Date
Name of assessor Marwan Farhan Ibrahim 20-5-2021

Time 10:00 Work area Construction site of Safeen road overpass project.

Task being assessed Construction activities including material shifting, digging, fabrication, mechanical work, electrical installations and civil work.

New risk
What is the Who might be How might Existing Risk rating Additional rating Action/ Action/
people be risk control monitored by monitored by
hazard? harmed? controls (Residual)
harmed? measures whom? when?
L C R L C R
-Civil A person may Workers using Barricade the All teams during Immediately.
Supervisors be harmed by essential PPEs suspicion area. proceed the job
-Civil
workers
falling tools (safety shoes, task. Depute guide in
-safety from height. safety helmets, Working more start of every
Fall a work tool inspectors and gloves). careful in the HSE manager shift on daily
from height -visitors Personal 4 3 12 height area. 1 3 3 shall depute one basis.
injury hardly. Using strategies person to guide
to covers person nearby passing
from height. workers.
- Project Moving vehicle Provide separate Project manager Clear road ways
manager may hit any walkways. shall ensure immediately.
-civil person, or any Speed limit sign Provide hard provision of separate Daily site
manager stationery boards installed fencing around in and out for inspection.
Vehicle vehicles & separate
movement -civil and object. and controlled. walkways.
4 5 20 All drivers must 1 5 5 walkways.
mechanical It can result in Separate in/out,
mistaken supervisors personal injury, be trained.
Civil manager will
provide hard fencing walkways along
-workers loss of material Clear road ways. around walkways. with fencing
-HSE staff or fetal accident HSE staff provide within week.
trainings to drivers.
Risk assessment form

New risk
What is the Who might be How might Existing Risk rating Additional rating Action/ Action/
people be risk control monitored by monitored by
hazard? harmed? controls (Residual)
harmed? measures whom? when?
L C R L C R
Workers Lifting heavy “How to lift No manual Project manager Immediately
load and poor load” work lifting of weight to ensure safe implement safe
work postures instruction signs more than 20 load lifting limit load lifting limit.
may lead boards installed. kgs provide is followed and
Manual handling towards personal 4 3 12 lifting aids 1 3 3 load lifting aids Provide lifting
strain injury (hand trolleys). provided at site. aids within one
including Use cranes for week.
musculoskeletal lifting heavy
injuries. loads.
-Project manager Scattered No control Remove Electric Immediately
-Civil manager electrical cables measure scattered naked supervisor shall repair or remove
-Civil and and wires on observed. wires. remove all damaged wires.
mechanical ground and roads Install safety scattered wires
Electric shock supervisors may result in signs. and provide Provide cable
4 4 16 2 3 6
-Workers electrocution and All wires shall insulation around trays and cable
-HSE staff severe electric be underground damaged wire. routes within one
burn injury. or through Civil supervisor week.
proper cable shall provide
tray channel. wire routes.

Review date 30-5-2021 Signature