You are on page 1of 5
authority under ittee” means a committee constituted by the competent the rules; “Competent authority” means the Secretary Irrigation Department Government of the Punjab, “DPE” means the Departmental Professional Examination of Sub-Engineers “Paper” means a paper specified in the Schedule; Service Rules means, Punjab Irrigation Department (Engineering Posts) Service Rules 2013; “Rules” means the Punjab Irrigation (Engineering Posts) Departmental Professional Examination Sub Engineer Cadre Rules, 2017 (g) “Schedule” means the schedule appended to the rules; (h) “Candidate” means person holding a post of subjected nomenclature “Sub- te Engineers” in the Administrative control of Irrigation Department Government i of the Punjab; and “Subject” means a subject specified in the Schedule. _ Anexpression used in the rules but not defined shall have the same meanings as jigned to it in the Service Rules. for promotion.- Sub Engineer shall not be promoted to the rank of Senior Sub Engineer and to tank of Sub Divisional Officer unless he has passed the Departmental Examination on the basis of seniority cum fitness subject to of conditions laid down in the Service Rules. 100 MCQs. shall be selected for each paper from the subjects given in schedule, each question shall carry one mark, only correct answer will be given marks and answers having cutting or overwriting will be treated cancelled or equal to zero marks. Date of examination.- The examination shall be conducted twice at least in a year on the dates fixed by the competent authority at Jeast thirty days before the commencement of the examination. Committee to conduct examination. (a) The competent authority shall constitute a committee for conduction the examination, (b) The committee shall consist of the following (@ Chief Engineer / Principal Government Engineering Academy Punjab, designated as Convener / Controller; Gi) Superintending Engineer, Irrigation Department, Government of the Punjab designated as Examiner; (iii) Executive Engineers Irrigation Department, Government of the Punjab designated as Sub Examiners for Professional-A, Professional-B & Professional-C of DPE. from different Circles, to assist the Examiner, (©) The papers to be set by a Superintending Engineer / Concerned Sub Examiner should first be submitted for approval to Convener / Controller Examination. Special care being exercised that the spirit of paragraph 1.106 of PWD Code is observed ive. “The Departmental Professional Examination is intended to show that officers are acquainted with the processes of preparing materials and modes of construction; that they have a good knowledge of resources of the districts in which they have been employed as to materials, the best mode of applying them, and their cost, and that they understand the management of labour and have made themselves acquainted with the account rules and Procedure of the Department, No theoretical point should be introduced, such as would in Practice be met by resort to ordinary books of reference.” checking and marking of answer rae oe © A Senet ph RAYA anys HP. sates PT 3 declaration of the result, is am’ (©) The Principal Government Engineering Academy Punjeb shall make all necessary arrangements for conduct of the examination. Qualifying standard. (@ The minimum qualifying marks for the examination shall be 45% marks in each paper and 50% marks in aggregate, A candidate who fails in any subject, may "appear ‘again in the subject in which he previously failed. In such case he must obtain not less than 50% marks in that subject in order to pass. 50% marks shall be the minimum ‘qualifying marks for the Compartment paper. (ii) The Committee shall prepare and place the result before the competent authority for announcement. (iii) ‘The result announced by the competent authority shall be final. (iv) Rechecking of papers can only be made upon approval of Competent Authority for consideration of unmarked question and re-counting of total. (v) Ifa Sub-Engineers or Senior Sub Engineers / Sub Divisional Officer / Assistant Executive Engineer / Assistant Design Engineer / Assistant Design Officer / Assistant Director Flood Monitoring / Assistant Director of Irrigation Department Government of the Punjab, who has already passed the examination or placed in compartment under the old PWD Code shall not be required to pass the same examination again ie. DPE Complete or Professional-A & Professional-B or Professional-A & Professional-C or Professional-B & Professional-C instead he should appear in relevant compartment. (vi) The Controller of examination may on receipt of candidate's application within thirty days of the declaration of result allow for re-checking of answer book and to be finalized within sixty days of declaration of result, to satisfy that: a) There is no mistake of the grand total and all totals have been correctly brought forward accordingly. b) No portion of answers has been left un-marked, ©) The Answer Book or any part thereof has not been replaced. d) Incase of any discrepancy found upon re-checking the decision of Controller shall be final and the person responsible declared in the finding of the : Controller shall be proceeded against under Rules, aa 7 oe ie ae of paragraph 1.106 of PWD Code is observed i.e. ee re oe ae — is intended to show that officers are acquainted terials and modes of construction; that they have a good powiedee of resources of the districts in which they have been employed as to material, the best mode of applying them, and their cost, and that they understand the management of labour and have made themselves acquainted with the account rules and procedure of the Department, No theoretical point should be introduced, such as would in practice be met by resort to ordinary books of reference.” Sr. ‘Subject and Prescribed books Max Max No. Marks | _Time 1 |2 3 4 Professional including Irrigation Hand book of Professional | 100 Two aa o me ders, hours Definition of terms in connection with irrigation Standard Notations, Punjab Canals,. Irrigation channels, outlets, Drains, Embankments, Theory of Silt Transport, silting tanks, Silt sampling, Bench Marks, Gauges and Discharges, Accidents to and on canal works, Canal Telegraphs, Kachha roads, Earth Work Construction & Repairs, Concrete, Masonary, Brick Flooring, Roofing, White & Colour Timber Work, Brick Work, Plastering, Pointing, Washing, Well Sinking, Pitching, Painting, Manufacturing, Surkhi, Lime, Mortar, Puddle, Dismantling, Rules & Instruction for reading river gauges, Observation of discharge of distributaries and water course and also of irrigation outlets, ‘Average supply of canals and distributaries, Drainages 10 be gauged, Rain gauges and rules regarding erection of Symons rain gauge and registration of rain fall, Instruction for record of well measurement of Punjab canals, Preparation of annual surveys and report in conjunction with canal head works, Inter divisional — ts and Irrigation Department) (updated)- Rules (updated) / Punjab igation Manual of oe Procurement Rules: . PWD Code Relevant part of PWD Code for Punjab Irrigation De -partment, Duties of Chief Engineer, Superintending Engineer, Sub-divisional Superintending of Works, Divisional officer. Head Draftsman, officer, Deputy Collector, Sub Engineer, f irrigation Department, Employment of Miscellaneous Draftsman and Tracer 0! Temporary and Work Charged Establishment, Rules(para 1.147-1.166), Chapter II, IV and V 3. PEEDA Act, 2006 (updated) SECRETARY GOVERNMENT OF THE PUNJAB IRRIGATION DEPARTMENT

You might also like