You are on page 1of 109

H PEKERJAAN MEKANIKAL ELEKTRIKAL DAN PLUMBING

NO URAIAN PEKERJAAN

1 2
A PEKERJAAN ELEKTRIKAL
Pekerjaan PLN, Genset, Panel & Kabel Feeder
PLN CONNECTION ; (BP & UJL) 1.110 kVA, termasuk biaya teknis & administrasi untuk AKLI & Kons
termasuk Arde Kubikel & Biaya pelaksanaan testing komissioning sisi PLN.

Medium Voltage Cubicle - Surge Arester


Incoming Cubicle pelanggan IM - SM6
Ourgoing Cubicle pelanggan QM - SM6
Kabel interkoneksi antar MV dan Peralatan
Kabel N2XSY 3 x 1 x 240mm2 dari Cubical PLN ke Cubical Pelanggan (Cubicle Pelanggan)
Kabel N2XSY 7 x 1 x 300mm2 dari Cubicle ke Trafo
Kabel NYY (4 x 1 x 300mm2 dari Trafo ke LV
Pengadaan Kabel Leader 600mm X 100mm
Pengadaan Tee Leader 600mm X 100mm
Elbow Ladder 600 mm (W) x 100 mm (H)
Outside Riser Ladder 600 mm (W) x 100 mm (H)
Inside Riser Ladder 600 mm (W) x 100 mm (H)
Dudukan Cubical
Termination kit 20 kV, sisi outgoing PLN (adaptor)
Termination kit 20 kV, sisi MV incoming pelanggan
Termination kit 20 kV, sisi MV outgoing pelanggan
Termination kit 20 kV, pada trafo (Elastimol)
Termination kit LV, pada trafo
Pengadaan Skun Cu 300 mm2
Pemasangan Heater pada Cubicle
Grounding System Body & Netral Cubicle max. 5 Ohm.

Pengadaan dan Pemasangan Trafo


Trafo oil type kapasitas 2000 KVA, 20 KV/400 V, 50 Hz, Dyn5, CU-CU
Grounding System Body & Netral Cubicle max. 5 Ohm.

PEKERJAAN PANEL
Pengadaan, Pemasangan dan Pengetesan lengkap dengan fitting dan acecories lainnya :
1 Panel LVMDP/ATS/AMF :
2 CAP. BANK 1.200 KVAR 525 V
3 Grounding

PEKERJAAN GENSET
Pemasangan Genset Open Type kapasitas min. 800 kVA dilengkapi dengan Alternator ex, Standford,
mufler, exhaust air duct, tangki BBM harian, pompa BBM, automatic stater dan semua perlengkapan y
diperlukan hingga berfungsi dengan baik.
SLO (Sertifikat Layak Operasi) Genset & IO (Ijin Operasi) Genset
Panel Kontrol Genset (PKG)

Perlengkapan & Accessories Genset

Fuel tank bulanan Kap. 6000 ltr, termasuk deepstick, electrical fuel level meter, vent breather pipe & ac

Fuel tank Mingguan Kap. 2000 ltr, termasuk deepstick, electrical fuel level meter, vent breather pipe &

Electric Fuel Transfer Gear Pump, 25 Lpm, H=20 mtr, incl. valve & accessories
Fuel Hand Pump, incl. valve & accessories
Residential Mufler
Ducting Exhaust Radiator BJLS 1,2 mm dari Genset sampai keluar ruang Genset
Intake Air Attenuator 6000x1500x1200 (PnjgxTnggxTbl)
Discharge Attenuator 2500x1500x1200 (PnjgxTnggxTbl)
Exhaust Fan Wall Mounted
Attenuator Exhaust Fan
Hot Exhaust Pipe, pipa gas dia. 200 mm
Grill Alumunium, untuk lubang Intake 6000x1500 mm
Grill Alumunium, untuk lubang Exhaust 2500x1500 mm
Panel Kontrol Fuel Pump c/w floater
Pemipaan bahan bakar dari tangki harian ke engine untuk supply & return, termasuk valve & accessor

Pemipaan bahan bakar dari tangki bulanan ke tangki harian, termasuk valve & accessories, pipa gas d

Fuel meter 50 mm Tokico type FRO 0541-04X termasuk valve & support
Water Separator lengkap support & accessories
Kabel Tray 600x100 dari Genset sampai PKG, termasuk support & accessories
Peredam ruangan, rock wool density 80 kg/m3, tebal 50 mm
Pengisian bahan bakar solar untuk tangki bulanan & tangki mingguan genset
Load Bank test on site

Supply, install and testing all these equipments complete with all necessary fittings and accessories req
Electrical Feeder cables install on tray to include Tie cable; from Genset #1 to PKG
; NYY 4 x 4x300 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from Genset #2 to PKG
; NYY 4 x 4x300 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from Panel Kontrol Genset to LVMDP
; 7 x NYY 4 x 1x300 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from SDP PUMP to Fuel pump transfer NY
Sqmm + HIC 20 mm

TESTING & COMMITIONING


Grounding panel max. 5 Ohm.

I PEKERJAAN PANEL
Pengadaan, Pemasangan dan Pengetesan Panel NCK; lengkap dengan fitting dan acecories lainnya :
1 Distibution Panel ( MDP) Bangunan Pasar
2 Power Panel Pompa Air Bersih (PP. CWP)
3 Power Panel Pompa Deep Well (PP. Deep Well 1)
4 Power Panel (PP. Pompa Air Kotor 1)
5 Power Panel (PP. Pompa Air Kotor 2)
6 Power Panel (PP. Pompa Air Kotor 3)
7 Power Panel (PP. Pompa Air Kotor 4)
8 Power Panel (PP. Pompa Air Hujan 1)
9 Power Panel (PP. Pompa Air Hujan 2)
10 Power Panel (PP. STP)
11 Power Panel (PP.Basement 1-01)
12 Power Panel (PP.Basement 1-02)
13 Power Panel (PP.Basement 1-03)
14 Power Panel (PP.Basement 2-01)
15 Power Panel (PP.Basement 2-02)
16 Power Panel (PP.Basement 2-03)
17 SDP Basement 1
18 SDP Basement 2
19 SDP lantai dasar
20 SDP lantai 1
21 SDP lantai 2
22 SDP lantai 3
23 SDP lantai 4
24 PP.LANTAI DASAR - 01(#1)
25 PP.LANTAI DASAR - 02(#2)
26 PP.LANTAI DASAR - 03(#3)
27 PP.LANTAI DASAR - 04(#4)
28 PP.LANTAI 1 - 01(#1)
29 PP.LANTAI 1 - 02(#2)
30 PP.LANTAI 1 - 03(#3)
31 PP.LANTAI 1 - 04(#4)
32 PP.LANTAI 2 - 01(#1)
33 PP.LANTAI 2 - 02(#2)
34 PP.LANTAI 2 - 03(#3)
35 PP.LANTAI 2 - 04(#4)
36 PP.LANTAI 3 - 01(#1)
37 PP.LANTAI 3 - 02(#2)
38 PP.LANTAI 3 - 03(#3)
39 PP.LANTAI 3 - 04(#4)
40 PP.LANTAI 4 - 01(#1)
41 PP.LANTAI 4 - 02(#2)
42 PP.LANTAI 4 - 03(#3)
43 PP.LANTAI 4 - 04(#4)
44 PP. Kios
45 PP.Toko
46 PP.OUTDOOR LIGHTING 1
47 PP.OUTDOOR LIGHTING 2
48 PP.OUTDOOR LIGHTING 3
49 PP.OUTDOOR LIGHTING 4
50 PP. Lift 1
51 PP. Lift 2
52 PP. Lift 3
53 PP. Lift 4
54 PP. Lift 5
55 PP. Lift 6
56 PP. Eskalator
57 Power Panel (PP. Pompa Hydrant)
58 Power Panel (PP. Exhaust Fan)
59 PP. Cold Room- 01
60 PP. Cold Room- 02
61 PP. Neon Sign
62 Grounding panel max. 5 Ohm.

II PEKERJAAN KABEL FEEDER


Pemasangan kabel feeder lengkap dengan kabel tie dan asesories dari LVMDP ke :
- MDP. BANGUNAN 7 x NYFGbY 4 x 300 mm2 + BC 95 mm2

PEKERJAAN LANTAI BASEMENT 1, BASEMENT 2, LANTAI DASAR,1, 2, 3


Electrical Feeder cables install on tray to include Tie cable; from MDP. Bangunan Pasar to SDP.Basem
; NYY 4 x 35 Sqmm + BC 35 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from MDP to SDP.BS-02
; NYY 4 x 25 Sqmm + BC 25 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from MDP to SDP.Lantai Dasar
; NYY 4 x 300 Sqmm + BC 95 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from MDP to SDP.Lantai 1
; NYY 4 x 300 Sqmm + BC 95 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from MDP to SDP.Lantai 2
; NYY 4 x 300 Sqmm + BC 95 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from MDP to SDP.Lantai 3
; NYY 4 x 300 Sqmm + BC 95 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from MDP to SDP.Lantai 4
; NYY 4 x 300 Sqmm + BC 95 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from SDP.BS-02 to PP. POMPA AIR KOTO
; NYY 4 x 6 Sqmm + BC 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from SDP.BS-02 to PP. POMPA AIR KOTO
; NYY 4 x 6 Sqmm + BC 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from SDP.BS-02 to PP. POMPA AIR KOTO
; NYY 4 x 6 Sqmm + BC 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from SDP.BS-02 to PP. POMPA AIR KOTO
; NYY 4 x 6 Sqmm + BC 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from SDP.BS-02 to PP. POMPA AIR Hujan
; NYY 4 x 6 Sqmm + BC 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from SDP.BS-02 to PP. POMPA AIR Hujan
; NYY 4 x 6 Sqmm + BC 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from SDP.BS-01 to PP.Basement 01
; NYY 4 x 10 Sqmm + BC 10 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from SDP.BS-01 to PP.Basement 02
; NYY 4 x 10 Sqmm + BC 10 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from SDP.BS-01 to PP.Basement 03
; NYY 4 x 10 Sqmm + BC 10 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from SDP.LT-Dasar to PP.LT Dasar 01
; NYY 4 x 70 Sqmm + BC 70 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from SDP.LT-Dasar to PP.LT Dasar 02
; NYY 4 x 70 Sqmm + BC 70 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from SDP.LT-Dasar to PP.LT Dasar 03
; NYY 4 x 25 Sqmm + BC 25 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from SDP.LT-Dasar to PP.LT Dasar 04
; NYY 4 x 25 Sqmm + BC 25 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from SDP.LT-Dasar to PP.Eskalator
; NYY 4 x 6 Sqmm + BC 6 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from SDP.LT-Dasar to PP.Cold Room 1
; NYY 4 x 4 Sqmm + NYA 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from SDP.LT-Dasar to PP.Cold Room 2
; NYY 4 x 4 Sqmm + NYA 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from SDP.LT-1 to PP.LT 1 01
; NYY 4 x 70 Sqmm + BC 70 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from SDP.LT-1 to PP.LT 1 02
; NYY 4 x 70 Sqmm + BC 70 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from SDP.LT-1 to PP.LT 1 03
; NYY 4 x 25 Sqmm + BC 25 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from SDP.LT-1 to PP.LT 1 04
; NYY 4 x 25 Sqmm + BC 25 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from SDP.LT-1 to PP.Eskalator
; NYY 4 x 6 Sqmm + BC 6 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from SDP.LT-2 to PP.LT 1 01
; NYY 4 x 70 Sqmm + BC 70 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from SDP.LT-2 to PP.LT 1 02
; NYY 4 x 70 Sqmm + BC 70 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from SDP.LT-2 to PP.LT 1 03
; NYY 4 x 25 Sqmm + BC 25 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from SDP.LT-2 to PP.LT 1 04
; NYY 4 x 25 Sqmm + BC 25 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from SDP.LT-2 to PP.Eskalator
; NYY 4 x 6 Sqmm + BC 6 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from SDP.LT-3 to PP.LT 1 01
; NYY 4 x 70 Sqmm + BC 70 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from SDP.LT-3 to PP.LT 1 02
; NYY 4 x 70 Sqmm + BC 70 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from SDP.LT-3 to PP.LT 1 03
; NYY 4 x 25 Sqmm + BC 25 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from SDP.LT-3 to PP.LT 1 04
; NYY 4 x 25 Sqmm + BC 25 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from SDP.LT-3 to PP.Eskalator
; NYY 4 x 6 Sqmm + BC 6 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from SDP.LT-4 to PP.LT 1 01
; NYY 4 x 70 Sqmm + BC 70 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from SDP.LT-4 to PP.LT 1 02
; NYY 4 x 70 Sqmm + BC 70 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from SDP.LT-4 to PP.LT 1 03
; NYY 4 x 25 Sqmm + BC 25 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from SDP.LT-4 to PP.LT 1 04
; NYY 4 x 25 Sqmm + BC 25 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from SDP.LT-4 to PP.Eskalator
; NYY 4 x 6 Sqmm + BC 6 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from SDP.LT-Dasar to Neon Sign
; NYY 4 x 6 Sqmm + BC 6 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from MDP to PP. POMPA CWP
; NYY 4 x 16 Sqmm + BC 16 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from MDP to PP. POMPA DEEP WELL 1
; NYY 4 x 6 Sqmm + BC 6 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from MDP to PP. POMPA DEEP WELL 2
; NYY 4 x 6 Sqmm + BC 6 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from MDP to PP. POMPA HYDRANT
; FRC 4 x 35 Sqmm + BC 35 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from SSDP.BS-03 to PP. STP
; NYY 4 x 6 Sqmm + BC 6 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from MDP to PP.Lift 1
; FRC 4 x 10 Sqmm + BC 10 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from MDP to PP.Lift 2
; FRC 4 x 10 Sqmm + BC 10 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from MDP to PP.Lift 3
; FRC 4 x 10 Sqmm + BC 10 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from MDP to PP.Lift 4
; FRC 4 x 10 Sqmm + BC 10 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from MDP to PP.Lift 5
; FRC 4 x 10 Sqmm + BC 10 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from MDP to PP.Lift 6
; FRC 4 x 10 Sqmm + BC 10 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 43
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 44
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 45
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 46
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 47
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 48
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 49
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 50
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 51
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 52
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 53
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 54
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 55
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 56
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 57
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 58
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 59
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 60
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 61
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 62
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 63
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 64
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 65
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 66
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 67
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 68
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 69
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 70
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 71
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 72
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 73
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 74
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 75
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 76
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 77
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 78
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 79
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 80
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 81
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 82
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 83
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 84
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 85
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 86
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 87
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 88
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 89
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 01
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 02
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 03
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 04
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 05
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 06
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 07
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 08
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 09
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 10
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 11
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 12
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 13
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 14
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 15
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 16
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 17
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 18
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 19
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 20
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 21
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 22
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 23
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 24
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 25
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 26
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 27
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 28
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 29
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 30
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 31
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 32
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 33
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 34
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 35
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 36
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 37
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 38
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 39
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 40
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 41
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 42
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Toko 18
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Toko 19
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Toko 20
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Toko 21
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Toko 22
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Toko 23
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Toko 24
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Toko 25
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Toko 26
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Toko 27
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Toko 28
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Toko 29
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Toko 30
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Toko 31
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Toko 32
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Bank 01
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Bank 02
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Kios 07
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Kios 08
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Kios 09
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Kios 10
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Kios 11
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Kios 12
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Toko 01
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Toko 02
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Toko 03
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Toko 04
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Toko 05
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Toko 06
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Toko 07
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Toko 08
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Toko 09
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Toko 10
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Toko 11
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Toko 12
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Toko 13
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Toko 14
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Toko 15
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Toko 16
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Toko 17
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Kios 01
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Kios 02
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Kios 03
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Kios 04
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Kios 05
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Kios 06
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 2 03 to PP.Toko 21
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 2 03 to PP.Toko 22
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 2 03 to PP.Toko 23
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 2 03 to PP.Toko 24
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 2 03 to PP.Toko 25
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 2 03 to PP.Toko 26
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 2 03 to PP.Toko 27
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 2 03 to PP.Toko 28
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 2 03 to PP.Toko 29
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 2 03 to PP.Toko 30
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 2 03 to PP.Toko 31
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 2 03 to PP.Toko 32
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 2 03 to PP.Toko 33
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 2 03 to PP.Toko 34
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 2 03 to PP.Toko 35
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 2 03 to PP.Toko 36
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 2 03 to PP.Toko 37
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 2 03 to PP.Toko 38
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 2 03 to PP.Toko 39
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 2 03 to PP.Toko 40
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 2 03 to PP.Toko 41
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 2 04 to PP.Toko 01
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 2 04 to PP.Toko 02
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 2 04 to PP.Toko 03
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 2 04 to PP.Toko 04
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 2 04 to PP.Toko 05
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 2 04 to PP.Toko 06
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 2 04 to PP.Toko 07
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 2 04 to PP.Toko 08
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 2 04 to PP.Toko 09
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 2 04 to PP.Toko 10
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 2 04 to PP.Toko 11
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 2 04 to PP.Toko 12
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 2 04 to PP.Toko 13
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 2 04 to PP.Toko 14
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 2 04 to PP.Toko 15
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 2 04 to PP.Toko 16
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 2 04 to PP.Toko 17
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 2 04 to PP.Toko 18
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 2 04 to PP.Toko 19
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 2 04 to PP.Toko 20
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 3 03 to PP.Toko 21
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 3 03 to PP.Toko 22
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 3 03 to PP.Toko 23
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 3 03 to PP.Toko 24
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 3 03 to PP.Toko 25
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 3 03 to PP.Toko 26
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 3 03 to PP.Toko 27
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 3 03 to PP.Toko 28
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 3 03 to PP.Toko 29
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 3 03 to PP.Toko 30
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 3 03 to PP.Toko 31
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 3 03 to PP.Toko 32
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 3 03 to PP.Toko 33
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 3 03 to PP.Toko 34
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 3 03 to PP.Toko 35
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 3 03 to PP.Toko 36
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 3 03 to PP.Toko 37
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 3 03 to PP.Toko 38
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 3 03 to PP.Toko 39
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 3 03 to PP.Toko 40
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 3 03 to PP.Toko 41
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 3 04 to PP.Toko 01
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 3 04 to PP.Toko 02
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 3 04 to PP.Toko 03
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 3 04 to PP.Toko 04
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 3 04 to PP.Toko 05
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 3 04 to PP.Toko 06
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 3 04 to PP.Toko 07
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 3 04 to PP.Toko 08
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 3 04 to PP.Toko 09
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 3 04 to PP.Toko 10
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 3 04 to PP.Toko 11
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 3 04 to PP.Toko 12
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 3 04 to PP.Toko 13
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 3 04 to PP.Toko 14
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 3 04 to PP.Toko 15
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 3 04 to PP.Toko 16
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 3 04 to PP.Toko 17
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 3 04 to PP.Toko 18
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 3 04 to PP.Toko 19
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 3 04 to PP.Toko 20
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 4 03 to PP.Toko 15
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 4 03 to PP.Toko 16
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 4 03 to PP.Toko 17
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 4 03 to PP.Toko 18
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 4 03 to PP.Toko 19
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 4 03 to PP.Toko 20
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 4 03 to PP.Toko 21
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 4 03 to PP.Toko 22
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 4 03 to PP.Toko 23
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 4 03 to PP.Toko 24
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 4 03 to PP.Toko 25
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 4 03 to PP.Toko 26
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 4 03 to PP.Toko 27
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 4 03 to PP.Toko 28
; NYY 3 x 4 Sqmm
Electrical Feeder cables install on tray to include Tie cable; from PP. Lantai 4 03 to PP.Toko 29
; NYY 3 x 4 Sqmm

Pemasangan kabel feeder lengkap dengan kabel tie dan asesories dari LVMDP ke :
- PP. Outdoor Lighting 01 NYFGbY 3 x 4 mm2
Pemasangan kabel feeder lengkap dengan kabel tie dan asesories dari LVMDP ke :
- PP. Outdoor Lighting 02 NYFGbY 3 x 4 mm2
Pemasangan kabel feeder lengkap dengan kabel tie dan asesories dari LVMDP ke :
- PP. Outdoor Lighting 03 NYFGbY 4 x .. mm2 + BC .. mm2NYFGbY 3 x 4 mm2
Pemasangan kabel feeder lengkap dengan kabel tie dan asesories dari LVMDP ke :
- PP. Outdoor Lighting 04 NYFGbY 3 x 4 mm2

III PEKERJAAN INSTALASI LISTRIK

LANTAI BASEMENT 1
Pekerjaan Instalasi titik lampu dan stopkontak
dengan kabel NYM 3 x 2.5 mm2 didalam konduit high impact
1 Instalasi Titik Lampu
2 Instalasi Stop Kontak
3 Instalasi Exhaust fan
4 Instalasi Boosting fan
5 Instalasi Ceiling Fan

Aksesoris :
1 Downlight LED 10,5 W
2 Downlight LED 5 W
3 Lampu TL 1 x LED 18 W
4 Saklar Tunggal
5 Saklar Seri
6 Saklar Tukar
7 Stop Kontak 13-16 Amp
8 Ceiling Fan
9 Ceiling Exhaust Fan

LANTAI BASEMENT 2
Pekerjaan Instalasi titik lampu dan stopkontak
dengan kabel NYM 3 x 2.5 mm2 didalam konduit high impact
1 Instalasi Titik Lampu
2 Instalasi Stop Kontak
3 Instalasi Exhaust fan
4 Instalasi Boosting fan
5 Instalasi AC

Aksesoris :
1 Downlight LED 10,5 W
2 Downlight LED 5 W
3 Lampu TL 1 x LED 18 W
4 Saklar Tunggal
5 Saklar Seri
6 Saklar Tukar
7 Stop Kontak 13-16 Amp
8 Ceiling Exhaust Fan

LANTAI DASAR
Pekerjaan Instalasi titik lampu dan stopkontak
dengan kabel NYM 3 x 2.5 mm2 didalam konduit high impact
1 Instalasi Titik Lampu
2 Instalasi Stop Kontak
3 Instalasi Exhaust fan
4 Instalasi Ceiling Fan
5 Instalasi AC

Aksesoris :
1 Downlight LED 10,5 W
2 Downlight LED 5 W
3 Lampu RMI 2 x 18 Watt LED
4 Lampu TL 1 x LED 18 W
5 Lampu TL 2 x 18 W
6 Lampu Spot LED 25 Watt
7 Saklar Tunggal
8 Saklar Seri
9 Saklar Tukar
10 Stop Kontak 13-16 Amp
11 Ceiling Fan
12 Ceiling Exhaust Fan

LANTAI 1
Pekerjaan Instalasi titik lampu dan stopkontak
dengan kabel NYM 3 x 2.5 mm2 didalam konduit high impact
1 Instalasi Titik Lampu
2 Instalasi Stop Kontak
3 Instalasi Exhaust fan
4 Instalasi Ceiling Fan

Aksesoris :
1 Downlight LED 10,5 W
2 Downlight LED 5 W
3 Lampu TL 1 x LED 18 W
4 Lampu Spot LED 25 Watt
5 Saklar Tunggal
6 Saklar Seri
7 Saklar Tukar
8 Stop Kontak 13-16 Amp
9 Ceiling Fan
10 Ceiling Exhaust Fan

LANTAI 2
Pekerjaan Instalasi titik lampu dan stopkontak
dengan kabel NYM 3 x 2.5 mm2 didalam konduit high impact
1 Instalasi Titik Lampu
2 Instalasi Stop Kontak
3 Instalasi Exhaust fan
4 Instalasi Ceiling Fan

Aksesoris :
1 Downlight LED 10,5 W
2 Downlight LED 5 W
3 Lampu TL 1 x LED 18 W
4 Lampu Spot LED 25 Watt
5 Saklar Tunggal
6 Saklar Seri
7 Saklar Tukar
8 Stop Kontak 13-16 Amp
9 Ceiling Fan
10 Ceiling Exhaust Fan

LANTAI 3
Pekerjaan Instalasi titik lampu dan stopkontak
dengan kabel NYM 3 x 2.5 mm2 didalam konduit high impact
1 Instalasi Titik Lampu
2 Instalasi Stop Kontak
3 Instalasi Exhaust fan
4 Instalasi Ceiling Fan

Aksesoris :
1 Downlight LED 10,5 W
2 Downlight LED 5 W
3 Lampu TL 1 x LED 18 W
4 Lampu Spot LED 25 Watt
5 Saklar Tunggal
6 Saklar Seri
7 Saklar Tukar
8 Stop Kontak 13-16 Amp
9 Ceiling Fan
10 Ceiling Exhaust Fan

LANTAI 4
Pekerjaan Instalasi titik lampu dan stopkontak
dengan kabel NYM 3 x 2.5 mm2 didalam konduit high impact
1 Instalasi Titik Lampu
2 Instalasi Stop Kontak
3 Instalasi Exhaust fan
4 Instalasi Ceiling Fan

Aksesoris :
1 Downlight LED 10,5 W
2 Downlight LED 5 W
3 Lampu TL 1 x LED 18 W
4 Lampu Spot LED 25 Watt
5 Saklar Tunggal
6 Saklar Seri
7 Saklar Tukar
8 Stop Kontak 13-16 Amp
9 Ceiling Fan
10 Ceiling Exhaust Fan

POWER HOUSE
Pekerjaan Instalasi titik lampu dan stopkontak
dengan kabel NYY 3 x 2.5 mm2 didalam konduit high impact
1 Instalasi Titik Lampu
2 Instalasi Stop Kontak
3 Instalasi Wall exhaust fan

Aksesoris :
1 Lampu TL 1 x LED 18 W
2 Saklar Tunggal
3 Saklar Seri
4 Stop Kontak 13-16 Amp
5 Wall Exhaust fan

LAMPU TAMAN
Pekerjaan Instalasi titik lampu dan stopkontak
dengan kabel NYY 3 x 2.5 mm2 didalam konduit high impact
1 Instalasi Titik Lampu
2 Instalasi Stop Kontak

Aksesoris :
1 Flood Light 20 Watt
2 Lampu LPJ 60 watt LED
3 Lampu Tiang 2 Cabang
4 Stop Kontak 13-16 Amp

IV INSTALASI RUANG POMPA


1 Instalasi kabel Exhaust fan. NYM 3 x 2.5 mm2 dalam konduit Clipsal 20 mm
2 Instalasi Pompa Booster NYY 4x4 mm2
3 Instalasi Pompa Sumur NYY 4x4 mm2
4 Instalasi Pompa submersible NYY 3x2.5 mm2
5 WLC Electroda Deep Well Cable installation. NYYHY 4 x 2,5 mm2.
6 WLC Electroda Clean Water tank Cable installation. NYYHY 4 x 2,5 mm2.
7 Compact axial Flow ventilating fan, Cap. 84 cfm

V PEKERJAAN PENANGKAL PETIR


Supply, install and testing all these equipments complete with all necessary fittings and accessories req
Lightning Protection Head (type Radius 80 Meter)
Lightning Pole GIP Med. 6 mtrs height as detail drawing
Down Conductor NYY 70 Sqmm
PVC AW dia. 1.25" As conduit
Lightning grounding system max. 5 Ohms.
Control box 30x30 cm c/w junction terminal.

B PEKERJAAN TELEPON
1 Pengadaan dan pemasangan PABX kapasitas 3 COL - 10 Extension;
2 UPS 1,200 VA Ex. ICA for Back Up System, inc:
cable & all accessories required: from UPS to PABX
3 Telkom DP Box 10" Pairs
4 Telephone Main Distribution Frame (MDF). 20 pair Krone LSA terminal,
arrester block 10", Polyester Cabinet IP 66. Ex. Legrand
5 Instalasi titik telepon ITC 2 pair didalam konduit dari TB ke Outlet telepon
6 Telepon outlet
7 Grounding , R maximum = 1 Ohm

C PEKERJAAN MATV
Pengadaan dan pemasangan peralatan MATV termasuk dengan instalasi kabel dan aksesoris lainnya
1 Local UHF&VHF TV reception antenna c/w pole support.
2 Jelly Coaxial cable RG 6 from antenna to MATV
3 UHF/VHF RF Booster Amplifier with 220 VAC
Power connection from nearest AC power cct.
4 Sterio Universal Modulator
5 Power Supply Unit
6 Selectif Programable 10 Chanel
7 Splitter 6 way -F-Type
8 Splitter 8 way -F-Type
9 TB/TV.
10 - MDF ~ TB/TV. ~ TOB ~ Splitter Jelly Coaxial cable RG 7C + HIC
11 - coaxial cable RG 6C + HIC ke Outlet TV
12 - Outlet TV

D PEKERJAAN FIRE ALARM


Pengadaan dan pemasangan peralatan Deteksi Kebakaran
( Fire Alarm ) lengkap dengan material bantunya :
1 Master Controlle Fire Alarm ( MCFA ) Semi Addressable system 1 loop
2 Annunciator
3 TB/FA lengkap dengan Interface Modul
4 Fire Alarm Feeder cables, Twisted Shielded AWG #18 + NYMHY 2x2.5 mm2
include HIC and all accessories required from:
- MCFA ~ TB/FA. Lantai 1
- Lantai Dasar ~ TB/FA. Basement 1
- Lantai basement 1 ~ TB/FA. Basement 2
- Lantai Basement 2 ~ TB/FA. Lantai 4
- Lantai 4 ~ TB/FA. Lantai 3
- Lantai 3 ~ TB/FA. Lantai 2
- Lantai 2 ~ TB/FA. Lantai 1

Pengadaan dan pemasangan instalasi Deteksi Kebakaran ( Fire Alarm )


lengkap dengan material bantunya kabelTwisted Shielded AWG #18 + NYMHY 2x1.5 mm2 didalam ko
1 Instalasi Heat Detector Twisted Shielded AWG #18 + HIC ∅20mm
2 Instalasi Smoke Detector Twisted Shielded AWG #18 + HIC ∅20mm
3 Instalasi Alarm Lamp & Bell Twisted Shielded
AWG #18 + NYMHY 2x1.5 mm2 + HIC ∅20mm
4 Instalasi Alarm Lamp Cable Twisted Shielded
AWG #18 + NYMHY 2x1.5 mm2 + HIC ∅20mm
5 Instalasi Push botton Cable Twisted Shielded
AWG #18 + NYMHY 2x1.5 mm2 + HIC ∅20mm
6 Instalasi Flow Switch CableTwisted Shielded
AWG #18 + NYMHY 2x1.5 mm2 + HIC ∅20mm
7 Heat Detector
8 Smoke Detector
9 Alarm Bell
10 Alarm Indicator Lamp
11 Push Botton
12 End of line
13 Fire Extinguisher type Powder 5 Kg

E PEKERJAAN CCTV
Pengadaan dan pemasangan peralatan untuk CCTV
lengkap dengan material bantu :
1 Digital Video Recorder (NVR) 64 Channel HDD 2 TB, include Keyboard Controller
2 LCD Display 32"
3 UPS 1,500 VA Ex. ICA for Camera power Supply
4 Server rack set 19"
6 Instalasi CCTV Kabel UTP cat 6 didalam konduit 20 mm
7 Infrared Camera type outdoor
8 Dome Camera

F PEKERJAAN CEILING SPEAKER


Pengadaan dan pemasangan peralatan untuk CEILING SPEAKER
lengkap dengan material bantu :
- Ceiling Speaker 6 W Z-2352SC
- Instalasi Speaker
-JB (Juction box)

Peralatan Utama
Pemasangan Unit 480 W Sistem Amplifier w/ Selector
- CD/MMC/USB player with FM Tunner Z-CD2011R
- Pemasangan Unit Remote Microphone W/Keypad Zone Selector
Pemasangan Unit Selector 10 CH
- Pemasangan Rack Cabinet w/Acc
Digital Matrix Mixer

Pekerjaan Instalasi Feeder Kabel Sound Sistem


Instalasi Feeder Kabel dari JB lantai 1 Menuju JB Basement NYYHY 2 x 2,5Sqmm
Instalasi Feeder Kabel dari JB lantai 1 Menuju JB lantai Dasar NYYHY 2 x 2,5Sqmm
Instalasi Feeder Kabel dari JB lantai 1 Menuju JB lantai 1 NYYHY 2 x 2,5Sqmm
Instalasi Feeder Kabel dari JB lantai 1 Menuju JB lantai 2 NYYHY 2 x 2,5Sqmm
Instalasi Feeder Kabel dari JB lantai 1 Menuju JB lantai 3 NYYHY 2 x 2,5Sqmm

G PEKERJAAN DATA
Pengadaan dan pemasangan peralatan untuk DATA KOMPUTER
lengkap dengan material bantu :
Biaya koneksi Internet, termasuk biaya administrasi, kompensasi dan koordinasi
Rack Server 42U 19"
PC Server DATA , O/S : Win XP + Router
Microtik 1400
Baterai Cadangan, UPS 2000VA
Main Switch hub. 48G Port
Data Rack 12 U, Switch Hub 24 Port
- Rack data 12U 19"
- Switch Hub 24G port, linksys
- UPS 600VA/220V

Data Feeder cables, Fiber Optic Single Core


- Server ~ Switch Hub #1 Lt. Dasar
- Server ~ Switch Hub #2 Lt. Dasar
- Server ~ Switch Hub #1 Lt. 1
- Server ~ Switch Hub #2 Lt. 1
- Server ~ Switch Hub #1 Lt. 2
- Server ~ Switch Hub #2 Lt. 2
- Server ~ Switch Hub #1 Lt. 3
- Server ~ Switch Hub #2 Lt. 3
- Server ~ Switch Hub #1 Lt. 4
- Server ~ Switch Hub #2 Lt. 4
Instalasi titik Data UTP Cat 6e didalam konduit dari TB ke Outlet Data
Data outlet
Wifi
Instalasi titik Power Wifi NYM 3x2,5 mm2 didalam konduit
Stop Kontak 13-16 Amp
Grounding , R maximum = 1 Ohm
Testing & Commissioning

H PEKERJAAN PLAMBING
PEKERJAAN INSTALASI AIR BERSIH

Pengadaan dan pemasangan Material Utama Air Bersih


sudah termasuk peralatan bantu yang mendukung :
Pekerjaan pembuatan sumur dalam 100 meter lengkap dengan chasing
Main Equipment

Supply and install booster pump unit (Hydro Multi-B 3 x CR 15 - 5) with centrifugal, horizontal, non sel

pumps controller panel & diaphragm pressure tank, Total Flow capacity =50 m3/h, Head = 40m (3 x 4
Supply and install Transfer pump unit (CR 10-3) c/w
pumps controller panel & diaphragm pressure tank, Total Flow capacity =2 x 8 m3/h, Head = 20m (2 x
Supply and install Deep Well pump unit (SP 9 -16) c/w pumps controller panel,
Total Flow capacity =35 m3/h, Head = 80m (11 kW/3P)
Cable NYY 4 x 4 Sqmm from PP. Pump to Control Panel Pump fixed on
Tray Cable c/w tie cable and other support material
Multimedia Sand Filter 9m3/h + Carbon Filter 9m3/h Automatic

Pengadaan dan pemasangan valve-valve dan material lainnya :


Supply and Install Clean water plumbing; Pipa Vinilon PPR PN 10 - Class steel support at shaft, clamp
Pekerjaan Lantai I
PPR PN 10 DN 75mm
PPR PN 10 DN 63mm
PPR PN 10 DN 50mm
PPR PN 10 DN 40mm
PPR PN 10 DN 32mm
PPR PN 10 DN 25mm
PPR PN 10 DN 20mm
Isolating Valve dia. 21/2" - Scr
Isolating Valve dia. 2" - Scr
Isolating Valve dia. 11/4" - Scr
Isolating Valve dia. 1" - Scr
Isolating Valve dia. 3/4" - Scr

Pengadaan dan pemasangan valve-valve dan material lainnya :


- Gate valves dia. 2 1/2"
- Gate valves dia. 2"
- Gate valves dia. 1 1/2"
- Gate valves dia. 1 1/4"
- Gate valves dia. 1"
- Butterfly valves dia. 3"
- Butterfly valves dia. 4"
- Ball valves dia.3"
- Check valve 1 1/2'
- Check valve 2'
- Floating valve dia.1"
- Automatic air vent incl. valve dia 1/2"
- Stainless Steel WLC Probe fixed at Clean Water tank c/w cable

Pengadaan dan pemasangan Pipa Vinilon PVC AW lengkap dengan Fitting, support & hanger,
material bantu lainnya sehingga Pipa terpasang dengan baik :
Dia 4"
Dia 3"
Dia 2"
Dia 11/2"
Dia 11/4"
Dia 1"
Dia 1/2"
Dia 3/4"
Pipa perporated Dia 1/2" siram taman atas

PEKERJAAN AIR KOTOR


Pengadaan dan pemasangan instalasi air Kotor termasuk Material Utama lengkap
dengan Panel, asesoris, support hanger dan material bantu lainnya :

Main Equipment (SCH-SW )


1 Summersible pomp Sumpit for waste water cap. 2x(5 m3/hr); 15 m; 2900 rpm,
(2 x 4)kW/ 3ph/ 380V/ 50Hz, Parallel Alternate with float switch
Pekerjaan STP
Pengadaan dan pemasangan STP Bio Health lengkap dengan galian, pondasi, urugan pasir serta sem
2 BIO STP dengan kapasitas min. 100m3/hari Paralel STP
STP Cap.50m3
3 RPH IPAL Potong Unggas
Galian Dan Urugan Pasir
4 PIT Untuk Over Flow Mini STP Dan Air Buangan Concrete Beton Dan Cover
5 Grease Trap Limbah Pasar
Pengadaan dan pemasangan pipa PVC AW (Klas 10 Kg/cm) lengkap dengan Fitting,
support & hanger, material bantu lainnya sehingga pipa terpasang dengan baik :
Supply and Install Sewage Water distribution Pipe c/w galvanized steel support at shaft, pipe clamp, bo

Pekerjaan Pipa Vinilon Lantai Basement, Lantai Dasar, Lantai 1,2,3,4


PVC AW dia. 1.25" as a vent pipe
PVC AW dia. 2" as a vent pipe
PVC AW dia. 3" as a vent pipe
PVC AW dia. 2"
PVC AW dia. 3"
PVC AW dia. 4"
PVC AW dia. 6"
PVC AW dia. 8"
Clean Out Stainles dia. 6"
Clean Out Stainles dia. 4"
Clean Out Stainles dia. 3"
Clean Out PVC dia. 4"
P-Trap dia 2"

PEKERJAAN AIR HUJAN


Pengadaan dan pemasangan instalasi air Kotor termasuk Material Utama lengkap
dengan Panel, asesoris, support hanger dan material bantu lainnya :

Main Equipment
Dome Roof Drain
Absorbtion Pit
Pengadaan dan pemasangan pipa air hujan PVC AW lengkap dengan fitting,
support & hanger, material bantu lainnya sehingga pipa terpasang dengan baik :
Supply and Install Rain/Storm Water Drainage Pipe c/w galvanized steel support at shaft, pipe clamp, b
Pekerjaan Lantai I
PVC AW dia. 3"
PVC AW dia. 4"
1 Summersible pomp Sumpit for Rain water cap. 2x(565Ltr/mnt ); 15 m; 2900 rpm,
2 Sumppit untuk penampungan air Hujan by Sipil )
3 Gutter ( by Sipil )
4 Pipa perporated Dia 2" Air Hujan taman atas
6 Check valves dia. 1"
7 Gate valves dia. 1"
8 Roof Drain dia. 4"
10 Galian dan urugan

I PEKERJAAN PEMADAM KEBAKARAN DAN SPRINGKLER


Pengadaan dan pemasangan peralatan Utama Pemadam Kebakaran lengkap
dengan instalasi pemipaan, isolasi, support, hanger dan material bantu lainnya :
1 Diesel Hydrant Pump, Cap.1000 US GPM, Head 80 m Incl. Plinth
2 Electric Main Hydrant Pump, Cap.1000 US GPM, Head 80 m Incl. Plinth
3 Jockey Hydrant Pump, Cap 20 US GPM, Head 80 m Incl. Plinth
4 Hydrant Pressure tank cap.500 ltr.-diaphragm tank
5 Header Pipe, GIP dia 6". Incl. Support
6 Pressure Switch, Incl. Valve
7 Pressure Gauge, Incl. Valve
8 Y Strainer 10K-w/Flange dia. 6"
9 Y Strainer 10K - w/flange dia. 2"
10 Flexible Joint dia. 4"
11 Flexible Joint dia. 2"
12 Buterffly Valve dia. 4" ex Kitz
13 Gate Valve 10 K-w/flange dia. 4", ex. Kitz
14 Gate Valve 10 K-w/flange dia. 2", ex. Kitz
15 PVC AW dia.4"
16 Suction Grill
17 Alarm Valve termasuk Alarm Gong
18 Safety valve
19 Solenoide valves dia. 2"
20 Stainless Steel WLC Probe fixed at HydrantWater tank
21 Savety Relief Valve 4"
22 Indoor Hydrant box complete with : 30 mtr - 11/2" Jet Fire Hose, Hydrant
Valve dia. 11/2", Variable Spray nozzle 11/2" and S/S hose rack as detail
23 Outdoor Hydrant box complete with : 30 mtr - 11/2" Jet Fire Hose, Hydrant
Valve dia. 11/2", Variable Spray nozzle 11/2" and S/S hose rack as detail
24 Hydrant Pylar dia. 4"x2.5"x2.5"
25 Seamese Connection dia. 4"x2.5"x2.5"
26 Automatic Air Vent dia 2"
27 Foot valve dia. 2"
28 Foot valve dia. 4"
Pengadaan dan pemasangan Pipa Blacksteel SCH 40 Med, lengkap isolasi dan Fitting,
support & hanger, material bantu lainnya sehingga Pipa terpasang dengan baik :
1 - BS Sch 40 Dia. 6"
2 - BS Sch 40 Dia. 4"
3 - BS Sch 40 Dia. 3"
4 - BS Sch 40 Dia. 21/2"
5 - BS Sch 40 Dia. 2"
6 - BS Sch 40 Dia. 11/2"
7 - BS Sch 40 Dia.11/4"
8 - BS Sch 40 Dia. 1"
9 Pengadaaan dan pemsangan Sprinkler head pendant Lantai Basement 1
10 Pengadaaan dan pemsangan Sprinkler head pendant Lantai Basement2
11 Pengadaaan dan pemsangan Sprinkler head pendant Lantai Dasar
12 Pengadaaan dan pemsangan Sprinkler head pendant Lantai 1
13 Pengadaaan dan pemsangan Sprinkler head pendant Lantai 2
14 Pengadaaan dan pemsangan Sprinkler head pendant Lantai 3
15 Pengadaaan dan pemsangan Sprinkler head pendant Lantai 4
16 Galian dan Urugan untuk pipa

J PEKERJAAN TATA UDARA


Pengadaan dan pemasangan instalasi Tata Udara AC Split
wall mounted dan Exhaust fan lengkap dengan aksesoris :
1 Indoor dan Outdoor Unit
- Kap. 24.200 BTUH ( INVERTER )
- Kap. 12,300 BTUH ( INVERTER )
- Kap. 7.600 BTUH ( INVERTER )
- Jet Fan cap. 3240 CFM
- Exhaust fan Kap. 7500 CFM
- Wall Exhaust fan Kap. 1700 CMH
2 Pipa Refrigerant lengkap dengan Isolasi Armaflex
sesuai dengan spesifikasi yang dianjurkan.
- Dia.1/4" - 1/2"
- Dia. 3/8" - 5/8"
- Pipa drain AC dia. 3/4"lengkap dengan isolasi
- Kabel NYM 3x2.5 mm2 dari indoor ke Outdoor
- Pipa PVC dia. 4" untuk exhaust fan

3 Exhaust Ducting & Accssories


- Ducting Exhaust BJLS 100, 1700X450 mm
- Ducting Exhaust BJLS 100, 1050X500 mm
- Exhaust Hood
- CO Sensor
- Kabel Instalasi CO Sensor
- Testing & Commisioning

K PEKERJAAN KABEL TRAY


Pekerjaan Kabel Tray Listrik
Pengadaan dan pemasangan kabel tray Lantai Basement 1, 2, Lantai 1,2,3,4

Pekerjaan Kabel Tray Elektronik


Pengadaan dan pemasangan kabel tray Lantai Basement 1, 2, Lantai 1,2,3,4

L PEKERJAAN SOLAR PANEL

A Verte Advante Solar Panel 445 WP


Rated Maximum Power (Pmax) (W) = 445 Watt
Cell
Weight
Dimensions
Module Efficiency
No. Cells
Warranty

Certificates
B Verte Advante Inverter On Grid + Wifi Stick
50K Inverter
Input (DC)

Output (AC)

Efficiency
Warranty
Certificates

C Verte Advante Foortop Mounting System


Fooftop Mounting System

D Cabling, Connection & Protecting System


Cabling, connection & protection system

E Transportation, Installation, Permit, Testing & Commissioning


Transportation, installation, permit, testing & commissioning

M PEKERJAAN LIFT DAN ESCALATOR


Pengadaan dan pemasangan instalasi LIFT Dan Escalator Lengkap Dengan Aksesoris :
- Lift Passenger Kapasitas 1000 kg - Sicher Passanger Elevator, MRL, 1000kg
- Lift Servis Kapasitas 800 kg - Sicher Service Elevator, MRL, 800kg
- Escalator (SES 30-1000, 3,240) Dengan Cover Cladding
- Anti Earthquake

N PEKERJAAN COLD ROOM


Pengadaan dan pemasangan instalasi COLD ROOM lengkap dengan aksesoris :
- Dimensi Cold Room ( 4000 x 3000 x 2500 ) mm
- Cap. Volume 24,5 m3
Adjustable Punched Pan Rack
Condensing Unit Chiller Room
(Suhu -18/-20)
Grill Gutter w/ Frame
Panel Coldroom
Installation, Delivery, Labour Cost, Material
MEKANIKAL ELEKTRIKAL DAN PLUMBING

URAIAN PEKERJAAN SATUAN

3
ELEKTRIKAL
N, Genset, Panel & Kabel Feeder
CTION ; (BP & UJL) 1.110 kVA, termasuk biaya teknis & administrasi untuk AKLI & Konsuil Bali
Ls
e Kubikel & Biaya pelaksanaan testing komissioning sisi PLN.

ge Cubicle - Surge Arester Unit


cle pelanggan IM - SM6 Unit
cle pelanggan QM - SM6 Unit
eksi antar MV dan Peralatan Unit
3 x 1 x 240mm2 dari Cubical PLN ke Cubical Pelanggan (Cubicle Pelanggan) Mtr
7 x 1 x 300mm2 dari Cubicle ke Trafo Mtr
x 1 x 300mm2 dari Trafo ke LV Mtr
abel Leader 600mm X 100mm Mtr
ee Leader 600mm X 100mm Bh
600 mm (W) x 100 mm (H) Bh
Ladder 600 mm (W) x 100 mm (H) Bh
Ladder 600 mm (W) x 100 mm (H) Bh
Bh
t 20 kV, sisi outgoing PLN (adaptor) Unit
t 20 kV, sisi MV incoming pelanggan Unit
t 20 kV, sisi MV outgoing pelanggan Unit
t 20 kV, pada trafo (Elastimol) Unit
t LV, pada trafo Unit
kun Cu 300 mm2 pcs
Heater pada Cubicle Unit
stem Body & Netral Cubicle max. 5 Ohm. Unit

an Pemasangan Trafo
kapasitas 2000 KVA, 20 KV/400 V, 50 Hz, Dyn5, CU-CU Unit
stem Body & Netral Cubicle max. 5 Ohm. Unit
emasangan dan Pengetesan lengkap dengan fitting dan acecories lainnya :
Unit
200 KVAR 525 V Unit
Unit

Genset Open Type kapasitas min. 800 kVA dilengkapi dengan Alternator ex, Standford, residential
st air duct, tangki BBM harian, pompa BBM, automatic stater dan semua perlengkapan yang Set
gga berfungsi dengan baik.
t Layak Operasi) Genset & IO (Ijin Operasi) Genset Unit
Genset (PKG) Unit

& Accessories Genset

nan Kap. 6000 ltr, termasuk deepstick, electrical fuel level meter, vent breather pipe & accessories Unit

gguan Kap. 2000 ltr, termasuk deepstick, electrical fuel level meter, vent breather pipe & accessories Unit

ransfer Gear Pump, 25 Lpm, H=20 mtr, incl. valve & accessories Unit
mp, incl. valve & accessories Unit
Unit
ust Radiator BJLS 1,2 mm dari Genset sampai keluar ruang Genset Set
nuator 6000x1500x1200 (PnjgxTnggxTbl) Set
enuator 2500x1500x1200 (PnjgxTnggxTbl) Set
Wall Mounted Unit
Unit
ipe, pipa gas dia. 200 mm m'
m, untuk lubang Intake 6000x1500 mm Unit
m, untuk lubang Exhaust 2500x1500 mm Unit
Fuel Pump c/w floater Unit
an bakar dari tangki harian ke engine untuk supply & return, termasuk valve & accessories Set

an bakar dari tangki bulanan ke tangki harian, termasuk valve & accessories, pipa gas dia. 50 mm Set

mm Tokico type FRO 0541-04X termasuk valve & support Unit


or lengkap support & accessories Unit
0x100 dari Genset sampai PKG, termasuk support & accessories m'
gan, rock wool density 80 kg/m3, tebal 50 mm m2
an bakar solar untuk tangki bulanan & tangki mingguan genset Ltr
Lot

and testing all these equipments complete with all necessary fittings and accessories required :
der cables install on tray to include Tie cable; from Genset #1 to PKG m1

der cables install on tray to include Tie cable; from Genset #2 to PKG m1

der cables install on tray to include Tie cable; from Panel Kontrol Genset to LVMDP m1
1x300 Sqmm
der cables install on tray to include Tie cable; from SDP PUMP to Fuel pump transfer NYY 3 x 2,5
Titik
20 mm

OMMITIONING Lot
nel max. 5 Ohm. Unit

emasangan dan Pengetesan Panel NCK; lengkap dengan fitting dan acecories lainnya :
nel ( MDP) Bangunan Pasar Unit
Pompa Air Bersih (PP. CWP) Unit
Pompa Deep Well (PP. Deep Well 1) Unit
PP. Pompa Air Kotor 1) Unit
PP. Pompa Air Kotor 2) Unit
PP. Pompa Air Kotor 3) Unit
PP. Pompa Air Kotor 4) Unit
PP. Pompa Air Hujan 1) Unit
PP. Pompa Air Hujan 2) Unit
Unit
PP.Basement 1-01) Unit
PP.Basement 1-02) Unit
PP.Basement 1-03) Unit
PP.Basement 2-01) Unit
PP.Basement 2-02) Unit
PP.Basement 2-03) Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
ASAR - 01(#1) Unit
ASAR - 02(#2) Unit
ASAR - 03(#3) Unit
ASAR - 04(#4) Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
R LIGHTING 1 Unit
R LIGHTING 2 Unit
R LIGHTING 3 Unit
R LIGHTING 4 Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
PP. Pompa Hydrant) Unit
PP. Exhaust Fan) Unit
Unit
Unit
Unit
nel max. 5 Ohm. Unit

KABEL FEEDER
kabel feeder lengkap dengan kabel tie dan asesories dari LVMDP ke :
GUNAN 7 x NYFGbY 4 x 300 mm2 + BC 95 mm2 Mtr'

LANTAI BASEMENT 1, BASEMENT 2, LANTAI DASAR,1, 2, 3


der cables install on tray to include Tie cable; from MDP. Bangunan Pasar to SDP.Basement 1
Sqmm + BC 35 Sqmm m1
der cables install on tray to include Tie cable; from MDP to SDP.BS-02
Sqmm + BC 25 Sqmm m1
der cables install on tray to include Tie cable; from MDP to SDP.Lantai Dasar
Sqmm + BC 95 Sqmm m1
der cables install on tray to include Tie cable; from MDP to SDP.Lantai 1
Sqmm + BC 95 Sqmm m1
der cables install on tray to include Tie cable; from MDP to SDP.Lantai 2
Sqmm + BC 95 Sqmm m1
der cables install on tray to include Tie cable; from MDP to SDP.Lantai 3
Sqmm + BC 95 Sqmm m1
der cables install on tray to include Tie cable; from MDP to SDP.Lantai 4
Sqmm + BC 95 Sqmm m1
der cables install on tray to include Tie cable; from SDP.BS-02 to PP. POMPA AIR KOTOR 1
qmm + BC 4 Sqmm m1
der cables install on tray to include Tie cable; from SDP.BS-02 to PP. POMPA AIR KOTOR 2
qmm + BC 4 Sqmm m1
der cables install on tray to include Tie cable; from SDP.BS-02 to PP. POMPA AIR KOTOR 3
qmm + BC 4 Sqmm m1
der cables install on tray to include Tie cable; from SDP.BS-02 to PP. POMPA AIR KOTOR 4
qmm + BC 4 Sqmm m1
der cables install on tray to include Tie cable; from SDP.BS-02 to PP. POMPA AIR Hujan 1
qmm + BC 4 Sqmm m1
der cables install on tray to include Tie cable; from SDP.BS-02 to PP. POMPA AIR Hujan 2
qmm + BC 4 Sqmm m1
der cables install on tray to include Tie cable; from SDP.BS-01 to PP.Basement 01
Sqmm + BC 10 Sqmm m1
der cables install on tray to include Tie cable; from SDP.BS-01 to PP.Basement 02
Sqmm + BC 10 Sqmm m1
der cables install on tray to include Tie cable; from SDP.BS-01 to PP.Basement 03
Sqmm + BC 10 Sqmm m1
der cables install on tray to include Tie cable; from SDP.LT-Dasar to PP.LT Dasar 01
Sqmm + BC 70 Sqmm m1
der cables install on tray to include Tie cable; from SDP.LT-Dasar to PP.LT Dasar 02
Sqmm + BC 70 Sqmm m1
der cables install on tray to include Tie cable; from SDP.LT-Dasar to PP.LT Dasar 03
Sqmm + BC 25 Sqmm m1
der cables install on tray to include Tie cable; from SDP.LT-Dasar to PP.LT Dasar 04
Sqmm + BC 25 Sqmm m1
der cables install on tray to include Tie cable; from SDP.LT-Dasar to PP.Eskalator
qmm + BC 6 Sqmm m1
der cables install on tray to include Tie cable; from SDP.LT-Dasar to PP.Cold Room 1
qmm + NYA 4 Sqmm m1
der cables install on tray to include Tie cable; from SDP.LT-Dasar to PP.Cold Room 2
qmm + NYA 4 Sqmm m1
der cables install on tray to include Tie cable; from SDP.LT-1 to PP.LT 1 01
Sqmm + BC 70 Sqmm m1
der cables install on tray to include Tie cable; from SDP.LT-1 to PP.LT 1 02
Sqmm + BC 70 Sqmm m1
der cables install on tray to include Tie cable; from SDP.LT-1 to PP.LT 1 03
Sqmm + BC 25 Sqmm m1
der cables install on tray to include Tie cable; from SDP.LT-1 to PP.LT 1 04
Sqmm + BC 25 Sqmm m1
der cables install on tray to include Tie cable; from SDP.LT-1 to PP.Eskalator
qmm + BC 6 Sqmm m1
der cables install on tray to include Tie cable; from SDP.LT-2 to PP.LT 1 01
Sqmm + BC 70 Sqmm m1
der cables install on tray to include Tie cable; from SDP.LT-2 to PP.LT 1 02
Sqmm + BC 70 Sqmm m1
der cables install on tray to include Tie cable; from SDP.LT-2 to PP.LT 1 03
Sqmm + BC 25 Sqmm m1
der cables install on tray to include Tie cable; from SDP.LT-2 to PP.LT 1 04
Sqmm + BC 25 Sqmm m1
der cables install on tray to include Tie cable; from SDP.LT-2 to PP.Eskalator
qmm + BC 6 Sqmm m1
der cables install on tray to include Tie cable; from SDP.LT-3 to PP.LT 1 01
Sqmm + BC 70 Sqmm m1
der cables install on tray to include Tie cable; from SDP.LT-3 to PP.LT 1 02
Sqmm + BC 70 Sqmm m1
der cables install on tray to include Tie cable; from SDP.LT-3 to PP.LT 1 03
Sqmm + BC 25 Sqmm m1
der cables install on tray to include Tie cable; from SDP.LT-3 to PP.LT 1 04
Sqmm + BC 25 Sqmm m1
der cables install on tray to include Tie cable; from SDP.LT-3 to PP.Eskalator
qmm + BC 6 Sqmm m1
der cables install on tray to include Tie cable; from SDP.LT-4 to PP.LT 1 01
Sqmm + BC 70 Sqmm m1
der cables install on tray to include Tie cable; from SDP.LT-4 to PP.LT 1 02
Sqmm + BC 70 Sqmm m1
der cables install on tray to include Tie cable; from SDP.LT-4 to PP.LT 1 03
Sqmm + BC 25 Sqmm m1
der cables install on tray to include Tie cable; from SDP.LT-4 to PP.LT 1 04
Sqmm + BC 25 Sqmm m1
der cables install on tray to include Tie cable; from SDP.LT-4 to PP.Eskalator
qmm + BC 6 Sqmm m1
der cables install on tray to include Tie cable; from SDP.LT-Dasar to Neon Sign
qmm + BC 6 Sqmm m1
der cables install on tray to include Tie cable; from MDP to PP. POMPA CWP
Sqmm + BC 16 Sqmm m1
der cables install on tray to include Tie cable; from MDP to PP. POMPA DEEP WELL 1
qmm + BC 6 Sqmm m1
der cables install on tray to include Tie cable; from MDP to PP. POMPA DEEP WELL 2
qmm + BC 6 Sqmm m1
der cables install on tray to include Tie cable; from MDP to PP. POMPA HYDRANT
Sqmm + BC 35 Sqmm m1
der cables install on tray to include Tie cable; from SSDP.BS-03 to PP. STP
qmm + BC 6 Sqmm m1
der cables install on tray to include Tie cable; from MDP to PP.Lift 1
Sqmm + BC 10 Sqmm m1
der cables install on tray to include Tie cable; from MDP to PP.Lift 2
Sqmm + BC 10 Sqmm m1
der cables install on tray to include Tie cable; from MDP to PP.Lift 3
Sqmm + BC 10 Sqmm m1
der cables install on tray to include Tie cable; from MDP to PP.Lift 4
Sqmm + BC 10 Sqmm m1
der cables install on tray to include Tie cable; from MDP to PP.Lift 5
Sqmm + BC 10 Sqmm m1
der cables install on tray to include Tie cable; from MDP to PP.Lift 6
Sqmm + BC 10 Sqmm m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 43
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 44
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 45
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 46
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 47
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 48
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 49
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 50
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 51
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 52
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 53
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 54
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 55
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 56
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 57
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 58
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 59
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 60
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 61
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 62
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 63
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 64
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 65
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 66
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 67
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 68
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 69
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 70
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 71
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 72
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 73
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 74
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 75
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 76
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 77
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 78
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 79
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 80
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 81
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 82
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 83
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 84
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 85
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 86
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 87
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 88
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 03 to PP.Kios 89
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 01
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 02
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 03
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 04
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 05
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 06
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 07
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 08
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 09
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 10
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 11
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 12
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 13
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 14
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 15
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 16
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 17
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 18
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 19
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 20
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 21
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 22
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 23
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 24
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 25
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 26
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 27
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 28
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 29
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 30
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 31
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 32
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 33
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 34
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 35
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 36
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 37
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 38
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 39
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 40
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 41
m1
der cables install on tray to include Tie cable; from PP. Lantai Dasar 04 to PP.Kios 42
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Toko 18
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Toko 19
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Toko 20
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Toko 21
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Toko 22
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Toko 23
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Toko 24
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Toko 25
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Toko 26
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Toko 27
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Toko 28
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Toko 29
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Toko 30
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Toko 31
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Toko 32
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Bank 01
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Bank 02
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Kios 07
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Kios 08
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Kios 09
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Kios 10
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Kios 11
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 03 to PP.Kios 12
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Toko 01
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Toko 02
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Toko 03
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Toko 04
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Toko 05
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Toko 06
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Toko 07
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Toko 08
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Toko 09
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Toko 10
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Toko 11
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Toko 12
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Toko 13
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Toko 14
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Toko 15
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Toko 16
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Toko 17
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Kios 01
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Kios 02
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Kios 03
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Kios 04
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Kios 05
m1
der cables install on tray to include Tie cable; from PP. Lantai 1 04 to PP.Kios 06
m1
der cables install on tray to include Tie cable; from PP. Lantai 2 03 to PP.Toko 21
m1
der cables install on tray to include Tie cable; from PP. Lantai 2 03 to PP.Toko 22
m1
der cables install on tray to include Tie cable; from PP. Lantai 2 03 to PP.Toko 23
m1
der cables install on tray to include Tie cable; from PP. Lantai 2 03 to PP.Toko 24
m1
der cables install on tray to include Tie cable; from PP. Lantai 2 03 to PP.Toko 25
m1
der cables install on tray to include Tie cable; from PP. Lantai 2 03 to PP.Toko 26
m1
der cables install on tray to include Tie cable; from PP. Lantai 2 03 to PP.Toko 27
m1
der cables install on tray to include Tie cable; from PP. Lantai 2 03 to PP.Toko 28
m1
der cables install on tray to include Tie cable; from PP. Lantai 2 03 to PP.Toko 29
m1
der cables install on tray to include Tie cable; from PP. Lantai 2 03 to PP.Toko 30
m1
der cables install on tray to include Tie cable; from PP. Lantai 2 03 to PP.Toko 31
m1
der cables install on tray to include Tie cable; from PP. Lantai 2 03 to PP.Toko 32
m1
der cables install on tray to include Tie cable; from PP. Lantai 2 03 to PP.Toko 33
m1
der cables install on tray to include Tie cable; from PP. Lantai 2 03 to PP.Toko 34
m1
der cables install on tray to include Tie cable; from PP. Lantai 2 03 to PP.Toko 35
m1
der cables install on tray to include Tie cable; from PP. Lantai 2 03 to PP.Toko 36
m1
der cables install on tray to include Tie cable; from PP. Lantai 2 03 to PP.Toko 37
m1
der cables install on tray to include Tie cable; from PP. Lantai 2 03 to PP.Toko 38
m1
der cables install on tray to include Tie cable; from PP. Lantai 2 03 to PP.Toko 39
m1
der cables install on tray to include Tie cable; from PP. Lantai 2 03 to PP.Toko 40
m1
der cables install on tray to include Tie cable; from PP. Lantai 2 03 to PP.Toko 41
m1
der cables install on tray to include Tie cable; from PP. Lantai 2 04 to PP.Toko 01
m1
der cables install on tray to include Tie cable; from PP. Lantai 2 04 to PP.Toko 02
m1
der cables install on tray to include Tie cable; from PP. Lantai 2 04 to PP.Toko 03
m1
der cables install on tray to include Tie cable; from PP. Lantai 2 04 to PP.Toko 04
m1
der cables install on tray to include Tie cable; from PP. Lantai 2 04 to PP.Toko 05
m1
der cables install on tray to include Tie cable; from PP. Lantai 2 04 to PP.Toko 06
m1
der cables install on tray to include Tie cable; from PP. Lantai 2 04 to PP.Toko 07
m1
der cables install on tray to include Tie cable; from PP. Lantai 2 04 to PP.Toko 08
m1
der cables install on tray to include Tie cable; from PP. Lantai 2 04 to PP.Toko 09
m1
der cables install on tray to include Tie cable; from PP. Lantai 2 04 to PP.Toko 10
m1
der cables install on tray to include Tie cable; from PP. Lantai 2 04 to PP.Toko 11
m1
der cables install on tray to include Tie cable; from PP. Lantai 2 04 to PP.Toko 12
m1
der cables install on tray to include Tie cable; from PP. Lantai 2 04 to PP.Toko 13
m1
der cables install on tray to include Tie cable; from PP. Lantai 2 04 to PP.Toko 14
m1
der cables install on tray to include Tie cable; from PP. Lantai 2 04 to PP.Toko 15
m1
der cables install on tray to include Tie cable; from PP. Lantai 2 04 to PP.Toko 16
m1
der cables install on tray to include Tie cable; from PP. Lantai 2 04 to PP.Toko 17
m1
der cables install on tray to include Tie cable; from PP. Lantai 2 04 to PP.Toko 18
m1
der cables install on tray to include Tie cable; from PP. Lantai 2 04 to PP.Toko 19
m1
der cables install on tray to include Tie cable; from PP. Lantai 2 04 to PP.Toko 20
m1
der cables install on tray to include Tie cable; from PP. Lantai 3 03 to PP.Toko 21
m1
der cables install on tray to include Tie cable; from PP. Lantai 3 03 to PP.Toko 22
m1
der cables install on tray to include Tie cable; from PP. Lantai 3 03 to PP.Toko 23
m1
der cables install on tray to include Tie cable; from PP. Lantai 3 03 to PP.Toko 24
m1
der cables install on tray to include Tie cable; from PP. Lantai 3 03 to PP.Toko 25
m1
der cables install on tray to include Tie cable; from PP. Lantai 3 03 to PP.Toko 26
m1
der cables install on tray to include Tie cable; from PP. Lantai 3 03 to PP.Toko 27
m1
der cables install on tray to include Tie cable; from PP. Lantai 3 03 to PP.Toko 28
m1
der cables install on tray to include Tie cable; from PP. Lantai 3 03 to PP.Toko 29
m1
der cables install on tray to include Tie cable; from PP. Lantai 3 03 to PP.Toko 30
m1
der cables install on tray to include Tie cable; from PP. Lantai 3 03 to PP.Toko 31
m1
der cables install on tray to include Tie cable; from PP. Lantai 3 03 to PP.Toko 32
m1
der cables install on tray to include Tie cable; from PP. Lantai 3 03 to PP.Toko 33
m1
der cables install on tray to include Tie cable; from PP. Lantai 3 03 to PP.Toko 34
m1
der cables install on tray to include Tie cable; from PP. Lantai 3 03 to PP.Toko 35
m1
der cables install on tray to include Tie cable; from PP. Lantai 3 03 to PP.Toko 36
m1
der cables install on tray to include Tie cable; from PP. Lantai 3 03 to PP.Toko 37
m1
der cables install on tray to include Tie cable; from PP. Lantai 3 03 to PP.Toko 38
m1
der cables install on tray to include Tie cable; from PP. Lantai 3 03 to PP.Toko 39
m1
der cables install on tray to include Tie cable; from PP. Lantai 3 03 to PP.Toko 40
m1
der cables install on tray to include Tie cable; from PP. Lantai 3 03 to PP.Toko 41
m1
der cables install on tray to include Tie cable; from PP. Lantai 3 04 to PP.Toko 01
m1
der cables install on tray to include Tie cable; from PP. Lantai 3 04 to PP.Toko 02
m1
der cables install on tray to include Tie cable; from PP. Lantai 3 04 to PP.Toko 03
m1
der cables install on tray to include Tie cable; from PP. Lantai 3 04 to PP.Toko 04
m1
der cables install on tray to include Tie cable; from PP. Lantai 3 04 to PP.Toko 05
m1
der cables install on tray to include Tie cable; from PP. Lantai 3 04 to PP.Toko 06
m1
der cables install on tray to include Tie cable; from PP. Lantai 3 04 to PP.Toko 07
m1
der cables install on tray to include Tie cable; from PP. Lantai 3 04 to PP.Toko 08
m1
der cables install on tray to include Tie cable; from PP. Lantai 3 04 to PP.Toko 09
m1
der cables install on tray to include Tie cable; from PP. Lantai 3 04 to PP.Toko 10
m1
der cables install on tray to include Tie cable; from PP. Lantai 3 04 to PP.Toko 11
m1
der cables install on tray to include Tie cable; from PP. Lantai 3 04 to PP.Toko 12
m1
der cables install on tray to include Tie cable; from PP. Lantai 3 04 to PP.Toko 13
m1
der cables install on tray to include Tie cable; from PP. Lantai 3 04 to PP.Toko 14
m1
der cables install on tray to include Tie cable; from PP. Lantai 3 04 to PP.Toko 15
m1
der cables install on tray to include Tie cable; from PP. Lantai 3 04 to PP.Toko 16
m1
der cables install on tray to include Tie cable; from PP. Lantai 3 04 to PP.Toko 17
m1
der cables install on tray to include Tie cable; from PP. Lantai 3 04 to PP.Toko 18
m1
der cables install on tray to include Tie cable; from PP. Lantai 3 04 to PP.Toko 19
m1
der cables install on tray to include Tie cable; from PP. Lantai 3 04 to PP.Toko 20
m1
der cables install on tray to include Tie cable; from PP. Lantai 4 03 to PP.Toko 15
m1
der cables install on tray to include Tie cable; from PP. Lantai 4 03 to PP.Toko 16
m1
der cables install on tray to include Tie cable; from PP. Lantai 4 03 to PP.Toko 17
m1
der cables install on tray to include Tie cable; from PP. Lantai 4 03 to PP.Toko 18
m1
der cables install on tray to include Tie cable; from PP. Lantai 4 03 to PP.Toko 19
m1
der cables install on tray to include Tie cable; from PP. Lantai 4 03 to PP.Toko 20
m1
der cables install on tray to include Tie cable; from PP. Lantai 4 03 to PP.Toko 21
m1
der cables install on tray to include Tie cable; from PP. Lantai 4 03 to PP.Toko 22
m1
der cables install on tray to include Tie cable; from PP. Lantai 4 03 to PP.Toko 23
m1
der cables install on tray to include Tie cable; from PP. Lantai 4 03 to PP.Toko 24
m1
der cables install on tray to include Tie cable; from PP. Lantai 4 03 to PP.Toko 25
m1
der cables install on tray to include Tie cable; from PP. Lantai 4 03 to PP.Toko 26
m1
der cables install on tray to include Tie cable; from PP. Lantai 4 03 to PP.Toko 27
m1
der cables install on tray to include Tie cable; from PP. Lantai 4 03 to PP.Toko 28
m1
der cables install on tray to include Tie cable; from PP. Lantai 4 03 to PP.Toko 29
m1

kabel feeder lengkap dengan kabel tie dan asesories dari LVMDP ke :
Lighting 01 NYFGbY 3 x 4 mm2 Mtr'
kabel feeder lengkap dengan kabel tie dan asesories dari LVMDP ke :
Lighting 02 NYFGbY 3 x 4 mm2 Mtr'
kabel feeder lengkap dengan kabel tie dan asesories dari LVMDP ke :
Lighting 03 NYFGbY 4 x .. mm2 + BC .. mm2NYFGbY 3 x 4 mm2 Mtr'
kabel feeder lengkap dengan kabel tie dan asesories dari LVMDP ke :
Lighting 04 NYFGbY 3 x 4 mm2 Mtr'

INSTALASI LISTRIK

alasi titik lampu dan stopkontak


NYM 3 x 2.5 mm2 didalam konduit high impact
Titik
Titik
Titik
Titik
Titik

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

alasi titik lampu dan stopkontak


NYM 3 x 2.5 mm2 didalam konduit high impact
Titik
Titik
Titik
Titik
Titik

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

alasi titik lampu dan stopkontak


NYM 3 x 2.5 mm2 didalam konduit high impact
Titik
Titik
Titik
Titik
Titik

Bh
Bh
x 18 Watt LED Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

alasi titik lampu dan stopkontak


NYM 3 x 2.5 mm2 didalam konduit high impact
Titik
Titik
Titik
Titik

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

alasi titik lampu dan stopkontak


NYM 3 x 2.5 mm2 didalam konduit high impact
Titik
Titik
Titik
Titik

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

alasi titik lampu dan stopkontak


NYM 3 x 2.5 mm2 didalam konduit high impact
Titik
Titik
Titik
Titik

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

alasi titik lampu dan stopkontak


NYM 3 x 2.5 mm2 didalam konduit high impact
Titik
Titik
Titik
Titik

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

alasi titik lampu dan stopkontak


NYY 3 x 2.5 mm2 didalam konduit high impact
Titik
Titik
Titik

Bh
Bh
Bh
Bh
Bh

alasi titik lampu dan stopkontak


NYY 3 x 2.5 mm2 didalam konduit high impact
Titik
Titik

Bh
Bh
Bh
Bh

UANG POMPA
Exhaust fan. NYM 3 x 2.5 mm2 dalam konduit Clipsal 20 mm Titik
pa Booster NYY 4x4 mm2 Mtr
pa Sumur NYY 4x4 mm2 Mtr
pa submersible NYY 3x2.5 mm2 Mtr
a Deep Well Cable installation. NYYHY 4 x 2,5 mm2. Mtr
a Clean Water tank Cable installation. NYYHY 4 x 2,5 mm2. Mtr
Flow ventilating fan, Cap. 84 cfm Unit

PENANGKAL PETIR
and testing all these equipments complete with all necessary fittings and accessories required :
ection Head (type Radius 80 Meter) Unit
GIP Med. 6 mtrs height as detail drawing Unit
tor NYY 70 Sqmm m1
1.25" As conduit m1
nding system max. 5 Ohms. Lot
0x30 cm c/w junction terminal. Nos

an pemasangan PABX kapasitas 3 COL - 10 Extension; Unit


Ex. ICA for Back Up System, inc: Unit
essories required: from UPS to PABX
Unit
in Distribution Frame (MDF). 20 pair Krone LSA terminal, Unit
10", Polyester Cabinet IP 66. Ex. Legrand
elepon ITC 2 pair didalam konduit dari TB ke Outlet telepon Titik
Bh
maximum = 1 Ohm Lot

an pemasangan peralatan MATV termasuk dengan instalasi kabel dan aksesoris lainnya :
HF TV reception antenna c/w pole support. Lot
able RG 6 from antenna to MATV Mtr'
Booster Amplifier with 220 VAC Lot
tion from nearest AC power cct.
al Modulator Unit
Unit
amable 10 Chanel Unit
Unit
Unit
Unit
V. ~ TOB ~ Splitter Jelly Coaxial cable RG 7C + HIC Mtr'
RG 6C + HIC ke Outlet TV Titik
Bh

FIRE ALARM
an pemasangan peralatan Deteksi Kebakaran
engkap dengan material bantunya :
lle Fire Alarm ( MCFA ) Semi Addressable system 1 loop Unit
Unit
p dengan Interface Modul Lot
eder cables, Twisted Shielded AWG #18 + NYMHY 2x2.5 mm2
nd all accessories required from:
FA. Lantai 1 Mtr'
r ~ TB/FA. Basement 1 Mtr'
ment 1 ~ TB/FA. Basement 2 Mtr'
ment 2 ~ TB/FA. Lantai 4 Mtr'
B/FA. Lantai 3 Mtr'
B/FA. Lantai 2 Mtr'
B/FA. Lantai 1 Mtr'

an pemasangan instalasi Deteksi Kebakaran ( Fire Alarm )


an material bantunya kabelTwisted Shielded AWG #18 + NYMHY 2x1.5 mm2 didalam konduit
Detector Twisted Shielded AWG #18 + HIC ∅20mm Titik
ke Detector Twisted Shielded AWG #18 + HIC ∅20mm Titik
m Lamp & Bell Twisted Shielded Titik
YMHY 2x1.5 mm2 + HIC ∅20mm
m Lamp Cable Twisted Shielded Titik
YMHY 2x1.5 mm2 + HIC ∅20mm
botton Cable Twisted Shielded Titik
YMHY 2x1.5 mm2 + HIC ∅20mm
Switch CableTwisted Shielded Titik
YMHY 2x1.5 mm2 + HIC ∅20mm
Bh
Bh
Bh
Bh
Bh
Bh
her type Powder 5 Kg Bh

an pemasangan peralatan untuk CCTV


an material bantu :
Recorder (NVR) 64 Channel HDD 2 TB, include Keyboard Controller Unit
Unit
Ex. ICA for Camera power Supply Unit
Unit
V Kabel UTP cat 6 didalam konduit 20 mm Titik
ra type outdoor Unit
Unit

CEILING SPEAKER
an pemasangan peralatan untuk CEILING SPEAKER
an material bantu :
ker 6 W Z-2352SC Bh
Titik
Bh

Unit 480 W Sistem Amplifier w/ Selector Unit


B player with FM Tunner Z-CD2011R Unit
n Unit Remote Microphone W/Keypad Zone Selector Unit
Unit Selector 10 CH Unit
n Rack Cabinet w/Acc Unit
Unit

alasi Feeder Kabel Sound Sistem


er Kabel dari JB lantai 1 Menuju JB Basement NYYHY 2 x 2,5Sqmm Mtr'
er Kabel dari JB lantai 1 Menuju JB lantai Dasar NYYHY 2 x 2,5Sqmm Mtr'
er Kabel dari JB lantai 1 Menuju JB lantai 1 NYYHY 2 x 2,5Sqmm Mtr'
er Kabel dari JB lantai 1 Menuju JB lantai 2 NYYHY 2 x 2,5Sqmm Mtr'
er Kabel dari JB lantai 1 Menuju JB lantai 3 NYYHY 2 x 2,5Sqmm Mtr'

an pemasangan peralatan untuk DATA KOMPUTER


an material bantu :
Internet, termasuk biaya administrasi, kompensasi dan koordinasi set
unit
TA , O/S : Win XP + Router unit
unit
gan, UPS 2000VA unit
ub. 48G Port unit
U, Switch Hub 24 Port Unit

24G port, linksys

ables, Fiber Optic Single Core


itch Hub #1 Lt. Dasar Mtr'
itch Hub #2 Lt. Dasar Mtr'
itch Hub #1 Lt. 1 Mtr'
itch Hub #2 Lt. 1 Mtr'
itch Hub #1 Lt. 2 Mtr'
itch Hub #2 Lt. 2 Mtr'
itch Hub #1 Lt. 3 Mtr'
itch Hub #2 Lt. 3 Mtr'
itch Hub #1 Lt. 4 Mtr'
itch Hub #2 Lt. 4 Mtr'
ata UTP Cat 6e didalam konduit dari TB ke Outlet Data Titik
Bh
Bh
ower Wifi NYM 3x2,5 mm2 didalam konduit Titik
Bh
maximum = 1 Ohm Lot
Lot

PLAMBING
INSTALASI AIR BERSIH

an pemasangan Material Utama Air Bersih


uk peralatan bantu yang mendukung :
mbuatan sumur dalam 100 meter lengkap dengan chasing Unit

stall booster pump unit (Hydro Multi-B 3 x CR 15 - 5) with centrifugal, horizontal, non self priming c/w Set

ler panel & diaphragm pressure tank, Total Flow capacity =50 m3/h, Head = 40m (3 x 4 kw/3P)
stall Transfer pump unit (CR 10-3) c/w Unit
ler panel & diaphragm pressure tank, Total Flow capacity =2 x 8 m3/h, Head = 20m (2 x 1,1 kw/3P)
stall Deep Well pump unit (SP 9 -16) c/w pumps controller panel, Set
pacity =35 m3/h, Head = 80m (11 kW/3P)
x 4 Sqmm from PP. Pump to Control Panel Pump fixed on m1
w tie cable and other support material
nd Filter 9m3/h + Carbon Filter 9m3/h Automatic Set

an pemasangan valve-valve dan material lainnya :


stall Clean water plumbing; Pipa Vinilon PPR PN 10 - Class steel support at shaft, clamp, bolt, hanger and other support material

m1
m1
m1
m1
m1
m1
m1
e dia. 21/2" - Scr Nos
e dia. 2" - Scr Nos
e dia. 11/4" - Scr Nos
e dia. 1" - Scr Nos
e dia. 3/4" - Scr Nos

an pemasangan valve-valve dan material lainnya :


Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
vent incl. valve dia 1/2" Bh
l WLC Probe fixed at Clean Water tank c/w cable Set

an pemasangan Pipa Vinilon PVC AW lengkap dengan Fitting, support & hanger,
lainnya sehingga Pipa terpasang dengan baik :
Mtr'
Mtr'
Mtr'
Mtr'
Mtr'
Mtr'
Mtr'
Mtr'
ed Dia 1/2" siram taman atas Mtr'

AIR KOTOR
an pemasangan instalasi air Kotor termasuk Material Utama lengkap
asesoris, support hanger dan material bantu lainnya :

nt (SCH-SW )
pomp Sumpit for waste water cap. 2x(5 m3/hr); 15 m; 2900 rpm, Unit
h/ 380V/ 50Hz, Parallel Alternate with float switch

an pemasangan STP Bio Health lengkap dengan galian, pondasi, urugan pasir serta semua asesoris yang diperlukan hingga dapat dipergunak
an kapasitas min. 100m3/hari Paralel STP
Set
ong Unggas Set

er Flow Mini STP Dan Air Buangan Concrete Beton Dan Cover
imbah Pasar Set
an pemasangan pipa PVC AW (Klas 10 Kg/cm) lengkap dengan Fitting,
ger, material bantu lainnya sehingga pipa terpasang dengan baik :
stall Sewage Water distribution Pipe c/w galvanized steel support at shaft, pipe clamp, bolt, hanger and other supporting material as required

a Vinilon Lantai Basement, Lantai Dasar, Lantai 1,2,3,4


1.25" as a vent pipe m1
2" as a vent pipe m1
3" as a vent pipe m1
m1
m1
m1
m1
m1
Unit
Unit
Unit
Unit
Unit

AIR HUJAN
an pemasangan instalasi air Kotor termasuk Material Utama lengkap
asesoris, support hanger dan material bantu lainnya :

Unit
Unit
an pemasangan pipa air hujan PVC AW lengkap dengan fitting,
ger, material bantu lainnya sehingga pipa terpasang dengan baik :
stall Rain/Storm Water Drainage Pipe c/w galvanized steel support at shaft, pipe clamp, bolt, hanger and other supporting material required.

m1
m1
pomp Sumpit for Rain water cap. 2x(565Ltr/mnt ); 15 m; 2900 rpm, Set
penampungan air Hujan by Sipil )

ed Dia 2" Air Hujan taman atas Mtr'


Bh
Bh
Bh
m'

PEMADAM KEBAKARAN DAN SPRINGKLER


an pemasangan peralatan Utama Pemadam Kebakaran lengkap
asi pemipaan, isolasi, support, hanger dan material bantu lainnya :
nt Pump, Cap.1000 US GPM, Head 80 m Incl. Plinth Unit
Hydrant Pump, Cap.1000 US GPM, Head 80 m Incl. Plinth Unit
nt Pump, Cap 20 US GPM, Head 80 m Incl. Plinth Unit
ure tank cap.500 ltr.-diaphragm tank Unit
GIP dia 6". Incl. Support Unit
ch, Incl. Valve Unit
ge, Incl. Valve Unit
K-w/Flange dia. 6" Unit
K - w/flange dia. 2" Unit
Unit
Unit
dia. 4" ex Kitz Unit
K-w/flange dia. 4", ex. Kitz Unit
K-w/flange dia. 2", ex. Kitz Unit
Mtr'
Unit
ermasuk Alarm Gong Unit
Unit
Bh
l WLC Probe fixed at HydrantWater tank Set
Unit
t box complete with : 30 mtr - 11/2" Jet Fire Hose, Hydrant Unit
2", Variable Spray nozzle 11/2" and S/S hose rack as detail
ant box complete with : 30 mtr - 11/2" Jet Fire Hose, Hydrant Unit
2", Variable Spray nozzle 11/2" and S/S hose rack as detail
dia. 4"x2.5"x2.5" Unit
nection dia. 4"x2.5"x2.5" Unit
Unit
Bh
Bh
an pemasangan Pipa Blacksteel SCH 40 Med, lengkap isolasi dan Fitting,
ger, material bantu lainnya sehingga Pipa terpasang dengan baik :
Mtr'
Mtr'
Mtr'
Mtr'
Mtr'
Mtr'
Mtr'
Mtr'
dan pemsangan Sprinkler head pendant Lantai Basement 1 Bh
dan pemsangan Sprinkler head pendant Lantai Basement2 Bh
dan pemsangan Sprinkler head pendant Lantai Dasar Bh
dan pemsangan Sprinkler head pendant Lantai 1 Bh
dan pemsangan Sprinkler head pendant Lantai 2 Bh
dan pemsangan Sprinkler head pendant Lantai 3 Bh
dan pemsangan Sprinkler head pendant Lantai 4 Bh
ugan untuk pipa mtr

TATA UDARA
an pemasangan instalasi Tata Udara AC Split
dan Exhaust fan lengkap dengan aksesoris :

TUH ( INVERTER ) Unit


TUH ( INVERTER ) Unit
UH ( INVERTER ) Unit
Unit
ap. 7500 CFM Unit
an Kap. 1700 CMH Unit
nt lengkap dengan Isolasi Armaflex
n spesifikasi yang dianjurkan.
Mtr
Mtr
dia. 3/4"lengkap dengan isolasi mtr
2.5 mm2 dari indoor ke Outdoor m'
4" untuk exhaust fan mtr

ng & Accssories
ust BJLS 100, 1700X450 mm m2
ust BJLS 100, 1050X500 mm m2
m2
m2
i CO Sensor m2
Lot

KABEL TRAY
bel Tray Listrik
an pemasangan kabel tray Lantai Basement 1, 2, Lantai 1,2,3,4 m1

bel Tray Elektronik


an pemasangan kabel tray Lantai Basement 1, 2, Lantai 1,2,3,4 m1

SOLAR PANEL

Solar Panel 445 WP Pcs


m Power (Pmax) (W) = 445 Watt
: Mono
: 23.5 kg
: 2094 mm x 1038 mm x 35 mm
: 20,5%
: 144 (6x24)
: 12 years product warranty
: 25 years linear power output warranty
IEC 61215, IEC 61730, UL 61730
ISO 9001 : 2008 Quality management systems
ISO 14001 : 2004 Environmental management systems
OHSAS 18001 : 2007 Occupational health and safety management systems

Inverter On Grid + Wifi Stick Pcs

Max. PV input voltage 1100 V


Max. PV input current 130 A
5 MPPT number
AC output power 55 kVA @ 40°C / 50 kVA @ 45°C
Max. AC output current 83.6 A
Feed-in phase / connection phases = 3 phases
Max. efficiency / European efficiency 98.7% / 98.4%
10 years product warranty
IEC 61727. IEC 62109

Foortop Mounting System kwp

ection & Protecting System Lot


ection & protection system

, Installation, Permit, Testing & Commissioning Lot


, installation, permit, testing & commissioning

LIFT DAN ESCALATOR


an pemasangan instalasi LIFT Dan Escalator Lengkap Dengan Aksesoris :
Kapasitas 1000 kg - Sicher Passanger Elevator, MRL, 1000kg Unit
asitas 800 kg - Sicher Service Elevator, MRL, 800kg Unit
S 30-1000, 3,240) Dengan Cover Cladding Unit
Lot

COLD ROOM
an pemasangan instalasi COLD ROOM lengkap dengan aksesoris :
Room ( 4000 x 3000 x 2500 ) mm

nched Pan Rack Unit


nit Chiller Room Unit
Unit
Unit
elivery, Labour Cost, Material Lot
VOLUME

1.00

1.00
1.00
2.00
1.00
20.00
20.00
140.00
20.00
2.00
5.00
3.00
4.00
3.00
1.00
1.00
1.00
1.00
1.00
56.00
3.00
2.00

1.00
2.00
1.00
1.00
1.00

2.00

2.00
1.00

1.00

1.00

1.00
1.00
4.00
2.00
1.00
2.00
4.00
4.00
50.00
1.00
2.00
1.00
2.00

1.00

1.00
2.00
10.00
216.00
8,000.00
1.00

15.00 60.00 132

18.00 72.00

31.00
217

1.00

1.00
1.00

1.00
1.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
101.00
143.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
8.00
1.00
7.00
1.00
1.00
1.00
1.00
-

174.00

55.00

15.00

60.00

90.00

95.00

99.00

103.00

79.00

99.00

48.00

36.00

39.00

115.00

15.00
53.00

147.00

15.00

43.00

138.00

122.00

89.00

29.00

25.00

15.00

43.00

125.00

115.00

84.00

15.00

43.00

125.00

115.00

84.00
15.00

43.00

125.00

115.00

84.00

15.00

43.00

125.00

115.00

84.00

145.00

10.00

12.00

15.00

10.00

15.00

85.00

90.00

120.00
125.00

130.00

135.00

68.00

67.00

45.00

50.00

55.00

60.00

65.00

70.00

60.00

43.00

35.00

40.00

33.00

36.00

41.00

46.00
51.00

56.00

61.00

35.00

33.00

35.00

33.00

36.00

41.00

46.00

51.00

56.00

61.00

31.00

36.00

42.00

46.00

51.00

56.00
21.00

17.00

12.00

10.00

25.00

30.00

35.00

40.00

25.00

30.00

35.00

40.00

22.00

27.00

33.00

38.00

23.00

20.00

22.00
27.00

32.00

37.00

20.00

17.00

17.00

27.00

32.00

37.00

37.00

32.00

37.00

32.00

35.00

40.00

45.00

50.00

55.00

58.00
47.00

42.00

50.00

45.00

35.00

40.00

45.00

50.00

55.00

58.00

45.00

50.00

55.00

60.00

65.00

75.00

34.00

31.00

25.00
34.00

31.00

25.00

20.00

63.00

58.00

53.00

42.00

37.00

32.00

28.00

26.00

25.00

28.00

30.00

25.00

20.00

15.00

10.00
8.00

27.00

25.00

29.00

33.00

43.00

22.00

25.00

33.00

43.00

37.00

43.00

48.00

53.00

58.00

63.00

68.00

71.00

18.00
23.00

27.00

33.00

38.00

41.00

27.00

22.00

18.00

37.00

34.00

30.00

37.00

34.00

30.00

20.00

62.00

58.00

55.00

52.00
49.00

46.00

43.00

42.00

26.00

28.00

65.00

27.00

25.00

23.00

28.00

25.00

29.00

33.00

43.00

22.00

25.00

33.00

43.00
37.00

43.00

48.00

53.00

58.00

63.00

68.00

71.00

27.00

22.00

18.00

37.00

34.00

30.00

37.00

34.00

30.00

20.00

62.00
58.00

55.00

52.00

49.00

46.00

43.00

42.00

26.00

28.00

65.00

27.00

25.00

23.00

28.00

25.00

29.00

33.00

43.00

22.00
25.00

33.00

43.00

37.00

43.00

48.00

53.00

58.00

63.00

68.00

71.00

37.00

34.00

30.00

20.00

26.00

28.00

65.00

62.00
58.00

55.00

52.00

49.00

46.00

43.00

42.00 349

49.00

142.00

247.00

202.00

191.00
173.00
10.00
20.00
1.00

2.00
24.00
165.00
11.00
15.00
16.00
173.00
1.00
10.00

186.00
7.00
10.00
20.00
1.00

2.00
24.00
160.00
9.00
17.00
8.00
7.00
10.00

838.00
465.00
11.00
60.00
9.00

718.00
27.00
8.00
23.00
10.00
52.00
102.00
37.00
18.00
465.00
60.00
11.00

890.00
785.00
15.00
78.00

768.00
36.00
8.00
52.00
61.00
38.00
18.00
785.00
78.00
15.00

821.00
774.00
15.00
78.00

725.00
36.00
8.00
52.00
54.00
32.00
18.00
774.00
78.00
15.00

822.00
774.00
15.00
78.00

725.00
36.00
8.00
53.00
55.00
42.00
18.00
774.00
78.00
15.00

867.00
871.00
15.00
78.00

770.00
36.00
8.00
53.00
45.00
67.00
11.00
871.00
78.00
15.00

15.00 148
17.00
10.00

35.00
22.00
33.00
17.00
10.00

90.00
16.00

35.00
22.00
33.00
16.00

2.00
6.00
150.00
8.00
150.00
15.00
4.00

1.00
5.00
125.00
125.00
3.00
3.00
148

1.00
1.00

1.00
1.00

17.00
17.00
1.00

1.00
70.00
1.00

1.00
1.00
1.00
6.00
6.00
2.00
244.00
9.00
9.00

1.00
1.00
14.00

52.00
95.00
65.00
152.00
67.00
67.00
75.00

163.00
581.00
21.00

21.00
21.00

7.00

163.00
581.00
21.00
21.00
21.00
35.00
42.00

3.00
2.00
1.00
1.00
154.00
29.00
125.00

894.00
894.00
13.00

14.00
1.00
2.00
1.00
1.00
1.00

250.00
125.00
125.00
125.00
125.00

1.00
1.00
1.00
1.00
1.00
1.00
10.00

92.00
211.00
12.00
149.00
105.00
189.00
109.00
193.00
114.00
197.00
39.00
39.00
34.00
34.00
34.00
1.00
1.00

2.00

1.00

2.00

2.00

30.00

1.00

d other support material

761.00
209.00
37.00
120.00
314.00
331.00
2,781.00
8.00
8.00
10.00
12.00
5.00

9.00
17.00
6.00
1.00
4.00
3.00
1.00
1.00
1.00
1.00
2.00
1.00
5.00

6.00
18.00
45.00
28.00
76.00
325.00
145.00
22.00
110.00

18.00

g diperlukan hingga dapat dipergunakan sebagaimana mestinya.


2.00
1.00
Termasuk Dalam Harga STP
By Sipil
4.00

other supporting material as required

448.00
315.00
480.00
851.00
1,678.00
1,699.00
240.00
84.00
3.00
32.00
98.00
76.00
98.00

94.00
12.00

other supporting material required.

324.00
2,492.00
4.00

110.00
2.00
2.00
6.00
1,275.00

1.00
1.00
1.00
1.00
3.00
2.00
5.00
2.00
1.00
2.00
2.00
3.00
3.00
4.00
2.00
1.00
1.00
1.00
1.00
2.00
1.00
42.00

4.00
2.00
1.00
3.00
1.00
2.00

392.00
222.00
1,086.00
1,202.00
743.00
1,327.00
1,849.00
5,545.00
236.00
241.00
278.00
231.00
231.00
231.00
231.00
185.00

2.00
4.00
7.00
30.00
8.00
160.00
132.00
125.00
148.00
165.00
123.00

837.00
33.00
104.00
16.00
16.00
1.00

1,820.00

1,820.00

542.00
4.00

241.19

1.00

1.00

3.00
3.00
8.00
1.00

9.00
1.00
1.00
1.00
1.00
KEBUTUHAN KABEL FEEDER
NO NAMA MATERIAL VOLUME HARGA SATUAN TOTAL
1 Kabel N2XSY 1 x 240mm2 60 mtr
2 Kabel N2XSY 1 x 300mm2 140 mtr
3 Kabel NYY 1 x 300mm2 777 mtr
4 Kabel NYY 4 x 300 mm2 579 mtr
5 Kabel NYFGbY 4 x 300 mm2 1218 mtr
6 Kabel NYY 4 x 35 mm2 55 mtr
7 Kabel NYY 4 x 25 mm2 995 mtr
8 Kabel NYY 4 x 6 mm2 944 mtr
9 Kabel NYY 4 x 10 mm2 215 mtr
10 Kabel NYY 4 x 70 mm2 232 mtr
11 Kabel NYY 4 x 4 mm2 210 mtr
12 Kabel NYY 4 x 16 mm2 10 mtr
13 Kabel NYY 3 x 4 mm2 9132 mtr
14 Kabel NYFGBY 3 x 4 mm2 640 mtr
15 Kabel NYA 4mm 54 mtr
16 Kabel FRC 4 x 35mm 10 mtr
17 Kabel FRC 4 x 10mm 685 mtr
18 Kabel BC 95mm 621 mtr
19 Kabel BC 35mm 55 mtr
20 Kabel BC 25mm 995 mtr
21 Kabel BC 4mm 505 mtr
22 Kabel BC 10mm 900 mtr
23 Kabel BC 70mm 232 mtr
24 Kabel BC 6mm 439 mtr
25 Kabel BC 16mm 10 mtr
26 Kabel NYM 3 x 2.5mm 1,081.00 rol
26 Kabel NYY 3 x 2.5mm 45.00 rol
26 Kabel NYYHY 4 x 2.5mm 2.00 rol