You are on page 1of 1

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS


AND HIGHWAYS

OFFICE OF THE BUILDING OFFICIAL


RECOMMENDING APPROVAL:

HEAD DATE

APPROVED:

BUILDING OFFICIAL DATE

JOLLIB OUSE
E D RY
H
E
WARE
A SE 1
PH

Total Ope
n Area: 7,5 RAMP UP

99.69 sqm
UP
Loading /
Unloading 01
Canopy A 03
02
rea 658.2 04
UP
2 sqm

EW LOT
01

02

03
05
04

05

06
06
07

106.24 sqm
Cold Sto. 07
Office: 08
01 Battery Ch 09
02 08
arging Area 10

AND N
03 07

06
: 169.13 sq
05
m
04 04

03
7000
AD

05

01
02
04
03
05
02

06
07
08
09
10
UP
06
Loading /
Unloading

12
11
Area 800.3
m 0 sq
O

XISTING
LR

07
08
09
10
11
12
UP
A

13
14
01
03

02
04
06

05
07

15
UP

Fabricatio 16
N

n Area: 43 14
.33 sqm
18
19
20 Storage A
VIC

ING E
22
21
Loading / zer , Ante
Blast Free rea: 3,496
Pallet Was
23
Unloading IS: 139.77
Room & NM m .94 sq
hing 47.37 sqm
sqm rea 975.70 A

USE
14.58 sqm
sqm
NO

Parts Sto.:

NNECT
O
I
AM

E H

O
1
C

Y WAR
DRAINAGE LAYOUT

AD C
ED RO
PC DR

PROPOS
J.O REFERENCE NOS.

CO 07-020768
THIS DRAWING IS ISSUED FOR

PERMIT

RPF 08-AUG-23
ISSUED BY DATE

REG NO. PROJECT TITLE: SHEET CONTENTS: OWNER/APPROVED: DESIGN ENGR. SHEET NO. REV. NO.

PTR NO. ENG'G CHECK:


DESIGN AND BUILD OF TAYUD
DATE:
ORCHID FARM WAREHOUSE FACILITY
DRAWN: MVC1_DR_D200 A
CONSTRUCTION PLACE: DRAWING CHECK:

TIN: CIVIL ENGINEER LOCATION: OWNER'S REPRESENTATIVE APPROVED: NO. BY DATE REVISIONS CONTROLLED COPY

You might also like