You are on page 1of 16

KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT

DIREKTORAT JENDERAL BINA MARGA


BALAI PELAKSANAAN JALAN NASIONAL SULAWESI TENGGARA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WIL I SULTRA
PPK 1.3 PROV. SULAWESI TENGGARA

REKAPITULASI LAPORAN KEMAJUAN PEKERJAAN


NAMA PAKET : PRESERVASI JALAN POMALAA - WOLULU
RUAS : POMALAA - WOLULU
KONTRAKTOR : PT. LINCE ROMAULI RAYA - PT. AGUNG SARANA PERSADA (KSO)
NO. KONTRAK : HK 0201-Bb21.1.3/286, Tanggal 17 Mei 2022
KONSULTAN : PT.UMUM
KEMENTERIAN PEKERJAAN TRIBINA MATRA CARYA
DAN PERUMAHAN RAKYAT CIPTA KSO PT. WINSOLUSI KONSULTAN -
PT. ARISTA CIPTA
DIREKTORAT JENDERAL BINA MARGA
BALAI PELAKSANAAN JALAN NASIONAL SULAWESI TENGGARA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WIL I SULTRA
REALISASI
PPK 1.3 PROV. KEMAJUAN
PEKERJAAN MINGGU KE 72 (28 Oktober - 03 Nopember 2023)
SULAWESI TENGGARA
BOBOT (%)
NO. OUTPUT PEKERJAAN
RENCANA REALISASI DEVIASI
I KONTRAK INDUK GABUNGAN 86.811 85.134 -1.678

1. PELEBARAN JALAN 86.746 85.222 -1.523

2. PEMELIHARAAN JALAN 91.588 79.564 -12.025

3. PEMELIHARAAN JEMBATAN 88.129 78.629 -9.500

II KONTRAK TAHUN 2023 80.335 77.726 -2.608

1. PELEBARAN JALAN 80.280 80.035 -0.245

2. PEMELIHARAAN JALAN 84.683 56.355 -28.328

3. PEMELIHARAAN JEMBATAN 83.400 57.465 -25.935

Disetujui Diperiksa Disiapkan


Direksi PUPR Konsultan Supervisi Kontraktor
PPK 1.3 Provinsi Sulawesi Tenggara PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI PT. LINCE ROMAULI RAYA - PT.
KONSULTAN - PT. ARISTA CIPTA AGUNG SARANA PERSADA (KSO)

DOLLY HUMADA SIREGAR, ST Ir. MUHAMMAD IDRIS RAZAK RISKY KURNIAWAN, ST


NIP. : 19760106 201410 1 001 Supervision Engineer Manager Proyek
PROGRES BULAN OKTOBER 2023
NAMA PAKET : PRESERVASI JALAN POMALAA - WOLULU 16
RUAS : POMALAA - WOLULU
KONTRAKTOR : PT. LINCE ROMAULI RAYA - PT. AGUNG SARANA PERSADA (KSO) MINGGU KE : 72
KONSULTAN : PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI KONSULTAN - PT. ARISTA CIPTA Periode : 28 Oktober - 03 Nopember 2023
NO. KONTRAK : HK 0201-Bb21.1.3/286, Tanggal 17 Mei 2022

PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT JUMLAH
Item ADD-06 SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
15S/D BULAN 15BULAN 16INI 15INI
I DIVISI 1. UMUM
1.2 Mobilisasi Ls 1.00 500,000,000.00 500,000,000.00 0.4189 0.700 - 0.700 0.293 - 0.293 350,000,000.00
1.80 Manajemen dan Keselamatan Lalu Lintas Ls 1.00 100,000,000.00 100,000,000.00 0.0838 0.727 0.017 0.745 0.061 0.001 0.062 74,486,842.11
1.17 Pengamanan Lingkungan Hidup
1.17.(1a) Pengujian pH Buah 9.00 70,000.00 630,000.00 0.0005 6.000 - 6.000 0.000 - 0.000 420,000.00
1.17.(1b) Pengujian Oksigen Terlarut (DO) Buah 9.00 100,000.00 900,000.00 0.0008 6.000 - 6.000 0.001 - 0.001 600,000.00
1.17.(1c) Pengujian Zat Padat Terlarut (TDS) Buah 9.00 150,000.00 1,350,000.00 0.0011 6.000 - 6.000 0.001 - 0.001 900,000.00
1.17.(1d) Pengujian Zat Tersuspensi (TSS) Buah 9.00 100,000.00 900,000.00 0.0008 6.000 - 6.000 0.001 - 0.001 600,000.00
1.17.(1e) Pengujian Biological Oxygen Demand (BOD) Buah 9.00 140,000.00 1,260,000.00 0.0011 6.000 - 6.000 0.001 - 0.001 840,000.00
1.17.(1f) Pengujian Chemical Oxygen Demand (COD) Buah 9.00 140,000.00 1,260,000.00 0.0011 6.000 - 6.000 0.001 - 0.001 840,000.00
1.17.(2c) Pengujian Parameter Kebisingan dan/atau Getaran Lainnya ……… Buah 9.00 140,000.00 1,260,000.00 0.0011 6.000 - 6.000 0.001 - 0.001 840,000.00
1.17.(3b) Pengujian Sulfurdioksida (SO2) Buah 9.00 200,000.00 1,800,000.00 0.0015 6.000 - 6.000 0.001 - 0.001 1,200,000.00
1.17.(3f) Pengujian Total Partikulat (TSP) - Debu Buah 9.00 125,000.00 1,125,000.00 0.0009 6.000 - 6.000 0.001 - 0.001 750,000.00
1.19 Keselamatan dan Kesehatan Kerja
1.00 1. Penyiapan RKK Buah 1.00 3,000,000.00 3,000,000.00 0.0025 1.000 - 1.000 0.003 - 0.003 3,000,000.00
2.00 2. Sosialisasi dan Promosi Dan Pelatihan Buah 1.00 5,000,000.00 5,000,000.00 0.0042 - - - - - - -
3.00 3. Alat Pelindung Kerja (APK) dan Alat Pelindung Diri (APD) Buah 1.00 35,000,000.00 35,000,000.00 0.0293 0.698 0.033 0.731 0.020 0.001 0.021 25,583,776.44
4.00 4. Asuransi dan Perizinan Buah 1.00 20,000,000.00 20,000,000.00 0.0168 1.000 - 1.000 0.017 - 0.017 20,000,000.00
5.00 5. Personel K3 Konstruksi Buah 1.00 99,000,000.00 99,000,000.00 0.0829 0.686 0.035 0.720 0.057 0.003 0.060 71,295,442.22
6.00 6. Fasilitas sarana kesehatan Buah 1.00 15,000,000.00 15,000,000.00 0.0126 - - - - - - -
7.00 7. Rambu-rambu terdiri atas Buah 1.00 22,727,272.73 22,727,272.73 0.0190 0.705 0.032 0.738 0.013 0.001 0.014 16,768,562.80
8.00 8. Konsultasi dengan Ahli Terkait Keselamatan Konstruksi Buah 1.00 15,000,000.00 15,000,000.00 0.0126 - - - - - - -
9.00 9. Lain-lain terkait pengendalian risiko K3 Buah 1.00 5,000,000.00 5,000,000.00 0.0042 - - - - - - -
1.21 Manajemen Mutu Ls 1.00 200,000,000.00 200,000,000.00 0.1676 0.723 0.013 0.735 0.121 0.002 0.123 147,000,000.00
Sub Total ( 1 ) 1,030,212,272.73 0.8631 0.591 0.008 0.599 715,124,623.57
II DIVISI 2. DRAINASE 18,587.000 50.000 18,637.000
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 11,009.65 25,000.00 275,241,150.00 0.2306 10,074.154 27.100 10,101.254 0.211 0.001 0.212 252,531,350.00
2.2.(1) Pasangan Batu dengan Mortar M3 8,363.10 700,000.00 5,854,170,000.00 4.9047 7,006.734 22.850 7,029.584 4.109 0.013 4.123 4,920,708,807.00
2.3.(15) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 100 cm x 100 cm M1 134.40 4,275,906.49 574,681,832.26 0.4815 134.400 - 134.400 0.481 - 0.481 574,681,832.26
2.3.(18) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 150 cm x 150 cm M1 354.00 7,268,205.12 2,572,944,612.48 2.1556 354.000 - 354.000 2.156 - 2.156 2,572,944,612.48
2.3.(20) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 250 cm x 250 cm M1 13.20 42,718,794.10 563,888,082.12 0.4724 13.200 - 13.200 0.472 - 0.472 563,888,082.12
2.3.(22) Saluran berbentuk U Tipe DS 1 (precast) M1 5,575.00 1,250,000.00 6,968,750,000.00 5.8385 5,213.000 48.000 5,261.000 5.459 0.050 5.510 6,576,250,000.00
Sub Total ( 2 ) 16,809,675,676.86 14.0833 12.889 0.064 12.953 15,461,004,683.85
III DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK -
3.1.(1a) Galian Biasa M3 94,032.95 16,000.00 1,504,527,200.00 1.2605 62,636.215 - 62,636.215 0.840 - 0.840 1,002,179,444.27
3.2.(2a) Timbunan Pilihan dari Sumber Galian M3 15,331.32 100,000.00 1,533,132,000.00 1.2845 18,293.102 538.942 18,832.045 1.533 0.045 1.578 1,883,204,474.36
3.3.(1) Penyiapan Badan Jalan M2 88,172.79 5,000.00 440,863,950.00 0.3694 68,754.346 - 68,754.346 0.288 - 0.288 343,771,729.95
3.4.(2) Pemotongan Pohon Pilihan diameter 15 – 30 cm Buah 147.00 39,983.05 5,877,508.35 0.0049 164.000 - 164.000 0.005 - 0.005 6,557,220.20
3.4.(3) Pemotongan Pohon Pilihan diameter > 30 – 50 cm Buah 218.00 61,536.34 13,414,922.12 0.0112 218.000 - 218.000 0.011 - 0.011 13,414,922.12
3.4.(4) Pemotongan Pohon Pilihan diameter > 50 – 75 cm Buah 390.00 112,032.53 43,692,686.70 0.0366 390.000 - 390.000 0.037 - 0.037 43,692,686.70
3.4.(5) Pemotongan Pohon Pilihan diameter > 75 cm Buah 78.00 233,248.73 18,193,400.94 0.0152 78.000 - 78.000 0.015 - 0.015 18,193,400.94
Sub Total ( 3 ) 3,559,701,668.11 2.9824 2.729 0.045 2.774 3,311,013,878.54

2 / 16
PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT JUMLAH
Item ADD-06 SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
V DIVISI 5. PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN
5.1.(1) Lapis Fondasi Agregat Kelas A M3 24,285.05 600,000.00 14,571,030,816.00 12.2078 24,080.320 - 24,080.320 12.105 - 12.105 14,448,192,000.00
5.1.(3a) Lapis Fondasi Agregat Kelas S M3 15,031.93 250,000.00 3,757,982,500.00 3.1485 8,612.083 240.385 8,852.468 1.804 0.050 1.854 2,213,116,923.08
Sub Total ( 5 ) 18,329,013,316.00 15.3562 13.909 0.050 13.959 16,661,308,923.08
VI DIVISI 6. PERKERASAN ASPAL
6.1 (1)(a) Lapis Resap Pengikat - Aspal Cair Liter 65,866.87 15,000.00 988,003,079.40 0.8278 64,826.414 242.951 65,069.365 0.815 0.003 0.818 976,040,468.34
6.1 (2)(a) Lapis Perekat - Aspal Cair Liter 68,220.25 13,000.00 886,863,250.00 0.7430 69,356.504 1,466.630 70,823.134 0.755 0.016 0.771 920,700,743.61
6.3.(8) Bahan anti pengelupasan Kg 3,983.28 75,000.00 298,745,827.03 0.2503 4,000.556 80.430 4,080.986 0.251 0.005 0.256 306,073,984.46
6.5.(1b) Laston Lapis Aus Asbuton Butir (AC-WC Asb Butir) Ton 22,538.67 1,425,000.00 32,117,602,968.75 26.9085 21,259.050 478.750 21,737.800 25.381 0.572 25.952 30,976,365,000.00
6.5.(2b) Laston Lapis Antara Asbuton Butir (AC-BC Asb Butir) Ton 12,814.17 1,350,000.00 17,299,127,228.88 14.4934 12,759.390 48.660 12,808.050 14.431 0.055 14.486 17,290,867,500.00

Sub Total ( 6 ) 51,590,342,354.06 43.2229 41.634 0.651 42.284 50,470,047,696.41


VII DIVISI 7. STRUKTUR
7.1 (5a) Beton struktur, fc’30 Mpa (Kubus 60 x 60 x 60) M3 438.48 3,557,765.22 1,560,008,893.67 1.3070 99.360 21.600 120.960 0.296 0.064 0.361 430,347,281.01
7.1 (6a) Beton struktur, fc’25 Mpa (untuk penutup saluran) M3 576.00 1,700,000.00 979,200,000.00 0.8204 - - - - - - -
7.1 (7a) Beton struktur, fc’20 MPa (untuk bahu diperkeras) M3 2,654.17 1,125,000.00 2,985,941,250.00 2.5017 849.750 417.375 1,267.125 0.801 0.393 1.194 1,425,515,625.00
7.1 (7d) Beton struktur, fc’20 Mpa (untuk pengaman pantai) M3 583.60 3,494,109.91 2,039,177,917.56 1.7084 24.200 73.750 97.950 0.071 0.216 0.287 342,248,065.68
7.1 (9) Beton Siklop, fc’15 Mpa (untuk pengaman pantai) M3 133.93 893,667.17 119,688,844.08 0.1003 57.274 - 57.274 0.043 - 0.043 51,183,536.03
7.1 (10) Beton, fc’10 Mpa M3 - 1,100,000.00 - - - - - - - - -
7.3 (1) Baja Tulangan Polos-BjTP 280 Kg 82,775.89 19,000.00 1,572,741,910.00 1.3177 - - - - - - -
7.3 (3) Baja Tulangan Ulir-BjTS 420 A Kg 27,677.40 20,934.10 579,401,459.34 0.4854 263.602 9,563.706 9,827.308 0.005 0.168 0.172 205,725,844.44
7.9.(1) Pasangan Batu M3 14,773.75 650,000.00 9,602,935,415.14 8.0454 14,683.953 165.940 14,849.893 7.997 0.090 8.087 9,652,430,126.31
7.10.(3a) Bronjong dengan kawat yang dilapisi Galvanis M3 500.00 725,000.00 362,500,000.00 0.3037 - - - - - - -
7.15.(1) Pembongkaran Pasangan Batu M3 869.00 304,690.52 264,776,061.88 0.2218 869.000 - 869.000 0.222 - 0.222 264,776,061.88
7.15.(2) Pembongkaran Beton M3 94.73 316,550.08 29,986,789.08 0.0251 94.730 - 94.730 0.025 - 0.025 29,986,789.08
Sub Total ( 7 ) 20,096,358,540.74 16.8369 9.459 0.932 10.391 12,402,213,329.43

IX DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN


9.1 Pekerjaan Harian
9.1.(2) Pekerja Biasa Jam 84.00 18,750.00 1,575,000.00 0.0013 - - - - - - -
9.1.(4) a Dump Truck, kapasitas 3 - 4 m³ Jam 84.00 200,000.00 16,800,000.00 0.0141 - - - - - - -
9.1.(6) Truk Tangki 3000 - 4500 Liter Jam 84.00 200,000.00 16,800,000.00 0.0141 - - - - - - -
9.1.(8) Motor Grader min 100 PK Jam 126.00 200,000.00 25,200,000.00 0.0211 5.000 - 5.000 0.001 - 0.001 1,000,000.00
9.1.(9) Loader Roda Karet 1.0 - 1.6 M3 Jam 126.00 200,000.00 25,200,000.00 0.0211 - - - - - - -
9.1.(13) Penggilas Roda Besi 6 - 9 Ton Jam 84.00 200,000.00 16,800,000.00 0.0141 5.000 - 5.000 0.001 - 0.001 1,000,000.00
9.2 Pekerjaan Lain-Lain
9.2.(1) Marka Jalan Termoplastik M2 12,284.04 120,000.00 1,474,084,800.00 1.2350 1,211.320 - 1,211.320 0.122 - 0.122 145,358,400.00
9.2.(3a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineering Grad Buah 144.00 450,000.00 64,800,000.00 0.0543 - - - - - - -
9.2.(5) Patok Pengarah, material Poly Ethylene (PE) Plastik murni/elastis Buah 1,490.00 300,000.00 447,000,000.00 0.3745 - - - - - - -
9.2.(6a) Patok Kilometer Buah 32.00 350,000.00 11,200,000.00 0.0094 - - - - - - -
9.2.(7) Rel Pengaman M1 4,072.80 850,000.00 3,461,880,000.00 2.9004 914.000 214.000 1,128.000 0.651 0.152 0.803 958,800,000.00
9.2(10a) Kerb Pracetak Jenis 1 (Peninggi/Mountable) M1 2,000.00 115,000.00 230,000,000.00 0.1927 56.000 254.000 310.000 0.005 0.024 0.030 35,650,000.00
9.2.(12a) Perkerasan Blok Beton pada Trotoar dan Median M2 2,400.00 135,000.00 324,000,000.00 0.2715 - - - - - - -
Sub Total ( 9 ) 6,115,339,800.00 5.1235 0.780 0.177 0.957 1,141,808,400.00

3 / 16
PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT JUMLAH
Item ADD-06 SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
X DIVISI10. PEKERJAAN PEMELIHARAAN
10.1 Pemeliharaan Jalan
10.1.(3) Perbaikan Pasangan Batu dengan Mortar M3 280.76 1,270,455.74 356,687,180.87 0.2988 - - - - - - -
10.1.(4) Perbaikan Lapis Fondasi Agregat Kelas A M3 130.61 600,000.00 78,366,000.00 0.0657 131.400 - 131.400 0.066 - 0.066 78,840,000.00
10.1.(10a) Perbaikan Campuran Aspal Panas dengan Asbuton M3 201.26 2,900,000.00 583,654,000.00 0.4890 214.095 - 214.095 0.520 - 0.520 620,874,129.18
10.1.(10b) Perbaikan Campuran Aspal Panas dengan Asbuton M3 29.80 3,200,000.00 95,359,994.13 0.0799 22.000 - 22.000 0.059 - 0.059 70,400,000.00
10.1.(21) Pembersihan Drainase dan Saluran Samping M1 29,383.09 5,500.00 161,606,995.00 0.1354 29,366.700 5,721.000 35,087.700 0.135 0.026 0.162 192,982,350.00
10.1.(22) Pengendalian Tanaman M2 519,937.66 500.00 259,968,830.00 0.2178 501,673.000 15,761.000 517,434.000 0.210 0.007 0.217 258,717,000.00
10.2 Pemeliharaan Jembatan
10.2.(1) Pemeliharaan Jembatan S SOPURA BOX Bentang 7 m LS 1.00 5,000,000.00 5,000,000.00 0.0042 0.786 - 0.786 0.003 - 0.003 3,931,428.57
10.2.(2) Pemeliharaan Jembatan S.SOPURA Bentang 20.8 m LS 1.00 22,000,000.00 22,000,000.00 0.0184 0.786 - 0.786 0.014 - 0.014 17,298,285.71
10.2.(3) Pemeliharaan Jembatan S.OKO-OKO I Bentang 9.8 m LS 1.00 12,500,000.00 12,500,000.00 0.0105 0.786 - 0.786 0.008 - 0.008 9,828,571.43
10.2.(4) Pemeliharaan Jembatan S.Oko-Oko II Bentang 8.9 m LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.786 - 0.786 0.007 - 0.007 7,862,857.14
10.2.(5) Pemeliharaan Jembatan S.Oko-Ok0 III Bentang 20.8 m LS 1.00 25,000,000.00 25,000,000.00 0.0209 0.786 - 0.786 0.016 - 0.016 19,657,142.86
10.2.(6) Pemeliharaan Jembatan S.Oko-Oko IV Bentang 9.8 m LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.786 - 0.786 0.007 - 0.007 7,862,857.14
10.2.(7) Pemeliharaan Jembatan S.Oko-Oko V Bentang 9.7 m LS 1.00 12,000,000.00 12,000,000.00 0.0101 0.786 - 0.786 0.008 - 0.008 9,435,428.57
10.2.(8) Pemeliharaan Jembatan S.Oko-Oko VI Bentang 6.8 m LS 1.00 9,000,000.00 9,000,000.00 0.0075 0.786 - 0.786 0.006 - 0.006 7,076,571.43
10.2.(9) Pemeliharaan Jembatan S.Lamedai I Bentang 8.9 m LS 1.00 11,500,000.00 11,500,000.00 0.0096 0.786 - 0.786 0.008 - 0.008 9,042,285.71
10.2.(10) Pemeliharaan Jembatan S.Lamedai II Bentang 8.9 m LS 1.00 11,500,000.00 11,500,000.00 0.0096 0.786 - 0.786 0.008 - 0.008 9,042,285.71
10.2.(11) Pemeliharaan Jembatan S.Box Tanggetada Bentang 6.9 m LS 1.00 6,000,000.00 6,000,000.00 0.0050 0.786 - 0.786 0.004 - 0.004 4,717,714.29
10.2.(12) Pemeliharaan Jembatan S.Tangketada Bentang 8.8 m LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.786 - 0.786 0.007 - 0.007 7,862,857.14
10.2.(13) Pemeliharaan Jembatan S.Anaiwoi I Bentang 8.9 m LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.786 - 0.786 0.007 - 0.007 7,862,857.14
10.2.(14) Pemeliharaan Jembatan S.Anaiwoi II Bentang 15.8 m LS 1.00 12,000,000.00 12,000,000.00 0.0101 0.786 - 0.786 0.008 - 0.008 9,435,428.57
10.2.(15) Pemeliharaan Jembatan S.Oneha I Bentang 10.3 m LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.786 - 0.786 0.007 - 0.007 7,862,857.14
10.2.(16) Pemeliharaan Jembatan S.Oneha II Bentang 9.2 m LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.786 - 0.786 0.007 - 0.007 7,862,857.14
10.2.(17) Pemeliharaan Jembatan S.Oneha III Bentang 8.7 m LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.786 - 0.786 0.007 - 0.007 7,862,857.14
10.2.(18) Pemeliharaan Jembatan S.Oneha IV Bentang 12.8 m LS 1.00 13,000,000.00 13,000,000.00 0.0109 0.786 - 0.786 0.009 - 0.009 10,221,714.29
10.2.(19) Pemeliharaan Jembatan S.Oneha V Bentang 10.9 m LS 1.00 13,000,000.00 13,000,000.00 0.0109 0.786 - 0.786 0.009 - 0.009 10,221,714.29
10.2.(20) Pemeliharaan Jembatan S.Toengge Bentang 31.2 m LS 1.00 30,000,000.00 30,000,000.00 0.0251 0.786 - 0.786 0.020 - 0.020 23,588,571.43
10.2.(21) Pemeliharaan Jembatan S.Polewali Bentang 11 m LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.786 - 0.786 0.007 - 0.007 7,862,857.14
10.2.(22) Pemeliharaan Jembatan S.Wolulu Bentang 30.3 m LS 1.00 30,000,000.00 30,000,000.00 0.0251 0.786 - 0.786 0.020 - 0.020 23,588,571.43
Sub Total ( 10 ) 1,828,143,000.00 1.5316 1.183 0.0330 1.216 1,451,802,050.61
TOTAL 119,358,786,628.49 100.000 PROGRESS REALISASI 83.173 1.960 85.134 101,614,323,585.49
Pajak Pertambahan Nilai (Ppn) 11% 13,129,466,529.13 PROGRESS RENCANA 85.135 1.676 86.811 11,177,575,594.40
TOTAL 132,488,253,157.63 DEVIASI (1.962) 0.284 (1.678) 112,791,899,179.89
DIBULATKAN 132,488,253,000.00 (0.284) 112,791,899,000.00

Disetujui Diperiksa Disiapkan


Direksi PUPR Konsultan Supervisi Kontraktor
PPK 1.3 Provinsi Sulawesi Tenggara PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI PT. LINCE ROMAULI RAYA - PT.
KONSULTAN - PT. ARISTA CIPTA AGUNG SARANA PERSADA (KSO)

DOLLY HUMADA SIREGAR, ST Ir. MUHAMMAD IDRIS RAZAK RISKY KURNIAWAN, ST


NIP. : 19760106 201410 1 001 Supervision Engineer Manager Proyek

4 / 16
PROGRES BULAN OKTOBER 2023
NAMA PAKET : PRESERVASI JALAN POMALAA - WOLULU 16
RUAS : POMALAA - WOLULU
KONTRAKTOR : PT. LINCE ROMAULI RAYA - PT. AGUNG SARANA PERSADA (KSO) MINGGU KE : 72
KONSULTAN : PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI KONSULTAN - PT. ARISTA CIPTA Periode : 28 Oktober - 03 Nopember 2023
NO. KONTRAK : HK 0201-Bb21.1.3/286, Tanggal 17 Mei 2022

PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT JUMLAH
Item ADD-02 SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
15S/D BULAN 15BULAN 16INI INI
I DIVISI 1. UMUM
1.2 Mobilisasi Ls 1.00 500,000,000.00 500,000,000.00 0.4254 0.700 - 0.700 0.298 - 0.298 350,000,000.00
1.80 Manajemen dan Keselamatan Lalu Lintas Ls 1.00 100,000,000.00 100,000,000.00 0.0851 0.727 0.017 0.745 0.062 0.001 0.063 74,486,842.11
1.17 Pengamanan Lingkungan Hidup
1.17.(1a) Pengujian pH Buah 9.00 70,000.00 630,000.00 0.0005 6.000 - 6.000 0.000 - 0.000 420,000.00
1.17.(1b) Pengujian Oksigen Terlarut (DO) Buah 9.00 100,000.00 900,000.00 0.0008 6.000 - 6.000 0.001 - 0.001 600,000.00
1.17.(1c) Pengujian Zat Padat Terlarut (TDS) Buah 9.00 150,000.00 1,350,000.00 0.0011 6.000 - 6.000 0.001 - 0.001 900,000.00
1.17.(1d) Pengujian Zat Tersuspensi (TSS) Buah 9.00 100,000.00 900,000.00 0.0008 6.000 - 6.000 0.001 - 0.001 600,000.00
1.17.(1e) Pengujian Biological Oxygen Demand (BOD) Buah 9.00 140,000.00 1,260,000.00 0.0011 6.000 - 6.000 0.001 - 0.001 840,000.00
1.17.(1f) Pengujian Chemical Oxygen Demand (COD) Buah 9.00 140,000.00 1,260,000.00 0.0011 6.000 - 6.000 0.001 - 0.001 840,000.00
1.17.(2c) Pengujian Parameter Kebisingan dan/atau Getaran Lainnya ……… Buah 9.00 140,000.00 1,260,000.00 0.0011 6.000 - 6.000 0.001 - 0.001 840,000.00
1.17.(3b) Pengujian Sulfurdioksida (SO2) Buah 9.00 200,000.00 1,800,000.00 0.0015 6.000 - 6.000 0.001 - 0.001 1,200,000.00
1.17.(3f) Pengujian Total Partikulat (TSP) - Debu Buah 9.00 125,000.00 1,125,000.00 0.0010 6.000 - 6.000 0.001 - 0.001 750,000.00
1.19 Keselamatan dan Kesehatan Kerja
1.00 1. Penyiapan RKK Buah 1.00 3,000,000.00 3,000,000.00 0.0026 1.000 - 1.000 0.003 - 0.003 3,000,000.00
2.00 2. Sosialisasi dan Promosi Dan Pelatihan Buah 1.00 5,000,000.00 5,000,000.00 0.0043 - - - - - - -
3.00 3. Alat Pelindung Kerja (APK) dan Alat Pelindung Diri (APD) Buah 1.00 35,000,000.00 35,000,000.00 0.0298 0.698 0.033 0.731 0.021 0.001 0.022 25,583,776.44
4.00 4. Asuransi dan Perizinan Buah 1.00 20,000,000.00 20,000,000.00 0.0170 1.000 - 1.000 0.017 - 0.017 20,000,000.00
5.00 5. Personel K3 Konstruksi Buah 1.00 99,000,000.00 99,000,000.00 0.0842 0.686 0.035 0.720 0.058 0.003 0.061 71,295,442.22
6.00 6. Fasilitas sarana kesehatan Buah 1.00 15,000,000.00 15,000,000.00 0.0128 - - - - - - -
7.00 7. Rambu-rambu terdiri atas Buah 1.00 22,727,272.73 22,727,272.73 0.0193 0.705 0.032 0.738 0.014 0.001 0.014 16,768,562.80
8.00 8. Konsultasi dengan Ahli Terkait Keselamatan Konstruksi Buah 1.00 15,000,000.00 15,000,000.00 0.0128 - - - - - - -
9.00 9. Lain-lain terkait pengendalian risiko K3 Buah 1.00 5,000,000.00 5,000,000.00 0.0043 - - - - - - -
1.21 Manajemen Mutu Ls 1.00 200,000,000.00 200,000,000.00 0.1702 0.723 0.013 0.735 0.123 0.002 0.125 147,000,000.00

Sub Total ( 1 ) 1,030,212,272.73 0.8765 0.600 0.008 0.608 715,124,623.57


II DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 11,009.65 25,000.00 275,241,150.00 0.2342 10,074.154 27.100 10,101.254 0.214 0.001 0.215 252,531,350.00
2.2.(1) Pasangan Batu dengan Mortar M3 8,363.10 700,000.00 5,854,170,000.00 4.9810 7,006.734 22.850 7,029.584 4.173 0.014 4.187 4,920,708,807.00
2.3.(15) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 100 cm x 100 cm (precast M1 134.40 4,275,906.49 574,681,832.26 0.4890 134.400 - 134.400 0.489 - 0.489 574,681,832.26
2.3.(18) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 150 cm x 150 cm (precast M1 354.00 7,268,205.12 2,572,944,612.48 2.1892 354.000 - 354.000 2.189 - 2.189 2,572,944,612.48
2.3.(20) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 250 cm x 250 cm (precast M1 13.20 42,718,794.10 563,888,082.12 0.4798 13.200 - 13.200 0.480 - 0.480 563,888,082.12
2.3.(22) Saluran berbentuk U Tipe DS 1 (precast) M1 5,575.00 1,250,000.00 6,968,750,000.00 5.9293 5,213.000 48.000 5,261.000 5.544 0.051 5.595 6,576,250,000.00
Sub Total ( 2 ) 16,809,675,676.86 14.3024 13.090 0.065 13.155 15,461,004,683.85
III DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK
3.1.(1a) Galian Biasa M3 94,032.95 16,000.00 1,504,527,200.00 1.2801 62,636.215 - 62,636.215 0.853 - 0.853 1,002,179,444.27
3.2.(2a) Timbunan Pilihan dari Sumber Galian M3 15,331.32 100,000.00 1,533,132,000.00 1.3045 18,293.102 538.942 18,832.045 1.556 0.046 1.602 1,883,204,474.36
3.3.(1) Penyiapan Badan Jalan M2 88,172.79 5,000.00 440,863,950.00 0.3751 68,754.346 - 68,754.346 0.292 - 0.292 343,771,729.95
3.4.(2) Pemotongan Pohon Pilihan diameter 15 – 30 cm Buah 147.00 39,983.05 5,877,508.35 0.0050 164.000 - 164.000 0.006 - 0.006 6,557,220.20
3.4.(3) Pemotongan Pohon Pilihan diameter > 30 – 50 cm Buah 218.00 61,536.34 13,414,922.12 0.0114 218.000 - 218.000 0.011 - 0.011 13,414,922.12
3.4.(4) Pemotongan Pohon Pilihan diameter > 50 – 75 cm Buah 390.00 112,032.53 43,692,686.70 0.0372 390.000 - 390.000 0.037 - 0.037 43,692,686.70
3.4.(5) Pemotongan Pohon Pilihan diameter > 75 cm Buah 78.00 233,248.73 18,193,400.94 0.0155 78.000 - 78.000 0.015 - 0.015 18,193,400.94
Sub Total ( 3 ) 3,559,701,668.11 3.0287 2.771 0.046 2.817 3,311,013,878.54

5 / 16
PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT JUMLAH
Item ADD-02 SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
V DIVISI 5. PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN 1,100.000 #REF!
5.1.(1) Lapis Fondasi Agregat Kelas A M3 24,285.05 600,000.00 14,571,030,816.00 12.3976 24,080.320 - 24,080.320 12.293 - 12.293 14,448,192,000.00
5.1.(3a) Lapis Fondasi Agregat Kelas S M3 15,031.93 250,000.00 3,757,982,500.00 3.1974 8,612.083 240.385 8,852.468 1.832 0.051 1.883 2,213,116,923.08
Sub Total ( 5 ) 18,329,013,316.00 15.5951 14.125 0.051 14.176 16,661,308,923.08
VI DIVISI 6. PERKERASAN ASPAL
6.1 (1)(a) Lapis Resap Pengikat - Aspal Cair Liter 65,866.87 15,000.00 988,003,079.40 0.8406 64,826.414 242.951 65,069.365 0.827 0.003 0.830 976,040,468.34
6.1 (2)(a) Lapis Perekat - Aspal Cair Liter 68,220.25 13,000.00 886,863,250.00 0.7546 69,356.504 1,466.630 70,823.134 0.767 0.016 0.783 920,700,743.61
6.3.(8) Bahan anti pengelupasan Kg 3,983.28 75,000.00 298,745,827.03 0.2542 4,000.556 80.430 ######## 0.255 0.005 0.260 #VALUE!
6.5.(1b) Laston Lapis Aus Asbuton Butir (AC-WC Asb Butir) Ton 22,538.67 1,425,000.00 32,117,602,968.75 27.3270 21,259.050 478.750 21,737.800 25.776 0.580 26.356 30,976,365,000.00
6.5.(2b) Laston Lapis Antara Asbuton Butir (AC-BC Asb Butir) Ton 12,814.17 1,350,000.00 17,299,127,228.88 14.7188 12,759.390 48.660 12,808.050 14.656 0.056 14.712 17,290,867,500.00
Sub Total ( 6 ) 51,590,342,354.06 43.8952 42.281 0.661 42.942 #VALUE!
VII DIVISI 7. STRUKTUR
7.1 (5a) Beton struktur, fc’30 Mpa (Kubus 60 x 60 x 60) M3 438.48 3,557,765.22 1,560,008,893.67 1.3273 99.360 21.600 120.960 0.301 0.065 0.366 430,347,281.01
7.1 (6a) Beton struktur, fc’25 Mpa (untuk penutup saluran) M3 576.00 1,700,000.00 979,200,000.00 0.8331 - - - - - - -
7.1 (7a) Beton struktur, fc’20 MPa (untuk bahu diperkeras) M3 2,654.17 1,125,000.00 2,985,941,250.00 2.5406 849.750 417.375 1,267.125 0.813 0.400 1.213 1,425,515,625.00
7.1 (7d) Beton struktur, fc’20 Mpa (untuk pengaman pantai) M3 583.60 3,494,109.91 2,039,177,917.56 1.7350 24.200 73.750 97.950 0.072 0.219 0.291 342,248,065.68
7.1 (9) Beton Siklop, fc’15 Mpa (untuk pengaman pantai) M3 133.93 893,667.17 119,688,844.08 0.1018 57.274 - 57.274 0.044 - 0.044 51,183,536.03
7.1 (10) Beton, fc’10 Mpa M3 - 1,100,000.00 - - - - - - - - -
7.3 (1) Baja Tulangan Polos-BjTP 280 Kg 82,775.89 19,000.00 1,572,741,910.00 1.3382 - - - - - - -
7.3 (3) Baja Tulangan Ulir-BjTS 420 A Kg 27,677.40 20,934.10 579,401,459.34 0.4930 263.602 9,563.706 9,827.308 0.005 0.170 0.175 205,725,844.44
7.9.(1) Pasangan Batu M3 14,773.75 650,000.00 9,602,935,415.14 8.1706 14,683.953 165.940 14,849.893 8.121 0.092 8.213 9,652,430,126.31
7.10.(3a) Bronjong dengan kawat yang dilapisi Galvanis M3 500.00 725,000.00 362,500,000.00 0.3084 - - - - - - -
7.15.(1) Pembongkaran Pasangan Batu M3 869.00 304,690.52 264,776,061.88 0.2253 869.000 - 869.000 0.225 - 0.225 264,776,061.88
7.15.(2) Pembongkaran Beton M3 94.73 316,550.08 29,986,789.08 0.0255 94.730 - 94.730 0.026 - 0.026 29,986,789.08
Sub Total ( 7 ) 20,096,358,540.74 17.0988 9.606 0.946 10.552 12,402,213,329.43

6 / 16
PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT JUMLAH
Item ADD-02 SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
IX DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN
9.1 Pekerjaan Harian
9.1.(2) Pekerja Biasa Jam 84.00 18,750.00 1,575,000.00 0.0013 - - - - - - -
9.1.(4) a Dump Truck, kapasitas 3 - 4 m³ Jam 84.00 200,000.00 16,800,000.00 0.0143 - - - - - - -
9.1.(6) Truk Tangki 3000 - 4500 Liter Jam 84.00 200,000.00 16,800,000.00 0.0143 - - - - - - -
9.1.(8) Motor Grader min 100 PK Jam 126.00 200,000.00 25,200,000.00 0.0214 5.000 - 5.000 0.001 - 0.001 1,000,000.00
9.1.(9) Loader Roda Karet 1.0 - 1.6 M3 Jam 126.00 200,000.00 25,200,000.00 0.0214 - - - - - - -
9.1.(13) Penggilas Roda Besi 6 - 9 Ton Jam 84.00 200,000.00 16,800,000.00 0.0143 5.000 - 5.000 0.001 - 0.001 1,000,000.00
9.2 Pekerjaan Lain-Lain
9.2.(1) Marka Jalan Termoplastik M2 12,284.04 120,000.00 1,474,084,800.00 1.2542 1,211.320 - 1,211.320 0.124 - 0.124 145,358,400.00
9.2.(3a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineering Grade Buah 144.00 450,000.00 64,800,000.00 0.0551 - - - - - - -
9.2.(5) Patok Pengarah, material Poly Ethylene (PE) Plastik murni/elastis Buah 1,490.00 300,000.00 447,000,000.00 0.3803 - - - - - - -
9.2.(6a) Patok Kilometer Buah 32.00 350,000.00 11,200,000.00 0.0095 - - - - - - -
9.2.(7) Rel Pengaman M1 4,072.80 850,000.00 3,461,880,000.00 2.9455 914.000 214.000 1,128.000 0.661 0.155 0.816 958,800,000.00
9.2(10a) Kerb Pracetak Jenis 1 (Peninggi/Mountable) M1 2,000.00 115,000.00 230,000,000.00 0.1957 56.000 254.000 310.000 0.005 0.025 0.030 35,650,000.00
9.2.(12a) Perkerasan Blok Beton pada Trotoar dan Median M2 2,400.00 135,000.00 324,000,000.00 0.2757 - - - - - - -
Sub Total ( 9 ) 6,115,339,800.00 5.2032 0.792 0.180 0.971 1,141,808,400.00
TOTAL 117,530,643,628.49 100.000 PROGRESS REALISASI 83.265 1.957 85.222 #VALUE!
Pajak Pertambahan Nilai (Ppn) 11% 12,928,370,799.13 PROGRESS RENCANA 85.074 86.746 #VALUE!
TOTAL 130,459,014,427.63 DEVIASI (1.809) 1.957 (1.523) #VALUE!
DIBULATKAN 130,459,014,000.00 (1.957) #VALUE!
Disetujui Diperiksa Disiapkan
Direksi PUPR Konsultan Supervisi Kontraktor
PPK 1.3 Provinsi Sulawesi Tenggara PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI PT. LINCE ROMAULI RAYA - PT. AGUNG
KONSULTAN - PT. ARISTA CIPTA SARANA PERSADA (KSO)

SUKARDJO Ir. MUHAMMAD IDRIS RAZAK RISKY KURNIAWAN, ST


NIP. : 19750226 200312 1 002 Supervision Engineer Manager Proyek

7 / 16
PROGRES BULAN OKTOBER 2023
NAMA PAKET : PRESERVASI JALAN POMALAA - WOLULU 16
RUAS : POMALAA - WOLULU
KONTRAKTOR : PT. LINCE ROMAULI RAYA - PT. AGUNG SARANA PERSADA (KSO) MINGGU KE : 72
KONSULTAN : PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI KONSULTAN - PT. ARISTA CIPTA Periode : 28 Oktober - 03 Nopember 2023
NO. KONTRAK : HK 0201-Bb21.1.3/286, Tanggal 17 Mei 2022

PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT JUMLAH
Item ADD-02 SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
15S/D BULAN 15BULAN 16INI 15INI
X DIVISI10. PEKERJAAN PEMELIHARAAN
10.1 Pemeliharaan Jalan
10.1.(3) Perbaikan Pasangan Batu dengan Mortar M3 280.76 1,270,455.74 356,687,180.87 23.2272 - - - - - - -
10.1.(4) Perbaikan Lapis Fondasi Agregat Kelas A M3 130.61 600,000.00 78,366,000.00 5.1031 131.400 - 131.400 5.134 - 5.134 78,840,000.00
10.1.(10a) Perbaikan Campuran Aspal Panas dengan Asbuton M3 201.26 2,900,000.00 583,654,000.00 38.0071 214.095 - 214.095 40.431 - 40.431 620,874,129.18
10.1.(10b) Perbaikan Campuran Aspal Panas dengan Asbuton M3 29.80 3,200,000.00 95,359,994.13 6.2098 22.000 - 22.000 4.584 - 4.584 70,400,000.00
10.1.(21) Pembersihan Drainase dan Saluran Samping M1 29,383.09 5,500.00 161,606,995.00 10.5237 29,366.700 5,721.000 35,087.700 10.518 2.049 12.567 192,982,350.00
10.1.(22) Pengendalian Tanaman M2 519,937.66 500.00 259,968,830.00 16.9290 501,673.000 15,761.000 517,434.000 16.334 0.513 16.847 258,717,000.00
Sub Total ( 10 ) 1,535,643,000.00 100.0000 77.0015 2.5622 79.5636 1,221,813,479.18
TOTAL 1,535,643,000.00 100.000 PROGRESS REALISASI 77.001 2.562 79.564 1,221,813,479.18
Pajak Pertambahan Nilai (Ppn) 11% 168,920,730.00 PROGRESS RENCANA 89.240 91.588 134,399,482.71
TOTAL 1,704,563,730.00 DEVIASI (12.239) 2.562 (12.025) 1,356,212,961.89
DIBULATKAN 1,704,563,000.00 (2.562) 1,356,212,000.00

Disetujui Diperiksa Disiapkan


Direksi PUPR Konsultan Supervisi Kontraktor
PPK 1.3 Provinsi Sulawesi Tenggara PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI PT. LINCE ROMAULI RAYA - PT.
KONSULTAN - PT. ARISTA CIPTA AGUNG SARANA PERSADA (KSO)

SUKARDJO Ir. MUHAMMAD IDRIS RAZAK RISKY KURNIAWAN, ST


NIP. : 19750226 200312 1 002 Supervision Engineer Manager Proyek

8 / 16
PROGRES BULAN OKTOBER 2023
NAMA PAKET : PRESERVASI JALAN POMALAA - WOLULU 16
RUAS : POMALAA - WOLULU
KONTRAKTOR : PT. LINCE ROMAULI RAYA - PT. AGUNG SARANA PERSADA (KSO) MINGGU KE : 72
KONSULTAN : PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI KONSULTAN - PT. ARISTA CIPTA Periode : 28 Oktober - 03 Nopember 2023
NO. KONTRAK : HK 0201-Bb21.1.3/286, Tanggal 17 Mei 2022

PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT JUMLAH
Item ADD-02 SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
15S/D BULAN 15BULAN 16INI INI
10.2 Pemeliharaan Jembatan
10.2.(1) Pemeliharaan Jembatan S SOPURA BOX Bentang 7 m LS 1.00 5,000,000.00 5,000,000.00 1.7094 0.786 - 0.786 1.344 - 1.344 3,931,428.57
10.2.(2) Pemeliharaan Jembatan S.SOPURA Bentang 20.8 m LS 1.00 22,000,000.00 22,000,000.00 7.5214 0.786 - 0.786 5.914 - 5.914 17,298,285.71
10.2.(3) Pemeliharaan Jembatan S.OKO-OKO I Bentang 9.8 m LS 1.00 12,500,000.00 12,500,000.00 4.2735 0.786 - 0.786 3.360 - 3.360 9,828,571.43
10.2.(4) Pemeliharaan Jembatan S.Oko-Oko II Bentang 8.9 m LS 1.00 10,000,000.00 10,000,000.00 3.4188 0.786 - 0.786 2.688 - 2.688 7,862,857.14
10.2.(5) Pemeliharaan Jembatan S.Oko-Ok0 III Bentang 20.8 m LS 1.00 25,000,000.00 25,000,000.00 8.5470 0.786 - 0.786 6.720 - 6.720 19,657,142.86
10.2.(6) Pemeliharaan Jembatan S.Oko-Oko IV Bentang 9.8 m LS 1.00 10,000,000.00 10,000,000.00 3.4188 0.786 - 0.786 2.688 - 2.688 7,862,857.14
10.2.(7) Pemeliharaan Jembatan S.Oko-Oko V Bentang 9.7 m LS 1.00 12,000,000.00 12,000,000.00 4.1026 0.786 - 0.786 3.226 - 3.226 9,435,428.57
10.2.(8) Pemeliharaan Jembatan S.Oko-Oko VI Bentang 6.8 m LS 1.00 9,000,000.00 9,000,000.00 3.0769 0.786 - 0.786 2.419 - 2.419 7,076,571.43
10.2.(9) Pemeliharaan Jembatan S.Lamedai I Bentang 8.9 m LS 1.00 11,500,000.00 11,500,000.00 3.9316 0.786 - 0.786 3.091 - 3.091 9,042,285.71
10.2.(10) Pemeliharaan Jembatan S.Lamedai II Bentang 8.9 m LS 1.00 11,500,000.00 11,500,000.00 3.9316 0.786 - 0.786 3.091 - 3.091 9,042,285.71
10.2.(11) Pemeliharaan Jembatan S.Box Tanggetada Bentang 6.9 m LS 1.00 6,000,000.00 6,000,000.00 2.0513 0.786 - 0.786 1.613 - 1.613 4,717,714.29
10.2.(12) Pemeliharaan Jembatan S.Tangketada Bentang 8.8 m LS 1.00 10,000,000.00 10,000,000.00 3.4188 0.786 - 0.786 2.688 - 2.688 7,862,857.14
10.2.(13) Pemeliharaan Jembatan S.Anaiwoi I Bentang 8.9 m LS 1.00 10,000,000.00 10,000,000.00 3.4188 0.786 - 0.786 2.688 - 2.688 7,862,857.14
10.2.(14) Pemeliharaan Jembatan S.Anaiwoi II Bentang 15.8 m LS 1.00 12,000,000.00 12,000,000.00 4.1026 0.786 - 0.786 3.226 - 3.226 9,435,428.57
10.2.(15) Pemeliharaan Jembatan S.Oneha I Bentang 10.3 m LS 1.00 10,000,000.00 10,000,000.00 3.4188 0.786 - 0.786 2.688 - 2.688 7,862,857.14
10.2.(16) Pemeliharaan Jembatan S.Oneha II Bentang 9.2 m LS 1.00 10,000,000.00 10,000,000.00 3.4188 0.786 - 0.786 2.688 - 2.688 7,862,857.14
10.2.(17) Pemeliharaan Jembatan S.Oneha III Bentang 8.7 m LS 1.00 10,000,000.00 10,000,000.00 3.4188 0.786 - 0.786 2.688 - 2.688 7,862,857.14
10.2.(18) Pemeliharaan Jembatan S.Oneha IV Bentang 12.8 m LS 1.00 13,000,000.00 13,000,000.00 4.4444 0.786 - 0.786 3.495 - 3.495 10,221,714.29
10.2.(19) Pemeliharaan Jembatan S.Oneha V Bentang 10.9 m LS 1.00 13,000,000.00 13,000,000.00 4.4444 0.786 - 0.786 3.495 - 3.495 10,221,714.29
10.2.(20) Pemeliharaan Jembatan S.Toengge Bentang 31.2 m LS 1.00 30,000,000.00 30,000,000.00 10.2564 0.786 - 0.786 8.064 - 8.064 23,588,571.43
10.2.(21) Pemeliharaan Jembatan S.Polewali Bentang 11 m LS 1.00 10,000,000.00 10,000,000.00 3.4188 0.786 - 0.786 2.688 - 2.688 7,862,857.14
10.2.(22) Pemeliharaan Jembatan S.Wolulu Bentang 30.3 m LS 1.00 30,000,000.00 30,000,000.00 10.2564 0.786 - 0.786 8.064 - 8.064 23,588,571.43
TOTAL 292,500,000.00 100.000 PROGRESS REALISASI 78.629 - 78.629 229,988,571.43
Pajak Pertambahan Nilai (Ppn) 11% 32,175,000.00 PROGRESS RENCANA 88.129 88.129 25,298,742.86
TOTAL 324,675,000.00 DEVIASI (9.500) - (9.500) 255,287,314.29
DIBULATKAN 324,675,000.00 - 255,287,000.00

Disetujui Diperiksa Disiapkan


Direksi PUPR Konsultan Supervisi Kontraktor
PPK 1.3 Provinsi Sulawesi Tenggara PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI PT. LINCE ROMAULI RAYA - PT.
KONSULTAN - PT. ARISTA CIPTA AGUNG SARANA PERSADA (KSO)

SUKARDJO Ir. MUHAMMAD IDRIS RAZAK RISKY KURNIAWAN, ST


NIP. : 19750226 200312 1 002 Supervision Engineer Manager Proyek

9 / 16
PROGRES BULAN OKTOBER 2023
NAMA PAKET : PRESERVASI JALAN POMALAA - WOLULU 16
RUAS : POMALAA - WOLULU
KONTRAKTOR : PT. LINCE ROMAULI RAYA - PT. AGUNG SARANA PERSADA (KSO) MINGGU KE 72 (KONTRAK TAHUN 2023)
KONSULTAN : PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI KONSULTAN - PT. ARISTA CIPTA Periode : 28 Oktober - 03 Nopember 2023
NO. KONTRAK : HK 0201-Bb21.1.3/286, Tanggal 17 Mei 2022

PRESTASI
VOLUME HARGA JUMLAH
No. BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT KONTRAK JUMLAH
Item SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
ANAK ADD-02
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
15S/D BULAN 15BULAN 16INI 72INI
I DIVISI 1. UMUM
1.2 Mobilisasi Ls 0.30 500,000,000.00 150,000,000.00 0.1659 - - - - - - -
1.80 Manajemen dan Keselamatan Lalu Lintas Ls 0.66 100,000,000.00 65,631,578.95 0.0726 0.384 0.017 0.401 0.042 0.002 0.044 40,118,421.05
1.17 Pengamanan Lingkungan Hidup
1.17.(1a) Pengujian pH Buah 6.00 70,000.00 420,000.00 0.0005 3.000 - 3.000 0.000 - 0.000 210,000.00
1.17.(1b) Pengujian Oksigen Terlarut (DO) Buah 6.00 100,000.00 600,000.00 0.0007 3.000 - 3.000 0.000 - 0.000 300,000.00
1.17.(1c) Pengujian Zat Padat Terlarut (TDS) Buah 6.00 150,000.00 900,000.00 0.0010 3.000 - 3.000 0.000 - 0.000 450,000.00
1.17.(1d) Pengujian Zat Tersuspensi (TSS) Buah 6.00 100,000.00 600,000.00 0.0007 3.000 - 3.000 0.000 - 0.000 300,000.00
1.17.(1e) Pengujian Biological Oxygen Demand (BOD) Buah 6.00 140,000.00 840,000.00 0.0009 3.000 - 3.000 0.000 - 0.000 420,000.00
1.17.(1f) Pengujian Chemical Oxygen Demand (COD) Buah 6.00 140,000.00 840,000.00 0.0009 3.000 - 3.000 0.000 - 0.000 420,000.00
1.17.(2c) Pengujian Parameter Kebisingan dan/atau Getaran Lainnya ……… Buah 6.00 140,000.00 840,000.00 0.0009 3.000 - 3.000 0.000 - 0.000 420,000.00
1.17.(3b) Pengujian Sulfurdioksida (SO2) Buah 6.00 200,000.00 1,200,000.00 0.0013 3.000 - 3.000 0.001 - 0.001 600,000.00
1.17.(3f) Pengujian Total Partikulat (TSP) - Debu Buah 6.00 125,000.00 750,000.00 0.0008 3.000 - 3.000 0.000 - 0.000 375,000.00
1.19 Keselamatan dan Kesehatan Kerja
1.00 1. Penyiapan RKK Buah 1.00 3,000,000.00 3,000,000.00 0.0033 - - - - - - -
2.00 2. Sosialisasi dan Promosi Dan Pelatihan Buah 1.00 5,000,000.00 5,000,000.00 0.0055 - - - - - - -
3.00 3. Alat Pelindung Kerja (APK) dan Alat Pelindung Diri (APD) Buah 0.64 35,000,000.00 22,449,291.24 0.0248 0.339 0.033 0.372 0.013 0.001 0.014 13,033,067.68
4.00 4. Asuransi dan Perizinan Buah 1.00 20,000,000.00 20,000,000.00 0.0221 - - - - - - -
5.00 5. Personel K3 Konstruksi Buah 0.67 99,000,000.00 66,050,649.96 0.0731 0.353 0.035 0.387 0.039 0.004 0.042 38,346,092.18
6.00 6. Fasilitas sarana kesehatan Buah 1.00 15,000,000.00 15,000,000.00 0.0166 - - - - - - -
7.00 7. Rambu-rambu terdiri atas Buah 0.63 22,727,272.73 14,206,206.32 0.0157 0.330 0.032 0.363 0.008 0.001 0.009 8,247,496.39
8.00 8. Konsultasi dengan Ahli Terkait Keselamatan Konstruksi Buah 1.00 15,000,000.00 15,000,000.00 0.0166 - - - - - - -
9.00 9. Lain-lain terkait pengendalian risiko K3 Buah 1.00 5,000,000.00 5,000,000.00 0.0055 - - - - - - -
1.21 Manajemen Mutu Ls 0.64 200,000,000.00 128,500,000.00 0.1421 0.365 0.013 0.378 0.081 0.003 0.084 75,500,000.00

Sub Total ( 1 ) 516,827,726.47 0.5717 0.187 0.011 0.198 178,740,077.31


II DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 6,099.13 25,000.00 152,478,150.00 0.1687 5,163.634 27.100 5,190.734 0.143 0.001 0.144 129,768,350.00
2.2.(1) Pasangan Batu dengan Mortar M3 5,710.20 700,000.00 3,997,143,493.00 4.4214 4,353.839 22.850 4,376.689 3.371 0.018 3.389 3,063,682,300.00
2.3.(15) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 100 cm x 100 cm (p M1 134.40 4,275,906.49 574,681,832.26 0.6357 134.400 - 134.400 0.636 - 0.636 574,681,832.26
2.3.(18) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 150 cm x 150 cm (p M1 296.40 7,268,205.12 2,154,295,997.57 2.3830 296.400 - 296.400 2.383 - 2.383 2,154,295,997.57
2.3.(20) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 250 cm x 250 cm (p M1 13.20 42,718,794.10 563,888,082.12 0.6237 - - - - - - -
2.3.(22) Saluran berbentuk U Tipe DS 1 (precast) M1 4,575.00 1,250,000.00 5,718,750,000.00 6.3258 4,213.000 48.000 4,261.000 5.825 0.066 5.892 5,326,250,000.00

Sub Total ( 2 ) 13,161,237,554.95 14.5582 12.358 0.085 12.443 11,248,678,479.82


III DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK
3.1.(1a) Galian Biasa M3 67,613.34 16,000.00 1,081,813,390.40 1.1966 36,216.602 - 36,216.602 0.641 - 0.641 579,465,634.67
3.2.(2a) Timbunan Pilihan dari Sumber Galian M3 11,144.96 100,000.00 1,114,496,000.00 1.2328 14,106.742 538.942 14,645.685 1.560 0.060 1.620 1,464,568,474.36
3.3.(1) Penyiapan Badan Jalan M2 64,166.26 5,000.00 320,831,300.00 0.3549 44,747.816 - 44,747.816 0.247 - 0.247 223,739,079.95
3.4.(2) Pemotongan Pohon Pilihan diameter 15 – 30 cm Buah 29.00 39,983.05 1,159,508.45 0.0013 149.000 - 149.000 0.007 - 0.007 5,957,474.45
3.4.(3) Pemotongan Pohon Pilihan diameter > 30 – 50 cm Buah 182.00 61,536.34 11,199,613.88 0.0124 218.000 - 218.000 0.015 - 0.015 13,414,922.12
3.4.(4) Pemotongan Pohon Pilihan diameter > 50 – 75 cm Buah 207.00 112,032.53 23,190,733.71 0.0257 382.000 - 382.000 0.047 - 0.047 42,796,426.46
3.4.(5) Pemotongan Pohon Pilihan diameter > 75 cm Buah 1.00 233,248.73 233,248.73 0.0003 76.000 - 76.000 0.020 - 0.020 17,726,903.48

Sub Total ( 3 ) 2,552,923,795.17 2.82 2.537 0.060 2.597 2,347,668,915.49

10 / 16
PRESTASI
VOLUME HARGA JUMLAH
No. BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT KONTRAK JUMLAH
Item SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
ANAK ADD-02
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
V DIVISI 5. PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN 1,100.000 #REF!
5.1.(1) Lapis Fondasi Agregat Kelas A M3 14,486.66 600,000.00 8,691,994,416.00 9.6146 14,281.926 - 14,281.926 9.479 - 9.479 8,569,155,600.00
5.1.(3a) Lapis Fondasi Agregat Kelas S M3 15,031.93 250,000.00 3,757,982,500.00 4.1569 8,612.083 240.385 8,852.468 2.382 0.066 2.448 2,213,116,923.08
Sub Total ( 5 ) 12,449,976,916.00 13.7715 11.860 0.066 11.927 10,782,272,523.08
VI DIVISI 6. PERKERASAN ASPAL
6.1 (1)(a) Lapis Resap Pengikat - Aspal Cair Liter 46,717.40 15,000.00 700,760,995.99 0.7751 45,676.942 242.951 45,919.892 0.758 0.004 0.762 688,798,384.93
6.1 (2)(a) Lapis Perekat - Aspal Cair Liter 48,419.05 13,000.00 629,447,646.02 0.6963 49,555.304 1,466.630 51,021.934 0.713 0.021 0.734 663,285,139.63
6.3.(8) Bahan anti pengelupasan Kg 3,891.90 75,000.00 291,892,571.00 0.3229 3,909.180 80.430 3,989.610 0.324 0.007 0.331 299,220,728.42
6.5.(1b) Laston Lapis Aus Asbuton Butir (AC-WC Asb Butir) Ton 16,063.68 1,425,000.00 22,890,738,656.25 25.3204 14,784.058 478.750 15,262.808 23.303 0.755 24.058 21,749,500,687.50
6.5.(2b) Laston Lapis Antara Asbuton Butir (AC-BC Asb Butir) Ton 8,976.25 1,350,000.00 12,117,934,751.65 13.4042 8,921.470 48.660 8,970.130 13.322 0.073 13.395 12,109,675,022.78

Sub Total ( 6 ) 36,630,774,620.92 40.5189 38.421 0.859 39.280 35,510,479,963.26


VII DIVISI 7. STRUKTUR
7.1 (5a) Beton struktur, fc’30 Mpa (Kubus 60 x 60 x 60) M3 438.48 3,557,765.22 1,560,008,893.67 1.7256 - 21.600 21.600 - 0.085 0.085 76,847,728.75
7.1 (6a) Beton struktur, fc’25 Mpa (untuk penutup saluran) M3 576.00 1,700,000.00 979,200,000.00 1.0831 - - - - - - -
7.1 (7a) Beton struktur, fc’20 MPa (untuk bahu diperkeras) M3 2,654.17 1,125,000.00 2,985,941,250.00 3.3029 - 417.375 417.375 - 0.519 0.519 469,546,875.00
7.1 (7d) Beton struktur, fc’20 Mpa (untuk pengaman pantai) M3 583.60 3,494,109.91 2,039,177,917.56 2.2556 - 73.750 73.750 - 0.285 0.285 257,690,605.86
7.1 (9) Beton Siklop, fc’15 Mpa (untuk pengaman pantai) M3 133.93 893,667.17 119,688,844.08 0.1324 - - - - - - -
7.1 (10) Beton, fc’10 Mpa M3 - 1,100,000.00 - - - - - - - - -
7.3 (1) Baja Tulangan Polos-BjTP 280 Kg 82,775.89 19,000.00 1,572,741,910.00 1.7397 - - - - - - -
7.3 (3) Baja Tulangan Ulir-BjTS 420 A Kg 25,549.07 20,934.10 534,846,777.78 0.5916 - 9,563.706 9,563.706 - 0.221 0.221 200,207,570.80
7.9.(1) Pasangan Batu M3 12,645.42 650,000.00 8,219,520,651.07 9.0920 12,555.622 165.940 12,721.562 9.027 0.119 9.147 8,269,015,362.25
7.10.(3a) Bronjong dengan kawat yang dilapisi Galvanis M3 500.00 725,000.00 362,500,000.00 0.4010 - - - - - - -
7.15.(1) Pembongkaran Pasangan Batu M3 529.49 304,690.52 161,330,583.43 0.1785 757.790 - 757.790 0.255 - 0.255 230,891,429.15
7.15.(2) Pembongkaran Beton M3 90.09 316,550.08 28,519,294.56 0.0315 90.094 - 90.094 0.032 - 0.032 28,519,294.56
Sub Total ( 7 ) 18,563,476,122.16 20.5339 9.3143 1.2302 10.5445 9,532,718,866.38

IX DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN


9.1 Pekerjaan Harian
9.1.(2) Pekerja Biasa Jam 84.00 18,750.00 1,575,000.00 0.0017 - - - - - - -
9.1.(4) a Dump Truck, kapasitas 3 - 4 m³ Jam 84.00 200,000.00 16,800,000.00 0.0186 - - - - - - -
9.1.(6) Truk Tangki 3000 - 4500 Liter Jam 84.00 200,000.00 16,800,000.00 0.0186 - - - - - - -
9.1.(8) Motor Grader min 100 PK Jam 121.00 200,000.00 24,200,000.00 0.0268 - - - - - - -
9.1.(9) Loader Roda Karet 1.0 - 1.6 M3 Jam 126.00 200,000.00 25,200,000.00 0.0279 - - - - - - -
9.1.(13) Penggilas Roda Besi 6 - 9 Ton Jam 79.00 200,000.00 15,800,000.00 0.0175 - - - - - - -
9.2 Pekerjaan Lain-Lain
9.2.(1) Marka Jalan Termoplastik M2 12,284.04 120,000.00 1,474,084,800.00 1.6305 1,211.320 - 1,211.320 0.161 - 0.161 145,358,400.00
9.2.(3a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineering Grade Buah 144.00 450,000.00 64,800,000.00 0.0717 - - - - - - -
9.2.(5) Patok Pengarah, material Poly Ethylene (PE) Plastik murni/elastis Buah 1,490.00 300,000.00 447,000,000.00 0.4944 - - - - - - -
9.2.(6a) Patok Kilometer Buah 32.00 350,000.00 11,200,000.00 0.0124 - - - - - - -
9.2.(7) Rel Pengaman M1 4,072.80 850,000.00 3,461,880,000.00 3.8293 914.000 214.000 1,128.000 - - - -
9.2(10a) Kerb Pracetak Jenis 1 (Peninggi/Mountable) M1 2,000.00 115,000.00 230,000,000.00 0.2544 56.000 254.000 310.000 - - - -
9.2.(12a) Perkerasan Blok Beton pada Trotoar dan Median M2 2,400.00 135,000.00 324,000,000.00 0.3584 - - - - - - -
Sub Total ( 9 ) 6,113,339,800.00 6.7622 0.161 - 0.161 145,358,400.00

11 / 16
PRESTASI
VOLUME HARGA JUMLAH
No. BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT KONTRAK JUMLAH
Item SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
ANAK ADD-02
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
X DIVISI10. PEKERJAAN PEMELIHARAAN
10.1 Pemeliharaan Jalan
10.1.(3) Perbaikan Pasangan Batu dengan Mortar M3 280.76 1,270,455.74 356,687,180.87 0.3945 - - - - - - -
10.1.(4) Perbaikan Lapis Fondasi Agregat Kelas A M3 (0.79) 600,000.00 (474,000.00) (0.0005) 161.195 - 161.195 0.107 - 0.107 96,716,716.38
10.1.(10a) Perbaikan Campuran Aspal Panas dengan Asbuton M3 (12.83) 2,900,000.00 (37,220,129.18) (0.0412) 49.900 - 49.900 0.160 - 0.160 144,710,418.43
10.1.(10b) Perbaikan Campuran Aspal Panas dengan Asbuton M3 7.80 3,200,000.00 24,959,994.13 0.0276 - - - - - - -
10.1.(21) Pembersihan Drainase dan Saluran Samping M1 16.39 5,500.00 90,145.00 0.0001 11,950.600 5,721.000 17,671.600 0.073 0.035 0.108 97,193,800.00
10.1.(22) Pengendalian Tanaman M2 18,264.66 500.00 9,132,330.00 0.0101 142,436.300 15,761.000 158,197.300 0.079 0.009 0.087 79,098,650.00
10.2 Pemeliharaan Jembatan
10.2.(1) Pemeliharaan Jembatan S SOPURA BOX Bentang 7 m LS 0.21 5,000,000.00 1,068,571.43 0.0012 0.356 - 0.356 0.002 - 0.002 1,780,000.00
10.2.(2) Pemeliharaan Jembatan S.SOPURA Bentang 20.8 m LS 0.21 22,000,000.00 4,701,714.29 0.0052 0.356 - 0.356 0.009 - 0.009 7,832,000.00
10.2.(3) Pemeliharaan Jembatan S.OKO-OKO I Bentang 9.8 m LS 0.21 12,500,000.00 2,671,428.57 0.0030 0.356 - 0.356 0.005 - 0.005 4,450,000.00
10.2.(4) Pemeliharaan Jembatan S.Oko-Oko II Bentang 8.9 m LS 0.21 10,000,000.00 2,137,142.86 0.0024 0.356 - 0.356 0.004 - 0.004 3,560,000.00
10.2.(5) Pemeliharaan Jembatan S.Oko-Ok0 III Bentang 20.8 m LS 0.21 25,000,000.00 5,342,857.14 0.0059 0.356 - 0.356 0.010 - 0.010 8,900,000.00
10.2.(6) Pemeliharaan Jembatan S.Oko-Oko IV Bentang 9.8 m LS 0.21 10,000,000.00 2,137,142.86 0.0024 0.356 - 0.356 0.004 - 0.004 3,560,000.00
10.2.(7) Pemeliharaan Jembatan S.Oko-Oko V Bentang 9.7 m LS 0.21 12,000,000.00 2,564,571.43 0.0028 0.356 - 0.356 0.005 - 0.005 4,272,000.00
10.2.(8) Pemeliharaan Jembatan S.Oko-Oko VI Bentang 6.8 m LS 0.21 9,000,000.00 1,923,428.57 0.0021 0.356 - 0.356 0.004 - 0.004 3,204,000.00
10.2.(9) Pemeliharaan Jembatan S.Lamedai I Bentang 8.9 m LS 0.21 11,500,000.00 2,457,714.29 0.0027 0.356 - 0.356 0.005 - 0.005 4,094,000.00
10.2.(10) Pemeliharaan Jembatan S.Lamedai II Bentang 8.9 m LS 0.21 11,500,000.00 2,457,714.29 0.0027 0.356 - 0.356 0.005 - 0.005 4,094,000.00
10.2.(11) Pemeliharaan Jembatan S.Box Tanggetada Bentang 6.9 m LS 0.21 6,000,000.00 1,282,285.71 0.0014 0.356 - 0.356 0.002 - 0.002 2,136,000.00
10.2.(12) Pemeliharaan Jembatan S.Tanggetada Bentang 8.8 m LS 0.21 10,000,000.00 2,137,142.86 0.0024 0.356 - 0.356 0.004 - 0.004 3,560,000.00
10.2.(13) Pemeliharaan Jembatan S.Anaiwoi I Bentang 8.9 m LS 0.21 10,000,000.00 2,137,142.86 0.0024 0.356 - 0.356 0.004 - 0.004 3,560,000.00
10.2.(14) Pemeliharaan Jembatan S.Anaiwoi II Bentang 15.8 m LS 0.21 12,000,000.00 2,564,571.43 0.0028 0.356 - 0.356 0.005 - 0.005 4,272,000.00
10.2.(15) Pemeliharaan Jembatan S.Oneha I Bentang 10.3 m LS 0.21 10,000,000.00 2,137,142.86 0.0024 0.356 - 0.356 0.004 - 0.004 3,560,000.00
10.2.(16) Pemeliharaan Jembatan S.Oneha II Bentang 9.2 m LS 0.21 10,000,000.00 2,137,142.86 0.0024 0.356 - 0.356 0.004 - 0.004 3,560,000.00
10.2.(17) Pemeliharaan Jembatan S.Oneha III Bentang 8.7 m LS 0.21 10,000,000.00 2,137,142.86 0.0024 0.356 - 0.356 0.004 - 0.004 3,560,000.00
10.2.(18) Pemeliharaan Jembatan S.Oneha IV Bentang 12.8 m LS 0.21 13,000,000.00 2,778,285.71 0.0031 0.356 - 0.356 0.005 - 0.005 4,628,000.00
10.2.(19) Pemeliharaan Jembatan S.Oneha V Bentang 10.9 m LS 0.21 13,000,000.00 2,778,285.71 0.0031 0.356 - 0.356 0.005 - 0.005 4,628,000.00
10.2.(20) Pemeliharaan Jembatan S.Toengge Bentang 31.2 m LS 0.21 30,000,000.00 6,411,428.57 0.0071 0.356 - 0.356 0.012 - 0.012 10,680,000.00
10.2.(21) Pemeliharaan Jembatan S.Polewali Bentang 11 m LS 0.21 10,000,000.00 2,137,142.86 0.0024 0.356 - 0.356 0.004 - 0.004 3,560,000.00
10.2.(22) Pemeliharaan Jembatan S.Wolulu Bentang 30.3 m LS 0.21 30,000,000.00 6,411,428.57 0.0071 0.356 - 0.356 0.012 - 0.012 10,680,000.00
Sub Total ( 10 ) 415,686,949.39 0.4598 0.534 0.044 0.577 521,849,584.8097
TOTAL 90,404,243,485.05 100.000 PROGRESS REALISASI 75.372 2.354 77.726 70,267,766,810.14
Pajak Pertambahan Nilai (Ppn) 11% 9,944,466,783.36 PROGRESS RENCANA 77.835 2.499 80.335 7,729,454,349.12
TOTAL 100,348,710,268.40 DEVIASI (2.463) (0.145) (2.608) 77,997,221,159.26
DIBULATKAN 100,348,710,000.00 0.145 77,997,221,000.00

Disetujui Diperiksa Disiapkan


Direksi PUPR Konsultan Supervisi Kontraktor
PPK 1.3 Provinsi Sulawesi Tenggara PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI PT. LINCE ROMAULI RAYA - PT.
KONSULTAN - PT. ARISTA CIPTA AGUNG SARANA PERSADA (KSO)

SUKARDJO Ir. MUHAMMAD IDRIS RAZAK RISKY KURNIAWAN, ST


NIP. : 19750226 200312 1 002 Supervision Engineer Manager Proyek

12 / 16
PROGRES BULAN OKTOBER 2023
NAMA PAKET : PRESERVASI JALAN POMALAA - WOLULU 16
RUAS : POMALAA - WOLULU
KONTRAKTOR : PT. LINCE ROMAULI RAYA - PT. AGUNG SARANA PERSADA (KSO) MINGGU KE 72 (KONTRAK TAHUN 2023)
KONSULTAN : PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI KONSULTAN - PT. ARISTA CIPTA Periode : 28 Oktober - 03 Nopember 2023
NO. KONTRAK : HK 0201-Bb21.1.3/286, Tanggal 17 Mei 2022

PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT JUMLAH
Item ADD-06 SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
15S/D BULAN 15BULAN 16INI INI
I DIVISI 1. UMUM
1.2 Mobilisasi Ls 0.30 500,000,000.00 150,000,000.00 0.1761 - - - - - - -
1.80 Manajemen dan Keselamatan Lalu Lintas Ls 0.66 100,000,000.00 65,631,578.95 0.0771 0.384 0.017 0.401 0.045 0.002 0.047 40,118,421.05
1.17 Pengamanan Lingkungan Hidup
1.17.(1a) Pengujian pH Buah 6.00 70,000.00 420,000.00 0.0005 3.000 - 3.000 0.000 - 0.000 210,000.00
1.17.(1b) Pengujian Oksigen Terlarut (DO) Buah 6.00 100,000.00 600,000.00 0.0007 3.000 - 3.000 0.000 - 0.000 300,000.00
1.17.(1c) Pengujian Zat Padat Terlarut (TDS) Buah 6.00 150,000.00 900,000.00 0.0011 3.000 - 3.000 0.001 - 0.001 450,000.00
1.17.(1d) Pengujian Zat Tersuspensi (TSS) Buah 6.00 100,000.00 600,000.00 0.0007 3.000 - 3.000 0.000 - 0.000 300,000.00
1.17.(1e) Pengujian Biological Oxygen Demand (BOD) Buah 6.00 140,000.00 840,000.00 0.0010 3.000 - 3.000 0.000 - 0.000 420,000.00
1.17.(1f) Pengujian Chemical Oxygen Demand (COD) Buah 6.00 140,000.00 840,000.00 0.0010 3.000 - 3.000 0.000 - 0.000 420,000.00
1.17.(2c) Pengujian Parameter Kebisingan dan/atau Getaran Lainnya ……… Buah 6.00 140,000.00 840,000.00 0.0010 3.000 - 3.000 0.000 - 0.000 420,000.00
1.17.(3b) Pengujian Sulfurdioksida (SO2) Buah 6.00 200,000.00 1,200,000.00 0.0014 3.000 - 3.000 0.001 - 0.001 600,000.00
1.17.(3f) Pengujian Total Partikulat (TSP) - Debu Buah 6.00 125,000.00 750,000.00 0.0009 3.000 - 3.000 0.000 - 0.000 375,000.00
1.19 Keselamatan dan Kesehatan Kerja
1.00 1. Penyiapan RKK Buah 1.00 3,000,000.00 3,000,000.00 0.0035 - - - - - - -
2.00 2. Sosialisasi dan Promosi Dan Pelatihan Buah 1.00 5,000,000.00 5,000,000.00 0.0059 - - - - - - -
3.00 3. Alat Pelindung Kerja (APK) dan Alat Pelindung Diri (APD) Buah 0.64 35,000,000.00 22,449,291.24 0.0264 0.339 0.033 0.372 0.014 0.001 0.015 13,033,067.68
4.00 4. Asuransi dan Perizinan Buah 1.00 20,000,000.00 20,000,000.00 0.0235 - - - - - - -
5.00 5. Personel K3 Konstruksi Buah 0.67 99,000,000.00 66,050,649.96 0.0776 0.353 0.035 0.387 0.041 0.004 0.045 38,346,092.18
6.00 6. Fasilitas sarana kesehatan Buah 1.00 15,000,000.00 15,000,000.00 0.0176 - - - - - - -
7.00 7. Rambu-rambu terdiri atas Buah 0.63 22,727,272.73 14,206,206.32 0.0167 0.330 0.032 0.363 0.009 0.001 0.010 8,247,496.39
8.00 8. Konsultasi dengan Ahli Terkait Keselamatan Konstruksi Buah 1.00 15,000,000.00 15,000,000.00 0.0176 - - - - - - -
9.00 9. Lain-lain terkait pengendalian risiko K3 Buah 1.00 5,000,000.00 5,000,000.00 0.0059 - - - - - - -
1.21 Manajemen Mutu Ls 0.64 200,000,000.00 128,500,000.00 0.1509 0.365 0.013 0.378 0.086 0.003 0.089 75,500,000.00
Sub Total ( 1 ) 516,827,726.47 0.6068 0.199 0.011 0.210 178,740,077.31
II DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 6,099.13 25,000.00 152,478,150.00 0.1790 5,163.634 27.100 5,190.734 0.152 0.001 0.152 129,768,350.00
2.2.(1) Pasangan Batu dengan Mortar M3 5,710.20 700,000.00 3,997,143,493.00 4.6931 4,353.839 22.850 4,376.689 3.578 0.019 3.597 3,063,682,300.00
2.3.(15) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 100 cm x 100 cm (precast M1 134.40 4,275,906.49 574,681,832.26 0.6747 134.400 - 134.400 - - - 574,681,832.26
2.3.(18) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 150 cm x 150 cm (precast M1 296.40 7,268,205.12 2,154,295,997.57 2.5294 296.400 - 296.400 2.529 - 2.529 2,154,295,997.57
2.3.(22) Saluran berbentuk U Tipe DS 1 (precast) M1 4,575.00 1,250,000.00 5,718,750,000.00 6.7144 4,213.000 48.000 4,261.000 6.183 0.070 6.254 5,326,250,000.00
Sub Total ( 2 ) 12,597,349,472.83 14.7907 12.442 0.090 12.532 11,248,678,479.82
III DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK
3.1.(1a) Galian Biasa M3 67,613.34 16,000.00 1,081,813,390.40 1.2702 36,216.602 - 36,216.602 0.680 - 0.680 579,465,634.67
3.2.(2a) Timbunan Pilihan dari Sumber Galian M3 11,144.96 100,000.00 1,114,496,000.00 1.3085 14,106.742 538.942 14,645.685 1.656 0.063 1.720 1,464,568,474.36
3.3.(1) Penyiapan Badan Jalan M2 64,166.26 5,000.00 320,831,300.00 0.3767 44,747.816 - 44,747.816 0.263 - 0.263 223,739,079.95
3.4.(2) Pemotongan Pohon Pilihan diameter 15 – 30 cm Buah 29.00 39,983.05 1,159,508.45 0.0014 149.000 - 149.000 0.007 - 0.007 5,957,474.45
3.4.(3) Pemotongan Pohon Pilihan diameter > 30 – 50 cm Buah 182.00 61,536.34 11,199,613.88 0.0131 218.000 - 218.000 0.016 - 0.016 13,414,922.12
3.4.(4) Pemotongan Pohon Pilihan diameter > 50 – 75 cm Buah 207.00 112,032.53 23,190,733.71 0.0272 382.000 - 382.000 0.050 - 0.050 42,796,426.46
3.4.(5) Pemotongan Pohon Pilihan diameter > 75 cm Buah 1.00 233,248.73 233,248.73 0.0003 76.000 - 76.000 0.021 - 0.021 17,726,903.48
Sub Total ( 3 ) 2,552,923,795.17 2.9974 2.693 0.063 2.756 2,347,668,915.49

V DIVISI 5. PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN 1,100.000 #REF!


5.1.(1) Lapis Fondasi Agregat Kelas A M3 14,486.66 600,000.00 8,691,994,416.00 10.2054 14,281.926 - 14,281.926 10.061 - 10.061 8,569,155,600.00
5.1.(3a) Lapis Fondasi Agregat Kelas S M3 15,031.93 250,000.00 3,757,982,500.00 4.4123 8,612.083 240.385 8,852.468 2.528 0.071 2.598 2,213,116,923.08
Sub Total ( 5 ) 12,449,976,916.00 14.6176 12.589 0.071 12.660 10,782,272,523.08

13 / 16
PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT JUMLAH
Item ADD-06 SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
VI DIVISI 6. PERKERASAN ASPAL
6.1 (1)(a) Lapis Resap Pengikat - Aspal Cair Liter 46,717.40 15,000.00 700,760,995.99 0.8228 45,676.942 242.951 45,919.892 0.804 0.004 0.809 688,798,384.93
6.1 (2)(a) Lapis Perekat - Aspal Cair Liter 48,419.05 13,000.00 629,447,646.02 0.7390 49,555.304 1,466.630 51,021.934 0.756 0.022 0.779 663,285,139.63
6.3.(8) Bahan anti pengelupasan Kg 3,891.90 75,000.00 291,892,571.00 0.3427 3,909.180 80.430 3,989.610 0.344 0.007 0.351 299,220,728.42
6.5.(1b) Laston Lapis Aus Asbuton Butir (AC-WC Asb Butir) Ton 16,063.68 1,425,000.00 22,890,738,656.25 26.8762 14,784.058 478.750 15,262.808 24.735 0.801 25.536 21,749,500,687.50
6.5.(2b) Laston Lapis Antara Asbuton Butir (AC-BC Asb Butir) Ton 8,976.25 1,350,000.00 12,117,934,751.65 14.2278 8,921.470 48.660 8,970.130 14.141 0.077 14.218 12,109,675,022.78
Sub Total ( 6 ) 36,630,774,620.92 43.0085 40.781 0.912 41.693 35,510,479,963.26
VII DIVISI 7. STRUKTUR
7.1 (6a) Beton struktur, fc’25 Mpa (untuk penutup saluran) M3 576.00 1,700,000.00 979,200,000.00 1.1497 - - - - - - -
7.1 (7a) Beton struktur, fc’20 MPa (untuk bahu diperkeras) M3 2,654.17 1,125,000.00 2,985,941,250.00 3.5058 - 417.375 417.375 - - - 469,546,875.00
7.1 (10) Beton, fc’10 Mpa M3 - 1,100,000.00 - - - - - - - - -
7.3 (1) Baja Tulangan Polos-BjTP 280 Kg 82,775.89 19,000.00 1,572,741,910.00 1.8466 - - - - - - -
7.9.(1) Pasangan Batu M3 12,645.42 650,000.00 8,219,520,651.07 9.6506 12,555.622 165.940 12,721.562 9.582 0.127 9.709 8,269,015,362.25
7.10.(3a) Bronjong dengan kawat yang dilapisi Galvanis M3 500.00 725,000.00 362,500,000.00 0.4256 - - - - - - -
7.15.(1) Pembongkaran Pasangan Batu M3 529.49 304,690.52 161,330,583.43 0.1894 757.790 - 757.790 0.271 - 0.271 230,891,429.15
7.15.(2) Pembongkaran Beton M3 90.09 316,550.08 28,519,294.56 0.0335 90.094 - 90.094 0.033 - 0.033 28,519,294.56
Sub Total ( 7 ) 14,309,753,689.07 16.8012 9.887 0.127 10.013 8,997,972,960.96
IX DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN
9.1 Pekerjaan Harian
9.1.(2) Pekerja Biasa Jam 84.00 18,750.00 1,575,000.00 0.0018 - - - - - - -
9.1.(4) a Dump Truck, kapasitas 3 - 4 m³ Jam 84.00 200,000.00 16,800,000.00 0.0197 - - - - - - -
9.1.(6) Truk Tangki 3000 - 4500 Liter Jam 84.00 200,000.00 16,800,000.00 0.0197 - - - - - - -
9.1.(8) Motor Grader min 100 PK Jam 121.00 200,000.00 24,200,000.00 0.0284 - - - - - - -
9.1.(9) Loader Roda Karet 1.0 - 1.6 M3 Jam 126.00 200,000.00 25,200,000.00 0.0296 - - - - - - -
9.1.(13) Penggilas Roda Besi 6 - 9 Ton Jam 79.00 200,000.00 15,800,000.00 0.0186 - - - - - - -
9.2 Pekerjaan Lain-Lain
9.2.(1) Marka Jalan Termoplastik M2 12,284.04 120,000.00 1,474,084,800.00 1.7307 1,211.320 - 1,211.320 0.171 - 0.171 145,358,400.00
9.2.(3a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineering Grade Buah 144.00 450,000.00 64,800,000.00 0.0761 - - - - - - -
9.2.(5) Patok Pengarah, material Poly Ethylene (PE) Plastik murni/elastis Buah 1,490.00 300,000.00 447,000,000.00 0.5248 - - - - - - -
9.2.(6a) Patok Kilometer Buah 32.00 350,000.00 11,200,000.00 0.0132 - - - - - - -
9.2.(7) Rel Pengaman M1 4,072.80 850,000.00 3,461,880,000.00 4.0646 914.000 214.000 1,128.000 - - - 958,800,000.00
9.2(10a) Kerb Pracetak Jenis 1 (Peninggi/Mountable) M1 2,000.00 115,000.00 230,000,000.00 0.2700 56.000 254.000 310.000 - - - 35,650,000.00
9.2.(12a) Perkerasan Blok Beton pada Trotoar dan Median M2 2,400.00 135,000.00 324,000,000.00 0.3804 - - - - - - -
Sub Total ( 9 ) 6,113,339,800.00 7.1777 0.171 - 0.171 1,139,808,400.00
TOTAL 85,170,946,020.45 100.000 PROGRESS REALISASI 78.762 1.274 80.035 70,205,621,319.92
Pajak Pertambahan Nilai (Ppn) 11% 9,368,804,062.25 PROGRESS RENCANA 77.793 80.280 7,722,618,345.19
TOTAL 94,539,750,082.70 DEVIASI 0.969 1.274 (0.245) 77,928,239,665.12
DIBULATKAN 94,539,750,000.00 (1.274) 77,928,239,000.00
Disetujui Diperiksa Disiapkan
Direksi PUPR Konsultan Supervisi Kontraktor
PPK 1.3 Provinsi Sulawesi Tenggara PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI PT. LINCE ROMAULI RAYA - PT. AGUNG
KONSULTAN - PT. ARISTA CIPTA SARANA PERSADA (KSO)

SUKARDJO Ir. MUHAMMAD IDRIS RAZAK RISKY KURNIAWAN, ST


NIP. : 19750226 200312 1 002 Supervision Engineer Manager Proyek

14 / 16
PROGRES BULAN OKTOBER 2023
NAMA PAKET : PRESERVASI JALAN POMALAA - WOLULU 16
RUAS : POMALAA - WOLULU
KONTRAKTOR : PT. LINCE ROMAULI RAYA - PT. AGUNG SARANA PERSADA (KSO) MINGGU KE 72 (KONTRAK TAHUN 2023)
KONSULTAN : PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI KONSULTAN - PT. ARISTA CIPTA Periode : 28 Oktober - 03 Nopember 2023
NO. KONTRAK : HK 0201-Bb21.1.3/286, Tanggal 17 Mei 2022

PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT JUMLAH
Item ADD-06 SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
15S/D BULAN 15BULAN 16INI 15INI
X DIVISI10. PEKERJAAN PEMELIHARAAN
10.1 Pemeliharaan Jalan
10.1.(3) Perbaikan Pasangan Batu dengan Mortar M3 280.76 1,270,455.74 356,687,180.87 48.1213 - - - - - - -
10.1.(4) Perbaikan Lapis Fondasi Agregat Kelas A M3 163.72 600,000.00 98,231,413.56 13.2526 161.195 - 161.195 13.048 - 13.048 96,716,716.38
10.1.(10a) Perbaikan Campuran Aspal Panas dengan Asbuton M3 52.42 2,900,000.00 152,031,454.78 20.5108 49.900 - 49.900 19.523 - 19.523 144,710,418.43
10.1.(10b) Perbaikan Campuran Aspal Panas dengan Asbuton M3 - 3,200,000.00 - - - - - - - - -
10.1.(21) Pembersihan Drainase dan Saluran Samping M1 11,737.60 5,500.00 64,556,800.00 8.7095 11,950.600 5,721.000 17,671.600 8.868 4.245 13.113 97,193,800.00
10.1.(22) Pengendalian Tanaman M2 139,436.30 500.00 69,718,150.00 9.4058 142,436.300 15,761.000 158,197.300 9.608 1.063 10.671 79,098,650.00
TOTAL 741,224,999.22 100.000 PROGRESS REALISASI 51.047 5.308 56.355 417,719,584.81
Pajak Pertambahan Nilai (Ppn) 11% 81,534,749.91 PROGRESS RENCANA 80.408 84.683 45,949,154.33
TOTAL 822,759,749.13 DEVIASI (29.361) 5.308 (28.328) 463,668,739.14
DIBULATKAN 822,759,000.00 (5.308) 463,668,000.00

Disetujui Diperiksa Disiapkan


Direksi PUPR Konsultan Supervisi Kontraktor
PPK 1.3 Provinsi Sulawesi Tenggara PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI PT. LINCE ROMAULI RAYA - PT.
KONSULTAN - PT. ARISTA CIPTA AGUNG SARANA PERSADA (KSO)

SUKARDJO Ir. MUHAMMAD IDRIS RAZAK RISKY KURNIAWAN, ST


NIP. : 19750226 200312 1 002 Supervision Engineer Manager Proyek

15 / 16
PROGRES BULAN OKTOBER 2023
NAMA PAKET : PRESERVASI JALAN POMALAA - WOLULU 16
RUAS : POMALAA - WOLULU
KONTRAKTOR : PT. LINCE ROMAULI RAYA - PT. AGUNG SARANA PERSADA (KSO) MINGGU KE 72 (KONTRAK TAHUN 2023)
KONSULTAN : PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI KONSULTAN - PT. ARISTA CIPTA Periode : 28 Oktober - 03 Nopember 2023
NO. KONTRAK : HK 0201-Bb21.1.3/286, Tanggal 17 Mei 2022

PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT JUMLAH
Item ADD-02 SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
15S/D BULAN 15BULAN 16INI INI
10.2 Pemeliharaan Jembatan
10.2.(1) Pemeliharaan Jembatan S SOPURA BOX Bentang 7 m LS 0.49 5,000,000.00 2,468,571.43 1.7094 0.284 - 0.284 0.982 - 0.982 1,418,571.43
10.2.(2) Pemeliharaan Jembatan S.SOPURA Bentang 20.8 m LS 0.49 22,000,000.00 10,861,714.29 7.5214 0.284 - 0.284 4.322 - 4.322 6,241,714.29
10.2.(3) Pemeliharaan Jembatan S.OKO-OKO I Bentang 9.8 m LS 0.49 12,500,000.00 6,171,428.57 4.2735 0.284 - 0.284 2.456 - 2.456 3,546,428.57
10.2.(4) Pemeliharaan Jembatan S.Oko-Oko II Bentang 8.9 m LS 0.49 10,000,000.00 4,937,142.86 3.4188 0.284 - 0.284 1.965 - 1.965 2,837,142.86
10.2.(5) Pemeliharaan Jembatan S.Oko-Ok0 III Bentang 20.8 m LS 0.49 25,000,000.00 12,342,857.14 8.5470 0.284 - 0.284 4.912 - 4.912 7,092,857.14
10.2.(6) Pemeliharaan Jembatan S.Oko-Oko IV Bentang 9.8 m LS 0.49 10,000,000.00 4,937,142.86 3.4188 0.284 - 0.284 1.965 - 1.965 2,837,142.86
10.2.(7) Pemeliharaan Jembatan S.Oko-Oko V Bentang 9.7 m LS 0.49 12,000,000.00 5,924,571.43 4.1026 0.284 - 0.284 2.358 - 2.358 3,404,571.43
10.2.(8) Pemeliharaan Jembatan S.Oko-Oko VI Bentang 6.8 m LS 0.49 9,000,000.00 4,443,428.57 3.0769 0.284 - 0.284 1.768 - 1.768 2,553,428.57
10.2.(9) Pemeliharaan Jembatan S.Lamedai I Bentang 8.9 m LS 0.49 11,500,000.00 5,677,714.29 3.9316 0.284 - 0.284 2.259 - 2.259 3,262,714.29
10.2.(10) Pemeliharaan Jembatan S.Lamedai II Bentang 8.9 m LS 0.49 11,500,000.00 5,677,714.29 3.9316 0.284 - 0.284 2.259 - 2.259 3,262,714.29
10.2.(11) Pemeliharaan Jembatan S.Box Tanggetada Bentang 6.9 m LS 0.49 6,000,000.00 2,962,285.71 2.0513 0.284 - 0.284 1.179 - 1.179 1,702,285.71
10.2.(12) Pemeliharaan Jembatan S.Tangketada Bentang 8.8 m LS 0.49 10,000,000.00 4,937,142.86 3.4188 0.284 - 0.284 1.965 - 1.965 2,837,142.86
10.2.(13) Pemeliharaan Jembatan S.Anaiwoi I Bentang 8.9 m LS 0.49 10,000,000.00 4,937,142.86 3.4188 0.284 - 0.284 1.965 - 1.965 2,837,142.86
10.2.(14) Pemeliharaan Jembatan S.Anaiwoi II Bentang 15.8 m LS 0.49 12,000,000.00 5,924,571.43 4.1026 0.284 - 0.284 2.358 - 2.358 3,404,571.43
10.2.(15) Pemeliharaan Jembatan S.Oneha I Bentang 10.3 m LS 0.49 10,000,000.00 4,937,142.86 3.4188 0.284 - 0.284 1.965 - 1.965 2,837,142.86
10.2.(16) Pemeliharaan Jembatan S.Oneha II Bentang 9.2 m LS 0.49 10,000,000.00 4,937,142.86 3.4188 0.284 - 0.284 1.965 - 1.965 2,837,142.86
10.2.(17) Pemeliharaan Jembatan S.Oneha III Bentang 8.7 m LS 0.49 10,000,000.00 4,937,142.86 3.4188 0.284 - 0.284 1.965 - 1.965 2,837,142.86
10.2.(18) Pemeliharaan Jembatan S.Oneha IV Bentang 12.8 m LS 0.49 13,000,000.00 6,418,285.71 4.4444 0.284 - 0.284 2.554 - 2.554 3,688,285.71
10.2.(19) Pemeliharaan Jembatan S.Oneha V Bentang 10.9 m LS 0.49 13,000,000.00 6,418,285.71 4.4444 0.284 - 0.284 2.554 - 2.554 3,688,285.71
10.2.(20) Pemeliharaan Jembatan S.Toengge Bentang 31.2 m LS 0.49 30,000,000.00 14,811,428.57 10.2564 0.284 - 0.284 5.894 - 5.894 8,511,428.57
10.2.(21) Pemeliharaan Jembatan S.Polewali Bentang 11 m LS 0.49 10,000,000.00 4,937,142.86 3.4188 0.284 - 0.284 1.965 - 1.965 2,837,142.86
10.2.(22) Pemeliharaan Jembatan S.Wolulu Bentang 30.3 m LS 0.49 30,000,000.00 14,811,428.57 10.2564 0.284 - 0.284 5.894 - 5.894 8,511,428.57
TOTAL 144,411,428.57 100.000 PROGRESS REALISASI 57.465 - 57.465 82,986,428.57
Pajak Pertambahan Nilai (Ppn) 11% 15,885,257.14 PROGRESS RENCANA 83.400 83.400 9,128,507.14
TOTAL 160,296,685.71 DEVIASI (25.935) - (25.935) 92,114,935.71
DIBULATKAN 160,296,000.00 - 92,114,000.00

Disetujui Diperiksa Disiapkan


Direksi PUPR Konsultan Supervisi Kontraktor
PPK 1.3 Provinsi Sulawesi Tenggara PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI PT. LINCE ROMAULI RAYA - PT.
KONSULTAN - PT. ARISTA CIPTA AGUNG SARANA PERSADA (KSO)

SUKARDJO Ir. MUHAMMAD IDRIS RAZAK RISKY KURNIAWAN, ST


NIP. : 19750226 200312 1 002 Supervision Engineer Manager Proyek