The safety and performance of this Grain Loop Support System, constructed
and readied for operation will be affected by the installation and construction
personnel. Grain Loop Support Systems generally involve extreme heights
and high winds. Careful consideration must be given to the structural
requirements. Brownie Systems cannot be responsible for the construction
of the Grain Loop Support System. The information obtained in this manual
is offered only as a convenience to the installer. No liability is expressed or
implied toward the installation.
PREFACE kas001-3_2011-11-07
You have purchased the finest Grain Loop Support System manufactured today. The following information
is intended as a guide for: Grain Loop Support System pre-assembly, proper construction of this Grain Loop
Support System, and safe and proper use of this Grain Loop Support System after construction.
Your safety and the safety of others associated with grain system equipment, is of prime
concern to us at Brownie Systems. This manual was written with the safety of the operator
and/or others who come into contact with the equipment as our prime concern. We wrote
this manual to help you to better understand how to safely build and use this Grain Loop
Support System (which includes all Grain Loop Support System Towers, Platforms,
Ladders, and Bin Sidewall Supports).
It is your responsibility as the owner, builder, operator, or supervisor, to know what specific
requirements, precautions, and hazards exist and to make these known to all personnel
working with the equipment or in the area, so that they too may take any necessary safety
precautions that may be required!
Failure to read this Manual and its Safety Instructions by all operators and all personnel is a
misuse of the equipment. We want you as our partner in safety!
All personnel, including construction personnel, must read and understand all equipment
Operator’s Manuals before starting Grain Loop Support System construction!
NOTE: Although Global Industries, Inc. language translations of this manual are made
as accurately as possible, if there is a conflict or difference between the English and the
other translations of this manual, the English text will prevail. kas001-6_2011-11-07
The Company’s sole obligation and the Customer’s exclusive remedy under this
warranty is as follows:
If within one (1) year after delivery to the customer the product fails to function properly
due to a defect in either materials or workmanship, the Company will at its option, either
repair the defective part or replace the defective part with a new or reconditioned part.
Labor charges for removing defective parts and installing replacement parts, shipping
charges with respect to such parts, and applicable sales and other taxes, if any, shall
not be covered by this warranty.
Global Industries Inc. assumes no liability with It shall be the duty of all operators to see that
respect to proper construction and inspection, children and/or other persons stay out of the
assembly, or use of its products established work area! Trespass into the work area by
under applicable laws, all of which is the sole anyone not involved in the actual operations,
responsibility of the purchaser and those doing or trespass into a hazard area by anyone, shall
the assembly work. kas002-1_2011-11-22 result in an immediate shut down by the operator.
At the time of manufacture, these optional 3 Obtain any applicable safety decals
items conform to applicable standards. from the manufacturer of the auxiliary
equipment and display each safety
Global Industries Inc. assumes no liability with decal in a visible location.
respect to proper construction and inspection,
assembly, or use of its products established 4 Make certain all electrical equipment is
under applicable laws, all of which is the sole properly installed and grounded by a
responsibility of the purchaser and those doing qualified electrician.
the assembly work. 5 Check availability and operation of
electrical lock-out and emergency stop
kas002-10_2011-11-07 systems.
OSHA, ANSI, NIOSH
You may obtain further relevant safety 6 Be certain all guards and shields are
information for the safe operation, construction, securely in place.
and use of this Tower, Platform, Ladder, Bin
7 Store all operations/maintenance
Sidewall Support, or Grain Loop Support
manuals in a safe place available for
System from OSHA, ANSI, and NIOSH:
future use.
www.osha.gov
1-800-321-OSHA
www.ansi.org
www.cdc.gov/niosh
1-800-232-4636 (cdc info, NIOSH)
Foundation and anchoring are of critical When adding additional equipment not
importance to Brownie structures such previously accounted for, considerable
as Towers. Contact a consulting engineer wind load or weight may be added to the
to design an adequate foundation for site Tower. Be certain that your Brownie Tower
soil conditions to support your structures. is designed and staged for all equipment,
Brownie Systems will supply the loading and any future additions. If you are
calculations to your engineer to aid in uncertain, contact the factory before
designing the foundation. installing the Tower.
When the Tower base stage is placed on Any alterations to Towers, Platforms,
the foundation plates, weldment is critical. Ladders, Bin Sidewall Supports, or
Certified welding personnel are required! Grain Loop Support Systems without the
authorization of the Brownie Systems
Engineering department is prohibited!
WARNING! kas003-10_2011-11-07
Use the torque values listed in the table above for all Tower, Platform,
Ladder, Bin Sidewall Support, and Grain Loop Support System
hardware connections!
3 7/8”
[98 mm]
7 3/4”
[197 mm]
4” [102 mm]
Post Height (post)
4 7/16” [113 mm] “H” Hole to Hole “B”
2 1/4” [57 mm] 120” = (10’) = [3,048 mm] 106” = 8’ 10” = [2,692 mm]
108” = (9’) = [2,743 mm] 94” = 7’ 10” = [2,388 mm]
96” = (8’) = [2,438 mm] 82” = 6’ 10” = [2,083 mm]
84” = (7’) = [2,134 mm] 70” = 5’ 10” = [1,778 mm]
72” = (6’) = [1,829 mm] 58” = 4’ 10” = [1,473 mm]
60” = (5’) = [1,524 mm] 46” = 3’ 10” = [1,168 mm]
tower 48” = (4’) = [1,219 mm] 34” = 2’ 10” = [864 mm]
post
8 holes in plate
material: 1/2” [13 mm] plate
BRACING CENTERLINE
7” [178 mm]
22.5°
2 3/4” [70 mm] 45°
90°
Part No:
3989608 Loc: Y15
1 assemble tower sections on ground
Desc: TWR DIAG 10X10 STG01 10FT SECT Assemble tower sections on relatively level
ground according to the instructions on the
next 2 pages! Assemble the heaviest tower
sections first. If access bracing is installed
at the tower base, see pages 21 - 22 for special
access bracing instructions.
Horizontals and Diagonals
Brace Ends Bolt Sections Together Using the Correct
Bracing for Each Section. Assemble bracing
between tower posts in agreement with the
stages 0 - 2 instructions in the next step. Bolt (1) diagonal
brace to the inside of the bracing ears and
bolt (1) diagonal brace to the outside of the
bracing ears. Bolt horizontals to the outside of
each bracing ear. See the next page. All tower
no reinforcing plate diagonal (X) braces are bolted together through
the center holes where the braces cross (see
the next page). Use 7/16” x 5” Grade 2 Bolt,
lock washers, and nuts at this connection.
Diagonal and Horizontal braces ends use
stage 3 7/8” diameter Grade 8 bolts, lock washers, and
nuts. Finger tighten only, during assembly.
TOWER STAGES
Horizontal
Stage 0 & 1 - 2” O.D. Tube
Stage 2 - 2 3/8” O.D. Tube
Diagonal
Stage 0 & 1 - 2” O.D. Tube
Stage 2 - 2 3/8” O.D. Tube
SPLICING HARDWARE
(32) 5/8” NC X 2 1/2” grade 8
hex bolt with lock washer and nut
horizontal
diagonal
horizontal
brace
The horizontal is
connected to the outside
of the post ear at both diagonal
the right and left ends. brace
post
ear
Section A - A
INSTALL BRACING BETWEEN TOWER POSTS; TYPICAL TOWER SECTION FACE SHOWN ABOVE
a
rest platform
END VIEW
post
at Field drill a 5/8” x 1-1/4” bolts and nuts
5/8” water drain (90000079 & 90005045)
base [8 places]
hole in each
bottom section post
1 1/2” above the post tower top plate
connecting plate! (G3984290 - Stages 0-3) post
connecting
plate
1 1/2” 4 post
[38 mm] tower top
plate package
(4508015)
tower
top plate
package
(4508016)
FIELD DRILL DRAIN OUT HOLE
a
horizontal DETAIL i
i ii access brace horizontal
access brace
DETAIL ii
horizontal
access brace diagonal
access brace
iii
DETAIL iii
diagonal
IMPORTANT: Both tabs of horizontal access
access brace
braces are bolted to the outside of tower ears
on 4’ [1,219 mm] wide towers only!
p/n 3981340
detail B
P handrail
(4502610)
L handrail
(4502614) 30” [762 mm]
handrail
(4502612)
view from
platform
underside
1-i After the completion of step 1, the platform outer frame should look the same as the
outer frame shown.
nuts(R)
74” [1,880 mm] (651426)
C-channel(2)
(G3501247)
1/2” x 1 1/4” bolts(F)
(018915)
1-ii Connect the 120” [3,048 mm] C-channels(1) to the 74” [1,880 mm] C-channels(2) using the C-channel
splice plates(7). Use 5/16” x 1” bolts(B), hex nuts(P) at the top and base of each splice. Use
1/2” x 1 1/4” bolts(F), lock washers(L), and nuts(R) at the splice sides.
1-iii Connect the 120” [3,048 mm] C-channels(1) to the 74” [1,880 mm] C-channels(2) using the C-channel
splice plates(7). Use 5/16” x 1” bolts(B), hex nuts(P) at the top and base of each splice. Use
1/2” x 1 1/4” bolts(F), lock washers(L), and nuts(R) at the splice sides.
2011-11-23 GLOBAL INDUSTRIES, INC. 29 Grain Loop Support System 4000031
Loadout Platform
1/2” nuts(R)
(651426)
1-iv Connect the platform C-channel side assemblies to the 47” [1,194 mm] C-channels(3). Use a
C-channel Clip #2 , C-channel Clips #1(U), 1/2” x 1 1/4” bolts(F), lock washers(L), and nuts(R).
(V)
1/2” nuts(R)
(651426)
1/2” lock washers(L)
(90010041)
1-v Connect the 44 1/2” [1,130 mm] C-channel(4) to the 22 3/4” [578 mm] C-channels(5). Use
C-channel Clips #1(U), 1/2” x 1 1/4” bolts(F), lock washers(L), and nuts(R).
1/2” nuts(R)
Do not tighten (L)
1/2” lock washers (651426)
hardware yet, (90010041)
C-Channel Clip #2(V) C-Channel Clip #1(U)
(G3501252) (G3501251)
will attach here
in the next step
use 1/2” x 1 1/4” bolts,
lock washers, and nuts
at the connections in
this example
(5)
1-vi Connect the 22 3/4”(U)[578 mm] C-channels(F) to the 120” [3,048 mm] C-channels(1). Use
C-channel Clips #1 , 1/2” x 1 1/4” bolts , lock washers , and nuts(R).
(L)
1/2” nuts(R)
(651426)
1-vii Connect the rest of the C-channel Clips #2(V) to the 120”(1) [3,048 mm], 74” [1,880 mm] (2), and
47” [1,194 mm] C-channels . Use 1/2” x 1 1/4” bolts(F), lock washers(L), and nuts(R).
(3)
2-i View the illustration above. After the completion of step 2, the platform internal bracing
should look the same as the the platform internal bracing shown above.
1/2” nuts(R)
1/2” lock washers(L) (651426)
(90010041)
2-ii Connect the 47” [1,194 mm] C-channels(3) to the assembly completed in step 1. Use
1/2” x 1 1/4” bolts(F), lock washers(L), and nuts(R)
1/2” nuts(R)
(651426)
2-iii Connect the C-channel Clips #1(U) to the 47” [1,194 mm] C-channels(3). Use
1/2” x 1 1/4” bolts(F), lock washers(L), and nuts(R).
(4)
2-iv Connect the 44 1/2” [1,130 mm] C-channel to the (2) C-channel Clips #1(U) that were just
installed. Use 1/2” x 1 1/4” bolts(F), lock washers(L), and nuts(R).
7/8” x 2” bolts(J)
(90000179)
wind diagonals(6)
(G3501254)
7/8” nuts(T)
(90005064)
(6)
2-iv Connect the wind diagonals to the asssembly completed in step 1.
Use 7/8” x 2” bolts , lock washers(N), and nuts(T).
(J)
short planks(13)
(C)
5/16” x 2 1/2” carriage bolts (G3501262)
(90000160)
and flange nuts(P)
(028002)
long planks(12)
(G3501261)
3-i View the illustration above. After the completion of step 3, the platform assembly should look
the same as the illustration shown in example 3-i. When connecting planks, make certain all the
bolt holes for connecting the planks are used. Also, all of the 5/16” x 2 1/2” carriage bolts(C) and
5/16” flange(P) nuts should be used to complete this step.
long plank(12)
(G3501261)
3-ii Install the long planks to the assembly completed in step 2. Use 5/16” x 2 1/2” carriage bolts(C)
and 5/16” flange nuts(P).
short plank(13)
(G3501262)
(13)
3-iii Install the short planks to the assembly completed in step 2. Use 5/16” x 2 1/2” carriage bolts(C)
(P)
and 5/16” flange nuts .
3-iv View the illustration in example i. Field cut the hole for the Loop System in the short planks (as
shown). Cut the hole so that the center of the hole is at the exact location shown in the drawing.
Use the exact dimensions for the hole location that are shown in the drawing. Match the diameter
of the field cut hole to the size of the loop that used in this assembly.
4-i View the illustration in example 4-i. After the completion of step 4, the platform assembly should
look the same as the illustration in example 4-i. Connect the 162”(14) [4,110 mm], 49 1/2”(15) [1,254 mm],
145 1/2”(16) [3,697 mm], 24 1/2”(17) [6,223 mm], 47”(18) [1,194 mm], and 43”(19) [1,096 mm] welded handrails to
the assembly completed in step 4. Use 3/8” x 2” bolts(D), lock washers(K), and nuts(Q). Position bolts so
the bolt head is to the outside of the platform.
3/8” nut(Q)
(90005021)
3/8” x 2” bolt(D)
(652971)
4-ii Connect the welded handrail with no posts(21) and the toeboard(22)
into (1) of the (2) locations. Use 3/8” x 3 1/2” bolts(E), lock
washers(K), and nuts(Q) to connect the welded handrail with no posts
to the welded handrails. Use 3/8” x 2” bolts(D), lock washers(K), and
nuts(Q) to connect the toeboard into the selected location.
3/8” nut(Q)
(90005021)
WARNING! kas011-4_2011-11-15
NOTE: The platform and the top 10’ [3,048 mm] tower
section are now ready to be hoisted to the top of the
Brownie Loop Tower Section!
see
example
5-iii
145” [3,687 mm] see
knee brace tube(9) example
(G3501256)
5-ii
5-i View the example above. After the completion of step 5, the platform and support tower should
look the same as the assembly shown in example above.
7/8” x 2”
bolt(J) 1/2” x 2 1/4”
(90000179) bolt(G)
lock washer(N) (90000059)
(90010054) lock washer(L)
and nut(T) (90010041)
(90005064) and nut(R)
(651426)
5-ii Connect the ear clamps #1(10) to the ear clamps #2(11) at
the top tower section near the tower section base. Use
1/2” x 2 1/4” bolts(G), lock washers(L), and nuts(R).
1/2” x 1 1/4”
bolt(F)
(018915)
lock washer(L)
(90010041)
and nut(R)
(651426)
7/8” x 2”
bolt(J)
(90000179)
lock washer(N)
(90010054)
and nut(T)
(90005064)
145” [3,687 mm]
knee brace tube(9)
(G3501256)
5-iv View the illustrations in examples 5-ii and 5-iii. Connect the knee braces to the ear clamps #1. Use
7/8” x 2” bolts(J), lock washers(T), and nuts(4). Connect the knee braces to the knee brace bolt plates.
Use 7/8” x 2” bolts(J), lock washers(T), and nuts(4).
5-v Connect the platform 120” [3,048 mm] C-channels and the 47” [1,194 mm] C-channels to the tops of the
tower posts. Bolt the platform assembly to the tops of the tower posts at every available C-channel
bolt hole location! Use 5/8” x 2” bolts(H), lock washers(M) and nuts(S).
WARNING! kas012-2_2011-11-07
tower ladder
tower angle ladder clip and bolt
ladder section (088028)
tower post
tower ladder
mid angle
1/2” hex nut
(018912)
3/8” grade 5 bolt
tower ladder
end bracket 3/8” nylock nut top ladder ladder clip and bolt
(3501129) (90005024) section (088028)
ladder clip
and bolt
(088028)
top ladder
tower mid section
angle
(3501134)
ladder
ladder
bracket
bracket
TOP VIEW, LADDER CLIP AND BOLT TOP VIEW, LADDER CLIP AND BOLT
b c
ladder section
ladder section
cage assembly
at platform
standard D-ring
ladder cage
double D-ring
double D-ring
used to join cage
sections together
ladder cage
upright
flared D-ring used
at the base of all
cage assemblies
FLARED CAGE
b
1/2” x 4” x 5” u - bolt
(90031038) landing
landing kicker
kicker (4502098)
landing
kickers (4502098)
(4502098)
1 1
1 tower ladder
landing base
(4502601)
vertical
support brace
(4502096)
tower ladder
2 landing base
(4502601)
1 1
4
landing kicker
(4502098)
3
tower post
1/2” x 4” x 5” u-bolt
(90031038)
tower ladder
landing base
(4502601)
VIEW A - A
A A
tower ladder
tower post landing base
(4502601)
back handrail /
toeboard
(4502603)
continuing
ladder section
half D ring
end handrail /
toeboard
(4502602)
connection strap
3 continue ladder installation NOTE: 1 1/2” [38 mm] square caps are not required
on galvanized handrails.
Tower ladder base clips, washers, and
diamond anchors must be used to connect the
continuing ladder section with the landing base.
Continue ladder installation. Follow the ladder
installation instructions.
tower ladder
base clip
landing
base
bolt, flat
75 5/8”
washer &
[1,921 mm]
end handrail / toe board diamond
toe board
(4502602) anchor
(4502085)
Step - Thru
extensions are connected to the ladder section
1 install extension rails below using the connections provided and
Extension rails are used to walk “through” 5/16” bolts and nuts. Stabilize the rails to the
the ladder and onto a tower platform. The platform using the braces.
extension connection
(080083)
extension rail
(080085)
5/16” bin
bolt / seal
washer
(018905) 5/16” nut
(018913)
ladder section
10021889 080082
4502600
080081
080086
080024
080068
tower ladder
angle
080023
10021887
tower ladder
angle
3501127
080082
080081
4502600
080086
080024
tower ladder
angle
080053
080054
080068
080023
080082
10021889 4502600
080081
080086
080024
080052
tower ladder
angle
080054
080068
080023
tower ladder
angle
10021887
3501127
080082
10021887
4502600
080081
080086
080024
tower ladder
angle
080026
080025
tower ladder
angle 080054
080053
080023
tower ladder
angle
080023
10021889 080082
4502600
080081
080086
tower ladder
angle
080026
080024
080025
tower ladder
angle
080054
080052
3501127
080087
080085
080026
080054
080068
080023
10021887
tower ladder
angle
3501127
080085 080087
080083
080054
080025
080024
tower ladder
angle
080023
10021887
tower ladder
angle
3501127
080085 080024
080083
080025
080054
080025
tower ladder
angle
080054
080052
tower ladder
angle
080023
10021887
tower ladder
angle
3501127
example of a example of a
tower having tower having
4 sections 5 sections
NOTE: This
drawing illustrates
the correct ladder
installation. The
ladder is not
installed on the
access side where
it would block the
access entrance.
upright
top angle
(G3987521)
12 gage 3K sidewall
bracket support
hardware Package
(4990514)
7/16” x 5” bolts
(90000169),
lock washers upright
(90010030), and (3987519)
nuts
(1714682)
This stiffener
3/4” x 2 1/2” bolts connects with the
(651366), grain bin.
lock washers
(068951), and
nuts
(068900)
SIDEWALL STIFFENER SUPPORT BRACKET ASSEMBLED, 14’ [4,267 mm] TALL BIN SIDEWALL SUPPORT SHOWN
a
sidewall bracket
(3987522)
SIDEWALL STIFFENER SUPPORT BRACKET ASSEMBLED, 20’ [6,096 mm] TALL BIN SIDEWALL SUPPORT SHOWN
b
section BB
diagonal brace
(3988310) top angle
(G3987521)
horizontal brace
(700278H) double brace plate
(700278G)
30’ [9,144 mm]
sidewall base post uprights
(700278B) hardware package
(700278K)
Drill holes in the
sidewall to match
adjust vertically
the bracket. Use the
to match up with
provided 3/8” x 1 1/4”
loop system
bin bolts with seal
elevation
washers, and nuts
sidewall bracket
(3987522)
SIDEWALL STIFFENER SUPPORT BRACKET ASSEMBLED, 30’ [9,144 mm] TALL BIN SIDEWALL SUPPORT SHOWN
a
WARNING!
The sidewall bracket upright must be
installed so that the base end of the
stiffener is not placed any higher than
the base end of the Sidewall Brackets.
The ends may be installed “flush” as
shown below.
Maximum height
above eave
upright
sidewall brackets
are all flush at the
base end
Small
Sidewall Brackets
upright
the sidewall
brackets
p/n 3987522
are installed
approximately
1” [25 mm]
below
the bin eave
Small
Sidewall Brackets
ANSI 7 foundations 9
B G
be alert 2 galvanized - hot dipped towers 20
braces identification 15
builder 3, 14
H
handrails 7
building codes 8, 11
hazards 3, 6
construction 3, 6, 7
I
install the loadout platform 27
crane lifts 8
install the welded platform 24
D internal bracing 23
diagonal brace 17
K
E knee brace 42
electrical equipment 7
electric codes 8
electrician 7
engineer 9, 11
L S
ladder angles 46, 47 safety 2, 3, 6, 7, 8, 9
lifts 8 stairways 7
loadout platform 27
lock-out 7
T
T2 Tower 14
N T2 Tower manual 11
platforms 7
W
post connection plate 13
warranty 5
posts identification 14
welded platform 24
precautions 3
welding 9, 18
proper personnel 6
wind load 9, 18
wind / weather 2
R
work area safety statement 6