You are on page 1of 8

PT.

Kilang Pertamina
Balikpapan

[Periode Januari – Maret 2023]

Jl. Yos Sudarso, Balikapapan


Kilang Pertamina Balikpapan
Kalimantan Timur, Indonesia
TIM ON DUTY HARI INI
HOUSEKEEPING COMPETITION

BACKGROUND
1. Good Housekeeping is the beginning of efforts to prevent work accidents, bad
Housekeeping is one of the causes of work accidents.
2. Housekeeping has not been done consistently.
3. Housekeeping is still considered to be about garbage/cleanliness alone, much more
important is about setting up material layouts, providing access, as well as the boundaries
of hazardous areas.
4. Housekeeping issues have always been a finding in the HSSE MWT/Joint Inspection/Audit.
5. Good Housekeeping is an integral part of construction activities, so an active role of area
supervisors is needed.
6. Realizing Good Housekeeping is the responsibility of all Departement at the RDMP Project
TIM ON DUTY HARI INI
HOUSEKEEPING COMPETITION

BAD HOUSEKEEPING!!
TIM ON DUTY HARI INI
HOUSEKEEPING COMPETITION

ABOUT THE PROGRAM

A program held to realize a work area that Ringkas, Rapi, Resik, Rajin &
Rawat (5R) and creating areas that meet safety standards for work
TIM ON DUTY HARI INI
HOUSEKEEPING COMPETITION

ABOUT THE PROGRAM


• Short (Seiri) (Ringkas)
• Distinguish between necessary and unnecessary items. Remove the latter.
Bedakan antara barang yang diperlukan dan yang tidak perlu. Singkirkan yang tidak diperlukan

5S Methodology

• Set in Order (Seiton) (Rapih)


5S • Enforce the dictum “a place for everything and everything in its place”
• Terapkan diktum "tempat untuk segala sesuatu dan segala sesuatu di tempatnya"

• Shine (Seiso) (Resik)


• Clean up the workplace and look for ways to keep it clean
• Bersihkan tempat kerja dan cari cara untuk menjaganya tetap bersih

• Standardize (Seiketsu) (Rawat)


• Maintain and monitor adherence to the first 3S
• Pertahankan dan pantau kepatuhan terhadap 3S pertama

• Sustain (Shitsuke) (Rajin)


• Follow the rules to keep the workplace 5R-right. Hold the gain.
• Ikuti aturan untuk menjaga tempat kerja tetap 5R dengan benar. Rasakan manfaatnya
TIM ON DUTY HARI INI
HOUSEKEEPING COMPETITION

STAGES OF THE PROGRAM


Group of Champion Assessment/Verificatio
Temporary Zone
Area n
Division Each area is judged by several
OSBL: 15 Zona The entire area of the judges using a format Announcement of
- ISBL: 17 Zona
Balikpapan & Lawe-Lawe according to the criteria (2 Champions
- Lawe-Lawe: 4 Zona
RDMP Project is divided times the assessment)
The champion will be
Average MP per Zone into several large areas announced at the
of 200 workers 3 following month's General

1 Coaching Materials:
5 Criteria Form Penilaian:
Safety Talk
Competition Champion
GHK Assessment 5 Kriteria Area Balikpapan
Penilaian GHK ▪ The Best 1
4
2 ▪ The Best 2
▪ The Best 3
- Area Lawe-Lawe
Score ▪ The Best 1
Recapitalization
5 Assessment Criteria Champion Coaching
The results of the
1. Waste Management and Socialization
assessment are
2. Construction Waste Management
Construction Supervisors recapitulated to obtain
3. Tidiness of the Work Area
4. Material layout and Safety Inspectors of the value of each area
5. Lay out work area (emergency each area guide their area
lane, drainage, parking area) according to the
Competition criteria
TIM ON DUTY HARI INI
HOUSEKEEPING COMPETITION

STAGES OF THE PROGRAM


ACTION
TAHAPAN Januari 2023 Februari 2023 Maret' 23
W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 Ket
Penyusunan Modul Program

Launching Program
- Leadership Team Meeting (BOD
Me e ti ng, Top MGT Me e ti ng KPB & SHRP
JO)
- Management Site Launching Via TBM, disiapkan
(as per Group On Duty) jadwal
Kampanye melalui
- Women Speech
verbal dan visual di area
- Visual Banner
kerja
30 menit GHK Serentak
- Gerebeg Housekeeping di seluruh
seluruh pekerja
Zona

Tim Penggerak di
Coaching sesuai kriteria
masing2 Zona

Penilaian 2 tahap penilaian

Pengumuman The Best Area Diumumkan saat


Champion General Safety Talk
plan 26 Jan’ 23
actual
TIM ON DUTY HARI INI

You might also like