Professional Documents
Culture Documents
COLLECTING TANK
PUS
WORKSHOP
USED
PLASTIC BOTTLES
FABRICATION OFFICE
LEGENDS:
EMD WORKSHOP
MOTORPOOL
DRYING BED
74.56SQ.M
C.R
OFFICE
PPES
OFFICE PPES
STOCKROOM
EXISTING
CLARIFIER
STORM DRAIN CANAL
TANK
C.R
MAN
HOLE
320.72 CLARIFYING
TANK
629.78
REUSABLE MATERIALS UP
EXISTING
CLEAR
TANK
SQ.M CLARIFYING SQ.M
TANK
(PMS AREA)
PUS
DISCHARGE
TANK CLARIFYING WORKSHOP
COVERED CANAL
TANK
WORKING AREA
WORKING AREA
PUMP
WORKING AREA
EXISTING AERATION
FABRICATION
MOTORPOOL
TANK
MECHANICAL
WORKING
RAC
MAN
EXISTING WORKSHOP
AREA
0.00
COLLECTING
HOLE
RAC
TANK
EXISTING
COLLECTING
PPES SHO
TANK
CR
LAV WC
URI
PUMP
ROOM WATER
TANK
MAN
HOLE
MAN
HOLE
RAMP UP
GUARD POST
DRY WAREHOUSE 1
STORM DRAIN CANAL
406.56 SQ.M
HAULING TRUCK
14300
2098
PLATFORM
MAN MAN
THAWING THAWING FRESH MEAT CHILLER
ON POST
4200
HOLE HOLE
AREA 1 AREA 2 ROOM TEMP (0 TO -5 °C)
12775 200
650
3700
800
M O T O R C Y C L E
650
Screw
Air
Compress
4550 or
MAN
HOLE
Air
7850
Compres
sor
8350
Vertical
Receiver Air
Comp
PROPOSED
Air
EMERGENCY EXIT
RAMP
SLIDING (D1)
Wika
Mega
Masterlink
Transformer
Atlas
Copco
HL
Refrigerant
Heat
Exchanger
MAN MAN
C A R
HOLE HOLE
STORM DRAIN CANAL
FRESH MEAT
RECEIVING
WIP
STORAGE
P A R K
UP
MAN MAN
P A R K
HOLE HOLE
CISTERN
TANK
MATERIALS
CISTERN
TANK CUSTODIAN
MAN HAND
HOLE
MAN WASHING BROKEN PALETTE AREA ±4.00m
VIEWING DECK
MAN
HOLE HOLE
STATION ±32.50sq.m.
BOOT DARK
DIP ROOM
SWIPING SWIPING SWIPING
512.98
HOLE HOLE
SQ.M
WATER
TANK
STORM DRAIN CANAL
ON STAND-BY
FIRE TRUCK
896.33
SQ.M
HASHER
VIEWING DECK
MAN MAN
HOLE HOLE
1750
TABLE
STORM DRAIN CANAL
MAN MAN
HOLE HOLE
BRINE
CHILLER
GUARD 300
POST
VIEWING DECK VIEWING DECK
MAN
HOLE
SHE HE
5350
GEN. BLAST FREEZER 3
SET
COVERED CANAL
COVERED CANAL
COVERED CANAL
TRENCHLINE
5450
BLAST FREEZER 2
3644
13925
1875 TRENCHLINE
14325
UP
6150
COMP. COMP. COMP. TEMP COMP. TEMP
BLAST FREEZER 1
6656
PANEL PANEL PANEL CONTROL PANEL CONTROL
W.D
TRENCHLINE
91.75 17950
2708
SQ.M
CA
2525
HALLWAY
BIN
ET
NU
POWER LVSB LVSB
PANEL PANEL COMP. COMP. TEMP.
RS
METER 2 3 PANEL PANEL CHECK CA
E
TIMED GATE-VALVE
EL:+2.25 FIL B.
ACCUACCU ACCU TIMED GATE-VALVE M M CA E
TIMED GATE-VALVE
EL:+1.75
M
M M FIL B.
PASSAGEHALL
EL:+1.75
E
TEMPORARY
TIMED GATE-VALVE
M
EL:+2.25
UP
TIMED GATE-VALVE
FIL B.
M
TIMED GATE-VALVE
EL:+2.00
CA
M
TIMED GATE-VALVE
EL:+1.50
E
M
M
EL:+1.00
M
M
76.56
SQ.M
OPEN CANAL
CONV.
TABLE
OPEN CANAL
CONDENSER UNIT
460V 3-PH
DO
SEALER
CAP
CT
134.52 SQ.,M
OR
OPEN CANAL
SEALER
CAP
PDS ATM
CONV.
TABLE
CO
WA TE
UN EA
ITI RING
AR
NG
/
149 SQ.M
SEALER
CAP
196.93 SQ.,M
MAN
HOLE
SQ.M
76.56
UP
NAN TONG
WD UP
UP
21489
2.5m x 12.5m
40 ftr
2889
FORMAX
11750
8512
656
188.36 SQ.,M
UP
TANK
2.5m x 10m
CE
32 ftr
AN
TR
EN
a
are
OLA
RAC
GOND
K
AREA
DN
OND
CR DIAM ER
2.5m x 10m
CHILL
SE
CHEE ER
CHILL
32 ftr
OLA
ZE
EE GOND
FR
HT D
RIG AN ZER OLA
UP ISL EE GOND
FR
OLA
GOND
RS D R
T AN
ISL EEZE
UP
3 DOOIGH R
UPR EZE FR
SPACE FOR
FRE
MANEUVERING
345 sq.m
E
3181
OR
ST
10m X 10m JD
O
2.5m x 12.5m
ftr
'S
DA OR
14429 ER
UM
16 x 5m
ST
40 ftr
ST
CO AREA
YD E
m
AY
1.7
'S
S
CT
35520
DU
RO
2.5m x 12.5m
RIP
AG
40 ftr
PDS
DW
4
TE
2.5m x 10m
GA
THRESHOLD
THRESHOLD
32 ftr
HEATER
HEATER
2.5m x 10m
COVERED CANAL
32 ftr
ftr
16 x 5m
1.7m x 5m
m
16 ftr
1.7
11519
0
10606
0
+- +- +- +- +- +- +-
36V 36V 36V 36V 36V 36V 36V
110A 90A 134A 140A 140A 140A 90A
BATTERY
CHARGING
AREA
DRAIN CANAL
SCRUBBER
DRAIN CANAL
CYCLONE WT
EXHAUST
RAMP
DR
UP
AIN
CA
NA
L
DRAIN CANAL
DRAIN CANAL
±200.48sq.m
DRAIN CANAL
DRAIN CANAL
BOILER
DRAIN CANAL
DRAIN CANAL
.2
70
3
TE
±2
GA
DRAIN CANAL
GE
RA
TO
N
A LS
CO
MP
RA N
D
UP MP
RA