Instructions
Download the pdf longitudinal drawing file and plot out A3 size. (note this drawing is set to plot A3
landscape size)
The drawing file contains the centre line longitudinal section of a proposed new road showing the existing
ground profile and proposed road profile. The attached table lists the cross sectional areas at the indicated
chainages.
Prepare a Mass Haul diagram for the works and prepare a suitable earthworks plan for 3 of the main hauls.
The mass haul diagram should be drawn below the Long section on the plotted long section.
As a condition of the contract all available cut material must be used to make up fill embankments before
bringing on site any external import materials. The contractor has sourced a suitable site for importing
suitable materials and also disposing of surplus materials alongside the new road at chainage 3400.
In your earthworks plan for the 3 required hauls list maximum distances in each case and also the amount of
material to be moved in each haul.
The cuts consist of the following materials:- (all cut material is deemed as acceptable for fill use)
Cut 1 - Stiff Clay
Cut 2 - Soft Rock
Cut 3 - Common Earth
Cut 4 - Stiff Clay
The method of operation is to be via excavators and dump trucks. For each Haul, the earthworks plan
should include the plant resources (excs and dumpers) used and the total time required for each operation.
1
Civil Engineering Construction 2 - Earthworks