Stones of the arches positioned in radial

direction and gaps between the stones filled


with smaller stones and mortar (1:3 mix)
Guard rails
Backfill made of gravel materials
Road level Road level
1200
100 100
600 600
2000 2000
700 300 700
3000
2100 2100 1500
1500
6000
800 800
4000
120°
Concrete blinding, C15 Hard core (Loose stones)
Reinforced concrete (100mm thick) (200mm, thick)
foundation 300mm thick
LONGITUDINAL SECTION
Client: Project Manager: Contractor: Project: Date:
REGIONAL MANAGER DISTRICT MANAGER Designed: A, Patrick OCTOBER, 2023 Title:
TANZANIA RURAL AND URBAN TANZANIA RURAL AND Date: LONGITUDINAL SECTION MASONRY
URBAN ROADS CONSTRUCTION OF ARCH BRIDGE Drawn: ARCH BRIDGE
ROADS AGENCY A, Patrick
OCTOBER, 2023
AGENCY 6X3M ALONG YAEDA AMPA-TUMATI
P.O.BOX 389 - Babati Date:
P.O.Box 94 - Mbulu ROAD Checked: Nuru, H
MANYARA
OCTOBER, 2023
Date: Scale: Drawing No: Revision
MANYARA Approved: Bwaya, SJ OCTOBER, 2023 AS SHOWN YA/MAB/004 01

You might also like