Professional Documents
Culture Documents
01000
60
59
58
57
56
55
54
53
52
51
50
49
48
02000
24100
47 D101 4/A301
46 D101 4/A301
45 D101 4/A301
44 D101
43 D101 4/A301
42 D101
41 D101
40 D101
39 D101 4/A301
38 D101
37 D102
36 D102 A102
35 D102
34 D102
33 D102
32 D102
31 D102
30 A103
29 A103
28 A103
27 A103
26 A103
25 A103
24 A103
23 A103
22 A103
21 A103
20 A103
19 A103
18 A103
17 A103
28213
16 H100
25626
03000
03600
15 S101 D3/S10
05000
51200
14 S101 B/D/S101
13 S101 D/S101
12 S101 B/D/S101
11 S101 B/S101
10 S101 D/S101
9 S101 D1/S101
8 S101 B/S101
7 S101 A/S101
6 S101 A/S101
5 S101 B/S101
4 S102
3 S102 B/S101
S101
A105
06000
61000
1
2 S102 1/S102
07000
79005
A105/
3
A301
A502
08000
81113
5 A502
6 A502
845213
A301 1/A301
87100
See specs.
22 A502
0056
See specs.
9 A502
0056
09000
92116
10 A101 A502
11 A101 A502
12 A102 A103
93000
13 A102
14 A102
15 A105
16 A105
17 A105
18 A105
19 A105
20 A105
95133
A102 2/A401
22 A102
A102 5/A501
99123
24 A105
25 A105
26 A105
11000
114000
27 A104
28 A104
29 A104
30 A104
31 A104
32 A104
33 A104
34 A104
35 A104
36 A104
37 A104
38 A104
39 A104
40 A104
41 A104
42 A104
21000
210553
43 FS101
212300
44 FS101
22000
16000
ABBREVIATI
ONS:
At Bronx River
UNIT TOTAL
DESCRIPTION QTY. UNIT
COST COST
DIVISION 01 - GENERAL REQUIREMENTS
MOBILIZATION 1 LS
BOND & INSURANCE (See Spec. Sec. G01740) 1 LS
PROJECT SUPERVISION & PROJECT MANAGEMENT 1 LS
SUBMITTALS, SAMPLES, SHOP DRAWINGS, SITE
1 LS
SAFETY PLAN, ETC. (See Spec. Sec. S01300)
TEMPORARY FACILITIES & CONTROLS INCL.
AUTHORITY FIELD OFFICE 1 LS
(See Spec. Sec. S01500)
PROJECT SCHEDULE (Primavera P3 or P6) See Spec.
1 LS
Sec. S01312
OFFICE OVERHEADS 1 LS
CLOSEOUT PROCEDURES (See Spec. Sec. G01700) 1 LS
PERMITS (DOT, DOB & After hour permits ETC.) 1 LS
(1) SECURITY GUARD (FOR 16 HOURS/DAY FOR 236
WEEKDAYS AND 24 HOURS/DAY FOR 94 WEEKENDS)
EXCLUDED 120 DAYS FOR SUBMITTALS, APPROVAL
HRS
AND PERMITS.
Performance Period 450 days
Normal school hours 8:00AM to 3:30PM
SHPO Note:
The building is designated as eligible for listing on the
national register of historical places.
- Plaster repairs are to be done to match existing
historic plaster in design and dimension.
- Match color, size, shape and texture of all stones,
terra-cotta & bricks to the existing.
DIVISION 02 - SITEWORK
DEMOLITION
Existing 7' Fire rated gypsum board Wall To Be
124 SF
Demolished
Existing Door (3' X 6'10'') To Be Removed 1 EA
Remove Existing Fire-Rated Roll-Down Shutters (4'3" x
5' 6"), Incl. Frames, Sills/Counter And All Associated 2 EA
Hardware/Wiring
Remove Exist. Quarry Tile Floor Throughout Kitchen, Incl. 476 SF
Closets
Remove Old Ceramic 8' Wall Tile: Scrape Off Adhesive
Residue, Level Surfaces. Wherever Old & New Wall
Surfaces Will Join, Prepare Joint To Be Invisible Beneath 308 SF
New Finishes (Such As New St. Stl Wall Flashing Behind
Range/Convection Oven).
Remove Exist. Steam Convector And Assoc. Piping Remove
/ Or Cap Associated Plumbing. G.C. To Coordinate. 1 EA
Remove Exist. Vinyl Tile Floor 107 SF
Existing Vinyl Floor To Remain At The Lounge Shall Be 523 SF
Protected During Demolition / Construction (Typ).
Remove Existing Glazing Panel, To Be Replaced With New
Insulated Panel Fitted Around New Incoming Duct. See 2 EA
Mech. Dwgs For Additional Info.
Remove Part Of The Gypsum Board Ceiling As Required For
New Construction. 225 SF
Existing Accustic Ceiling To Be Removed 390 SF
Existing Light Fixture To Be Removed Due To Demolition
Work And R Installed As Indicated On Rc Flan Dwg A-10200 4 EA
Indicates Devise To Be Removed 4 EA
Existing Light Fixture To Be Removed 7 EA
Existing Gyp. Bd. Ceiling & Soffits To Be Removed. Ceilings
And Soffits In Dining Room To Be Restored To Original 171 SF
Condition.
Remove Existing Hood 18.1 SF
Remove Existing Strobe Light 1 EA
Sink to be removed and return to DFTA 1 EA
Hand wash sink to be relocated 1 EA
Reach in refrigrator to be relocated
D35"XW53"XH78" 1 EA
Ice Maker to be relocated
D35-3/4" X W17-3/4"X H31-1/4" 1 EA
Storage Bins to be relocated
29"DX13"WX30"H 1 EA
Existing Work Table to be removed
96"L X 24"D X varies H 1 EA
Steam Table (4 trays) to be reinstall 1 EA
Water Dispenser to be relocated
L85"-1/2XW83"XH46" 1 EA
Exhaust hood to be removed 1 EA
Chef Desk to be relocated
32DX48W 1 EA
free standing shelving to be reinstalled
24DX48L 1 EA
Towel dispenser & Soap Dispenser to be relocated 1 EA
Rolling Shutters to be relocated 1 EA
Fire Extinguisher to be relocated 1 EA
ASBESTOS ABATEMENT
Asbestos to be removed 91 SF
DUST CONTROL
DIVISION 03 - CONCRETE
GROUTING
No shrunk grout on both side of dunnage 4 LOC
DIVISION 05 - METAL
STRUCTURAL STEEL FRAMING
4 STD pipes on 6 sides of dunage 18 LF
11'' x 6'' x 1/4'' Pl with 4 5/8'' dia A325 Bolts W/nuts
4 EA
and washer
11'' x 5'' x 1/4'' Pl with 4 5/8'' dia A325 Bolts W/nuts
6 EA
and washer
11'' x 4'' x 1/4'' Pl with 4 5/8'' dia A325 Bolts W/nuts
2 EA
and washer
8'' x 8'' x 1/4'' PL with 4- 3/8" HILTI KH-EZ carbon steer
4 EA
scre anchors W/Nominal embed
6'' x 9'' x 1/4'' PL with 4 5/8'' dia A325 Bolts W/Nuts &
4 EA
washer
11 1/2'' x 3 1/4" x 1/4'' 1 Gusset on each support 8 EA
W 12x30 dunage (49.2 LF) 0.739 TON
W 8x10 dunage section (14.5 LF) 0.0725 TON
HSS 5 x 5 x 1/4 0.071 TON
DIVISION 09 - FINISHES
GYPSUM BOARD ASSEMBLIES
New Wall 2
-3-1/2" Metal Stud Header
-Vertical 2-5/8" Metal Stud 16" O.C.
-2 Layers Of 58" Gypsum Board (Type-X) 142 SF
-One Layers Of Fire Rated Gypsum Board
-New Ceramic Tile Quarry Tile Base (6'1 High)
-New Quarry Tile Flooring (6X6)
New Wall 2
-3-1/2" Metal Stud Header
-Vertical 2-5/8" Metal Stud 16" O.C.
40 SF
-2 Layers Of 58" Gypsum Board (Type-X)
-One Layers Of Fire Rated Gypsum Board
-New Quarry Tile Flooring (6X6)
New Gypsum board ceiling. 57.06 SF
CIRAMIC TILING
New 2'x2' recessed light fixture for lighthning fixture 2 EA
Full tile 1 EA
New arctic white ciramic tilees on walls
445.5 SF
-Size: 0190 - 3'' x 6''
New Quarry tiles
-Color: red blaze DQ40 476.5 SF
-Size: 60'' X 60"
Vinyl floor to be Protected 13.2 SF
Wall base
144.1 LF
-Color: Red blaze
Wall base
67 Lf
-Color: match existing
Corner guards 4 EA
INTERIOR PAINTING
Paint match existing adjacent sheen on wall 663 SF
Ceiling paint semi-gloss 66.5 SF
Ceiling paint to be matched with existing 86 SF
adjacent color
DIVISION 11 - EQUIPMENTS
FOOD SERVICE EQUIPMENT
New convection oven
1 EA
-Model BGS/22SC 67"H X 38"D X 38"W
New Sink
-Model X60 RR 1 EA
-Size: 59-1/16"W X 35-1/2"D X 57"H
New food prep table (above bins)
-Model 600S2171718LFT 1 EA
-Size: 2 Bowls @ 17" X 17" X12 "D draine board left
Relocated Storage bins
-Model 21 gal 3 EA
-Size: 29" D X 13" W X 30" H
Relocated ice maker
1 EA
-Model: 048-GM-48196
Relocated Hand wash sink
1 EA
-Model: HS - 2L
New Dishwasher
-Model: AM15VLT 1 EA
-Size: 26"X30"X69"-76"
New clean dish table
Model: DTC-S70-24L 1 EA
-Size: 15"W X 3"D X34"H
New mid mount shelf
1 EA
-Size: 84"L X15"W
new standing prep table SS366
1 EA
-Size: 72"L 36"W
New stainless steel wall shield
1 EA
-Size: 7'-0" X11'-0"
New Exhaust hood/ FSS System
1 EA
-Size: 5'-0" X 11'-0"
New tabular drainage shelf DT-6R-72
1 EA
-Size: 15"D X 72"W
New Rolling Shutter, counter & frame
1 EA
-Size:60"H 60"W
New wall shelf PS-15-84
1 EA
15" X 7'
Chef's Desk and equipment shelf
-Desk 24"D X 50"W 1 EA
-Shelf 24"D X 50" W
DIVISION 21 - FIRE SUPPRESION
IDENTIFICATION FOR FIRE SUPPRESSION
PIPING AND EQUIPMENT
DIVISION 22 - PLUMBING
(PLEASE GET PRICE FROM HVAC CONTRACTOR)
DIVISON 26 - ELECTRICAL
(PLEASE GET PRICE FROM ELECTRICAL CONTRACTOR)
DIVISION 27 - COMMUNICATION
(PLEASE GET PRICE FROM ELECTRICAL CONTRACTOR)