You are on page 1of 1
alla olla gil dala auugall Ee Date-06"0672023 APPRECIATION LETTER, “This socom that Integrated Systems Services Trading Company (OPTIMUM), Saudi CR;1010994604 has done Flashing, ol cleaning, and filing ofthe Thermal Oi System, Cleaning ofthe Pipeine, Cleaning ofthe Tank, and Cleaning of the whole system fr 18 pumps in thre ferent sites at Fubail ~ Riyadh Water Transmission System Package C (30403) line Water Conversion Compoation (SWCC) (PSI, PS2,PS3)suecessull In both Marchand ‘April 2028, “The whole work was perforred with professionalism and with significant imesaving The quality of the work was excellent and approved by SWC. ‘Wie thank Integrated Systems Services Trading Company (OPTIMUM). for their support to SWC. Sincerely, Eng, Saleh Al Saleb Project Director SWC ~ JRWTS Project va pet ht ae tsa a7 NE Foe

You might also like