JEL Maintenance Pte Ltd

Date : JURONG SYNTHETIC PLANT (JSP) PROJECT Doc No : -

26-Mar-16 JML/FW/JSP/QC/WRP/012
MATERIAL CONTROL PROCEDURE
Rev : 0 Page : 1 OF 5

FOSTER WHEELER ASIA PACIFIC PTE LTD

JURONG SYNTHETIC PLANT (JSP) PROJECT

Project No: 1-PD-0448

Contract No: FC-1-PD0448-040 Req. No: 0448-3500-A02

Equip. Item No: NA Req. Item No: NA

SubContractor Doc No: JML/FW/JSP/QC/WRP/012 SC Rev: 0

AFW Doc Type: DSN: AFW Rev: 1

Status Code AFW Eng. Dept. Date

COMMENT STATUS CODE


1 - Rejected;
2 - Comments as Noted;
3 - Minor Comments, Acceptable;
4 - No Comments;
5 - Information Only

0 26-Mar-2016 Issued for Review & Approval Varatharajan Meyyappan Eswar

Rev Date Reason for Issue Prepared By Checked By Approved By


FOSTER WHEELER ASIA PACIFIC PTE LTD

JURONG SYNTHETIC PLANT (JSP) PROJECT

Project No: 1-PD-0448

Contract No: FC-1PD0448-040 Req. No: 0448-3500A/02

Equip. Item No: (If Applicable) Req. Item No: (if Applicable)

SubContractor Doc No: (By SC) SC Rev: (By SC)

AFW Rev: 1(Always


AFW Doc Type: (Refer to DSN: (Refer to
Rev 1 for 1st
Deliverable List) Deliverable List)
Submission)

Status Code AFW Eng. Dept. Date

COMMENT STATUS CODE


1 - Rejected; 2 - Comments as Noted;
3 - Minor Comments, Acceptable;
4 - No Comments; 5 - Information Only