,142,831.42
6.667 m2 Cetakan bekisting @ Rp. - = Rp -
Total harga = Rp 2,533,191.62
REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB)

NAMA PERKERJAAN : RENOVASI RUMAH

LOKASI : JL. EMPUNALA

No Uraian Pekerjaan Jumlah Harga Ket

1 2 3 4

A Err:509 Err:509

B Err:509 Err:509

C Err:509 Err:509

JUMLAH Rp. Err:509


JUMLAH TOTAL Err:509
DIBULATKAN Err:509

Terbilang : Dua Ratus Lima Puluh Dua Juta Lima Puluh Dua Ribu Rupiah

Mengetahui :
Mengetahui : Mojokerto, 28 April 2023
Dibuat Oleh:
Kontraktor Pelaksana
CV. SANDANG PANGAN

HERY KYSWANTO
Direktur
RENCANA ANGGARAN BIAYA
NAMA PEKERJAAN : RENOVASI RUMAH
LOKASI : JL. EMPUNALA

HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT SATUAN HARGA KETERANGAN
Rp. Rp.
1 2 3 4 5 6 7
I PEKERJAAN PERSIAPAN
1 Pembongkaran atap, tembok dan plat lantai 1.00 Ls Rp 5,000,000.00 Rp 5,000,000.00
2 Pembersihan lokasi 1.00 Ls Rp 500,000.00 Rp 500,000.00
Sub Jumlah Rp 5,500,000.00
II PEKERJAAN TANAH DAN PONDASI
1 Galian tanah 3.59 m3 Rp 50,000.00 Rp 179,500.00
2 Pas. Pondasi rollag 2.57 m2 Rp 550,000.00 Rp 1,410,750.00
Sub Jumlah Rp 1,590,250.00
II PEKERJAAN BETON
1 Pile cap 60x60x20 0.14 m3 Rp 3,000,000.00 Rp 432,000.00
2 Sloof 15x20 0.51 m3 Rp 3,500,000.00 Rp 1,795,500.00
3 Kolom 15x15 0.54 m3 Rp 3,500,000.00 Rp 1,890,000.00
4 Balok 10x20 0.34 m3 Rp 4,000,000.00 Rp 1,368,000.00
5 Rabat beton 1.13 m3 Rp 4,000,000.00 Rp 4,504,000.00
Sub Jumlah Rp 9,989,500.00
III PEKERJAAN PASANGAN
1 Pekerjaan bata ringan 68.40 m2 Rp 125,000.00 Rp 8,550,000.00
2 Pekerjaan plesteran 136.80 m2 Rp 60,000.00 Rp 8,208,000.00
3 Pintu PVC 2.00 bh Rp 400,000.00 Rp 800,000.00
Sub Jumlah Rp 17,558,000.00
IV PEKERJAAN LANTAI
1 Pasang keramik 40x40 36.55 m2 Rp 200,000.00 Rp 7,310,000.00
2 Pasang keramik 30x30 8.21 m2 Rp 195,000.00 Rp 1,600,950.00
3 Pasang keramik 25x25 1.80 m2 Rp 180,000.00 Rp 324,000.00
4 Pasang keramik 25x40 8.64 m2 Rp 190,000.00 Rp 1,641,600.00
Sub Jumlah Rp 10,876,550.00
V PEKERJAAN ATAP
1 Pasang plafon (rangka kayu lama) 76.46 m2 Rp 100,000.00 Rp 7,646,000.00
2 Pasang atap spandek rangka galvalume 13.98 m2 Rp 500,000.00 Rp 6,987,500.00
Sub Jumlah Rp 14,633,500.00
VII PEKERJAAN LISTRIK
1 Pasang lampu Downlight 15.00 bh Rp 105,000.00 Rp 1,575,000.00
2 Perbaikan instalasi listrik 1.00 ls Rp 500,000.00 Rp 500,000.00
Sub Jumlah Rp 2,075,000.00
VIII PEKERJAAN PINTU
1 Rolling door 12.00 m2 Rp 650,000.00 Rp 7,800,000.00
Sub Jumlah Rp 7,800,000.00

JUMLAH Rp 70,022,800.00
JUMLAH TOTAL Rp 70,022,800.00
DIBULATKAN Rp 70,022,000.00

Mojokerto, 28 April 2023


Dibuat Oleh:
Kontraktor Pelaksana
CV. SANDANG PANGAN

HERY KYSWANTO
Direktur
RENCANA ANGGARAN BIAYA ( RAB )
NAMA PEKERJAAN : REHAB RUMAH

LOKASI : JL.CANDI PANGGUNG KEL.MOJOLANGU KOTA MALANG

HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT SATUAN HARGA
Rp. Rp.
1 2 3 4 5 6
A PEKERJAAN PENDAHULUAN
I Pekerjaan Persiapan & Mobilisasi 1.00 Ls Rp 1,000,000.00 Rp 1,000,000.00
Sub Jumlah Rp 1,000,000.00
II PEKERJAAN PERSIAPAN
1 Pekerjaan Pembersihan Awal dan Akhir 1.00 Ls Rp 500,000.00 Rp 500,000.00
2 Pembongkaran Pagar & Kusen 1.00 Ls Rp 1,000,000.00 Rp 1,000,000.00
Sub Jumlah Rp 1,500,000.00
Jumlah A Rp 2,500,000.00
B PEKERJAAN PASANGAN PAGAR
I PEKERJAAN TANAH
1 Pekerjaan Bor Strouss Diameter 30 cm #NAME? m1 Rp 35,700.00 #NAME?
2 Pekerjaan Galian Pile Cap #NAME? m3 Rp 98,437.50 #NAME?
3 Pekerjaan Galian Pondasi #NAME? m3 Rp 98,437.50 #NAME?
4 Pekerjaan Urug Kembali #NAME? m3 Rp 32,812.50 #NAME?
5 Pekerjaan Urug Pasir Bawah Pondasi #NAME? m3 Rp 285,075.00 #NAME?

Sub Jumlah #NAME?


II PEKERJAAN PONDASI
1 Pekerjaan Cor Strouss #NAME? m3 Rp 2,730,032.72 #NAME?
2 Pekerjaan Pile Cap 80x80x20cm #NAME? m3 Rp 5,701,376.46 #NAME?
Sub Jumlah #NAME?
III PEKERJAAN PASANGAN
1 Pekerjaan Pasangan Bata 1PC : 5 PS #NAME? m2 Rp 123,764.55 #NAME?
2 Pekerjaan Plesteran 1PC : 5 PS #NAME? m2 Rp 74,218.41 #NAME?
3 Pekerjaan Acian #NAME? m2 Rp 45,648.75 #NAME?
4 Pekerjaan Benangan #NAME? m1 Rp 20,574.75 #NAME?
5 Pekerjaan Roaster #NAME? m2 Rp 110,500.00 #NAME?
6 Pekerjaan Pintu Pagar 1.00 set Rp 5,000,000.00 Rp 5,000,000.00
Sub Jumlah #NAME?
V PEKERJAAN BETON
1 Pekerjaan Sloof 15x20cm #NAME? m3 Rp 5,360,858.31 #NAME?
2 Pekerjaan Kolom 20x20cm #NAME? m3 Rp 8,155,390.27 #NAME?
Sub Jumlah #NAME?
VI PEKERJAAN FINISHING
1 Pekerjaan Pengecatan Dinding #NAME? m2 Rp 52,749.38 #NAME?
Sub Jumlah #NAME?
Jumlah B #NAME?
C PEKERJAAN REHAB RUMAH
1 Pekerjaan Urug Sirtu Leveling Err:509 m3 Err:509 Err:509
2 Pekerjaan Lantai Wiremesh M-8 1 Lapis Tebal 10cm Err:509 m3 Err:509 Err:509
3 Pekerjaan Keramik Lantai Halus 40x40cm Err:509 m2 Err:509 Err:509
4 Pekerjaan Keramik Lantai Kasar 40x40cm Err:509 m2 Err:509 Err:509
5 Pekerjaan Balok Latei 12x15cm Err:509 m3 Err:509 Err:509
6 Pekerjaan PJ 1 Err:509 set Err:509 Err:509
7 Pekerjaan PJ 2 Err:509 set Err:509 Err:509
8 Pekerjaan P1 Err:509 set Err:509 Err:509
9 Pekerjaan PKM Err:509 set Err:509 Err:509
10 Pekerjaan J1 Err:509 set Err:509 Err:509
11 Pekerjaan Pengecatan Dinding Err:509 m2 Err:509 Err:509
12 Pekerjaan Pengecatan Plafon Err:509 m2 Err:509 Err:509
Jumlah C Err:509
D PEKERJAAN DRAINASE
1 Pekerjaan Galian Pondasi 0.00 m3 Rp 98,437.50 Rp -
2 Pekerjaan Urug Kembali #NAME? m3 Rp 32,812.50 #NAME?
3 Pekerjaan Urug Pasir Bawah Pondasi #NAME? m3 Rp 285,075.00 #NAME?
4 Pekerjaan Rabat Beton t=5cm #NAME? m3 Rp 957,586.25 #NAME?
5 Pekerjaan Pasangan Bata 1PC : 5 PS #NAME? m2 Rp 123,764.55 #NAME?
6 Pekerjaan Plesteran 1PC : 5 PS #NAME? m2 Rp 74,218.41 #NAME?
7 Pekerjaan Acian #NAME? m2 Rp 45,648.75 #NAME?
8 Pekerjaan Plat Duiker #NAME? m3 Rp 4,438,591.62 #NAME?
Jumlah D #NAME?
E PEKERJAAN ATAP
1 Pekerjaan Rangka Atap Galvalum #NAME? m2 Rp 293,202.63 #NAME?
2 Pekerjaan Penutup Atap Geteng Karang Pilang #NAME? m2 Rp 187,766.25 #NAME?
3 Pekerjaan Bubungan Karang pilang #NAME? m1 Rp 170,562.00 #NAME?
4 Pekerjaan Kalsiplank 2/30 #NAME? m1 Rp 64,575.00 #NAME?
Sub Jumlah #NAME?
JUMLAH #NAME?
DIBULATKAN #NAME?
BACK UP VOLUME
NO URAIAN PEKERJAAN Koef/
Panjang Lebar Tinggi
Berat
1 2 3 4 5 6
Err:509 Err:509
I PEKERJAAN PERSIAPAN
1 Pembongkaran atap, tembok dan plat lantai

II PEKERJAAN TANAH DAN PONDASI


1 Galian tanah 43.30 0.70 0.70
2 Pas. Pondasi rollag 43.30 0.45 0.60

II PEKERJAAN BETON
2 Sloof 15x20 43.30 0.15 0.20
3 Kolom 15x15 0.15 0.15 3.50 15.00
4 Balok 10x20 43.30 0.15 0.15

III PEKERJAAN PASANGAN


1 Pekerjaan pasangan bata ringan 43.30 3.50
P1 1.50 2.00 2.00
P2 0.80 2.00 3.00
J1 1.40 1.50 4.00
BV 0.60 0.50 2.00

2 Pekerjaan Plesteran
3 Pekerjaan acian

IV PEKERJAAN LANTAI
1 Rabat Lantai 5 cm 9.00 5.80 0.05
7.80 1.20 0.05

2 Pasang keramik 40x40 cm 9.00 5.80


7.80 1.20

V PEKERJAAN PINTU DAN JENDELA


1 Pasang Pintu P1
2 Pasang Pintu P2
3 Pasang Jendela J1

VI PEKERJAAN PENGECATAN
1 Pengecatan dinding 6.00 3.80 2.00 2.00
12.00 3.80 2.00 2.00
2.50 3.80 2.00
8.50 3.80 2.00

2 Pengecatan lantai bergambar 9.00 5.80

B PEKERJAAN LANTAI 2
I PEKERJAAN STRUKTUR
1 Kolom beton 15x30 0.15 0.30 3.00
2 Balok WF 200.100.5,5.8 mm 30.00 #REF!
3 Balok beton 15x20 0.15 0.20 1.00
4 Plat Bordes tebal 10 cm 1.00 1.00 0.10
5 Plat Tangga tebal 10 cm 1.00 0.30 0.10
6 Panel lantai 2,5x0,6x0,125 m 12.00 6.00

III PEKERJAAN PASANGAN


1 Pekerjaan pasangan bata ringan 6.00 1.00 2.00
12.00 1.00 2.00
8.50 1.00 1.00
2.50 1.00 1.00

2 Pekerjaan Plesteran
3 Pekerjaan acian

IV PEKERJAAN LANTAI
1 Rabat lantai 5 cm 6.00 12.00 0.05
2 #REF! 6.00 12.00
3 Pasang lantai vinyl 6.00 12.00

V PEKERJAAN PINTU DAN JENDELA


1 Pasang Pintu P1
2 Pasang Pintu geser P2
3 Pasang Jendela J1
4 Pasang Railing tangga

VI PEKERJAAN PENGECATAN
1 Pengecatan dinding 94.00
12.00 2.50 2.00 2.00
6.00 2.50 2.00 2.00
24.00 2.50 2.00

C PEKERJAAN LANTAI 3
I PEKERJAAN LANTAI
1 Rabat lantai 5 cm 6.00 12.00 0.05
2 Pasang rumput sintesis 6.00 12.00

II PEKERJAAN PASANGAN
1 Pekerjaan pasangan bata ringan 6.00 1.00 2.00
12.00 1.00 2.00

2 Pasang rooster beton

III PEKERJAAN ATAP


1 Pasang atap rooftop 6.00 12.00

IV PEKERJAAN PENGECATAN
1 Pengecatan dinding
2 Pengecatan waterproof
BACK UP VOLUME
SATUAN Ket.
Jumlah Luas Sub Vol Volume
7 8 9 10 11 12

1.00 Ls

21.22 21.22 m3
11.69 11.69 m3
#REF!

1.30 1.30 m3
1.18 1.18 m3
0.97 0.97 m3

151.55
-6.00
-4.80
-8.40
-0.60
131.75 131.75 m2

263.50 m2
263.50 m2

2.61
0.47
3.08 3.08 m3

52.20
9.36
61.56 61.56 m2

1.00 unit
1.00 unit
1.00 ls
91.20
182.40
19.00
64.60
357.20 357.20 m2

52.20 52.20 m2

20.00 2.70 2.70 m3


#REF! #REF! kg
6.00 0.18 0.18 m3
0.10 0.10 m3
25.00 0.75 0.75 m3
72.00 72.00 m2

12.00
24.00
8.50
2.50
47.00 47.00 m2
94.00 m2
94.00 m2

3.60 3.60 m3
72.00 72.00 m2
72.00 72.00 m2

3.00 unit
1.00 unit
4.00 unit
1.00 ls

94.00
120.00
60.00
120.00
394.00 394.00 m2
3.60 3.60 m3
72.00 72.00 m2

12.00
24.00
36.00 36.00 m2

50.00 Bh

72.00 72.00 m2

72.00 m2
36.00 m2
Pekerjaan Acian Lantai
24.04.01.21 m2
(Hardener)
Tenaga:
23.06.01.01.02 Mandor 0.0100 O.H
23.06.01.01.01 Kepala Tukang Batu 0.0100 O.H
23.06.01.01.05 Tukang Batu 0.1200 O.H
23.06.01.01.07 Pekerja/Buruh Tak Terampil 0.1800 O.H

Bahan:
20.01.01.02.01 Harderner 0.2000 ltr
20.01.01.02.02 Semen portland (40 kg) 0.0813 Zak

Nilai HSPK :
200,000 Rp 2,000.00
150,000 Rp 1,500.00
150,000 Rp 18,000.00
105,000 Rp 18,900.00
Jumlah: Rp 40,400.00

168,000 Rp 33,600.00
89,658 Rp 7,284.71
Jumlah: Rp 40,884.71
Nilai HSPK : Rp 81,284.71
Lantai Wiremesh M-8 2 Lapis Tebal
10cm Koef m3
Tenaga:
Mandor 0.2650 O.H 150,000
Kepala Tukang Besi 0.2850 O.H 125,000
Tukang Besi 0.7800 O.H 125,000
Tukang Batu 0.4750 O.H 125,000
Tukang Kayu 0.3300 O.H 125,000
Pekerja / Buruh Tak Terampil 4.1000 O.H 120,000
Jumlah:
Bahan:
Semen portland (40kg) 8.8750 Zak 89,658
Pasir Beton 0.4300 m3 708,900
Batu Pecah Mesin 1/2 cm 0.7100 m3 584,000
Wiremesh M-8 1.0000 Lbr 450,000
Kawat Beton 1.0100 Kg 26,900
Kayu meranti bekisting 0.1010 m3 -
Plywood tebal 9 mm 0.8000lembar -
Paku Usuk 1.2000 Kg -
Minyak Bekisting 0.8000 ltr -
Jumlah:
Nilai HSPK :

Pekerjaan Acian Lantai (Hardener) m2


Tenaga:
Mandor 0.0100 O.H 200,000
Kepala Tukang Batu 0.0100 O.H 125,000
Tukang Batu 0.1200 O.H 125,000
Pekerja/Buruh Tak Terampil 0.1800 O.H 120,000
Jumlah:
Bahan:
Harderner 0.2000 ltr 168,000
Semen portland (40 kg) 0.0813 Zak 89,658
Jumlah:
Nilai HSPK :
39,750.00
35,625.00
97,500.00
59,375.00
41,250.00
492,000.00
765,500.00

795,714.75
304,827.00
414,640.00
450,000.00
27,169.00
-
-
-
-
1,992,350.75
2,757,860.00

Rp 2,000.00
Rp 1,250.00
Rp 15,000.00
Rp 21,600.00
Rp 39,850.00

Rp 33,600.00
Rp 7,284.71
Rp 40,884.71
Rp 80,734.71