Professional Documents
Culture Documents
Egd GR 11 Nov 2017 p1 Eng
Egd GR 11 Nov 2017 p1 Eng
L
INSTRUCTIONS AND INFORMATION
AP
ST
SENIOR CERTIFICATE 1
2
3
4
GRADE 11 TOTAL
2 0 0 2 0 0
FINAL CONVERTED CHECKED BY
MARK
NAME
MARKS: 200 EXAMINATION CENTRE
TIME: 3 hours
EXAMINATION CENTRE
This question paper consists of 6 pages. *IGRDSE1*
1100
the indicated scale.
2700
QUESTIONS ANSWERS
ANSWER 17
C B
16400 In the space provided below, draw, in 1 What is the reference code for the drawing? 1
100 A neat freehand, the front view and top
2 Who checked the drawing? 1
view of the SANS 10143 convention
BEDROOM GARAGE for a WATER CLOSET. 3 What scale is indicated for the drawing? 1
BATH- CARPET GRANO
3500
ROOM 4 Which drawing is this in the set of drawings? 1
4800
1700
1310
7 What feature is indicated by B? 1
D E
8 What feature is indicated by C? 1
4100
Given:
F The front view and the incomplete left view of a transition
piece that must be made from a single sheet of steel. The
top edge of the transition piece must be welded on each of
the four sides. EF is the seam.
On the answer sheet, the XY planes for the orthographic
drawing and the origin EF for the development.
Instructions:
Draw, to scale 1 : 1, the following views of the transition
piece:
2.1 The complete front view,
2.2 The complete left view,
2.3 The complete top view,
2.4 Develop the surface of the transition piece.
70 70
20
F
F'
70
20
E E'
20
Y1
ASSESSMENT CRITERIA
1 FRONT VIEW 3
2 LEFT VIEW 4
3 TOP VIEW 4 21
4 TRUE LENGHTS 6
DEVELOPMENT +
5 CONSTRUCTION
20 21
PENALTIES (-)
TOTAL 38
NAME
NAME 3
Copyright reserved Please turn over
Engineering graphichs and design / P1 NCS EC DBE/November 2017
QUESTION 3: PERSPECTIVE
LE
AP
ST
Given:
Two views of an entrance to a library and the
information needed to draw a two-point
perspective drawing
PP − Picture plane
RO HL − Horizon line
OM GL − Ground line
SP − Station point
DO
OR Instructions:
OP Complete the perspective drawing.
EN
AT
ING SE
AT
SE
· Align the drawing sheet with the ground line
(GL).
· Determine and label the vanishing points.
· Show ALL necessary construction.
· Show the wall thickness at the openings.
· NO hidden detail is required. [40]
ST
EP PILLAR
S
ASSESSMENT CRITERIA
1 CONSTRUCTION + VPs 8
2 STEPS 9
3 WALLS 13
4 OPENINGS 4
PP
5 ROOF 6
TOTAL 40
HL HL
DOOR OPENING
SEAT SEAT SEAT SEAT
STEPS STEPS
GL
SP EXAMINATION NUMBER
EXAMINATION NUMBER 4
Copyright reserved Please turn over
Engineering graphichs and design / P1 NCS EC DBE/November 2017
WINDOW OPENING
· The incomplete north elevation of a proposed new flat,
1 showing the walls, window, steps and the door opening
· The incomplete floor plan showing the walls, position of the
2700
1200
INCOMPLETE FLOOR PLAN · The outside walls, window, steps and door detail
· The finished floor level
2100
2100
WINDOW (W1)
4.2 In the space provided on page 6, draw, to scale 1 : 20,
600
a DETAILED SECTION according to cutting plane A-A of
200 100
the area in the ellipse shown on the floor plan
800
150 x 220 mm 150 x 100 mm · Show the following features on this view:
LINTEL ABOVE LINTEL ABOVE · The complete foundation, external wall, and window
WINDOW DOOR OPENING WINDOW (W2) SLIDING DOOR detail
1500 DOOR FRAME AND
OPENING FRAME AND DOOR · ALL hatching detail. ONLY the substructure hatching
DOOR (D1)
400 (D2)
may be drawn in neat freehand.
· The lintels above the door and windows
NOTE: 175 x 20 mm · The complete foundation, internal wall and door detail
1200
2700
400
GROUND LEVEL
700
400
455
NOTE:
200
200
200
850
850
850
750
600 400
symbols contained in the SANS 10143. [85]
FLOOR LEVEL
INCOMPLETE
INCOMPLETE
FOUNDATION AND
500
FOUNDATION AND
350
400
600
200
EXTERNAL WALL
850
5
Copyright reserved Please turn over
Engineering graphichs and design / P1 NCS EC DBE/November 2017
OFFICIAL USE
LE 1 INCORRECT OVERALL SCALE
AP
ST
ASSESSMENT CRITERIA
FLOOR PLAN
DOORS +
1 WINDOWS + STEPS 19
2 FIXTURES 11 21
3 HATCHING 6
4 LABELS 4
SUBTOTAL 40 21
NORTH ELEVATION
1 WALLS + STEPS 5 21
2 SLIDING DOOR 3
3 WINDOW 4
A A 4 LABELS 2
SUBTOTAL 14 21
DETAILED SECTION
FOUNDATIONS +
1 WALLS + SLAB + 12
LINTELS
2 DOOR + WINDOW 4
3 HATCHING 8
4 LABELS 2
STARTING POINT FOR 5 FIXTURES 4
DETAILED SECTION
SUBTOTAL 30
(EXTERNAL WALL
FOUNDATION) TOTAL 85
PENALTIES (-)
FINAL TOTAL
SECTION A-A
FLOOR PLAN NAME
SCALE 1 : 20
SCALE 1 : 50
NAME 6
Copyright reserved