You are on page 1of 1

DAFTAR HARGA RUMAH

GREENLAND KEMANG BOGOR


Margin KPR : Bank BSI 5.99 % Fixed 5 Tahun
Promo Dapat Berubah Sewaktu-waktu

Luas Luas Angsuran KPR Minimum Gaji


DP 2
No. BLOK Tunai KPR Booking Fee DP 1 Plafond KPR
Bangunan Tanah (khusus KPR) 15 Thn 20 Thn 20 Thn

1 48 115 C7-01 668,624,000 734,026,000 3,000,000 5,000,000 65,402,000.00 660,624,000 5,571,152 4,729,105 12,380,338
C7
2 48 60 2,3,4,5,6,7,8,9,10,11 452,494,000 493,882,000 3,000,000 5,000,000 41,388,000 444,494,000 3,748,492 3,181,929 8,329,982
12,13,14,15,16,17
3 48 156 C7-18 833,739,000 917,487,000 3,000,000 5,000,000 83,748,000 825,739,000 6,963,595 5,911,088 15,474,655
4 48 126 C7-19 711,838,000 782,042,000 3,000,000 5,000,000 70,204,000 703,838,000 5,935,583 5,038,454 13,190,185
5 48 60 C7-20 452,494,000 493,882,000 3,000,000 5,000,000 41,388,000 444,494,000 3,748,492 3,181,929 8,329,982
6 48 60 C7-21 452,494,000 493,882,000 3,000,000 5,000,000 41,388,000 444,494,000 3,748,492 3,181,929 8,329,982
7 48 84 C7-22 541,831,000 593,145,000 3,000,000 5,000,000 51,314,000 533,831,000 4,501,886 3,821,452 10,004,191
8 48 80 C7-23 525,932,000 575,479,000 3,000,000 5,000,000 49,547,000 517,932,000 4,367,807 3,707,638 9,706,237
C7
9 48 60 452,494,000 493,882,000 3,000,000 5,000,000 41,388,000 444,494,000 3,748,492 3,181,929 8,329,982
24,25,26,27,28,29
10 48 89 C7-30 561,808,000 615,342,000 3,000,000 5,000,000 53,534,000 553,808,000 4,670,355 3,964,458 10,378,567
11 48 94 C7-31 561,808,000 615,342,000 3,000,000 5,000,000 53,534,000 553,808,000 4,670,355 3,964,458 10,378,567
C7
32,33,34,35,36,37
12 48 60 452,494,000 493,882,000 3,000,000 5,000,000 41,388,000 444,494,000 3,748,492 3,181,929 8,329,982
38,39,40,41,42,43
44,45,46,47,48,49
13 48 115 C7-50 668,624,000 734,026,000 3,000,000 5,000,000 65,402,000 660,624,000 5,571,152 4,729,105 12,380,338
14 64 103 C8-01 685,749,000 753,054,000 3,000,000 5,000,000 67,305,000 677,749,000 5,715,570 4,851,695 12,701,267
C8
2,3,4,5,6,7,8,9,10
15 64 65 535,544,000 586,160,000 3,000,000 5,000,000 50,616,000 527,544,000 4,448,866 3,776,446 9,886,370
11,12,13,14,15,16,17
18,19,20,21
16 64 128 C8-22 785,634,000 864,037,000 3,000,000 5,000,000 78,403,000 777,634,000 6,557,917 5,566,726 14,573,149
17 64 113 C8-23 723,664,000 795,182,000 3,000,000 5,000,000 71,518,000 715,664,000 6,035,314 5,123,111 13,411,808
C8
24,25,26,27,28,29,30
18 64 65 535,544,000 586,160,000 3,000,000 5,000,000 50,616,000 527,544,000 4,448,866 3,776,446 9,886,370
31,32,33,34,35,36,37
38,39,40,41,42,43
19 64 103 C8-44 685,749,000 753,054,000 3,000,000 5,000,000 67,305,000 677,749,000 5,715,570 4,851,695 12,701,267

Syarat KPR
- Copy KTP suami-istri (3 lembar)
Waktu Pembayaran Tunai KPR KPR
- Copy Kartu Keluarga (3 lembar)
- Copy surat nikah (3 lembar)
Booking Fee Rp. 3.000.000 Rp. 3.000.000 Rp. 3.000.000,- - Asli slip gaji 3 bulan terakhir
Pembayaran DP 1 - 1 minggu setelah booking fee - Copy rekening koran/tabungan 3 bulan terakhir
Pelunasan Harga Tunai - Rp.3.000.000,- Bank - Asli surat keterangan kerja (masa kerja minimal 2 tahun)
- Copy NPWP pribadi
Kantor Pemasaran - Pas foto suami & istri 3x4 masing masing 3 lembar
Jl. Raya Parung Bogor
Kabupaten Bogor Berlaku Efektif Sejak: 1 Mei 2021
Telp: Price List Approval
Catatan : Prepared By Checked By Approved By
- Keputusan pembelian harus dipertimbangkan secara matang Sales Manager General Manager VP

- Perpindahan Unit, dikenakan biaya sebesar Rp. 500.000,-


- Persyaratan KPR harus sudah diserahkan paling lambat 1 minggu setelah booking, atau pemesanan unit akan ditinjau kembali
- Jika pengajuan KPR ditolak oleh pihak bank, maka dana yang sudah masuk akan dikembalikan setelah dipotong Booking Fee Rp. 3.000.000,-
dan mengikuti ketentuan administratif yang tercantum dalam Perjanjian Pengikatan Jual Beli (PPJB)
- Developer tidak menjamin disetujuinya pengajuan KPR oleh bank
- Pelaksanaan pemasangan instalasi listrik sepenuhnya merupakan kewenangan PLN Date: Date: Date:
- Harga belum termasuk : BPHTB, AJB, BBN Sertifikat, Biaya KPR
- Harga sudahtermasuk : IMB, Biaya Pecah Sertifikat, Listrik dan Penyambungan PDAM
- Harga dan ketentuan diatas dapat berubah sewaktu-waktu tanpa pemberitahuan terlebih dahulu
* contoh
- Setiap pembayaran via rekening harus mencantumkan nama pengirim, nomor unit dan jenis pembayaran, Fardi -:A.1-23 - Booking Fee
* Fardi - A.1-23 - Pelunasan

You might also like