Wrekla Project ab Rae
Teds
Sacion Sheet role
2
eat by Bate fone Date eaiby [Date
M 10/5/2023
‘Components and cladding pressures - Wall (Table 30.3+1)
Component | Zone | Length | Width [etarea | «G6, | GG, | Prosqnve) | Pree(va)
(ft) (ft) (fe) (psf) (psf
=r [4s |- : 10 | os | 090 | as 265
0st ee e =o | [oo (oo | ao
200 sf 4 5 2000 | oss | -o7e | 198 218
soot f4# | - : soot | 068 | -072 | 184 204
sot [s |- = woo | os | -128 | ms 226
S0st 5_|- = so | o7e | -t08__| 220 216
200 sf 5_|- = 2000 | 060 | 085 (| 198 233
sor [5 |= - soot [ose [ove | tea 204
I
“rete
eran few
sk
sor
ES ceatonatsoowen
Wind Pressure action on Door = 24 pst
Area of Door = 12 ft height x 9 ft wide
Total Wind Force acting on the wall = 24 psf x (12ft x 9ft) = 2592 Ibs
Force on one side Door Jamb = 2592 Ibs/2 = 1300 Ibs (approx)
‘Anchor plate to design at base of Door Jamb,