Mario L. Cassimo - Relatorio (Cadam)
Mario L. Cassimo - Relatorio (Cadam)
General Information:
Project: Análise de Estabilidade de Barragem Gravidade
Dam: Barragem de Ribaué
Owner: Mário Lourenço Cássimo
Dam location: Nampula
Project engineer: Mário Lourenço Cássimo
Analysis performed by: Eng.º Ezequiel Fernandez Carvalho
Date: 09/08/2019
Geometrical Dimensions & Concrete Volumetric Mass( ):
L4
G
F
L3
L2
DOWNSTREAM
E
UPSTREAM
1 2 1 ,0 0 0
1 2 0 ,0 0 0 1 2 0 ,5 0 0
1 1 9 ,0 0 0
1 1 9 ,0 0 0
D I
H C
1 1 7 ,5 0 0 A B
1 1 7 ,0 0 0
L1
1 1 6 ,0 0 0
1 1 5 ,0 0 0 L1 = 15,000 m
1 1 4 ,5 0 0
L2 = 1,500 m
L3 = 3,000 m
1 1 3 ,0 0 0
1 1 2 ,0 0 0 L4 = 3,000 m
1 1 1 ,5 0 0 1 1 1 ,5 0 0 1 1 1 ,0 0 0
Elev. A = 107,000 m
1 1 1 ,0 0 0
Elev. B = 107,000 m
1 1 0 ,0 0 0 1 1 0 ,0 0 0 1 1 0 ,0 0 0 Elev. C = 112,000 m
1 0 9 ,0 0 0 Elev. D = 111,000 m
1 0 8 ,5 0 0
Elev. E = 119,000 m
Elev. F = 122,000 m
Elev. G = 122,000 m
Elev. H = 110,000 m
Elev. I = 110,000 m
10/08/2019 de
SEMESTRE\Projecto 23:20:43
Barragem\Barragens_de_Betao-Cadam\CADAM - PROJECTOS\Mario Lourenco Cassimo.dam
CADAM - Model parameters Page 2
by Martin Leclerc, M. Ing.
NSERC / Hydro-Quebec / Alcan Industrial Chair on Structural Safety of Concrete Dams
École Polytechnique de Montréal, Canada
Material Properties:
Option 1 Option 2
Concrete strength Shear strength
Material name f'c ft Cohesion Angle ( )
n Curve type
(kPa) (kPa) (kPa) (deg) (kPa) (kPa)
Betao - B2 30000,0 0,000 Peak: 2500,000 51,340 0,000 Option 1
Residual: 0,000 45,000 0,000 Option 2
Base joint 30000,0 0,000 Peak: 196,200 32,000 200000,00 0 Option
Residual: 1 0,00 0 45,00 0 0,00 0 Option
Lift Joint(s):
Upstream end Downstream end
ID Material name Elevation Position x Elevation Position x Length Inertia
(m) (m) (m) (m) (m) (m^4)
1 Betao - B2 121,000 1,500 121,000 5,455 3,955 5,1535734
2 Betao - B2 120,500 1,500 120,500 5,932 4,432 7,2537830
3 Betao - B2 119,000 1,500 119,000 7,364 5,864 16,800409
4 Betao - B2 117,500 1,179 117,500 8,795 7,617 36,825668
5 Betao - B2 117,000 1,071 117,000 9,273 8,201 45,969168
6 Betao - B2 116,000 0,857 116,000 10,227 9,370 68,557597
7 Betao - B2 115,000 0,643 115,000 11,182 10,539 97,546603
8 Betao - B2 114,500 0,536 114,500 11,659 11,123 114,69083
9 Betao - B2 113,000 0,214 113,000 13,091 12,877 177,91999
10 Betao - B2 111,500 0,000 111,500 14,523 14,523 255,24856
11 Betao - B2 111,000 0,000 111,000 15,000 15,000 281,25000
12 Betao - B2 110,000 0,000 110,000 15,000 15,000 281,25000
13 Betao - B2 109,000 0,000 109,000 15,000 15,000 281,25000
14 Betao - B2 108,500 0,000 108,500 15,000 15,000 281,25000
15 Base joint 107,000 0,000 107,000 15,000 15,000 281,25000
10/08/2019 de
SEMESTRE\Projecto 23:20:44
Barragem\Barragens_de_Betao-Cadam\CADAM - PROJECTOS\Mario Lourenco Cassimo.dam
CADAM - Model parameters Page 3
by Martin Leclerc, M. Ing.
NSERC / Hydro-Quebec / Alcan Industrial Chair on Structural Safety of Concrete Dams
École Polytechnique de Montréal, Canada
Concentrated Mass(es):
ID Elevation Position x Horizontal mass Vertical mass
(m) (m) (kg) (kg)
1 114,500 7,500 67149,000 67149,000
Uplift pressures:
Uplift pressures are considered as an external load (linearisation of effective stresses)
10/08/2019 de
SEMESTRE\Projecto 23:20:44
Barragem\Barragens_de_Betao-Cadam\CADAM - PROJECTOS\Mario Lourenco Cassimo.dam
CADAM - Model parameters Page 4
by Martin Leclerc, M. Ing.
NSERC / Hydro-Quebec / Alcan Industrial Chair on Structural Safety of Concrete Dams
École Polytechnique de Montréal, Canada
Cracking options:
Cracking is considered for all combinations ? YES
Tensile strength:
Numerical options:
Convergence method: Bracketing + Bi-section method
Accuracy: Medium (1E-6)
10/08/2019 de
SEMESTRE\Projecto 23:20:44
Barragem\Barragens_de_Betao-Cadam\CADAM - PROJECTOS\Mario Lourenco Cassimo.dam
II - Results Report
CADAM - Results report Page 1
by Martin Leclerc, M. Ing., Research Engineer
NSERC / Hydro-Quebec / Alcan Industrial Chair on Structural Safety of Concrete Dams
École Polytechnique de Montréal, Canada
General Information:
Project: Análise de Estabilidade de Barragem Gravidade
Dam: Barragem de Ribaué
Owner: Mário Lourenço Cássimo
Dam location: Nampula
Project engineer: Mário Lourenço Cássimo
Analysis performed by: Eng.º Ezequiel Fernandez Carvalho
Date: 09/08/2019
10/08/2019 23:22:09
DO SONGO\QUARTO ANO\SEGUNDO SEMESTRE\Projecto de Barragem\Barragens_de_Betao-Cadam\CADAM - PROJECTOS\Mario Lourenco Cassimo.dam
CADAM - Results report Page 2
by Martin Leclerc, M. Ing., Research Engineer
NSERC / Hydro-Quebec / Alcan Industrial Chair on Structural Safety of Concrete Dams
École Polytechnique de Montréal, Canada
10/08/2019 23:22:09
DO SONGO\QUARTO ANO\SEGUNDO SEMESTRE\Projecto de Barragem\Barragens_de_Betao-Cadam\CADAM - PROJECTOS\Mario Lourenco Cassimo.dam
CADAM - Results report Page 3
by Martin Leclerc, M. Ing., Research Engineer
NSERC / Hydro-Quebec / Alcan Industrial Chair on Structural Safety of Concrete Dams
École Polytechnique de Montréal, Canada
10/08/2019 23:22:09
DO SONGO\QUARTO ANO\SEGUNDO SEMESTRE\Projecto de Barragem\Barragens_de_Betao-Cadam\CADAM - PROJECTOS\Mario Lourenco Cassimo.dam
III - Loads report
CADAM - Loads report Page 1
by Martin Leclerc, M. Ing., Research Engineer
NSERC / Hydro-Quebec / Alcan Industrial Chair on Structural Safety of Concrete Dams
École Polytechnique de Montréal, Canada
General Information:
Project: Análise de Estabilidade de Barragem Gravidade
Dam: Barragem de Ribaué
Owner: Mário Lourenço Cássimo
Dam location: Nampula
Project engineer: Mário Lourenço Cássimo
Analysis performed by: Eng.º Ezequiel Fernandez Carvalho
Date: 09/08/2019
Static Loads:
D: Dead load
M: Masses
H: Horizontal hydrostatic
Vnc or Vfc V: Vertical hydrostatic
Flood U: Uplift
level I: Ice
S: Silt
Pc P: Post-tension
FD F: Applied force
Normal FD: Floating debris
level
I
u: Upsream
d: Downstream
Pd c: Crest
Vfu h: Horizontal
v: Vertical
Vnu n: Normal level
D f: Flood level
Mv
Silt Flood
Normal
level Hfu level
Hnu level
Sv Fv
Vfd
Vnd
Sh Fh
Hnd
Hfd
l
UPSTREAM
DOWNSTREAM
Un
Uf
X
10/08/2019 23:23:50
DO SONGO\QUARTO ANO\SEGUNDO SEMESTRE\Projecto de Barragem\Barragens_de_Betao-Cadam\CADAM - PROJECTOS\Mario Lourenco Cassimo.dam
CADAM - Stability drawing Page 2
Joint # SSF SSF OSF OSF USF Normal Shear Moment Res. Pos.
(peak) (residual) (U/S <-) (-> D/S) (kN) (kN) (kN·m) (% joint)
1 > 100 > 100 > 100 > 100 > 100 -81,9 0,0 -18,6 44,242
2 > 100 > 100 > 100 > 100 > 100 -131,2 0,0 -44,0 42,442
3 > 100 > 100 > 100 > 100 > 100 -313,0 0,0 -200,0 39,106
4 > 100 45,069 11,719 8,802 9,875 -497,4 11,0 -369,1 40,258
5 > 100 28,946 9,583 7,115 8,059 -567,9 19,6 -441,1 40,531
6 > 100 16,369 7,454 5,408 6,241 -722,6 44,1 -606,1 41,048
7 > 100 11,410 6,399 4,541 5,330 -895,4 78,5 -796,8 41,556
8 > 100 16,586 11,090 5,640 7,710 -1647,4 99,3 23,2 50,126
9 > 100 11,068 8,315 4,679 6,157 -1954,3 176,6 -684,3 47,281
10 > 100 8,328 6,856 4,109 5,301 -2297,7 275,9 -1539,4 45,387
11 > 100 7,660 6,511 3,980 5,107 -2417,2 315,6 -1909,9 44,732
12 > 100 6,441 5,477 3,592 4,565 -2623,2 407,3 -1549,6 46,062
10/08/2019 23:23:50
DO SONGO\QUARTO ANO\SEGUNDO SEMESTRE\Projecto de Barragem\Barragens_de_Betao-Cadam\CADAM - PROJECTOS\Mario Lourenco Cassimo.dam