You are on page 1of 1

PERABUNG SENG (LAPIS PAPAN 2/10)

NOK GORDING 5/10 (FINISHING RESIDU)


ATAP SENG GELOMBANG WARNA BJLS 20 K
GORDING 5/10 (FINISHING RESIDU)
KAKI KUDA-KUDA 6/12 (FINISHING RESIDU)
+6.62
14

BALOK TARK 2x6/12 (FINISHING RESIDU)


287

PLAFOND PLYWOOD 4 MM (FINISHING CAT AIR)


+3,50
LISTPLANK 2 x 10
(FINISHING CAT MINYAK)
PLAFOND PLYWOOD 4 MM LISTPLANK 2 x 20
ELEVASI + 3,20 (FINISHING CAT MINYAK)
60

60
PIRI - PIRI 2/10
SELIMUT KOLOM (FINISHING BATU ALAM)
350

105

105

200
RABBAT RABBAT

105

105
BETON BETON
±0.00
-0.30
-0.60
RABAT RUANG BACA / KOLEKSI SELASAR RABAT
POTONGAN A - A
Skala 1:100 700 200

You might also like