DRYDOCK SPECIFICATION AS FELICIA - 2021-3RD SPECIAL SURVEY YA wiheimsen Wilhelmsen Ship Management. Printed : 13-MAY-2021 Wa Wilhelmsen Ship Management DRYDOCK SPECIFICATION (a) AS FELICIA - 2021-3RD SPECIAL SURVEY Table of Contents Page Vessel Particulars l Invitation to Tender Company Safety Regulations 8 Shipyard Tariff Rates List of Reference Drawings a3 AL Agency/Clearances/Spares Handling 44 Agent fees 14 Superintendent's expenses 14 a2 Tugs/Pilot/Line Handling/Docking/Wharfage as Docking, Undocking 6 1st 24hre in dock as Subsequent days in Drydock 16 Wharfage / Berthing 16 Tugboat Assistance 1 Pilotage a Removal Keel / Side Blocks 17 AS General Dock Services/Crannage/Slop & Garbage Disposal/Gas Free Cert 18. Gangway Fire Line/s Disconnection of Fire Line/s Daily fire line/s und ssure Provision of Cooling Water Line/s Connection § Disconnection of Cooli Daily usage rental of cooling wat Electric Shore Power Supply 440V / Connection s Disconnection of Shore Powe: Total Shore Power Consumption kith Earth connection Supply of Ballast Water Supply Connection § Disconnection of Ballast Line/s Total Ballast Water Supply Domestic Fresh Water Supply Connection § Disconnection of Domestic FW Supply of domestic fresh water Supply of Compressed Air Connection s Disconnection of Com Daily supply of Compressed Air ze Watchman § Security Watchman Fire Watchman Security Watchman Yard Equipment Services PLEASE USE JOB NUMBERS IN ALL CORRESPONDENCE. Wa Wilhelmsen Ship Management DRYDOCK AS FELICIA - 2021-3RD SPECIAL SURVEY SPECIFICATION (23) Table of Contents e Be e Crane Services for Owners use Fork lift service for Owners use ‘Telephone Connection s Disconnection of Sewage Line/s Sewage Disposal Garbage Removal & Disposal Food waste disposal costs Oily rags disposal costs Engine Room Bilges/ Oily Water ¢ Sludge Disposal ER Bilges / Oily Water Disposal Sludge disposal Manhole Covers for FOT ¢ WET Fuel Tanks Manhole Covers Ballaste Tanke Manhole Covers Initial Gas-free Inspection « Certificate Following gas free inspections Temporary Lighting Covering of floors in superstructure Ventilation Blowers Staging Seatrial after dry dock Hull Preparation/Grit Disposal/Coating Protection against grit blasting - on deck Protection against grit blasting - underwater High Pressure Washing t Blasting Grit Blasting to $A 2.0 Grit Sweep Blasting to SA 1.0 Cleaning of main deck from grit blasting and sand Grit removal and disposal from dock floor Hull Cleaning before Painting Painting on Ship's Hull Empty paint bins disposal, per pe Scupper plug - Mount/dismount Draught marks, plimsol marks, etc Rebuilt ICCP insulation shields Paint Supply Paint Supply CH & Deck Sea Chests & Gratings/Anodes/Plugs/Hull Equipment & Transducers Sea Chests (High & Low Suction incl Emergency) Bottom Drain Plugs (WBT & FOT) Bottom Drain Plugs WET Bottom Drain Plugs in FOT Anode Renewal ICCP system Hull Steelwork/Deck Penetrations/Thickness Gauging UT Measurement Dock Repair - Steelworks based on UTM report Steel renewal - Deck Area 52 52 52 Printed: 13-MAY- 2021. PLEASE USE JOB NUMBERS IN ALL CORRESPONDENCE. Wa Wilhelmsen Ship Management AS FELICIA - 2021-3RD SPECIAL DRYDOCK SURVEY SPECIFICATION (eres) Table of Contents 2 Steel renewal - Cargo Hold No. Steel renewal - Cargo Hold No. Steel renewal - Cargo Hold No. Steel renewal - Cargo Hold No. Steel renewal - Wing Ballast Tanks Steel renewal - Hatch Covers Steel renewal - Lashing Bridge Steel renewal - Coamings Steel renewal - Ventilation Ducts Panama chock steel deck renewal Voyage Repair - Steelworks based on UTM Steel renewal - Cargo Hold No. 1 Steel renewal - Coamings Steel renewal - Deck & others Steel renewal - Lashing bridge Anchors & Chains / Chains Lockers / Hawse Pipe Anchor/chains lowering/restowing Anchor bitter end securing overhaul PS/SB Anchor chain examination Anchor chain stud repair PS and SB chain lockers maintenance Anchor chain lockers - mud disposal Chain lockers bottom plates Bow Thruster Propeller & Seals Bow Thruster Overhaul Bow Thruster Owners appointed service eng Bow Thruster Tube Weld Seam Re-Welding Bow Thruster Tube Pit Welding Bow Thruster Spare Parts Supply Rudder Shaft & Seals Rudder pintle and neck bearing clearances Rudder press test Rudder stock dismantling Rudder removal Rudder blade and horn cavitation repair Tailshaft/Stern Seals/Stern Tube/Propeller CPP hub overhaul/tailshaft withdrawal Spares CPP Technician for CPP boil for Hub and tailshat Propeller Polishing Propeller NDT/DPT Propeller Cavition Repair Tailshaft clearance Rope Guard Removal SY Assistance for Tailshaft/CPP we Printed: PLEASE USE JOB NUMBERS IN ALL CORRESPONDENCE. Wa Wilhelmsen Ship Management AS FELICIA - 2021-3RD SPECIAL SURVEY DRYDOCK SPECIFICATION Table of Contents Page 3 Di Ship Side Valves/Sea Tubes Ship's Side Valves Ship's Side Valve Repair Speedlog bottom valve overhaul Echosounder bottom valve overhaul Tank & Hold Pipework/Steel/Coating/Insulation/Incl.access/clean/gas fr 85 Fuel Oil Tank Cleaning HFO sett tank 1 HFO sett tank 2 MDO overflow tank Ballast tank cleaning Deck Pipework/Stee1/Coating/Insulation Replacement of manhole rubber seals and damaged bolt and nuts Vent heads overhaul Cross-bays ventilation screens and meshes renewal Cell guides (Bay 30) renewal Ballast pipes and anti-heeling system air Various Bracing, brackets, holders renewal Deck cross-bays corroded areas renewal Cargo Hold blasting & painting Water ballast tanks clogged sounding pipes renewal Cargo Hold Cell guides repair Cargo Holds Ventilation Duct Repair Hatch Covers/Tank Lids/Hull Doors & Ramps Hatch Covers - Shifting Hatch covers - Rubber renewal Hatch covers - Rubber channel blasting & painting Hatch Covers - Hose test Supervising Service for hatch repairs Spares supply for hatch covers repairs. Twistlock foundation renewal Hatch covers flexi-pads replacement Cargo Gear / Cranes / Derricks E/R crane load test Cargo Crane load test Cargo cranes #1 and s renewal Provision crane jib top repair Cargo cranes #1 and #2 guard rails and out: Bolts slewing bearing cargo crane 11 Provision Crane Overhaul 102 Safety & Pollution Prevention Systems/Equipment 103 ¢ Fall Life boat - shifting to shore 103 Free Fall Life boat - painting with Owners supplied paint Los 11 Lifeboat - Weight Check 104 es and flanges reconditio 90 82 68 84 pairs 100 PLEASE USE JOB NUMBERS IN ALL CORRESPONDENCE. Wa Wilhelmsen Ship Management DRYDOCK SPECIFICATION (wv) AS FELICIA - 2021-3RD SPECIAL SURVEY Table of Contents Page 11 Lifeboat - Fall Wire Renewal 104 11 Lifeboat Davit -Dynamic Load Test 104 : 11 Lifeboat Davit- Survey by Maker Los DE.7 Free fall boat resting place with sliding rollers recondition 10s Dele Rescue boat lifting from accommodation Loe De.9 Rescue boat - painting with Owners supplied paint 16 De.lo Rescue boat - Weight Check 107 De.lL Rescue boat Davit —Dynamic Load Test 107 De.l2 Rescue boat Davit - Survey by Maker 107 De.13, Water ballast valves indication sensors and level gauges recondition 108 Do Accommodation / Other Deck Repairs Da.. Accomodation ladder load test : Overhauling of accommodation gangway winches Port and Stbd. D313 Accommodation floor repair D9.4 Accomodation outside area blasting & painting EL Main Engine & Turbocharger/Reduction Gear/Intermediate Shafting & Bear 111 El. ME Crankshaft Deflection Before Dock uu nkshaft Deflection After Dock & Clean Crankcase qn ME bearings inspection as per Class aur ME Main bearing inspection un nkpin bearing inspection 112 sshead bearing inspection 112 ME turbo charger overhaul 13 cooler cleaning ua ME Cyl Head overhaul 115 ME Piston overhaul us ME FO pumps Overhaul lie ME Governor 47 ME Exhaust gas compensator 47 E113 Reduction Gear Oil Cooler cleaning iis Ele Reduction Gear foundation bolts tightening lie E115 Main Starting Air Reservoir Inspection iis 2 Auxiliary Engines & Turbochargers No.3 A/E Overhaul No.1,2,3,4 Auxiliary engine - Charge Air Coolers No.l A/E Vibration damper Ea Pumps/Boilers/Heat Exchangers/Compressors/Pressure Vessels/Steering Aux Boiler - Open/close water & steam side to inspect Aux Boiler - internal cleaning Aux boiler - furnace repair Aux Boiler outfittings - Inspection and press test Aux Boiler Safety valves - Inspect/press test Aux Boiler Pressure Gauge Calibration ES Engine Pipework/Steel/Coating/Insulations 124 Water ballast suction pipe flange recondition Main Engine sea Water Cooling system LT Cooler No 1 2 PLEASE USE JOB NUMBERS IN ALL CORRESPONDENCE. Wa Wilhelmsen Ship Management DRYDOCK SPECIFICATION (va) AS FELICIA - 2021-3RD SPECIAL SURVEY Table of Contents Main Engine sea Water Cooling system LT Cooler No 2 Aux Engine sea Water Cooling system LT Cooler No 1 Aux Engine sea Water Cooling system LT Cooler No 2 AE LT cooler renew of SW system butterfly valves ME LT cooler renew of SW system butterfly valves Main sea water cooling lil Food waste grinder pipe line renewal ER ventilation ducts Port side and STSD side renewal 56 Electrical Systems & Equipment/Automation/Control Systems 132 Main Switchboard internal inspection and cleaning 132 Main Switchboard - Inspection of Generator ACB's 132 Main Switchboard - Inspection of Bow thruster ACB 133 Emergency Switchboard internal inspection and cleaning 134 Emergency Switchboard - Inspection of Em Gen ACB 134 Anemometer electric cable renewal 135 E/R Vent fan No.2 overhaul 135 PL Installation of Ballast Water Treatment System 137 Plt BNIS Installation 137 List of Attachments ise Printed: 13-MAY-2021. PLEASE USE JOB NUMBERS IN ALL CORRESPONDENCE. Wa Wilhelmsen Ship Management AS FELICIA - 2021-3RD SPECIAL SURVEY Vessel Particulars Printe Vessel Specific Information: Name. AS Felicia Call Sign. corys Bort of Regist: Madeira Flag. Portugal IMO Number! 9395020 Hull No 2035 Builder Zheijiang Ouhua Shipbuilding Co., Ltd. Delivered Year. Vessel Type 2006 Container Vessel Size 1296 (TEU) Dimensions: LOA. 166.15 © Beam... 25.25 Depth. : Drafc.. 9150 M 15375 5983 18350 Main Engine MAN 8158/64 ME output... 21200 (xi) Tank Capacities: Fuel Oil. 134.5 Diesel 041. 363.7 MP Ballast Fu 13-MAY-2021. DRYDOCK SPECIFICATION Page: 1 Vwinoimsen Ship Management DRYDOCK SPECIFICATION Page AS FELICIA - 2021-3RD SPECIAL SURVEY Invitation to Tender 1.1 Delivery, Berthing and Dues The vessel shall be deemed delivered to the Contra: the port of repair, or nearest safe place as nominated by the Contractor. All general service charges during the yard period including but not limited to berthing and unberthing, docking and undocking, shifting, tovage, mooring and unmooring, fire and security watches, shore power connection and supply, fire hose connection and pressurizing cooling water supply for the refrigeration machinery, supply of domestic fresh water and sanitary water, daily removal of garbage, temporary shifting of bunkers, lub oils and / or slops and shifting back on completion of the work, dry and wet dock dues incurred, and cranage and expenses which may be necessary after delivery of the vessel tors until redelivery to the Owners on completion of repairs must be borne by the Contractors and included in the tendered price. This price will be the final price including all expenses for the period required to carry out all specified repairs. = upon arrival at 1.2 Costs The costs quoted by the Contractor, including quotations for additional and/or extra work, outlined in the specifications and whether or not stated therein include all costs for labour, tools, services, material, equipment, removals, replacements, machining, temporary light, staging, shoring, aids for erection and assembly of any kind, ventilation, removal of item to shop, if necessary, access work, cranage, transport to and from workshop, re-installation, cleaning-up after completion of work, proving tight on test, external blasting of new plating, two coats of approved primer to all new and disturbed work, ramming-out and re-installing keel blocks and any other work or appliances necessary to accomplish the repairs, removing / replacing floor plates and cleaning, and any other work or appliances necessary to accomplish the repairs, Also costs concerning removal, landing ashore, supply and transport of pumping equipment and appliances, connecting up and disconnecting, storage drums, containers and/or lorries, transport, cranage and disposal of all scale, sludge, mud, debris, oil, water etc. shall be itemised and included in che final price. The final price agreed with the Yard shall be gross, thus inclusive of taxes and duties or charges levied by any Governmental body, or authority, including V.A.T. 1.3 Extras Whenever it becomes necessary for the Owners’ Superintendent to call upon the Contractor to carry out work in addition to that specified, or that the Contractor realizes extra work to the guoted items is necessary, the Contractor should, at all urnish the Owners’ Superintendent immediately, but at maximum within 24 hours after receiving the extra work order, in writing with a realistic quotation for each item specified, prior tO the work being put in hand. Such work must be specifically ordered and the quoted price agreed before the said work is assigned. Additional work, ordered during the course of the repairs and not previously Covered in the original specification shall not be at a higher price than the price level of the quoted works and in the event chat the quantity of the work is extensive a new unit price shall be negotiated downwards accordingly. Any deviation from these rates will not be acceptable Owners. No exténsion of time shall be allowed unless it is mutually agreed that the extra work cannot be effected simultaneously wit! specified repairs. che che Wa Wilhelmsen Ship Management DRYDOCK SPECIFICATION Page: 3 AS FELICIA - 2021-3RD SPECIAL SURVEY Invitation to Tender (cont.) Printe 1.4 Progress of Work The repairs etc. to the vessel shall be commenced without delay, and shall be continued diligently and at such a rate of expedition as in the opinion of the Owners’ Superintendent will be necessary © complete the work within the time stated in the Tender. The Yard must issue a diagrammatic schedule of all major works. It is a condition of this Agreement that the Yard redelivers the vessel to the Owners by the agreed delivery date, such date being regarded as the essence of the contract. If, due to pressure of work, labour shortage, late supply of materials, or through other similar causes, delay to the vessel is caused, it shall be incumbent on the Contractors to use every possible means at their disposal to minimise delay by working overtime, double shifts etc. with no extra expense to the Owner. Should such action cause delay then Clause 1.19 will apply. The quotation for tender, as set out under the individual headings, and the time required for repairing and redelivery of the vessel, are to be stated on the basis of consecutive running days. If Saturdays and Sundays are not nozmally worked and there are any national holidays intervening the period then this is to be mentioned in the ndez. No surcharges for work effected on such days will be accepted by che Owner Each day, at a mutually agreed fixed time, the Owners’ Superintendent requires 2 meeting on board said vessel with the Yard's repair manager and appropriate Yard foreman, in order to discuss the progress, problems, future planning etc. of the repairs. Also additional/extra répaire will be ordered and discussed at this meeting. All work must be co-ordinated in such a way that one job does not unduly delay another, such as external work near the propelle: preventing required rotation of main engine, or sand blasting of stern area preventing withdrawal of tailshaft. 1.5 Work carried out by crew The own serve the right to perform normal overhaul on deck and in the engine room by using their own crew whilst the vessel is on the Contractor's premises and / or utilising a riding squad. 1.6 Subcontractors The Owners reserve the right to engage subcontractors to perform work, furnish services and/or material not covered by the Specification. The Contractor shall permit employees of such Subcontractor to have access to the shipyard and the vessel for such purposes. Safety Test ctors must satisfy themselves that the vessel is roughly cleaned and free from all inflammable vapour, and must obtain 2 fully qualified Analyst's Certificate, certifying this, before commencing works in any compartment where any hazardous or noxious substance has been contained. 1.8 Cleaning All compartments have to be cleaned out as required before, duzing and after repairs, and finally left clean and dry. Any engine room floor-plates lifted for access to bilges or other work is to be replaced on completion. During the course of repairs all dirt and refuse have to be landed on shore and disposed of by the Contrac’ The vessel shall be left in good condition throughout. Docks have to be kept clean and as clear as possible. Dirt and waste resulting from above 13-MAY-2021. Wa Wilhelmsen Ship Management DRYDOCK SPECIFICATION Page: 4 AS FELICIA - 2021-3RD SPECIAL SURVEY Invitation to Tender (cont.) Printed: mentioned work have to be cleared-up, as it progresses. Cleaning ch: will be applied to the individual spaces as listed later. 1.9 Firewatching ize precautions by Contractors’ labourers are to be as follows: Imen are to be provided by Contractors to attend continuously constant patrolling of all spaces for fire hazard daily from commencement until two hours following completion of work (including of sub-contractors employed by Owners’ direct order). At that time the vessel has to be thoroughly inspected together with the ship's Duty Officer to the effect that all is in order and that Fire Fighting Equipment is available for the ship's Duty Officer during the nigh 1.10 Workmanship and Material All workmanship and materials to comply with first class international shipbuilding and marine engineering practice, in compliance with Classification Society's rules as well as to the satisfaction of Owners’ Superintendents. For all items which require Class approval and are under the control of the Yard, the Yard is responsible for arranging the attendance of the Classification Surveyor, or any other society surveyor to effect the necessary surveys in due time. The Yard shall for a period of 6 months after redelivery of the vessel to the shipowner guarantee against any defects in the repair effected due to defects in the materials delivered and / or in the work effected by the Yard, its employees , agents and / or subcontractors. 1.11 Electric Light and Power Electric wires, lamps etc. to be fitted up on board for work inside and outside the vessel, also for lighting accommodation and oth power requizements as necessary. On completion all gear has to be disconnected and removed ashore. Present power supply on board per vessel's particulars as attached. 1.12 Material The Contractor must guarantee that he has the necessary new material and/or parte in stock oz can obtain same without delay, as no extension of time will be allowed in this respect and any delay so caused will fall within the scope of Clause 1.19. All old material shall become the Contractors’ property, excluding heavy machinery pa 1,13 Strikes or Lock-outs The Contzactor shall not be liable for any delay in delivery caused by strikes or lock-outs and/or any delay in delivery by a cause which after all efforts by the Yard, could not have been prevented. In such a case where delay in delivery is foreseeable the Yard is to notify © Owners immediately such delay is inevitable in order that the Owner can take whatever action is available including but not limited co the safeguard of any contractual commitments. In such an instance the Ouners have the option to rescind the agreement in as far as not yt executed and without prejudice to all rights accrued between the parties prior to the date of termination. 1.14 Insurance The Owner shall maintain adequate hull and machinery and crew risk insurance during the period the vessel is in the Yard and whilst y, equipment and / or gear remains on board. From the time any machinery, equipment and / or gear passes the ship's rails the Owners’ insurances cease to apply and the machinery,equipment and / or gear become the responsiblity of fore 13-MAY-2021. Wa Wilhelmsen Ship Management DRYDOCK SPECIFICATION Page: 5 AS FELICIA - 2021-3RD SPECIAL SURVEY Invitation to Tender (cont.) required to make adequate provision for any loss or damage sustained by such items howsoever caused. It is assumed that the charge under this heading is absorbed by normal overheads. 1.15 Price Correction All the work noted in the attached Specification must be carried out in its entirety and no deviation whatsoever will be allowed, unless mutually agreed. The Owners reserve the right to correct errors or omissions or make deductions from, oz additions to the Specification. However, in such event, the increas¢d or decreased cost, if any, and the time of completion herein specified shall be adjusted accordingly. Acceptance of the tender shall in no way amount to acceptance of any terms and conditions save those contained herein in this Agreement, 1.16 Opening of Tender - (included in Declaration Form Annex A) 1.17 Payment Terms - (included in Declaration Form attached Annex A) 1.18 Yard Representatives In the event that the Yard is represented by an agent, the Owner reserves the right to deal direct with the Yard on all matters associated with this Agreement and expressly states that any dealings associated with the tender negotiations shall be dealt with direct with e Yard and not with the Yard's Representative. The Yard is to remain strictly liable for the actions of the Representative at all times. 1.19 Dispute This contract is governed by English law and all disputes arising under or in connection with it shall be referred to arbitration in London. The arbitration shall be conducted in accordance with one of the following LMAA procedures :— (4) where the amount claimed by the claimants is less than USD * "Note : where no figure is inserted, the parties shall be deemed to have agreed a limit of USD 250.000, 00, excluding i! excluding interest, the reference shall be made @ arbitration shall be conducted in accordance with the IMAA FALCA Rules; (42) where the amount claimed by the claimants is less than USD 50.000,00 excluding interest, (or such other sum as the parties may agree) the reference shall be to a sole arbitrator and the arbitration shall be conducted in accordance with the IMAA Small Claims Procedure; (422) in any case where the IMAA procedures referred to above Go not apply the reference shall be to three arbitrators (one to be appointed by each of the parties and the hird by the azbitrators so chosen) in accordance with che LMAA Terms in force at the relevant time. 1.20 Penalty Clause - (included in Declaration Form attached as Annex A) 1.21 Assignment Neither the Yard nor the Owner is entitled to assign the rights and obligations under this Contract to any third party, unless prior Printed: 13-MAY-2021. aw ilhelmsen Ship Management DRYDOCK SPECIFICATION Page: 6 AS FELICIA - 2021-3RD SPECIAL SURVEY Invitation to Tender (cont.) Printed: written consent shall have been obtained from the shall not be unreasonably withheld. ex party which 1.22 Acceptance of terms and conditions. The Owner is deemed to have provided and the Yard is deemed +! have read the terms and conditions herein contained upon signing of the attached declaration form, which shall be sufficient proof of contract between the parties. 1.23 Validity The terms and conditions of this Agreement, save for the specific items expressed in the Declaration Form, attached as Annex A, which shall vary for each dry docking, shall remain in force, unless either party gives one months’ written notice of any amendments or mination. Remark: Under the condition of this Tender the Owners reserve select the most convenient shipyard free of any obliga’ ei rights to 18 and cond! Declaration form attaching ons It is hereby agreed that upon signing of this Declaration both pai aze bound by the Wilhelmsen Ahrenkiel Ship Management GmbH & Co. KG Texms and Conditions of Tender (hereinafter referred to as the "Terms"), as per Clause 1.22 of the Terms. The following items are items which are specific to the tender for the repairs of the Mv" " as pe: completion the specification dated DAY.MONTH.YEAR attached and require y the Yard prior to signing and return of this Declaration. 1.16 Opening of Tender Tenders will require to be handed in not later than, , addressed to: Wilhelmsen Ahrenkiel Ship Management GmbH & Co. KG Palmaille 67 22767 Hanbi Phone +49 (40) 380 22-3800 E-Mail: contact@wilhelmsen-ahrenkiel.com The Yard hereby agrees to faithfully carry o' and complete all the A repairs, renewals and replacements to the mentioned vessel as set f © Specification dated, ; and to abide by all the conditions expressed or implied thezein, for the amounts as quoted under ¢ individual headings and for (2) Time needed at the yard being total number of running days. (44) Time needed in dry-dock being total number of running days. 1.17 Payment Terms It is mutually agreed that payment of the final invoice for the entire cost of the repair, along with all ancilliary costs shall be as follows 13-MAY-2021. Wa Wilhelmsen Ship Management DRYDOCK SPECIFICATION Page: 7 AS FELICIA - 2021-3RD SPECIAL SURVEY Invitation to Tender (cont.) 1/3 of total amount 30 days after completion 1/3 of total amount 80 days after completion 1/3 of total amount 180 days after completion The Owner reserves the right to settle any amounts earlier than the stipulated time scale above and has the option to settle 90 percent of draft invoice amount upon completion, with the remaining 10 percent being payable upon approval of the final invoice. The latter option shall be in return for 2 percent reduction of the final invoice. 1.20 Penalty Clause Should the Yard not redeliver the vessel within the stipulated me quoted in the Tender, it is agreed that the Contractor shall pay as liquidated danages the sum of US £ 12.500,00 in proportion to the vessel's daily hire rate, per whole day action thereof e Ouners. ‘The compensation should be due commencing from the 1st day of delay. Signed this day, by The Yard The Omer Wa Wilhelmsen Ship Management DRYDOCK SPECIFICATION Page: & AS FELICIA - 2021-3RD SPECIAL SURVEY Company Safety Regulations SAFETY The Yard shall at all times, provide continuously adequate safety and security protection of the work, Owner's property and adjacent property, and take all necessary precaution to free che work place from recognised hazards which are likely to cause death, illness, (or) injury to persons oz damage to property. Yard shall cause all its employees, subcontractors, agents, and other: under the Yard control entering the Vessel to perform the work in connection therewith to comply with all applicable health, safety and environmental laws, ordinances, rules and regulations. Owner or his/her representative, shall not be required to police Yard to comply with any of the health, Safety or environmental rules, laws, regulations, or ordinances generally referred to herein and shall not establish of confirm any regulations, or orders. All confined spaces, tanks, vessels, strainers, etc., with limited natural ventilation are to be provided with forced ventilation prior to entry. These spaces must be certified "Safe for Workers" by the Yard's marine chemist before entry. If hot work is to be performed, the Yard's marine chemist shall certify that the space is safe for hot work. Ship staff may elect to do their own/additional But it will be the Yard who is the final auchori hot work permits. ank atmosphere testing. cy for tank entry and Safety meetings: Prior to vessel arrival, Safety meeting will be held between yard and Owner representative and minutes will be documented by Yard. On vessel arrival before commencement of work, a kick off Safety meeting will be held between yard Officials and supervisors, Senior ship staff and owner representatives. On each subsequent day, 2 similar safety meeting will be held to discuss HSEQ aspects of the jobs to be done and being ca Yard and di! ded out. Minutes of me: puted to attendees. ng will be maintained by Wa Wilhelmsen Ship Management DRYDOCK SPECIFICATION Page: 8 AS FELICIA - 2021-3RD SPECIAL SURVEY Shipyard Tariff Rates cess shall provide t jobs cipating in this tender/bidding p: service tariff rates that are applicable to carry o} dock for guide and reference. 1, Steel renewal, removal, repair and refit Please provide your best unit prices for the following steel items: Steel renewal price per Kg - From 1 to § tons = Over 5 to 10 tons - Single curvature = Double curvature - Bottom plates, shell plates, side shell plates - High tension plates - Internals/ Frames in car holds, machinery space = Internals/ DB tanks, WING tanks and PEAK tanks. = Up to 1 ton in separate compartment or on deck Steel fairing in place Renewal of Bulwark railing Blasting of seams and butts Rotary brushing of seams and butts Chipping out, and re-welding both sides of seams and butts. Gouging and welding seams and bu Deck plates and casings Deck stringer plate Water Tight bulkheads Shaped plate -Faring of welded straight and shaped shell plating in place as well as oft -Or release, fair, and re-weld 12-30 mm per Kg. Renewal of welded straight and shaped internals/ Renewal of chequered plate per Kg Renewal of bulwark plates per Kg Renewal of rails and stanchion per running me} Chipping and V-eeing out and re-welding b 8-30 mm per running meter. Gouging and re-welding of co meter run. Provide minimum steel quantity in each area for unit rate. rame per Kg sides of seams and butts ded weld seams and butts on the hull per ces for re-building steel Please provide your best competitive p: surface area by means of Pit-welding. Assume 1 pit to be 50 * 50 * 10 mm? and include all necessary surface preparation, and final cleaning and paint touch up. Also quote standard welding prices for renewal of welding seams per meter, on hull, rudder and other applicable locations. 2. Piping Renewal Please quote your best prices for complete standard, s meter. Price list shall include variable pipe diam and non-galvanized steel with different schedule. aight pipe per s for galvanized Please also quote your best prices for piping inclusive rubber lining. Steel pipe SGP , to renew straight steel pipes on deck with nominal diamece 25A, 50A, @0A, 100A, 125A, 150A, 200A, 250A, 300A, 400A, 500A. Wa Wilhelmsen Ship Management DRYDOCK SPECIFICATION Page: 10 AS FELICIA - 2021-3RD SPECIAL SURVEY Shipyard Tariff Rates (cont.) Printe Pl quote separately for and including supports, fa 40 sch , 80 sch, 160 sch. Same as above for Galvanized pipe Same as above for yokalbro pipes Indicate price for first bend and for subsequent bends on all above ivems Renewal of flanges for all above sizes/cypes Renewal of nuts and bolts Renewal of gasket 3. Valve Overhaul Please quote your best competitive prices for overhaul of butterfly valves, storm valves, globe valves and gate valves of various size and type. Also quote your best prices for yard supplied new valves of same size/type as quoted above. 4, Electrical Motor Overhaul Please quote your best competitive prices for complete overhaul and rewinding of Electrical driven Motors. Indicate price for different kWh ratings. O- 0.75 x = 3.75 ki = 11125 kW = 22.50 ki = 37150 ki = 75.00 ki = 100 kW - 150 kW = 1300 kW (For Bow thruster) = 1800 kW Please give two separate prices, 4.1 For yard supplied spares (ail) and 4.2 Unit price when Owner supplies bearings. 4.3 Cost of resleeving bearing housing if necessary for each motor size 5. Thickness Measurements Please quote your best price for obtaining thickness measurements. Quote per measurement in various tanks, outside deck / hull etc. Per point and pez day, NDT: Please quote £1 differen NDT testing used for checking welds. 6. Hull treatment Kindly quote your be: ve prices for all variable hull eacments. Please cost per m for top sides, boot top, tical bottom including rudder, flat bottom, sea chests: Ve: HP Fresh water washing (over 250 bar) tre Hard scraping per m* stand: Degreasing 13-MAY-2021. Wa Wilhelmsen Ship Management DRYDOCK SPECIFICATION Page: 11 AS FELICIA - 2021-3RD SPECIAL SURVEY Shipyard Tariff Rates (cont.) Hose down Dise sanding Waze brushing Touch up /full coat using Owner supply conventional paint less microns and over 150 microns dft Touch up/ full coat using Owner supply SPC paint with dft less than 150 microns and over 150 microns. Chemical cleaning / removal of oily stains per m*. an 150 7. Tank Cleaning Please quote your best unit rates per m* for cleaning sludge tanks, bilge tanks, fuel oil tanks and ballast other tanks where a different unit cost applies. Quote also for disposal of mud per m* and for disposal of oily sludge per m? nks such as inks and any 8. Man hour unit rates Kindly quote us your standard man hour rates, for skilled and non-skilled labour. Kindly breakdown the unit prices into separate disciplines, such as welding, cleaning, scaffolding, riggers, etc. Rates include 411 necessary gear/equipment for the service he/she is providing. 9. Cherry Picker Please provide your best competitive prices for use of cherry pickers in dock or inside car holds per hour and per day. If you have separate prices per type, please provide list with overview. 10. Crane Please quote your be: prices for use of crane per hour or per 11. Garbage Container Please quote price pr garbage container per day. To include removal and emptying on a daily basis with yard handling emptied garbage disposed from vessel. 12. Scaffolding Please provide your best rates for scaffolding per m*, please give detail on location = On open deck - Engine room = Cargo Holds = Double bottom tank - Water ballast cank = Wing Tanks and Peak tanks Also provide your rates per single plank where planks and hanging staging is used. 13. Scuppers Please provide your unit costs for fit and refit of scuppers per plug including applying cement to ensure there are no leaks. This includes fixing of drain off pipes on port and starboard side. 14. Keel blocks / side blocks Please provide your best unit co and side block remove uncapped keel block 15. Ventilation Please quote the unit cost of 1 connected ventilation fan per 24 hour: Wa Wilhelmsen Ship Management DRYDOCK SPECIFICATION Page: 12 AS FELICIA - 2021-3RD SPECIAL SURVEY Shipyard Tariff Rates (cont.) 16. Sludge pumping service Please state your cost of removing sludge per m*. If cost varies based on location please provide these details. 17. Bilge pumping service Please state your cost of location please provide 18. Sewage tank Please provide cost of connecting sewage tank while vessel is in dock. 19. Lines Connection Please provide a list of your best prices for connection and disconnection of 1 line, broken down on separate services, such as ballast water lines, fite lines, cooling water line, air line, power cable ou @ sum displays the sum of [connection cost + disconnection cost]. 20. Anodes Please quote your be: Aluminium and Zinc. Also please provide your cost of install and supply of anodes per kilo - Aluminium and Zinc. price to install Owner supplied anodes per kilo ~ 21. Final Cleaning Pléase quote your best unit price for final cleaning of vessel per and standard rate, It is understood that price of cleaning each work area is included in price of each job. 22. Cabin heating Pléase provide unit cost per heating elements for use in cabins. 23. Working lamps Please provide the unit cost per 24 hours for variable types of working lamps. Cost to include power. 24. Manholes, open and close Please provide your unit cost per manhole cover. Cost to include opening and closing of cover and price of packing. Also add your separate price for stainless steel studs, nuts and washers per piece. 25. NDT tests Kindly quote your unit prices for the following NDT items: Dye Penetration per meter Vacuum test per meter XoRay per point MPT ~ tests per m Ultra Sonic per meter Any othe me oo wp standard teste. Wa Wilhelmsen Ship Management DRYDOCK SPECIFICATION Page: 13 AS FELICIA - 2021-3RD SPECIAL SURVEY List of Reference Drawings Li of drawings as attached ATTACHED FILES: Section Plan.PDF plan.pat Docking pian Blattl.pdf nted: 13-MAY-2021. Wa Wilhelmsen Ship Management AS FELICIA - 2021-3RD SPECIAL SURVEY Section A1, Agency/Clearances/Spares Handling Job Job Description ALL Agent fees [No Yard Involvement: AL.2 Superintendent's expenses Superintendent cost during repair hotel and business fees from shipy exiod which include transportation, QUOTE PRICE AS FOLLOWS: TOTAL COST (Io be recorded as "Bia" Quotation Package") ASE USE JOB NUMBERS IN ALL CORRESPONDENCE. Wa Wilhelmsen Ship Management AS FELICIA - 2021-3RD SPECIAL SURVEY Section A2, Tugs/Pilot/Line Handling/Docking/Wharfage DRYDOCK SPECIFICATION Page: 15 Job Job Des tion Docking, Undocking & ist 24hrs in dock The vessel is to be docked and undocked in a graving dock or floating dock with a docking block arrangement to suit the docking plan and approved by the Master & Owner Superintendent. Account should be made for maximum block loading, ballast distribution, protrusions, transducers and any specified damaged areas that may require access and repair during the refit. A docking plan must be provided by the Owner Superintendent prior to the vessels arrival. The SHIPYARD must submit an accurate plan of the block arrangement not later than 48 hours prior to the vessel's actual docking, to be included in that plan are the specifically calculated block loading, and full detailed specification of the block loading allowance. Th docking plan must be sighted, signed and approved by Ouner Superintendent and vessel s Master prior to taking to the blocks. The actual block location on the hull is to be confirmed during ary-docking. Note: Any known or suspected bottom damage will be specified with details of the location Port or Starboard side between frames. If bottom damage is suspected and specified, then allowance must also be made for a div with relevant approvals to be used for assistance during docking. Preparation of the dock to accept the vessel. Cost to include preparation of the block arrangement plan for this vessel and all calculations. Cost for Vessel's docking/undocking including 1st 24 hrs of dzy-dock dues. All inclusive of divers and other work required for docking and undecking. 3. Costs of subsequent days in dry-dock based on the time required for completion of all specified works. 4. Cost of line handlers for docking and undocking the vessel. 5. Cost of line handling boat service for each shifting. Allow docking and undecking. Surcharge for working beyond normal working hours including Sundays 6 Public Holidays. Please quote for above as lump sum with cost break down for the various jobs including unit costs where required. ‘*Allow, as a separate cost, for removing aside 1 block for access to Doppler log transducer etc. QUOTE PRICE AS FOLLOWS: TOTAL COST (To be recorded as "Bid" in the "Yard Quotation Package") COMMENT! our information also quote prices for: First day of dzydock dues (24 hrs) How many days required for this vessel docking Unit price for shifting of blocks Applicable overtime expenses. El Please inform maximum allowable docking drafts and trim. (Jo be recorded as "Comments" in "Yard Quotation Package") PLEASE USE JOB NUMBERS IN ALL CORRESPONDENCE. Wa Wilhelmsen Ship Management AS FELICIA - 2021-3RD SPECIAL SURVEY Section A2, Tugs/Pilot/Line Handling/Docking/Wharfage DRYDOCK SPECIFICATION Page: 16 Job Job Description 2.2 Subsequent days in Drydock Please quote for above as lump sum for costs of subsequent days in dry-dock based on the time required for completion of all specified works. QUOTE PRICE AS FOLLOW: TOTAL COST (Jo be recorded as "Bid" in the "Yard Quotation Package") COMMENT: For our information also quote prices for: A, Subsequent day drydock dues (day = 24hrs) (To be recorded as "Comments" in "Yard Quotation Package") 22.3 Wharfage / Berthing If not free of charge, quote wharfage dues whilst the vessel is alongside the yard repair berth. Wharfage cost is applicable when vessel is directly alongside berth and not double banked. Vessel must be placed alongside safe berth where all necessary services and cranage are accessible Quote lump sum for duration of repairs. (To be recorded as "Bid" in "Yard Quotation Package") COMMENT: For our information also quote prices fort A, Wharfage cost / tariff per day (fo be recorded as "Comments" in "Yard Quotation Package") A248 Tugboat Assistance Yard to provide Tug Service and Labour, line handlers, boats for shifting the vessel as required whilst the vessel is in the yard. This includes arrival, shifting to / from dock and departure. Note: Shifting of vessel for yard's own convenience to be on yard's Cost of wooden boat or any other vessel used to assist in mooring § unmooring must be included in quoted cost Quote lump sum for a. Arrival to Wharf x 1 move b. Wharf to Dock # 1 move 1 Dock to Wha: z 1 move d. Wharf to Departure x 1 move Surcharge for working beyond normal working hours including Sundays 6 Public Holidays. (To be recorded as "Bid" in "Yard Quotation Package") COMMENT: For our information also quote prices for: A. Price per tug and number of tugs to be used per shifting. and estimated number of riggers to be used pr shifting. = of shiftings considered in lump sum calculation. D. Also inform if any overtime rates are applicable, and surcharge if shifting is without engine. E, Cost for line handling boats/wooden boats PLEASE USE JOB NUMBERS IN ALL CORRESPONDENCE. Wa Wilhelmsen Ship Management AS FELICIA - 2021-3RD SPECIAL SURVEY Section A2, Tugs/Pilot/Line Handling/Docking/Wharfage DRYDOCK SPECIFICATION Page: 17 Job Job Des ption Tugboat Assistance (cont.) (To be recorded as "Comments" in "Yard Quotation Package") Pilotage Yard to arrange Pilot / Dock Master Service as and when necessary vincluding Arrival, departure and internal shifting (from pier to dock and dock to pier) + Note: Cost for internal shifting for yard convenience wi Quote lump sum for all shifting. yard account Quote lump sum for Arrival to Wharf b. Wharf to Dock harge for working beyond normal working hours Public Holidays. (To be recorded as "Bia" i Dock to Wha Wharf to Departure x neluding Sundays « "Yard Quotation Package") COMMENT: For our information also quote prices fort A. Cost of Pilot per shifting. B. Please state if Pilot is required for internal yard shifting Please state if there is any overtime surcharge for Pilot (Io be recorded as "Comments" in "Yard Quotation Package") Removal Keel / Side Blocks **Allow, as a separate cost, for removing aside one(1) block for access to Doppler log transducer etc. QUOTE PRICE AS FOLLOW: TOTAL COST (Io be recorded as "Bia" COMMENT: For our information also quote prices for: A. Unit price for shifting of blocks (Io be recorded as "Comments" in "Yard Quotation Package") che "Y Quotation Package") PLEASE USE JOB NUMBERS IN ALL CORRESPONDENCE. Wa Wilhelmsen Ship Management DRYDOCK SPECIFICATION Page: 18 AS FELICIA - 2021-3RD SPECIAL SURVEY Section A3, General Dock Services/Crannage/Slop & Garbage Disposal/Gas Free Cert Job Job Des ption A3.1 Provision of Gangway Provide safe access to vessel while at berth by Yard gangway. Gangway should be well lit at night. Provide cost of gangway, if not free of cost for duration of vessel stay at berth. Gangway provided must be suitable for 2 person to pass safely. Incline of the gangway should not be excessive. Gangway to be provided with safety net. Shipyard to provide emergency gangvay to exit from vessel in case required. Cost of all above to be included in the quotation. QUOTE TOTAL CosT (To be recorded as "Bid" in the "Yard Quotation Package") COMMENT: For our information also quote prices fort A. Cost of gangway per day. (To be recorded as "Comments" in "Yard Quotation Package") A3.2 Provision of Fire Line/s Connect and disconnect shore Fire connections for the whole repair di yard. re lines to be kept under pressure, over 4.5 kg/em* at all times. shore fire line should be available on Deck, in Engine room, hot work, and accommodation Note/s i) Yard must ensure that Fire line/s must be under constant pressure at all times during the entire repair period. ii) In the event of damage of fire hose/s, yard must ensure on the spot repair or replacement of the damaged hose/s at y own cost. iii) Owner will only pay the actual usage based on actual report duly signed by Chief Officer. Please indicate any additional cost for placing additional portable fire extinguishers on board if this is required as per yard safety regulations. If so required, the cost to be included in the total quoted cost. A.2.1 Connection & Disconnection of Fire Line/s Please quote fort Fire line/s connection & US$ uxx/Line/ ‘*Allow for 2 fire lines X 3 times connect/disconnect. QUOTE PRICE AS FOLLOW: TOTAL COST (To be recorded as "Bia" COMMENT: For our information also quote prices for: A, Connection/Disconnection cost x of connections required for entire vessel. the "Yard Quotation Package") PLEASE USE JOB NUMBERS IN ALL CORRESPONDENCE. Wa Wilhelmsen Ship Management AS FELICIA - 2021-3RD SPECIAL SURVEY Section A3, General Dock Services/Crannage/Slop & Garbage Disposal/Gas Free Cert DRYDOCK SPECIFICATION Page: 13 Job Job Description 3.2.1 Connection & Disconnection of Fire Line/s (cont.) Please indicate any additional cost for pla: fire extinguishers on board if this is requil regulations. If so required, the cost to be cost, (To be recorded as "Comments" in "Yard Quotation Package") 3.2.2 Daily fire line/s under pressure Please quote for total cost to keep the fire 1ii whole repair durations. Rental of Fire Line/s -- US$ xxx/line/day **Allow for 2 fire lines X total days in shipy QUOTE PRICE AS FOLLOW: TOTAL COST (Jo be recorded as "Bid" in the "Yard Quotation Package") COMMENT! For our information also quote prices for: A. Price per day (To be recorded as "Comments" in "Yard Quotation Package") A3.3 Provision of Cooling Water Line/s A3.3.1 Connection & Disconnection of Cooling Line/s Yard to provide cooling water for Domestic Reefer plants and Air Conditioning plants whilst the vessel is in dry dock or without power. Length of hoses and flanges to be connected as necessary and connections up to and from the respective condensers are to be made. Pressure of water should be between 2.0 and 2.5 bar at connection point - this must not be exceeded. Please quote for the following: Connect/disconnect -- US$ xxx/line/time **Allow to quote for 2 lines x1 time ‘*Allow for fitting a relief valve to prevent overpress| reefer plants and Air Conditioning Plants. for Domestic Note/s i) Yard must ensure that cooling lines/hoses are properly connected and working at all times while connected the ship's plant. Any damage to the plant and other related items/system due to yard's fault, all costs of repair/ renewal of the damaged items/system shall be under yard's account. ii) Owner shall only pay the actual usage based on actual report duly Signed by Chief Enginee! QUOTE PRICE AS FOLLOW: TOTAL COST (To be recorded as "Bia" COMMENT: Quotation Package") PLEASE USE JOB NUMBERS IN ALL CORRESPONDENCE. Wa Wilhelmsen Ship Management AS FELICIA - 2021-3RD SPECIAL SURVEY Section A3, General Dock Services/Crannage/Slop & Garbage Disposal/Gas Free Cert DRYDOCK SPECIFICATION Page: 20 Job Job Des ption 3.3.1 Connection & Disconnection of Cooling Line/s (cont.) our information also quote prices for: A. Cost of one Connection/Disconnection B. Price for fitting ONE relief valve Yard to quote lump sum for the total days in dock. (To be recorded as "Comments" in "Yard Quotation Package") Daily usage rental of cooling water line/s Yard to provide cooling water for Domestic Reefer plants and Air Conditioning plants whilst the vessel is in dry dock or without power. Length of hoses and flanges to be connected as necessary and connections up to and from the respective condensers are to be made. Pressure of 2 av connection point - this must water should be between 2.0 and 2.5 bi not be exceeded. Please quote for the following: Rental of cooling line/s -- US$ xxx/line/day **Allow to quote for 2 lines = No. of days in dock must ensure that cooling lines/hoses are properly connected and working at all times while connected the ship's plant. Any damage to the plant and other related items/system due to yard's fault, all costs of newal of the damaged items/system shall be under yard's ii) Owner shall only pay the actual usage based on actual report duly Signed by Chief Enginee! QUOTE PRICE AS FOLLOW: TOTAL COST (To be recorded as "Bid" i: COMMENT! x our information also quote prices for: B. Price per day per connection. Yard to quote lump sum for the total days in dock. (To be recorded as "Comments" in "Yard Quotation Package") the "Yard Quotation Package") Electric Shore Power Supply 440V / 60Hz Connection & Disconnection of Shore Power Line Shore Power Power Supply, S-phase 440V/220V/60H2/S00A to be supp! during vessel's stay in dock. Please quote Connect/ Disconnect -- US$ xxx/line/time **Allow to quote for 1 line x 2 times connection/disconnection. Note/s a) Yard must ensure that no power interruption while connected to the vessel. In case of necessary or emergency power interruption by the yard, yard must communicate with ship's crew/ ChE prior to such interruption to ensure safety of the ship's crew/ yard's personnel Printe 13-MAY-2021. PLEASE USE JOB NUMBERS IN ALL CORRESPONDENCE. Wa Wilhelmsen Ship Management AS FELICIA - 2021-3RD SPECIAL SURVEY Section A3, General Dock Services/Crannage/Slop & Garbage Disposal/Gas Free Cert DRYDOCK SPECIFICATION Page: 21 Job Job Des tion AS.4.1 Connection & Disconnection of Shore Power Line (cont.) working onboard including ship's equipment. b) In the event of damage of equipment or incident due to miscommunication or yard did not properly communicated the interruption, all costs of repair for any damages/incidents shall be under yard's account. c) Owner shall only pay the actual total power consumption based on actual readings duly signed by Chief Engineer/ Ship's Electrician. QUOTE PRICE AS FOLLOWS: TOTAL COST (To be recorded as "Bid" in the WY. COMMENT: For our information also quote prices for: A, Connection and Disconnection cost (To be recorded as "Comments" in "Yard Quotation Package") Quotation Package") Total Shore Power Consumption kWh Quote for Shore power consumption -- US$ xxx/Kih **Allow for 3000kWh x No. of days in dock. Note/s a) Yard must ensure that no power interruption while connected to the vessel. In case of necessary or emergency power interruption by the yard, yard must communicate with ship's crew/ ChE prior to such interruption to ensure safety of the ship's crew/ yard's personnel working onboard including ship's equipment. b) In the event of damage of equipment or incident due to miscommunication or yard did not properly communicated the interruption, all costs of repair for any damages/incidents shall be under yard's account. c) Owner shall only pay the actual toval power consumption based on actual readings duly signed by Chief Engineer/ Ship's Electrician. QUOTE PRICE AS FOLLOW: TOTAL COST (Jo be recorded as "Bid" in the "Y. COMMENT: For our information also quote prices for: A. Price pr kiih. B. Price if using yard's supplied generator. Cl Brice for direct power connection to ballast pumps and windlass. (To be recorded as "Comments" in "Yard Quotation Package") Quotation Package") Earth connection Earth connection to be provided during shipyard stay along the quay and inside dock. PLEASE USE JOB NUMBERS IN ALL CORRESPONDENCE. Wa Wilhelmsen Ship Management DRYDOCK SPECIFICATION Page: 2: AS FELICIA - 2021-3RD SPECIAL SURVEY Section A3, General Dock Services/Crannage/Slop & Garbage Disposal/Gas Free Cert Job Job Description A343 Earth connection (cont.) Quote lump sum cost for one earth connection including connect/disconnect. Earth Connection ~~ US$ xxx (Lumpsum) QUOTE PRICE AS FOLLOW: TOTAL COST (To be recorded as "Bid" in the "Yard Quotation Package") A3.5 Supply of Ballast Water Supply 3.5.1. Connection & Disconnection of Ballast Line/s Supply of Ballast Water to nominated ballast tanks for undocking. Please quote for the following: Connection/disconnection -- US$ xxx/line/time **Allow to quote for 2 lines x1 time Cost to include removal and refit of air pipes. ‘*Allow for removal and refit of 5 units Air pipes. Note/s: i) For calculating connections, one connection must be capable of supplying a minimum of 200 tong of ballast water per hour ii)Owner will only pay the actual amount based on actual Zeport duly signed by Chief Officer. TOTAL COST (To be recorded as "Bid" in the "Yard Quotation Package") COMMENT: For our information also quote prices for: A. Price for connection / disconnection per tank. (fo be recorded as "Comments" in "Yard Quotation Package") 3.5.2 Total Ballast Water Supply Supply of Ballast Water to nominated ballast tanks for undocking. Please quote for the following: Ballast Water Supply -- US$ xxx/ tonnes **Allow to quote for 3000 tonnes Note/s i) For calculating connections, one connection must be capable of supplying a minimum of 200 tong of ballast water per hot ii.) Actual amount of ballast water shall be reconfirmed by Tech Supt/ Chief Officer during repair period. i1i)Owner will only pay the actual amount based on actual report duly signed by Chief Officer. TOTAL COST (To be recorded as "Bia" Quotation Package") COMMENT: Printed: 13-MAY-2021. PLEASE USE JOB NUMBERS IN ALL CORRESPONDENCE. Wa Wilhelmsen Ship Management Page: AS FELICIA - 2021-3RD SPECIAL SURVEY Section A3, General Dock Services/Crannage/Slop & Garbage Disposal/Gas Free Cert DRYDOCK SPECIFICATION 23 Job Job Des ption 3.5.2 Total Ballast Water Supply (cont.) our information also quote prices for: ‘ton of water. (Zo be recorded as "Comments" in "Yard Quotation Package") Domestic Fresh Water Supply Connection & Disconnection of Domestic FW Line/s Potable Fresh Water for domestic pi Ship Fresh water tank. Quote lump sum f 1) 2 lines 2) one time connection disconnection oses to be supplied by hoses to Note/s: i) Actual amount of fresh water shall be reconfi Officer during repair period. ii) Owner will only pay the actual amount based on actual report duly signed by Chief Officer. m by Tech Supt/ Chief QUOTE PRICE AS FOLLOWS: TOTAL COST (Jo be recorded as "Bia" COMMENT: For our information also quote prices for: A. Connection / disconnection (Zo be recorded as "Comments" in "Yard Quotation Package") che "Y Quotation Package") Supply of domestic fresh water Potable Fresh Water for domestic pi Ship Fresh water tank. Quote lump sum for 100 tonnes. to be supplied by hoses to Note/s: i) Actual amount of fresh water shall be recon! Officer during repair period. ii) Owner will only pay the actual amount based on actual report duly signed by Chief Officer. m by Tech Supt/ Chief QUOTE PRICE AS FOLLOWS: TOTAL COST (Io be recorded as "Bia" COMMENT: our information also quote prices for: A. Unit price per tonnes of FW supply (Zo be recorded as "Comments" in "Yard Quotation Package") che "Yar Quotation Package") Supply of Compressed Air Printe 13-MAY-2021. PLEASE USE JOB NUMBERS IN ALL CORRESPONDENCE. Wa Wilhelmsen Ship Management DRYDOCK SPECIFICATION Page: 24 AS FELICIA - 2021-3RD SPECIAL SURVEY Section A3, General Dock Services/Crannage/Slop & Garbage Disposal/Gas Free Cert Job Job Des ption A3.7.1 Connection & Disconnection of Compressed Air Line/s Yard to provide compressed aiz at line as of repa: 0 kg/em? to vessel compressed a: quested by the attending Tech Supt. during the entire duration for operation of deck air and pneumatic tools by ship Crew. Please quote the following: Connection/ Disconnection ~~ US$ xxx/line/time **Allow to quote for 1 line x 2 times QUOTE PRICE AS FOLLOW: TOTAL COST (To be recorded as "Bia" COMMENT: For our information also quote prices for: A. Pez connection / disconnection (To be recorded as "Comments" in "Yard Quotation Package") che "Y Quotation Package") 3.7.2 Daily supply of Compressed Air Yard to provide compressed aiz at 7.0 kg/cm? to vessel compressed air line as requested by the attending Tech Supt. during the entire duration of repairs for operation of deck air and pneumatic tools by ship Crew. Please quote the followin: Daily usage vental -- US$ axx/line/day **Allow to quote for 1 line x repair days in y QUOTE PRICE AS FOLLOW: TOTAL COST (To be recorded as "Bid" i: COMMENT! x our information also quote prices for: the "Yard Quotation Package") A. Per daily usage. (To be recorded as "Comments" in "Yard Quotation Package") 3.8 Fire Watchman & Security Watchman 3.8.1 Fire Watchman Shipyard to provide trained Fire Watchman as required by the yard and pozt authorities during the entire period when vessel is undergoing repairs. This is in addition to hot work specific fire watchman which is included separately in each hot work job. The identity of fire watchman should be informed each day. Fire watchman is not Safety supervisor who conducts Safety meetings. Please quote the following: Fire Watchmen -- US$ xx/man/day **Allow to quote for No. of men x No. of days in yard PLEASE USE JOB NUMBERS IN ALL CORRESPONDENCE. Wa Wilhelmsen Ship Management DRYDOCK SPECIFICATION Page: 25 AS FELICIA - 2021-3RD SPECIAL SURVEY Section A3, General Dock Services/Crannage/Slop & Garbage Disposal/Gas Free Cert Job Job Des tion 3.8.1. Fire Watchman (cont.) Note/s: i) Owners will not pay per day in case both fire & security men doing only safety rounds in yard, per day means 24 hours safety watch on board. ii) Fire Watchman must at all times ensure the safety w environment onboard during the entire repair period. iii) Security watchman must at all times ensure security onboard vessel to avoid any loses of property of both Ship's Crew and shipyard staff. Any such loses resulting from lack of securing measures, all loses shall be under yard's account. ing QUOTE PRICE AS FOLLOW: TOTAL COST (To be recorded as "Bid" in the "Yard Quotation Package") COMMENT: For our information also quote prices fort A. Price per day for 1 fire watchman B. Any other cost for fire watchman as per Yard regulation. C. Total number of watchmen included in lump sum. (fo be recorded as "Comments" in "Yard Quotation Package") 3.8.2 Security Watchman Shipyard to provide Security watchman during the entire period when vessel is undergoing repairs. If there is ISPS cost, amount shall be included in lump sum cost. The identity of security watchman should be informed daily. Security Watchman will be stationed on vessel at top of gangway and he is NOT the boarding office Please quote the following: Security Watchmen -- US$ xx/man/day **Allow to quote for No. of men x No. = days in yard Note/s: i) Owners will not pay per day in case both fire & security men ar doing only safety rounds in yard, per day means 24 hours safety watch on board. ii) Fire Watchman must at all times ensure the safety working environment onboard during the entire repair period. iii) Security watchman must at all times ensure security onboard vesse: to avoid any loses of property of both Ship's Crew and shipyard staff. Any such loses resulting from lack of securing measures, all loses shall be under yard's account. QUOTE PRICE AS FOLLOW: TOTAL COST (To be recorded as "Bid" in the "Yard Quotation Package") COMMENT: For our information also quote prices fort A. Price per day for 1 security watchman B. Yard / port requirements and regulations for Security watchman. Total number of security watchmen and days included in lump sum. DL ISPS cost, (To be recorded as "Comments" in "Yard Quotation Package") Printed: 13-MAY-2021. PLEASE USE JOB NUMBERS IN ALL CORRESPONDENCE. Wa Wilhelmsen Ship Management AS FELICIA - 2021-3RD SPECIAL SURVEY Section A3, General Dock Services/Crannage/Slop & Garbage Disposal/Gas Free Cert DRYDOCK SPECIFICATION Page: 26 Job Job Description A3.9 Yard Equipment Services 3.9.1. Crane Services for Owners use Shipyard to provide Shore Crane and riggers and signal men for lifting ship's stores, spare parts arranged by Owner. Crane services must be arranged at agreed times to prevent delays to the project. Please quote for the following: a) Crane rental for Owner's use ~ USS xxx/hr b, Riggers if required -- USS xxx man/hr **Allow for 30 hours crane usage/vental. Cost to include any additional charges for signal man, riggers etc. Note/s: i) Crane rental cost should include operator & signal men ii) Owner shall only pay the actual total usage based on actual request reports duly signed by Chief Engineer/Office: i1i)Coste related to the use of Crane service related to S¥ jobs, to be included in all quotations. Therefore not to be charged separately. QUOTE PRICE AS FOLLOWS: TOTAL COST (Jo be recorded as "Bid" in the "Yard Quotation Package") COMMENT: For our information also quote prices for: A. Hourly use of crane, or per time including riggers and signal man and any other safety procedures for use of crane. B. Please inform if there is any restriction or notice required. (To be recorded as "Comments" in "Yard Quotation Package") 3.9.2 Cherry Picker Services for Owners use Shipyard to provide cherry picker and operator for Owner usage. Chery: picker services must be arranged at agreed times to prevent delays to the project. Please quote the followin: Rental rate -- US$ xxx/ unit/day Note/s i) Rental cost should include operator ii) Yard must ensure that the cherry picker unit/s provided is fully functional with updated testing certificate to ensure safety of the iii) In the event of delays/damages/incidents resulting to injuries/ loss of life/s due to the functionality and obsolete certificate of the unit, all costs relating to the delays/damages/incidents shall be under yard's account. iv) Owner shall only pay the actual total usage based on actual reports duly signed by Chief Engineer/ Officer. v)Costs for the use of Cherry pickers and dock arm related to SY jobs, to be included in all quotations. Therefore not to be charged PLEASE USE JOB NUMBERS IN ALL CORRESPONDENCE. Wa Wilhelmsen Ship Management Page: AS FELICIA - 2021-3RD SPECIAL SURVEY Section A3, General Dock Services/Crannage/Slop & Garbage Disposal/Gas Free Cert DRYDOCK SPECIFICATION Job Job Description 3.9.2 Cherry Picker Services for Owners use (cont.) separately. QUOTE PRICE AS FOLLOWS: TOTAL COST (Jo be recorded as "Bid" in the "Yard Quotation Package") COMMENT: our information also quote prices for: A, Hourly use of cherry picker and any other safety procedures of cherry picker. B. Please inform if there is any restriction or notice required. (To be recorded as "Comments" in "Yard Quotation Package") 3.9.3, Fork lift service for Owners use Shipyard to provide Forklift and operator for transporting ship's stores, spare parts arranged by Owner. Forklift services must be arranged at agreed times to prevent delays to the project. Please quote the followin: Rental rate -- US$ xix/ unit/hr of day **Allow for total 6 hours X one unit fork life Note/s i) Rental cost should include operator 4i)Yard must ensure that the forklift unit/s provided is fully functional with updated testing certificate to ensure safety of the iii) In the event of delays/damages/incidents resulting to injuries/ loss of life/s due to or relating to the functionality and obsolete certificate of the unit, all costs relating to the delays/ damages/ incidents shall be under yard's account. iv) Owner shall only pay the actual total usage based on actual reports duly signed by Chief Engineer/ Officer. v)Costs related to the use of Fork lift service related to S¥ jobs, to be included in all quotations. Therefore not to be charged separately. QUOTE PRICE AS FOLLOW: TOTAL COST (To be recorded as "Bia" Package") COMMENT! For our information also quote prices for: A. Hourly rate for Fork lift. Please inform if there is any res! notice required. (To be recorded as "Comments" in "Yard Quotation Package") A310 ‘Telephone Shipyard to provide: 1) Land line phone on vessel for local calls and emergency purpose. 2) 4 pes mobile phones for local calls and emergency puzpose. Please quote lump sum for telephone including local calls only ai repair period. ng PLEASE USE JOB NUMBERS IN ALL CORRESPONDENCE. Wa Wilhelmsen Ship Management Page: AS FELICIA - 2021-3RD SPECIAL SURVEY Section A3, General Dock Services/Crannage/Slop & Garbage Disposal/Gas Free Cert DRYDOCK SPECIFICATION 28 Job Job Description A3.10 Telephone (cont.) Quote for this service for entire duration of docking. QUOTE TOTAL cosT TOTAL Cost (Jo be recorded as "Bid" in the "Yard Quotation Package") COMMENT: our information also quote prices for: A, Quote cost pr day. (To be recorded as "Comments" in "Yard Quotation Package") AS.11 Connection & Disconnection of Sewage Line/s Shipyard to provide connection for Sewage line from vessel to discharge treated sewage to shore. This is to be taken to sewage tank provided by shipyard for duration of vessel stay at repair berth and in in dock. Please quote the following: Connect/Disconnect -- USS xxx /line/time **Allow to quote for 1 line x 2 times Note/s: i) Yard must ensure to provide the sewage tank at all times while to connected to the vessel. ii) In the event that the tank is full, the yard must change tank with an empty tank for continuous usage of the ship's crew. QUOTE PRICE AS FOLLOWS: TOTAL COST (Jo be recorded as "Bid" in the "Yard Quotation Package") COMMENT: our information also quote prices for: A, Cost of daily rate (To be recorded as "Comments" in "Yard Quotation Package") 3.11.1 Sewage Disposal Shipyard to provide connection for Sewage line from vessel to discharge treated sewage to shore. This is to be taken to sewage tank provided by shipyard for duration of vessel stay at repair berth and in in dock. Please quote the following: Sewage Disposal -- US$ xxx /tonne **Allow to quote for 2 tonnes sewage disposal. Note/s i) Yard must ensure to provide the sewage tank at all times while to connected to the vessel. ii) In the event that the tank is full, the yard must change tank with an empty tank for continuous usage of the QUOTE PRICE AS FOLLOWS: TOTAL COST PLEASE USE JOB NUMBERS IN ALL CORRESPONDENCE. Wa Wilhelmsen Ship Management Page AS FELICIA - 2021-3RD SPECIAL SURVEY Section A3, General Dock Services/Crannage/Slop & Garbage Disposal/Gas Free Cert DRYDOCK SPECIFICATI ‘ON 29 Job Job Description A3.11.1 Sewage Disposal (cont.) be recorded as "Bid" in the "Yard Quotation Package") COMMENT: For our information also quote prices for: A. Cost of sewage disposal per tonnes (Io be recorded as "Comments" in "Yard Quotation Package") A3.12 3.12.1 Food waste disposal costs Please quote for the following: Ship's Galley refuse -- USS xxx/bin/day **Allow to quote for 2 bins x No of days during repair period. Note/s: i.) Yard must ensure garbage disposal daily and no rubbish allowed to accumulate on board the ship. ii.) Owner shall only pay the actual total usage based on actual reports duly signed by Chief Engineer/ Officer. QUOTE PRICE AS FOLLOW: TOTAL COST (To be recorded as "Bid" in the "Yard Quotation Package") 3.12.2 Oily rags disposal costs Please quote for the following: Oily rags -- USS xxx/per kg **ALlow to quote for 100kgs Note/s: i.) Yard must ensure garbage disposal daily and no rubbish allowed to agcumulate on board the ship. ii.) Owner shall only pay the actual total usage based on actual reports duly signed by Chief Engineer/ Officer. QUOTE PRICE AS FOLLOW: TOTAL COST (To be recorded as "Bid" in the "Yard Quotation Package") 3.13 Engine Room Bilges/ Oily Water & Sludge Disposal 3.13.1 ER Bilges / Oily Water Disposal Please quote for the following: Removal £ disposal of ER Bilge/Oily water -- USS xxx /m* **Allow to quote for S000: Printed: USE JOB NUMBERS IN ALL CORRESPONDENCE. Wa Wilhelmsen Ship Management AS FELICIA - 2021-3RD SPECIAL SURVEY Section A3, General Dock Services/Crannage/Slop & Garbage Disposal/Gas Free Cert DRYDOCK SPECIFICATION Page: 30 Job Job Description 3.13.1 ER Bilges / Oily Water Disposal (cont.) Note/s: i.) All disposal of above shall be based on the request or concurrence of Chief Engineer ¢ Tech Supt. ii.) Owner shall only pay the actual total disposed amount based on actual reports duly signed by Chief Engineer/ Officer. iii.) Yard to provide disposal certificate based on the actual dispose volume/weight. QUOTE PRICE AS FOLLOWS TOTAL COST (To be recorded as "Bid" in the "Yard Quotation Package") COMMENT! our information also quote prices for: A. Removal and disposal per m* Er bilge/oily water B. Cost in issuing sludge disposal certificate (To be recorded as "Comments" in "Yard Quotation Package") 3.13.2 Sludge_disposal Facilities to be provided for removal and disposal of unpumpable / solid sludge from fuel oil tanks or other spaces on vessel. Certificate of removal/disposal to be provided Please quote for the following Removal & disposal of Sludge -- US$ xxx/tonne **Allow to quote for 10 tonnes Note/s: i.) All disposal of above shall be based on the request or concurrence of Chief Engineer ¢ Tech Supt. ii.) Owner shall only pay the actual total disposed amount based on actual reports duly signed by Chief Engineer/ Officer. iii.) Yard to provide disposal certificate based on the actual dispose volume/weight. QUOTE PRICE AS FOLLOW: TOTAL COST (Jo be recorded as "Bid" in the "Yard Quotation Package") COMMENT: For our information also quote prices for: A. Removal and disposal per tonnes sludge B. Cost in issuing sludge disposal certificate (fo be recorded as "Comments" in "Yard Quotation Package") A3.14 Manhole Covers for FOT & WBT A3.14.1 Fuel Tanks Manhole Covers The fuel tanks to be opened throughout the repair period for access for inspection, repairs and renewal of gaskets. Safety barricades handrail to be provided around manholes for fuel tanks. Please quote the following: PLEASE USE JOB NUMBERS IN ALL CORRESPONDENCE. Wa Wilhelmsen Ship Management AS FELICIA - 2021-3RD SPECIAL SURVEY Section A3, General Dock Services/Crannage/Slop & Garbage Disposal/Gas Free Cert DRYDOCK SPECIFICATION Page: 31 Job Job Description A3.14.1 Fuel Tanks Manhole Covers (cont.) a) Open ¢ Close manhole cover -- US$ xxx/cover **Allow to quote for 40 covers to be opened b) Renewal of broken studs with yard supply -- US$ xxx/pe. **Allow to quote for 50 studs Note/s i) Prior to any opening of fuel tanks the responsible officer must be informed and authorized. ii) The owner's representative must complete a final inspection of the tank prior to the removal of lighting and ventilation and before the closing of any manholes. 44i)AL1 openings must be protected and barricaded to prevent accidental fall. iv) Atmospheric checks is covered under a separate job. v) Ships staff to de-scale and coat the manhole covers if required z to replacement. vi} for access unless being used for ventilation should be covered with open gratings or other suitable means and appropriate signage posted. Cost for ventilation, temporary lighting and gas free inspection are covered under different jobs. QUOTE PRICE AS FOLLOWS: TOTAL COST (To be recorded as "Bid" in the "Yard Quotation Package") COMMENT: For our information also quote prices for: A. Price per manhole open and close B. Renewal of stainless steel stud (M20) using yard supply and weld in place. C. Renewal of seat ring with threaded holes. D. Renewal of manhole cover using yard supply material. E. Supply of stainless steel nuts (M20) (To be recorded as "Comments" in "Yard Quotation Package") A3.14.2 Ballasts Tanks Manhole Covers The ballast tanks to be opened throughout the repair period for access for inspection, repairs and renewal of gaskets. Safety barricades handrail to be provided around manholes for ballast tanks. Please quote the followin: 2) Open & Close manhole cover -- US$ xxx/cover **Allow to quote for 40 covers to be opened b) Renewal of broken studs with yard supply -- US$ xxx/pe. **Allow to quote for 50 studs Note/s i) to any opening of ballast tanks the responsible officer must be informed and authorized. Prince 13-MAY-2021. PLEASE USE JOB NUMBERS IN ALL CORRESPONDENCE. Wa Wilhelmsen Ship Management DRYDOCK SPECIFICATION Page: 32 AS FELICIA - 2021-3RD SPECIAL SURVEY Section A3, General Dock Services/Crannage/Slop & Garbage Disposal/Gas Free Cert Job Job Description A3.14.2 Ballasts Tanks Manhole Covers (cont.) ii) The owner's representative must complete a final inspection of the tank prior to the removal of lighting and ventilation and before the closing of any manholes. 44i)AL1 openings must be protected and barricaded to prevent accidental fall. iv) Atmospheric checks is covered under a separate job. v) Ships staff to de-scale and coat the manhole covers equired prior to replacement. vi} for access unless being used for covered with open gratings or other suitable means and appropriate signage posted. Cost for ventilation, temporary lighting and gas free inspection are covered under different jobs. QUOTE PRICE AS FOLLOW: TOTAL COST (To be recorded as "Bid" in the "Yard Quotation Package") COMMENT: For our information also quote prices for: A. Price per manhole open and close B. Renewal of stainless steel stud (M20) using yard supply and weld in place. Renewal of seat ring with threaded holes. D. Renewal of manhole cover using yard supply material. E, Supply of stainless steel nuts (M20) (fo be recorded as "Comments" in "Yard Quotation Package") 3.15 Initial Gas-free Inspection & Certificate Gas Free Inspection/Certificate to be issued as required by Port Authorities / Yard Policy on arrival. Please quote the following: Initial gas free inspection -- US$ xxx (Lumpsum) **Allow for any launch boat charges for chemist boarding the vessel the anchorag: Note/s: i) Initial gas free inspection shall be done by Chemist of Port Authority to issue gas free certificate to enable vessel to enter shipyard. ii) Yard has maintain and update gas free reading of tanks under inspection or repair to ensure safety of working personnel. QUOTE PRICE AS FOLLOW: TOTAL COST (To be recorded as "Bia" COMMENT: For our information also quote prices for: A, Quote for initial gas free certificate. (To be recorded as "Comments" in "Yard Quotation Package") che "Y Quotation Package") PLEASE USE JOB NUMBERS IN ALL CORRESPONDENCE. Wa Wilhelmsen Ship Management Page: AS FELICIA - 2021-3RD SPECIAL SURVEY Section A3, General Dock Services/Crannage/Slop & Garbage Disposal/Gas Free Cert DRYDOCK SPECIFICATION 33 Job Job Description 3.15.1 Following gas free inspections Daily gas free inspection of all enclosed spaces to be carried out daily. Gas free certificates to be issued daily for duration of vesse! stay in shipya: Please quote the following: Subsequent gas free inspection -- US$ xxx/day Quote for the entire duration of vessel stay in yard. Allow for daily hot work certificate in the engine room workshop for ship crew work. ALL areas of the vessel to be included in the daily gas free check. The cost will not be per tank, but per day for the duration of repairs. Cost of tank entry certificates or gas free certificates or hot work certificates will not be added to any job. Note/s: i) Initial gas free inspection shall be done by Chemist of Port Authority to issue gas free certificate to enable vessel to enter shipyard. ii) Yard has maintain and update gas free reading of tanks under inspection or repair to ensure safety of working personnel. QUOTE PRICE AS FOLLOWS: TOTAL COST (Jo be recorded as "Bid" in the "Yard Quotation Package") COMMENT: our information also quote prices for: A. Quote for daily inspection by yard’s chemist during repair period fo: confirmation of vessel gas free condition. (To be recorded as "Comments" in "Yard Quotation Package") A3.16 ‘Temporary Lighting Shipyard to arrange safe lighting in ballast and fuel tanks as required to carry out Owner / Crew inspection and repairs. Lighting at site of scheduled yard jobs is part of each specified job and not included under this item. Please include cost of power considering 8 hours per day. Please quote the followin: Connect/Disconnect -- US$ xxx/lamp/time as per Shipyard Daily Usage -- US$ xxx/lamp/day inclusive of power consumption ‘*Allow for 6 lamps X 6 days usages QUOTE PRICE AS FOLLOW: TOTAL COST (Jo be recorded as "Bid" in the "Yard Quotation Package") COMMENT: For our information also quote prices for: connection / disconnection B. Per daily usage. PLEASE USE JOB NUMBERS IN ALL CORRESPONDENCE.

You might also like