Date 11.08.

23
Contractor Sheak Samun (VIJAY Team)
Site 049/22/AHP
Work NMR
LABOURS OVER TIME
SNO DATE WORK M/S M/C M/S OT M/C OT REMAKS
Inner toilet plastering, column diamond steel
1 04-08-2023 6 8 16 -
binding, curing
Inner toilet plastering, column diamond steel
2 05-08-2023 6 9 16 -
binding, curing
3 06-08-2023 - - - - -
cube removing, Night road concrete material
4 07-08-2023 1 - 16 -
shifting
inner toilet plastering,Main building outer plastering
5 08-08-2023 5 6 16 -
,Curing
inner toilet plastering,Main building outer plastering
6 09-08-2023 5 6 8 -
,Curing
7 10-08-2023 inner toilet plastering, Block work ,Curing 5 6 - -
Total manpower 28 35 72 0

Rate of labour 800 600 100 75


This week Total 50600
Deduction Mason( Due to repair work ) 2400
old balance as per the vijay told 120890
Grand total 169090