You are on page 1of 16

S# DWG DETAIL CSI NO

01000
60
59
58
57

56

55
54
53
52

51

50

49

48

02000
24100

47 D101 4/A301
46 D101 4/A301

45 D101 4/A301

44 D101

43 D101 4/A301

42 D101
41 D101
40 D101

39 D101 4/A301

38 D101
37 D102
36 D102 A102
35 D102
34 D102

33 D102

32 D102
31 D102
30 A103
29 A103
28 A103

27 A103

26 A103

25 A103
24 A103
23 A103
22 A103
21 A103
20 A103
19 A103
18 A103
17 A103
28213
16 H100
25626

03000
03600
15 S101 D3/S10

05000
51200
14 S101 B/D/S101
13 S101 D/S101

12 S101 B/D/S101

11 S101 B/S101

10 S101 D/S101

9 S101 D1/S101
8 S101 B/S101
7 S101 A/S101
6 S101 A/S101
5 S101 B/S101

4 S102
3 S102 B/S101

S101

A105

06000
61000
1

2 S102 1/S102

07000

79005
A105/
3
A301
A502
08000
81113

5 A502

6 A502

845213

A301 1/A301

87100

See specs.
22 A502
0056
See specs.
9 A502
0056

09000
92116

10 A101 A502

11 A101 A502

12 A102 A103

93000
13 A102
14 A102
15 A105

16 A105

17 A105
18 A105

19 A105
20 A105

95133
A102 2/A401
22 A102

A102 5/A501

99123
24 A105
25 A105

26 A105

11000
114000

27 A104

28 A104

29 A104

30 A104

31 A104

32 A104

33 A104

34 A104

35 A104

36 A104

37 A104

38 A104
39 A104

40 A104

41 A104

42 A104

21000

210553

43 FS101

212300
44 FS101

22000

16000

ABBREVIATI
ONS:
At Bronx River

UNIT TOTAL
DESCRIPTION QTY. UNIT
COST COST
DIVISION 01 - GENERAL REQUIREMENTS
MOBILIZATION 1 LS
BOND & INSURANCE (See Spec. Sec. G01740) 1 LS
PROJECT SUPERVISION & PROJECT MANAGEMENT 1 LS
SUBMITTALS, SAMPLES, SHOP DRAWINGS, SITE
1 LS
SAFETY PLAN, ETC. (See Spec. Sec. S01300)
TEMPORARY FACILITIES & CONTROLS INCL.
AUTHORITY FIELD OFFICE 1 LS
(See Spec. Sec. S01500)
PROJECT SCHEDULE (Primavera P3 or P6) See Spec.
1 LS
Sec. S01312
OFFICE OVERHEADS 1 LS
CLOSEOUT PROCEDURES (See Spec. Sec. G01700) 1 LS
PERMITS (DOT, DOB & After hour permits ETC.) 1 LS
(1) SECURITY GUARD (FOR 16 HOURS/DAY FOR 236
WEEKDAYS AND 24 HOURS/DAY FOR 94 WEEKENDS)
EXCLUDED 120 DAYS FOR SUBMITTALS, APPROVAL
HRS
AND PERMITS.
Performance Period 450 days
Normal school hours 8:00AM to 3:30PM

CUSTODIAL PERMIT (FOR 8 HOURS/PER DAY FOR 236


WEEKDAYS) EXCLUDED 120 DAYS FOR SUBMITTALS,
APPROVAL AND PERMITS. AFTER 120 DAYS HOLIDAYS HRS
AND OVERTIMES ARE EXCLUDED.
Performance Period 450 days
SCAFFOLDING SF
SIDEWALK SHED
Note: As a minimum sidewalk shed is provided LF
around perimeter of building at all paved areas.

SHPO Note:
The building is designated as eligible for listing on the
national register of historical places.
- Plaster repairs are to be done to match existing
historic plaster in design and dimension.
- Match color, size, shape and texture of all stones,
terra-cotta & bricks to the existing.

DIVISION 02 - SITEWORK
DEMOLITION
Existing 7' Fire rated gypsum board Wall To Be
124 SF
Demolished
Existing Door (3' X 6'10'') To Be Removed 1 EA
Remove Existing Fire-Rated Roll-Down Shutters (4'3" x
5' 6"), Incl. Frames, Sills/Counter And All Associated 2 EA
Hardware/Wiring
Remove Exist. Quarry Tile Floor Throughout Kitchen, Incl. 476 SF
Closets
Remove Old Ceramic 8' Wall Tile: Scrape Off Adhesive
Residue, Level Surfaces. Wherever Old & New Wall
Surfaces Will Join, Prepare Joint To Be Invisible Beneath 308 SF
New Finishes (Such As New St. Stl Wall Flashing Behind
Range/Convection Oven).
Remove Exist. Steam Convector And Assoc. Piping Remove
/ Or Cap Associated Plumbing. G.C. To Coordinate. 1 EA
Remove Exist. Vinyl Tile Floor 107 SF
Existing Vinyl Floor To Remain At The Lounge Shall Be 523 SF
Protected During Demolition / Construction (Typ).
Remove Existing Glazing Panel, To Be Replaced With New
Insulated Panel Fitted Around New Incoming Duct. See 2 EA
Mech. Dwgs For Additional Info.
Remove Part Of The Gypsum Board Ceiling As Required For
New Construction. 225 SF
Existing Accustic Ceiling To Be Removed 390 SF
Existing Light Fixture To Be Removed Due To Demolition
Work And R Installed As Indicated On Rc Flan Dwg A-10200 4 EA
Indicates Devise To Be Removed 4 EA
Existing Light Fixture To Be Removed 7 EA
Existing Gyp. Bd. Ceiling & Soffits To Be Removed. Ceilings
And Soffits In Dining Room To Be Restored To Original 171 SF
Condition.
Remove Existing Hood 18.1 SF
Remove Existing Strobe Light 1 EA
Sink to be removed and return to DFTA 1 EA
Hand wash sink to be relocated 1 EA
Reach in refrigrator to be relocated
D35"XW53"XH78" 1 EA
Ice Maker to be relocated
D35-3/4" X W17-3/4"X H31-1/4" 1 EA
Storage Bins to be relocated
29"DX13"WX30"H 1 EA
Existing Work Table to be removed
96"L X 24"D X varies H 1 EA
Steam Table (4 trays) to be reinstall 1 EA
Water Dispenser to be relocated
L85"-1/2XW83"XH46" 1 EA
Exhaust hood to be removed 1 EA
Chef Desk to be relocated
32DX48W 1 EA
free standing shelving to be reinstalled
24DX48L 1 EA
Towel dispenser & Soap Dispenser to be relocated 1 EA
Rolling Shutters to be relocated 1 EA
Fire Extinguisher to be relocated 1 EA
ASBESTOS ABATEMENT
Asbestos to be removed 91 SF
DUST CONTROL

DIVISION 03 - CONCRETE
GROUTING
No shrunk grout on both side of dunnage 4 LOC

DIVISION 05 - METAL
STRUCTURAL STEEL FRAMING
4 STD pipes on 6 sides of dunage 18 LF
11'' x 6'' x 1/4'' Pl with 4 5/8'' dia A325 Bolts W/nuts
4 EA
and washer
11'' x 5'' x 1/4'' Pl with 4 5/8'' dia A325 Bolts W/nuts
6 EA
and washer
11'' x 4'' x 1/4'' Pl with 4 5/8'' dia A325 Bolts W/nuts
2 EA
and washer
8'' x 8'' x 1/4'' PL with 4- 3/8" HILTI KH-EZ carbon steer
4 EA
scre anchors W/Nominal embed
6'' x 9'' x 1/4'' PL with 4 5/8'' dia A325 Bolts W/Nuts &
4 EA
washer
11 1/2'' x 3 1/4" x 1/4'' 1 Gusset on each support 8 EA
W 12x30 dunage (49.2 LF) 0.739 TON
W 8x10 dunage section (14.5 LF) 0.0725 TON
HSS 5 x 5 x 1/4 0.071 TON

New access ladder


Details:
-height:17'-2 1/2"
-Weight: 2'-2"
- 2, HSS 3"x3"x1/4" ( 56.6 LF)
- 2, HSS 3 x3x 3/16 posts ( 8 LF) 1 EA
- 4, 2 1/2" STD pipe for diagonal support (L:38LF)
- 2, 3'-0" x3" x 3/8" PL. (below )
- 2, 1'-10" x3" x3/8" plate ( below )
- 3'-9" x 2'-3" x 3/8" thk. CHK'D plate.
- 8, 8" x8"x 1/4" plates
New metal stairs
Detail:
-Lenght = 5'7"
-Width = 6'0"
1 EA
-Steel bar grating platform/landing W/ checker : ( 34
SF)
-Steel bar grating stair tread W/ checker ( 5 EA)
- MC 18 x10.6 stringer ( 2 EA)

Provide handrail ( 42" high min) on both sides of


23 LF
metal stairs
16 GA, 6'-8" W x 8" W x1" H stainless steel sill
1 EA
cladding
DIVISION 06 - WOOD AND PLASTICS
ROUGH CARPENTRY
Hood and Duckt 55.42 SF
Insert Wooden Shim PL. thightlyu to secure ladder
movemrnt 2 EA
-PL Size: 8'' x 8'' x 1/4''
DIVISION 07 - THERMAL AND MOISTURE
PROTECTION
JOINT SEALERS
Joint sealent at exposed joints 172 LF
Sealent at door head and jam 35 LF
DIVISION 08 - OPENINGS
HOLLOW METAL DOORS AND FRAMES
New Metal door N1 of type D2
-Size: (2'0'' x 6'10" x 1' 3/4'') 1 EA
-Hardware set 2
New Metal door N2 of type D2
-Size: (3'0'' x 6'10'' x 1' 3/4'') 1 EA
-hardware set 1
METAL-CLAD INSULATED WINDOW PANELS
insulated window panels
2 EA
-Size: (2'10'' x 3'0'')
DOOR HARDWARE
Hardware set #1
-Hinges: 3 each. 5.5 x 4.5 extra heavy duty, stainless
steel
2 EA
-Lockset: 1 each .Model # LV90509 07A
-Door stop: 1 each. Model # 100H
-Silencer: 3 each Black or grey rubber
Hadware set # 2
-Hinges: -.5BB1HW 4.5 x 4.5 full mortise, extra heavy
duty, stainless steel
-Locket: 1 set, model #LV9070P 07A
-Flush bolt: 1 set. Model FB31P
2 EA
-Floor strike: 1 (inactive door), model #DP#2
-Coordinator: 1 set, model #CORXFL
-Closer: 1 Each, model #4040XP H
-Door step: 1 each, model # WS402CCV
-Silencer: 3 each, Black or grey rubber

DIVISION 09 - FINISHES
GYPSUM BOARD ASSEMBLIES
New Wall 2
-3-1/2" Metal Stud Header
-Vertical 2-5/8" Metal Stud 16" O.C.
-2 Layers Of 58" Gypsum Board (Type-X) 142 SF
-One Layers Of Fire Rated Gypsum Board
-New Ceramic Tile Quarry Tile Base (6'1 High)
-New Quarry Tile Flooring (6X6)

New Wall 2
-3-1/2" Metal Stud Header
-Vertical 2-5/8" Metal Stud 16" O.C.
40 SF
-2 Layers Of 58" Gypsum Board (Type-X)
-One Layers Of Fire Rated Gypsum Board
-New Quarry Tile Flooring (6X6)
New Gypsum board ceiling. 57.06 SF

CIRAMIC TILING
New 2'x2' recessed light fixture for lighthning fixture 2 EA
Full tile 1 EA
New arctic white ciramic tilees on walls
445.5 SF
-Size: 0190 - 3'' x 6''
New Quarry tiles
-Color: red blaze DQ40 476.5 SF
-Size: 60'' X 60"
Vinyl floor to be Protected 13.2 SF
Wall base
144.1 LF
-Color: Red blaze
Wall base
67 Lf
-Color: match existing
Corner guards 4 EA

METAL PANNEL CEILING SYSTEM


New Gypsum board ceiling system 57 SF
New 2'x2' ceiling grid 407 LF
New suspendede metal tile ceiling
Description:
-Sanp bar
-1/4'' dia hanger 318.1 SF
-security clip
-Wire T clip
1/2'' cold rolled channel

INTERIOR PAINTING
Paint match existing adjacent sheen on wall 663 SF
Ceiling paint semi-gloss 66.5 SF
Ceiling paint to be matched with existing 86 SF
adjacent color
DIVISION 11 - EQUIPMENTS
FOOD SERVICE EQUIPMENT
New convection oven
1 EA
-Model BGS/22SC 67"H X 38"D X 38"W
New Sink
-Model X60 RR 1 EA
-Size: 59-1/16"W X 35-1/2"D X 57"H
New food prep table (above bins)
-Model 600S2171718LFT 1 EA
-Size: 2 Bowls @ 17" X 17" X12 "D draine board left
Relocated Storage bins
-Model 21 gal 3 EA
-Size: 29" D X 13" W X 30" H
Relocated ice maker
1 EA
-Model: 048-GM-48196
Relocated Hand wash sink
1 EA
-Model: HS - 2L
New Dishwasher
-Model: AM15VLT 1 EA
-Size: 26"X30"X69"-76"
New clean dish table
Model: DTC-S70-24L 1 EA
-Size: 15"W X 3"D X34"H
New mid mount shelf
1 EA
-Size: 84"L X15"W
new standing prep table SS366
1 EA
-Size: 72"L 36"W
New stainless steel wall shield
1 EA
-Size: 7'-0" X11'-0"
New Exhaust hood/ FSS System
1 EA
-Size: 5'-0" X 11'-0"
New tabular drainage shelf DT-6R-72
1 EA
-Size: 15"D X 72"W
New Rolling Shutter, counter & frame
1 EA
-Size:60"H 60"W
New wall shelf PS-15-84
1 EA
15" X 7'
Chef's Desk and equipment shelf
-Desk 24"D X 50"W 1 EA
-Shelf 24"D X 50" W
DIVISION 21 - FIRE SUPPRESION
IDENTIFICATION FOR FIRE SUPPRESSION
PIPING AND EQUIPMENT

Identification for Fire cabinet ansul system :


- 1B 3 Gallon tank
- 3 OEM regulated release
- 5 Ansulex liquid agent ( 3 GAL.)
- 7 Cartridge ( 101-20)
- 10 Test link
- 11 Double microswitch
- 12 House assembly
- 1100 Duct nozzle (430913)
- 2W Duct nozzle (419337)
- 1W Nozzle assembly (419336)
- 1F Nozzle assembly (419333)
- 1N Nozzle assembly (419335)
- 1/2N Nozzle assembly (419334) 27 EA
- 3N Nozzle assembly (419338)
- 245 Nozzle assembly (419340)
- 230 Nozzle assembly (419339)
- 2120 Nozzle assembly (419343)
- 290 Nozzle assembly (419342)
- 260 Nozzle assembly (419341)
- 28 Detector bracket
- 29 Low fusible link
- 30 High temp fusible link
- MSG mechanical gas valve
- EGV Electrical gas valve
- 34 Remote manual pull station
- S Swivel adaptor

CHEMICAL FIRE-EXTINGUISHING SYSTEM


Insul R-102 system
System should include a regulated release mechanism
and wet chemical storage tank housed within a single
enclosure.
Detail as follows: 1 EA
- Size : 3
- Flow points : 10
- Hood 10'-5" long x 66" widge x 24" high
- Riser Size: 12" x 14"

DIVISION 22 - PLUMBING
(PLEASE GET PRICE FROM HVAC CONTRACTOR)

DIVISION 23 - HEATING, VANTILATING AND


AIR CONDITIONING
(PLEASE GET PRICE FROM ELECTRICAL CONTRACTOR)

DIVISON 26 - ELECTRICAL
(PLEASE GET PRICE FROM ELECTRICAL CONTRACTOR)

DIVISION 27 - COMMUNICATION
(PLEASE GET PRICE FROM ELECTRICAL CONTRACTOR)

DIVISION 28 - FIRE DETECTION AND ALARM


(PLEASE GET PRICE FROM ELECTRICAL CONTRACTOR)