Professional Documents
Culture Documents
Introduction
support, quality, reliability, cost, lead times and customer service when
Based on the criteria outlined above, here are the leading low
PCBWay
PCBWay serves over 500,000 customers worldwide with their rapid low
JLCPCB
ALLPCB
Advanced Circuits
provide:
rapid delivery.
Sierra Circuits
industries.
Sunstone Circuits
Volume Lead
Company Location Layers Assembly DFM Support
Range Time
RayMing PCB & 5 – 3 – 15
China 16+ Advanced Full team
Assembly 1,000 days
5 – 1 – 5
PCBWay China 6 max Basic Limited
1,000 days
5 –
JLCPCB China 2-4 24 Hours Basic Minimal
1,000
Volume Lead
Company Location Layers Assembly DFM Support
Range Time
1 – 3 – 5 Dedicated
ALLPCB China 12 max Basic
1,000 days engineer
5 –
Elecrow China 2-4 24 Hours None Minimal
1,000
Advanced 25 –
USA 16 max 24 Hours Basic Included
Circuits 1,000
10 – 5 – 15
Sierra Circuits USA 16+ None Included
1,000 days
Sunstone 5 – 15
USA 25 – 500 12 max Basic Minimal
Circuits days
Conclusion
resources make RayMing the ideal partner for low volume circuit
manufacturing:
production?
Q: How are lead times for delivery of low volume PCB orders?
Lead times can range from 24 hours for rush fabrication of simple
Q: What are the cost differences between low and high volume
PCB production?
Low volume PCBs typically cost significantly more per unit than
production?
https://www.raypcb.com/low-volume-pcb-assembly/