You are on page 1of 1
TJS ENTERPRISE METHODOLOGY FOR PROOFEX EIM 80 (TOUCH VOLTAGE) Surface Preparation - Concrete surfaces should be smooth and free from cavities, oil, dirt, and other laitance. - Aminimum of 25 x 25mm angle filet shall be provided at wallifloor interfaces and other upstands. Application of Proofex Primer by brush. Only prime on the area to which Proofex EIM 80 can be applied the same day. Before laying the membrane, remove first the release paper. Press the film firmly. Ensure that the adhesives compound bonds continuously to the substrate with no air pockets. Allow a 75mm edge and a 150mm end lap. All laps should be sealed properly. The application should start from the lowest level upwards for vertical and inclined surfaces, The general contractor should immediately protect the membrane using a protection board or conerete topping 2F TJS Bidg., 219 Almendrala St, San Vicente, San Pedro, Laguna | Tel. No.: 02 8843 2746

You might also like