You are on page 1of 593

BUREAU OF FISHERIES AND AQUATIC RESOURCES

CITIZEN'S CHARTER
CY-2022 (2nd Edition)

1
BUREAU OF FISHERIES AND AQUATIC RESOURCES

I. MANDATE
The bureau is responsible for the development, improvement, management and conservation of the country's fisheries and
aquatic resources.

II. VISION
“An institution of excellence in sustainable fisheries management and innovative services contributing to the nation’s food
security and improving fisher folk’s quality of life.

III. MISSION
"To ensure sustainable use of fisheries and aquatic resources by empowering fisherfolk towards productivity and resiliency."

IV. SERVICE PLEDGE:


We commit to:

F- urther provide quality administrative and technical assistance to clients and stakeholders specifically aimed at increasing
resource productivity, improving resource use efficiency, and ensuring the long term sustainability of the country’s fishery and
aquatic resources;

I - mprove our frontline services to meet the clientele and stakeholders’ increasing demand for fast and efficient service,
transparency and accountability;

S - ubscribe to local and international best practices and conduct in all, frontline services, office processes and adopt high
quality assurance standards;

H - umbly respond to inquiries swiftly, efficiently and with utmost courtesy through our Public Assistance Counter (PAC) at the
Anti-Red Tape Unit (ARTU) office at Ground Floor Lobby, Fisheries Building Complex, BPI Compound, Barangay
Vasra, Visayas Avenue, Quezon City from Mondays to Fridays, 8:00 a.m. to 5:00 p.m. and even beyond as warranted by the
circumstances and demands from the public;

E - nsure strict compliance with quality service standard in the delivery of frontline services towards creativity and innovative
approaches to uplift public service;

R - eadily offer a wide range of quality frontline services which are easily accessible and affordable to the general public by
giving value to every client’s comments, suggestions and complaints;

I - ndividually strive to nurture an efficient, enthusiastic and competent workforce with appropriate technologies and
competencies for better service to our clientele;

E - nlighten the public with 24/7 access to the BFAR website (http://www.bfar.da.gov.ph) and;

S - implify procedures to speed up frontline transactions within the BFAR premises.

2
PART I:
LIST OF SERVICES

Page Number
I. Quarantine: Accreditation/Health Certificate/Permit/Clearance
BFAR- Fisheries Inspection and Quarantine Division (FIQD) -
Fisheries Certification Section (FCS)

1. Issuance of Local Transport Permit (LTP) for Regularly Transported Species/Commodities 9


2. Issuance of Local Transport Permit (LTP) for Alien/Exotic Species 12
3. Issuance of Domestic Health Certificate (DHC) for Export of Fish and Fishery/Aquatic Products 15
4. Issuance of Food Pass for Vehicles 17
5. Issuance of Certificate of Registration of Exporter of Shells and Shellcrafts 19
6. Issuance of Sanitary Health Certificate (SHC) for Export of Fresh Chilled, Frozen Fish and
Fishery/Aquatic Products 22
7. Issuance of Sanitary Health Certificate (SHC) for Export of Live Food Fish and Live Tropical/
Ornamental Fish 25
8. Issuance of Export Commodity Clearance (ECC) for Fresh Chilled, Frozen Fish and Fishery/
Aquatic Products 28
9. Issuance of Export Commodity Clearance (ECC) for Shells and Shellcrafts, Live Food Fish,
Live Tropical/Ornamental Fish and Dried Fish and Fishery/Aquatic Products 31
10. Issuance of Certificate of Accreditation of Importer 34
11. Manual Issuance of Sanitary Phyto-Sanitary Import Clearance (SPSIC) for research/sample
and for one-time shipment only of Regulary Transported Species 36
12. Manual Issuance of Sanitary Phyto-Sanitary Import Clearance (SPSIC) for research/sample
and for one-time shipment only of Alien/Exotic Species 39
13. Manual issuance of Sanitary Phyto-Sanitary Import Clearance (SPSIC) under FAO 259 42
14. Online Issuance of Sanitary Phyto-Sanitary Import Clearance (SPSIC) under FAO 195 45

15. Online Application of Additional Imprtables under FAO 195 48

3
Page Number
II. Quarantine: Inspection/Certificate of Registration
BFAR-Fisheries Inspection & Quarantine Division (FIQD)-Fisheries Quarantine
Section (FQS)
1. Issuance of Certificate of Registration of Exporter and Fishery Establishment for Export 50
2. Issuance of Inspection Report for Export/Import of Live Aquatic Animals 53

III. Quarantine: Inspection/Certificate of Accreditation/Registration


BFAR- Fisheries Inspection & Quarantine Division (FIQD)-
Fisheries Inspection Section (FIS)

1. Inspection of Cold Storage Warehouse for Issuance of License to Operate (LTO) 54


2. Inspection of Fishery/Aquatic Products/Establishments (New Applicant) for Registration &

Issuance of HAACP/GMP/SSOP/Vessel Certificate 57


3. Inspection of Fishery Establishments for Export of Fishery/Aquatic Products for Issuance
Certificate of HAACP/GMP/SSOP/Vessel (Renewal) 61
4. Inspection of Traders/Exporters (without processing establishment) for Issuance of Certificate of
Registrarion 65

5. Inspection for Inventory of Stocks in Cold Storage and Verification of Importer's Facility and Volume
Requirements of Processing Plants (canning and processing) and Institutional Buyers 68

6. Pre-shipment Inspection 70
7. 2nd Boarder Inspection (Post Boarder) 71

IV. Quarantine: System and Investigative Audit


BFAR-Fisheries Inspection & Quarantine Division (FIQD)-
Fisheries Audit Section(FAS)
1. Conduct System and Performance Audit 72
2. Conduct Investigative Audit 75

4
V. Regulatory: Licensing/Permit/Registration/Clearance Page Number
BFAR- Fisheries Regulatory and Licensing Division (FRLD) -
Capture Fisheries Licensing Section (CFLS)
1. Processing of Application for Commercial Fishing Vessel License (CFVL) 78

2. Processing of Application for Distant Water Fishing Permit (DWFP) 83

3. Processing of Application for Fishing Gear Registration 88

4. Processing of Application for Pa-aling Fishermen’s License 92


5. Processing of Application for Regular Catch Certificates (RCC) 95

6. Processing of Application for Simplified Catch Certificates (SCC) 98

7. Processing of Application for Special Fishing Permit (SFP) 101


8. Processing of Application for Construction or Importation Clearance for support vessels during the
Moratorium prescribed under BFAR A.C. No. 253-1, series of 2018 105

9. Processing of Application for Construction or Importation Clearance pursuant to FAO No. 198-1,
series of 2018
108

VI. Regulatory: Special Permits


BFAR- Fisheries Regulatory and Licensing Division (FRLD) - Aquatic Wildlife Regulatory Section
(AWRS)
1. Issuance of Fisheries Special Permit for Aquatic Wildlife 111
2. Issuance of Gratuitous Permit for the Collection of Aquatic Wildlife for Research/Scientific
Purposes for Central Office
115

3. Issuance of CITES Permit for Aquatic Wildlife 121


4. Issuance of Endorsement Letter for Export Commodity Clearance for Aquatic Wildlife 123

VII. Regulatory: Fishpond Lease/Rentals/Endorsement


BFAR- Fisheries Regulatory and Licensing Division (FRLD) -
Fish Pond Lease Section (FLS)

1. Processing of Application for Issuance of 25-Years Fishpond Lease Agreement (FLA);


Aquasilviculture Stewardship Contract (ASC); and Gratiutous Permit (GP) (Sections 3, 6, 12, 13, 45,
46, 50, 55, 57, 65, 103 (b) and 107 of Republic Act No. 8550, s. 1998, Republic Act 8289 as 124
amended by Republic Act 9501 and Executive Order No. 26, series of 2011 and Fisheries
Administrative Order (FAO) No. 197-1, s. of 2012)

2. Annual Payment of Fishpond Rentals at BFAR Central Office 129

5
Page Number
BFAR- Fisheries Resources Management Division (FRMD)
Coastal Resources Management Section (CRMS)

1. Issuance of Cyanide Endorsement Letter to Department of Environment Natural Resources


(DENR) for Importation Clearance 131

VIII. Laboratory Report of Test


BFAR- National Fisheries Laboratory Division (NFLD)

1. Issuance of Laboratory Report of test for Physico-Chemical, Gross or Microscopic and


Parasitological Exam
134

2. Issuance of Laboratory Report of Test for Molecular Diagnostic and Paralytic shellfish Toxin (PST)
Analysis
136

3. Issuance of Laboratory Report of Test for Formaldehyde, Cyanide, Amnesic Shellfish Toxin (AST)
and pH (chemical analysis for raw material) Analysis and DST
138

4. Issuance of Laboratory Report of Test for Water Activity (AW), % Salt (NaCl), Moisture, Microbial
Analysis and Bacterial Identification for Finfish
140

5. Issuance of Laboratory Report of Test for Brevetoxin, Ciguatera, Antibiotic Residue (CAP, AOZ,
AMOZ and Aflatoxin), Histamine and Heavy Metals (Lead, Cadmium and Mercury) Analysis and 142
Histopathology

Feedback and Complaint Mechanism 145

List of Offices 147

Certificate of Compliance (CoC) for the year 2021 148

6
BUREAU OF FISHERIES AND AQUATIC RESOURCES

CENTRAL OFFICE

EXTERNAL SERVICE
(FRONTLINE SERVICE )

PART I

7
I. QUARANTINE:

BFAR-Fisheries Inspection and Quarantine Division (FIQD) - Fisheries Certification Section (FCS)

LOCAL/DOMESTIC:

1. Issuance of Local Transport Permit (LTP) for Regularly Transported Species/Commodities

2. Issuance of Local Transport Permit (LTP) for Alien/Exotic Species

3. Issuance of Domestic Health Certificate (DHC) for Transboundary Movement of Fish and Fishery/Aquatic Products

4. Issuance of Food Pass for Vehicles

EXPORT:

5. Issuance of Certificate of Registration of Exporter of Shells and Shellcrafts

6. Issuance of Health Certificate (HC) for Export of Fresh Chilled, Frozen Fish and Fishery/Aquatic Products

7. Issuance of Health Certificate (HC) for Export of Live Food Fish and Live Tropical/Ornamental Fish

8. Issuance of Export Commodity Clearance (ECC) for Fresh Chilled, Frozen Fish and Fishery/Aquatic Products

9. Issuance of Export Commodity Clearance (ECC) for Shells and Shellcrafts, Live Food Fish,

Live Tropical/Ornamental Fish and Dried Fish and Fishery/Aquatic Products

IMPORT:

10. Issuance of Certificate of Accreditation of Importer

11. Manual Issuance of Sanitary Phyto-Sanitary Import Clearance (SPSIC) for research/sample and
one time shipment only of Regularly Transported Species
12. Manual Issuance of Sanitary Phyto-Sanitary Import Clearance (SPSIC) for research/sample and

one time shipment only of Alien/Exotic Species

13. Manual Issuance of Sanitary Phyto-Sanitary Import Clearance (SPSIC) for Wet Market under FAO 259

14. Online Issuance of Sanitary Phyto-Sanitary Import Clearance (SPSIC) under FAO 195

15. Online Application of Additional Importables under FAO 195

8
1. Issuance of Local Transport Permit (LTP) for Regularly Transported
Species/Commodities
The Local Transport Permit (LTP) for domestic movement of regularly transported species/commodities provides documented
evidence that the product is compliant to Sanitary Phytosanitary (SPS), food safety standards and aquatic wildlife conservation
regulations and other relevant fishery laws. It acts as traceability for the commodities from their origin which an essential risk
management tool enabling individual members of supply chain to quickly identify problems and to promptly disseminate this
information to affected parties.
BFAR Fisheries Inspection and Quarantine Division (FIQD) -
Office or Division
Fisheries Certification Section (FCS)

Classification Simple

Type of Transaction G2C - Government to Citizen; G2B-Government to Business Entity

Traders of Fish and Fishery/Aquatic Products and BFAR Registered


Who may avail:
Exporters (EXTERNAL)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

BFAR Website(www.bfar.da.gov.ph)/ BFAR FIQD-FCS, G/Flr.,


1. Filled-out application form (1 original)
Fisheries Bldg., BPI Compound, Brgy. Vasra, Quezon

2. Traceability document (e.g. Auxillary Invoice,


Collector's Permits, Official Receipt and etc.) Local Government Unit/BFAR/Company/Supplier
(1 original and/or 1 photocopy)

BFAR FIQD-FCS, G/Flr., Fisheries Bldg. Complex, BPI Compound,


3. Order of Payment (1 original)
Brgy. Vasra, Visayas Ave., Quezon City

BFAR Cashier, G/Flr., Fisheries Bldg. Complex, BPI Compound, Brgy.


4. Official Receipts (1 original, 1 photocopy)
Vasra, Visayas Ave., Quezon City

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Apply and Submit filled- 1. Receive filled-out
out application form and application form and Administrative Officer IV
requirements to BFAR submitted requirements for BFAR FIQD-FCS
FIQD-FCS,Ground Flr, initial assessment G/Flr., Fisheries Bldg.
Fisheries Bldg., BPI None 15 Minutes Complex, BPI
Compound Compound, Brgy. Vasra,
Visayas Ave., Quezon
City

1.1 Evaluate the


completeness and
authenticity of the
submitted requirements, Administrative Officer IV
and forward to FRLD- or Fishing Regulations
None Fisheries Quarantine None 15 Minutes Officer II
Section (FQS) for the BFAR FIQD-FCS
conduct of risk assessment

9
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
2. Conduct risk assessment Fishing Regulations
of regularly transported Officer II
species/commodities and BFAR FIQD-FQS
submit the results of risk G/Flr., Fisheries Bldg.
None assessment to FRLD-FIQD- None 20 Minutes
Complex, BPI
FCS Compound, Brgy. Vasra,
Visayas Ave., Quezon
City
3. Receive results of the
risk assessment from the Administrative Officer IV
FRLD-Fisheries Quarantine or Fishing Regulations
None Section (FQS) and process None 5 Minutes Officer II
the permit BFAR FIQD-FCS

3.1 Assign Local Transport


Permit (LTP) number on
the application form and
None None 10 Minutes
record details in the
logbook

3.2 Compute fees based on


FAO 233 S. 2010 and Administrative Officer IV
advice client to secure BFAR FIQD-FCS
None None 10 Minutes
order of payment on the G/Flr., Fisheries Bldg.,
required fees BPI Compound,
Visayas Ave., Q.C.
2. Secure Order of 3.3 Issue Order of Payment
Payment for required for the required fees
fees at BFAR FIQD-FCS,
G/Flr., Fisheries Bldg. None 5 Minutes
Complex, BPI
Compound,

3. Pay the required fees 4. Accept the payment *10kg &


at the BFAR-Cashier, based on the issued Order below=P20
G/Flr., Fisheries Bldg. of Payment and issue *10.1kg to Cashier
Complex, BPI Official Receipt 50kg=P30 BFAR Cashier
Compound, Brgy. Vasra, *50.1kg to G/Flr., Fisheries Bldg.
Visayas Ave., Quezon 100kg=P50 25 Minutes Complex, BPI
City and secure Official *100 kg & Compound, Brgy. Vasra,
Receipt above=P100 Visayas Ave., Quezon
City

4. Present the issued 5. Check the presented


Official Receipt to BFAR Official Receipt for
FIQD-FCS, G/Flr., encoding and Aquaculturist II
Fisheries Bldg. Complex, process/prepare the Local BFAR FIQD-FCS
and secure Official Transport Permit (LTP) G/Flr., Fisheries Bldg.
Receipt for the None 25 Minutes Complex, BPI
processing of Local Compound, Brgy. Vasra,
Transport Permit (LTP ) Visayas Ave., Quezon
City

10
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
5.1 Review the printed Aquaculturist II
Local Transport Permit BFAR FIQD-FCS
(LTP) and place stamp G/Flr., Fisheries Bldg.
None seal/security feature None 35 Minutes Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City
5.2 Approve and sign Local
Certifying Officer
Transport Permit (LTP)
BFAR FIQD
G/Flr., Fisheries Bldg.
None None 1 Hour Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City
5. Receive notification on 5.3. Notify client to claim
the approved Local the approved Local
Transport Permit (LTP) Transport Permit (LTP) None 10 Minutes

Administrative Officer V
6. Claim the approved 5.4. Release the approved BFAR FIQD-FCS
Local Transport Permit Local Transport Permit G/Flr., Fisheries Bldg.
(LTP) at BFAR FIQD- (LTP) and record the date Complex, BPI
FCS and time released Compound, Brgy. Vasra,
G/Flr., Fisheries Bldg. Visayas Ave., Quezon
None 10 minutes
Complex, BPI City
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City
TOTAL:
*10kg &
below=P20
*10.1kg to
50kg=P30
4 hours and 5 minutes
*50.1kg to
100kg=P50
*100 kg &
above=P100
Notes:

Computation of Fees is based on Fisheries Administrative Order 233 s. 2010 (FAO 233)

Conduct of Risk Assessment is based on Fisheries Administrative Order 221 s. 2003 (FAO 221)

11
2. Issuance of Local Transport Permit (LTP) for Alien/Exotic Species
The Local Transport Permit (LTP) for domestic movement of alien/exotic species provides documented evidence that the
product is compliant to Sanitary Phytosanitary (SPS), food safety standards and aquatic wildlife conservation regulations and
other relevant fishery laws. It acts as traceability for the commodities from their origin which an essential risk management tool
enabling individual members of supply chain to quickly identify problems and to promptly disseminate this information to
affected parties.
BFAR Fisheries Inspection and Quarantine Division (FIQD) - Fisheries Certification Section
Office or Division
(FCS)

Classification Simple

Type of Transaction G2C - Government to Citizen; G2B-Government to Business Entity

Who may avail: Traders of Fish and Fishery/Aquatic Products and BFAR Registered Exporters (EXTERNAL)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

BFAR Website(www.bfar.da.gov.ph)/ BFAR FIQD-FCS, G/Flr.,


1. Filled-out application form (1 original)
Fisheries Bldg., BPI Compound, Brgy. Vasra, Quezon City

2. Traceability document (e.g. Auxillary Invoice,


Collector's Permits, Official Receipt and etc.) Local Government Unit/BFAR/Company/Supplier
(1 original and/or 1 photocopy)

BFAR FIQD-FCS, G/Flr., Fisheries Bldg. Complex, BPI Compound,


3. Order of Payment (1 original)
Brgy. Vasra, Visayas Ave., Quezon City

BFAR Cashier, G/Flr., Fisheries Bldg. Complex, BPI Compound, Brgy.


4. Official Receipts (1 original, 1 photocopy)
Vasra, Visayas Ave., Quezon City

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Apply and submit filled- 1. Receive filled-out
out application form and application form and Administrative Officer IV
requirements through submitted requirements BFAR-FIQD FCS
email address at through email for initial G/Flr., Fisheries Bldg.
fiqd.certification@gmail.c assessment None 15 Minutes Complex, BPI
om Compound, Brgy. Vasra,
Visayas Ave., Quezon
City

1.1 Evaluate the


completeness and
authenticity of the Administrative Officer IV
submitted requirements, or Fishing Regulations
and forward to Fisheries Officer II
None None 15 Minutes
Quarantine Section (FQS)
BFAR-FIQD FCS
for the conduct of risk
assessment

12
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
2. Conduct risk assessment
of alien/exotic species and Fishing Regulations
submit the results of risk Officer II
assessment to FIQD-FCS BFAR FIQD-Fisheries
Quarantine Section
None None 7 days
(FQS)
G/Flr., Fisheries Bldg.
Complex, BPI
Compound,

3. Receive results of the


risk assessment from the Fishing Regulations
Fisheries Quarantine Officer II
Section (FQS) BFAR FIQD-FCS
None None 5 Minutes
G/Flr., Fisheries Bldg.
Complex, BPI
Compound,

3.1 Assign Local Transport


Permit (LTP) number on Administrative Officer IV
the application form and BFAR-FIQD FCS
record details in the G/Flr., Fisheries Bldg.
None logbook None 10 Minutes Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City

3.2 Compute fees based on Administrative Officer IV


FAO 233 S. 2010 and
BFAR-FIQD FCS
advice client to secure
G/Flr., Fisheries Bldg.
order of payment on the
None None 10 Minutes Complex, BPI
required fees
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City
2. Secure Order of 3.3 Issue Order of Payment
Payment for required for the required fees
fees at BFAR FIQD-FCS Administrative Officer IV
G/Flr., Fisheries Bldg. BFAR-FIQD FCS
Complex, BPI None 5 Minutes G/Flr., Fisheries Bldg.
Compound, Complex, BPI
Compound,

3. Pay the required fees 4. Accept the payment 10kg &


at the BFAR-Cashier, based on the issued Order below=P20.00
G/Flr., Fisheries Bldg. of Payment and issue *10.1kg to
50kg=P30.00 Cashier
Complex, BPI Official Receipt
*50.1kg to BFAR Cashier
Compound, and secure
100kg=P50.00 G/Flr., Fisheries Bldg.
Official Receipt
*100 kg & 25 Minutes Complex, BPI
above=P100.00 Compound, Brgy. Vasra,
Visayas Ave., Quezon
City

13
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
4. Present the issued 5. Check the presented
Official Receipt to BFAR Official Receipt for
FIQD-FCS G/Flr., encoding and process the Aquaculturist II
Fisheries Bldg. Complex, Local Transport Permit BFAR-FIQD FCS
BPI Compound, and (LTP) G/Flr., Fisheries Bldg.
secure Official Receipt None 25 Minutes Complex, BPI
for the processing of LTP Compound, Brgy. Vasra,
Visayas Ave., Quezon
City

5.1 Review the printed Aquaculturist II


Local Transport Permit BFAR FIQD FCS
(LTP) and place stamp G/Flr., Fisheries Bldg.
None seal/security feature None 35 Minutes Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City
5.2 Approve and sign Local
Certifying Officer
Transport Permit (LTP)
BFAR FIQD
G/Flr., Fisheries Bldg.
None None 1 hour Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City
5. Receive notification 5.3 Notify client through
through email on the email to claim the approved
approved Local Transport Local Transport Permit Administrative Officer V
Permit (LTP) (LTP) at BFAR-FIQD FCS BFAR-FIQD FCS
G/Flr., Fisheries Bldg. G/Flr., Fisheries Bldg.
Complex, BPI Compound, None 10 Minutes Complex, BPI
Brgy. Vasra, Visayas Ave., Compound, Brgy. Vasra,
Quezon City Visayas Ave., Quezon
City

6. Claim the approved 5.4 Release the approved Administrative Officer V


Local Transport Permit LTP and record the date
BFAR-FIQD FCS
(LTP) at BFAR-FIQD and time released
G/Flr., Fisheries Bldg.
FCS None 10 minutes Complex, BPI
G/Flr., Fisheries Bldg. Compound, Brgy. Vasra,
Complex, BPI Compound Visayas Ave., Quezon
City
*10kg &
below=P20.00
*10.1kg to
50kg=P30.00
7 days, 3 hour, and 45
TOTAL: *50.1kg to
100kg=P50.00 minutes
*100 kg &
above=P100.00

NOTE:

Computation of Fees is based on Fisheries Administrative Order 233 s. 2010 (FAO 233)
Conduct of Risk Assessment is based on Fisheries Administrative Order 221 s. 2003 (FAO 221)

14
3. Issuance of Domestic Health Certificate (DHC) for Export of Fish and Fishery / Aquatic Products

The Domestic Health Certificate of fish and fishery/aquatic products is used for the domestic movement/transport of fish and
fishery/aquatic products. It provides documented evidence that the products have been cultured, collected/harvested, handled,
transported, manufactured, packed, stored and distributed under established SPS and food safety standards and in accordance
to relevant rules and regulations.

BFAR Fisheries Inspection and Quarantine Division (FIQD) - Fisheries Certification Section
Office or Division
(FCS)
Classification Simple

Type of Transaction G2C - Government to Citizen; G2B-Government to Business Entity

Who may avail: Traders of Fish and Fishery/Aquatic Products/BFAR Registered Exporter (EXTERNAL)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

BFAR Website(www.bfar.da.gov.ph)/ BFAR FIQD-FCS, G/Flr.,


1. Filled-out request form (1 original)
Fisheries Bldg., BPI Compound, Brgy. Vasra, Quezon City

2. Laboratory Analysis (1 original or 1 photocopy) BFAR National Fisheries Laboratory Division (NFLD)

3. Authorization Letter (1 original) Company/Business Entity

BFAR FIQD-FCS, G/Flr., Fisheries Bldg. Complex, BPI Compound,


5. Order of Payment (1 original)
Brgy. Vasra, Visayas Ave., Quezon City

BFAR Cashier, G/Flr., Fisheries Bldg. Complex, BPI Compound, Brgy.


6. Official Receipts (1 original, 1 photocopy)
Vasra, Visayas Ave., Quezon City

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit filled-out 1. Receive filled-out
application form and application form and
requirements at BFAR required documents, and
FIQD-FCS, G/Flr., evaluate for completeness.
Fisheries Bldg. Complex, None 10 Minutes
BPI Compound

Administrative Assistant
VI
1.1 Record and stamp with BFAR FIQD-FCS
date and time received. G/Flr., Fisheries Bldg.
None None 5 Minutes Complex, BPI
Compound, Brgy. Vasra,
1.2 Evaluate for validity and Visayas Ave., Quezon
authenticity of submitted City
None documents. None 15 Minutes

1.3 Assign a Domestic


Health Certificate reference
None number None 5 Minutes

15
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
2. Secure Order of 1.4 Issue Order of Payment Administrative Assistant
Payment at BFAR FIQD- for the required fees VI
FCS at the G/Flr., BFAR FIQD-FCS
Fisheries Bldg. Complex, G/Flr., Fisheries Bldg.
None 10 Minutes
BPI Compound Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City
3. Pay the required fees 2. Accept the payment Cashier
at the BFAR Cashier, based on the issued Order BFAR-Cashier
G/Flr., Fisheries Bldg. of Payment and issue PHP 50.00 per G/Flr., Fisheries Bldg.
Complex, BPI Compound Official Receipt Domestic Health 25 Minutes Complex, BPI
Certificate Compound, Brgy. Vasra,
Visayas Ave., Quezon
City
4. Present the issued 3. Check the presented
Official Receipt to BFAR Official Receipt for
Administrative Assistant
FIQD-FCS, G/Flr., encoding and
VI
Fisheries Bldg. Complex, process/prepare Domestic None 25 Minutes
or
BPI Compound Health Certificate (DHC)
Senior Administrative
Assistant II
or
3.1 Review the printed
Senior Administrative
Domestic Health Certificate
Assistant III
None (DHC) and place stamp None 35 Minutes
seal/security feature BFAR FIQD-FCS

3.2 Approve and sign the Certifying Officer


Domestic Health Certificate BFAR- Fisheries
(DHC) Inspection and
Quarantine Division
(FIQD)
None None 1 hour
G/Flr., Fisheries Bldg.
Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City
5. Receive notification on 3.3 Notify client to claim the
the approved Domestic approved Domestic Health
Health Certificate (DHC) Certificate (DHC)
None 10 Minutes
Administrative Assistant
VI
or
6. Claim the approved 3.4 Release the approved Senior Administrative
Domestic Health Domestic Health Certificate Assistant II
Certificate (DHC) (DHC) and record the date BFAR FIQD-FCS
and time released None 10 Minutes

PHP 50.00 per


TOTAL: Domestic Health 3 hours and 30 minutes
Certificate

16
4. Issuance of Food Pass for Vehicles

The Food Pass is used as a rapid pass for vehicles containing fish and fishery/aquatic products for domestic movement.

BFAR - Fisheries Inspection and Quarantine Division (FIQD) - Fisheries Certification Section
Office or Division
(FCS)

Classification Simple

Type of Transaction G2C - Government to Citizen; G2B-Government to Business Entity

Who may avail: Traders of Fish and Fishery/Aquatic Products/BFAR Registered Exporter (EXTERNAL)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Certificate of Registration of vehicle Company/Business Entity

2. Mayor’s Permit City Hall/LGU

3. DTI/CDA/DOLE/SEC Registration DTI/CDA/DOLE/SEC

4. FORM A (downloadable form) DA Website: agribusiness.da.gov.ph/food-pass

5. FORM B (downloadable form) DA Website: agribusiness.da.gov.ph/food-pass

6. FORM C (downloadable form) DA Website: agribusiness.da.gov.ph/food-pass

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit requirements 1. Receive application for
and forms via e-mail at Food Pass through email
fiqd.ltpfoodpass@gmail.c
om or None 10 Minutes
fiqd@bfar.da.gov.ph

1.1 Assess/Verify the


None submitted documents of the None 20 Minutes
client Aquaculturist II or
1.2 a. If approved, Fishing Regulations
process/ prepare the Food Officer II
Pass based on the client's BFAR FIQD-FCS
application. Stamp with G/Flr., Fisheries Bldg.
BFAR seal, date and time. Complex, BPI
None None 30 Minutes Compound, Brgy. Vasra,
b. If not approved, Visayas Ave., Quezon
inform client of the City
deficiencies of application
through email.

2. Receive notification on 1.3 Notify client through


the approved Food Pass email to receive/claim the
through email approved Food Pass None 10 Minutes

17
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
3. Receive Food Pass via 1.4 Release the food pass
email or claim personally to the client through
at BFAR FIQD-FCS electronic/hard copies and
G/Flr., Fisheries Bldg. record the date and time Aquaculturist II or
Complex, BPI released. Fishing Regulations
Compound, Brgy. Vasra, None 10 Minutes
Officer II
Visayas Ave., Quezon BFAR FIQD-FCS
City

1 hour and
TOTAL: None
20 minutes

18
5. Issuance of Certificate of Registration of Exporter of Shells and Shellcrafts
The registration for fishery business establishments secures that the Fishery Aquaculture Business Operators (FABOs) comply
with the International Union for Conservation of Nature (IUCN), Convention on International Trade in Endangered Species of
Wild Fauna and Flora (CITES) and BFAR laws and regulations to export shells and shellcrafts (including its by-products and
derivatives).
BFAR Fisheries Inspection and Quarantine Division (FIQD) - Fisheries Certification Section
Office or Division
(FCS)

Classification Highly Technical


Type of Transaction G2B-Government to Business entity
Who may avail: Exporters of Shells and Shellcrafts (EXTERNAL)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

BFAR Website(www.bfar.da.gov.ph)/ BFAR FIQD-FCS, G/Flr.,


1. Filled-out application form (1 original)
Fisheries Bldg., BPI Compound, Brgy. Vasra, Quezon City

2. Letter of Intent (1 original) Company/Business Entity

3. Request Letter for Inspection (for exporter with


Company/Business Entity
facility) (1 original)

4. Certified True Copy of SEC Registration/DTI Permit


DTI/SEC
(1 photocopy)

5. Certified True Copy of Business Permit (1


City Hall
photocopy)

7. Photos of Facility (1 original) Company/Business Entity

8. Manpower Profile (1 photocopy) Company/Business Entity

9. Complete List of Product Source (1 original) Company/Business Entity

10. Facility Lay-out (1 original) Company/Business Entity

12. BIR Certificate of Registration (1 photocopy) Bureau of Internal Revenue (BIR)

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit filled-out 1. Receive filled-out
application form and application form and
requirements at BFAR requirements for initial
FIQD-FCS G/Flr., assessment None 10 Minutes Aquaculturist II or
Fisheries Bldg. Complex,
Fishing Regulations
BPI Compound
Officer II
BFAR FIQD-FCS
1.1 Evaluate the G/Flr., Fisheries Bldg.
completeness, accuracy Complex, BPI
and validity of the 2 Hours
None None Compound, Brgy. Vasra,
submitted requirements Visayas Ave., Quezon
City
1.2 Schedule for the
inspection of facility 1 Hour
None None

19
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1.3 Prepare Travel
Authority for approval of the Division Chief
Division Chief of FIQD BFAR FIQD
G/Flr., Fisheries Bldg.
None None 1 Hour Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City

2. Process Travel Authority


for approval of the Bureau
Director BFAR Fisheries
Planning and Economic
Division (FPED)
4th Floor
BFAR Director's Office
3rd Floor
None None 3 days
BFAR Administrative
Division
2nd Flr., Fisheries Bldg.
Complex, BPI Compound,
Brgy. Vasra, Visayas
Ave., Quezon City

2. Receive notification on 3. Notify client on the


the scheduled inspection scheduled inspection of
through email or phone facility/ establishment None 10 Minutes
call through email or phone call
Aquaculturist II or
3. Allow inspection of 3.1 Conduct inspection of
Fishing Regulations
facility/establishment the facility/establishment
Officer II
None 5 days BFAR FIQD-FCS
G/Flr., Fisheries Bldg.
Complex, BPI
3.2 Conduct evaluation and Compound, Brgy. Vasra,
final assessment of Visayas Ave., Quezon
Inspection Report and other City
documentary requirements 6 Hours
None None

3.2 Prepare/Process
Certificate of Registration Aquaculturist II or
Fishing Regulations
None None 30 Minutes
Officer II
BFAR FIQD-FCS

3.3 Initial by the Section


Section Chief, FCS
Chief and Division Chief
Division Chief, FIQD
prior to signing/approval of
BFAR FIQD
None Bureau Director None 1 Hour
G/Flr., Fisheries Bldg.
Complex, BPI
Compound,

20
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
4. Approve and sign
Certificate of Registration Bureau Director
BFAR Director's Office,
None None 3 days 3/Flr., Fisheries Bldg.
Complex, BPI
Compound,

5. Place BFAR seal for


None security features/measures None 10 Minutes

4. Receive notification on 5.1 Notify client on the


the approved Certificate approved Certificate of Aquaculturist II or
of Registration through Registration through email Fishing Regulations
None 10 Minutes
email or phone call or phone call Officer II
BFAR FIQD-FCS,
Ground Flr., Fisheries
5. Claim the approved 5.2 Release the approved
Bldg.,
Certificate of Registration Certificate of Registration
at the FIQD-FCS, G/Flr., and record the date and 20 Minutes
Fisheries Bldg., time released None

12 days, 4 hours, and


TOTAL: None
30 minutes

21
6. Issuance of Sanitary Health Certificate (S/HC) for Export of Fresh Chilled, Frozen Fish and
Fishery/Aquatic Products

The Sanitary Health Certificate (S/HC) for Export of Fresh chilled, Frozen Fish and Fishery/Aquatic Products provides
documented evidence that the products have been cultured, harvested/collected, handled, transported, manufactured, packed,
stored and distributed under established SPS and/or food safety standards and in accordance to relevant rules and regulations.

BFAR Fisheries Inspection and Quarantine Division (FIQD) - Fisheries Certification Section
Office or Division
(FCS)

Classification Simple

Type of Transaction G2B-Government to Business Entity

Who may avail: BFAR Registered Exporters of Fish and Fishery/Aquatic Products (EXTERNAL)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

BFAR Website(www.bfar.da.gov.ph) / BFAR FIQD-FCS, G/Flr.,


1. Filled-out request form (1 original)
Fisheries Bldg., BPI Compound, Visayas Ave., Q.C.

2. Invoice (1 original) Company/Business Entity

3. Authorization Letter (1 original)* Company/Business Entity


BFAR National Fisheries Laboratory Division (NFLD), 860 Arcadia
4. Laboratory Analysis (1 original, 1 photocopy)* Bldg., Quezon Avenue, Q.C.

5. Request Letter for amendment ( 1 original)* Company/Business Entity

6. Original Copy of Health Certificate (if HC is for BFAR FIQD-FCS, G/Floor, Fisheries Bldg., BPI Compound, Visayas
amend)* Ave, Q.C.

BFAR FIQD-FCS, G/Floor, Fisheries Bldg., BPI Compound, Visayas


7. Preshipment Inspection Report ( 1 original)*
Ave, Q.C.

BFAR FIQD-FCS, G/Floor, Fisheries Bldg., BPI Compound, Visayas


8. Order of Payment (1 original)
Ave, Q.C.

BFAR FIQD-FCS, G/Floor, Fisheries Bldg., BPI Compound, Visayas


9. Official Receipts (1 original, 1 photocopy)
Ave, Q.C.

*if necessary or as required by the importing country

22
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit filled-out 1. Receive filled-out
Administrative Assistant
application form and application form and
V or VI
requirements to BFAR submitted requirements for
BFAR FIQD-FCS
FIQD-FCS, G/Flr., initial assessment
Ground Flr., Fisheries
Fisheries Bldg., BPI None 15 Minutes
Bldg. Complex, BPI
Compound
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City
1.1 Evaluate completeness
Administrative Assistant
and accuracy of submitted
V or VI
documents and
BFAR FIQD-FCS
requirements of importing
Ground Flr., Fisheries
None country None 15 Minutes
Bldg. Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City
1.2 Assign a Health
Certificate reference
number and record
None applicant information None 10 Minutes Administrative Assistant
V or VI
BFAR FIQD-FCS
2. Secure Order of 1.3 Issue Order of Payment Ground Flr., Fisheries
Payment issued at for the required fees Bldg. Complex, BPI
BFAR FIQD-FCS located Compound, Brgy. Vasra,
at G/Flr., Fisheries Bldg., Visayas Ave., Quezon
None 10 Minutes City

3. Pay the required fees 2. Accept the payment


at the BFAR Cashier, based on the issued Order
G/Flr., Fisheries Bldg. of Payment and issue
Complex, BPI Compound Official Receipt BFAR Cashier
and secure Official G/Flr., Fisheries Bldg.
PHP 50.00 per
Receipt Complex, BPI
Sanitary Health 25 Minutes
Compound, Brgy. Vasra,
Certificate
Visayas Ave., Quezon
City

4.Present the issued 3. Check the presented Administrative Assistant


Official Receipt to BFAR Official Receipt and V
FIQD-FCS, at the G/Flr., process/prepare the or
Fisheries Bldg. Complex, Sanitary Health Certificate Senior Administrative
BPI Compound, for the (S/HC) Assistant III
processing of the None 25 Minutes BFAR FIQD-FCS
Sanitary Health G/Flr., Fisheries Bldg.
Certificate (S/HC) Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City

23
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
3.1 Review/Validate entries
of Sanitary Health Administrative Assistant
Certificate (S/HC) and V
place BFAR seal as or
security features/measures Senior Administrative
None None 35 Minutes
Assistant III
BFAR FIQD-FCS
G/Flr., Fisheries Bldg.
Complex, BPI Compound

3.2 Approve and sign the


Certifying Officer
Sanitary Health
BFAR FIQD
Certificate (S/HC)
G/Flr., Fisheries Bldg.
None None 1 hour Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City
5. Receive notification on 3.3 Notify client to claim the
the approved Sanitary approved Sanitary Health
Health Certificate (S/HC) Certificate (S/HC) for None 10 Minutes
for Export Export Administrative Assistant
V or VI
BFAR FIQD-FCS
6. Claim the approved 4. Release the approved Ground Flr., Fisheries
Sanitary Health Sanitary Health Certificate Bldg. Complex, BPI
Certificate at BFAR FIQD- (S/HC) and record the date Compound, Brgy. Vasra,
FCS G/Floor, Fisheries and time released Visayas Ave., Quezon
None 10 Minutes
Bldg., BPI Compound, City
Visayas Avenue, Q.C.

PHP 50.00 per


TOTAL: Sanitary Health 3 hours and 35 minutes
Certificate

24
7. Issuance of Sanitary Health Certificate (S/HC) for Export of Live Food Fish and Live
Tropical/Ornamental Fish

The Sanitary Health Certificate (S/HC) for Export of Live Food Fish and Live Tropical/Ornamental Fish provides documented
evidence that the products have been cultured, harvested/collected, handled, transported, manufactured, packed, stored and
distributed under established SPS and/or food safety standards and in accordance to relevant rules and regulations.

BFAR Fisheries Inspection and Quarantine Division (FIQD) - Fisheries Certification Section
Office or Division
(FCS)
Classification Simple

Type of Transaction G2B-Government to business entity

Who may avail: BFAR Registered Exporters of Fish and Fishery/Aquatic Products (EXTERNAL)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

BFAR Website(www.bfar.da.gov.ph) / BFAR FIQD-FCS, G/Flr.,


1. Filled-out request form (1 original) Fisheries Bldg., BPI Compound, Visayas Ave., Q.C.

2. Invoice (1 original) Company/Business Entity

3. Authorization Letter (1 original)* Company/Business Entity

4. Laboratory Analysis (1 original, 1 photocopy)* BFAR National Fisheries Laboratory Division (NFLD)

5. Request Letter for amendment ( 1 original)* Company/Business Entity

6. Original Copy of Health Certificate (if HC is for BFAR FIQD-FCS, G/Flr., Fisheries Bldg. Complex, BPI Compound,
amend)* Brgy. Vasra, Visayas Ave., Quezon City

BFAR FIQD-FCS, G/Flr., Fisheries Bldg. Complex, BPI Compound,


7. Order of Payment (1 original)
Brgy. Vasra, Visayas Ave., Quezon City

BFAR FIQD-FCS, G/Flr., Fisheries Bldg. Complex, BPI Compound,


8. Official Receipts (1 original, 1 photocopy)
Brgy. Vasra, Visayas Ave., Quezon City

*if necessary or as required by the importing country

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit filled-out 1. Receive filled-out
application form and application form and
requirements to BFAR submitted requirements for
FIQD-FCS G/Flr., initial assessment
Fisheries Bldg. Complex, None 15 Minutes
BPI Compound Administrative Assistant
V or VI
BFAR FIQD-FCS
Ground Flr., Fisheries
Building, BPI Compound,
1.1 Evaluate completeness Visayas Ave., Q.C.
and accuracy of submitted
requirements
None None 15 Minutes

25
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1.2 Assign a Health
Certificate reference Administrative Assistant V
number and record or VI
applicant information BFAR FIQD-FCS
G/Flr., Fisheries Bldg.
None None 10 Minutes
Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City

1.3 Forward to Fisheries


Quarantine Section (FQS)
Administrative Assistant V
for the conduct of
or VI
verification of species to be
BFAR FIQD-FCS
exported and quarantine
G/Flr., Fisheries Bldg.
None measures None 5 Minutes
Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City

2. Conduct of verification of
species to be exported and Fishing Regulation
quarantine measures and Officer II
submit the results of BFAR FIQD-Fisheries
verification to FIQD-FCS Quarantine Section
(FQS)
None None 2 days
G/Flr., Fisheries Bldg.
Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City

3. Receive results of the Administrative Assistant V


verification from the or VI
Fisheries Quarantine BFAR FIQD-FCS
Section (FQS) G/Flr., Fisheries Bldg.
None None 5 Minutes
Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City
2. Secure Order of 3.1 Issue Order of Payment
Payment issued at for the required fees
BFAR FIQD-FCS G/Flr.,
Fisheries Bldg. Complex, Administrative Assistant V
BPI Compound or VI
BFAR FIQD-FCS
G/Flr., Fisheries Bldg.
None 10 Minutes
Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City

26
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

3. Pay the required fees 4. Accept the payment


at the BFAR Cashier, based on the issued Order BFAR Cashier
G/Flr., Fisheries Bldg. of Payment and issue G/Flr., Fisheries Bldg.
Complex, BPI Compound Official Receipt PHP 50.00 per
Complex, BPI
and secure Official Sanitary Health 25 Minutes
Compound, Brgy. Vasra,
Receipt (OR) Certificate
Visayas Ave., Quezon
City

4.Present the issued 5. Check the presented Admin. Assistant V


Official Receipt to BFAR Official Receipt and or
FIQD-FCS, at the G/Flr., process/prepare the Senior Admin. Assistant
Fisheries Bldg. Complex, Sanitary Health Certificate III
BPI Compound, for the (S/HC) None 25 Minutes BFAR FIQD-FCS
processing of Sanitary G/Flr., Fisheries Bldg.
Health Certificate (S/HC) Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Q.C.
5.1 Review/Validate entries
Admin. Assistant V
of Sanitary Health
Certificate (S/HC) and or
place BFAR seal/security Senior Admin. Assistant
features III
None None 35 Minutes BFAR FIQD-FCS
G/Flr., Fisheries Bldg.
Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Q.C.
5.2 Approve and sign the Certifying Officer
Sanitary Health BFAR FIQD
Certificate (S/HC) G/Flr., Fisheries Bldg.
None None 1 hour Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City
5. Receive notification on 5.3 Notify client to claim the Administrative Assistant
the approved Sanitary approved Sanitary Health V or VI
Health Certificate (S/HC) Certificate (S/HC) for BFAR FIQD-FCS
for export at BFAR FIQD- export G/Flr., Fisheries Bldg.
None 10 Minutes
FCS G/Flr., Fisheries Complex, BPI
Bldg. Complex, BPI Compound, Brgy. Vasra,
Compound Visayas Ave., Quezon
City
6. Claim the approved 5.4 Release the approved Administrative Assistant
Sanitary Health Sanitary Health Certificate V or VI
Certificate at BFAR FIQD- (S/HC) and record the date BFAR FIQD-FCS
FCS, at the G/Flr., and time released None 10 Minutes G/Flr., Fisheries Bldg.
Fisheries Bldg. Complex, Complex, BPI
BPI Compound Compound, Brgy. Vasra,
Visayas Ave., Q.C.

PHP 50.00 per


2 days, 3 hours, and 45
TOTAL: Sanitary Health
minutes
Certificate

27
8. Issuance of Export Commodity Clearance (ECC) for fresh chilled, frozen fish and fishery/ aquatic
products

The Export Commodity Clearance (ECC) for fresh chilled, frozen fish and fishery/ aquatic products provides documented
evidence that the product is not derived from Illegal, Unreported and Unregulated (IUU) Fishing, and compliant to aquatic
wildlife conservation regulations, and other relevant fishery laws.

BFAR Fisheries Inspection and Quarantine Division (FIQD) - Fisheries Certification Section
Office or Division
(FCS)
Classification Simple

Type of Transaction G2C - Government to Citizen; G2B- Government to Business Entity

Traders of fresh chilled, frozen fish and fishery/ aquatic products; BFAR Registered Exporters of Fish
Who may avail:
and Fishery/Aquatic Products (EXTERNAL)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE


BFAR Website(www.bfar.da.gov.ph)
1. Filled-out application form (1 original) /BFAR FIQD-FCS, G/Flr., Fisheries Bldg. Complex, BPI Compound,
Brgy. Vasra, Visayas Ave., Quezon City
2. Proforma Invoice (1 original) Company/ Business Entity

3. Local Transport Permit or Auxiliary Invoice (1


BFAR Regional Office (concerned) or Local Government Unit
original or 1 photocopy)

BFAR FIQD-FCS, G/Flr., Fisheries Bldg. Complex, BPI Compound,


4. Sanitary Health Certificate (1 original)
Brgy. Vasra, Visayas Ave., Quezon City
5. Pre-Shipment Inspection Report (1 original or 1 BFAR FIQD-FIS/RFIQU (depending on the location of the
photocopy)* establishment)
6. Export Declaration (1 original)* Bureau of Customs

7. Authorization Letter (1 original)* Company/Business Entity

BFAR FIQD-FCS, G/Flr., Fisheries Bldg. Complex, BPI Compound,


8. Order of Payment (1 original)
Brgy. Vasra, Visayas Ave., Quezon City

BFAR Cashier, G/Flr., Fisheries Bldg. Complex, BPI Compound, Brgy.


9. Official Receipts (1 original, 1 photocopy)
Vasra, Visayas Ave., Quezon City
*if necessary or as required by the importing country

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit filled-out 1. Receive filled-out
application form and application form and
requirements at BFAR requirements, and evaluate
Administrative Assistant
FIQD-FCS, at the G/Flr., for initial assessment
V
Fisheries Bldg. Complex, None 20 Minutes
BFAR FIQD-FCS
BPI Compound,
G/Flr., Fisheries Bldg.
Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
1.1 Record and stamp with
City
date and time received
None None 15 Minutes

28
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1.2 Evaluate the validity Aquaculturist II
and authenticity of or
submitted documents and Fishing Regulations
assign Export Commodity Officer II
Clearance (ECC) number BFAR FIQD-FCS
None None 40 Minutes
G/Flr., Fisheries Bldg.
Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City
1.4 Compute the required
fees and advice client to based on FAO
secure Order of Payment 233-1 & FAO 233-
on the required fees 2 *as per to the Aquaculturist II
None 10 Minutes
type of BFAR FIQD-FCS
commodity and
it's volume

2. Secure Order of 1.5 Issue Order of


Payment at BFAR FIQD- Payment for the required
Administrative Assistant
FCS, at the G/Flr., fees
None 10 Minutes V
Fisheries Bldg. Complex,
BFAR FIQD-FCS
BPI Compound

3. Pay the required fees 2. Accept the payment


and secure Official based on the issued Order Cashier
of Payment and issue based on FAO
Receipt at BFAR BFAR Cashier
Official Receipt 233-1 and FAO
Cashier, G/Flr., Fisheries G/Flr., Fisheries Bldg.
Bldg. Complex, BPI 233-2 *as per to
25 Minutes Complex, BPI
Compound, the type of
Compound, Brgy. Vasra,
commodity and
Visayas Ave., Quezon
it's volume
City

4. Present the issued 3. Check the presented


Official Receipt for the official receipt and
processing of the Export process/prepare the Export
Commodity Clearance Commodity Clearance
(ECC) to BFAR FIQD- (ECC)
None 30 Minutes
FCS, at the G/Flr.,
Fisheries Bldg. Complex,
BPI Compound,
Aquaculturist II
BFAR FIQD-FCS G/Flr.,
3.1 Review for correctness Fisheries Bldg., BPI
and accuracy of the entries Compound
to the Export Commodity
Clearance (ECC) and place
BFAR seal for security
None None 35 Minutes
features/measures

29
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
3.2 Approve and sign the Certifying Officer
Export Commodity BFAR FIQD
Clearance (ECC) G/Flr., Fisheries Bldg.
None None 1 hour Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City
5. Receive notification on 3.3. Notify client to claim
the approved Export the approved Export
Commodity Clearance Commodity Clearance
(ECC) (ECC) None 10 Minutes

Administrative Assistant
6. Claim the approved 3.4 Release the approved V
Export Commodity Export Commodity BFAR FIQD-FCS
Clearance (ECC) at Clearance (ECC) and
BFAR FIQD-FCS G/Flr., record the date and time
None 10 Minutes
Fisheries Bldg. Complex, released
BPI Compound

based on FAO
233-1 & FAO 233-
2 *as per to the
TOTAL: 4 Hours and 25 Minutes
type of
commodity and
it's volume

30
9. Issuance of Export Commodity Clearance (ECC) for Shells and shellcrafts, Live Food Fish, Live
Tropical/Ornamental Fish and Dried Fish and Fishery/Aquatic Products

The Export Commodity Clearance (ECC) for Shells and shellcrafts, Live Food Fish, Live Tropical/Ornamental Fish and Dried
Fish and Fishery/Aquatic Products provides documented evidence that the product is not derived from Illegal, Unreported and
Unregulated (IUU) Fishing, and compliant to aquatic wildlife conservation regulations, and other relevant fishery laws.

Office or Division BFAR Fisheries Inspection and Quarantine Division (FIQD) - Fisheries Certification Section (FCS)

Classification Simple

Type of Transaction G2C - Government to Citizen; G2B- Government to Business Entity

Traders of fresh chilled, frozen fish and fishery/ aquatic products; BFAR Registered Exporters of Fish
Who may avail:
and Fishery/Aquatic Products (EXTERNAL)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

BFAR Website (www.bfar.da.gov.ph)/BFAR FIQD-FCS, Ground Flr.,


1. Filled-out application form (1 original) Fisheries Bldg. Complex, BPI Compound, Brgy. Vasra, Visayas Ave.,
Quezon City

2. Proforma Invoice (1 original) Company/ Business Entity


3. Local Transport Permit or Auxiliary Invoice (1 BFAR Regional Office or Local Government Unit
original or 1 photocopy)
BFAR FIQD-FCS, Ground Flr., Fisheries Bldg. Complex, BPI
4. Sanitary Health Certificate (1 original)
Compound, Brgy. Vasra, Visayas Ave., Quezon City

5. Pre-Shipment Inspection Report (1 original or 1 BFAR FIQD-FIS/RFIQU (depending on the location of the
photocopy)* establishment)

6. Export Declaration (1 original)* Bureau of Customs

7. Authorization Letter (1 original)* Company/Business Entity

BFAR FIQD-FCS, Ground Flr., Fisheries Bldg. Complex, BPI


8. Order of Payment (1 original)
Compound, Brgy. Vasra, Visayas Ave., Quezon City

BFAR Cashier, Ground Flr., Fisheries Bldg. Complex, BPI Compound,


9. Official Receipts (1 original, 1 photocopy)
Brgy. Vasra, Visayas Ave., Quezon City
National Fisheries Research and Development Institute (NFRDI),
10. Certificate of Taxonomic Identification (1 original 101 Mother Ignacia Ave., Diliman, Quezon City or any Accredited
or 1 photocopy)* Taxonomic Center
*if necessary or as required by the importing country

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit filled-out 1. Receive filled-out
application form and application form and Fishing Regulations
requirements at BFAR required documents, and Officer I
FIQD-FCS, One Stop evaluate for initial BFAR FIQD-FCS
None 20 Minutes
Export Documentation assessment One Stop Export
Center (OSEDC), Pasay Documentation Center
City (OSEDC), Pasay City

31
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1.1 Record and stamp with Fishing Regulations
date and time received
Officer I
BFAR FIQD-FCS
None None 15 Minutes
One Stop Export
Documentation Center
(OSEDC), Pasay City
1.2 Verify, Identify (inspect
sample in case of
None shellcrafts) and validate None 3 Hours
submitted export
documents
Fishing Regulations
1.3 Assign Export
Officer I
None Commodity Clearance None 10 Minutes
BFAR FIQD-FCS
(ECC) number
One Stop Export
1.4 Compute the required based on FAO Documentation Center
fees and advice client to 233-1 & FAO 233- (OSEDC), Pasay City
secure Order of Payment 2 *as per to the
None on the required fees type of 10 Minutes
commodity and
it's volume

2. Secure Order of 1.5 Issue Order of Payment


Payment at BFAR FIQD- for the required fees based on FAO Fishing Regulations
FCS One Stop Export 233-1 and FAO Officer I
Documentation Center 233-2 *as per to BFAR FIQD-FCS
10 Minutes
(OSEDC), Pasay City the type of One Stop Export
commodity and Documentation Center
it's volume (OSEDC), Pasay City

3. Pay the required fees 2. Accept the payment based on FAO


and secure Official based on the issued Order 233-1 and FAO
Receipt at BFAR of Payment and issue 233-2 *as per to
Designated Collecting Official Receipt the type of BFAR Designated
Officer/Landbank commodity and 25 Minutes Collecting
it's volume Officer/Landbank

4. Present the issued 3. Check the presented


Official Receipt to BFAR official receipt and
FIQD-FCS, at the One process/prepare the Export
Stop Export Commodity Clearance
Documentation Center (ECC)
None 30 Minutes
(OSEDC), Pasay City for
the processing of the Fishing Regulations
Export Commodity Officer I
Clearance (ECC) BFAR FIQD-FCS
One Stop Export
3.1 Review for correctness Documentation Center
and accuracy of the entries (OSEDC), Pasay City
to the Export Commodity
Clearance (ECC) and place
None None 40 Minutes
BFAR seal for security
features/measures

32
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
3.2 Approve and sign the
Export Commodity Certifying Officer
Clearance (ECC) BFAR FIQD,
None None 1 hour One Stop Export
Documentation Center
(OSEDC), Pasay City

5. Receive notification on 3.3 Notify client to claim the


Fishing Regulations
the approved Export approved Export
Officer I
Commodity Clearance Commodity Clearance
BFAR FIQD-FCS
(ECC) (ECC) None 10 Minutes
One Stop Export
Documentation Center
(OSEDC), Pasay City
6. Claim the approved 3.4 Release the approved
Export Commodity Export Commodity Fishing Regulations
Clearance (ECC) at Clearance (ECC) and Officer I
BFAR FIQD- FCS, One record the date and time BFAR FIQD-FCS
released None 10 Minutes
Stop Export One Stop Export
Documentation Center Documentation Center
(OSEDC), Pasay City (OSEDC), Pasay City

based on FAO
233-1 & FAO 233-
2 *as per to the
type of
TOTAL: commodity and 7 hours
it's volume

33
10. Issuance of Certificate of Accreditation of Importer

The issuance of Certificate of Accreditation of importer for fishery business establishments that secures the Fishery
Aquaculture Business Operators (FABOs) comply with the Sanitary Phytosanitary (SPS) measures, food safety standards and
BFAR laws and regulations to import fish and fishery/aquatic products.

BFAR Fisheries Inspection and Quarantine Division (FIQD) - Fisheries Certification Section
Office or Division
(FCS)

Classification Complex

Type of Transaction G2B-Government to Business Entity

Who may avail: Importers of Fish and Fishery/Aquatic Products (EXTERNAL)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

BFAR Website(www.bfar.da.gov.ph)/ BFAR FIQD-FCS, Ground Flr.,


1. Filled-out application form (1 original) Fisheries Bldg. Complex, BPI Compound, Brgy. Vasra, Visayas Ave.,
Quezon City

SEC Registration- Securities and Exchange Commission (SEC); DTI


Registration (single proprietorship)- Department of Trade and Industry
2. SEC/DTI/CDA Registration (1 photocopy) (DTI); CDA Registration (for cooperatives)- Cooperative Development
Authority (CDA)

City Hall/LGU
3. Mayor's Business Permit (1 photocopy)

4. BIR Certificate of Registration (1 photocopy) Bureau of Internal Revenue (BIR)

5. BOC Certificate of Accreditation (1 photocopy) Bureau of Customs (BOC)

Bureau of Customs (BOC)


6. BOC Certificate of Registration (1 photocopy)

7. FDA License to Operate (1 photocopy)* Food and Drug Administration (FDA)

8. List of Names of Company's Officer with ID,


Signature and Photo (1 original or 1 photocopy) Company/Business Entity/Applicant

9. Authorization Letter (1 original) Company/Business Entity/Applicant

10. Cold Storage Warehouse Department of Agriculture (DA)

a. Copy of Certificate of Accreditation (1 Department of Agriculture (DA)


photocopy)
b. Lease Contract Agreement (1 photocopy) Company of Cold Storage Warehouse

11. Farm Registration (1 photocopy) BFAR Regional Office where the facility is located

*For canning and processing only

Note: bring original copies for validation

34
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit filled-out 1.Receive application form
application form and and requirements for initial
requirements to BFAR assessment and forward to
FIQD-FCS, G/Flr., FIQD-Fisheries Inspection None 30 Minutes
Senior Administrative
Fisheries Bldg. Complex, Section (FIS) for
Assistant II
BPI Compound verification
BFAR FIQD-FCS
G/Flr., Fisheries Bldg.
2. Receive notification 1.1 Notify client through Complex, BPI
through email or phone email or phone call on the Compound, Brgy. Vasra,
call on the conduct of conduct of verification of Visayas Ave., Quezon
verification of volume volume requirements and City
None 10 Minutes
requirements and validation of disposition
validation of disposition report
report

3. Allow verification of 2. Conduct verification of Fish Inspectors


facility/establishment volume requirements and BFAR FIQD-Fisheries
validation of disposition Inspection Section
report during on-site None 7days (FIS),
inspection G/Flr., Fisheries Bldg.
Complex, BPI
Compound, Brgy. Vasra,
3. Receive the verification
report from FIQD-FIS and
None evaluate/assess results and None 1 hour
essential documents Senior Administrative
Assistant II
BFAR FIQD-FCS
3.1 Prepare/Process the
None Certificate of Accreditation None 2 hours

4. Approve and sign Bureau Director


Certificate of BFAR Director's Office,
Accreditation 3/Flr., Fisheries Bldg.
None None 3 days
Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Q.C.
4. Receive notification 5. Notify client through
through email to claim the email to claim the approved
approved Certificate of Certificate of Accreditation
None 10 Minutes
Accreditation of Importer of Importer Senior Administrative
Assistant II
BFAR FIQD-FCS
5. Claim the approved 5.1 Release the approved G/Flr., Fisheries Bldg.
Certificate of Certificate of Accreditation, Complex, BPI
Accreditation at BFAR record the date and time Compound, Brgy. Vasra,
FIQD-FCS, at the G/Flr., released; and endorse the Visayas Ave., Quezon
None 20 Minutes
Fisheries Bldg. Complex, accredited importer to City
BPI Compound Intercommerce through
email

9 Days,
TOTAL: None 5 Hours, and 45 minutes

*Note: The indicated time is the total processing time of the Inspection for Inventory of Stocks in Cold Storage and Verification of Importer's Facility and
Volume Requirement of Processing Plants (canning and processing) and Institutional Buyers which is one of the frontline services of Fisheries
Inspection Section.

35
11. Manual Issuance of Sanitary Phyto-Sanitary Import Clearance (SPSIC) for research/ sample and
for one time shipment only of regularly transported species

The Manual Issuance of Sanitary Phytosanitary Import Clearance (SPSIC) for research/sample and one time shipment only of
regularly transported species provides documented evidence and ensures that the product is imported based on its approved
purpose under established SPS and food safety standards and in accordance to relevant rules and regulations.

BFAR Fisheries Inspection and Quarantine Division (FIQD) - Fisheries Certification Section
Office or Division
(FCS)

Classification Complex

Type of Transaction G2C - Government to Citizen; G2B - Government to Business Entity

Who may avail: Importers of Fish and Fishery/Aquatic Products; Researchers (EXTERNAL)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

BFAR Website(www.bfar.da.gov.ph) / BFAR FIQD-FCS, Ground Flr.,


1. Filled-out application form (1 original) Fisheries Bldg. Complex, BPI Compound, Brgy. Vasra, Visayas Ave.,
Quezon City
2. Invoice ( (1 original or 1 photocopy) Supplier/Shipper/Client/Applicant/Business Entity

3. Health Certificate (if applicable) (1 photocopy) Supplier/Shipper/Client/Applicant/Business Entity

4. Government issued ID of applicant (1 photocopy) Client

BFAR FIQD-FCS, Ground Flr., Fisheries Bldg. Complex, BPI


5. Order of Payment (1original)
Compound, Brgy. Vasra, Visayas Ave., Quezon City

BFAR Cashier, Ground Flr., Fisheries Bldg. Complex, BPI Compound,


6. Official Receipts (1 original, 1photocopy)
Brgy. Vasra, Visayas Ave., Quezon City

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit filled-out 1. Receive filled-out
application form and application form and
requirements to BFAR requirements for initial
FIQD-FCS, at the G/Flr., assessment
Fisheries Bldg. Complex,
BPI Compound None 20 Minutes Aquaculturist II or
Fishing Regulations
Officer II
BFAR FIQD-FCS
G/Flr., Fisheries Bldg.
Complex, BPI
1.1 Evaluate the accuracy Compound, Brgy. Vasra,
of submitted documents Visayas Ave., Quezon
and forward to Fisheries City
Quarantine Section (FQS)
None for the conduct of risk None 20 Minutes
assessment

36
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
2. Conduct Risk Aquaculturist II or
Assessment of regularly Fishing Regulations
transported species and Officer II
submit results of the risk BFAR FIQD-FCS
None assessment to FIQD-FCS None 20 Minutes G/Flr., Fisheries Bldg.
Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City
3. Receive results of the
risk assessment from the
Fisheries Quarantine None 5 Minutes
Aquaculturist II or
Section (FQS)
Fishing Regulations
None 3.1 Issue Order of Payment Officer II
for the required fees BFAR FIQD-FCS
None 10 Minutes

3. Pay the required fees 4. Accept the payment *PHP 1,650 for
and secure Official based on the issued Order fresh chilled,
Receipt at BFAR of Payment received and frozen fish and
Cashier, at the G/Flr., issue Official Receipt fishery products
Fisheries Bldg. Complex, (based on FAO
BPI Compound 195) BFAR Cashier
*PHP 150 for 25 Minutes Ground Flr, Fisheries
live aquatic Bldg., BPI Compound,
animals Visayas Avenue, Q.C.
(based on FAO
221)

4. Present the Official 5. Check the presented 30 Minutes


Receipt to BFAR FIQD- Official Receipt and Aquaculturist II or
FCS at the G/Floor, encode/process the Fishing Regulations
Fisheries Bldg., BPI Sanitary Phytosanitary None
Officer II
Compound Import Clearance (SPSIC) BFAR FIQD-FCS

5.1 Review for correctness None 35 Minutes


and accuracy of the entries
to the SPSIC and place
None BFAR seal/security Aquaculturist II or
features Fishing Regulations
Officer II
5. Receive notification on 5.2 Notify client on the None 10 Minutes BFAR FIQD-FCS
the status of SPSIC status of SPSIC application
application

6. Approve and sign the


Bureau Director
SPSIC
BFAR Director's Office
3/Flr., Fisheries Bldg.
None None 3 Days Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City

37
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
6. Receive notification 7. Notify client through
through email or phone email or phone call to claim
call to claim the approved the approved Sanitary
Sanitary Phytosanitary Phytosanitary Import
Import Clearance Clearance (SPSIC) at
(SPSIC) BFAR FIQD-FCS G/Flr.,
Fisheries Bldg. Complex, None 10 Minutes Aquaculturist II or
BPI Compound, Brgy. Fishing Regulations
Vasra, Visayas Ave., Officer II
Quezon City BFAR FIQD-FCS
G/Flr., Fisheries Bldg.
Complex, BPI
Compound, Brgy. Vasra,
7. Claim the approved 7.1 Release the approved Visayas Ave., Quezon
Sanitary Phytosanitary SPSIC and record the date City
Import Clearance and time released
(SPSIC) at BFAR FIQD-
FCS G/Flr., Fisheries None 10 Minutes
Bldg. Complex, BPI
Compound

TOTAL: 3 days, 3 hours, 15


minutes

REQUIRED FEES/PAYMENT:
*PHP 1,650 for fresh chilled, frozen fish and fishery products (based on FAO 195)
*PHP 150 for live aquatic animals (based on FAO 221)

38
12. Manual Issuance of Sanitary Phyto-Sanitary Import Clearance (SPSIC) for research/ sample and
for one time shipment only of Alien/Exotic Species

The Manual Issuance of Sanitary Phytosanitary Import Clearance (SPSIC) is for research/sample and one time shipment of
alien/exotic species. It provides documented evidence and ensures that the product is imported based on its approved purpose
under established SPS and food safety standards and in accordance to relevant rules and regulations.

BFAR Fisheries Inspection and Quarantine Division (FIQD) - Fisheries Certification Section
Office or Division
(FCS)

Classification Highly Technical

Type of Transaction G2C - Government to Citizen; G2B - Government to Business Entity

Who may avail: Importers of Fish and Fishery/Aquatic Products; Researchers (EXTERNAL)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Filled-out application form (1 original) BFAR Website(www.bfar.da.gov.ph) / BFAR FIQD-FCS, Ground Floor,
Fisheries Bldg Complex, BPI Compound, Brgy. Vasra, Visayas Avenue,
Quezon City
2. Invoice ( (1 original or 1 photocopy) Supplier/Shipper/Client/Applicant/Business Entity

3. Health Certificate (if applicable) (1 photocopy) Supplier/Shipper/Client/Applicant/Business Entity

4. Government issued ID of applicant (1 photocopy) Client

5. Order of Payment (1original) BFAR FIQD-FCS, Ground Floor, Fisheries Bldg Complex, BPI
Compound, Brgy. Vasra, Visayas Avenue, Quezon City

6. Official Receipts (1 original, 1photocopy) BFAR Cashier, Ground Flr., Fisheries Bldg. Complex, BPI Compound,
Brgy. Vasra, Visayas Ave., Quezon City

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit filled-out 1. Receive filled-out
application form and application form and
requirements through requirements through email
email at for initial assessment
fiqd.certification@gmail.c None 20 Minutes
om Aquaculturist II or
Fishing Regulations
Officer II
BFAR FIQD-FCS
G/Flr., Fisheries Bldg.
1.1 Evaluate the accuracy Complex, BPI
of submitted documents Compound, Brgy. Vasra,
and forward to Fisheries Visayas Ave., Quezon
Quarantine Section (FQS) City
None for the conduct of risk None 20 Minutes
assessment

39
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
2. Conduct Risk
Assessment of alien/exotic
species and submit results
of risk assessment to FIQD- Fishing Regulations
FCS Officer II
None None 15 Days
BFAR FIQD-Fisheries
Quarantine Section
(FQS)
G/Flr., Fisheries Bldg.
Complex, BPI
3. Receive results of the Compound, Brgy. Vasra,
risk assessment from the Visayas Ave., Q.C.
None Fisheries Quarantine None 5 Minutes
Section (FQS)

2. Receive notification 3.1 Notify client through


through email or phone email or phone call on the Fishing Regulations
call on the status of status of SPSIC application Officer II
SPSIC application and to and advice client to secure BFAR FIQD-FCS
secure an Order of an Order of Payment G/Flr., Fisheries Bldg.
Payment at BFAR FIQD- None 10 Minutes
Complex, BPI
FCS, G/Flr., Fisheries Compound, Brgy. Vasra,
Bldg. BPI Compound, Visayas Ave., Quezon
City

3. Secure Order of 3.2 Issue Order of Payment Aquaculturist II or


Payment at BFAR FIQD- for the required fees Fishing Regulations
FCS, G/Flr., Fisheries Officer II
Bldg. Complex, BPI BFAR FIQD-FCS
None 10 Minutes
Compound G/Flr., Fisheries Bldg.
Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
4. Pay the required fees 4. Accept the payment *PHP 1,650 for
and secure Official based on the issued Order fresh chilled, BFAR Cashier
Receipt at BFAR of Payment received and frozen fish and G/Flr., Fisheries Bldg.
Cashier, G/Flr., Fisheries issue Official Receipt fishery products Complex, BPI
25 Minutes
Bldg. Complex, BPI (based on FAO Compound, Brgy. Vasra,
Compound 195) Visayas Ave., Quezon
*PHP 150 for live City
aquatic animals
5. Present the issued 5. Check the presented (based on FAO
Official Receipt to BFAR Official Receipt and
FIQD-FCS, G/Flr., encode/process the
None 30 Minutes Aquaculturist II or
Fisheries Bldg. Complex, Sanitary Phytosanitary
Fishing Regulations
BPI Compound Import Clearance (SPSIC)
Officer II
BFAR FIQD-FCS
5.1 Review for correctness
G/Flr., Fisheries Bldg.
and accuracy of the entries
Complex, BPI
to the Sanitary
Compound, Brgy. Vasra,
Phytosanitary Import
None None 35 Minutes Visayas Ave., Quezon
Clearance (SPSIC) and
City
place BFAR seal/security
features

40
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
6. Approve and sign the
Sanitary Phytosanitary Bureau Director
Import Clearance (SPSIC) BFAR Director's Office
3/Flr., Fisheries Bldg.
None None 3 Days Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City
6. Receive notification 7. Notify client through
through email or phone email or phone call to claim Aquaculturist II or
call to claim the approved the approved Sanitary Fishing Regulations
Sanitary Phytosanitary Phytosanitary Import Officer II
Import Clearance Clearance (SPSIC) at BFAR FIQD-FCS
(SPSIC) at BFAR-FIQD- BFAR FIQD-FCS Office None 10 Minutes G/Flr., Fisheries Bldg.
FCS, G/Floor, Fisheries Complex, BPI
Bldg., BPI Compound Compound, Brgy. Vasra,
Visayas Ave., Quezon
City

7. Claim the approved 7.1 Release the approved None


Aquaculturist II or
Phytosanitary Import SPSIC and record the date
Fishing Regulations
Clearance (SPSIC) at and time released
Officer II
BFAR FIQD-FCS, G/Flr.,
BFAR FIQD-FCS
Fisheries Bldg. Complex, 10 Minutes
G/Flr., Fisheries Bldg.
BPI Compound
Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Q.C.
TOTAL: 18 days, 2 hours, and 55
minutes
REQUIRED FEES/PAYMENT:
*PHP 1,650 for fresh chilled, frozen fish and fishery products (based on FAO 195)
*PHP 150 for live aquatic animals (based on FAO 221)

41
13. Manual Issuance of Sanitary Phyto-Sanitary Import Clearance (SPSIC) for Wet Market under FAO
259

The manual issuance of Sanitary Phytosanitary Import Clearance (SPSIC) is for fish and fishery/aquatic products intended for
wet markets under FAO 259 where Certificate of Necessity to Import (CNI) during Closed Fishing Season/ lean months and fish
shortage/ crisis is significantly needed. It also provides documented evidence and ensures that the product is imported based
on its approved purpose under established SPS and food safety standards and in accordance to relevant rules and regulations.

BFAR Fisheries Inspection and Quarantine Division (FIQD) - Fisheries Certification Section
Office or Division
(FCS)

Classification Complex

Type of Transaction G2B- Government to Business Entity

Who may avail: PFDA Accredited Importers of Fish and Fishery/Aquatic Products (EXTERNAL)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. SPSIC Processing Fee (P1,650.00 / SPSIC) Company/Business Entity

2. Filled-up online application form (1 electronic copy) DA Intercommerce Online Account of Importer

3. Proforma Invoice (1 electronic copy) Company/Business Entity


4. Distribution Report/Production Data (1 electronic Company/Business Entity
copy)
BFAR FIQD-FCS, Ground Flr., Fisheries Bldg. Complex, BPI
5. Order of Payment (1 original)
Compound, Brgy. Vasra, Visayas Ave., Quezon City

BFAR Cashier, Ground Floor, Fisheries Bldg Complex, BPI Compound,


6. Official Receipts (1 original, 1photocopy)
Brgy. Vasra, Visayas Avenue, Quezon City

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit filled-out 1. Receive application and
application form and requirements through email
requirements through and conduct assessment
email address at and validation None 1 Hour
fiqd.certification@gmail.c
om

Aquaculturist II or
1.1 Record application
Fishing Regulations
details and stamp with date
Officer II
and time received
None None 20 Minutes BFAR FIQD-FCS
G/Flr., Fisheries Bldg.
Complex, BPI
Compound, Brgy. Vasra,
1.2 Prepare/process the
Visayas Ave., Quezon
Sanitary Phytosanitary
City
Import Clearance (SPSIC),
importation checklist and
None reports and place BFAR None 5 Hours
seal/security features

42
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
2. Endorse the Sanitary
Phytosanitary Import Division Chief
Clearance (SPSIC), BFAR-FIQD
importation checklist and G/Flr., Fisheries Bldg.
reports to the Division Chief Complex, BPI
of FIQD and Division Chief Compound, Brgy. Vasra,
of Legal Division for initial, Visayas Ave., Q.C.
None and forward to BFAR None 2 Hours Chief
Director's Office for Legal Division
approval and signature 2/Flr., Fisheries Bldg.
Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City

3. Approve and sign the


Sanitary Phytosanitary
Import Clearance (SPSIC) BFAR Director,
as recommended by the BFAR Director Staff
Division Chief of FIQD and BFAR Director's Office,
None Division Chief of Legal None 2 Days 3/Flr., Fisheries Bldg.
Division, and forward to the Complex, BPI
Office of the DA Secretary Compound, Brgy. Vasra,
for approval and signature Visayas Ave., Q.C.

4. Approve and sign the


Sanitary Phytosanitary
Import Clearance (SPSIC) DA Secretary ,
as recommended by the Office of the Secretary
Bureau Director and place Department of
None None 3 Days
the DA seal/hologram Agriculture,
Elliptical Rd., Diliman,
Quezon City

4.1 Notify through e-mail or


phone call the BFAR FIQD-
FCS to claim approved Office of the Secretary
Sanitary Phytosanitary Department of
None None 15 minutes
Import Clearance (SPSIC) Agriculture, Elliptical Rd.,
Diliman, Quezon City

5. Receive notification and


claim the approved Aquaculturist II or
Sanitary Phytosanitary Fishing Regulations
Import Clearance (SPSIC) Officer II
at Department of BFAR FIQD-FCS
None Agriculture, Elliptical Rd., None 30 minutes G/Flr., Fisheries Bldg.
Diliman, Quezon City Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City

43
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
2. Receive notification 5.1 Notify client for the
through email or phone issuance of Order of
call for the issuance of Payment
Order of Payment at the
BFAR FIQD-FCS, G/Flr., None 10 minutes Aquaculturist II or
Fisheries Bldg. Complex, Fishing Regulations
BPI Compound Officer II
BFAR FIQD-FCS
G/Flr., Fisheries Bldg.
Complex, BPI
3. Secure Order of 5.2 Issue Order of Payment Compound, Brgy. Vasra,
Payment at the BFAR for the required fees Visayas Ave., Quezon
FIQD-FCS, G/Flr., City
Fisheries Bldg. Complex, None 10 minutes
BPI Compound

4. Pay the required fees 6. Accept payment based BFAR Cashier


and secure Official on the issued Order of G/Flr., Fisheries Bldg.
Receipt at BFAR Payment and issue Official Complex, BPI
Cashier, G/Flr., Fisheries Receipt Php 1,650 per
25 Minutes Compound, Brgy. Vasra,
Bldg. Complex, B SPSIC
Visayas Ave., Quezon
City

5. Present the Official 7. Check the presented


Receipt and claim the Official Receipt and release
approved Sanitary the approved Sanitary
Phytosanitary Import Phytosanitary Import Aquaculturist II or
Clearance (SPSIC) at Clearance (SPSIC), record Fishing Regulations
BFAR FIQD-FCS G/Flr., the date and time released None 10 Minutes
Officer II
Fisheries Bldg. Complex, BFAR FIQD-FCS
BPI Compound,

TOTAL: 6 days and 2 hours

REQUIRED FEES/PAYMENT:
*PHP 1,650 for fresh chilled, frozen fish and fishery products (based on FAO 195)
*PHP 150 for live aquatic animals (based on FAO 221)

44
14. Online Issuance of Sanitary Phytosanitary Import Clearance (SPSIC) under FAO 195
The online issuance of Sanitary Phytosanitary Import Clearance (SPSIC) is for fish and fishery/aquatic products intended for
commercial purposes (institutional buyer, canning, processing). It also provides documented evidence and ensures that the
product is imported based on its approved purpose under established SPS and food safety standards and in accordance to
relevant rules and regulations.

BFAR Fisheries Inspection and Quarantine Division (FIQD) - Fisheries Certification Section
Office or Division
(FCS)

Classification Highly Technical

Type of Transaction G2B- Government to Business Entity

Who may avail: BFAR Accredited Importers of Fish and Fishery/Aquatic Products

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. SPSIC Processing Fee (PHP 1,650.00 per SPSIC) Company/Business Entity

2. Filled-up online application form (1 electronic copy) Dept. Of Agriculture (DA), Intercommerce Online Account of Importer

3. Proforma Invoice (1 electronic copy) Company/Business Entity


4. Distribution Report/Production Data
Company/Business Entity
(1 electronic copy)
5. Health Certificate from exporting country (1 original,
Company/Business Entity
1photocopy)*
BFAR FIQD-FCS, Ground Floor, Fisheries Bldg Complex, BPI
6. Order of Payment (1original)
Compound, Brgy. Vasra, Visayas Avenue, Quezon City

BFAR Cashier, Ground Floor, Fisheries Bldg Complex, BPI Compound,


7. Official Receipts (1 original, 1photocopy)
Brgy. Vasra, Visayas Avenue, Quezon City
*if necessary

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1.Request/secure for 1. Issue Order of Payment Senior Administrative
Order of Payment to Assistant II or
deposit in their online Aquaculturist I,
Intercommerce account BFAR FIQD-FCS
at BFAR FIQD-FCS, None 10 Minutes G/Flr., Fisheries Bldg.
G/Flr., Fisheries Bldg. Complex, BPI
Complex, BPI Compound Compound, Brgy. Vasra,
Visayas Ave., Quezon
City
2. Pay the fees and 2. Accept the payment
secure Official Receipt at based on the issued Order
BFAR Cashier, G/Flr., of Payment received and BFAR Cashier
Fisheries Bldg. Complex, issue Official Receipt G/Flr., Fisheries Bldg.
PHP 1,650.00
BPI Compound, Brgy. Complex, BPI
(Based on FAO 25 Minutes
Vasra, Visayas Ave., Compound, Brgy. Vasra,
195, FAO 221)
Quezon City Visayas Ave., Quezon
City

45
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
3. Apply for SPSIC online 3. Review the SPSIC
through Intercommerce application and
and upload the requirements online for
requirements completeness and
authenticity

a. If the application and


attachments are correct
and valid, the reviewer
endorses the application to
Aquaculturist II or
Fisheries Inspection
Fishing Regulations
Section (FIS) for
Officer II,
verification when
BFAR FIQD-FCS
necessary.
b. If with deficiencies, the None 1 day G/Flr., Fisheries Bldg.
reviewer rejects the Complex, BPI
application, inform importer Compound, Brgy. Vasra,
of the lacking requirements Visayas Ave., Quezon
or changes, and advise to City
reapply the same
application with complete
and correct requirements. A
notification will be visible to
the importer's account
regarding the status of his
application.

4. Allow the conduct of 4. Conduct verification of


verification of cold the availability of cold
storage and validation of storage and volume Fishing Regulations
disposition report. requirements as well as Officer II/ Fish Inspectors
validation of disposition BFAR FIQD-Fisheries
report during on-site Inspection Section
inspection. None 7 days (FIS)
G/Flr., Fisheries Bldg.
Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Q.C.

5. Verify the status of 5. Review further the


SPSIC application via SPSIC application based
online at DA on the verification report Vet Med or Fishing
Intercommerce System from FIS None Regulations Officer II
(Reviewer)
BFAR FIQD
1day G/Flr., Fisheries Bldg.
a. If the application Complex, BPI
passes, tag "For Compound, Brgy. Vasra,
Endorsement" and it will be Visayas Ave., Quezon
None None
forwarded to the endorser. City

46
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
b. If with deficiences, tag as
"Reject", inform importer of
the lacking requirements Vet Med or Fishing
and advise to reapply the Regulations Officer II
same application with (Reviewer)
complete and correct BFAR FIQD
None requirements. A notification None 1 day G/Flr., Fisheries Bldg.
will be visible to the Complex, BPI
importer's account Compound, Brgy. Vasra,
regarding the status of his Visayas Ave., Quezon
application. City

6. Verify the status of 6. Review further the


SPSIC application via SPSIC application.
online at DA
Intercommerce System a. If the application has
complete and correct
requirements and entries, None 4 hours
tag "For Approval" and it
will be forwarded to the Vet Med or Fishing
approver Regulations Officer I/II
(Endorser)
b. If with deficiences, tag as BFAR FIQD
"Reject", inform importer of G/Flr., Fisheries Bldg.
the lacking requirements Complex, BPI
and advise to reapply the Compound, Brgy. Vasra,
same application with Visayas Ave., Quezon
complete and correct City
requirements. A notification
will be visible to the
importer's account
regarding the status of his
application.

7. Verify the status of 7. Conduct final review of Bureau Director


SPSIC application via application and approve it (Approver)
Intercommerce and print BFAR Director's Office
the approved SPSIC None 4 hours 3/Flr., Fisheries Bldg.
Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Q.C.

PHP 1,650.00
9 days, 2 hours and 10
TOTAL: (Based on FAO
minutes
195)

*Note: The indicated time is the total processing time of the Inspection for Inventory of Stocks in Cold Storage and Verification of Importer's Facility and
Volume Requirement of Processing Plants (canning and processing) and Institutional Buyers which is one of the frontline services of Fisheries
Inspection Section.

47
15. Online Application of Additional Importables under FAO 195
The online application of importables for SPSIC application with Harmonized System (HS) Codes ensures that the product is
imported based on its approved purpose under established Sanitary and Phytosanitary (SPS) and food safety standards and in
accordance to relevant rules and regulations.

BFAR Fisheries Inspection and Quarantine Division (FIQD) - Fisheries Certification Section
Office or Division
(FCS)
Classification Highly Technical
Type of Transaction G2B- Government to Business Entity
Who may avail: BFAR Accredited Importers of Fish and Fishery/Aquatic Products (EXTERNAL)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter of Intent Company/Business Entity

2. List of Clients Company/Business Entity

3. Contract Supply Agreement Company/Business Entity

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

1. Submit Letter of Intent 1. Receive the letter of


and requirements through intent through email and
Aquaculturist II or
email at review the requirements for
Fishing Regulations
fiqd.certification.import@ initial assessment online
Officer II
gmail.com and forward to Fisheries
BFAR FIQD-FCS
Quarantine Section
None 1 Hour G/Flr., Fisheries Bldg.
(FQS)/Fisheries Inspection
Complex, BPI
Section (FIS) for the
Compound, Brgy. Vasra,
conduct of risk assessment
Visayas Ave., Quezon
City

2. Conduct risk assessment


of the applied additional
importables a. Fishing Regulations
Officer II
a. For live aquatic animals, BFAR FIQD-Fisheries
forward to Fisheries Quarantine Section
Quarantine Section (FQS) (FQS)

b.For fresh chilled, frozen b. Fishing Regulations


fish and fishery products, Officer II
None None 1 day
forward to Fisheries BFAR FIQD-Fisheries
Inspection Section (FIS) Inspection Section
(FIS)
G/Flr., Fisheries Bldg.
Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City

48
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

3. Receive results of the


Fishing Regulations
risk assessment from the
Officer II
Fisheries Quarantine
BFAR FIQD-FCS
None Section (FQS)/Fisheries None 5 Minutes
G/Flr., Fisheries Bldg.,
Inspection Section (FIS)
BPI Compound, Brgy.
Vasra, Visayas Ave., Q.C.
2. Receive notification 3.1. Notify client through
Fishing Regulations
through email or phone email or phone call on the
Officer II
call on the conduct of conduct of verification of
verification of volume volume requirements and BFAR FIQD-FCS
None 10 Minutes G/Flr., Fisheries Bldg.
requirements and validation of disposition
validation of disposition report Complex, BPI
Compound, Brgy. Vasra,
report
Visayas Ave., Q.C.
3. Allow verification of the 4. Conduct verification of
Fishing Regulations
facility/establishment the volume
Officer II
requirement/capacity/ lease
of contract with cold BFAR FIQD-FIS
storage, supply agreement G/Flr., Fisheries Bldg.
None 7 days
with clients for the Complex, BPI
additional importables and Compound, Brgy. Vasra,
submit verification report to Visayas Ave., Quezon
FIQD-FCS City
5. Receive verification Fishing Regulations
report and conduct further Officer II
assessment of the BFAR FIQD-FCS
None application based on the None 20 Minutes G/Flr., Fisheries Bldg.
verification report Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Q.C.
4. Receive notification 5.1 Notify client through
through email on the email on the status of
status of application for application for additional
additional importables importables. Fishing Regulations
a. If approved, the Officer II
application for additional BFAR FIQD-FCS
importables will be None 20 Minutes G/Flr., Fisheries Bldg.
endorsed online to the Complex, BPI
Intercommerce. Compound, Brgy. Vasra,
Visayas Ave., Q.C.
b. Otherwise, advise the
client for non-
endorsement.
5. Verify the status of 5.2 Approve the additional
SPSIC application via importable via Section Chief
online at DA intercommerce. BFAR FIQD-FCS
Intercommerce System A notification will be visible G/Flr., Fisheries Bldg.
None 30 Minutes
to the importer's account Complex, BPI
regarding the status of his Compound, Brgy. Vasra,
application. Visayas Ave., Q.C.

7 Days and
TOTAL: None
4 Hours
*Note: The indicated time is the total processing time of the Inspection for Inventory of Stocks in Cold Storage and Verification of Importer's Facility and
Volume Requirement of Processing Plants (canning and processing) and Institutional Buyers which is one of the frontline services of Fisheries
Inspection Section.

49
II. QUARANTINE: Certificate of Registration/Inspection
BFAR-Fisheries Inspection and Quarantine Division (FIQD)
Fisheries Quarantine Section (FQS)

1. Issuance of Certificate of Registration of Exporter and Fishery Establishment for Export

The Certificate of Registration of Exporter and Fishery Establishment for Export is issued to individual who intends to export live
aquatic animals.

Office or Division Fisheries Inspection and Quarantine Division (FIQD) - Fisheries Quarantine Section (FQS)

Classification Highly Technical (Food Safety and Public Health Concern)

Type of Transaction G2B-Government to Business entity

Who may avail: Exporters of Live Aquatic Animals

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Filled-out application form (BFAR-FIQD-Form 1) Company/Business Entity

2. Letter of Intent Company/Business Entity

3. Request Letter for Inspection (for exporter with


Company/Business Entity
facility)

Dept. Of Trade and Industry (DTI)/ Security & Exchange Commision


4. SEC Registration/DTI Permit
(SEC)

5. Business Permit City Hall

6. Approved SSOP Company/Business Entity

7. Location Map Company/Business Entity

8. Photos of Facility Company/Business Entity

9. Manpower Profile Company/Business Entity

10. Complete List of Product Source Company/Business Entity

11. Facility Lay-out Company/Business Entity

12. Taxonomic Identification Certificate Company/Business Entity

12. BIR Certificate of Registration Bureau of Internal Revenue (BIR)

13. Endorsement Letter from BFAR Regional Office BFAR Regional Offices

14. Inspection Report Signed by Regional Inspectors BFAR Regional Offices

50
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

1. Submit filled-out 1. Receive filled-out Fisheries Quarantine


application form and it's application form and it's Officers
requirements to the requirements BFAR - Fisheries
BFAR-FIQD-FQS, G/Flr., Quarantine Section
Fisheries Bldg., BPI None 15 Minutes (FQS)
Compound G/Flr., Fisheries Bldg.
Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Q.C.
1.1 Evaluate the
completeness, accuracy,
and validity of the
submitted documents/
requirements (If the
Fisheries Quarantine
requirements are
None None 4 Hours Officers
incomplete, inaccurate and
BFAR - Fisheries
not valid the application will
Quarantine Section
be rejected)
(FQS)
G/Flr., Fisheries Bldg.
Complex, BPI
1.2 Prepare the Travel Compound, Brgy. Vasra,
Authority for the scheduling Visayas Ave., Q.C.
of fishery
None None 3 Days
establishment/facility
inspection

2. Receive notification on 2. Notify client on the


the scheduled inspection scheduled inspection of
of fishery fishery establishment thru e- Fisheries Quarantine
establishment/facility mail or thru phone calls None 5 Minutes
Officers
BFAR - Fisheries
Quarantine Section
3. Allow inspection of 3. Conduct inspection of (FQS)
fishery establishment/ the fishery G/Flr., Fisheries Bldg.
6 Hour (NCR Area) Complex, BPI
facility establishment/facility
None Compound, Brgy. Vasra,
Visayas Ave., Q.C.
3 Days (Regional
Area)
4. Attend the discussion 4. Discuss/Present the
on the findings/ findings/deficiencies during
deficiencies of the the closing meeting of the
Fisheries Quarantine
inpsection conducted inspection conducted (If the
Officers
fishery establishment is non-
BFAR - Fisheries
compliant, a corrective
Quarantine Section
action plan shall be
None 1 Hour (FQS)
submitted by the client)
G/Flr., Fisheries Bldg.
Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Q.C.

51
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
5. Submit the Corrective 5. Evaluation of Corrective
Action Plan based on the Action Plan and/or Re- Fisheries Quarantine
Inspection Report or Non- inspection of the Fishery Officers
Compliance (For Non- Establishment if needed BFAR - Fisheries
Compliant Fishery (Application will be rejected Quarantine Section
Establishment Only) if the client fails to submit None 7 Days (FQS)
Corrective Action Plan G/Flr., Fisheries Bldg.
within the allotted timeline) Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Q.C.

5.1 Prepare/Process
Certificate of Registration
and Endorsement Letter to Fisheries Quarantine
be forwarded to Director’s Officers
Office for approval BFAR - Fisheries
/signature Quarantine Section
None None 2 Hours (FQS)
G/Flr., Fisheries Bldg.
Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Q.C.

5.2 Approval and signature


of Certificate of
Registration by the BFAR BFAR National Director
Director Director's Office
3rd/Flr., Fisheries
None None 3 Days
Building Complex, BPI
Compound, Brgy. Vasra,
Visayas Avenue, Q.C.

6. Receive notification on 6. Record and notify client Fisheries Quarantine


the approved and ready on the approved and ready Officers
for release Certificate of for release Certificate of
None 10 Minutes BFAR - Fisheries
Registration Registration
Quarantine Section
(FQS)

17 Days, 5 Hours, and 30


TOTAL: None
Minutes

52
2. Issuance of Inspection Report for Export/Import of Live Aquatic Animals
The Inspection Report is issued to fishery establishment operators that has been inspected for facility registration/monitoring
purposes.

Office or Division Fisheries Inspection and Quarantine Division (FIQD) - Fisheries Quarantine Section (FQS)

Classification Simple

Type of Transaction G2B-Government to Business Entity

Who may avail: Exporters and Importers of Live Aquatic Animals

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Client's Profile (Facility Lay-out, Standard Operating


Company/ Requesting Party
Procedures (SOP) and etc.)

2. Request Letter for Inspection (for importers) Company/ Requesting Party

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit request letter 1. Receive the request with
and submission of the required documentary
requirements for approval requirements and followed
of inspection and Allow with the conduct of actual
the inspection team and inspection of the fishery
None 4 Hours
provide access to the establishment/facility
fishery establishment/
facility
Fisheries Quarantine
Officers
2. Attend the discussion 2. Discuss/Present findings BFAR - Fisheries
on the findings of the from the conduct of fishery Quarantine Section
inspection conducted establishment/facility (FQS)
inspection G/Flr., Fisheries Bldg.
None 1 Hour Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City

3. Sign conforme and 3. Provide copy of


receive inspection report inspection report after
signing on the conforme
None 5 Minutes

5 Hours and 5
Minutes (NCR
Areas)
TOTAL: None

* 3 Days (Regional Areas)

53
III. QUARANTINE: Certificate of Accreditation/Inspection
BFAR-Fisheries Inspection and Quarantine Division (FIQD)
Fisheries Inspection Section (FIS)

1. Inspection of Cold Storage Warehouse for Issuance of License to Operate (LTO)


This inspection activity is conducted to verify compliance set in Administrative order AC 1 s. 2021 on the Accreditation of Cold
Storage Warehouse Facility.

Office or Division BFAR-Fisheries Inspection Quarantine Division (FIQD) - Fisheries Inspection Section (FIS)

Classification Complex

Type of Transaction G2C- Government to Citizen; G2B- Government to Business Entity

Who may avail: Cold Storage Warehouse Operators (EXTERNAL)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Duly accomplished,notarized and verified


BFAR- Website- www.bfar.gov.ph
Application Form (New Applicant & Renewal)

2. Floor Plan/Layout showing all storage rooms and


Cold Storage Warehouse Operators
other facilities for Specific products (New Applicant)

3. Recent photographs of the inner and outer portions


of the CSW (New Applicant) ; Photographs of Cold Storage Warehouse Operators
additional facilities/improvements, if any (for renewal)

4. Updated Business Permit (New Applicant &


City/Municipal Government
Renewal)

5 Environment Compliance Certificate/Certificate of


Department of Environment and Natural Resources (DENR)
Non-Coverage (New Applicant & Renewal)

6. Permit to Operate (Air Pollution Source/Control


Department of Environment and Natural Resources (DENR)/Laguna
Installations, Exemption Certificate) - New Applicant &
Lake Development Authority (LLDA)
Renewal
* Provided that, in case the cold storage facility is also
7. Photocopy of Business Registration (New Applicant Department of Trade and Industry (DTI)/ Security of Exchange
& Renewal) Commission (SEC)

8. Sanitary Permit/Letter of Approval of Water Source


DOH + NWRB/LGU Health Office
and Potability (New Applicant & Renewal)

9. Reliable recording system for readily available


Cold Storage Warehouse Operators
information (New Applicant)

10. Rated Capacity (New Applicant) Cold Storage Warehouse Operators

11. List of clientele for the last two (2) years (New
Applicant & Renewal) Cold Storage Warehouse Operators

54
CHECKLIST OF REQUIREMENTS WHERE TO SECURE

12. List of products/commodity stored (Local &


Cold Storage Warehouse Operators
Imported) - New Applicant & Renewal
13. GOP/HACCP Certificate, when applicable (New
Cold Storage Warehouse Operators
Applicant & Renewal)

14. Previous License to Operate (LTO) of CSW Cold Storage Warehouse Operators

BFAR Cashier, G/Floor, Fisheries Building Complex, BPI Compound,


15. Order of payment
Brgy.Vasra,Visayas Avenue, Quezon City

BFAR Cashier, G/Floor, Fisheries Building Complex, BPI Compound,


16. Official Receipt
Brgy.Vasra,Visayas Avenue, Quezon City

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit accomplished 1. Receive the application Senior Administrative
application form together form together with the Assistant II or Fish
with the required required documents Inspector
documentary including the review and BFAR FIQD-FIS,
requirements to BFAR evaluation of the None 35 Minutes G/Floor, Fisheries
FIQD-FIS documents and it's Building Complex, BPI
completeness Compound,
Brgy.Vasra,Visayas
Avenue, Q.C.
2. Pay the required fees 2. Accepts the payment Collecting Officer
and secure Official based on the Order of BFAR Cashier,
Receipt at BFAR Payment and issue Official G/Floor, Fisheries
PHP 4,000
Cashier Receipt 30 Minutes Building Complex, BPI
Compound,
Brgy.Vasra,Visayas
Avenue, Q.C.
3. Receive notification on 3. Notify the clients of the
the scheduled inspection scheduled inspection
and allow inspection and conduct onsite
team to inspect and inspection of cold storage
facility based on the agreed
schedule that covers the
following
a. Opening meeting with Fish Inspector
the cold storage BFAR FIQD-FIS
representative and CSW
None 3 Days
b. Walk through in the cold representatives,
storage premises Cold Storage Warehouse
c. Documents review Facility address on site
d. Desk review
e. Close door meeting
f. Exit meeting with the cold
storage representative
g. Final report preparation

3.1 Review/ Evaluate Chief, FIS


inspection report BFAR FIQD-FIS
G/Floor, Fisheries
None None 1 Hour Building Complex, BPI
Compound,
Brgy.Vasra,Visayas
Avenue, Quezon City

55
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
3.2 Prepare/Process
Senior Administrative
Certificate for Cold Storage
Assistant II
Accreditation (License to
BFAR FIQD-FIS
Operate) if compliant on
G/Floor, Fisheries
None the requirements None 30 Minutes
Building Complex, BPI
Compound,
Brgy.Vasra,Visayas
Avenue, Q.C.
3.3 Forward the License to Senior Administrative
Operate Certificate to Assistant II FIS Chief &
Section & Division Chief for FIQD Chief
final review and initials BFAR FIQD
None None 30 Minutes G/Floor, Fisheries
Building Complex, BPI
Compound,
Brgy.Vasra,Visayas
Avenue, Q.C.
3.4 Scan and forward the
Senior Administrative
License to Operate
Assistant II
Certificate (LOC) for initials
of Assistant Director for BFAR FIQD-FIS
Research, Regulations and G/Floor, Fisheries
None None 10 Minutes
International Engagements Building Complex, BPI
(ADRRIE) to review further Compound,
and evaluate Brgy.Vasra,Visayas
Avenue, Quezon City
4. Review/evaluate the None 4 hours Assistant Director
received scan copy of ADRRIE Office
certificate and forward to 3rd Floor, Fisheries
None Director's Office for Building Complex, BPI
approval / sinature Compound,
Brgy.Vasra,Visayas
Avenue, Q.C.
5. Approve and sign the None 3 Days Bureau Director
License to Operate (LTO) BFAR-Director's Office
certificate 3rd Floor, Fisheries
None Building Complex, BPI
Compound,
Brgy.Vasra,Visayas
Avenue, Q.C.
4. Receive the notification 6. Notify the client that the Senior Administrative
to claim at the BFAR approved License To Assistant II
FIQD-FIS the approved Operate Certificate is ready BFAR FIQD-FIS,
License to Operate (LTO) for release G/Floor, Fisheries
None 10 Minutes
Building Complex, BPI
Compound,
Brgy.Vasra,Visayas
Avenue, Q.C.

6 Days. 7 Hours, and 15


TOTAL: PHP 4,000
Minutes

56
2. Inspection of Fishery/Aquatic Products/Establishments (New Applicant) for Registration and
Issuance of HACCP/GMP/SSOP/Vessel Certificate

The food safety inspection is conducted to enable the Fishery and Aquaculture Business operators (FABO) to export their
products to other countries.

Office or Division BFAR-Fisheries Inspection Quarantine Division (FIQD) - Fisheries Inspection Section (FIS)

Classification Complex

Type of Transaction G2C- Government to Citizen; G2B- Government to Business Entity

Fishery Aquaculture Business Operators (FABO) of fish processing plants, pre- processing, ice
Who may avail: plant,fishing vessel & boats, buying station, auction market, and fish port facility
(EXTERNAL)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE


Requirements for primary processing
establishment:
( Original
1. Letter ofand photocopy,
Intent 1 copy
/Application letter each) Fishery/Aquatic Products Business Operators (FABO)

2. Updated Sanitary permit (issued by LGU) ,written


Sanitary permit- Local Government Unit (LGU), GMP/SSOP/HACCP
Simplified HACCP based program, GMP & SSOP
Program-FABO
Program for pre- processing plants, buying station

3. License to Operate (LTO issued by Philippine FDA)


LTO-FDA, GMP/SSOP Program- FABO
and written GMP & SSOP Program for ice plant

4. Updated Sanitary permit (issued by LGU) and GOP


program for cold storage ware house , fish port Sanitary permit- Local Government Unit (LGU), GOP Program-FABO
facilities and auction market
5. Updated Sanitary permit (issued by LGU), written
Sanitary permit- Local Government Unit (LGU), GMP/SSOP/HACCP
GMP & SSOP Program Dry Warehouse (i.e for dried
Program-FABO
seaweeds and dried sea cucumber)
Requirements for secondary processing
establishment:
1. Updated sanitary permit Local Government Unit (LGU)

2. License to Operate Food and Drug Administration (FDA)


3. GMP/ SSOP/ HACCP Program for fish processing
Fishery Aquaculture Business Operators (FABO)
plant
Requirements for fishing vessel or boats > 3
gross tons:
1. Certificate of Registration MARINA
2. GMP and SSOP/HACCP (as required) for fishing
and freezer vessel (*refrigerated and non- Fishery Aquaculture Business Operators (FABO)
refrigerated)
BFAR- Fisheries Regulatory License Division (FRLD) G/Flr.,
3. Commercial Fishing Vessel License (CFVGL)
Fisheries Building Complex, BPI Compound, Brgy.Vasra,Visayas
issued by BFAR
Avenue, Quezon City

Requirements for fishing vessel or boats less than


3 gross tons:

57
1. Certificate of Registration issued by the Local
Local Government Unit (LGU)
Government Unit (LGU)

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit the application 1. Receive Senior Administrative
letter together with the application/request letter Assistant II or Fish
documentary and check the Inspector
requirements to BFAR completeness of the BFAR FIQD-FIS
FIQD-FIS, G/Flr., documentary requirements None 30 minutes G/Floor, Fisheries
Fisheries Bldg., BPI Building Complex, BPI
Compound, Compound,
Brgy.Vasra,Visayas
Avenue, Quezon City
1.1 Review and evaluate
Fish Inspector
the required food safety
BFAR FIQD-FIS
programs submitted
G/Floor, Fisheries
None None 2 Days Building Complex, BPI
Compound,
Brgy.Vasra,Visayas
Avenue, Quezon City
2. Receive notification on 2. Notify the client on the Senior Administrative
the scheduled inspection schedule of pre- Assistant II or Fish
assessment/desk Inspector
review/system audit BFAR FIQD-FIS
Inspection None 10 Minutes G/Floor, Fisheries
Building Complex, BPI
Compound,
Brgy.Vasra,Visayas
Avenue, Quezon City
3. Allow inspection/ 3. Conduct on- site
assessment and access inspection with the
to the facility following order of activities:

a. opening meeting with the Fish Inspector


plant representative BFAR FIQD-FIS
b. walk through in plant 3 Days (per and plant
None
premises Plant per Product) representatives,
c. Documents review/ Desk Fishery Establishment
review Address on site
d. Close door meeting
e. Exit meeting with the
plant management

4. Submit pending 4. Review/evaluate Fish Inspector


documents/records submitted BFAR FIQD-FIS
(refer to checklist of documents/records and plant
None 2 Days
requirements) representatives,
Fishery Establishment
Address on site
4.1 Prepare and sign the Fish Inspector
final inspection report by BFAR FIQD-FIS
the inspectors and G/Floor, Fisheries
None Philippine Accreditation None 3 Days Building Complex, BPI
Bureau (PAB) authorized Compound,
signatory (if applicable) Brgy.Vasra,Visayas
Avenue, Quezon City

58
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
4.2 Review/ Evaluate and
approval of inspection
report Chief, FIS
• If passed- on the
BFAR FIQD-FIS,
inspection: Issue the
G/Floor, Fisheries
None HACCP certificate None 3 days Building Complex, BPI
• If failed- No Health
Compound,
Certificate/GMP/SSOP
Brgy.Vasra,Visayas
/HACCP Certificate shall be
Avenue, Quezon City
issued until deficiencies are
rectified

4.3 Prepare/Process the Senior Administrative


HACCP/GMP/SSOP/Vesse Assistant II
l Certificate if compliant on BFAR FIQD-FIS
None the requirements None 30 Minutes G/Floor, Fisheries
Building Complex, BPI
Compound,
Brgy.Vasra,Visayas
Avenue, Quezon City
4.4 Forward the processed
HACCP/GMP/SSOP/Vesse Senior Administrative
l Certificate to FIS Section Assistant II FIS Chief &
& Division Chief for final FIQD Chief
review and place initials BFAR FIQD
None None 30 Minutes G/Floor, Fisheries
Building Complex, BPI
Compound,
Brgy.Vasra,Visayas
Avenue, Quezon City

4.5 Scan and forward the


processed
Senior Administrative
HACCP/GMP/SSOP/Vesse
Assistant II
l Certificate with proper
BFAR FIQD-FIS
initials of Assistant Director
G/Floor, Fisheries
None for Research, Regulations None 10 Minutes
Building Complex, BPI
and International
Compound,
Engagements (ADRRIE)
Brgy.Vasra,Visayas
for further review and
Avenue, Quezon City
evaluation

5. Review/evaluate the Assistant Director


received scan copy of ADRRIE Office
certificate and forward to 3rd Floor, Fisheries
None Director's Office for None 4 hours Building Complex, BPI
approval Compound,
Brgy.Vasra,Visayas
Avenue, Quezon City
6. Approve and sign the
HACCP/GMP/SSOP/Vesse Bureau Director
l Certificate BFAR-Director's Office
3rd Floor, Fisheries
None None 3 days Building Complex, BPI
Compound,
Brgy.Vasra,Visayas
Avenue, Quezon City

59
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
5. Receive the notification 7. Notify the client on the Senior Administrative
to claim at the BFAR approved Assistant II
FIQD-FIS the approved/ HACCP/GMP/SSOP/Vesse BFAR FIQD-FIS
signed l Certificate and ready for G/Floor, Fisheries
HACCP/GMP/SSOP/Ves release to client None 10 Minutes
Building Complex, BPI
sel Certificate Compound,
Brgy.Vasra,Visayas
Avenue, Quezon City

16 Days, 2
TOTAL: None Hours, and
40 Minutes
Note:
- For those applying for EU, FABO shall wait for the notification from European Commission approval prior to export of their products, - For non-EU,
FABO shall coordinate with BFAR FIQD-FIS ,G/Floor, Fisheries Bldg., BPI Compound, Visayas Ave., Quezon City for other export requirements

60
3. Inspection of Fishery Establishment for Export of Fishery/Aquatic Products for Issuance of
Certificate of HACCP/GMP/SSOP/Vessel (Renewal)

The inspection is conducted to enable the Fishery and Aquaculture Business operators (FABO) to sustain their compliance to
food safety requirements and standard and continous export of their products to other countries.

Office or Division BFAR-Fisheries Inspection Quarantine Division (FIQD) - Fisheries Inspection Section (FIS)

Classification Complex

Type of Transaction G2C- Government to Citizen; G2B- Government to Business Entity

Fishery Aquaculture Business Operators (FABO) of fish processing plants, pre-processing, ice plant,
Who may avail:
fishing vessel & boats, buying station, auction market, and fish port facility (EXTERNAL)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

Requirements for primary processing


establishment: (Original and Photocopy,1 copy
each)
1. Letter of Intent /Application letter Fishery Aquaculture Business Operators (FABO)

2. Updated Sanitary permit (issued by LGU) ,written


Sanitary permit- Local Government Unit (LGU) GMP/SSOP/HACCP
Simplified HACCP based program, GMP & SSOP
Program-FABO
Program for pre- processing plants, buying station

3. License to Operate (LTO issued by Philippine FDA)


LTO-FDA, GMP/SSOP Program- FABO
and written GMP & SSOP Program for ice plant

4. Updated Sanitary permit (issued by LGU) and GOP


Sanitary permit- Local Government Unit (LGU), GMP/SSOP/HACCP
program for cold storage ware house , fish port
Program-FABO
facilities and auction market

5. Updated Sanitary permit (issued by LGU), written


Sanitary permit- Local Government Unit (LGU), GMP/SSOP/HACCP
GMP & SSOP Program Dry Warehouse (i.e for dried
Program-FABO
seaweeds and dried sea cucumber)

Requirements for secondary processing


establishment: (Original and Photocopy, 1 copy
each)

1. Updated sanitary permit (issued by LGU) Sanitary permit- Local Government Unit (LGU)

2. License to Operate (LTO issued by Philippine FDA) License to Operate (LTO)-FDA

3. GMP/ SSOP/ HACCP Program for fish processing


Fishery Aquaculture Business Operators (FABO)
plant
Requirements for fishing vessel or boats >3 gross
tons:

1. Certificate of Registration MARINA

2. GMP and SSOP/HACCP (as required) for fishing


and freezer vessel (*refrigerated and non- Fishery Aquaculture Business Operators (FABO)
refrigerated)

61
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
BFAR- Fisheries Regulatory License Division (FRLD), G/Floor,
3. Commercial Fishing Vessel License (CFVGL) Fisheries Building Complex, BPI Compound, Brgy.Vasra,Visayas
issued by BFAR Avenue, Quezon City

Requirements for fishing vessel or boats less than


3 gross tons:

1. Certificate of Registration issued by the Local


Local Government Unit (LGU)
Government Unit

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit application 1. Receive
letter together with the application/request letter
required documentary and check the Senior Administrative
requirements to BFAR completeness of the None 30 minutes Assistant II or Fish
FIQD-FIS, G/Flr., documentary requirements Inspector
Fisheries Bldg., BPI BFAR FIQD-FIS
Compound G/Floor, Fisheries
2. Receive notification on 2. Notify the client on the Building Complex, BPI
the scheduled inspection/ schedule of pre- Compound,
pre-aassessment assessment/desk Brgy.Vasra,Visayas
None 10 Minutes Avenue, Quezon City
review/system audit
Inspection

3. Allow inspection and 3. Conduct on- site


access to facility inspection with the
following order of activities:

a. opening meeting with the


plant representative Fish Inspector
b. walk through in plant BFAR FIQD-FIS
premises 1 day (per Plant per and plant
None
c. Documents review/ Desk Product) representatives,
review Fishery Establishment
d. Close door meeting Address on site
e. Exit meeting with the
plant management

4. Submit pending 4. Review/evaluate the


documents/records submitted Fish Inspector
(refer to checklist of documents/requirements BFAR FIQD-FIS
requirements) and plant
None 2 days
representatives,
Fishery Establishment
Address on site
4.1 Prepare and sign the
final inspection report by Fish Inspector
the inspectors and G/Floor, Fisheries
Philippine Accreditation Building Complex, BPI
None Bureau (PAB) approved None 3 Days
Compound,
signatory inspector/s (if Brgy.Vasra,Visayas
applicable) Avenue, Quezon City

62
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
4.2 Review/ Evaluation
and approval of inspection
report
• If passed- in the Chief, FIS
inspection: Issue the BFAR FIQD-FIS,
HACCP certificate G/Floor, Fisheries
None • If failed- No Health None 3 Days Building Complex, BPI
Certificate/GMP/SSOP Compound,
/HACCP Certificate shall be Brgy.Vasra,Visayas
issued until deficiencies are Avenue, Quezon City
rectified

4.3 Prepare/Process the


HACCP/GMP/SSOP/Vesse
l Certificate if compliant on Senior Administrative
the requirements Assistant II
BFAR FIQD-FIS
G/Floor, Fisheries
None None 30 Minutes
Building Complex, BPI
Compound,
Brgy.Vasra,Visayas
Avenue, Quezon City

4.4 Forward the processed Senior Administrative


HACCP/GMP/SSOP/Vesse Assistant II FIS Chief &
l Certificate to Section & FIQD Chief
Division Chief for final BFAR FIQD
None review and initials None 30 Minutes G/Floor, Fisheries
Building Complex, BPI
Compound,
Brgy.Vasra,Visayas
Avenue, Quezon City
4.5 Scan and forward the
HACCP/GMP/SSOP/Vesse
l Certificate with initials to
Assistant Director for
Research, Regulations and Senior Administrative
None International Engagements None 10 Minutes Assistant II
(ADRRIE) for further BFAR FIQD-FIS
review and evaluation

5. Review/evaluate the None


received scan copy of Assistant Director
certificate and forward to ADRRIE Office
Director's Office for 3rd Floor, Fisheries
None approval 4 hours Building Complex, BPI
Compound,
Brgy.Vasra,Visayas
Avenue, Quezon City

63
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
6. Approve and sign the None
HACCP/GMP/SSOP/Vesse Bureau Director
l Certificate BFAR-Director's Office
3rd Floor, Fisheries
None 3 Days Building Complex, BPI
Compound,
Brgy.Vasra,Visayas
Avenue, Quezon City

5. Receive the notification 7. Notify the client that the


to claim at the BFAR approved
FIQD-FIS the approved HACCP/GMP/SSOP/Vesse Senior Administrative
HACCP/GMP/SSOP/Ves l Certificate is ready for None 10 Minutes Assistant II
sel Certificate release BFAR FIQD-FIS

12 Days, 5 Hours, 50
TOTAL: None
Minutes

Note:
- For those applying for EU, FABO shall wait for the notification from European Commission approval prior to export of their products, - For non-EU,
FABO shall coordinate with BFAR FIQD-FIS ,G/Floor, Fisheries Bldg., BPI Compound, Visayas Ave., Quezon City for other export requirements

64
4. Inspection of Traders/Exporters (without processing establishment) for Issuance of Certificate of
Registration

Office or Division BFAR-Fisheries Inspection Quarantine Division (FIQD) - Fisheries Inspection Section (FIS)

Classification Complex

Type of Transaction G2C- Government to Citizen; G2B- Government to Business Entity

Who may avail: Traders/Exporters without processing establishment (EXTERNAL)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter of Intent /Application letter Traders/Exporters Company

BFAR- Website- www.bfar.gov.ph/BFAR-FIQD-FIS, G/Flr., Fisheries


2. Duly accomplished and verified Application Form
Bldg., BPI Compound, Visayas Ave., Q.C.

3. SEC Certificate of Incorporation and SEC General


Information Sheet
*Primary purpose of corporation must be exportation/ Security of Exchange Commission (SEC)
manufacturer of fish/ sea foods products
* IDs of officer with signature

4.Department of Trade and Industry (DTI) Certificate


Department of Trade and Industry (DTI)
for single proprietor

5. Certification from Department of Labor and


Department of Labor and Industry (DOLE)
Employment (DOLE) for associations

6. Certification from Cooperative Development


Cooperative Development Authority (CDA)
Authority (CDA) for Cooperatives

7.Bureau of Internal Revenue (BIR) Certificate of


Registration
*Line of Business
Bureau of Internal Revenue (BIR)
Example:
1513 – Fish/ Fishery Products/ Seafoods
5190 – Marine Products/ Other Wholesaling

8.Updated ayor’s Permit (with Sanitary Permit) Local Government Unit (LGU)

9.Special Power of Attorney (SPA) For authorized


Traders/Exporters Company
representative with ID and signature of representative

10.License to Operate as Exporter from FDA Food and Drug Administration (FDA)

11.List of Officers of the Company and Valid IDs Traders/Exporters Company

65
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit accomplished 1.Receive the application
application form together formtogether with the Senior Administrative
with the required required documents and Assistant II or Fish
documentary output including the review Inspector
None 35 Minutes
requirements to BFAR and evaluation of BFAR FIQD-FIS
FIQD-FIS, G/Flr., documents completeness G/Floor, Fisheries
Fisheries Bldg., Building Complex, BPI
Compound,
2. Receive notification on 2. Notify the client on the Brgy.Vasra,Visayas
the scheduled inspection schedule of Inspection None 10 Minutes Avenue, Quezon City

3. Allow inspection and 3. Conduct on- site


access to facility inspection with the
following order of activities:
Fish Inspector
a. opening meeting with the
BFAR FIQD-FIS
company representative
and company
b. walk through in company None 1 day
premises representatives,
c. Review of documentary Company Address on
requirements site

4. Submit pending 4. Review/evaluate the Fish Inspector


documents/records submitted BFAR FIQD-FIS
(refer to checklist of documents/requirements None 2 Days and company
requirements) representatives,
Company Address on
4.1 Prepare/Process the site
Senior Administrative
Certificate of Registration Assistant II
(COR) if compliant on the BFAR FIQD-FIS
requirements G/Floor, Fisheries
None None 30 Minutes
Building Complex, BPI
Compound,
Brgy.Vasra,Visayas
Avenue, Quezon City
4.2 Forward the Certificate Senior Administrative
of Registration (COR) to Assistant II FIS Chief &
FIS Section & Division FIQD Chief
Chief for final review and BFAR FIQD
None initials None 30 Minutes G/Floor, Fisheries
Building Complex, BPI
Compound,
Brgy.Vasra,Visayas
Avenue, Quezon City
4.3 Scan and forward the
Certificate of Registration
(COR) with initials to
Assistant Director for
Senior Administrative
Research, Regulations and
None None 10 Minutes Assistant II
International Engagements
BFAR FIQD-FIS
(ADRRIE) for further review
and evaluation

66
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
5. Review/evaluate the
received scan copy of
certificate and forward to Assistant Director
Director's Office for ADRRIE Office
approval 3rd Floor, Fisheries
None None 4 hours Building Complex, BPI
Compound,
Brgy.Vasra,Visayas
Avenue, Quezon City

6. Approve and sign the


Certificate of Registration Bureau Director
(COR) BFAR-Director's Office
3rd Floor, Fisheries
None None 3 Days Building Complex, BPI
Compound,
Brgy.Vasra,Visayas
Avenue, Quezon City

5. Receive the notification 7. Notify the client on the


to claim at the BFAR approved
FIQD-FIS the approved HACCP/GMP/SSOP/Vesse Senior Administrative
HACCP/GMP/SSOP/Ves l Certificate and ready for None 10 Minutes Assistant II
sel Certificate release BFAR FIQD-FIS

6 days,
TOTAL: None 2 Hours, and
45 Minutes

67
5. Inspection for Inventory of Stocks in Cold Storage and Verification of Importer's Facility and
Volume Requirements of Processing Plants (canning and processing) and Institutional Buyers

This inspection is conducted to verify the production capacity of the processing plants and institurional buyes.

Office or Division BFAR-Fisheries Inspection Quarantine Division (FIQD) - Fisheries Inspection Section (FIS)

Classification Complex

Type of Transaction G2G-Government to Govenrment

Who may avail: BFAR-FIQD Fisheries Certification Section (INTERNAL)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

BFAR FIQD-Fisheries Certification Section (FCS), G/Floor, Fisheries


1.Endorsement letter Building Complex, BPI Compound, Brgy.Vasra,Visayas Avenue, Quezon
City

BFAR FIQD-Fisheries Certification Section (FCS), G/Floor, Fisheries


2. List of clients and Supply Agreement Building Complex, BPI Compound, Brgy.Vasra,Visayas Avenue, Quezon
City

BFAR FIQD-Fisheries Certification Section (FCS), G/Floor, Fisheries


3.Lease of Contract of Cold Strage Warehouse facility Building Complex, BPI Compound, Brgy.Vasra,Visayas Avenue, Quezon
City

4.Distribution List of Imported Fishery Products (If


Importer
applicable)

5.Production Records (for canning & processing) Importer

6. Company Profile Importer

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Receive the Senior Administrative
endorsement
Assistant II or Fish
communication with
Inspector
relevant documents from
BFAR FIQD-FIS
BFAR-FIQD-Fisheries
None None 5 Minutes G/Floor, Fisheries
Certification Section (FCS)
Building Complex, BPI
for the conduct of
Compound,
verfication
Brgy.Vasra,Visayas
Avenue, Quezon City
1.1 Check and review the
completeness of Fish Inspector
documentary requirements BFAR FIQD-FIS
G/Floor, Fisheries
None None 1 hour Building Complex, BPI
Compound,
Brgy.Vasra,Visayas
Avenue, Quezon City

68
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

1. Receive notification on 2. Notify the client on the


the scheduled inspection schedule of Inspection Senior Administrative
Assistant II or Fish
None 10 Minutes
Inspector
BFAR FIQD-FIS

2. Allow inspection and 3. Conduct on- site


access to facility inspection with the
following order of activities: None 1 day
Fish Inspector
a. opening meeting with the BFAR FIQD-FIS
4. Submit pending importer's
4. representative
Review/evaluate the None and importer's
documents/records submitted representatives
(refer to checklist of documents/requirements Company address on
requirements) 2 days site

4.1 Prepare and sign the


Senior Administrative
final verification reports
Assistant II FIS Chief &
FIQD Chief
BFAR FIQD
None None 3 days G/Floor, Fisheries
Building Complex, BPI
Compound,
Brgy.Vasra,Visayas
Avenue, Quezon City
5. Received notification 5. Endorse the signed
from BFAR-FCS on the verification report to
signed verification report Fisheries Certification Senior Administrative
and adviced to proceed Section (FCS) for Assistant II or Fish
to the BFAR-FCS for processing of Import Permit None 30 Minutes
Inspector
processing of Import and the FCS will notify the BFAR FIQD-FIS
Permit client on the status of
application

6 Days, 1 Hour, and 45


TOTAL: None
Minutes

69
6. Pre-shipment Inspection

The pre-shipment inspection is conducted prior to or during van loading of products bound for shipment as pre-requisite for the
issuance of Health Certificate.

BFAR-Fisheries Inspection Quarantine Division (FIQD) - Fisheries Inspection Section (FIS)


Office or Division

Classification Complex

Type of Transaction G2C- Government to Citizen; G2B- Government to Business Entity

Who may avail: Traders, Exporters, Processors (EXTERNAL)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Packing List Traders, Exporters, Processors,company

2. Auxillary/Commercial invoice Traders, Exporters, Processors,company

BFAR FIQD-Fisheries Certification Section, G/Floor, Fisheries


3. Local Transport Permit (LTP) Building Complex, BPI Compound, Brgy.Vasra,Visayas Avenue, Quezon
City

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Request pre-shipment 1. Receive the request of
inspection thru phone pre-shipment inspection Senior Administrative
call/letter/emails and Assistant II or Fish
other mode of Inspector
communication BFAR FIQD-FIS,
5 Minutes
None G/Floor, Fisheries
Building Complex, BPI
Compound,
Brgy.Vasra,Visayas
Avenue, Quezon City

2. Allow inspection 2. Conduct actual pre-


shipment inspection
4 hours Fish Inspector
None
BFAR FIQD-FIS
and company
3. Receive Pre- shipment 3. Release the pre- representative,
inspection report shipment inspection report Company Address on
5 Minutes site
None

4 Hours and
TOTAL: None
10 Minutes

70
7. 2nd Border Inspection (Post Boarder)
This covers the inspection of imported fishery products stored in accredited cold storage warehouses to verify compliance to
FAO 259 & FAO 195 for imported fish and fishery products.

Office or Division BFAR-Fisheries Inspection Quarantine Division (FIQD) - Fisheries Inspection Section (FIS)

Classification Simple

Type of Transaction G2G-Government to Government

Who may avail: Concerned Government Agencies (EXTERNAL)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Electronic Request for Inspection (eRFI) BFAR Fisheries Quarantine Officer

2. Packing List Importer/Company

3. Commercial Invoice Importer/Company

4. Health Certificate Exporting Country

BFAR Fisheries Certification Section (FCS), Ground Floor, Fisheries


5. Sanitary and Phytosanitary Import Clearance
Building Complex, BPI Compound, Brgy.Vasra,Visayas Avenue, Quezon
(SPSIC)
City
6. Certificate of Origin Exporting Country
7. BOC Single Administrative Document Bureau of Customs

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Receive electronic
Request for Inspection (e-
RFI) issued by border 5 Minutes
None inspectors Manila None
International Container Port
(MICP)
1. Allow inspection and 1.1 Verify and check the
provide relevant completeness of
documents documentary requirements BFAR 2nd Border
Inspectors
None 4 hours per container
1.2 . Conduct of on-site 2nd Fisheries Building
border inspection for every Complex, BPI
None Compound,
Container arrived
Brgy.Vasra,Visayas
1.3 Prepare and submit the Avenue, Quezon City
electronic inspection report
for FIQD and FIS Chief for
future reference, monitoring
None inspection and database of None 1 DAY
imported fishery products

1 Day, 4 Hours, and 5


TOTAL: None
Minutes

71
IV. QUARANTINE: System/Investigative Audit
BFAR-Fisheries Inspection and Quarantine Division (FIQD)
Fisheries Audit Section (FAS)

1. Conduct System and Performance Audit


Conduct system and perfromance audit of FIQD and RFIQU in compliance to the requirement of ISO/IEC 17020:2012 and ISO
9001:2015 standards

BFAR-Fisheries Inspection Quarantine Division (FIQD) - Fisheries Audit Section (FAS)-


Office or Division
Central and Regional Offices

Classification Highly Technical


Type of Transaction G2G- Government to Government
Who may avail: FIQD/RFIQU

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

BFAR-Fisheries Inspection Quarantine Division (FIQD) - Fisheries Audit


1. Approved Audit Program
Section (FAS)- Central Office

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Receive notification 1. Communicate with the Fisheries Audit Section
and schedule of conduct RFIQU/FIQD to confirm the Auditor
of system and audit schedule specified in BFAR- FIQD-FAS,
performance audit thru the audit Program None 30 minutes
G/Floor, Fisheries Bldg.,
email/phone call BPI Compound, Visayas
Ave., Q.C.
1.1 Prepare Fisheries Audit Section
memorandum/audit Auditor
plan/travel order/pass slip BFAR- FIQD-FAS,
None regarding the set schedule None 1 hour
G/Floor, Fisheries Bldg.,
of audit BPI Compound, Visayas
Ave., Q.C.
2. Process the
memorandum/letter/travel BFAR Fisheries Planning
order for approval of and Economic Division,
Bureau Director BFAR Director's Office,
3/Floor , Fisheries Bldg.,
BPI Compound, Visayas
None None 3 days
Ave., Q.C. BFAR
Administrative Division
2/Floor, Fisheries Bldg.,
BPI Compound, Visayas
Ave., Q.C.

2. Receive approved 3. Send the approved


Fisheries Audit Section
memorandum/letter memorandum and audit
Auditor
plan to RFIQU/FIQD thru
BFAR- FIQD-FAS,
email None 15 minutes
G/Floor, Fisheries Bldg.,
BPI Compound, Visayas
Ave., Q.C.

72
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
3.Allow the conduct of on- 3.1 Conduct on- site
site system and system and performance
performance audit audit with the following
order of activities:
Fisheries Audit Section
a. Opening meeting with
Auditor
FIQD/ RFIQU head and
BFAR- FIQD-FAS,
staff None 5 days
G/Floor, Fisheries Bldg.,
b. Desk review
BPI Compound, Visayas
c. Performance evaluation
Ave., Q.C.
(observation of activities
conducted)
d. Close-door meeting
e. Exit meeting

3.2 Prepare corrective


Fisheries Audit Section
action reports and
Auditor
memorandum regarding
audit findings BFAR- FIQD-FAS,
None None 6 days
G/Floor, Fisheries Bldg.,
BPI Compound, Visayas
Ave., Q.C.
3.3 Review and sign by the
auditors and team leader Fisheries Audit Section
Auditor
BFAR- FIQD-FAS,
None None 1 day
G/Floor, Fisheries Bldg.,
BPI Compound, Visayas
Ave., Q.C.

4. Endorse the corrective


action report and Fisheries Audit Section
memorandum for review Auditor
and initial signature of the BFAR- FIQD-FAS,
None None 1 day
Section Chief and Division G/Floor, Fisheries Bldg.,
Chief BPI Compound, Visayas
Ave., Q.C.

5. Forward the initially


signed memorandum with
attached corrective action ADRRIE
reports for endorsement of 3/Floor, Fisheries
None Assistant Director for None 2 days Building Complex, BPI
Research,Regulations and Compound, Visayas
International Engagements Ave., Q.C.

6. Approved and signed the


memorandum regarding BFAR Director's Office
audit findings by Bureau 3/Floor, Fisheries
None Director None 3 days Building Complex, BPI
Compound, Visayas
Ave., Q.C.

73
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
4. Receive the approved 7. Send the corrective Fisheries Audit Section
memorandum and action reports and Auditor
corrective action reports approved memorandum to BFAR- FIQD-FAS,
FIQD/RFIQU thru None 1 hour
G/Floor, Fisheries Bldg.,
email/hard copy (courier) BPI Compound, Visayas
Ave., Q.C.
5. Submission of 7.1 Receive and review the
accompished corrective accomplished corrective Fisheries Audit Section
action report to FIQD- action report from the Auditor
FAS thru courier RFIQU/FIQD for BFAR- FIQD-FAS,
None 10 days
verification by next system G/Floor, Fisheries Bldg.,
audit. BPI Compound, Visayas
Ave., Q.C.

31 days, 2 hrs and 45


TOTAL
minutes

74
2. Conduct of Investigative Audit

Conduct investigation/verification of establishment with import refusal abroad.

Office or Division BFAR-Fisheries Inspection Quarantine Division (FIQD) - Fisheries Audit Section (FAS)

Classification Highly Technical

G2B- Government to Business Entity;


Type of Transaction
G2G - Government to Government

Who may avail: BFAR Registered Exporter with Import Refusal Abroad

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

Thru website (e.g US- Food and Drug Administration (US-FDA), etc.,)/
1. Import refusal notification ( 1 Eletrconic Copy) Department of Foreign Affairs - Organization for International Economic
Relations (DFA-OIER)

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Receive and print import Fisheries Audit Section
refusal notification from Auditor &
OIER/website (e.g., US Division/Section Head
None FDA) for action of division None 30 minutes BFAR- FIQD-FAS
chief and section chief G/Floor, Fisheries Bldg.,
BPI Compound, Visayas
Ave., Q.C.
None 1.1 Instruct the FAS auditor
to communicate with
theFishery Aquaculture
Division/Section Head
Business
Operator/Regional BFAR- FIQD-FAS,
Fisheries Inspection and None 1 hour G/Floor, Fisheries Bldg.,
Quarantine Unit regarding BPI Compound, Visayas
the import refusal Ave., Q.C.
notification

1. Receive notificationand 1.2 Communicate with


schedule of conduct of Fishery Aquaculture
investigative audit thru Business
Fisheries Audit Section
email/phone call on the Operator/Regional
Auditor
import refusal notification Fisheries Inspection and
BFAR- FIQD-FAS
Quarantine Unit regarding None 1 hour
G/Floor, Fisheries Bldg.,
the import refusal
BPI Compound, Visayas
notification and schedule of
Ave., Q.C.
conduct of investigative
audit thru email/phone call

1.3 Prepare
Fisheries Audit Section
memorandum/letter/ travel
Auditor
authority for RFIQU/FABO
BFAR- Fisheries audit
regarding the schedule and
None None 1 hour Section (FAS)
details of investigative
G/Floor, Fisheries Bldg.,
audit
BPI Compound, Visayas
Ave., Q.C.

75
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
2. Process the BFAR Fisheries Planning
memorandum/letter/travel and Economic Division,
order/pass slip for approval rd/Floor , BFAR
of Bureau Director Director's Office, 3/Floor ,
Fisheries Bldg., BPI
Compound, Visayas
None None 3 days
Ave., Q.C.
BFAR Administrative
Division 2/Floor,
Fisheries Bldg., BPI
Compound, Visayas
Ave., Q.C.
2. Receive approved 3. Send the approved
memorandum/letter memorandum/letter to the Fisheries Audit Section
FABO/RFIQU thru email Auditor BFAR-
Fisheries audit Section
None 15 minutes
(FAS) G/Floor, Fisheries
Bldg., BPI Compound,
Visayas Ave., Q.C.

3.Allow the conduct of on- 3.1 Conduct on- site


site investigative audit investigative audit with the
following order of activities:
Fisheries Audit Section
a. opening meeting with the
Auditors BFAR-
plant representative
Fisheries audit Section
b. walk through in plant None 5 days
(FAS) G/Floor, Fisheries
premises
Bldg., BPI Compound,
c. Desk review
Visayas Ave., Q.C.
d. Close door meeting
e. Exit meeting with the
plant management

3.2 Prepare investigative


Fisheries Audit Section
audit report
Auditors BFAR-
Fisheries audit Section
None None 7 days
(FAS) G/Floor, Fisheries
Bldg., BPI Compound,
Visayas Ave., Q.C.
3.3 Endorse the report for
Fisheries Audit Section
review and for the signature
Auditor &
of the Section Chief and
Division/Section Head
Division Chief
None None 1 Day BFAR- FIQD-FAS
G/Floor, Fisheries Bldg.,
BPI Compound, Visayas
Ave., Q.C.
4. Endorse the signed
report for initial of Assistant ADRRIE
Director for 3/Floor, Fisheries
None Research,Regulations and None 3 days Building Complex, BPI
International Engagements Compound, Visayas
Ave., Q.C.

76
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
5. Approved and signed the BFAR Director's Office
investigative audit report by 3/Floor, Fisheries
None Bureau Director None 3 days Building Complex, BPI
Compound, Visayas
Ave., Q.C.
4. Receive the approved 6. Send the approved
investigative audit report investigative audit report to Fisheries Audit Section
RFIQU/FABO and OIER Auditors BFAR-
thru email/courier Fisheries audit Section
None 1 day
(FAS) G/Floor, Fisheries
Bldg., BPI Compound,
Visayas Ave., Q.C.

23 days 3 hours and 45


TOTAL
minutes

77
V. REGULATORY: LICENSING/PERMIT/REGISTRATION/CLEARANCE
FISHERIES REGULATORY & LICENSING DIVISION (FRLD) - Capture Fisheries Licensing Section
(CFLS)

1. Processing of Application for Commercial Fishing Vessel License (CFVL)

This service involves the processing of application for Commercial Fishing Vessel License (CFVL) authorizing the fishing vessel
to fish within commercial waters or waters beyond 15 km from the shoreline and with gross tonnage of 3.1 and above.

BFAR Fisheries Regulatory and Licensing Division (FRLD) –Capture Fisheries Licensing
Office or Division
Section (CFLS)
Classification Highly Technical

Type of Transaction G2C – Government to Citizen; G2B – Government to Business Entity

Who may avail Commercial Fishing Vessel Owners/Operators

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

BFAR-Regional Field Offices/BFAR- Fisheries Regulatory Licensing


Division-Capture Fisheries Licensing Section (FRLD-CFLS) - Ground
1. Duly accomplished BFAR CFVL application form;
Floor, Fisheries Bldg., BPI Compound, Brgy. Vasra, Visayas Ave.,
Quezon City
2. Two (2) copies of "8x10" vessel unaltered pictures
showing the port, starboard and required identification
Applicant (Fishing vessel owner/operator)
and marking as specified in Annex 1 of FAO 198-1
series of 2018;

3. Grid map indicating the proposed fishing ground/s; Applicant (Fishing vessel owner/operator)

4. Original or authenticated photocopy of Maritime Industry Authority (MARINA) Certificates:

a. Certificate of Philippine Registry (CPR);

b. Certificate of Ownership (CO); and


Maritime Industry Authority (MARINA)

c. Valid/Unexpired Fishing Vessel Safety Certificate.

5. Approved articles of Incorporation and By-Laws for


corporation, the primary or secondary purpose of Security and Exchange Commission (SEC), Department of Trade and
which is to engage in fishing, or business name Industry (DTI) or Local Government Unit (LGU)
registration, certificate

BFAR-Regional Field Office/BFAR- Fisheries Regulatory Licensing


6. Fishing logsheet for catcher vessel for registration
Division-Capture Fisheries Licensing Section (FRLD-CFLS) - Ground
and approval by BFAR upon payment of registration
Floor, Fisheries Bldg., BPI Compound, Brgy. Vasra, Visayas Ave.,
fee of Fifty pesos (PhP 50.00) ;
Quezon City

7. Affidavit specifying that the vessel has no pending


Applicant (Fishing vessel owner/operator)
criminal, civil or administrative case;

BFAR-Regional Field Office/BFAR- Fisheries Regulatory Licensing


8. Importation or construction clearance (in case the Division-Capture Fisheries Licensing Section (FRLD-CFLS) - Ground
fishing vessel is imported or newly constructed); Floor, Fisheries Bldg., BPI Compound, Brgy. Vasra, Visayas Ave.,
Quezon City

78
CHECKLIST OF REQUIREMENTS WHERE TO SECURE

9. Copy of official receipts covering payment of BFAR Central Office-Library/Cashier - Ground/4th Floor, Fisheries
application and license fees; and Bldg., BPI Compound, Brgy. Vasra, Visayas Ave., Quezon City

10. Tax Identification Number of the vessel owner Bureau of Internal Revenue (BIR)

BFAR Central Office - BFAR-Integrated Marine Environment


11. Compliance with vessel monitoring system
Monitoring System (IMEMS) - 4th Floor, Fisheries Bldg., BPI
requirement.
Compound, Brgy. Vasra, Visayas Ave., Quezon City

12. Payment of Php. 400.00 for Commercial Fishing


Vessel License (CFVL) for application fee and secure
Official receipt
13. Secure official receipt for Commercial Fishing Designated Special Collecting Officer (Library)/Cashier - Ground Flr.
Vessel License (CFVL) license fee based on the gross or 4th Floor, Fisheries Bldg., BPI Compound, Brgy. Vasra, Visayas Ave.,
tonnage of the vessel Quezon City

14. Secure official receipt for cashbond deposit based


on the gross tonnage of the vessel
Note: An "Order of Payment" is issued by FRLD-CFLS to the applicants before payment, which they then submit to the collecting Officer to be used as reference for
the computation and total amount of fees to be collected. It is not included in the list of regulatory requirements for application of Commercial Fishing Vessel License.

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Secure and fill out 1. Provide Commercial
Commercial Fishing Fishing Vessel License
Vessel License (CFVL) (CFVL) application form
application form and and list of requirement.
comply with all regulatory
requirements to the None 15 minutes
BFAR-FRLD-CFLS,
G/Flr, Fisheries Bldg., Administrative
BPI Compound Aide/Assistant Fishing
Regulations Officers
BFAR FRLD-CFLS
2. Submit duly filled up 2. Accept filled out CFVL Ground Floor/3rd,
application form together application with complete Fisheries Bldg., BPI
with the complete regulatory requirements Compound, Brgy. Vasra,
regulatory requirements either thru the following Visayas Ave., Quezon
to the Director's Office at Offices: City
3rd Floor, Fisheries Bldg.,
None 1 hour
or at BFAR-FRLD-CFLS a. Office of the Director
at G/Floor, Fisheries (forward to FRLD-CFLS);
Bldg., or
b. FRLD-CFLS (directly)

2.1. Check, verify and Fishing Regulations


evaluate the authenticity Officers
and completeness of the BFAR FRLD-CFLS
None submitted requirements None 1 day Ground Floor, Fisheries
Bldg., BPI Compound,
Brgy. Vasra, Visayas
Ave., Quezon City

79
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
3. Receive Notification on 3. Schedule an inspection Fishing Regulations
the Scheduled Inspection and notify the client on the Officers
of the fishing vessel and schedule of inspection BFAR FRLD-CFLS
allow inspection None 5 mins Ground Floor, Fisheries
Bldg., BPI Compound,
Brgy. Vasra, Visayas
Ave., Quezon City
3.1 Conduct inspection on Fishing Regulations
the fishing vessel of the Officers
client and advice the BFAR FRLD-CFLS
None applicant/client to pay the None 5 days Ground Floor, Fisheries
required fees at BFAR Bldg., BPI Compound,
main Office. Brgy. Vasra, Visayas
Ave., Quezon City
4. Secure "Order of 4. Issue "Order of
Payment" at the BFAR- Payment" Administrative
FRLD-CFLS located at Aide/Assistant Fishing
None 15 minutes
G/Floor, Fisheries Bld., Regulations Officers
BPI Compound BFAR FRLD-CFLS

5. Submit "Order of 5. Receive and review the


Payment" to the computation of the
designated Special submitted "Order of Designated Special
Collecting Officer at Payment" Collecting Officer
BFAR-Library located at BFAR (Library)/Cashier
G/Floor, Fisheries Bldg., None 15 minutes Ground or 4th Floor,
or at the BFAR-Cashier Fisheries Bldg., BPI
located at 4th Floor, Compound, Brgy. Vasra,
Fisheries Bldg., Visayas Ave., Q.C.

6. Pay the necessary 5.1. Accept the payment


fees and secure an based on the amount in the
Official Receipt at BFAR- "Order of Payment" and
Php. 400.00
Cashier located at 4th issue an Official Receipt to
Application Fee,
Floor, Fisheries Bldg., client Designated Special
P 50.00 for
BPI Compound, Visayas Collecting Officer
logbook, *License
Ave., Q.C. BFAR (Library)/Cashier
Fee, & *Cash
G/Flr. or 4th Floor,
Bond Deposit 15 minutes
Fisheries Bldg., BPI
based on gross
Compound, Brgy. Vasra,
tonnage (please
Visayas Ave., Quezon
see *notes
City
below for
computation)

6. Submit the original 6. Receive and photocopy


copy of the Official the submitted O.R. and Administrative
Receipt (O.R.) to FRLD- return the original copy to Aide/Assistant Fishing
CFLS located at Ground the client Regulations Officers
Floor, Fisheries Bldg., BFAR FRLD-CFLS
None 15 minutes
Ground Floor, Fisheries
Bldg., BPI Compound,
Brgy. Vasra, Visayas
Ave., Quezon City

80
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
7. Prepare/Process the
CFVL and affix initials of Administrative
the authorized signatories Aide/Assistant Fishing
and endorse/forward to Regulations Officers;
BFAR Assistant Director. FRLD-CFLS Chief,
Division Head
None None 3 hours
BFAR FRLD-CFLS
Ground Floor, Fisheries
Bldg., BPI Compound,
Brgy. Vasra, Visayas
Ave., Quezon City

8. Review/Evaluate the
CFVL application together
with the requirements and Asst. Director for
None affix initial. None 3 hours Research Regulations
and International
Engagements (ADRRIE)
8.1 Forward to the 3rd Floor, Fisheries
Director's Office for Bldg., BPI Compound,
signature and approval of Brgy. Vasra, Visayas
None None 15 minutes Ave., Quezon City
the license to operate

9. Approve and sign


Commercial Fishing Vessel BFAR National Director
None None 5 days
License (CFVL) Director's Office
3rd Floor, Fisheries
9.1 Forward to BFAR- Bldg., BPI Compound,
Record Section for Brgy. Vasra, Visayas
None None 15 minutes
releasing to client Ave., Quezon City

7. Receive notification 10. Notify/Inform clients


thru call, text or e-mail of thru call, text or e-mail on
the approved CFVL, and the approved CFVL and
None 15 minutes
is ready for pick-up ready for pick up
Records Section-Staffs
BFAR-Record Section
8. Receive/Claim the 11. Release approved Ground Floor, Fisheries
Bldg., BPI Compound,
approved CFVL license CFVL to the applicant
Brgy. Vasra, Visayas
to operate either thru the following:
Ave., Quezon City
None 5 minutes
a. pick-up by applicant;

b. send copy thru e-mail


to BFAR-Regional Office;
or,

c. send original copy thru Records Section-Staffs


None None 10 minutes
a registered mail to BFAR- BFAR-Record Section
Regional Office

81
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

Php. 400.00
Application Fee,
P 50.00 for
logbook,
*License Fee, &
*Cash Bond 12 days, 6 hours, and 15
TOTAL:
Deposit based minutes
on gross
tonnage (please
see *notes
below for
computation)
*NOTES:

1. This procedure is applicable for applications filed in BFAR-Central Office. This does not cover the CFVL applications filed in BFAR-Regional Office
and forwarded to BFAR-Central Office.

2. Consider bulk applications in this procedure which are submitted at the same time but cannot be processed at the same time due to manpower
limitation. Processing time shall start only after finishing the processing of the previous transaction.

3. Inspection of commercial fishing vessel depends on the availability of the vessel/s as well as the inspectors (five (5) working days upon the availability
of the vessel). In case that the vessel is not available at the time of inspection, there should be an extension of time.

4. Application fee for CFVL is PhP400.00, while the license fee and Cash Bond Deposit is based on the gross tonnage of the vessel under Section 26
(a) and 27 of FAO 198-1 s. 2018.

*License Fee:
1. For fishing vessel 3.1-20.0 GT - P200.00 + P2.00/GT or a fraction thereof
2. For fishing vessel 20.1-50.0 GT - P250.00 + 2.00/GT or a fraction thereof
3. For fishing vessel 50.1 – 100.0 GT - P300.00 + 2.00/GT or a fraction thereof
4. For fishing vessel 100.1-125.0 GT - P500.00 + 3.00/GT or a fraction thereof
5. For fishing vessel 125.0-150.0 GT - P1,000.00 + 3.00/GT or a fraction thereof
6. For fishing vessels 150.0 -250.0 GT - P1,500.00 + 3.00 / GT or a fraction thereof
7. For fishing vessels 250.1 and above - P2,500.00 + 4.00/GT or a fraction thereof
*Cash Bond Deposit:
1. For fishing vessel 3.0 to 20 GT - P250.00
2. For fishing vessel 20.1 to 50 GT - P350.00
3. For fishing vessel 50.1 to 75 GT - P450.00
4. For fishing vessel 75.1 to 100 GT - P550.00
5. For fishing vessel 100.1-150.0 GT - P650.00
6. For fishing vessels 150.0 -250.0 GT - P750.00
5. For fishing vessel 250.1-500.0 GT - P850.00
6. For fishing vessels 500.1 and above - P950.00
5. Approval of CFVL depends on the availability of the BFAR National Director.

82
2. Processing of Application for Distant Water Fishing Permit (DWFP)

This service involves the processing of application for Distant Water Fishing Permit (DWFP) authorizing the Philippine-Flagged
fishing vessel to fish in distant waters as defined under Section 3 (k) of FAO 198-1, series of 2018.

BFAR- Fisheries Regulatory and Licensing Division (FRLD) – Capture Fisheries Licensing
Office or Division
Section (CFLS)
Classification Highly Technical
Type of Transaction G2B - Government to Business Entity
Who may avail: Commercial Fishing Vessel (CFV) Operators

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

BFAR Central Office - Office of the Director/FRLD-CFLS - 4th


1. Accreditation as Distant Water Fishing Vessel by
Flr./Ground Floor, Fisheries Bldg., BPI Compound, Brgy. Vasra, Visayas
the BFAR Director;
Ave., Quezon City
BFAR-Regional Field Office/BFAR- Fisheries Regulatory Licensing
Division-Capture Fisheries Licensing Section (FRLD-CFLS) - Ground
2. A valid CFVL and/or CFGL;
Floor, Fisheries Bldg., BPI Compound, Brgy. Vasra, Visayas Ave.,
Quezon City
BFAR-Regional Field Office concerned /BFAR- Fisheries Regulatory
3. Duly accomplished and notarized Distant Water Licensing Division-Capture Fisheries Licensing Section (FRLD-CFLS) -
Fishing Permit Application Form; Ground Floor, Fisheries Bldg., BPI Compound, Brgy. Vasra, Visayas
Ave., Quezon City
4. Copy of the fishing permit/license from the coastal
state (for fishing vessels operating in waters of the Competent authority of the Coastal State
other coastal states) ;
5. Ship Station License issued by NTC; National Telecommunication Commission (NTC)

6. Payment of application fee in the amnount of PhP


1,000.00 and permit fee of PhP 1,500.00 for fishing in
High Seas Pocket No. 1 (HSP1) pursuant to Section
39 (f) (g) of FAO 198-1, series of 2018. Designated Special Collecting Officer (Library)/Cashier - Ground or 4th
Floor, Fisheries Bldg., BPI Compound, Brgy. Vasra, Visayas Ave.,
7. Payment of application fee in the amnount of PhP Quezon City
3,000.00 and permit fee of PhP 5,00.00 for fishing in
waters of other coastal States pursuant to Section 4
(e) (f) of BFAR AC No. 252-1, series of 2020.

8. Payment of authorization fee for Special Fishing Designated Special Collecting Officer (Library)/Administrative Aide
Permit to operate on the high seas (for catcher VICashier - Ground or 4th Floor, Fisheries Bldg., BPI Compound, Brgy.
vessels operating in WCPFC HSP-1 only); Vasra, Visayas Ave., Quezon City

9. Affidavit of Undertaking that the vessel shall not,


except when otherwise authorized by BFAR, operate
Applicant (Fishing Company/Operator)
in Philippine waters, including the Exclusive Economic
Zone during the duration of DWFP.

BFAR Central Office - BFAR-Integrated Marine Environment Monitoring


10. Compliance with vessel monitoring system
System (IMEMS) - 4th Floor, Fisheries Bldg., BPI Compound, Brgy.
requirement.
Vasra, Visayas Ave., Quezon City

11. Compliance with fisheries observer requirement BFAR Central Office - BFAR-National Marine Fisheries Development
(for catcher vessels operating in high seas only). Center (NMFDC) - Navotas, Metro Manila

83
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
12. Payment of Php. 8,000.00 for Distant Water
Fishing Permit (DWFP) application and license fee for
vessels operating in other coastal waters and secure
Official receipt Designated Special Collecting Officer (Library)/Cashier - Ground or
4th Floor, Fisheries Bldg., BPI Compound, Brgy. Vasra, Visayas Ave.,
13. Payment of Php. 2,500.00 for Distant Water
Quezon City
Fishing Permit (DWFP)application and license fee for
vessels operating in High Seas Pocket-1 and secure
Official receipt
Note: An "Order of Payment" is issued by FRLD-CFLS to the applicants before payment, which they then submit to the collecting Officer to be used as reference for
the computation and total amount of fees to be collected. It is not included in the list of regulatory requirements for application of Distant Water Fishing Permit.

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Secure and fill out 1. Provide Distant Water
Distant Water Fishing Fishing Permit (DWFP) Administrative
Permit (DWFP) application form and list of Aide/Assistant Fishing
application form and regulatory requirements. Regulations Officers
comply with all regulatory BFAR FRLD-CFLS
requirements. None 15 minutes Ground Floor/3rd,
Fisheries Bldg., BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City

2. Submit duly filled up 2. Accept filled out CFVL


application form together application with complete
with the complete regulatory requirements
regulatory requirements either thru the following Administrative
to the Director's Office Offices: Aide/Assistant Fishing
at 3rd Floor, Fisheries Regulations Officers
Bldg., or at BFAR-FRLD- a. Office of the Director BFAR FRLD-CFLS
CFLS at G/Floor, (forward to FRLD-CFLS); None 1 hour Ground Floor/3rd,
Fisheries Bldg., or Fisheries Bldg., BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
b. FRLD-CFLS (directly)
City

2.1 Check, verify and


evaluate the authenticity Fishing Regulations
and completeness of the Officers
submitted requirements. BFAR FRLD-CFLS,
None None 1 day
Ground Flr., Fisheries
Bldg., BPI Compound,
Visayas Ave., Q.C.

4. Secure "Order of 3. Issue "Order of


Payment" at the BFAR- Payment"
Administrative
FRLD-CFLS located at
Aide/Assistant Fishing
G/Floor, Fisheries Bld., None 15 minutes
Regulations Officers
BPI Compound
BFAR FRLD-CFLS

84
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
5. Submit "Order of 4. Receive and review the
Payment" to the computation of the
designated Special submitted "Order of
Collecting Officer at Payment"
BFAR-Library located at
None 15 minutes
G/Floor, Fisheries Bldg.,
at the BFAR-Cashier
located at 4th Floor,
Fisheries Bldg.,

6. Pay the necessary 4.1. Accept the payment Designated Special


fees and secure an based on the amount in the Collecting Officer
Official Receipt at BFAR- "Order of Payment" and BFAR (Library)/Cashier
Cashier located at BFAR- issue an Official Receipt to Ground or 4th Floor,
Php. 2,500.00 Fisheries Bldg., BPI
Library, Ground Floor or client application and
4th Floor, Fisheries Bldg., Compound, Brgy. Vasra,
permit fee for Visayas Ave., Quezon
BPI Compound, Visayas vessels operating
Ave., Q.C. City
in high seas;
Php. 8,000.00 15 minutes
application and
permit fee for
vessels operating
in other coastal
States

5. Submit the original 5. Receive and photocopy Administrative


copy of the Official the submitted O.R. and Aide/Assistant Fishing
Receipt (O.R.) to BFAR- return the original copy to Regulations Officers
FRLD-CFLS located at the client BFAR FRLD-CFLS
None 15 minutes
G/Floor, Fisheries Bldg., - Ground Floor, Fisheries
Bldg., BPI Compound,
Brgy. Vasra, Visayas
Ave., Q.C.
6. Prepare/Process the Administrative
DWFP and affix initials of Aide/Assistant Fishing
the authorized signatories Regulations Officers;
and endorse/forward to the FRLD-CFLS Chief,
BFAR Assistant Director for Division Head
None further review and None 3 hours
BFAR FRLD-CFLS
evaluation Ground Floor, Fisheries
Bldg., BPI Compound,
Brgy. Vasra, Visayas
Ave., Q.C.
7. Receive/Review and Asst. Director for
Evaluate then Endorse and Research Regulations
affix initial on DWFP and International
application to the Director Engagements
for signature/approval BFAR
None None 1 Day
(ADRRIE)/ADDRIE
3rd Floor, Fisheries
Bldg., BPI Compound,
Brgy. Vasra, Visayas
Ave., Quezon City

85
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
7.1 Forward to the Asst. Director for
Director's Office for Research Regulations
approval and signature and International
Engagements
BFAR
None None 15 minutes
(ADRRIE)/ADDRIE
3rd Floor, Fisheries
Bldg., BPI Compound,
Brgy. Vasra, Visayas
Ave., Quezon City
8. Approve and sign
Distant Water Fishing BFAR National Director
None None 5 days
Permit (DWFP) Director's Office
3rd Floor, Fisheries
8.1 Forward to BFAR- Bldg., BPI Compound,
Record Section for Brgy. Vasra, Visayas
None None 15 minutes
releasing to client Ave., Quezon City

9. Receive notification 9. Notify/Inform clients thru


thru call, text or e-mail of call, text or e-mail on the
the approved DWFP, and approved DWFP and ready None 15 minutes
is ready for pick-up for pick up
10. Receive/Claim 10. Release approved
approved DWFP DWFP to client either thru Record Section Staff
the following: BFAR-Record Section
Ground Floor, Fisheries
a. pick-up by applicant; Bldg., BPI Compound,
b. send copy thru e-mail Brgy. Vasra, Visayas
to BFAR-Regional Office; None 15 minutes Ave., Quezon City
or,

c. send original copy thru


a registered mail to BFAR-
regional Office

*Php. 2,500.00
application and
permit fee for
vessels
operating in
high seas; *Php. 7 days, 6
TOTAL: 8,000.00 hours, and 15
application and minutes
permit fee for
vessels
operating in
other coastal
States

86
*Notes:

1. This procedure is applicable to DWFP applications filed in BFAR-CO. This does not cover the DWFP applications filed in BFAR-Regional Office that
are forwarded to BFAR-CO. The steps for applying CFVL shall apply.

2. Consider bulk applications in this procedure which are submitted at the same time but cannot be processed at the same time due to manpower
limitation. Processing time shall start only after finishing the processing of the previous transaction.

3. Accreditation refers to the registration of the fishing vessel with the Western and Central Pacific Fisheries Commission Record of Fishing Vessels
(RFV). For more information, please visit https://www.wcpfc.int/record-fishing-vessel-database.

4. Payment for DWFP application and license fee for fishing in HSP1 are PhP 1,000.00 and PhP 1,500.00, respectively pursuant to Section 39 (f) (g) of
FAO 198-1 s. 2018. Payment for DWFP application and permit fee for fishing in waters of other Coastal State are PhP 3,000.00 and PhP 5,000.00
pursuant to Section 4 (e) (f) of BFAR Administrative Circular No. 252-1 series of 2020.

5. Approval of DWFP depends on the availability of the BFAR National Director (five (5) working days upon the availability of the Director)

87
3. Processing of Application for Fishing Gear Registration

This service involves the processing of application for Fishing Gear Registration authorizing the fishing gear to be used for
fishing within waters beyond 15 km. from the shoreline. The registration of gear is applicable to catcher vessels only.

BFAR- Fisheries Regulatory and Licensing Division (FRLD) – Capture Fisheries Licensing
Office or Division
Section (CFLS)

Classification Highly Technical

Type of Transaction G2B- Government to Business Entity

Who may avail: Commercial Fishing Vessel Operators

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

BFAR-Regional Field Office/BFAR- Fisheries Regulatory Licensing


1. Duly accomplished and notarized BFAR Fishing Division-Capture Fisheries Licensing Section (FRLD-CFLS) -
Gear Registration Form; Ground Floor, Fisheries Bldg., BPI Compound, Brgy. Vasra, Visayas
Ave., Quezon City

2. Fishing Gear technical design and specifications


Applicant (Fishing Company/Operator)
duly certified by the master net mender and owner;

BFAR-Regional Field Office/BFAR- Fisheries Regulatory Licensing


Division-Capture Fisheries Licensing Section (FRLD-CFLS) - Ground
3. Fishing Gear inspection report.
Floor, Fisheries Bldg., BPI Compound, Brgy. Vasra, Visayas Ave.,
Quezon City
4. Payment of Php. 200.00 for Fishing Gear
application fee and secure Official receipt
Designated Special Collecting Officer (Library)/Cashier - Ground Flr.
5. Payment of Php. 200.00 forFishing Gear
or 4th Floor, Fisheries Bldg., BPI Compound, Brgy. Vasra, Visayas Ave.,
registration fee and secure Official receipt
Quezon City
6. Secure Official receipt for gear license fee based on
the gross tonnage of the vessel
Note: An "Order of Payment" is issued by FRLD-CFLS to the applicants before payment, which they then submit to the collecting Officer to be used
as reference for the computation and total amount of fees to be collected. It is not included in the list of regulatory requirements for application of
Fishing Gear Registration.
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Secure and fill out 1. Provide Fishing Gear Administrative
Fishing Gear Registration application Aide/Assistant Fishing
Registration application form and list of Regulations Officers
form and comply with all requirements. BFAR FRLD-CFLS
regulatory requirements. None 15 minutes Ground Floor/3rd,
Fisheries Bldg., BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City
2. Submit duly filled up 2. Accept application for
application form together gear registration with
with the complete complete regulatory Administrative
regulatory requirements requirements either thru the None Aide/Assistant Fishing
1 hour
to the Director's following Offices: Regulations Officers
Office/FRLD-CFLS BFAR FRLD-CFLS

88
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
a. Office of the Director
(forward to FRLD-CFLS); Administrative
or Aide/Assistant Fishing
None None
Regulations Officers
b. FRLD-CFLS (directly) BFAR FRLD-CFLS

2.1 Check, verify and


evaluate the authenticity
None and completeness of the None 1 Day Fishing Regulations
submitted requirement. Officers
BFAR FRLD-CFLS
3. Receive Notification of 3. Schedule an inspection Ground Floor, Fisheries
Scheduled Inspection and notify the client on the Bldg., BPI Compound,
schedule of inspection Brgy. Vasra, Visayas
None 5 days
Ave., Quezon City
3.1 Conduct inspection on
the fishing vessel

4. Secure "Order of 4. Issue "Order of Administrative


Payment" at the BFAR- Payment" Aide/Assistant Fishing
FRLD-CFLS located at Regulations Officers
G/Floor, Fisheries Bld., BFAR FRLD-CFLS
BPI Compound None 15 minutes
Ground Floor, Fisheries
Bldg., BPI Compound,
Brgy. Vasra, Visayas
Ave., Q.C.
5. Submit "Order of 5. Receive and review the
Payment" to the computation of the
designated Special submitted "Order of
Collecting Officer at Payment"
Library located at
G/Floor, Fisheries None 15 minutes
Bldg., Or at the BFAR-
Cashier located at 4th
Floor, Fisheries Bldg.,

Designated Special
6. Pay the necessary 5.1. Accept the payment
Collecting Officer
fees and secure an based on the amount in the
BFAR (Library)/Cashier
Official Receipt at BFAR- "Order of Payment" and
Ground or 4th Floor,
Cashier located at 4th issue an Official Receipt to
Fisheries Bldg., BPI
Floor, Fisheries Bldg., client PHP 200.00 for Compound, Brgy. Vasra,
BPI Compound, Visayas Application fee, Visayas Ave., Quezon
Ave., Q.C. Php. 200.00 City
registration fee
*License fee
15 minutes
based on gross
tonnage (please
see *notes
below for
computation)

89
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
5. Submit the original 6. Receive and photocopy
copy of the Official the submitted O.R. and Administrative
Receipt (O.R.) to BFAR- return the original copy to Aide/Assistant Fishing
FRLD-CFLS located at the client Regulations Officers
G/Floor, Fisheries Bldg., BFAR FRLD-CFLS
None 15 minutes
Ground Floor, Fisheries
Bldg., BPI Compound,
Brgy. Vasra, Visayas
Ave., Quezon City

7. Prepare/Process the Administrative


Fishing Gear Registration Aide/Assistant Fishing
and affix initials of the Regulations Officers
authorized signatories and FRLD-CFLS Chief,
endorse/forward to BFAR Division Head
None Assistant Director. None 3 hours
BFAR FRLD-CFLS
Ground Floor, Fisheries
Bldg., BPI Compound,
Brgy. Vasra, Visayas
Ave., Quezon City
8. Receive and Review the
application of Fishing Gear
Registration and affix
initial. Then, forward to the Asst. Director for
Director's Office Research Regulations
None None 1 Day
and International
Engagements (ADRRIE)
3rd Floor, Fisheries
Bldg., BPI Compound,
Brgy. Vasra, Visayas
8.1 Forward to the Ave., Quezon City
Director's Office signature
None and approval None 15 minutes

9. Approve and sign


Fishing Gear Registration. BFAR National Director
None None 5 days Director's Office
3rd Floor, Fisheries
9.1 Forward to BFAR- Bldg., BPI Compound,
Record Section for Brgy. Vasra, Visayas
None None 15 minutes Ave., Quezon City
releasing to client
10. Receive notification 10. Notify/Inform clients
thru call, text or e-mail of thru call, text or e-mail on Record Section Staff
the approved Fishing the approved Fishing Gear BFAR Records
Gear Registration, and is Registration and ready for Ground Floor, Fisheries
None 15 minutes
ready for pick-up pick-up Bldg., BPI Compound,
Brgy. Vasra, Visayas
Ave., Quezon City

11. Receive/Claim 11. Release approved Record Section Staff


approved Fishing Gear Fishing Gear Registration BFAR Records
Registration to client either thru the Ground Floor, Fisheries
folloeing: None 15 minutes
Bldg., BPI Compound,
Brgy. Vasra, Visayas
Ave., Quezon City

90
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
a. pick-up by applicant;
Record Section Staff
b. send copy thru e-mail BFAR Records
to BFAR-Regional Office; Ground Floor, Fisheries
or, Bldg., BPI Compound,
c. send original copy thru Brgy. Vasra, Visayas
a registered mail to BFAR- Ave., Quezon City
regional Office

PHP 200.00 for


Application fee,
Php. 200.00
registration fee
*License fee 12 days, 6 hours, and 15
TOTAL:
based on gross minutes
tonnage (please
see *notes
below for
computation)

*Notes:
1. This procedure is applicable for applications filed in BFAR-Central. This does not cover the Fishing Gear Registration applications filed in BFAR-
Regional Office and are forwarded to BFAR-Central.
2. Inspection of fishing gear depends on the availability of the vessel/s as well as the inspectors (maximum of five (5) working days upon the availability
of the vessel).
3. Fishing Gear Registration and application fee is Php. 400.00 in total , while the license fee is based on the gross tonnage of the vessel under Section
26 (b) of FAO 198-1, series of 2018 , to wit:
a. For fishing vessel 3.1-20.0 GT- P400.00 per year

b. For fishing vessel 20.1-150.00 GT- Php. 800.00 per year

c. For fishing vessel 150.1 – 300.00 GT - Php. 1,200.00 per year

d. For fishing vessel 300.1-500.00 GT - Php. 2,000.00 per year

4. Approval of Fishing Gear Registration depends on the availability of the National Director (maximum of five (5) working days upon the availability of
the Director).
5. Eight (8) hours is equivalent to one (1) working day.

91
4. Processing of Application for Paaling Fishermen’s License
This service involves the processing of application for Paaling Fishermen's License authorizing the fishermen/crews on-board
and to conduct fishing method called Paaling .

BFAR- Fisheries Regulatory and Licensing Division (FRLD) – Capture Fisheries Licensing
Office or Division
Section (CFLS)
Classification Simple

Type of Transaction G2C- Government to Citizen; G2B- Government to Business Entity

Who may avail: Fishermen/Crew

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

BFAR-Regional Field Office/BFAR- Fisheries Regulatory Licensing


1. Duly Accomplished Pa-aling Fishermen's License Division-Capture Fisheries Licensing Section (FRLD-CFLS) -
Application Form; Ground Floor, Fisheries Bldg., BPI Compound, Brgy. Vasra, Visayas
Ave., Quezon City

2. Two (2) copies of 1” X 1” ID picture; Fisherman/Crew


3. Valid government-issued ID or Barangay Fisherman/Crew
Clearance;
Designated Special Collecting Officer (Library)/Cashier - Ground or
4. Payment of Php. 40.00 for Pa-aling Fishermen's
4th Floor, Fisheries Bldg., BPI Compound, Brgy. Vasra, Visayas Ave.,
License license fee and secure Official receipt
Quezon City
Note: An "Order of Payment" is issued by FRLD-CFLS to the applicants before payment, which they then submit to the collecting Officer to be used
as reference for the computation and total amount of fees to be collected. It is not included in the list of regulatory requirements for application of Pa-
aling Fishworker's License.

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Secure and fill up 1. Provide Paaling
Administrative
Paaling Fishermen’s Fishermen’s License
Aide/Assistant Fishing
License application form application form and list of
Regulations Officers
and comply with all requirements.
regulatory requirements. BFAR FRLD-CFLS
None 15 minutes Ground Floor/3rd,
Fisheries Bldg., BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City
2. Submit duly filled up 2. Accept application for
application form together Pa-aling Fishermen's
with the complete License with complete Administrative
regulatory requirements regulatory requirements Aide/Assistant Fishing
to the Director's either thru the following Regulations Officers
Office/FRLD-CFLS Offices: BFAR FRLD-CFLS
None 1 hour Ground Floor/3rd,
a. Office of the Director Fisheries Bldg., BPI
(forward to FRLD-CFLS); Compound, Brgy. Vasra,
or Visayas Ave., Quezon
City
b. FRLD-CFLS

92
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
2.1 Check, verify and
evaluate the authenticity Fishing Regulations
and completeness of the Officers ; BFAR FRLD-
submitted requirements. CFLS
None None 30 minutes Ground Floor, Fisheries
Bldg., BPI Compound,
Brgy. Vasra, Visayas
Ave., Quezon City

3. Secure "Order of 3. Issue "Order of


Payment" at the BFAR- Payment"
Administrative
FRLD-CFLS located at
Aide/Assistant Fishing
G/Floor, Fisheries Bld.,
Regulations Officers
BPI Compound
BFAR FRLD-CFLS
None 15 minutes
Ground Floor, Fisheries
Bldg., BPI Compound,
Brgy. Vasra, Visayas
Ave., Quezon City

4. Submit "Order of 4. Receive and review the


Payment" to the computation of the
designated Special submitted "Order of
Collecting Officer at Payment"
Library located at
G/Floor, Fisheries Bldg., None 15 minutes
at the BFAR-Cashier Designated Special
located at 4th Floor, Collecting Officer
Fisheries Bldg., BFAR (Library)/Cashier
Ground or 4th Floor,
5. Pay the necessary 5. Accept the payment Fisheries Bldg., BPI
fees and secure an based on the amount in the Compound, Brgy. Vasra,
Official Receipt at BFAR- "Order of Payment" and Visayas Ave., Quezon
Cashier located at 4th issue an Official Receipt to City
Floor, Fisheries Bldg., client Php. 40.00
BPI Compound, Visayas Application and 15 minutes
Ave., Q.C. License Fee

6. Submit the original 6. Receive Official Receipt


copy of the Official and reproduce a duplicate
Receipt to BFAR-FRLD- copy to be retained by
CFLS located at G/Floor, FRLD-CFLS. Then return Administrative
Fisheries Bldg., the original copy to the Aide/Assistant Fishing
client Regulations Officers
BFAR FRLD-CFLS
None 30 minutes
Ground Floor, Fisheries
Bldg., BPI Compound,
Brgy. Vasra, Visayas
Ave., Quezon City

93
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

7. Prepare/Process the
Paaling Fishermen’s
License and affix initial of Administrative
authorized signatories Aide/Assistant Fishing
None None 30 minutes Regulations Officers
7.1 Approve and sign FRLD-CFLS Chief,
Paaling Fishermen’s Division Head BFAR
License. FRLD-CFLS
Ground Floor, Fisheries
7.3 Forward to BFAR- Bldg., BPI Compound,
Records Section the Brgy. Vasra, Visayas
None approved license for None 10 mins Ave., Quezon City
release to client

8. Receive notification 8. Notify/Inform clients thru


Record Section Staff
thru call, text or e-mail of call, text or e-mail on the
BFAR Records
the approved Paaling approved Paaling
Ground Floor, Fisheries
Fishermen’s License, and Fishermen’s License and None 15 minutes
Bldg., BPI Compound,
is ready for pick-up ready for pick-up
Brgy. Vasra, Visayas
Ave., Quezon City
9. Receive/Claim 9. Release approved
approved Paaling Paaling Fishermen’s
Fishermen’s License License to client either thru Record Section Staff
the following: BFAR Records
a. pick-up by applicant; or, Ground Floor, Fisheries
None 15 minutes
Bldg., BPI Compound,
Brgy. Vasra, Visayas
b. send original copy thru Ave., Quezon City
a registered mail to BFAR-
Regional Office

Php. 40.00
4 hours and
Application and
10 Minutes
License Fee

Notes:

1. This applies to fishermen working on board paaling fishing vessels only.


2. Consider bulk applications submitted at the same time. Paaling Fishermen’s License applications are always submitted in bulk at the same time
because fishermen on board paaling vessels operates in group. In this case, the processing time for each transaction multiplied by the total number of
applications shall be the total processing time for bulk applications.

94
5. Processing of Application for Regular Catch Certificates (RCC)

This service involves the processing of application for Regular Catch Certificate covering catches of Philippine-flagged fishing
vessels (with size 20 gross tonnage or more) exported to European Union Member Countries.

BFAR- Fisheries Regulatory and Licensing Division (FRLD) -Capture Fisheries Licensing
Office or Division
Section (CFLS)

Classification Complex

Type of Transaction G2C- Government to Citizen; G2B- Government to Business Entity

Who may avail: Fishing companies/Accredited Exporters/Processors/Canneries

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Duly accomplished fishing vessel log sheet, which


must bear the signature or stamp of the vessel Applicant (Fishing Vessel Owner/Operator)
captain;

BFAR-Regional Field Office/BFAR- Fisheries Regulatory Licensing


Division-Capture Fisheries Licensing Section (FRLD-CFLS) -
2. Regular Catch Certificate (RCC) Form;
Ground Floor, Fisheries Bldg., BPI Compound, Brgy. Vasra, Visayas
Ave., Quezon City

Applicant (Fishing Vessel Owner/Operator) or BFAR-Regional Field


3. Copy of the Commercial Fishing Vessel License Office/BFAR- Fisheries Regulatory Licensing Division-Capture
(CFVL); Fisheries Licensing Section (FRLD-CFLS) - Ground Floor, Fisheries
Bldg., BPI Compound, Brgy. Vasra, Visayas Ave., Q.C.

4. Copy of Certificate of Ownership (CO) and


Maritime Industry Authority (MARINA)
Certificate of Philippine Registry (CPR);

5. Transhipment Certificate issued by the fishing


vessel captain and printed in paper bearing fishing
company logo, accompanied with the fish carrier’s Applicant (Fishing Vessel Owner/Operator)
Stowage Plan (if transhipment at sea or at port
occurred);
6. Catch Origin Landing Declaration (COLD)
submitted by the captain or master of fishing vessel or
his representative and verified by the concerned BFAR Regional Field Office concerned
BFAR Regional Office (if the catch was landed in
Philippines);

7. Original copy of fish summary/sizing report which


must be signed by the authorized representative of the Applicant (Fishing Vessel Owner/Operator) or Canning Factory
fishing company and the cannery);

Applicant (Fishing Vessel Owner/Operator) or BFAR-Regional Field


Office/BFAR- Fisheries Regulatory Licensing Division-Capture Fisheries
8. Copy of Distant Water Fishing Permit;
Licensing Section (FRLD-CFLS) - Ground Floor, Fisheries Bldg., BPI
Compound, Brgy. Vasra, Visayas Ave., Quezon City

9. Copy of fishing license/permit from PNG/or other


Competent authority of the Coastal State
coastal states;

95
10. Original or authenticated copy of Fish Origin
Declaration Form issued by the National Fisheries Applicant (Fishing Vessel Owner/Operator)
Agency of PNG;
CHECKLIST OF REQUIREMENTS WHERE TO SECURE

11. Transhipment declaration, in case there is Competent authority of the port State (e.g. National Fisheries Authority
transhipment of catch at foreign port; of PNG)

12. Landing declaration, in case there is


landing/unloading of catch in foreign port/unloading of Competent authority of the Port State
catch in foreign port.
13. Payment of Php. 50.00 for Regular Catch Designated Special Collecting Officer (Library)/Cashier - Ground or
Certificate (RCC) application fee and secure Official 4th Floor, Fisheries Bldg., BPI Compound, Brgy. Vasra, Visayas Ave.,
receipt Quezon City
Note: An "Order of Payment" is issued by FRLD-CFLS to the applicants before payment, which they then submit to the collecting Officer to be used
as reference for the computation and total amount of fees to be collected. It is not included in the list of regulatory requirements for application of
European Union Regular Catch Certificate.

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit duly 1 Receive duly
accomplished Regular accomplished Regular
Administrative
Catch Certificate (RCC), Catch Certificate (RCC)
Aide/Assistant Fishing
based from the BFAR form, together with
Regulations Officers
prescribed form together complete regulatory
BFAR FRLD CFLS
with complete regulatory requirements. None 15 minutes
- Ground Floor/3rd,
requirements to
Fisheries Bldg., BPI
BFAR=FRLD-FLCS
Compound, Brgy. Vasra,
located at G/Floor,
Visayas Ave., Q.C.
Fisheries Bldg.,

2. Verify or validate the


data contained in the
accomplished EU Regular
None Catch Certificate submitted, None 3 days
based on the submitted
Fishing Regulations
documentary requirements
Officers
BFAR FRLD-CFLS
2.1 Process and validate Ground Floor, Fisheries
EU Regular Catch Bldg., BPI Compound,
Certificate and stamp the Brgy. Vasra, Visayas
BFAR wet and dry seal Ave., Quezon City
None (Box 9) as security feature None 4 hours
on the submitted RCC form
as an additional safety
measure

3. Affix the initial and


sign/approve the Fishing Regulations
application for Regular Officers (evaluators)
Catch Certificate (RCC) OIC, FRLD-CFLS; OIC
None Alternate Signatories: None 15 minutes BFAR FRLD
Ground/3rd Floor,
a. BFAR-National Director Fisheries Bldg., BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
b. BFAR-Assistant Director City
None None 15 minutes

96
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
2. Secure "Order of 4. Issue "Order of
Fishing Regulations
Payment" at the BFAR- Payment"
Officers, BFAR FRLD-
FRLD-CFLS located at
CFLS
G/Floor, Fisheries Bld.,
None 15 minutes Ground Floor, Fisheries
BPI Compound
Bldg., BPI Compound,
Brgy. Vasra, Visayas
Ave., Quezon City
3. Submit "Order of 5. Receive and review the
Payment" to the computation of the
designated Special submitted "Order of
Collecting Officer at Payment"
Library located at none 15 minutes Designated Special
G/Floor, Fisheries Bldg.,
Collecting Officer
at the BFAR-Cashier
BFAR (Library)/Cashier
located at 4th Floor,
Ground or 4th Floor,
Fisheries Bldg.,
Fisheries Bldg., BPI
4. Pay the necessary 6. Accept the payment Compound, Brgy. Vasra,
fees and secure an based on the amount in the Visayas Ave., Q.C.
Official Receipt at BFAR- "Order of Payment" and
Cashier located at 4th issue an Official Receipt to Php. 50.00 15 minutes
Floor, Fisheries Bldg., client
BPI Compound,

5. Submit the original 7. Receive and photocopy


copy of the Official the submitted O.R. and
Receipt to BFAR-FRLD- return the original copy to None 15 minutes
CFLS located at G/Floor, the client Administrative
Fisheries Bldg., Aide/Assistant Fishing
Regulations Officers
7. Receive notification 8. Notify/Inform client thru BFAR FRLD-CFLS
thru call, text or e-mail of call, text or e-mail on the Ground Floor, Fisheries
the approved RCC and is approved RCC and ready None 15 minutes
Bldg., BPI Compound,
ready for pick-up for pick-up Brgy. Vasra, Visayas
8. Receive/Claim 9. Release Ave., Quezon City
approved RCC approved/signed RCC to None 15 minutes
client

TOTAL: Php. 50.00 3 days, 6 hours

Notes:

1. Consider bulk applications in this procedure which are submitted at the same time but cannot be processed at the same time due to manpower
limitation. Processing time shall start only after finishing the processing of the previous transaction.
2. Eight (8) hours is equivalent to one (1) working day.

97
6. Processing of Application for Simplified Catch Certificates (SCC)

This service involves the processing of application for Simplified Catch Certificate covering catches of Philippine-flagged fishing
vessels (with size less than 20 gross tonnage) exported to European Union Member Countries.

BFAR- Fisheries Regulatory and Licensing Division (FRLD) –Capture Fisheries Licensing Section
Office or Division
(CFLS)
Classification Complex

Type of Transaction G2C- Government to Citizen; G2B- Government to Business Entity

Who may avail: Accredited Exporters / Processing Plants / Canneries

CHECKLIST OF REQUIREMENTS WHERE TO SECURE


1. Duly accomplished Simplified Catch Certificate
Accredited Exporter/Processing Plant/Cannery
(SCC) form;
2. Copy of the municipal registration papers and/or
Local Government Unit concerned
fishing license or CFVGL;
3. Duly accomplished BFAR-prescribed fish catch
report using the prescribed forms in Annex 7 of FAO Fishing boat owner/captain
238, series of 2012;
4. Any of the following documents:

a. Original copy of Auxiliary Invoice issued by the


Local Government Unit (LGU) where the catch was Local Government Unit concerned
obtained;

b. Local Transport Permit issued by BFAR Regional


BFAR Regional Field Office where the fishery product originated
Office concerned; or

c. Official receipt issued by the supplier whose


specimen signature had been previously submitted by Supplier of fishery products
the exporter to and validated.

5. Payment of Php. 50.00 for Simplified Catch Designated Special Collecting Officer (Library)/Cashier - Ground or
Certificate (SCC) application fee and secure Official 4th Floor, Fisheries Bldg., BPI Compound, Brgy. Vasra, Visayas Ave.,
receipt Quezon City

Note: An "Order of Payment" is issued by FRLD-CFLS to the applicants before payment, which they then submit to the collecting Officer to be used
as reference for the computation and total amount of fees to be collected. It is not included in the list of regulatory requirements for application of
European Union Simplified Catch Certificate.

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit duly 1. Receive duly
accomplished Simplified accomplished Simplified
Catch Certificate (SCC) Catch Certificate (SCC) Administrative
Form together with form together with complete Aide/Assistant Fishing
complete regulatory regulatory requirements Regulations Officers
requirements to the BFAR FRLD-CFLS
None 15 minutes
BFAR-FRLD-CFLS Ground Floor/3rd,
located at Ground Flr, Fisheries Bldg., BPI
Fisheries Bldg., Compound, Brgy. Vasra,
Visayas Ave., Q.C.

98
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
2. Verify or validate the
data contained in the
accomplished EU
Simplified Catch Certificate
None (SCC) based on the None 3 days
submitted documentary Fishing Regulations
requirements Officers BFAR FRLD-
CFLS
3. Process and validate EU Ground Floor, Fisheries
Simplified Catch Certificate Bldg., BPI Compound,
and stamp the BFAR wet Diliman, Quezon City
and dry seal (Box 5) as
None security feature on the None 4 hours
submitted SCC form as an
additional safety measure

3. Affix the initial and


sign/approve the
Fishing Regulations
application for Simplified
Officers (evaluators);
Catch Certificate (SCC)
OIC, FRLD-CFLS; OIC
BFAR FRLD
None Alternate Signatories: None 15 minutes Ground/3rd Floor,
Fisheries Bldg., BPI
a. BFAR-National Director Compound, Brgy. Vasra,
Visayas Ave., Quezon
b. BFAR-Assistant Director City

2. Secure "Order of 5. Issue "Order of Administrative


Payment" at the BFAR- Payment" Aide/Assistant Fishing
FRLD-CFLS located at Regulations Officers
G/Floor, Fisheries Bld., BFAR FRLD-CFLS
BPI Compound None 15 minutes
Ground Floor, Fisheries
Bldg., BPI Compound,
Brgy. Vasra, Visayas
Ave., Quezon City
3. Submit "Order of 6. Receive and review the
Payment" to the computation of the
designated Special submitted "Order of
Collecting Officer at Payment"
Library located at none 15 minutes
G/Floor, Fisheries Bldg., Designated Special
at the BFAR-Cashier Collecting Officer
located at 4th Floor, BFAR (Library)/Cashier
Fisheries Bldg., Ground or 4th Floor,
Fisheries Bldg., BPI
4. Pay the necessary 7. Accept the payment Compound, Brgy. Vasra,
fees and secure an based on the amount in the Visayas Ave., Quezon
Official Receipt at BFAR- "Order of Payment" and City
Cashier located at 4th issue an Official Receipt to
Php. 50.00 15 minutes
Floor, Fisheries Bldg., client
BPI Compound, Visayas
Ave., Q.C.

99
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
5. Submit the original 8. Receive and photocopy Administrative
copy of the Official the submitted O.R. and Aide/Assistant Fishing
Receipt to BFAR-FRLD- return the original copy to Regulations Officers
CFLS located at G/Floor, the client BFAR FRLD-CFLS
Fisheries Bldg., None 15 minutes
Ground Floor, Fisheries
Bldg., BPI Compound,
Brgy. Vasra, Visayas
Ave., Quezon City
6. Receive notification 9. Notify/Inform client thru
thru call, text or e-mail on call, text or e-mail on the Administrative
the approved SCC and is approved SCC and ready None 15 minutes Aide/Assistant Fishing
ready for pick-up for pick-up Regulations Officers
BFAR FRLD-CFLS
7. Receive/Claim 10. Release Ground Floor, Fisheries
approved/signed SCC approved/signed SCC Bldg., BPI Compound,
client None 15 minutes Brgy. Vasra, Visayas
Ave., Quezon City

3 days and 6
TOTAL: Php. 50.00
hours
Notes:

1. Consider bulk applications in this procedure which are submitted at the same time but cannot be processed at the same time due to manpower
limitation. Processing time shall start only after finishing the processing of the previous transaction.

100
7. Processing of Application for Special Fishing Permit (SFP)

This service involves the processing of application for Special Fishing Permit (SFP) authorizing the Philippine-Flagged Fishing
Vessel to fish in the High Seas Pocket-1 as a Special Management Area (HSP1-SMA).

BFAR Fisheries Regulatory and Licensing Division (FRLD) –Capture Fisheries Licensing Section
Office or Division
(CFLS)

Classification Highly Technical

Type of Transaction G2C – Government to Citizen; G2B – Government to Business Entity

Who may avail Commercial Fishing Vessel Owners/Operators

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

BFAR-Regional Field Office/BFAR- Fisheries Regulatory Licensing


1. Duly accomplished and notarized BFAR Issuance of Division-Capture Fisheries Licensing Section (FRLD-CFLS) -
Special Fishing Permit (SFP) Application Form; Ground Floor, Fisheries Bldg., BPI Compound, Brgy. Vasra, Visayas
Ave., Quezon City

2. Notarized Affidavit of Undertaking specifying that


the vessel need to comply the Catch Documentation Applicant (Fishing vessel owner/operator)
Scheme;

3. Authenticated copy of valid Fishing Vessel Safety


Maritime Industry Authority (MARINA)
Certificate (FVSC);

BFAR-Regional Field Office/BFAR- Fisheries Regulatory Licensing


Division-Capture Fisheries Licensing Section (FRLD-CFLS) -
4. Copy of valid CFVL and DWFP;
Ground Floor, Fisheries Bldg., BPI Compound, Brgy. Vasra, Visayas
Ave., Quezon City

5. Copy of Ship Station License issued by National


National Telecommunication Commission (NTC)
Telecommunication Commission;

6. Certificate of Inspection of Fishing Gear; BFAR Regional Field Office concerned

7. Vessel Tracking Agreement Form (VTAF) and/or


Applicant (Fishing vessel owner/operator)
MTU Checklist;
8. Proof that the vessel has assigned authorized
BFAR-Marine Fisheries Development and Vessel Operation Center
fisheries observer;

Designated Special Collecting Officer-BFAR Library/Cashier -


9. Copy of Official Receipt showing payment for
Ground or 4th Floor, Fisheries Bldg., BPI Compound, Brgy. Vasra,
Special Fishing Permit (SFP) fee;
Visayas Ave., Quezon City

BFAR Central Office - BFAR-Integrated Marine Environment


10. Compliance with vessel monitoring system
Monitoring System (IMEMS) - 4th Floor, Fisheries Bldg., BPI
requirement.
Compound, Brgy. Vasra, Visayas Ave., Quezon City

11. Compliance with fisheries observer requirement BFAR Central Office - BFAR-National Marine Fisheries Development
(for catcher vessels operating in high seas only). Center (NMFDC) - Navotas, Metro Manila

Designated Special Collecting Officer-BFAR Library/Cashier -


12. Payment of Special Fishing Permit (SFP)
Ground or 4th Floor, Fisheries Bldg., BPI Compound, Brgy. Vasra,
application fee and secure Official receipt
Visayas Ave., Quezon City
Note: An "Order of Payment" is issued by FRLD-CFLS to the applicants before payment, which they then submit to the collecting Officer to be used
as reference for the computation and total amount of fees to be collected. It is not included in the list of regulatory requirements for application of
Special Fishing Permit.

101
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit duly 1. Provide Distant Special
accomplished Special Fishing Permit (SFP) Administrative
Fishing Permit (SFP) application form and list of Aide/Assistant Fishing
Form together with regulatory requirements. Regulations Officers
complete regulatory BFAR FRLD-CFLS
None 15 minutes
requirements to the Ground Floor/3rd,
BFAR-FRLD-CFLS Fisheries Bldg., BPI
located at Ground Flr, Compound, Brgy. Vasra,
Fisheries Bldg., Visayas Ave., Q.C.

2. Submit duly filled up 2. Accept/Review SFP


and notarized SFP application with complete
application form together regulatory requirements Administrative
with the complete either thru the following Aide/Assistant Fishing
regulatory requirements Offices: Regulations Officers
to the Director's Office BFAR FRLD-CFLS
None 1 hour
located at 3rd Floor, a. Office of the Director Ground Floor/3rd,
Fisheries Bldg., OR at (forward to FRLD-CFLS); Fisheries Bldg., BPI
BFAR-FRLD-CFLS or Compound, Brgy. Vasra,
located at G/Floor, Visayas Ave., Q.C.
Fisheries Bldg., b. FRLD-CFLS

2.1 Check and evaluate the Fishing Regulations


completeness and Officers BFAR FRLD-
authenticity of the
CFLS
None requirements None 1 day Ground Floor, Fisheries
Bldg., BPI Compound,
Brgy. Vasra, Visayas
Ave., Quezon City
2. Secure "Order of 3. Issue "Order of Administrative
Payment" at the BFAR- Payment" Aide/Assistant Fishing
FRLD-CFLS located at Regulations Officers
G/Floor, Fisheries Bld., BFAR FRLD-CFLS
None 15 minutes
BPI Compound Ground Floor, Fisheries
Bldg., BPI Compound,
Brgy. Vasra, Visayas
Ave., Quezon City
3. Submit "Order of 4. Receive and review the
Payment" to the computation of the Designated Special
designated Special submitted "Order of Collecting Officer
Collecting Officer at Payment" BFAR (Library)/Cashier
Library located at None 15 minutes Ground or 4th Floor,
G/Floor, Fisheries Bldg., Fisheries Bldg., BPI
at the BFAR-Cashier Compound, Brgy. Vasra,
located at 4th Floor, Visayas Ave., Q.C.
Fisheries Bldg.,
4. Pay the necessary 5. Accept the payment
fees and secure an based on the amount in the USD 2,000.00 Designated Special
Official Receipt at BFAR- "Order of Payment" and for 2018 and Collecting Officer
Cashier located at 4th issue an Official Receipt to additional BFAR (Library)/Cashier
Floor, Fisheries Bldg., client incremental fee Ground or 4th Floor,
BPI Compound, Visayas 15 minutes
of USD 100.00 Fisheries Bldg., BPI
Ave., Q.C. annually Compound, Brgy. Vasra,
thereafter until Visayas Ave., Quezon
2021 City

102
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
5. Submit the original 5.1. Receive and Administrative
copy of the Official photocopy the submitted Aide/Assistant Fishing
Receipt to BFAR-FRLD- O.R. and return the original Regulations Officers
CFLS located at G/Floor, copy to the client BFAR FRLD-CFLS -
Fisheries Bldg., None 15 minutes
Ground Floor, Fisheries
Bldg., BPI Compound,
Brgy. Vasra, Visayas
Ave., Quezon City
6 Prepare/Process the SFP
application, affix initials of Administrative
the authorized signatories Aide/Assistant Fishing
and endorse/forward to Regulations Officers;
BFAR Assistant Director for FRLD-CFLS Chief,
further review and Division Head
None None 3 Hours
evaluation BFAR FRLD-CFLS
Ground Floor, Fisheries
Bldg., BPI Compound,
Brgy. Vasra, Visayas
Ave., Quezon City

7. Review/Evaluate the Assistant Director


SFP application and affix Asst. Director for
None initial by Assistant Director None 1 day
Research Regulations
and International
7.1 Forward to the Engagements (ADRRIE)
Director's Office for 3rdFloor, Fisheries Bldg.,
None signature and approval of None 15 minutes BPI Compound, Brgy.
the Permit Vasra, Visayas Ave.,
Q.C.
8. Approve and sign the
BFAR National Director
None Special Fishing Permit None 5 days
(SFP) BFAR Director's Office
3rd Floor, Fisheries
8.1 Forward to BFAR- Bldg., BPI Compound,
Record Section for Brgy. Vasra, Visayas
None None 15 minutes
releasing to client Ave., Quezon City

6. Receive notification 9. Notify/Inform client thru


thru call, text or e-mail of call, text or e-mail on the
the approved/signed approved/signed SFP and
SFP and is ready for pick- ready for pick-up None 15 minutes
up

BFAR-Record Section
7. Receive/Claim 10. Release Staff
approved/signed Special approved/signed SFP to BFAR Records
Fishing Permit (SFP) client either thru the Ground Floor, Fisheries
following: Bldg., BPI Compound,
Brgy. Vasra, Visayas
Ave., Quezon City
a. pick-up by applicant; None 15 minutes

b. send copy thru e-mail


thru BFAR-Regional
Offices; and,

103
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
c. send original copy thru BFAR-Record Section
a registered mail thru Staff
BFAR-Regional Office BFAR Records
Ground Floor, Fisheries
Bldg., BPI Compound,
Brgy. Vasra, Visayas
Ave., Quezon City

USD 2,000.00
for 2018 and
additional
incremental fee 7 days, 6 hours and 15
TOTAL:
of USD 100.00 Minutes
annually
thereafter until
2021

NOTES:

1. This procedure is applicable for applications filed in BFAR Regional Field Office and forwarded to BFAR Central Office for issuance of Special Fishing
Permit. The steps for applying CFVL and DWFP shall apply.
2. Pursuant to Section 3.2 of FAO 245-4 series of 2018, the payment for Special Fishing Permit fee is in the amount of USD 2,000.00, or its equivalent
in Philippine Peso starting 2018, subject to annual renewal and additional incremental fee of USD100.00 annually thereafter until 2021.
3. Approval of Special Fishing Permit depends on the availability of the BFAR National Director.
4. Consider bulk applications in this procedure. Processing time shall start only after finishing the processing of the previous transaction.

104
8. Processing of Application for Construction or Importation Clearance for support vessels during
the Moratorium prescribed under BFAR A.C. No. 253-1, series of 2018

This service involves the processing of application for Construction/ Importation Clearance authorizing the construction or
importation of support vessels in accordance with BFAR Administrative Circular No. 253-1 series of 2018.

BFAR Fisheries Regulatory and Licensing Division (FRLD) – Capture Fisheries Licensing Section
Office or Division
(CFLS)
Classification Highly Technical
Type of Transaction G2B – Government to Business Entity
Who may avail Commercial Fishing Vessel Owners/Operators
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. Letter of Intent to the Director requesting for
Construction or Importation Clearance for support
Applicant (Fishing vessel owner/operator)
vessels specifying the vessel type and estimated size
in gross tonnage;
2. Affidavit of Undertaking stating that vessel shall be
constructed within one (1) year from the issuance of Applicant (Fishing vessel owner/operator)
Construction Clearance; and
3. Secure Official receipt for payment of Cashbond
BFAR-Regional Field Office concerned / BFAR- Fisheries Regulatory
Deposit based on the gross tonnage of the vessel
Licensing Division-Capture Fisheries Licensing Section (FRLD-
CFLS) - Ground Floor, Fisheries Bldg., BPI Compound, Brgy. Vasra,
Visayas Ave., Q.C.
Note: An "Order of Payment" is issued by FRLD-CFLS to the applicants before payment, which they then submit to the collecting Officer to be used
as reference for the computation and total amount of fees to be collected. It is not included in the list of regulatory requirements for application of
Construction or Imporation Clearance.
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit letter of intent 1. Accept Letter of intent
together with the and requirements either
complete regulatory thru the following Offices:
Administrative
requirements to the
Aide/Assistant Fishing
Director's Office located None 15 minutes
a. Office of the Director Regulations Officers
at 3rd Floor, Fisheries
(forward to FRLD-CFLS); BFAR FRLD-CFLS
Bldg., OR at BFAR-
or Ground Floor, Fisheries
FRLD-CFLS located at
b. FRLD-CFLS Office Bldg., BPI Compound,
G/Floor, Fisheries Bldg.,
Brgy. Vasra, Visayas
Ave., Quezon City
2. Evaluate the Letter of
None Intent and regulatory None 1 day
requirements submitted
2. Secure "Order of 3. Issue "Order of Administrative
Payment" at the BFAR- Payment" Aide/Assistant Fishing
FRLD-CFLS located at Regulations Officers
G/Floor, Fisheries Bld., BFAR FRLD-CFLS
None 15 minutes
BPI Compound Ground Floor, Fisheries
Bldg., BPI Compound,
Brgy. Vasra, Visayas
Ave., Quezon City
4. Receive and review the Designated Special
computation of the Collecting Officer
submitted "Order of BFAR (Library)/Cashier
Payment" None 15 minutes Ground or 4th Floor,
Fisheries Bldg., BPI
Compound, Visayas
Ave., Q.C.

105
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
4. Pay the necessary 4.1. Accept the payment
fees and secure an based on the amount in the
Cash Bond Designated Special
Official Receipt at BFAR- "Order of Payment" and
Deposit based Collecting Officer
Cashier located at 4th issue an Official Receipt to
on the Gross BFAR (Library)/Cashier
Floor, Fisheries Bldg., client
Tonnage 15 minutes Ground or 4th Floor,
BPI Compound, Visayas
(please see Fisheries Bldg., BPI
Ave., Q.C.
*notes below for Compound, Brgy. Vasra,
computation) Visayas Ave., Q.C.

5. Prepare/Process the Administrative


"Construction / Importation Aide/Assistant Fishing
Clearance"by affixing Regulations Officers;
initials of the authorized FRLD-CFLS Chief,
signatories and Division Head
None endorse/forward to BFAR None 3 Hours
BFAR FRLD-CFLS
Assistant Director afor Ground Floor, Fisheries
further review and Bldg., BPI Compound,
evaluation Brgy. Vasra, Visayas
Ave., Quezon City
6. Review the
"Construction / Importation Assistant Director
Clearance" application and Asst. Director for
None None 1 day Research Regulations
affix initial by Assistant
Director and International
Engagements (ADRRIE)
6.1. Forward to the 3rdFloor, Fisheries Bldg.,
Director's Office for BPI Compound, Brgy.
None signature and approval of None 15 minutes Vasra, Visayas Ave.,
the Clearance Quezon City

7. Approve and sign


Construction / Importation BFAR National Director
Clearance Director's Office
3rd Floor, Fisheries
None None 5 days
Bldg., BPI Compound,
Brgy. Vasra, Visayas
Ave., Quezon City
5. Receive notification 8. Notify/Inform client thru
thru call, text or e-mail of call, text or e-mail on the
the approved/signed approved/signed
"Construction/ "Construction/ Importation
Importation Clearance" Clearance" and ready for None 15 minutes
and is ready for pick-up pick-up Record Section Staff
BFAR-Record
Ground Floor, Fisheries
Bldg., BPI Compound,
6. Receive/Claim 9. Release
Brgy. Vasra, Visayas
approved/signed approved/signed
Ave., Quezon City
"Construction/ "Construction/ Importation
Importation Clearance" Clearance" to client either
None 15 minutes
thru the following:

106
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

a. pick-up by applicant;

Record Section Staff


b. send copy thru e-mail BFAR-Record
to BFAR-Regional Office; Ground Floor, Fisheries
or, None 15 minutes
Bldg., BPI Compound,
c. send original copy thru Brgy. Vasra, Visayas
a registered mail to BFAR- Ave., Quezon City
regional Office

Cash Bond
Deposit based
on the Gross
TOTAL: Tonnage (please 7 days, 5 hours
see *notes
below for
computation)

*NOTES:
1. This transaction is applicable only to the construction or importation of support vessels during the moratorium prescribed under BFAR A.C. No. 253-1
series of 2018. This procedures applies to the application of Construction or Importation Clearance with complete regulatory requirements.
2. Payment for Cash Bond Deposit (CBD) is based on the gross tonnage of the vessel under Section 3 d.ii. Of BFAR Administrative Circular No. 253 -
1, series of 2018, to wit:
3. One (1) day is equivalent to eight (8) hours.
*Cash Bond Deposit:
1. For fishing vessel 3.1 to 10.0 GT - P2,500.00
2. For fishing vessel 10.1 to 20 GT - P6,000.00
3. For fishing vessel 20.1 to 50.0 GT - P14,000.00
4. For fishing vessel 50.1 to 100 GT - P15,000.00
5. For fishing vessel 100.1and above - P40,000.00
4. Approval of Construction or Importation Clearance depends on the availability of the BFAR National Director.

107
9. Processing of Application for Construction or Importation Clearance pursuant to FAO No. 198-1,
series of 2018

This service involves the processing of application for Construction/ Importation Clearance authorizing the fishing
company/single proprietorship to construct/import commercial fishing vessels pursuant to FAO No. 198-1, series of 2018.

BFAR Fisheries Regulatory and Licensing Division – Capture Fisheries Licensing Section (FRLD-
Office or Division
CFLS)

Classification Highly Technical

Type of Transaction G2C – Government to Citizen; G2B – Government to Business Entity


Who may avail Commercial Fishing Vessel (CFV) Owners/Operators

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter of Intent to the Director requesting for


Construction or Importation Clearance for new fishing
Applicant (Fishing vessel owner/operator)
vessel specifying the vessel name (if any), country of
origin and gross tonnage;

2. Certificate of Deletion from Philippine Registry of


Maritime Industry Authority (MARINA)
the scrapped/sunken fishing vessel; and

3. Certificate of Deletion from Vessel Registry of the


vessel to be imported from the country of origin (for Competent authority of the exporting country
second hand fishing vessels).

Note: An "Order of Payment" is issued by FRLD-CFLS to the applicants before payment, which they then submit to the collecting Officer to be used
as reference for the computation and total amount of fees to be collected. It is not included in the list of regulatory requirements for application of
Construction or Imporation Clearance.

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

1. Submit letter of intent 1. Accept Letter of intent


together with the and requirements either
complete regulatory thru the following Offices:
requirements to the Administrative
Director's Office located Aide/Assistant Fishing
at 3rd Floor, Fisheries a. Office of the Director Regulations Officers
Bldg., OR at BFAR- (forward to FRLD-CFLS); BFAR FRLD-CFLS
FRLD-CFLS located at or Ground Floor OR /
G/Floor, Fisheries Bldg., None 15 minutes
Director's Staff, 3rd,
Fisheries Bldg., BPI
b. FRLD-CFLS Compound, Brgy. Vasra,
Visayas Ave., Quezon
City

108
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
2. Evaluate the Letter of
Intent and regulatory Administrative
requirements submitted Aide/Assistant Fishing
Regulations Officers;
FRLD-CFLS Chief,
Division Head
None None 1 day
BFAR FRLD-CFLS
Ground Floor, Fisheries
Bldg., BPI Compound,
Brgy. Vasra, Visayas
Ave., Quezon City

3. Prepare/Process the Administrative


"Construction / Importation Aide/Assistant Fishing
Clearance"by affixing Regulations Officers;
initials of the authorized FRLD-CFLS Chief,
signatories and Division Head
None None 3 Hours
endorse/forward to BFAR BFAR FRLD-CFLS
Assistant Director afor Ground Floor, Fisheries
further review and Bldg., BPI Compound,
evaluation Brgy. Vasra, Visayas
Ave., Quezon City
4. Review the
"Construction / Importation Assistant Director
Clearance" application and Asst. Director for
None None 1 Day Research Regulations
affix initial by Assistant
Director and International
Engagements (ADRRIE)
4.1 Forward to the 3rdFloor, Fisheries Bldg.,
Director's Office for BPI Compound, Brgy.
None signature and approval of None 15 minutes Vasra, Visayas Ave.,
the Clearance Quezon City

5. Approve and sign


Construction / Importation
None None 5 days
Clearance BFAR National Director
Director's Office
5.1 Forward the 3rd Floor, Fisheries
approved/signed Clearance Bldg., BPI Compound,
to BFAR-Record Section Brgy. Vasra, Visayas
None for releasing to client None 15 minutes
Ave., Quezon City

5. Receive notification 6. Notify/Inform client thru


thru call, text or e-mail of call, text or e-mail on the
the approved approved "Construction/
"Construction/ Importation Clearance" and Record Section Staff
Importation Clearance" ready for pick-up BFAR Records
and is ready for pick-up Ground Floor, Fisheries
None 15 minutes
Bldg., BPI Compound,
Brgy. Vasra, Visayas
Ave., Quezon City

109
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
6. Receive/Claim 7. Release Record Section Staff
approved/signed approved/signed BFAR Records
"Construction/ "Construction/ Importation Ground Floor, Fisheries
Importation Clearance" Clearance" to client either Bldg., BPI Compound,
thru the following: Brgy. Vasra, Visayas
None 15 minutes Ave., Quezon City
a. pick-up by applicant;
b. send copy thru e-mail
toc.BFAR-Regional Office;
send original copy thru
a registered mail to BFAR-
Regional Office
7 days, 4 hours, and 15
TOTAL:
Minutes
NOTES:
1. This transaction is applicable only to the construction or importation of commercial fishing vessels pursuant to FAO 198-1 series of 2018. This
procedures applies to the application of Construction/Importation Clearance with complete regulatory requirements.
2. The requirement for Certificate of Deletion from the country of origin is applicable only to application for Importation Clearance.
3. Approval of Construction Clearance depends on the availability of the BFAR National Director.

110
VI. REGULATORY: SPECIAL PERMITS

FISHERIES REGULATORY & LICENSING DIVISION (FRLD) -Aquatic Wildlife Regulatory Section
(AWRS)

1. Issuance of Fisheries Special Permit for Aquatic Wildlife


Aquatic Wildlife may be utilized for show exhibition, educational, or documentation for commercial purposes (FAO No. 233,
Sec.26)
BFAR- Fisheries Regulatory and Licensing Division (FRLD) - Aquatic Wildlife Regulatory
Office or Division
Section (AWRS)
Classification Complex
Type of Transaction G2B - Government to Business Entity; G2C -Government to Citizen
Corporation, Association, Business Enterprises, Foreign Entity or Research Institution, Non-
Who may avail:
Government Organizations (NGOs) involved in scientific research

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. For temporary importation of live mammals for


show purposes:

a. Letter of Intent Client/Requesting Party


b. Invoice from supplier Photocopy of the CITES-
Export Permit from the country of origin (If CITES- Client/Requesting Party
listed)

c. Animal Show Permit issued by the Bureau of


Bureau of Animal Inspection (BAI)
Animal Industry (BAI)

2. For activities requiring fisheries special permits:

a. Letter of Intent Client/Requesting Party

b. Other supporting documents Client/Requesting Party

BFAR-Fisheries Regulatory and Licensing Division-Aquatic Wildlife


3. Payment as per approved under FAO No. 233 Regulatory Section (AWRS), G/Flr., Fisheries Bldg., BPI Compound,
Visayas Avenue, Quezon City

BFAR-Fisheries Regulatory and Licensing Division-Aquatic Wildlife


4. Order of Payment Regulatory Section (AWRS) G/Flr., Fisheries
Bldg., BPI Compound, Visayas Avenue, Quezon City

BFAR Central Office Cashier , 4th Floor, Fisheries Bldg., BPI


5. Official Receipts (Original Copy)
Compound, Visayas Avenue, Quezon City

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit letter of intent 1. Receive Letter of intent
and needed requirements and needed requirements BFAR Director's Office
to the Director's office, and Forward to BFAR 3rd Floor, Fisheries
3rd Flr., Fisheries Bldg., FRLD-AWRS for None 15 Minutes Bldg., BPI Compound,
BPI Compound appropriate action Visayas Avenue, Quezon
City

111
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
2. Receive forwarded
documents and Check and BFAR FRLD - AWRS
review the submitted Office G/Flr.,
documents None 1 Hour Fisheries Bldg., BPI
Compound, Visayas
Avenue, Quezon City

2.1 Forward application


and documents via email
for comments to:

a. NFRDI (101 Corporate


Bldg., Mother Ignacia,
South Triangle, Timog
Ave., Q. C.) BFAR FRLD - AWRS
Office G/Flr.,
None 1 Day Fisheries Bldg., BPI
b. BFAR-NFLD- (G/Flr., Compound, Visayas
Arcadia Bldg., Quezon Avenue, Quezon City
Ave., Quezon City)

2.2 Receive comments


from NFRDI and NFLD thru
email then coordinate with
FIQD - FQS for the
scheduled facility
inspection
2. Receive the notification 3. Notify the importer via
on the scheduled facility letter/phone call for facility
inspection inspection schedule None 15 Minutes

3. Allow and accompany 3.1 Conduct facility


the inspection team on inspection
inspection of facilities FIQD-FQS Office
G/Flr., Fisheries Bldg.,
BPI Compound, Visayas
Avenue, Quezon City
3.2 Prepare Inspection None 2 Days
Report with its comments
and recommendations then
submit to FRLD - AWRS
for processing of permit

4. Receive
recommendation from
BFAR FRLD - AWRS
FIQD - FQS then
Office
prepare/process Permit and
None None 5 mins G/Flr., Fisheries Bldg.,
endorsement letter
BPI Compound, Visayas
Avenue, Quezon City

112
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
4.1 Prepare and forward
the endorsement letter and BFAR FRLD - AWRS
Permit to the Director’s Office
None Office for approval/ None 1 hour G/Flr., Fisheries Bldg.,
signature BPI Compound, Visayas
Avenue, Quezon City

5. Receive the forwarded


documents and
approved/signed the BFAR Director's Office
endorsement letter and 3rd Floor, Fisheries
None permit then None 3 Days Bldg., BPI Compound,
returned/forwarded to Visayas Avenue, Quezon
FRLD-AWRS for the City
continued process

6. Receive the forwarded


documents and prepare BFAR FRLD - AWRS
Document Tracking Slip Office
None (DTS) and forward to BFAR None 15 Minutes G/Flr., Fisheries Bldg.,
Record Section for release BPI Compound, Visayas
to DA Avenue, Quezon City

7. Receive the documents


from BFAR FRLD-AWRS BFAR Records Section
and forward to Department G/Flr., Fisheries Bldg.,
None None 1 Hour
of Agriculture (DA) for BPI Compound, Visayas
approval of the Special Avenue, Quezon City
Permit

8. Receive forwarded
documents and forward to DA Records Section
None DA Office of the Secretary None 15 Minutes G/Flr., Elliptical Road,
(OSEC) for the approval of Diliman, Quezon City
Special Permit

9. Receive the documents


and signed/approved the
None Special Permit None 5 Days
DA OSEC
2nd Floor, Elliptical
9.1 Forward the approved Road, Diliman, Quezon
City,
Special Permit to DA
None None 15 Minutes
Record Section for
transmitting to BFAR

10. Receive the approved


DA Records Section
Special Permit and forward
None None 1 Hour G/Flr, Elliptical Road,
to BFAR Record Section
Diliman, Quezon City
for appropriate action

113
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

11. Receive the approved


Special Permit from the BFAR Records Section
Department of Agriculture G/Flr., Fisheries Bldg.,
None None 15 Minutes
(DA) Records and forward BPI Compound, Visayas
to BFAR FRLD-AWRS for Avenue, Quezon City
appropriate action

12. Receive notification


via email on the approved
12. Receive the approved
Special Permit and to pay
the required fee Special Permit from BFAR
Records and notify the
None 10 Minutes
applicant via email to pay
the required fees to claim
the Special Permit
BFAR FRLD - AWRS
Office G/Flr.,
13. Secure "Order of 13. Issue Order of Payment
Fisheries Bldg., BPI
payment" at BFAR for Special Permit
Compound, Visayas
FRLD-AWRS then Avenue, Quezon City
proceed to Cashier Office
at G/Flr., BFAR Library,
Fisheries Bldg., BPI None 10 Minutes
Compound, Visayas
Avenue, Quezon City for
payment

14. Submit Order of 14. Accept the required


payment to the BFAR payment and issue Official BFAR Central Office
Cashier and pay the Receipt Cashier
(As per
required fees for Special 3rd Floor, Fisheries
approved under 15 Minutes
Permit and secure official Bldg., BPI Compound,
FAO No. 233)
receipts Visayas Avenue, Quezon
City

15. Present Official 15. Check presented


Receipt and claim/ Official Receipt and affix BFAR FRLD – AWRS
receive Special Permit BFAR Seal then release Office G/Flr.,
Special Permit None 15 Minutes Fisheries Bldg., BPI
Compound, Visayas
Avenue, Quezon City

11 Days, 6 Hours, 20
TOTAL
Minutes
Required fees:
As per approved under FAO No. 233, Series of 2010

Exhibition/Shows/Documentation for Commercial Purposes - - - - - - - - - - P300.00

Educational Purpose - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - P50.00

114
2. Issuance of Gratuitous Permit for the Collection of Aquatic Wildlife for Research/Scientific
Purposes (Central Office)
Gratuitous Permit (GP) - privilege given to an individual, academes, research institution or organization to capture/harvest and
transport aquatic wildlife species from the natural habitat for scientific and other authorized purposes. (FAO No. 233, series of
2010 - Sec.1)

BFAR- Fisheries Regulatory and Licensing Division (FRLD) - Aquatic Wildlife Regulatory
Office or Division
Section (AWRS)

Classification Highly Technical

Type of Transaction G2C - Government to Citizen; G2G - Government to Government

Individual researchers from research institution or conservation organization; Foreign entity,


individual or a Filipino citizen affiliated with foreign institution; Students affiliated with local academic
institutions for thesis and dissertation; Government agencies implementing research or scientific
Who may avail:
projects; Local academic institutions and Non- Government Organizations (NGO’s) involved in
scientific researches. (*Given that the target species to be studied are not fully protected by the
Philippine Law and/or not listed in CITES)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter of Intent addressed to BFAR Director Client's End, Foreign/Local Collaborator

2. Detailed Research Proposal to include funding


Client's End, Foreign/Local Collaborator
source & list of research affiliates, if there’s any

3. Endorsement Letter from Head of Institution Client's End

4. Institutional Profile or Resume of the Proponent Client's End

5. Free and Prior Informed Consent, if collection is


Client's End
made from the wild
6. Collaborative Research Agreement, if there’s a
Client's End
foreign entity involved

8. MOA - original copy (5 copies) Client's End

7. Notarized MOA (2 copies) Client's End

BFAR FRLD-AWRS, G/Flr., Fisheries Bldg., BPI Compound, Visayas


9. Order of Payment
Avenue, Quezon City

BFAR Central Office Cashier, 4th Floor, Fisheries Bldg., BPI


10. Official Receipt
Compound, Visayas Avenue, Quezon City

BFAR FRLD-AWRS, G/Flr., Fisheries Bldg., BPI Compound, Visayas


11. Photocopy of Official Receipt (1 copy)
Avenue, Quezon City

115
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit letter of intent 1. Receive letter and
and needed requirements needed requirements and
to the BFAR-FRLD- forward to Fisheries
AWRS, G/Flr., Fisheries Regulatory and Licensing Concerned Regional
Bldg., BPI Compound Division (FRLD) - AWRS, None 15 Minutes
Director's Office
Central Office via email

2. Receive via email and


check/review the
submitted/transmitted
None None 1 Hour
documents

BFAR FRLD -
2.2 Notify and transmit the AWRS Office
received documents to G/Flr., Fisheries Bldg.,
Philippine Aquatic Red List BPI Compound, Visayas
Committee (PARLC) Avenue, Quezon City
None members thru email for None 15 Minutes
comments/
recommendation if the
involve species is listed in
CITES
3. Received and review the
submitted
PARLC
documents/requirements
101 Mother Ignacia Ave.,
None and return/transmit the None 1 Day
Brgy, Diliman, Quezon
documents with
City
recommendations to FRLD-
AWRS thru email
BFAR FRLD -
4 Schedule a panel
AWRS Office
discussion/presentation
None None 10 Minutes G/Flr., Fisheries Bldg.,
with the applicant and
BPI Compound, Visayas
PARLC Members
Avenue, Quezon City

BFAR FRLD - AWRS


5. Notify client on the
2. Receive notification to Office G/Flr.,
scheduled panel
attend the scheduled None 5 Minutes Fisheries Bldg., BPI
discussion with PARLC
panel discussion Compound, Visayas
members
Avenue, Quezon City

3. Attend Technical 6. Conduct and attend the


BFAR FRLD - AWRS
Meeting or panel Technical Meeting intiated
Office
discussion/presentation between the applicant,
None 4 Hours G /Flr., Fisheries Bldg.,
with the PARLC PARLC Members and
BPI Compound, Visayas
Members and FRLD- FRLD-AWRS Chief thru
Avenue, Quezon City
AWRS Personnel panel discussion

BFAR FRLD - AWRS


6.1 Finalize Office
None recommendations agreed None 1 Day G /Flr., Fisheries Bldg.,
during the panel discussion BPI Compound, Visayas
Avenue, Quezon City

116
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

6.2 Prepare draft MOA BFAR FRLD - AWRS


between DA-Secretary and Office
None the applicant and submit it None 30 Minutes G /Flr., Fisheries Bldg.,
to BFAR Legal Office for BPI Compound, Visayas
review Avenue, Quezon City

7. Review and make the BFAR Legal Office


necessary corrections/ 3rd Floor, Fisheries
None comments to the draft MOA None 3 Days Bldg., BPI Compound,
and return to FRLD – Visayas Avenue, Quezon
AWRS Office City
4. Receive & review the
drafted MOA for any 8. Receive from Legal
comments Office the draft MOA and
forward via email to the
applicant for their review None 15 Minutes
and revisions and advise to
send back the MOA within
3 days from receipt
BFAR FRLD - AWRS
Office
4.1 Submit and inform the G/Flr., Fisheries Bldg.,
8.1 Wait the draft MOA BPI Compound, Visayas
BFAR FRLD-AWRS on
from the proponent with None 3 Days Avenue, Quezon City
the revisions made on the
comments/ suggestions
drafted MOA thru email

8.2 Receive the revised


MOA via email from the
None applicant then forward to None 20 Minutes
BFAR Legal Office for
further review
9. Receive the revised
MOA and review the BFAR Legal Office
None None
applicant’s 3rd Floor, Fisheries
comments/revisions 1 Hour Bldg., BPI Compound,
9.1 Forward the reviewed Visayas Avenue, Quezon
None MOA to BFAR FRLD- None City
AWRS

10. Receive the reviewed


MOA from the BFAR Legal
None Office and incorporate the None 30 Minutes
approved changes and BFAR FRLD - AWRS
finalize the MOA Office
G/Flr., Fisheries Bldg.,
BPI Compound, Visayas
5. Accept and 11. Forward the final MOA Avenue, Quezon City
Agree/conform to the final to the client for the
None 5 Minutes
MOA revisions then, affix signature of the MOA on
signatures the part of the applicant

117
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

5.1 Submit five (5) BFAR FRLD -


original copies of MOA AWRS Office
11.1 Receive the duly
duly signed by the None 7 Days G/Flr., Fisheries Bldg.,
signed MOA from the client
signatories to BFAR BPI Compound, Visayas
FRLD-AWRS Avenue, Quezon City

11.2 Check the MOA and


other documents and
prepare for the Department BFAR FRLD -
of Agriculture (DA) AWRS Office
None briefer/endorsement letter None 4 Hours G/Flr., Fisheries Bldg.,
for Director's signature and BPI Compound, Visayas
initial on Gratuitous Permit; Avenue, Quezon City
then forward to ADRRIE
Office for initial

12. Receive and review the Assitant Director


forwarded documents then ADRRIE Office
put an initial on the 3rd Floor, Fisheries
None None 3 Days
Endorsement Letter and Bldg., BPI Compound,
forwarded to Director's Visayas Avenue, Quezon
Office for approval City

13. Receive the forwarded


documents and Director Office
approve/sign the 3rd Floor, Fisheries
None endorsement letter, DA None 5 Days Bldg., BPI Compound,
briefer, and signed as Visayas Avenue, Quezon
witness to the MOA and City
initials on Gratuitous Permit

13.1 Forward to FRLD the Director's Office Staff


endorsement letter, DA 3rd Floor, Fisheries
None briefer, approved/signed None 15 Minutes Bldg., BPI Compound,
MOA and signed Gratuitous Visayas Avenue, Quezon
Permit City

14. Receive and check all


the documents (MOA and
None None 10 Minutes
GP) if all needed
documents are signed BFAR FRLD –
AWRS Office
G/Flr., Fisheries Bldg.,
14.1 Forward the BPI Compound, Visayas
documents (MOA and GP) Avenue, Quezon City
None to the Record Section for None 5 Minutes
proper transmittal to DA -
(USEC) Under secretary

118
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

15. Receive the forwarded


documents and prepare
BFAR Records Section
transmittal and forwarded
G/Flr., Fisheries Bldg.,
None the documents to the office None 15 Minutes
BPI Compound, Visayas
of DA-USEC for Fisheries
Avenue, Quezon City
for further review and affix
initial

16. Review the forwarded


documents and sign the DA USEC
None transmittal letter and None 1 Day Elliptical Road, Diliman,
forwarded to DA OSEC for Q.C.
approval

17. Receive and review and


then sign/approve the MOA DA Secretary
None and GP and forwarded to None 3 Days Elliptical Road, Diliman,
DA Records for release to Quezon City
BFAR Records

18. Forward the


DA Records Section
approved/signed MOA and
None None 1 hour Elliptical Road, Diliman,
GP to BFAR Records
Quezon City
Section

19. Receive the BFAR Record Section


approved/signed MOA and G/Flr., Fisheries Bldg.,
None None 15 Minutes
Gratuitous Permit then BPI Compound, Visayas
forwarded to FRLD-AWRS Avenue, Quezon City

6. Receive notification via 20. Receive and record the


email on the approved approved/signed
copy of MOA and documents and Notify
Gratuitous Permit (GP) applicant to claim the None 15 Minutes
for release approved copy of MOA and
Gratuitous Permit

7. Secure the signed 20.1 Release MOA to


MOA for notarization. applicant and advice them
to notarize the said MOA. None 5 Minutes BFAR FRLD –
AWRS Office
G/Flr., Fisheries Bldg.,
BPI Compound, Visayas
8. Notarize the MOA and 20.2 Receive the notarized Avenue, Quezon City
provide a two (2) file copy copy of MOA and secure
None 10 Minutes
to BFAR thru FRLD- two (2) file copies for the
AWRS BFAR and DA Offices

9. Secure Order of 20.3 Issue Order of


Payment at the FRLD- Payment
AWRS, G/Flr., Fisheries None 10 Minutes
Bldg.,

119
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

BFAR Central Office


10. Submit Order of 21. Accept the payment
(As per approved Cashier 3rd Floor,
Payment and pay the based on the Order of
under FAO No. 10 Minutes Fisheries Bldg., BPI
Gratuitous Permit fee and Payment and issue Official
233) Compound, Visayas
secure official receipts Receipt
Avenue, Quezon City

11. Present original copy


of Official Receipt and 22. Receive copy of Official
submit photocopy of Receipt and attach BFAR FRLD –
Official Receipt, secure photocopy to applicant’s AWRS Office
the sign MOA and claim documents, then release None 10 Minutes G/Flr., Fisheries Bldg.,
Gratuitous Permit original copy of the MOA BPI Compound, Visayas
and Gratuitous Permit, and Avenue, Quezon City
one copy will remain as file

28 Days, 7 Hours, 25
TOTAL
Minutes

REQUIRED FEES:

As per approved under FAO No. 233, Series of 2010

1. Scientific research ‐‐‐‐‐‐‐‐‐‐‐

For Filipino students (primary to tertiary) ‐‐‐‐‐‐‐‐‐‐‐ None

Other researchers and graduate students P100.00

2. Gratuitous Permit ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐

For Filipino students ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ P20.00

Other researchers P100.00

120
3. Issuance of CITES Export Permit for Aquatic Wildlife

CITES Export Permit authorizes an individual to bring, send or transport wildlife listed under the appendices of the Convention
on the International Trade in Endangered Species of Wild Fauna and Flora (CITES), including its by-products or derivatives,
from the Philippines to other countries, in cases where such export is allowed. (FAO No. 233, Series of 2010 - Sec. 1)

BFAR- Fisheries Regulatory and Licensing Division (FRLD) - Aquatic Wildlife Regulatory
Office or Division
Section (AWRS)
Classification Simple

Type of Transaction G2C- Government to Citizen; G2G- Government to Government

Individual researchers from research institution or conservation organization; Foreign entity,


individual or a Filipino citizen affiliated with foreign institution; Students affiliated with local academic
Who may avail: institutions for thesis and dissertation; Government agencies implementing research or scientific
projects; and Local academic institutions and NGO’s involved in scientific researches. (Given that
the target species to be exported are listed under CITES)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter of Intent addressed to Regional Director; Client's End

2. Copy of approved GP and duly signed and


Client's End
notarized MOA approved by the DA Secretary;

3. List of species with scientific and local names,


Client's End
number, weight;

4. Copy of the CITES Permit from the original


Client's End
exporting country (for re-exportation only)

5. Copy of the approved import permit issued by the


Client's End
BFAR-FIQD

BFAR FRLD-AWRS, G/Flr.,Fisheries Bldg., BPI Compound, Visayas


6. Order of Payment
Avenue, Quezon City
BFAR Central Office Cashier, 4th Floor, Fisheries Bldg., BPI
7. Official Receipt
Compound, Visayas Avenue, Quezon City

8. Photocopy of Official Receipt (1 Copy) Requesting Party/Applicant (will provide)

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit Letter of intent
and needed requirements 1. Receive letter of intent
to the Diretor's Office 3rd and needed requirements
Flr., Fisheries Bldg. BFAR Director's Office
for encoding to Document
3rd Floor, Fisheries
Tracking System (DTS)
None 15 Minutes Bldg., BPI Compound,
and forward to Fisheries
Visayas Avenue, Quezon
Regulatory and Licensing
City
Division (FRLD) - AWRS
for approriate action

121
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

2. Receive and review the


None submitted letter and its None 15 Minutes
requirements BFAR FRLD –
AWRS Office
G/Flr., Fisheries Bldg.,
2.1 Prepare/Process the BPI Compound, Visayas
CITES Export Permit and Avenue, Quezon City
None None 15 Minutes
forward to CITES
Management Authority

2.2 Receive CITES Export Division Chief


Permit for signature and BFAR FRLD Office
None approval then return to None 10 Minutes G/Flr., Fisheries Bldg.,
FRLD -AWRS to facilitate BPI Compound, Visayas
payment Avenue, Quezon City

2. Receive notification to
pay and secure Order of BFAR FRLD –
Payment and proceed to AWRS Office
BFAR-Cashier located at 2. Issue Order of Payment None 5 Minutes G/Flr., Fisheries Bldg.,
4th Flr., Fisheries Bldg., BPI Compound, Visayas
BPI Compound, Visayas Avenue, Quezon City
Avenue, Q.C.

3. Submit Order of BFAR Central Office


Payment and pay the Cashier
3. Receive/Accept the (As per approved
required fees and secure 4th Floor, Fisheries
payment and issue Official under FAO No. 5 Minutes
Official Receipt to the Bldg., BPI Compound,
Receipt 233)
BFAR-Cashier, 4th Flr., Visayas Avenue, Quezon
Fisheries Bldg. City

BFAR FRLD –
4. Present Official 4. Check the presented AWRS Office
Receipt and claim CITES Official Receipt and release None 5 Minutes G/Flr., Fisheries Bldg.,
Permit CITES Permit BPI Compound, Visayas
Avenue, Q.C.

TOTAL 1 Hour and 10 Minutes

REQUIRED FEES:

As per approved under FAO No. 233, Series of 2010

Export/ Re export Permit

1. Commercial (CITES and Non CITES) ‐‐‐‐‐

a. Aquatic Fauna/Flora, by products or derivatives 3% of export value


‐‐‐‐‐‐‐‐‐‐
b. Aquatic Fauna/Flora (propagated)
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 3% of export value
i. Economically Important Species
‐ ii. Local species
‐ (propagated) 2% of export value
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
2. Non Commercial (1 20 pieces or not more than 10 kilos, whichever comes first)
‐ species
a. CITES ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ P 250.00/permit

b. Non CITES species P 150.00/permit

122
4. Issuance of Endorsement Letter for Export Commodity Clearance for Aquatic Wildlife

Endorsement Letter for Export COmmodity Clearance is issued prior to the Issuance of Export Commodity Clerance to
transport/export samples of aquatic wildlife species.

BFAR- Fisheries Regulatory and Licensing Division (FRLD) - Aquatic Wildlife Regulatory
Office or Division
Section (AWRS)
Classification Simple
Type of Transaction G2C- Government to Citizen; G2G- Government to Government
Individual researchers from research institution or conservation organization; Foreign entity,
individual or a Filipino citizen affiliated with foreign institution; Students affiliated with local academic
Who may avail: institutions for thesis and dissertation; Government agencies implementing research or scientific
projects; and Local academic institutions and NGO’s involved in scientific researches. (Given that
the target species to be studied are not CITES listed)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter of Intent addressed to National Director; Client's End


2. Copy of approved GP and MOA issued by the DA
Client's End
Secretary;
3. List of species with scientific and local names,
Client's End
number, weight;
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit letter of intent 1. Receive letter of intent
and needed relevant and needed requirements
BFAR Director's Office
requirements to BFAR for encoding to Document
3rd Floor, Fisheries
Director's Office Tracking System (DTS)
None 15 Minutes Bldg., BPI Compound,
and Forward to Fisheries
Visayas Avenue, Quezon
Regulatory and Licensing
City
Division (FRLD) for
appropriate action
2. Receive and review the
submitted documents/
None None 15 Minutes
requirements
BFAR FRLD –
AWRS Office
2.1 Prepare/Process the
G/Flr., Fisheries Bldg.,
Endorsement Letter for
BPI Compound, Visayas
Export Commodity
None None 15 Minutes Avenue, Quezon City
Clearance (ECC) and
forward to FRLD Chief for
signature
2.3 Receive Endorsement
Division Chief
Letter for approval/
BFAR FRLD Office
signature and forward to
None None 10 Minutes G/Flr., Fisheries Bldg.,
FRLD - AWRS staff for
BPI Compound, Visayas
release to client
Avenue, Quezon City
3. Claim approved 3. Receive and release the
Endorsement Letter then Endorsement Letter then BFAR FRLD –
proceed to FIQD located instruct the applicant to AWRS Office
at G/Flr., Fisheries Bldg., proceed to FIQD Office at None 5 Minutes G/Flr., Fisheries Bldg.,
BPI Compound, Visayas G/Flr., Fisheries Bldg., BPI BPI Compound, Visayas
Avenue, Quezon City Compound, Visayas Avenue, Quezon City
Avenue, Quezon City
TOTAL 1 Hour

123
VII. REGULATORY: FISHPOND LEASE/RENTALS/ENDORSEMENT

FISHERIES REGULATORY & LICENSING DIVISION (FRLD) - Fishpond Lease Section (FLS)

1. Processing of Applications for Issuance of 25-Years Fishpond Lease Agreement (FLA);


Aquasilviculture Stewardship Contract (ASC); and Gratiutous Permit (GP) (Sections 3, 6, 12, 13, 45,
46, 50, 55, 57, 65, 103 (b) and 107 of Republic Act No. 8550, s. 1998, Republic Act 8289 as amended by
Republic Act 9501 and Executive Order No. 26, series of 2011 and Fisheries Administrative Order
(FAO) No. 197-1, s. of 2012)
The service involves the processing of applications for issuance of Fishpond Lease Agreements, Aquasilviculture Stewardship
Contract and Gratuitous Permits to individuals or corporations, fisherfolk asssociation/cooperatives, micro, small and medium
enterprise; or any branch of government or academic, scientific or research institutions for the use of public lands released for
fishpond development/purposes

Office or Division Fisheries Regulatory and Licensing Division (FRLD) - Fishpond Lease Section (FLS)

Classification Highly Technical


Type of Transaction G2C Government to Citizen; G2B - Government to Business Entity
Philippine Citizens at least 21 years of age; Philippine-registered corporations, fisherfolk
Who may avail:
associations/cooperatives; Micro, small and medium enterprises
CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Initial requirements
a. Duly notarized application for Fishpond Lease Provincial, Regional or Central Office of BFAR
b. Application Fee of Php 2,000.00;

c. Four (4) copies of the sketch or survey plan of


the area released for fishpond purposes with its
Sketch or survey plan to be provided by the applicant; Certificate of
technical description as extracted from the Land
Land Classification Status from DENR
Classification Map of the Forest Management Bureau,
DENR

d. In case of a juridical person, two (2) certified true


copies of By-laws and Articles of Incorporation,
Cooperation, Association or Partnership duly Securities and Exchange Commission; Cooperative Development
approved by government agencies concerned, the Authority; Department of Trade and Industry
primary purpose of which is to engage in
fishery/aquaculture business ;

e. A Certificate of Bank Deposit issued by any


Banking Institution showing that the applicant has a
current or checking account and has capital in cash of
Any banking institution where the applicant has an account
P5,000.00 per hectare or fraction thereof and the bank
statements of said account for the preceding six (6)
months;

f. An affidavit declaring that the initial capital


deposited in the Bank shall be used exclusively for the Applicant
development of the area;

g. Notarized affidavit of adherence to Good


Aquaculture Practices in the form prescribed in Annex Provincial, Regional or Central Office of BFAR
A of FAO No. 197-1;

124
CHECKLIST OF REQUIREMENTS WHERE TO SECURE

h. Proof of compliance with Section 5 A (a) or 5 A


Cooperative Development Authority, Department of Trade and Industry
(b), of FAO No. 197-1, whenever applicable

For Applications for Gratuitous Permit (GP), the


requirements are:
1. Duly notarized application for Gratuitous Permit
Provincial, Regional or Central Office of BFAR
(GP);
2. Project profile which states:
a. The general and specific objectives of the
project
b. A brief description of the project

Applicant
c. The methodology of project implementation,
which includes names of personnel involved and
percentage of time allocated to the project; schedule
of implementation, funding requirement and sources,
both local and foreign; target beneficiaries; and
monitoring and evaluation scheme

2. Final Requirements
a. Twelve (12) copies of the survey plans of the
area duly approved by the Director of Lands or
Applicant submits survey plan to DENR for approval and thereafter,
Regional Director of Lands, or if under cadastral
submits required copies to BFAR
survey, the same shall be certified by the Lands
Management Bureau

b. Duly accomplished FLA or ASC acknowledged


Provincial, Regional or Central Office of BFAR
before a Notary Public

c. Certifications issued by the Regional Director and


the Regional Trial Court in the judicial district where
Regional Office of BFAR; Regional Trial Court in the judicial district
the area applied for is located to the effect that the
where area applied for is located
same is not involved in any pending administrative
and judicial case, respectively;

d. Payment of cash bond deposit and initial rental Applicant


e. Certification issued by the Regional Director to
the effect that the area applied for is not subleased to BFAR Regional Office
any other person/s
f. Environmental Compliance Certificate (ECC) or
Certificate of Non-Coverage from the DENR, Department ofEnvironment and Natural Resources
whichever is applicable
g. Proof of updated remittances to the Social
Security System covering contributions of permanent
Applicant or SSS
fishpond workers employed in the fishpond, whenever
applicable
3. Requirements for Transfer of Rights involving
FLA or ASC
a. Prior written approval of the transfer by the
Secretary, Department of Agriculture
Secretary of Agriculture
CHECKLIST OF REQUIREMENTS WHERE TO SECURE

b. Duly accomplished application form Provincial, Regional or Central Office of BFAR

125
c. Original copy of the Deed of Assignment or
Applicant
Transfer and Assumption of Obligations
d. Certified true copies of original official receipts of
Applicant
updated payment of rentals
e. Payment of assignment or transfer fee Applicant
f. Posting of required cash bond deposit Applicant
g. Latest report of improvements verified by the
Regional Director or his authorized representative,
showing that the fishpond area of the ASC or FLA Provincial or Regional Office of BFAR
subject of the proposed assignment or transfer has
been developed
h. Twelve (12) copies of the survey plan of the area
under his/her name duly approved by the Director of Applicant
Lands or Regional Director of Lands

i. Contract or lease form duly accomplished and


Provincial, Regional or Central Office of BFAR
acknowledged before a Notary Public

j. Certification issued by the BFAR Regional


Director and Regional Trial Court in the judicial district
where the area applied for is located to the effect that BFAR Regional Office;Regional Trial Court
the same is not involved in any pending administrative
and judicial case, respectively
k. Affidavit and certification executed and issued by
the applicant and BFAR Regional Director
Applicant;BFAR Regional Office
respectively, to the effect that the area applied for is
not subleased to any person/s
l. Notarized affidavit of adherence to Good
Provincial, Regional or Central Office of BFAR
Aquaculture Practices
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. File fishpond 1. Receives application and
application and submit determines completeness Will be determined by the Receiving Clerk
Application Fee
initial requirements of initial requirements Regional or Provincial Regional or Provincial
of Php 2,000.00
submitted Office Fisheries Office
2. Receives thru mail a 2. Schedules conduct of
copy of the letter- ocular inspection of the Fisheries Management,
notification of BFAR area to determine feasibility Will be determined by the Regulatory and
–RO, re: conduct of or suitability thereof for None Regional or Provincial Enforcement Division
investigation and ocular fishpond purposes Office Regional or Provincial
inspection of area Fisheries Office

3. Submits him/herself for 3. Conducts investigation


investigation and allow on applicant Fisheries Management,
site inspection upon Will be determined by the Regulatory and
receipt of notification None Regional or Provincial Enforcement Division
from BFAR-RO/PO Office Regional or Provincial
Fisheries Office

4. Conducts ocular
inspection of the area Fisheries Management,
Will be determined by Regulatory and
None None Regional or Provincial Enforcement Division
Office Regional or Provincial
Fisheries Office

126
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
5. Submits report of
Fisheries Management,
inspection and investigation
Will be determined by Regulatory and
with specific
None None Regional or Provincial Enforcement Division
recommendation to FRLD,
Office Regional or Provincial
BFAR Central Office
Fisheries Office
6. Evaluates report Fisheries Regulatory
submitted by ROs/POs None 30 Minutes Officer
7. Prepares letter to FRLD
None applicant advising him/her G/Flr., Main BFAR Bldg,
to submit final requirements None 30 Minutes Fisheries Bldg. Complex,
BPI Cmpd, Visayas Ave,
QC
4. Submits final 8. Receives and evaluates Cash Bond Fisheries Regulatory
requirements the final requirements Deposit & Initial 30 Minutes Officer
rental FRLD
8.1 Prepares FLA/ASC/GP *refer to table of G/Flr., Main BFAR Bldg,
and endorsement letter to fees below Fisheries Bldg. Complex,
None 30 Minutes BPI Cmpd, Viasyas Ave,
Department of Agriculture
(DA) for its approval QC
9.0 Validates documents, Office-in-Charge of
Signs and initials FRLD and Office-in-
endorsement letter to Charge of ADDRIE &
Department of Agriculture BFAR Director,
None (DA) None 1 Day
G/F & 3/F Main BFAR
Bldg. Fisheries Building
Complex, BPI Cmpd,
Visayas Ave., QC
10. Receives, records, Liaison Officer,
consolidates and transmits
Records Section
processed FLA/ASC/GP to
G/F Main BFAR Bldg.
None Department of Agriculture None 1 Day
Fsheries Bldg Complex,
(DA)
BPI Cmpd, Visayas Ave,
QC
11. Receives the processed Records Division,
FLA/ASC/GP application Will be determined by the
Department of
None None Department of Agriculture
for recording Agriculture
(DA)
G /Flr., DA Office,
12. Evaluates the Elliptical Rd, QC
application for Legal Service
Will be determined by the
FLA/ASC/GP and Department of
None None Department of Agriculture
requirements Agriculture , 2nd/F DA
(DA)
Office, Elliptical Rd, QC
13. Approves/Signs the
FLA/ASC/GP Department of
Will be determined by
Agriculture Secretary
None None Department of Agriculture
2nd/F, DA Office,
(DA)
Elliptical Rd, QC

14. Transmits approved


FLA/ASC/GP back to BFAR Department of
Will be determined by
Agriculture Records
None None Department of Agriculture
Liaison Officer, 1st/F DA
(DA)
Office, Elliptical Rd QC

127
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
15.Receives and forwards BFAR Records Officer
the approved and signed 1st/F, Main BFAR Bldg.
None FLA/ASC/GP to FRLD None 15 minutes Fisheries Bldg Complex,
BPI Cmpd, Visayas Ave
QC
16. Records and prepares
the approved and signed
FLA/ASC for notarization
Fisheries Regulatory
Officer, FRLD, G/Flr.,
Fisheries Bldg
Complex, BPI Cmpd,
Visayas Ave, QC
(Previously, the DA
Records Officer sees
Notarial Fee of
None 4 hours to the notarization of
Notary Public
the FLA after being
signed by the DA
Secretary; now, the
notarization is
contracted out to
available Notary Public
near the BFAR Office)

17. Prepares transmittal Fisheries Regulatory


letter to lessee for signature Officer
of the Director FRLD
None 20 Minutes
G /Flr.,, Main BFAR Bldg.
Fisheries Bldg. Complex,
None BPI Cmpd Visayas Ave
18.0 Signs transmittal letter BFARQC Director
3/F Main BFAR
None 1 Hour Bldg.Fisheries Bldg
Complex BPI Cmpd
Visayas Ave, QC
5. Receives his/her copy 19. Records, sorts, Mailing cost Chief Records Officer
of the approved FLA thru consolidates, mails Record Section, G/Flr.,
registered mail approved FLA/ASC/GP 1 Day Main BFAR Bldg.
Fisheries Bldg Complex
BPI Cmpd Visayas Ave
3 days, 7 hours, and QC
TOTAL:
35 minutes

Required Fees:

As per Fisheries Administrative Order (FAO) No. 197-1, s. of 2012)


Fishpond Application Fee Php2,000.00

Cash Bond Deposit Php 500.00 per hectare or fraction thereof


Transfer Fee Php 100.00 per hectare or fraction thereof
Annual Rental Php 1,500.00 per hectare or fraction thereof
Notes:
1. The total number of hours listed above does not include the time it takes for the DA-Legal Service to evaluate the fishpond application; for the DA-
USEC to sign and notarize the approved FLA.

128
2. Step Nos. 1-3 are undertaken by the BFAR Regional or Provincial Office concerned, hence, the amount of time to perform the activities will have to
be determined by concerned offices
3. Step No. 4- the number of minutes listed does not take into account the time it takes for the applicant to secure the final requirements needed. This is
the period when the applicant secures from BFAR and other government agencies (like EMB-DENR, Lands Management Service-DENR, Regional Trial
Court, etc.) the final requirements needed.
4. Step 16 - Notarization of the approved FLA/ASC - traditionally this is the function/activity of the DA Legal Service or the Office of the Secretary; what
is being notarized or recorded publicly is the approval of the Secretary of the FLA/ASC

2. Annual Payment of Fishpond Rental Fees at BFAR Central Office

Fishpond Lease Agreement (FLA) holders may opt to pay the fishpond rentals at the Central Office; the following procedures is
observed.

Office or Division BFAR-Fisheries Regulatory and Licensing Division (FRLD) - Fishpond Lease Section (FLS)

Classification Simple

Type of Transaction G2C- Government to Client; G2B- Government to Business Entity

Philippine Citizens at least 21 years of age; Philippine-registered corporations, fisherfolk


Who may avail:
associations/cooperatives; Micro, small and medium enterprises

CHECKLIST OF REQUIREMENTS WHERE TO SECURE


BFAR-FRLD-Fishery Licensing Section (FLS), G/Flr., Fisheries Bldg.,
1. Bill of Payment
BPI Compound, Visayas Ave., Q.C.
BFAR-FMD-Accounting Section, 4th Flr, Fisheries Building, BPI
2. Order of Payment
Compound, Visayas Ave., Q.C
BFAR- Library Section (Cashier), G/Flr, Annex Building, BPI
3. Official Receipts
Compound, Visayas Ave., Q.C

3. Certified true copy of Official Receipt Requesting Party/Applicant

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Secure bill of payment 1. Issue of Bill of payment
Fisheries Regulatory
Officer,
BFAR- FRLD-FLS
None 5 Minutes Office, Ground Flr.,
Fisheries Bldg., BPI
Compound, Visayas
Ave., Q.C.
2. Secure order of 2. Issues Order of payment
payment for required fees Administrative
and proceed to the FMD- Assistant V;
Acctg., 4/Flr., Fisheries Senior Administrative
Bldg., BPI Compound, Assistance I
Visayas Ave., Q.C. None 5 Minutes BFAR-Accounting
Section, 4th Floor,
Fisheries Bldg., BPI
Compound, Visayas,
Ave., Q.C.

129
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

3. Pay the fishpond rental 3. Accepts the payment


Administrative Assistant
fees at the BFAR-Library based on the Order of
VI/Special Collecting
(Cashier), Ground Flr., Payment issued and issue
Officer 1
Fisheries Building, and Official Receipt *Refer to table of
5 Minutes BFAR-Library Section,
secure Official Receipts fees below
G/Floor, Fisheries Bldg.,
BPI Compound, Visayas,
Ave., Q.C.
4. Certifys the photocopy 4. Photocopies Official
of Official Receipt as Receipt to be certified by Fisheries Regulatory
certified true copy and the client and submit the Officer,
submit to BFAR-FRLD- said copy to BFAR-FRLD- BFAR- FRLD-FLS
FLS, G/Floor, Fisheries FLS None 2 Minutes Office, Ground Flr.,
Bldg., BPI Compound Fisheries Bldg., BPI
Compound, Visayas
Ave., Q.C.

* Refer to table
TOTAL: 17 Minutes
of fees below

* Required Fees:

As per Fisheries Administrative Order (FAO) No. 197-1, s. of 2012)

Fishpond Application Fee Php2,000.00

Cash Bond Deposit Php 500.00 per hectare or fraction thereof

Transfer Fee Php 100.00 per hectare or fraction thereof

Annual Rental For the year 2015: Php 1,200.00 per hectare or fraction thereof

For the year 2016: Php 1,300.00 per hectare or fraction thereof

For the year 2017: Php 1,400.00 per hectare of fraction thereof

For the year 2018 and every year thereafter: Php 1,500.00 per hectare of fraction thereof

130
FISHERIES RESOURCE MANAGEMENT DIVISION (FRMD)

1. Issuance of Cyanide Endorsement Letter to DENR for Importation Clearance

Informing that Bureau of Fisheries and Aquatic Resources (BFAR) interposes no objection to the approval of their importation
clearance with the Department of Environment Natural Resources (DENR) provided that the company shall guarantee that the
chemicals shall be used exclusively for the purposes they were intended, that safeguard/s shall be set to prevent the chemicals
from being diverted to unscrupulous fishermen for illegal fishing purposes.

BFAR- Fisheries Resources Management Division (FRMD) -


Office or Division
Conservation and Environmental Protection Section (CEPS)

Classification Simple

Type of Transaction G2B - services whose client is business entity / G2C - services whose client is the transacting public

Who may avail: Importers of Cyanide and Chemicals Containing Cyanide

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter of Request for Cyanide Endorsement Client/Requesting party

2. Affidavit of Undertaking Client/Requesting party

3. List of Clients Client/Requesting party

4. Inventory of Cyanide Client/Requesting party

5. Chemical Management Plan Client/Requesting party

6. Business Registration Securities and Exchange Commission (SEC)

7. Business Permit Philippine Economic Zone Authority (PEZA) or Municipal Government

8. Environmental Compliance Certificate (ECC) DENR

9. Chemical Control Order (CCO) Registration DENR-EMB

10. Permit to Operate DENR-EMB


11. DENR issued CCO Importation Certificate
DENR-EMB
(if applicable)
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submits original, 1. Receives/records clients Administrative IV/
complete and compliant application for Cyanide Technical Personnel
documents for Cyanide Endorsement Letter (Biologist II/COS)
Endorsement request as Request for DENR FRMD
per checklist Importation Clearance; None 1 hour 3rd Floor Fisheries
requirements Assess/evaluates client's Building Complex,
submitted documents; and Bureau of Plant Industry
Issuance of initial screening Compound, Visayas
results Ave., Quezon City

131
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

2. Prepares/process Technical Personnel


Cyanide Endorsement (Biologist II/COS)/CEPS
Letter and submits to the Section Head-
Section Head for initial Supervising
Aquaculturist
None None 10 minutes FRMD CEPS
3rd Floor Fisheries
Building Complex,
Bureau of Plant Industry
Compound, Visayas
Ave., Quezon City
3. Reviews and affix initial Chief
to Cyanide Endorsement FRMD Division
Letter 3rd Floor Fisheries
Building Complex,
None None 5 hours
Bureau of Plant Industry
Compound, Visayas
Ave., Diliman, Quezon
City
4. Forwards Cyanide
Administrative IV/
Endorsement Letter to
Technical Personnel
ADRRIE for further review
(Biologist II/COS)
and initial
BFAR FRMD
None None 15 minutes 3rd Floor Fisheries
Building Complex,
Bureau of Plant Industry
Compound, Visayas
Ave., Quezon City
5. Review the documents
forwarded and place initial BFAR Assistant Director
for approval/signature of for Technical Services
the director Office of the Assistant
Director for Research,
Regulations and
International
None None 3 Days
Engagements (ADRRIE)
3rd Floor Fisheries
Building Complex,
Bureau of Plant Industry
Compound, Visayas
Ave., Quezon City

6. Approval and signature


of Cyanide Endorsement BFAR Director
Letter BFAR Director's Office,
3rd Floor Fisheries
Building Complex,
None None 4 hours
Bureau of Plant Industry
Compound, Visayas
Ave., Diliman, Quezon
City

132
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
2. Receives notification 7. Process approved
on the approved/signed Cyanide Endorsement BFAR FRMD
Cyanide Endorsement Letter and notify client on Conservation and
Letter the approved and ready for Environmental Protection
None 10 Minutes
release document Section (CEPS)
Technical Personnel
(Biologist II/COS)

3. Claims/receives the 8. Release the


approved/signed Cyanide approved/signed Cyanide
Endorsement Letter; and Endorsement Letter to
Accomplishes the client for importation Administrative IV/
Citizen/Client Satisfaction clearance; provide Client Aquaculturist II (COS)
Survey Form (BFAR-F- the Citizen/Client BFAR FRMD
01) secured from Guard Satifaction Survey Form 3rd Floor Fisheries
on duty at the loby. (BFAR-F-01); and secures None 5 Minutes Building Complex,
the accomplished Bureau of Plant Industry
Citizen/Client Satisfaction Compound, Visayas
Survey Form (BFAR-F-01) Ave., Diliman, Quezon
City

4 Days,
TOTAL: None 2 Hour, and
40 Minutes

133
VII. LABORATORY TEST REPORT

BFAR-National Fisheries Laboratory Division (NFLD)

1 . Issuance of Laboratory Report of Test for Physico-Chemical, Gross or Microscopic and


Parasitological Exam

The samples for analysis must comply with the sample requirements like volume, quantity and condition of sample for the
analysis requestyed as indicated in the Masterlist of Analysis of the NFLD.

The samples to be submitted must have a complete information or documents aboutr the samples for filling out the Request for
Laboratory Analysis and for traceability purposes.

Office or Division BFAR-National Fisheries Laboratory Division (NFLD)

Classification Simple

Type of Transaction G2C (Government to Citizen) and G2G (Government to Government)

BFAR Regional Office, BFAR-FIQD (Verification), Local Government Office, Exporter, Academe,
Who may avail:
Law Enforcement and Fish Farmers

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. The Samples for Analysis in accordance with the 1. The samples are from Client/Customer
set requirements of sample per analysis in terms of 2. Sample requirements are posted in BFAR Website and can be secure
volume, weight, quantity and condition of sample. at the NFLD Receiving Area.

2. Information of the sample to be submitted Client/Customer

3. Request for Laboratory Analysis (RLA) BFAR-National Fishereies Laboratory Division (NFLD), 860
ARCADIA Bldg., Ground Flr., Quezon Avenue, Q.C. (Receiving counter)

4. Order of Payment BFAR-National Fishereies Laboratory Division (NFLD), 860


ARCADIA Bldg., Ground Flr., Quezon Avenue, Q.C. (Receiving counter)

5. Official Receipt (1 original & 1 duplicate copy)


Designated Cashier Personnel at BFAR-FIQD, Ground Flr. Lobby,
Fisheries Building, BPI Compd., Brgy. Vasra, Visayas Ave., Quezon City

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Fill-up Request for 1. Receive request form
Laboratory Analysis from clients
None 10 Minutes
(RLA) Form
Client/Customer and
2. Submit accomplished 2. Assess submitted Customer Service Officer
form and samples documents and NFLD Office
requirements for analysis Ground Flr.ARCADIA
and issue duplicate copy of None 20 Minutes Bldg., Q.Avenue, Q.C.
RLA and Claim Stub

134
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
3. Secure Order of 3. Issue of Order of Client/Customer and
Payment and pay for Payment Customer Service Officer
necessary fee None 3 Minutes NFLD Office-Ground
Flr.ARCADIA Bldg.,
Q.Avenue, Q.C.
4. Secure duplicate copy 4. Provide the duplicate Client/Customer and
of RLA and claim stub copy of RLA and claim stub Customer Service Officer
None 10 Minutes NFLD Office-Ground
Flr.ARCADIA Bldg.,
Q.Avenue, Q.C.
5. Pay appropriate fee 5. Accept payment and Cashier Personnel
and secure Official issue Official Receipt BFAR-FIQD, G/Flr.
Receipt at the G/Flr., (original and duplicate Lobby, Fisheries
Fisheries Bldg., BPI copy) see below 5 Minutes
Building, BPI Compd.,
Compound, Visayas Brgy. Vasra, Visayas
Ave., Q.C. Ave., Quezon City
6. Conduct Laboratory PER SAMPLE
Analysis a. P 30.00
b. P 100.00
c. P 100.00
d. P 150.00
e. P 180.00
f. P 180.00 1 working day after sample Laboratory Analyst/s /
None
g. P 300.00 receipt Technical Manager
h. P 300.00
i. P 30.00

P 75.00

P 100.00
7. Calculate and record
result of analysis Laboratory Analysis /
None None 1 Hour
Technical Manager

8. Verify results, prepare, Laboratory Analysis /


review and approval of Test Technical Manager /
None Report None 1-2 Working Days Customer Service Officer
/ Section Chief /
Laboratory Manager
6 . Present Claim Stub 9. Release Report of Test
and duplicate copy of Client/Customer and
Official Receipt to claim Customer Service Officer
test report(s)/result(s) None 10 Minutes NFLD Office-Ground
Flr.ARCADIA Bldg.,
Q.Avenue, Q.C.

3 Working Days after


TOTAL:
sample receipt

135
2. Issuance of Laboratory Report of Test for Molecular Diagnostic and Paralytic Shellfish Toxin (PST)
Analysis
The samples for analysis must comply with the sample requirements like volume, quantity and condition of sample for the
analysis requestyed as indicated in the Masterlist of Analysis of the NFLD.
The samples to be submitted must have a complete information or documents aboutr the samples for filling out the Request for
Samples for PST analysis must also submit a Local Transport Permit (LTP) or Auxillary Invoice to where the samples from for
traceability purposes.

Office or Division BFAR-National Fisheries Laboratory Division (NFLD)

Classification Complex
Type of Transaction G2C (Government to Citizen) and G2G (Government to Government)

BFAR Regional Office, BFAR-FIQD (Verification), Local Government Office, Exporter, Academe,
Who may avail:
Feeds Millers and Fish Farmers

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. The Samples for Analysis in accordance with the 1. The samples are from Client/Customer
set requirements of sample per analysis in terms of 2. Sample requirements are posted in BFAR Website and can be secure
volume, weight, quantity and condition of sample. at the NFLD Receiving Area.

2. Information of the sample to be submitted Client/Customer


Client/Customer, BFAR FIQD, BFAR Regioanl Offices, LGU or
3. Local Transport Permit (LTP) or Auxilliary Invoice
Municipal

BFAR-National Fishereies Laboratory Division (NFLD), 860


4. Request for Laboratory Analysis (RLA)
ARCADIA Bldg., Ground Flr., Quezon Avenue, Q.C. (Receiving counter)

BFAR-National Fishereies Laboratory Division (NFLD), 860


5. Order of Payment
ARCADIA Bldg., Ground Flr., Quezon Avenue, Q.C. (Receiving counter)

Designated Cashier Personnel at BFAR-FIQD, Ground Flr. Lobby,


6. Official Receipt (1 original & 1 duplicate copy)
Fisheries Building, BPI Compd., Brgy. Vasra, Visayas Ave., Quezon City

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Fill-up Request for 1. Receive request form Client/Customer and
Laboratory Analysis from clients Customer Service Officer
(RLA) Form None 10 Minutes NFLD Office-Ground
Flr.ARCADIA Bldg.,
Q.Avenue, Q.C.
2. Submit accomplished 2. Assess submitted
Client/Customer and
form and samples documents and
Customer Service Officer
requirements for analysis
None 20 Minutes NFLD Office-Ground
and issue duplicate copy of
Flr.ARCADIA Bldg.,
RLA and Claim Stub
Q.Avenue, Q.C.
3. Secure Order of 3. Issue of Order of Client/Customer and
Payment and pay for Payment Customer Service Officer
necessary fee None 3 Minutes NFLD Office-Ground
Flr.ARCADIA Bldg.,
Q.Avenue, Q.C.

136
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
4. Secure duplicate copy 4. Provide the duplicate Client/Customer and
of RLA and claim stub copy of RLA and claim stub Customer Service Officer
None 10 Minutes NFLD Office-Ground
Flr.ARCADIA Bldg.,
Q.Avenue, Q.C.
5. Pay appropriate fee 5. Accept payment and Cashier Personnel
and secure Official issue Official Receipt FIQD-BFAR New
P 600.00 per
Receipt at the G/Flr., (original and duplicate Building, Brgy. Vasra,
analysis per 5 Minutes
Fisheries Bldg., BPI copy) BPI Compd., Brgy.
sample
Compound, Visayas Vazra, Visayas Ave.,
Ave., Q.C. Quezon City
6. Conduct lab analysis
Laboratory Analyst/s and
3 working days after
Technical Manager
sample receipt
None
7. Calculate and record
Laboratory Analysis /
result of analysis 1 Hour
Technical Manager
8. Verify results, prepare,
Laboratory Analysis /
review and approval of Test
Technical Manager /
Report
None 1-2 Working Days Customer Service Officer
/ Section Chief /
Laboratory Manager
7. Present Claim Stub 9. Release Report of Test
Client/Customer and
and duplicate copy of to client
Customer Service Officer
Official Receipt to claim
None 10 Minutes NFLD Office-Ground
test report(s)/result(s)
Flr.ARCADIA Bldg.,
Q.Avenue, Q.C.

5 Working Days after


TOTAL:
sample receipt

137
3. Issuance of Laboratory Report of Test for Formaldehyde, Cyanide, Amnesic Shellfish Toxin (AST),
pH (chemical analysis for raw material) Analysis and DST

The samples for analysis must comply with the sample requirements like volume, quantity and condition of sample for the
analysis requestyed as indicated in the Masterlist of Analysis of the NFLD.

The samples to be submitted must have a complete information or documents aboutr the samples for filling out the Request for
Laboratory Analysis and for traceability purposes specifically for CYANIDE samples.
Samples for AST and DST analysis must also submit a Local Transport Permit (LTP) or Auxillary Invoice to where the samples
from for traceability purposes.

Office or Division BFAR-National Fisheries Laboratory Division (NFLD)

Classification Complex

Type of Transaction G2C (Government to Citizen) and G2G (Government to Government)

BFAR Regional Office, BFAR-FIQD (Verification), Local Government Office, Exporter, Academe,
Who may avail:
Law Enforcement and Fish Farmers

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. The Samples for Analysis in accordance with the 1. The samples are from Client/Customer
set requirements of sample per analysis in terms of 2. Sample requirements are posted in BFAR Website and can be secure
volume, weight, quantity and condition of sample. at the NFLD Receiving Area.

2. Information of the sample to be submitted Client/Customer or Law Enforcement for CYANIDE

Client/Customer, BFAR FIQD, BFAR Regioanl Offices, LGU or


3. Local Transport Permit (LTP) or Auxilliary Invoice
Municipal

BFAR-National Fishereies Laboratory Division (NFLD), 860


4. Request for Laboratory Analysis (RLA)
ARCADIA Bldg., Ground Flr., Quezon Avenue, Q.C. (Receiving counter)

BFAR-National Fishereies Laboratory Division (NFLD), 860


5. Order of Payment
ARCADIA Bldg., Ground Flr., Quezon Avenue, Q.C. (Receiving counter)

Designated Cashier Personnel at BFAR-FIQD, Ground Flr. Lobby,


6. Official Receipt (1 original & 1 duplicate copy)
Fisheries Building, BPI Compd., Brgy. Vasra, Visayas Ave., Quezon City

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Fill-up Request for 1. Receive request form
Laboratory Analysis from clients Client/Customer and
(RLA) Form Customer Service Officer
None 10 Minutes NFLD Office-Ground
Flr.ARCADIA Bldg.,
Q.Avenue, Q.C.
2. Submit accomplished 2. Assess submitted
form and samples documents and Client/Customer and
requirements for analysis Customer Service Officer
and issue duplicate copy of None 20 Minutes NFLD Office-Ground
RLA and Claim Stub Flr.ARCADIA Bldg.,
Q.Avenue, Q.C.

138
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
3. Secure Order of 3. Issue of Order of Client/Customer and
Payment and pay for Payment Customer Service Officer
necessary fee None 3 Minutes NFLD Office-Ground
Flr.ARCADIA Bldg.,
Q.Avenue, Q.C.
4. Secure duplicate copy 4. Provide the duplicate
of RLA and claim stub copy of RLA and claim stub Client/Customer and
Customer Service Officer
None 10 Minutes NFLD Office-Ground
Flr.ARCADIA Bldg.,
Q.Avenue, Q.C.

5. Pay appropriate fee 5. Accept payment and


Cashier Personnel
and secure Official issue Official Receipt
BFAR-FIQD, G/Flr.
Receipt at the G/Flr., (original and duplicate
Lobby, Fisheries
Fisheries Bldg., BPI copy) None 5 Minutes
Building, BPI Compd.,
Compound, Visayas
Brgy. Vasra, Visayas
Ave., Q.C.
Ave., Quezon City
6. CONDUCT OF PER SAMPLE
ANALYSIS

-Formaldehyde P 250.00

-Cyanide
P 250.00
Laboratory Analyst/s and
-AST 6 working days after
P 2,500.00 Technical Manager
sample receipt
-pH (chemical analysis
for raw materials) P 50.00

-DST For DST


P 3,000.00 per
analysis per
sample
7. Calculate and record
result of analysis
Laboratory Analysis /
None None 1 Hour
Technical Manager

8. Verify results, prepare, Laboratory Analysis /


review and approval of Test Technical Manager /
Report None 1-2 Working Days Customer Service Officer
/ Section Chief /
Laboratory Manager
7. Present Claim Stub 9. Release Report of Test
Client/Customer and
and duplicate copy of
Customer Service Officer
Official Receipt to claim
None 10 Minutes NFLD Office-Ground
test report(s)/result(s)
Flr.ARCADIA Bldg.,
Q.Avenue, Q.C.

7 Working Days after


TOTAL:
sample receipt

139
4. Issuance of Laboratory Report of Test Water Activity (AW), % Salt (NaCl), Moisture, Microbial
Analysis and Bacterial Identification for Finfish
The samples for analysis must comply with the sample requirements like volume, quantity and condition of sample for the
analysis requestyed as indicated in the Masterlist of Analysis of the NFLD.
The samples to be submitted must have a complete information or documents aboutr the samples for filling out the Request for
Laboratory Analysis and for traceability purposes.

Office or Division BFAR-National Fisheries Laboratory Division (NFLD)

Classification Complex

Type of Transaction G2C (Government to Citizen) and G2G (Government to Government)

BFAR Regional Office, BFAR-FIQD (Verification), Local Government Office, Exporter, Academe,Law
Who may avail:
Enforcement, and Fish Farmers

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. The Samples for Analysis in accordance with the 1. The samples are from Client/Customer
set requirements of sample per analysis in terms of 2. Sample requirements are posted in BFAR Website and can be secure
volume, weight, quantity and condition of sample. at the NFLD Receiving Area.

2. Information of the sample to be submitted Client/Customer or Law Enforcement for CYANIDE

3. Request for Laboratory Analysis (RLA) BFAR-National Fishereies Laboratory Division (NFLD), 860
ARCADIA Bldg., Ground Flr., Quezon Avenue, Q.C. (Receiving counter)

4. Order of Payment BFAR-National Fishereies Laboratory Division (NFLD), 860


ARCADIA Bldg., Ground Flr., Quezon Avenue, Q.C. (Receiving counter)

5. Official Receipt (1 original & 1 duplicate copy)


Designated Cashier Personnel at BFAR-FIQD, Ground Flr. Lobby,
Fisheries Building, BPI Compd., Brgy. Vasra, Visayas Ave., Q.C.

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Fill-up Request for 1. Receive request form Client/Customer and
Laboratory Analysis from clients Customer Service Officer
(RLA) Form None 10 Minutes NFLD Office-Ground
Flr.ARCADIA Bldg.,
Q.Avenue, Q.C.
2. Submit accomplished 2. Assess submitted
form and samples documents and Client/Customer and
requirements for analysis Customer Service Officer
and issue duplicate copy of None 20 Minutes NFLD Office-Ground
RLA and Claim Stub Flr.ARCADIA Bldg.,
Q.Avenue, Q.C.

140
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
3. Secure Order of 3. Issue of Order of Client/Customer and
Payment and pay for Payment Customer Service Officer
necessary fee None 3 Minutes NFLD Office-Ground
Flr.ARCADIA Bldg.,
Q.Avenue, Q.C.
4. Secure duplicate copy 4. Provide the duplicate Client/Customer and
of RLA and claim stub copy of RLA and claim stub Customer Service Officer
None 10 Minutes NFLD Office-Ground
Flr.ARCADIA Bldg.,
Q.Avenue, Q.C.
5. Pay appropriate fee 5. Accept payment and Cashier Personnel
and secure Official issue Official Receipt BFAR-FIQD, G/Flr.
Receipt at the G/Flr., (original and duplicate Lobby, Fisheries
None 5 Minutes
Fisheries Bldg., BPI copy) Building, BPI Compd.,
Compound, Visayas Brgy. Vasra, Visayas
Ave., Q.C. Ave., Quezon City
6. Conduct laboratory PER SAMPLE
analysis

P 75.00

P 160.00

P 85.00

a. P 200.00 8 working days after Laboratory Analyst/s and


b. P 300.00 sample receipt Technical Manager
c. P 250.00
d. P 250.00

e. P 350.00
f. P 400.00
g. P 400.00
h. P 400.00
i. P350.00

7. Calculate and record


Laboratory Analysis /
result of analysis None 1 Hour
Technical Manager
8. Verify results, prepare, Laboratory Analysis /
review and approval of Test Technical Manager /
Report None 1-2 Working Days Customer Service Officer
/ Section Chief /
Laboratory Manager
7. Present Claim Stub 9. Release Report of Test Client/Customer and
and duplicate copy of Customer Service Officer
Official Receipt to claim None 10 Minutes NFLD Office-Ground
test report(s)/result(s) Flr.ARCADIA Bldg.,
Q.Avenue, Q.C.

10 Working Days after


TOTAL:
sample receipt

141
5. Issuance of Laboratory Report of Test for Brevetoxin, Ciguatera, Antibiotic Residue (CAP, AOZ,
AMOZ and Aflatoxin), Histamine, Heavy Metals (Lead, Cadmium and Mercury) Analysis and
Histopathology
The samples for analysis must comply with the sample requirements like volume, quantity and condition of sample for the
analysis requestyed as indicated in the Masterlist of Analysis of the NFLD.

The samples to be submitted must have a complete information or documents aboutr the samples for filling out the Request for
Laboratory Analysis and for traceability purposes specifically for CYANIDE samples.
Samples for Brevetoxin, Ciguatera and Antibiotic Residue (CAP, AOZ and AMOZ) analysis for live exporters or samples from
wild caught must also submit a Local Transport Permit (LTP) or Auxillary Invoice to where the samples from for traceability
purposes.

Office or Division BFAR-National Fisheries Laboratory Division (NFLD)

Classification Complex

Type of Transaction G2C (Government to Citizen) and G2G (Government to Government)

BFAR Regional Office, BFAR-FIQD (Verification), Local Government Office, Exporter, Academe,
Who may avail:
Feeds Millers and Fish Farmers

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. The Samples for Analysis in accordance with the 1. The samples are from Client/Customer
set requirements of sample per analysis in terms of 2. Sample requirements are posted in BFAR Website and can be secure
volume, weight, quantity and condition of sample. at the NFLD Receiving Area.

2. Information of the sample to be submitted Client/Customer or Law Enforcement for CYANIDE

Client/Customer, BFAR FIQD, BFAR Regioanl Offices, LGU or


3. Local Transport Permit (LTP) or Auxilliary Invoice
Municipal

BFAR-National Fishereies Laboratory Division (NFLD), 860


4. Request for Laboratory Analysis (RLA)
ARCADIA Bldg., Ground Flr., Quezon Avenue, Q.C. (Receiving counter)

BFAR-National Fishereies Laboratory Division (NFLD), 860


5. Order of Payment
ARCADIA Bldg., Ground Flr., Quezon Avenue, Q.C. (Receiving counter)

Designated Cashier Personnel at BFAR-FIQD, Ground Flr. Lobby,


6. Official Receipt (1 original & 1 duplicate copy)
Fisheries Building, BPI Compd., Brgy. Vasra, Visayas Ave., Quezon City

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Secure and fill-up 1. Provide RLA Form and
Request for Laboratory Receive filled-up RLA form
Analysis (RLA) Form from clients Client/Customer and
Customer Service Officer
None 10 Minutes NFLD Office-Ground
Flr.ARCADIA Bldg.,
Q.Avenue, Q.C.

142
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
2. Submit accomplished 2. Assess submitted Client/Customer and
form and samples documents and Customer Service Officer
requirements for analysis None 20 Minutes NFLD Office-Ground
and issue duplicate copy of Flr.ARCADIA Bldg.,
RLA and Claim Stub Q.Avenue, Q.C.
3. Secure Order of 3. Issue of Order of
Payment and pay for Payment Client/Customer and
necessary fee Customer Service Officer
None 3 Minutes NFLD Office-Ground
Flr.ARCADIA Bldg.,
Q.Avenue, Q.C.

4. Secure duplicate copy 4. Provide the duplicate Client/Customer and


of RLA and claim stub copy of RLA and claim stub Customer Service Officer
None 10 Minutes NFLD Office-Ground
Flr.ARCADIA Bldg.,
Q.Avenue, Q.C.
5. Pay appropriate fee 5. Accept payment and
Cashier Personnel
and secure Official issue Official Receipt
BFAR-FIQD, G/Flr.
Receipt at the G/Flr., (original and duplicate
Lobby, Fisheries
Fisheries Bldg., BPI copy) None 5 Minutes
Building, BPI Compd.,
Compound, Visayas
Brgy. Vasra, Visayas
Ave., Q.C.
Ave., Quezon City
6. Conduct Laboratory PER SAMPL
Analysis 13 working days after
P 4,500.00
completion of the required
a. P 1,000.00
b. P 1,000.00 number of samples per
c. P 1,000.00 filter plate for Brevetoxin
d. P 1,000.00 and Ciguatera;

P 450.00 13 working days after Laboratory Analyst/s and


None
a. P 1,200.00 sample preparation for Technical Manager
b. P 1,200.00 Antibiotic Residues;
c. P 1,200.00
13 working days after
P 500.00 sample receipt for
Histopathology, Histamine
and Heavy Metals

6. Calculate and record


result of analysis

Laboratory Analysis /
None None 1 Hour
Technical Manager

143
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
7. Verify results, prepare, Laboratory Analysis /
review and approval of Test Technical Manager /
None Report None 1-2 Working Days Customer Service Officer
/ Section Chief /
Laboratory Manager
7. Present Claim Stub 8. Release Report of Test Client/Customer and
and duplicate copy of Customer Service Officer
Official Receipt to claim None 10 Minutes NFLD Office-Ground
test report(s)/result(s) Flr.ARCADIA Bldg.,
Quezon Avenue, Q.C.

15 WORKING DAYS AFTER after completion of


the required number of samples per filter plate for
Brevetoxin and Ciguatera;
TOTAL:
15 WORKING DAYS AFTER SAMPLE
PREPARATION FOR ANTIBIOTIC RESIDUES,
HISTOPATHOLOGY, HISTAMINE AND HEAVY
METALS;

15 WORKING DAYS AFTER after completion of the required number of samples per filter plate for Brevetoxin and Ciguatera;

15 WORKING DAYS AFTER SAMPLE PREPARATION FOR ANTIBIOTIC RESIDUES, HISTOPATHOLOGY, HISTAMINE AND HEAVY
METALS;

144
FEEDBACK AND COMPLAINTS MECHANISMS

A. For walk-in Clients: (in 3 easy step)

1. Where to get the Citizen/Client Satisfaction Survey Form: Guard on post/podium or at ARTU
Office located at the Ground Floor Lobby, Fisheries Complex Bldg., BPI Compound, Visayas Ave.,
Q.C.
2. When to accomplish the form: After rendition of goods and/or service by the appropriate office,
the office will then be rated accordingly by the client using the form.
3. Where to submit the accomplished form: The client may drop the same at the drop-box near the
guard on post at the ground floor lobby.

B. On goods and/or projects and programs rendered outside the office:


Where to get the Client Satisfaction Survey Form: From the program/project/office implementer,
usually given after the delivery of goods or the conduct of activity (livelihood assistance, technical
assistance, workshops, trainings or other related field activity where stakeholders are involved).

When to accomplish the form: The client/beneficiary/stakeholder is given time to observe the quality
How to send a feedback of goods delivered and/or the effectiveness of the activity undertaken. After the lapse of five (5)
months from the date of delivery or activity, the client accomplishes the form given.

Where and How to submit the accomplished form: Through ordinary mail, email or personal delivery
to the program/project/office implementer. The latter in turn submits the same to the Fisheries
Planning and Economics Division (FPED) for evaluation and assessment.

C. Through official website and social media account


Where and How to get the Client Feedback Form thru
Website: https://www.bfar.da.gov.ph/ by clicking and answering the specially designed client
feedback widget.

Facebook: https://www.facebook.com/BFAR.Central/
After the client’s inquiry has been answered, the client will be provided a feedback form

Except for letter b hereunder, all feedbacks are collected every FRIDAY by the following offices:

a. For walk-in clients – Anti-Red Tape Unit (ARTU)- Administrative Division;


b. For goods, projects or programs of the Bureau - will be collected by the project/program
implementer or the office who delivered the goods then submits the same to the Fisheries Planning
and Economics Division (FPED) for assessment and evaluation;
How feedback is c. BFAR website: Fisheries Information Management Section (FIMS)
processed d. BFAR social media: Information and Fisherfolk Coordination Unit (IFCU)

Feedback requiring answers will be forwarded to the appropriate offices, by the above-mentioned
offices and they are required to relay their answer to the client within three (3) days from receipt of
the feedback, copy furnish the office.
Negative feedbacks, which do not affect policies, processes or established rules, are immediately
brought to the concerned office for their appropriate action.

Meanwhile, feedbacks which affects policies, processes or established rules, are discussed during
the Quality Management System (QMS) management review or during Management Committee
Meeting (ManCom)

145
FEEDBACK AND COMPLAINTS MECHANISMS
The above-mentioned offices are required to make an annual report containing the summary of the
feedbacks collected. The same will be reported during the QMS Management Review
How feedback is
processed All offices will be furnished the client assessment and evaluation report by the above-mentioned
offices

a. For complaint involving disciplinary and non-disciplinary actions against civil service official or
employee, the complaint must comply with the form required under the Revised Rules on
Administrative Cases in the Civil Service (RRACCS) .
How to file a complaint
b. For other complaints, the client will be requested to proceed with the Anti-Red Tape Unit (ARTU)
located at the Ground Floor Lobby, Fisheries Bldg., BPI Compound, Visayas Ave., Q.C. thru the
designated Complaint Officer to fill up a Client Complaint Form. Upon completion, it will be dropped
at the drop-box located at the Guard podium at the Fisheries building lobby.

a. For complaint involving disciplinary and non-disciplinary actions against civil service official or
employee, the complaint will be processed in accordance with the Revised Rules on Administrative
Cases in the Civil Service (RRACCS) .

b. For other complaints, the complaints officer assigned in the Anti-Red Tape Unit-(ARTU) opens the
complaints drop box on a weekly basis and evaluates each complaint.
How complaints are
Upon evaluation, the Complaints Officer shall start the investigation and forward the complaint to the
processed
relevant office for their explanation.The Complaints Officer will make a report after the investigation
and shall submit it to the Head of Agency for appropriate action.

The client will be informed, in writing, of the action taken by the management and its results.
c. A yearly report containing the summary of client complaints will discussed during the QMS
Management Review

ARTA: complaints @arta.gov.ph


1-ARTA (2782)
Contact Information of
PCC : 8888
CCB, PCC, ARTA
CCB : 0908-881-6565 (SMS)
Anti-Red Tape Unit (ARTU) : 8-294-3620

146
LIST OF OFFICES

Main Office Address Contact Information

Head/Main Office:
3rd Floor, Fisheries Building Complex, BPI Fisheries Bldg., Tel No. +63(2)8929-9597; 8929-
DIRECTOR'S OFFICE Compound, Visayas Avenue, Quezon City 8074

FRONTLINE SERVICES: External Service


FISHERIES Assigned contact number is still on process due to the
INSPECTION & Ground Floor, Fisheries Building Complex, recent transfer of location from the previous office
QUARANTINE DIVISION BPI Compound, Visayas Avenue, Quezon City location at PCA, Elliptical Road to Fisheries Bldg.,
(FIQD) BPI Compound, Visayas Avenue
FISHERIES Assigned contact number is still on process due to the
REGULATORY & Ground Floor, Fisheries Building Complex, recent transfer of location from the previous office
LICENSING DIVISION BPI Compound, Visayas Avenue, Quezon City location at PCA, Elliptical Road to Fisheries Bldg.,
(FRLD) BPI Compound, Visayas Avenue
Assigned contact number is still on process due to the
FISHERIES RESOURCE
3rd Floor, Fisheries Building Complex, BPI recent transfer of location from the previous office
MANAGEMENT
Compound, Visayas Avenue, Quezon City location at PCA, Elliptical Road to Fisheries Bldg.,
DIVISION (FRMD)
BPI Compound, Visayas Avenue

NATIONAL FISHERIES
860 ARCADIA Building, Quezon Avenue,
LABORATORY BFAR- ARCADIA - Tel. No. (2) 8-3732894
Quezon City
DIVISION (NFLD)

TECHNICAL SERVICES: External Service (Frontline)

BFAR NATIONAL CENTERS


National Freshwater
Fisheries Technology CLSU Cmpd. Science City of Nueva Ecija Tel No. (44) 456-06-70; 456-02-41
Center (NFFTC)

National Inland Fisheries


Technology Center 51 KM Manila East Road, Sauyoc Tanay Rizal Contact No. 0917-133-9451 (Mobile Number)
(NIFTC)

National Marine Fisheries Tel No. (046) 524-20-61


Development Center Naval Base, Ave. Sangley Point Cavite City loc. 4420
(NMFDC)

National Integrated
Fisheries Technology Tel No. (075) 653-03-25; 653-03-85
Binloc Dagupan City
Development Center
(NIFTDC)

National Brackishwater
Fisheries Technology Sitio Iringan Palsabangon Pagbilao, Quezon Tel No. (+63) 9174251027
Center (NBFTC)

National Seaweeds
Technology and
Cabid-an Sorsogon Tel No. 9391258448
Development Center
(NSTDC)

147
CERTIFICATE OF COMPLIANCE

148
149
BUREAU OF FISHERIES AND AQUATIC RESOURCES

INTERNAL SERVICES
(TECHNICAL AND ADMINISTRATIVE)

PART II

CITIZEN'S CHARTER
CY-2022 (2nd Edition)

150
TECHNICAL SERVICES
Page Number

I. Capture Fisheries Division (CFD)


1. Policy Formulation (Fisheries Administrative Order (FAO) 156
2. Request for Technical Assistance for Site Survey, Construction and 161
3. Technical Assistance for Fisheries Management Areas (FMA) 164

II. Fisheries Resources Management Division (FRMD) -


1. Technical Assistance on the Conduct of Rapid Resource Assessment 166
2. Technical Assistance for Walk-in Clients 168
3. Request for Fishing Boat Registration (BOAT-R) and Fisherfolk Registration (FISH-R) Data 169

III. Inland Fisheries and Aquaculture Division (IFAD)


1. On-Site Water Quality Test and Pond Side Disease Detection of Cultured Species TWG/Task 171
2. Field Monitoring and Evaluation of Maturation, Breeding, Spawning, and Larval Rearing of 172
3. Technical Assistance thru Letter Request (Information Education and Communication (IEC)
Materials, Available Data/ References, Resource Person, TWG/Task Force Membership 173

4. Technical Assistance thru Letter Request/Memorandum (Technical Inputs/ Comments) 175


5. Technical Assistance thru Telephone Inquiry 176
6. Technical Assistance thru Walk-in Clients 177

IV. Fisheries Post-Harvest Technology Division (FPHTD)


1. Letter Request for Assistance/Conduct (Technology Demonstration, Lecture, Field Visit, and 178
2. Technical Assistance thru Letter Request (Information Education and Communication (IEC)
181
Materials, Available Data/ References, Resource Person, TWG/Task Force Membership, On-the-Job
Trainees Schedule)
3. Technical Assistance thru Letter Request/ Memorandum (Technical Inputs/ Comments)
184
4. Technical Assistance thru Telephone Inquiry 186
5. Technical Assistance thru Walk-in Clients 187

V. Fisheries Industry Development Support and Services Division (FIDSSD)


1. Technical Assistance thru Walk-in Clients 188
2. Technical Assistance thru Telephone, and SMS Inquiry 191
3. Technical Assistance thru Letter / Email 192
4. Technical Assistance - Fisheries Market Matching (Reactionary) 194

151
ADMINISTRATIVE SERVICES
Page Number
Director’s Office (DO)

I. Office for Special Concerns (OSC)


1. Inquiry and Application for the FSP-Nationwide Qualifying Examination (Face-to-face) 196
2. Online Recruitment and Application for FSP-NQE 197
3. Preliminary activities before FSP-NQE 199
4. Pre-Administration of the FSP-Nationwide Qualifying Examination 200
5. Administration of the FSP-Nationwide Qualifying Examination 202
6. Checking, Scoring, Encoding, Ranking and Releasing of FSP-NQE results 205

II. Legal Division


1. Fact-finding Investigation 207
2. Review of Contracts and Policies and Rendering of Legal Opinion 209
3. Drafting of COA Replies, Appeals and Petitions 210
4. Legal Assistance to the Prosecution of Criminal Cases 211
5. Adjudication of Administrative Cases 212

6. Drafting a recommendation to the Secretary of Agriculture for the cancellation of a Fishpond 214
Lease Agreement (FLA) due to the non-compliance of the terms and conditions of the FLA
7. Drafting a recommendation to the Secretary of Agriculture for the cancellation of Abandoned
216
or Underdeveloped FLA areas

Adjudication Committee
1. Approval of Settlement Offers 219
2. Resolution of Fisheries Adjudicative Cases 220
3. Resolution of Fisheries Administrative Cases 222

Fisheries Protection and Law Enforcement Group (FPLEG)


1. Technical Assistance for Fisheries Administrative Cases with Probable Cause 224
2. Technical Assistance for Fisheries Administrative Cases without Probable Cause 226

National Fisheries and Aquatic Reseouces Management Council (NFARMC)


1. Deliberation of the proposed Fisheries Administrative Order (FAOs) and other Fisheries 227

III. Information and Fisherfolk Coordination Unit (IFCU) (Information and Public
Relations Group)
1. Provision of Information, Education and Communication (IEC) Materials 230
2. Responding to Inquiries (Walk-in) 231
3. Responding to Inquiries through Internet 232
4. Facilitating Interview Request through Internet 233
5. Facilitating Interview Request (Walk-in) 235
6. Provision of Message/Speech/Presentation of BFAR Key Official(s) 237

IFCU - Library Section


1. Borrowing of Books and other Reference Materials 239
2. Inter-Library Loan Services 241
3. Inquiry Assistance through Telephone Calls, E-mails and Registered mail 242
4. Provide Request of BFAR Technology Publication for Information Dissemination for walk in 244
5. Request for Photocopying / Reproduction of Reference Materials 245
6. Request for Signing of Clearance for Leave, Retirement, Transfer of Office / Work 247
7. Issuance of Official Receipt for Payment of Fishpond Rentals, Application, License, Cash 248

152
Page Number
IV. ADMINISTRATIVE SERVICES:

A. Human Resource Management (HRMS)


1. BFAR Employees Scholarship Program and Civil Service Commission (CSC) 249
2. BFAR Learning and Development ( L & D) In-house Training (Phase 1- IDP Analysis) 252
3. BFAR Learning and Development ( L & D) In-house Training (Phase 2- Conduct of Training) 253
4. Procesing of Daily Time Record (DTR) 254
5. Local and International Scholarship/Training 256
6. Processing of Terminal Leave Benefits for Retirees in the Central Office 258
7. Processing of Terminal Leave Benefits for Retirees in the Regional Office 261
8. Processing of Salary (Permanent and Casual) 264
9. Processing of Request for Official Travel Authority (Abroad) 267
10. Recruitment, Selection and Placement Process 269
11. Rewards and Recognition of Qualified Employees and Officials 273
12. Strategic Performance Management System (SPMS) Process 275
13. Processing of Leave Application 277

HRMS-Public Assistance Counter (ARTU)


1. Technical Assistance for Walk-in Clients 278
2. Procedure in Handling Complaints or Negative Feedback 279

BFAR Medical Clinic


1. Evaluation of Health status and COVID-19 risk daily 281
2. Administrative of First Aid Treatment to Internal and External Clients 282

B. Records Section
1. Disposal of Valueless Records 283
2. Lending of Fishpond Lease Agreement (FLA) and Commercial Fishing Vessel and Gear 286
3. Issuance of Certified Photocopy of Fishpond Lease Agreement (FLA) and Commercial Fishing 287

4. Mailing of Official Document 289


5. Releasing of documents through Messengerial Service 291
6. Issuance of Certified Photocopy of Fishpond Lease Agreement (FLA) and Commercial Fishing 292

C. Property & Inventory Section


1. Issuance of Approved Purchase Order for Commercial Suppliers ensures that only those 293
2. Stability, orderliness, proper stacking of supplies, materials, and equipment ensures protection 296
3. Purchase, storage, and issuance of common-use supplies and materials from DBM- 298
4. The issuance of the Waste Material Report ensures that all waste materials previously taken 299
5. The issuance of Clearance from Property Accountability/ies ensures compliance to COA 300
6. The issuance of Property Acknowledgment Receipt (PAR) for Newly-Acquired Property, Plant, 301
7. The issuance of Property Acknowledgment Receipt (PAR) for Transferred PPE ensures that 302
8. The issuance of Inventory Custodian Slip (ICS) for Newly-Acquired and Transferred 303
9. The issuance of Request for Dropping from Books of Account Due to Loss of Property ensures 304
10. The issuance of Request for Dropping from Books of Account Due to Transfer of Property 305
11. The issuance of the Request for Booking to Books of Account Due to Donation or Transfer by 306
12. The issuance of Gate Pass for Bringing Out Property ensures that the property is properly 307

D. General Services Section (GSS)


1. Maintenance and Repair of Vehicles 308
2. Maintenance of Utilities and Equipment 309
3. Processing of Payment for Utilities and Fuel Consumptions 310
4. Provision of Accomodation of BFAR Dormitory 311
5. Vehicle Dispatching 312

153
Page Number
E. Cashier Section
A. EXTERNAL
1. Issuance of Official Receipt 313
2. Issuance of Check Re: Payment for External Providers 314
3. Releasing of Checks 315

B. INTERNAL
1. Payment of Salary for Permanent Employees and other remuneration 316
2. Payment of Salary for Contract Of Service Personnel 317

V. Finance and Management Division (FMD)


1. Transfer of Cash Allocation to Regional Offices (Notice of Transfer Allocation) 318
2. Recognition of Obligations 319
3. Issuance of Order of Payment for Collections and Deposits 320
4. Transfer of Allotment to Regional Offices (Advice of Sub-Allotment) 321
5. Issuance of Certificate of Payment for Remittances 322

VI. Fisheries Planning and Economic Division (FPED)

A. EXTERNAL
1. Consolidation, Analysis and Reporting of CFLC Project 323
2. Provision of Technical Assistance to Walk-in Clients and Telephone Inquiries 324
3. Evaluation, Analysis and Consolidation of BFAR Accomplishments 326
4. Gathering, Preparation and Processing of Fisheries Data/Statistics 328
B. INTERNAL
1. Receiving, Recording, Processing and Sending-Out of Travel Orders, Purchase Requests 330
2. Procurement Requests (PR) Evaluation 332

Fisheries Information Management Section (FIMS)


(INTERNAL)
1. Technical Assistance for Clients 333

VII. Bids and Awards Committee (BAC)

I. PROCUREMENT UNDER PUBLIC BIDDING

A. EXTERNAL
1. Procurement under Public Bidding for Goods 335
2. Procurement under Public Bidding for Infrastructure 343
3. Consultancy Services under Public Bidding 353
4. Procurement under Repeat Order 365
5. Procurement under Negotiated Procurement (Two-Failed Biddings) 368

B. INTERNAL
1. Procurement under Public Bidding for Goods 378
2. Procurement under Public Bidding for Infrastructure 386
3. Consultancy Services under Public Bidding 394
4. Procurement under Repeat Order 403
5. Public Bidding under Negotiated Procurement (Two-Failed Biddings) 406

154
II. ALTERNATIVE MODE OF PROCUREMENT

A. INTERNAL
1. Alternative Mode of Procurement Under Small Value 417
2. Alternative Mode of Procurement Under Lease of Real Property/Venue 420
3. Alternative Mode of Procurement Under Shopping 422
4. Alternative Mode of Procurement Under Direct Contracting 424
5. Alternative Mode of Procurement Under Agency to Agency 426
6. Alternative Mode of Procurement Under Emergency Cases 429
7. Alternative Mode of Procurement Under Scientific, Scholarly or Artistic Work, 432
8. Alternative Mode of Procurement Under Consultancy Services 434

B. EXTERNAL
1. Alternative Mode of Procurement Under Small Value 437
2. Alternative Mode of Procurement Under Lease of Real Property/Venue 438
3. Alternative Mode of Procurement Under Shopping 440

155
TECHNICAL SERVICES

BFAR-Capture Fisheries Division (CFD)

1. Policy Formulation (Fisheries Administrative Order (FAO))


Based on Rule 65.2 of the RA 10654, the Rules and Regulation shall be based on scientific studies and the affected regions
should attend the consultations for them to participate in the discussion and have a chance to provide their comments and/or
suggestions. Proposed regulation/policy should be available in public prior to consultation.

Office or Division BFAR-Capture Fisheries Division (CFD)

Classification Highly Technical

Type of Transaction G2G (Government to Government) / G2C (Government to Citizen) / G2B (Government to Business)

Various Stakeholders from Capture Fisheries Sector (Local


Government Office, Fisherfolks, Fishing Industry, Academe, Non-Governmental Organizations
Who may avail:
(NGOs), National Government Agencies (NGAs), Indigenous People (IPs), Local Government Unit
(LGU) and BFAR- Regional Offices)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Request for Formulation/Amendment of Fisheries Client/Requesting Party


Administrative Order (FAO)

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit request for the 1. Receive and review the
formulation or request
amendment of Fisheries
Administrative Order
(FAO) to the Capture
Fisheries Division (CFD), None
2nd Flr., Fisheries Bldg.,

Concerned Staff
5 days BFAR-Capture
1.1 Draft propose FAO (this Fisheries Division
includes research for (CFD)
technical studies, science- 2nd Flr., Fisheries Bldg.,
based data, etc.) Complex, BPI
None None Compound, Brgy. Vasra,
Visayas Ave., Quezon
City

1.2 Schedule the conduct


of consultation with the
concerned technical
None personnel and Regional None 5 days
Directors

156
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
2. Attend the scheduled 1.3 Conduct of the
consultation consultation with concerned
(national/regional national/regional technical
technical and Regional personnel and Regional
Directors) Directors in accordance None
with Rule 65.2 of RA
10654*
5 days

1.4 Finalize the drafted


FAO
None None Concerned Staff, BFAR-
Capture Fisheries
Division (CFD), 2nd Flr.,
1.5 Schedule the conduct
Fisheries Bldg.,
of consultation with the
None None Complex, BPI
institutions/sector involved
Compound, Brgy. Vasra,
Visayas Ave., Quezon
3. Attend the scheduled 1.6 Conduct of the City
consultation consultation with the
(institutions/sectoral) (3 institutions/sectors involved
None
Cluster) (3 cluster consultations) 40 days

1.7 Revise the first drafted


FAO incorporating inputs
from the 2 consultation
None conducted None

1.8 Submit the revised


drafted FAO to Legal Concerned Staff
Division for initial review BFAR-Capture
None None 5 minutes
Fisheries Division
(CFD)

2. Review/Evaluate the 1st


drafted FAO (format, legal
None and technical concerns) None
BFAR Legal Division
2nd Flr., Fisheries Bldg.
Complex, BPI
2.1 Return the drafted FAO 5 days
Compound, Brgy. Vasra,
to Capture Fisheries Visayas Ave., Quezon
Division for further City
None None
comments and additional
inputs/revisions

3. Finalize the drafted FAO Concerned Staff


and submit to Legal BFAR-Capture
None Division for further None 1 day
Fisheries Division
review/comments (CFD)
4. Endorse the final drafted
FAO to the BFAR Director BFAR Legal Division,
None for review/evaluation None 10 minutes 2nd Flr., Fisheries Bldg.,
BPI Compound

157
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
5. Review/Evaluate the
None drafted FAO None
BFAR Director
5.1 Endorse the final
Office of the Director
drafted FAO to the USEC
3rd Flr., Fisheries Bldg.
for Fisheries/Chairman of
3 days Complex, BPI
the NFARMC for review
Compound, Brgy. Vasra,
None (copy furnished the None Visayas Ave., Quezon
NFARMC Secretariat for
City
the scheduled
deliberation/conference)

6. Coordinate on the
confirmation of attendance Concerned Staff
on the final scheduled BFAR-Capture
meeting/conference with
Fisheries Division
the NFARMC
(CFD)
None None * 10 days 2nd Flr., Fisheries Bldg.,
*(Preparation of NFARMC
Complex, BPI
meeting/conference will
Compound, Brgy. Vasra,
take 10 days based on the
Visayas Ave., Quezon
guidelines approved)
City

3. Attend and participate 7. Attend and participate on NFARMC


on the deliberation the deliberation NFARMC Office
2nd Flr.,BFAR Annex
Bldg.,BPI Compound,
Brgy. Vasra, Visayas
None 1 day Avenue, Quezon City &

Concerned Staff
BFAR-Capture
Fisheries Division
(CFD)
8. Review and revise the
drafted FAO taking into Concerned Staff
consideration the outputs BFAR-Capture
None from the NFARMC None 1 day
Fisheries Division
deliberation (CFD),
2nd Flr., Fisheries Bldg.,
8.1 Forward the drafted Complex, BPI
FAO to Legal Division for Compound, Brgy. Vasra,
None review None 5 minutes Visayas Ave., Quezon
City

9. Review the drafted FAO


(format, legal, technical
None concerns) None BFAR Legal Division
2nd Flr., Fisheries Bldg.
Complex, BPI
9.1 Return to Capture 5 days
Compound, Brgy. Vasra,
Fisheries Division (CFD) Visayas Ave., Quezon
None for final revision None City

158
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
10. Receive and finalize the Concerned Staff
drafted FAO from Legal BFAR-Capture
and return back to Legal Fisheries Division
Division for final review (CFD)
None None 1 day 2nd Flr., Fisheries Bldg.,
Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Q.C.

11. Review and endorse


the drafted FAO to the BFAR Legal Division
Director for final evaluation 2nd Flr., Fisheries Bldg.
Complex, BPI
None None 10 minutes
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City

12. Review/Evaluate the


final drafted FAO BFAR Director
Office of the Director
3rd Flr., Fisheries Bldg.
None None 3 days Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City

12.1 Endorse the reviewed BFAR Director


and final drafted FAO to the Office of the Director
USEC for 3rd Flr., Fisheries Bldg.
None Fisheries/Chairman of None 10 minutes Complex, BPI
NFARMC for final review Compound, Brgy. Vasra,
Visayas Ave., Quezon
City
13. Evaluate FAO and Undersecretary for
recommend/endorse to the Fisheries
Office of the Secretary for Office of the
signature/approval Undersecretary
None None 3 days
3rd Flr., Fisheries Bldg.
Complex, Brgy. Vasra,
Visayas Ave., Quezon
City
14. Evaluate/ Review and DA Secretary
approve/sign the FAO Office of the Secretary
Department of
None None 15 days
Agriculture, Elliptical
Road, Diliman, Quezon
City
15. Forward to BFAR Concerned Staff
Records the approved FAO BFAR-Capture
for appropriate actions Fisheries Division
(CFD)
None None 5 minutes 2nd Flr., Fisheries Bldg.,
Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City

159
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
16. Facilitate the
processing of the approved
FAO by placing the BFAR Records Section
appropriate number Ground Flr., Fisheries
Bldg. Complex, BPI
None None 15 minutes
Compound, Brgy., Vasra,
Visayas Avenue, Quezon
City

17. Publish the approved Concerned Staff


FAO to Official gazette, to BFAR-Capture
atleast two (2) news Fisheries Division
paper/circulation and (CFD)
None uploaded to DA-BFAR None 5 days
2nd Flr., Fisheries Bldg.,
website Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City
TOTAL: 103 days and 1 hour

* RA 10654- AN ACT TO PREVENT, DETER AND ELIMINATE ILLEGAL, UNREPORTED AND UNREGULATED FISHING, AMENDING
REPUBLIC ACT NO. 8550, OTHERWISE KNOWN AS "THE PHILIPPINE FISHERIES CODE OF 1998," AND FOR OTHER PURPOSES
RULE 65.2- FORMULATION OF RULES AND REGULATIONS

160
2. Request for Technical Assistance for Site Survey, Construction and
Installation of Lambaklad (Set Net)

Lambaklad project helps the community to their livelihood, provides a regular source of extra income, and additional
employment opportunities to the fisherfolks. Better quality of fish supply will increase with lesser lives risk considering that it is a
coastal type of fishing. Also, it increases trade with other communities and the other economic activities will generate more
revenue to the community and the government.

Office or Division BFAR-Capture Fisheries Division (CFD)

Classification Complex

Type of Transaction G2G (Government to Government) / G2C (Government to Citizen)

Cooperatives or Fisherfolk Association registered with the Local


Who may avail:
Government Unit (LGU)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE


1. Request Letter or Proposal from the Cooperatives
or Fisherfolk Association Registered Cooperatives or Fisherfolk Association

2. Endorsement Letter from the Local Gov't Unit


Local Government Unit (LGU)
(LGU)

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit request 1. Receive and review
letter/proposal with request then forward to
endorsement from the BFAR-Capture Fisheries
LGU/BFAR-RFOs to the Division for appropriate Admin Staff
Office of the BFAR action Office of the Director
Director, 3rd Flr., 3rd Flr., Fisheries Bldg.
Fisheries Bldg. Complex, None 5 Minutes Complex, BPI
BPI Compound, Brgy. Compound, Brgy. Vasra,
Vasra, Visayas Ave., Visayas Ave., Quezon
Quezon City City

2. Receive
request/proposal and
evaluate the request by
conducting table study of Concerned
the site, design, and Staff/Lambaklad Focal
technical considerations Person/Division Chief
BFAR-Capture
Fisheries Division
None None 2 Hours (CFD)
2nd Flr., Fisheries Bldg.,
Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Q.C.

161
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
2.1 Prepare initial findings
and draft response to client
None on actions to be taken None 2 Hours
Concerned
Staff/Lambaklad Focal
2.2 Facilitate approval of
Person/Division Chief
the CFD Chief and
BFAR-Capture Fisheries
None signature of the Director on None 2 Hours Division (CFD)
the requested technical
2nd Flr., Fisheries Bldg.,
assistance
Complex, BPI
2. Receive the letter 2.3 Coordinate with the Compound, Brgy. Vasra,
response and concerned RFO, LGU and Visayas Ave., Quezon
agreed/confirmed on the inform the client on the City
schedule of on-site scheduled site survey visit None 2 Hours
visit/validation survey and advise also on the
necessary data needed for
the on-site visit
3. Accompany the CFD 2.4 Conduct Site Survey Concerned
Technical Staff during the (determine/plot project Staff/Lambaklad Focal
on-site visit/validation deployment location and Person/Division Chief
survey design using standard BFAR-Capture
protocols and criterias) Fisheries Division
None 4 Hours (CFD)
2nd Flr., Fisheries Bldg.,
Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Q.C.

2.5 Plan-out site Concerned


installation, design, Staff/Lambaklad Focal
schedule and logistics (for Person/Division Chief
construction and BFAR-Capture
installation) Fisheries Division
None None 4 Hours (CFD)
2nd Flr., Fisheries Bldg.,
Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Q.C.

3. Construction and
installation of the
Lambaklad (Set Net) Technical Staff
BFAR-Capture
Fisheries Division
(CFD)
2nd Flr., Fisheries Bldg.,
Complex, BPI
None None 14 days
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City &
Provincial Fisheries
Office/Regional Office
(Production Division)

162
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
3. Receive the 3.1 Turn-over of the
Technical Staff
constructed/installed requested technical
BFAR-Capture
Lambaklad (Set Net) assistance on
Fisheries Division
Project constructed/installed
(CFD)
Lambaklad (Set-net) project
2nd Flr., Fisheries Bldg.,
Complex, BPI
None 1 day
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City &
Provincial Fisheries
Office/Regional Office
(Production Division)

TOTAL: 17 Days and 5 Minutes

163
3. Technical Assistance for Fisheries Management Areas (FMA)

Based on the Establishement of Fisheries Management Area (FMA) for the conservation and management of fisheries in the
Philippine waters (Fisheries Office Order (FOO) 263, Series of 2019), the Capture Fisheries Division is tasked to conduct
consultation and capacitate BFAR employee in the Regional offices in order to aim the optimal sustainable utilization of the
fisheries resource for the benefit of humankind whilst safeguarding the ecosystem. Modern Fisheries Management is based on
scientific information that is used to develop the rules under which fisheries operate.

Office or Division BFAR-Capture Fisheries Division (CFD)

Classification Simple

Type of Transaction G2G (Government to Government) / G2C (Government to Citizen) / G2B (Government to Business)

Internal: BFAR- Regional Offices


External: Stakeholders within Fisheries Management Areas (including Local Government Office,
Who may avail: Fisherfolks, Academe, Non-Governmental Organizations (NGOs), Indigenous People (IPs), Person
With Disabilities (PWDs), National Government Agencies (NGAs), and Local Government Unit
(LGU).

CHECKLIST OF REQUIREMENTS WHERE TO SECURE


1.Letter Request for Technical Assistance Client/ Requesting Party
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit Letter Request 1. Receive Letter Request
for Technical Assistance and forward to concerned
to the concerned Regional Office
Provincial Fishery Office Provincial Fisheries
None 5 Minutes
(PFO) Office (PFO)concerned

2. Receive transmitted
letter request from
concerned PFOs and
forward/endorse Letter
Request thru email to the Regional Office/s
None Office of the BFAR National None 1 Hour concerned based on the
Director (Central Office) for area of requesting party
appropriate action

3.Receive letter request /


endorsement letter from
concerned Regional Office Technical/Admin Staff
and forward to BFAR-CFD Office of the Director
for appropriate action 3rd Flr., Fisheries Bldg.
None None 10 Minutes Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City

164
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
4. Receive letter
request/endorsement letter
from the Office of the
Director
None None 10 Minutes Admin Staff
BFAR-Capture
Fisheries Division
(CFD)
4.1 Forward to CFD Chief 2nd Flr., Fisheries Bldg.,
for appropriate action Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
None None 15 Minutes City

5. Receive letter request Chief


and assign to concerned BFAR-Capture
Technical Staff/Focal Fisheries Division
Person for appropriate (CFD)
None action None 5 Minutes 2nd Flr., Fisheries Bldg.,
Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City
6. Review/evaluate the
letter request and
prepare/facilitate the
None approval of letter response None 30 Minutes Focal Person/Technical
Staff BFAR-Capture
Fisheries Division
2. Receive notification on 6.1 Coordinate/Notify client (CFD)
the approved letter on the approved letter 2nd Flr., Fisheries Bldg.,
response request thru phone call/e- Complex, BPI
mail on the scheduled date Compound, Brgy. Vasra,
of rendering technical None 30 Minutes Visayas Ave., Quezon
assistance on the City
acitivity/training needed

3. Confirm attendance 7. Render/provide the


and attend appropriate Technical Assistance Focal Person/Technical
training schedule requested/needed: Staff BFAR-Capture
Fisheries Division
- Acts as Resource Person (CFD)
None 5 days 2nd Flr., Fisheries Bldg.,
- Conduct training Complex, BPI
orientation Compound, Brgy. Vasra,
Visayas Ave., Quezon
City

5 Days, 2 Hours, and 45


TOTAL:
Minutes

165
BFAR- Fisheries Resource Management Division (FRMD)

1. Technical Assistance on the Conduct of Rapid Resource Assessment

Render technical assistance to Client/s in the Rapid Resource Assessment of Marine Habitat

BFAR- Fisheries Resources Management Division (FRMD) - Coastal Resource Managemnet


Office or Division
Section (CRMS)

Classification Complex

G2B - Government to Business Entity; G2G- Government to Government; G2C- Government to


Type of Transaction Citizen

Who may avail: (External) Local Government Unit (LGU)/Other Stakeholders

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter Request Client/Requesting Party/ies

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1.Submit request letter to 1. Receive request letter Administrative Staff
the FRMD Office located and forward request letter 3rd flr., FRMD Office
at 3rd Flr., Fisheries to the Division Chief for Fisheries Building
Bldg., instructions to concerned Complex, Bureau of
section/ section chief None 10 minutes Plant Industry
Compound, Visayas
Ave., Diliman, Quezon
City

2. Receive and review Section Chief


request letter from the Coastal Resource
Division Chief for Managemnet Section
None appropriate action None 1 day (CRMS)
3rd flr., FRMD Office,
Fisheries Bldg.,

2. Receive schedule of 3. Coordinate with the Technical Staff


Technical Assistance client/requesting party Coastal Resource
and/or collaborators Managemnet Section
(Regional Fisheries Offices/ (CRMS)
Provincial Fisheries 3rd flr., FRMD Office,
Offices) on the details of None 20 Minutes Fisheries Bldg.,
activity (i.e. schedule ,
requirements, etc.)

166
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
4. Prepare/ Process the Administrative Staff
approval of travel order by 3rd flr., FRMD Office
the Division Chief Fisheries Building
None None 1 hour Complex, Bureau of
Plant Industry
Compound, Visayas
Ave., Diliman, Quezon
City
5. Processing and approval FPED. FMD, ADAS,
of necessary travel HRMS
None documents None 5 days 3rd & 4th flr, Fisheries
Bldg., BPI Compound

3. Allow/Accompany the 6. Conduct of On-site Technical Staff


technical staff on the Technical Assistance Coastal Resource
conduct of on-site Managemnet Section
assessment None 5 days (CRMS)
3rd flr., FRMD Office,
Fisheries Bldg.,
4. Wait for the 7. Analysis of data/ Technical Staff
assessment/ evaluation information gathered during Coastal Resource
report the actual assessment for Managemnet Section
preparation of technical None 4 days (CRMS)
report 3rd flr., FRMD Office,
Fisheries Bldg.,
8. Prepare Technical Technical Staff
Report based on the site Coastal Resource
assessment and Managemnet Section
None Endorsement Letter for None 1 hour (CRMS)
review and approval 3rd flr., FRMD Office,
Fisheries Bldg.,
9. Review and approval of FRMD Chief
Technical Report 3rd flr., FRMD Office,
None None 1 day Fisheries Bldg., BPI
Compound

10. Approve the Bureau Director ,


dissemination of the BFAR-Director's Office,
None Technical Report None 4 hours 3rd Flr.

5. Receive copy of 11. Release of the Administrative Staff


Technical Report from Technical Report to client Coastal Resource
the FRMD Managemnet Section
None 10mins
(CRMS)
3rd flr., FRMD Office

16 days, 6 hours, and 40


TOTAL: None
minutes

167
2. Technical Assistance for Walk-in Clients

Renders advisory services and technical assistance to walk-in clients on the Fisheries Resource Management and Coastal
Resource Management matters/concerns.

BFAR- Fisheries Resources Management Division (FRMD) - Coastal Resource Managemnet


Office or Division
Section (CRMS)

Classification Simple
G2B - Government to Business Entity; G2G- Government to Government; G2C- Government to
Type of Transaction Citizen

Who may avail: (External) Local Government Unit (LGU)/Other Stakeholders

CHECKLIST OF REQUIREMENTS WHERE TO SECURE


1. Letter Request (if applicable) Client/Requesting Party/ies

2. Citizen/ Client Satisfaction Survey Form BFAR-Fisheries Resource Management Division (FRMD), 3rd Floor or
at the Ground floor, Lobby, Fisheries Building Complex, Bureau of Plant
Industry Compound, Visayas Ave., Diliman, Quezon City

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit letter request / 1. Receive or attend to the 20 Minutes Administrative Staff
Inquiry client/s inquiry and refer to 3rd flr., FRMD Office
concerned technical staff Fisheries Building
None Complex, Bureau of
Plant Industry
Compound, Visayas
Ave., Diliman, Quezon
City
2. Discuss the inquiry 2. Render technical 30 minutes Technical Staff
with the technical assistance to the client 3rd flr., FRMD Office
personnel/staff None

3. Submit the 3. Request the client to 10 Minutes Administrative Staff/


accomplished Citizen/ accomplished the Client Guard on duty
Client Satisfaction Survey Satisfaction Survey Form
secured from the guard and instruct to place the
on duty at the ground Form at the drop box None
lobby located at Ground floor
lobby at the Guard podium.

TOTAL: None
1 Hour

168
3. Request for Fishing Boat Registration (BOAT-R) and Fisherfolk Registration (FISH-R) Data

Collection of Data and Inventory towards policy formulation.


BFAR- Fisheries Resources Management Division (FRMD) - Coastal Resource Management
Office or Division Section (CRMS)

Classification Simple
G2B - Government to Business Entity; G2G- Government to Government; G2C- Government to
Type of Transaction Citizen

Who may avail: (External) Local Government Unit (LGU)/Other Stakeholders

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Written and/or e-mail Request Letter Client/Requesting Party/ies

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit Letter Request 1. Receive and forward Administrative Staff
letter request to the 3rd flr., FRMD Office
Division Chief for Fisheries Building
instructions to concerned None 10 minutes Complex, Bureau of
section/ Section Chief Plant Industry
Compound, Visayas
Ave., Q.C.
2. Review and refer the Division Chief
request letter to the 3rd flr., FRMD Office, 3rd
concerned section to Flr.,Fisheries Bldg.,
None render the assistance None 1 day
needed

3. Receive and review Section Chief,


request letter from the Coastal Resource
Division Chief for Management,
None appropriate action and None 1 hour 3rd flr., FRMD Office
forward to concerned
technical personnel for
action

4. Render the technical Technical Staff


assistance by extraction of 3rd flr., FRMD Office
data from the website
Municipal Fisherfolk
Registration System
None (Fish'R) or Municipal None 1 day
Fishing Boat and Gear
Registration System
(Boat'R)

5. Prepare letter reply for Technical Staff , Section


further review and Chief, Division Chief,
endorsement for the and Assistant Directors
None approval of the Director None 1 day

169
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
6. Approval and signature Bureau Director
of the letter reply 3rd flr., Fisheries
None None 4 hours Bldg.Complex, BPI
Compound

2. Receive thru e-mail 7. Notify the client on the None 5 minutes Administrative Staff
notification on the approved letter response 3rd flr., FRMD Office
approved letter reply and thru email
needed information

3. Receive the approved 8. Release approved letter None 5 minutes Administrative Staff
letter of reply thru email reply and needed 3rd flr., FRMD Office
information to the Client
thru e-mail
TOTAL: None
3 days, 5 hours, and 20
minutes

170
BFAR- Inland Fisheries and Aquaculture Division (IFAD)

1. On-Site Water Quality Test and Pond Side Disease Detection of Cultured Species

IFAD through the National Shrimp Production Program conducts collection of soil and on-site water quality test and pond side
disease detection of cultured species in registered and accredited grow-out farms and hatcheries.

BFAR- Inland Fisheries and Aquaculture Division - National Shrimp Production Program (IFAD-
Office or Division
NSPP)

Classification Simple

Type of Transaction G2B- Government to Business Entity

Who may avail: Registered and Accredited Grow-Out Farms and Hatcheries

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Shrimp samples (300 pieces post larvae/ 15 pieces


juvenile) per tank/ pond; Requesting Party/Business Entity
2. water (1 liter) per pond/ tank

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

1. Coordinate with the Aquaculturist I


BFAR Regional Officer/ BFAR- IFAD Office
client / Requesting party for 2nd Floor, Fisheries
None the schedule of monitoring None 30 Minutes Building Complex, BPI
and evaluation Compound Brgy. Vasra,
Visayas Avenue Quezon
City
2. Received the 2. Conduct on-site water
scheduled visit/ quality test and disease
inspection and Allow to detection of cultured
collect samples on the species None 1 Day
site and attend the exit
meeting

3. Prepare test report for


Aquaculturist I/
water quality test and
Aquaculturist II/
disease detection
Veterinarian II
None None 10 minutes BFAR- IFAD Office

3. Receive test report 4. Record and release the


thru e-mail Test Report to clients thru e-
mail None 1 Hour

1 Day, 1 Hours, &


TOTAL: None
40 Minutes

171
2. Field Monitoring and Evaluation of Maturation, Breeding, Spawning, and Larval Rearing of
Hatchery Facilities and Grow-out Farms of Aquaculture Species

IFAD throught its National Shrimp Production Program conducts monitoring and evaluation of hatchery facilities and grow-out
farms in compliance to minimun biosecurity measures.

Office or Division BFAR- Inland Fisheries and Aquaculture Division (IFAD)

Classification Simple

Type of Transaction G2B- Government to Business; G2G- Government to Government

Who may avail: Registered and Accredited Grow-Out Farms and Hatcheries/Regional Offices Concern

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Original copy of Certificate of


Compliance/Registration Client's/Requesting Party

2. Biosecurity Operation Procedure Client's/Requesting Party

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Coordinate with the client
and/or BFAR Regional
Officer regarding the Technical Staff
None conduct of schedule None 30 Minutes BFAR- IFAD Office
monitoring and evaluation
in the area
2. Present the Certificate 2. Conduct actual
of Compliance/ monitoring and assessment
Registration and of farm/ hatchery facilities Aquaculturist I/
Biosecurity Operating and conduct exit meeting Aquaculturist II/ Senior
Procedures prior to with client Aquaculturist/
None 1 Day
assesment of hatchery Supervising
facilities/ farm and attend Aquaculturist
the exit meeting BFAR- IFAD Office

2.1 Prepare the


assessment report Aquaculturist I
None 1 Hour
BFAR- IFAD Office

3. Receive the copy of 3. Provide the Regional


the Assessment Report Office/client a copy of the
thru e-mail or thru assessment report thru e-
Aquaculturist I
Regional Office Concerns mail None 10 Minutes
BFAR- IFAD Office

1 Day, 1 Hour, and


TOTAL: None
40 minutes

172
3. Technical Assistance thru Letter Request (Information Education and Communication (IEC)
Materials, Available Data/ References, Resource Person, TWG/Task Force Membership
IFAD render technical assistance through a) dessimination of IEC materials and data/ references; b) act as resource person and
TWG member

Office or Division BFAR- Inland Fisheries and Aquaculture Division (IFAD)

Classification Simple

G2C - Government to Citizen; G2B- Government to Business Entity; G2G Government to


Type of Transaction
Government

Internal: Provincial Fishery Offices, National Centers, Regional Offices, Central Office Personnel

External: Academe (students, professors, On-the-Job Trainees, researchers)


Operators and potential operators (fishpond/fish cage)
Who may avail:
Fisherfolk organizations/associations people's organizations/cooperatives
Other government agencies (National Government Agencies and Local Government Units)
Senior Citizens
Indigenous People

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter Request Client's/Requesting Party

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit letter request to 1. Receive the letter
the Director's Office request and forward to Administrative Assistant
located at 3rd Flr., IFAD office for appropriate BFAR-Director's Office
Fisheries Bldg., action 3rd Floor, Fisheries
None 7 Minutes Building Complex, BPI
Compound Brgy. Vasra,
Visayas Avenue Quezon
City

2. Receive and Prepare


response letter with Aquaculturist I/
appropriate action and Aquaculturist II/ Senior
forward reply letter to the Aquaculturist/
Director for approval Supervising
None None 1 Day Aquaculturist
BFAR- IFAD Office, 2nd
Flr., Fisheries Bldg.,
BPI Compound,
Visayas Ave., Q.C.

3. Receive and approve


letter reply and forward to Administrative Assistant
None IFAD for appropriate action None 2 days Bureau Director
BFAR-Director's Office

173
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

4. Receive the approve


letter from Director's Office Administrative Assistant
and forward to Records BFAR- IFAD Office
Section for notification and 2nd Floor, Fisheries
None release to client None 5 minutes Building Complex, BPI
Compound Brgy. Vasra,
Visayas Avenue Quezon
City

2. Receive notification on 5. Notify client on the


the approved letter reply approved letter reply
None 3 Minutes Administrative Assistant
BFAR-Record Section
Ground Floor, Fisheries
3. Receive the approved 6. Release the approved Building Complex, BPI
reply letter thru reply letter to client thru Compound Brgy. Vasra,
registered mail or e-mail registered mail or e-mail Visayas Avenue Quezon
None 5 Minutes City

3 Days and
TOTAL: None
20 Minutes

174
4. Technical Assistance thru Letter Request/ Memorandum (Technical Inputs/ Comments)

IFAD renders technical assistance to its clients through the provision of technical inputs/ comments to pertinent documents
pertaining to fisheries

Office or Division BFAR- Inland Fisheries and Aquaculture Division (IFAD)

Classification Simple
G2C - Government to Citizen; G2B- Government to Business Entity; G2G Government to
Type of Transaction
Government
Internal: Provincial Fishery Offices (PFOs), BFAR-National Centers, Regional Offices, and Central
Office Personnel
External: Academe (students, professors, researchers)
Who may avail: Operators and potential operators (fishpond/fish cage)
Fisherfolk organizations/associations people's organizations/cooperatives
Other government agencies (National Government Agencies (NGAs) and Local Government Units
(LGU), Senior Citizens, Indigenous People, OFWs

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter Request or Memorandum Client's/Requesting Party

2. Copy (e.g. project proposals, technical documents)


Client's/Requesting Party
of the document for technical inputs/ comments

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit letter request 1. Receive the letter Administrative Assistant
with complete request and forward the BFAR-Director's Office
attachments letter request to IFAD for 3rd Floor, Fisheries
None 10 Minutes
appropriate action Building Complex, BPI
Compound Brgy. Vasra,
Visayas Avenue Q.C.
2. Receive and record the
letter request for review, Aquaculturist I/
comment/ input Aquaculturist II/ Senior
consolidation and prepare Aquaculturist/Su
letter reply for signature of BFAR- IFAD Office
None None 3 days
the Director 2nd Floor, Fisheries
Building Complex, BPI
2.1. Forward the letter reply Compound Brgy. Vasra,
for approval of the Director Visayas Avenue Q.C.

3. Receive and approve/ Bureau Director


signed letter reply with BFAR-Director's Office
corresponding inputs/ 3rd Floor, Fisheries
None comments None 2 days Building Complex, BPI
Compound Brgy. Vasra,
Visayas Avenue Q.C.

4. Receive the approve


letter from Director's Office Administrative Assistant
and forward to Records BFAR- IFAD Office
Section for release to client 2nd Floor Fisheries
None None 5 minutes Building Complex, BPI
Compound Brgy. Vasra,
Visayas Avenue Quezon
City

175
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
2. Receive notification on 5. Notify client on the Administrative Assistant
the approved letter approved letter request and BFAR-Record Section
request and receive the release the approved reply Ground Floor Fisheries
approved letter reply with letter thru registered mail or Building Complex, BPI
required technical inputs e-mail None 8 Minutes Compound Brgy. Vasra,
thru registered mail or e- Visayas Avenue, Q.C.
mail

TOTAL: None 5 Days, 23 Minutes

5. Technical Assistance thru Telephone Inquiry

Inland Fisheries and Aquaculture Division (IFAD) provides technical assistance to its clients via telephone inquiry.

Office or Division BFAR- Inland Fisheries and Aquaculture Division (IFAD)

Classification Simple

Type of Transaction G2C - Government to Citizen


Internal: Provincial Fishery Offices, National Centers, Regional Offices, Central Office Personnel
Who may avail:
External: Academe (students, professors, On-the-Job Trainees, researchers)
CHECKLIST OF REQUIREMENTS WHERE TO SECURE

None None

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Make a phone call 1. Answer telephone inquiry Administrative Assistant
BFAR- IFAD Office
2nd Floor, Fisheries
None 2 Minutes Building Complex, BPI
Compound Brgy. Vasra,
Visayas Avenue Quezon
City
2. Discuss inquiry/ 2. Render appropriate Aquaculturist I/
needed response to inquiry/ needed Aquaculturist II/ Senior
information/concerns information/ concerns Aquaculturist/
immediately BFAR- IFAD Office
None 7 Minutes 2nd Floor, Fisheries
Building Complex, BPI
Compound Brgy. Vasra,
Visayas Avenue Quezon
City

TOTAL: None 9 Minutes

176
6. Technical Assistance thru Walk-in Clients

One of the Inland Fisheries and Aquaculture Division (IFAD) funtions is to provide technical assistance and advisory services on
aquaculture and inland water management to it's walk-in clients.

Office or Division BFAR- Inland Fisheries and Aquaculture Division (IFAD)

Classification Simple
Type of Transaction G2C - Government to Citizen; G2B- Government to Business Entity
Internal: Provincial Fishery Offices (PFOs), BFAR-National Centers, Regional Offices, and Central
Office Personnel
External: Academe (students, professors, researchers)
Who may avail: Operators and potential operators (fishpond/fish cage)
Fisherfolk organizations/associations people's organizations/cooperatives
Other government agencies (National Government Agencies (NGAs) and Local Government Units
(LGU), Senior Citizens, Indigenous People, OFWs
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
Acomplish Service Delivery Tracking Form (IFAD-F-
IFAD's Office
05 Rev. No. 00)
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Accomplish the 1. Provide the Service Administrative Assistant
Service Delivery Tracking Delivery Tracking Form BFAR- IFAD Office
Form (IFAD-F-05 Rev. (IFAD-F-05 Rev. No. 00) to 2nd Floor, Fisheries
No. 00) provided the client and receive the Building Complex, BPI
in the IFAD's office accomplished/filled-out None 3 Minutes Compound Brgy. Vasra,
located at 2nd Flr., sheet Visayas Avenue Quezon
Fisheries Bldg., BPI City
Compound

2. Discuss inquiries/ 2. Render technical


concerns with the IFAD assistance requested by
None 25 Minutes
technical personnel client

3. Filled-out Citizen/Client 3. Require the client to filled- Aquaculturist I/


Satisfaction Survey Form out and answer the ratings Aquaculturist II/ Senior
provided by guard and of the Citizen/Client Aquaculturist/
drop in the client's Satisfaction Survey form BFAR- IFAD Office
sugeestion box located at from BFAR Guard on Duty 2nd Floor Fisheries
the guard lobby (Ground and advice the client to put Building Complex, BPI
Floor Fisheries Building in the suggestion box None 2 Minutes Compound Brgy. Vasra,
Complex, BPI Compound Visayas Avenue Quezon
Brgy. Vasra, Visayas City
Avenue Quezon City )

TOTAL: None 30 minutes

177
BFAR- Post-Harvest Technology Division (PHTD)

1. Letter Request for Assistance/Conduct (Technology Demonstration, Lecture, Field Visit, and Site
Validation)

The Fisheries Post Harvest Technology Division conducts technology demonstration and lectures on available fisheries
postharvest technologies; renders assistance thru field visits and site validation as per request from concerned stakeholders.

Office or Division BFAR- Fisheries Post-Harvest Technology Division (FPHTD)

Classification Complex
G2C - Government to Citizen; G2B- Government to Business Entity; G2G Government to
Type of Transaction
Government
Internal:) Provincial Fishery Offices, BFAR Regional Fishery Officers, BFAR and Central Office
Personnel

External:) MSMEs, Exporters/Fish Processors, Potential Fish Processors, Academe (Students,


Who may avail: Professors, On-the-Job Trainee, Research), Fisherfolk Organizations, Associations, People’s
Organizations, Cooperatives, Women’s associations, Housewives, Senior Citizens, Indigenous
People, Other government agencies (National Government Agencies (NGAs), Local Government
Unit (LGU), House of Representatives) and Non-Government Organizations (NGOs)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter request Client/Requesting Party

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit letter request to 1. Receive, record and
the Director’s Office 3rd forward documents/letter
Flr., Fisheries bldg. request to the Fisheries
Administrative Assistant
Post-Harvest Technology
BFAR-Director's Office
Division (FPHTD) for
3rd Floor, Fisheries
appropriate action None 10 Minutes
Bldg., BPI Compound
Visayas Ave., Brgy.
Vasra, Quezon City

2. Receive and record letter


request from Director's
office and submit to PHTD Administrative Assistant
Division Chief for
III BFAR-FPHTD
appropriate action
2nd Floor, Fisheries
None None 5 Minutes
Bldg., BPI Compound
Visayas Ave., Brgy.
Vasra, Quezon City

178
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
2.1 Review and refer to
Division Chief/OIC
technical staff for
BFAR-FPHTD Office
appropriate action
3rd Floor, Fisheries
None None 1 Hour
Bldg., BPI Compound
Visayas Ave., Brgy.
Vasra, Quezon City
2.2 Prepare reply letter with Aquaculturist I,
proposed activity details Aquaculturist II, Senior
Aquaculturist,
Supervising
Aquaculturist
None None 3 Hours
BFAR-FPHTD Office
2nd Floor, Fisheries
Bldg., BPI Compound
Visayas Ave., Brgy.
Vasra, Quezon City
2.3 Forward letter reply to
Administrative Assistant
Assistant Director for
VI, Administrative
Operations (ADO) for
Assistant III
review and initial and
BFAR-FPHTD Office
forward to FPHTD for
None None 10 Minutes
appropriate action
2nd Floor, Fisheries
Bldg., BPI Compound
Visayas Ave., Brgy.
Vasra, Quezon City
2.4 Receive letter reply Administrative Assistant
from ADO with VI, Administrative
Corresponding initial and Assistant III
forward to Director’s Office BFAR-FPHTD Office
None for approval/signature None 2 days
2nd Floor, Fisheries
Bldg., BPI Compound
Visayas Ave., Brgy.
Vasra, Quezon City
3. Receive letter reply for Director's Office Staff
approval and Forward the Director’s Office
approved/ signed reply 3rd Floor, Fisheries
None letter to FPHTD None 5 Minutes
Bldg., BPI Compound
Visayas Ave., Brgy.
Vasra, Quezon City
4. Receive, record and Administrative Assistant
send Notification on the III
approved reply letter to the
BFAR-FPHTD Office
client thru email
None None 10 Minutes 2nd Floor, Fisheries
Bldg., BPI Compound
Visayas Ave., Brgy.
Vasra, Quezon City
2. Receive letter reply 2. Receive approval Administrative Assistant
and acitivity details reply letter and forward to V, Administrative
None 16 hours
Record Section to release Assistant III
BFAR-Record Section

179
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
2. Receive approved/ 5. Coordinate/notify and
signed letter reply and finalize Aquaculturist I,
notification/ coordination schedulevisit/demo/site Aquaculturist II, Senior
on the schedule of validation with the client Aquaculturist,
visit/site validation/demo Supervising
presentation Aquaculturist
None 1 Hour
BFAR-FPHTD Office
2nd Floor, Fisheries
Bldg., BPI Compound
Visayas Ave., Brgy.
Vasra, Quezon City

3. Actively 6. Conduct of Technology Aquaculturist I,


participate/attend in the demonstration/ Lecture, Aquaculturist II, Senior
activities (site/Vist field visit/site validation Aquaculturist,
validation, Technology Supervising
demostration, None 5 days Aquaculturist (JO),
presentation Senior Admintrative
Assistant III (JO),
Administrative Assistant
V (JO)
7 Days, 5 Hours, 40
TOTAL: None
Minutes

180
2. Technical Assistance thru Letter Request (Information Education and Communication (IEC)
Materials, Available Data/ References, Resource Person, TWG/Task Force Membership, On-the-Job
Trainees Schedule)

The Fisheries Post Harvest Technology Division provides IEC materials and available post harvest related data/references
upon request from concerned stakeholders; sends resource person on specific postharvest topics upon request; allows
technical staff to serve as members of postharvest related TWG/Task force and schedules request for OJT.

Office or Division BFAR- Fisheries Post-Harvest Technology Division (FPHTD)

Classification Simple
G2C - Government to Citizen; G2B- Government to Business Entity; G2G Government to
Type of Transaction
Government
Internal:) Provincial Fishery Offices, BFAR Regional Fishery Officers, BFAR and Central Office
Personnel

External:) MSMEs, Exporters, Fish Processors, Potential Fish Processors, Academe (Students,
Who may avail: Professors, On-the-Job Trainee, Research), Fisherfolk Organizations, Associations, People’s
Organizations, Cooperatives, Women’s associations, Housewives, Senior Citizens, Indigenous
People, Other government agencies (National Government Agencies (NGAs), Local Government
Unit (LGU), House of Representatives) and Non-Government Organizations (NGOs)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter Request Client/Requesting Party

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

1. Submit letter request to 1. Receive, record and


the Director’s Office 3rd forward documents/ letter Administrative Assistant
Flr., Fisheries Bldg. request to the Fisheries BFAR-Director's Office
Post-Harvest Technology 3rd Floor, Fisheries
None 10 Minutes
Division (FPHTD) for Bldg., BPI Compound
appropriate action Visayas Ave., Brgy.
Vasra, Quezon City

2. Receive and record letter


request and forward to Administrative Assistant
Division Chief for III
appropriate action BFAR-FPHTD Office
None None 5 Minutes 2nd Floor, Fisheries
Bldg., BPI Compound
Visayas Ave., Brgy.
Vasra, Quezon City

2.1 Review and refer to


technical staff for Division Chief/ OIC
appropriate action BFAR-FPHTD Office
2nd Floor, Fisheries
None None 1 Hour
Bldg., BPI Compound
Visayas Ave., Brgy.
Vasra, Quezon City

181
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

2.2 Review and conduct


data gathering Aquaculturist I,
Aquaculturist II, Senior
Aquaculturist,
Supervising
Aquaculturist
None None 4 Hours
BFAR-FPHTD Office
2nd Floor, Fisheries
Bldg., BPI Compound
Visayas Ave., Brgy.
Vasra, Quezon City

2.3 Prepare reply letter and Aquaculturist I,


refer to Division Chief for Aquaculturist II, Senior
initial Aquaculturist,
Supervising Aquaclturist
Divison Chief/OIC
None None 1 Hour
BFAR-FPHTD Office
2nd Floor, Fisheries
Bldg., BPI Compound
Visayas Ave., Brgy.
Vasra, Quezon City
2.4 Forward/ Received
letter reply to Assistant Administrative Assistant
Director for Operations VI, Administrative
(ADO) for review/ initial and Assistant III
Forward to Director's Office BFAR-FPHTD Office
None None 10 Minutes
for approval 2nd Floor, Fisheries
Bldg., BPI Compound
Visayas Ave., Brgy.
Vasra, Quezon City

3. Receive letter reply with


Bureau Director
ADO initial and Director
approval/ signature BFAR-Director's Office
3rd Floor, Fisheries
None None 2 days
Bldg., BPI Compound
Visayas Ave., Brgy.
Vasra, Quezon City
2. Receive signed letter 4. Receive approved/
reply with approved signed Administrative Assistant
attached pertinent reply letter and forward to VI, Administrative
documents Record Section for release Assistant III
BFAR-FPHTD Office
None 5 Minutes
2nd Floor, Fisheries
Bldg., BPI Compound
Visayas Ave., Brgy.
Vasra, Quezon City

5. Receive, record and Administrative Assistant


send Notification the III
approved reply letter to the BFAR-FPHTD Office
None client thru email None 5 Minutes 2nd Floor, Fisheries
Bldg., BPI Compound
Visayas Ave., Brgy.
Vasra, Quezon City

182
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
3. Receive signed/ 6. Release signed/
approved document thru approved document and/or Administrative Assistant
e-mail or registered mail send thru e-mail or III
registered mail BFAR-FPHTD Office
None 5 minutes 2nd Floor, Fisheries
Bldg., BPI Compound
Visayas Ave., Brgy.
Vasra, Quezon City

2 Days, 6 Hours, 35
TOTAL: None
Minutes

183
3. Technical Assistance thru Letter Request/ Memorandum (Technical Inputs/ Comments)

The Fisheries Post Harvest Division provides technical inputs/comments on post harvest related matters as per letter request
from concerned stakeholders or memorandum from other concerned agencies and BFAR divisions.

Office or Division BFAR- Fisheries Post-Harvest Technology Division (FPHTD)

Classification Simple

G2C - Government to Citizen; G2B- Government to Business Entity; G2G Government to


Type of Transaction
Government

Internal:) Provincial Fishery Offices, BFAR Regional Fishery Officers, BFAR and Central Office
Personnel

External:) MSMEs, Exporters/Fish Processors, Potential Fish Processors, Academe (Students,


Who may avail: Professors, On-the-Job Trainee, Research), Fisherfolk Organizations, Associations, People’s
Organizations, Cooperatives, Women’s associations, Housewives, Senior Citizens, Indigenous
People, Other government agencies (National Government Agencies (NGAs), Local Government
Unit (LGU), House of Representatives) and Non-Government Organizations (NGOs)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter Request Client's/Requesting Party

2. Memorandum Office Requesting the Service


3. Hard copy of the document for technical inputs/
Client's/Requesting Party
comments
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit letter request 1. Receive, record and
Letter and/or forward letter request ad /or Administrative Assistant
Memorandum with merandum to the FPHTD BFAR-Director's Office
attached pertinent for appropriate action 2nd Floor, Fisheries
documents to Director's None 10 Minutes
Bldg., BPI Compound
Office, 3rd Flr., Fisheries Visayas Ave., Brgy.
Bldg. Vasra, Quezon City

2. Receive and record letter


request and/or Administrative Assistant
memorandum III
BFAR-FPHTD Office
None None 5 Minutes 2nd Floor, Fisheries
Bldg., BPI Compound
Visayas Ave., Brgy.
Vasra, Quezon City

2.1 Review and refer to


technical staff for Division Chief/OIC
appropriate action BFAR-FPHTD Office
2nd Floor, Fisheries
None None 1 Hour
Bldg., BPI Compound
Visayas Ave., Brgy.
Vasra, Quezon City

184
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
2.2 Review and conduct of Aquaculturist I,
data gathering and Aquaculturist II, Senior
technical inputs Aquaculturist,
Supervising
Aquaculturist
None None 4 days
BFAR-FPHTD Office
2nd Floor, Fisheries
Bldg., BPI Compound
Visayas Ave., Brgy.
Vasra, Quezon City
2.3 Prepare reply letter and Aquaculturist I,
recommend technical Aquaculturist II, Senior
inputs and forward to Aquaculturist,
Director's Office Supervising
Aquaculturist, Divison
None None 1 Hour Chief/ OIC
BFAR-FPHTD Office
2nd Floor, Fisheries
Bldg., BPI Compound
Visayas Ave., Brgy.
Vasra, Quezon City
3. Receive letter reply and Bureau Director
affix initial and forward to BFAR-Director's Office
Director’s Office for 3rd Floor, Fisheries
None approval/signature None 2 days
Bldg., BPI Compound
Visayas Ave., Brgy.
Vasra, Quezon City
3.1 Approved/ signed Director's Office Staff
letterreply and Forward the Director’s Office
approved reply letter to 3rd Floor, Fisheries
None FPHTD for facilitation None 5 Minutes
Bldg., BPI Compound
Visayas Ave., Brgy.
Vasra, Quezon City
4. Receive and record the
approved reply letter to the
client thru email
None None 10 Minutes
Administrative Assistant
III
BFAR-FPHTD Office
2nd Floor, Fisheries
2. Receive signed/ 5. Release signed/
Bldg., BPI Compound
approved document thru approved document and
Visayas Ave., Brgy.
e-mail or registered mail send thru e-mail or
registered mail Vasra, Quezon City
None 10 minutes

6 Days, 2 Hours, 40
TOTAL: None
Minutes

185
4. Technical Assistance thru Telephone Inquiry

The Fisheries Post Harvest Technology Division renders advisory services and technical inputs thru telephone inquiry to
provide support to the fisheries post harvest sector through promotion of appropriate and verified post harvest technologies;
provide appropriate guidelines on the operation of post harvest facilities, equipment and machineries; provide technical
assistance to comply with national and international food safety regulations and other fisheries post harvest related matters.

Office or Division BFAR- Fisheries Post-Harvest Technology Division (FPHTD)

Classification Simple
G2C - Government to Citizen; G2B- Government to Business Entity; G2G Government to
Type of Transaction
Government
Internal:) Provincial Fishery Offices, BFAR Regional Fishery Officers, BFAR and Central Office
Personnel

External:) MSMEs, Exporters, Fish Processors, Potential Fish Processors, Academe (Students,
Who may avail: Professors, On-the-Job Trainee, Research), Fisherfolk Organizations, Associations, People’s
Organizations, Cooperatives, Women’s associations, Housewives, Senior Citizens, Indigenous
People, Other government agencies (National Government Agencies (NGAs), Local Government
Unit (LGU), House of Representatives) and Non-Government Organizations (NGOs)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

2nd Floor, Fisheries Bldg., BPI Compound Visayas Ave., Brgy. Vasra,
Telephone Inquiry Form (FPHTD-F-06)
Quezon City

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Make a Telephone call 1. Answer telephone call
to BFAR- FPHTD and discuss necessary
information to be written in Administrative Assistant
the Telephone inquiry form None 5 Minutes III
BFAR-FPHTD Office
2nd Floor, Fisheries
Bldg., BPI Compound
1.1 Refer the client's inquiry Visayas Ave., Brgy.
to the concerned Vasra, Quezon City
None section/technical personnel None 5 Minutes

2. Discuss needed 2. Render the required Aquaculturist I,


information/concerns/ technical assistance and/or Aquaculturist II, Senior
inquiry provide the needed Aquaculturist,
information by the Supervising
appropriate Division staff or Aquaculturist
technical personnel None
10 Minutes BFAR-FPHTD Office
2nd Floor, Fisheries
Bldg., BPI Compound
Visayas Ave., Brgy.
Vasra, Quezon City

TOTAL: None 20 Minutes

186
5. Technical Assistance thru Walk-in Clients

The Fisheries Post Harvest Technology Division renders advisory services and technical inputs to walk-in clients to provide
support to the fisheries post harvest sector through promotion of appropriate and verified post harvest technologies; provide
appropriate guidelines on the operation of post harvest facilities, equipment and machineries; provide technical assistance to
comply with national and international food safety regulations and other fisheries post harvest related matters.

Office or Division BFAR- Fisheries Post-Harvest Technology Division (FPHTD)

Classification Simple
G2C - Government to Citizen; G2B- Government to Business Entity; G2G Government to
Type of Transaction
Government
Internal:) Provincial Fishery Offices, BFAR Regional Fishery Officers, BFAR and Central Office
Personnel

External:) MSMEs, Exporters, Fish Processors, Potential Fish Processors, Academe (Students,
Who may avail: Professors, On-the-Job Trainee, Research), Fisherfolk Organizations, Associations, People’s
Organizations, Cooperatives, Women’s associations, Housewives, Senior Citizens, Indigenous
People, Other government agencies (National Government Agencies (NGAs), Local Government
Unit (LGU), House of Representatives) and Non-Government Organizations (NGOs)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

2nd Floor, Fisheries Bldg., BPI Compound Visayas Ave., Brgy. Vasra,
1. Walk-in Inquiry Form (FPHTD-F-07)
Quezon City
Ground /Flr., Fisheries Bldg., BPI Compound Visayas Ave., Brgy. Vasra,
2. Client Satisfaction Form
Quezon City
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Fill-out walk-in inquiry 1. Receive and review
Administrative Assistant
form and submit to accomplished walk-in
III
FPHTD for the neede inquiry form
BFAR-FPHTD Office
info/ concerns
None 5 Minutes 2nd Floor, Fisheries
Bldg., BPI Compound
Visayas Ave., Brgy.
Vasra, Quezon City
2. Discuss 2. Render the required
Aquaculturist I,
inquiry/concerns technical assistance and/or
Aquaculturist II, Senior
provide the needed
Aquaculturist,
information by the
appropriate Division staff or Supervising
technical staff Aquaculturist
None 2 Hours
BFAR-FPHTD Office
2nd Floor, Fisheries
Bldg., BPI Compound
Visayas Ave., Brgy.
Vasra, Quezon City
3. Accomplish client 3. Advice client to submit
feedback form the accomplished client
satisfaction form to the None 5 Minutes Ground Floor Lobby
guard lobby

TOTAL: None 2 Hours, 10 Minutes

187
BFAR- Fisheries Industry Development Support and Services Division (FIDSSD)

1. Technical Assistance thru Walk-in Clients

Render technical assistance to fisheries stakeholders relevant to regular inquiries on marketing, credit facilitation, enterprise
development, and other support services on-site.

Office or Division Fisheries Industry Development Support and Services Division (FIDSSD)

Classification Simple

G2C - Government to Client


Type of Transaction G2B - Government to Business
G2G - Government to Government

Internal: BFAR Central Office, Regional Offices, and Centers.


External: Fishery-based MSMEs, Exporters, Fisherfolk, Organizations, Associations, Cooperatives,
Who may avail:
Academe, Other government agencies (National Government Agencies (NGAs), Local Government
Unit (LGU), and Non-Government Organizations (NGOs), General Public

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Walk-in Client Inquiry & Feedback Form (FIDSSD-


FIDSSD Office: 3/Flr., FIDSSD Office, Fisheries Building Complex, BPI
F-05 Rev. No. 01)
Compound, Brgy. Vasra, Visayas Ave, Quezon City
2. Visitor's Logbook

3. Citizen / Client Satisfaction Survey (BFAR-F-01 BFAR Guard on duty: G/Flr., Fisheries Building Complex, BPI
Rev.No.02) Compound, Brgy. Vasra, Visayas Ave, Quezon City

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

1. Provide Walk-in Client Receiving Personnel


1. Get the Walk-in Client
Inquiry & Feedback Form BFAR-FIDSSD Office
Inquiry & Feedback Form
and let client sign in the None 5 minutes 3rd Flr., Fisheries Bldg.,
and sign in the visitor's
visitor's logbook) - for BPI Compound, Visayas
logbook
deletion Ave., Q.C.

1. Submit Accomplished 1. Receive the


Walk-in Client Inquiry & accomplished walk-in None
Receiving Personnel
Feedback Form inquiry & feedback form
BFAR-FIDSSD Office
15 minutes 3rd Flr., Fisheries Bldg.,
1.2. Review and forward BPI Compound, Visayas
the requested form to the Ave., Q.C.
None None
concerned
section/personnel

2. Discuss
inquiry/concerns 2. Respond to the Division Chief**
inquiry/concern and render Section Chief**
None
the appropriate technical 2 Hours* Technical Staff**
assistance. FIDSSD Office

188
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
3. Fill-out the Citizen
/Client Satisfaction 3. After rendering the
Survey (given upon Technical Assistance,
Division Chief
arrival of the client) advise client to accomplish
Section Chief
provided by the Guard on the Client Satisfaction None 5 minutes
Admin Staff
duty at the ground lobby Survey and drop in the drop-
FIDSSD Office
box located at the ground
lobby.

2 Hours,
TOTAL: None
25 Minutes
Note: *Time duration (maximum of 2 hours) may vary depending on the nature of the inquiry
** The responsible person who can address/ respond to client's
TA request may vary depending on the nature of TA requested

189
2. Technical Assistance thru Telephone, and SMS Inquiry

Render technical assistance to fisheries stakeholders relevant to regular inquiries on marketing, credit facilitation, enterprise
development, and other support services thru telephone calls, text or FB messenger.

Office or Division BFAR- Fisheries Industry Development Support and Services Division (FIDSSD)

Classification Simple

G2C - Government to Client


Type of Transaction G2B - Government to Business
G2G - Government to Government

Internal: BFAR Central Office, Regional Offices, and Centers.


External: Fishery-based MSMEs, Exporters, Fisherfolk, Organizations, Associations, Cooperatives,
Who may avail:
Academe, Other government agencies (National Government Agencies (NGAs), Local Government
Unit (LGU), and Non-Government Organizations (NGOs), General Public

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Telephone Inquiry Form (FIDSSD-F-06)


FIDSSD Office: 3/Flr., FIDSSD Office, Fisheries Building Complex, BPI
(To be filled-out by FIDSSD staff upon taking the call /
Compound, Brgy. Vasra, Visayas Ave, Quezon City
text)

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Call, send SMS text to 1.. Respond to telephone
BFAR-FIDSSD telephone inquiry and ask for the
and mobile number. necessary information to be
written in the telephone None
inquiry form.

FIDSSD Staff*
1.1. Transpose/ transfer 5 Minutes
Client's Inquiry through FIDSSD Office
SMS into the Inquiry Form

1.2. Forward the inquiry to


the concerned
None None
section/personnel for
appropriate action

2. Discuss with the


2. Respond and render to Division Chief**
concerned technical staff
the client the appropriate Section Chief**
the requested None 1 hour
technical assistance and Technical Staff**
information/ data, and
information required. FIDSSD Office
assistance needed.

1 hour,
TOTAL: None
5 minutes

Note: * TA requests/ inquiries via telephone and SMS maybe received by any FIDSSD staff
** The responsible person who can address/ respond to client's TA
Request may vary depending on the nature of TA requested

190
3. Technical Assistance thru Letter / Email

Render technical assistance to fisheries stakeholders relevant to inquiries on marketing, credit facilitation, enterprise
development and other support services thru letters / email.

Office or Division BFAR- Fisheries Industry Development Support and Services Division (FIDSSD)

Classification Complex

G2C - Government to Client


Type of Transaction G2B - Government to Business
G2G - Government to Government

Internal: BFAR Central Office, Regional Offices, and Centers.


External: Fishery-based MSMEs, Exporters, Fisherfolk, Organizations, Associations, Cooperatives,
Who may avail:
Academe, Other government agencies (National Government Agencies (NGAs), Local Government
Unit (LGU), and Non-Government Organizations (NGOs), General Public

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Request Letter / email Requesting Party

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

1. Send a request letter / 1. Receive and record the Receiving Personnel


email request request letter / email Section Chief
None 5 Minutes
request FIDSSD Staff
FIDSSD Office

2. Review, and forward to


Division Chief
concerned
None None 30 minutes Section Chief
section/personnel for
FIDSSD Office
appropriate action

3. Prepare the response Division Chief**


letter with supporting Section Chief
None None 3 days*
documents/ data, if Technical Staff
required FIDSSD Office

3.1 Final review and


recommending approval
Division Chief
None (initial signature) of the None 4 hours
FIDSSD Office
response letter and
supporting documents

3.2 Forward response letter


and supporting documents
to the Office of the Bureau Administrative Staff
None None 15 minutes
Director or his authorized FIDSSD Office
alternate signatory for
approval

191
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

4. Approve the response BFAR National Director


letter and supporting 3F Director's Office
documents by the Bureau Fisheries Building
None Director or his authorized None 3 days Complex, BPI
alternate signatory, and Compound, Brgy. Vasra,
forward/ release of the Visayas Ave, Quezon
same to FIDSSD City

4.1 Receive and record the


approved response letter
from the Director's Office Receiving Personnel
None None 15 minutes
and forward to the FIDSSD Office
concerned FIDSSD
personnel

Section Chief
2. Receive response 5. Release the requested
Technical Staff
letter with attached document thru hand-carry, None 15 Minutes
Administrative Staff
pertinent documents e-mail or registered mail
FIDSSD Office

6 days,
TOTAL: None 5 hours,
20 minutes

Note: * Time may vary due to technical nature of inquiry and data / inputs required
** Division Chief may also directly respond to email inquiries if addressed to her

192
4. Technical Assistance - Fisheries Market Matching (Reactionary)

Provides and facilitates market linkage between fish suppliers & buyers.

Office or Division BFAR- Fisheries Industry Development Support and Services Division (FIDSSD)

Classification Highly-Technical
G2C - Government to Client
Type of Transaction G2B - Government to Business
G2G - Government to Government
External: Fishery-based MSMEs, Exporters, Potential Buyers and Suppliers, Fisherfolk
Who may avail:
Cooperatives, Organizations, and Associations

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

FIDSSD Office: 3F FIDSSD Office, Fisheries Building Complex, BPI


1. Market Request Form (MRF) FIDSSDMAS-F-01
Compound, Brgy. Vasra, Visayas Ave, Quezon City

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit the 1.1 Receive and record
accomplished Market accomplished Market
Request Form (MRF) to Request Form (MRF) thru None 5 mins
FIDSSD office / email email/walk-in
Section Chief
Administrative Staff
1.2 Check the authenticity FIDSSD Office
and background profile of
None the client None 1 day

1.3 Find potential matches


with thorough analysis and
Section Chief
assessment based on
None None 10 days* Technical Staff
commodity/ area/
FIDSSD Office
requirements.

2. Prepare a response
letter and schedule an
exploratory meeting Section Chief
None (physical/ virtual) with the None Technical Staff
requesting client to discuss FIDSSD Office
his/ her specific 1 day
requirements
2.1. Approval of the
proposed schedule of the Division Chief
None meeting and response None
FIDSSD Office
letter
3. Forward response letter
and get client's
2. Receive the letter and concurrence on the
Technical Staff
concur with the proposed proposed meeting None 2 days
FIDSSD Office
meeting schedule schedule.

193
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
3. Attend and discuss 4. Conduct of exploratory Division Chief
specific requirements meeting (physical/ virtual) Section Chief
None 4 hrs
Technical Staff
FIDSSD Office

5. Profiling of possible
Section Chief
match with the client based
None None 7 days Technical Staff
on the provided
FIDSSD Office
requirements

4. Receive notification 6. Notify the requesting


Section Chief
and concur with the client via email on the
None 2 days Technical Staff
market matching schedule of the "market
FIDSSD Office
schedule matching" (physical/ virtual)

5. Attend and discuss the


7.1. Conduct and facilitate
specific requirements
the "market matching" None
with the party being
activity (physical/ virtual)
matched Division Chief
Section Chief
4 hrs
Technical Staff
7.2. Provide Client FIDSSD Office
6. Accomplish and submit Satisfaction Form
the Client Satisfaction immediately after the None
Form conduct of "Market
Matching" activity

24 days,
TOTAL: None
5 minutes

Note: *Time may vary due to highly technical and intricate verification process of buyer/supplier profile

194
ADMINISTRATIVE SERVICES

DIRECTOR'S OFFICE (DO)

BFAR - OFFICE OF SPECIAL CONCERN (OSC)


1. Inquiry and Application for the FSP-Nationwide Qualifying Examination (Face-to-face)

This responds to inquiries and applications for admission to the FSP- Nationwide Qualifying Examination (face to face)

Office or Division BFAR-Office for Special Concerns (OSC)

Classification Highly Technical


Type of Transaction G2C - Government to Clients (beneficiaries)
Senor High School Graduates, Graduating students with honors, Graduating students with
Who may avail:
parents/guardians who are registered Fisherfolk, ALS graduates.

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Application Form BFAR Regional Office where the examinees come from

2. Birth Certificate issued by PSA Phil Statistics Authority (PSA)

3. Form 138 or 137 School

4. Certification from the School Head that the


applicant belong to TOP TEN/with HONORS (for FILG School
only)

5. Photocopy of fishR/Mangingisdang Juan or


Certificate of Registration of parent/s or guardian/s Municipal Agriculture Office or BFAR
(for FCEG only)

6. Certificate of Confirmation (COC) issued by NCIP-


Regional/Provincial Office or certification form tribal NCIP
chieftain (for FILG only)

7. Certification of good moral character School

8. Two (2) recent 2x2 pictures Regional Office

9. Barangay residence certificate Regional Office /LGU

FEES TO BE PERSON/OFFICE
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Secure application 1. Provides the client
forms and checklist of application form with Regional Fisheries
requirements from the checklist of requirements Scholarship Program
BFAR-RFO or PFO Coordinator (RFSPC)
/Alternates, Regional
None 15 minutes
Focal Person for
Indigenous Peoples
(RFPIP) /Alternate,and
PFOs

195
FEES TO BE PERSON/OFFICE
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
2. Submit the filled-out 2. Receipt of application RFSPC/Alternates,
application form with form with supporting RFPIP/Alternates, and
documentary requirement documents None 5 minutes PFOs

3. Validate/Evaluate the RFSPC/Alternates,


submitted application form RFPIP/Alternates, and
and supporting documents 10 minutes (per PFOs
None None
of the applicants application)

3.Receive Admission slip 4. Issue Admission Slip to RFSPC/Alternates,


qualified applicant 10 minutes (per RFPIP/Alternates, and
None PFOs
application)

TOTAL None 40 minutes

2. Online Recruitment and Application for FSP-NQE


Another mode of applying for FSP - Nationwide Qualifying Examination (online)

Office or Division BFAR-Office for Special Concerns (OSC)

Classification Highly Technical


Type of Transaction G2C - Government to beneficiaries
Senor High School Graduates, Graduating students with honors, Graduating students with
Who may avail:
parents/guardians who are registered Fisherfolk, ALS graduates.

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Application Form BFAR Regional Office website or FSP-IS

2. Birth Certificate issued by PSA PSA


3. Form 138 or 137 School
4. Certification from the School Head that the
applicant belong to TOP TEN/with HONORS (for FILG School
only)
5. Photocopy of fishR/Mangingisdang Juan or
Certificate of Registration of parent/s or guardian/s Municipal Agriculture Office or BFAR
(for FCEG only)

6.Certificate of Confirmation (COC) issued by NCIP-


Regional/Provincial Office or certification form tribal NCIP
chieftain (for FILG only)

7. Certification of good moral character School

8. Two (2) pcs. recent 2x2 pictures Regional Office

9. Barangay residence certificate Regional Office

196
FEES TO BE PERSON/OFFICE
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1.Log-in to the FSP-
Information System
(http://fsp.bfar.da.gov.ph/ None None Applicant
#/login)

2. Fill-out the application 1. Receive the filled out Regional Fisheries


form online and upload application form and Scholarship Program
the documentary uploaded documentary Coordinator (RFSPC)
requirements requirements in the FSP-IS /Alternates, Regional
Regional account None 30 minutes* Focal Person for
Indigenous Peoples
(RFPIP) /Alternates,and
Provincial Fishery
Officers (PFOs)
2. Validate/Evaluate the
submitted filled-out
application form and RFSPC/Alternates,
uploaded documentary within the day, 30 minutes
None None RFPIP/Alternates, and
requirements of the after opening the FSP-IS*
PFO
applicants

3. Download, print and file


the filled-out application
forms and documentary RFSPC/Alternates,
1 Day (within
None requirements of the None RFPIP/Alternates, and
the day*)
qualified applicants PFO

3. Wait for the approval 4. Approve the application


of the application and Issue Admission slip to
RFSPC/Alternates,
qualified applicants
None 10 minutes* RFPIP/Alternates, and
PFO

5. Notify the applicant on


the approved application RFSPC/Alternates,
None and issue admission slip None 10 minutes* RFPIP/Alternates, and
PFO

4. Receive notification of 6. Record the admission


the approved application slip number and file RFSPC/Alternates,
and claim the admission accordingly None 30 minutes* RFPIP/Alternates, and
slip PFO

5.Receive Admission slip 7. Issue Admission Slip to


qualified applicant RFSPC/Alternates,
None 30 minutes* RFPIP/Alternates, and
PFO

TOTAL None 10 hours and 50 minutes

197
3. Preliminary activities before FSP-NQE

These activities are done prior to the conduct of the FSP- Nationwide Qualifying Examination

Office or Division BFAR-Office for Special Concerns (OSC)

Classification Highly Technical

Type of Transaction
G2C - Government to beneficiaries
Who may avail: All Qualified Examinees Issued with Admission Slips

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1.Admission Slip BFAR Regional Office or PFO where the examinees come from

2. Valid I.D School / Barangay

3. Test Booklets Office for Special Concerns

4. Answer Sheets Office for Special Concerns

5. Validated Masterlist of Examinees Office for Special Concerns

6. other test supplies & materials Regional Office where the testing centers are located

FEES TO BE PERSON/OFFICE
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Prepare test materials Office for Special
and paraphernalia Concerns 4th Flr.
containing the following: Fisheries Building
• Envelopes properly Complex,Bureau of Plant
labelled Industry
• Test booklets Compound,Visayas Ave.
• Answer Sheets Quezon City
• Mastercopy of test
booklets
• Attendance Sheet
• Scratch paper
• Masterlist of Examinees
None per component None 20 days
• Masterlist of testing center
per component

198
FEES TO BE PERSON/OFFICE
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

2. Pack the test materials in


boxes (per region) Office for Special
Concerns 4th Flr.
Fisheries Building
None None 10 days Complex,Bureau of Plant
Industry
Compound,Visayas Ave.
Quezon City

3. Send the boxes Office for Special


containing test materials Concerns 4th Flr.
via air and land cargo to the Fisheries Building
regions Complex,Bureau of Plant
None None
Industry
5 days Compound,Visayas Ave.
Quezon City

Sent all the boxes


containing test materials None

TOTAL: 35 days

4. Pre-Administration of the FSP-Nationwide Qualifying Examination

These activities are done to guide the designated examiners and proctors before, and during the conduct of the FSP-NQE

Office or Division BFAR-Office for Special Concerns (OSC)

Classification Highly Technical

Type of Transaction
G2C - Government to beneficiaries

Who may avail: All Qualified Examinees/Issued Admission Slips

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

BFAR Regional Office where the examinees come from


1. Final FOO of Regional Directors designating the
Examiners and Proctors
School / Barangay

Office for Special Concerns


2. Final Masterlist of Examinees per testing center
submitted by the Regions
Office for Special Concerns

199
FEES TO BE PERSON/OFFICE
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Designate examiners,
proctors and all those who
None will be involved in None 1 Day Regional Directors (RDs)
administering the FSP-
NQE
2. Conduct orientation to Office for Special
Examiners and Proctors. Concerns 4th Flr.
None None 4 hours Fisheries Building
Complex,Bureau of Plant
Industry
3. Conduct orientation to Compound,Visayas
Regional Fisheries Ave.
regional counterparts. Scholarship Program
None None 4 hours
Coordinator (RFSPC))
/Alternates
4. Conduct ocular
inspection of the testing RFSPC/Alternate,
center Regional Focal Person
•Clean the room for Indigenous Peoples
None None 2 hours
• Check the lighting and (RFPIP) /Alternates,and
ventilation PFOs and Designated
•Arrange and number the Examiners & Proctors
chairs
1. Before Examination 5. Accommodate the
Day (in cases when the examinees
examinees' residence is
far from the designated
testing center) proceed to 1 Hour
the Regional Office, PFO None PFOs, Chief of TOS,
(30 minutes - 1 hour)
or Technology Outreach
Station (TOS) near the
testing center for
accommodation
2. Fill-out Client 6.Collect and Analyze all
Satisfaction Survey Customer Satisfaction
(CSS) Survey (CSS)

1 Hour
None TOS staff
(30 minutes - 1 hour)

2. Complied with all Pre- 7. Completed the Pre-


administration Activities administration Activities

TOTAL: 20 hours

200
5. Administration of the FSP-Nationwide Qualifying Examination

The FSP - NQE are administered simultaneously nationwide

Office or Division BFAR-Office for Special Concerns (OSC)

Classification Highly Technical

Type of Transaction
G2C - Government to beneficiaries
Who may avail: All Qualified Examinees/Issued Admission Slips

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Admission Slip BFAR Regional Office where the examinees come from

2. Valid I.D School / Barangay

3. Test Booklets Office for Special Concerns


4. Answer Sheets Office for Special Concerns

5. Final Masterlist of Examinees per testing center


Office for Special Concerns
submitted by the Regions

FEES TO BE PERSON/OFFICE
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
Examination day

1. Bring all test materials to


the designated testing
center/s and room/s
None 1 day Examiners and Proctors

2. Under take board work;


give instructions on:
•How to write name
•How to shade answers
•Where to write test booklet None 10 minutes Examiners
number

3. Unpack the test


materials in the presence of
witnesses (proctors)

None 30 minutes Examiners and Proctors

201
FEES TO BE PERSON/OFFICE
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

1. The examinees arrive 4. Instruct the examinees to


and register at the start lining up
designated testing center,

The examinees observe


the IATF Health
Protocols:
•present the vaccination
card None 30 minutes Examiners and Proctors
•have their body
temperature checked
•Wear face masks
•Fill-out Health
Declaration Form*

2. Present the valid id's, 5. Check the examinees


& admission slip and fill valid id's and admission
out the attendance sheet slips one by one and guide
them to their respective None 30 minutes Examiners and Proctors
seats

6. Distribute the test


materials and caution the
examinees that the test
booklets are not to be
None opened until they are told to None 15 minutes Examiners and Proctors
do so

3. Fill out the information 7. Go around and see if the


at the top of the answer examinees are following
sheets direction
None 20 minutes Examiners and Proctors

8. Read aloud the "boxed


in" directions exactly as
None presented. None 20 minutes Examiners and Proctors

4. Start answering the 9. Monitor the time allotted


test questions to answer for each subject
area None 4 hours Examinees

5. Finish the examination 10. Collect the test


materials and arrange them
in ascending order and
None 30 minutes Examiners and Proctors
place in the labelled
envelope/s.

202
FEES TO BE PERSON/OFFICE
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

6. Ask for the possible 11. Inform the examinees


date of release of the on the possible date of
result release of the result None 5 minutes Examiners and Proctors

12. Put all the test materials


None in one box, label and seal. None 1 hour Examiners and Proctors

13. Proceed to the


designated distribution
center upon arrival to RFSPCs/ Alternates,
None ensure that the test None 1 day
RFPIPs
materials are not taken
anywhere.

14. Send back all boxes


containing test materials to
all Regions except Region
the Office for Special RFSPCs/ Alternates,
None Freight 2, three (3) days.
Concerns via Air Cargo RFPIPs
Region 2- seven (7) days

7. Return to their
respective residences
and wait for the result

9 days, 3 hours and 10


TOTAL:
minutes

203
6. Checking, Scoring, Encoding, Ranking and Releasing of FSP-NQE results

Last phase prior to the determination of passers and new batch of scholars

Office or Division BFAR-Office for Special Concerns (OSC)

Classification Highly Technical

Type of Transaction G2C - Government to Client (beneficiaries)


Who may avail: FSP-NQE Passers

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Admission Slip BFAR Regional Office

2. Attendance Sheets BFAR Regional Office

3.Test Booklets Office for Special Concerns


4.Answer Sheets Office for Special Concerns

FEES TO BE PERSON/OFFICE
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

1. Open the boxes and


account the test materials
returned from the regions.

2. Analyze and evaluate of Office for Special


test materials Concerns 4th Flr.
• Envelopes and box Fisheries Building
None (sealed and signed) None 15 days Complex,Bureau of Plant
•Mastercopy of test Industry
booklets Compound,Visayas Ave.
•Test booklets Quezon City
•Answer sheets
•Admission slips
•Masterlist of examinees
per component
•Attendance sheets
3. Check and score the
answer sheets Office for Special
None None 10 days
Concerns

4. Encode the scores


Office for Special
None None 5 days
Concerns
5. Rank the passers Office for Special
None None 10 days Concerns

6. Prepare memorandum Office for Special


addressed to the Regional Concerns
Directors informing them of
the results (to be signed by
None National Director) None 3 days

204
FEES TO BE PERSON/OFFICE
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
7. Prepare letter to IFCU Office for Special
and FIMS to post the Concerns, FIMS and
examination results in the IFCU
None BFAR website and other None 1 day
socmed platform

1. Visit the BFAR 8. Post the result and notify RFSPCs/Alternates,


Website or other social all passers RFPIPs
media platforms/website None 1 day

9. Prepare roster of RFSPCs/Alternates,


None passers None 1 day RFPIPs

2. Coordinate with the 10. Inform the passers of RFSPCs/Alternates,


RFSPCs/Alternates and the requirements of RFPIPs
RFPIPs enrollment None 4 hours

Wait for the enrollment Welcome the new set of


FSP scholars None

TOTAL None 45 days

205
BFAR- LEGAL DIVISION

1. Fact-finding Investigation

This service is rendered to comply with the 2017 Rules on Administrative Cases in the Civil Service to determine whether a
prima facie case exists to warrant the issuance of a formal charge/notice of charge.

Office or Division BFAR- Legal Division

Classification Highly Technical

Type of Transaction G2G- Government to Government; G2C- Government to Citizen

Who may avail: Internal and External

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Written Complaint (1 original) Complainant

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. File written complaint 1. Receive the written
against personnel of the complaint and the
Administrative Assistant;
Bureau with attached attachments thereto, if any
Receiving Personnel
documents, if any, to the
BFAR-Legal Division
receiving personnel of the
2nd/Flr., Fisheries Bldg.
Legal Division None 5 Minutes
Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City

1.1 Forward to the


Head of Litigation
Litigation Section and to
the assigned lawyer for Section BFAR-
evaluation Legal Division
2nd/Flr., Fisheries Bldg.
None None 5 Minutes
Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City
1.2. Draft Notice to Answer

Attorney
BFAR-Legal Division
2nd/Flr., Fisheries Bldg.
None None 10 Minutes Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City

206
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

1.3 Forward Notice to


Answer to Division Chief for
review and signature
None None 5 Minutes Administrative Assistant
BFAR-Legal Division
2nd/Flr., Fisheries Bldg.
Complex, BPI
Compound, Brgy. Vasra,
2. Receive Notice to 2. Send Notice to Answer Visayas Ave., Quezon
Answer to Answer to respondent, City
copy furnish the None 5 Minutes
complainant

3. Filling of answer by 3. Wait for the Answer and


respondent within 5 days receive the same, if any, Administrative Assistant;
from receipt of Notice and forward it to assigned None 5 days Receiving Personnel
Lawyer** BFAR-Legal Division

3.1 Prepare Notice of


None Hearing if hearing is None 10 Minutes
required
3.2 Forward Notice of
Hearing to Divsion Chief for
None review and signature None 5 Minutes
Attorney
BFAR-Legal Division
4. Attend Clarificatory *4. Conduct Clarificatory
Conference, if required Conference None 4 Hours

5. Conduct Preliminary
None Investigation None 20 days

5.1 Prepare Investigation


Report and forward it to the Attorney
None Division Chief for review None 5 Days
BFAR-Legal Division

5.2 Review Investigation


Report Division Chief
None None 2 Hours
BFAR-Legal Division

6. Forward Investigation
Report to the Office of the
None Director for evaluation None 5 Minutes

Administrative Assistant
6. Receive notification 6.1 Notify the respondent BFAR-Legal Division
regarding the result of the and complainant regarding
Fact-Finding Investigation the result of the Fact- None 5 Minutes
Finding Investigation

30 Days, 6 Hours, and


TOTAL: None
55 Minutes

This service is rendered in accordance with the 2017 Rules on Administrative Cases in the Civil Service
*If necessary, the parties may be summoned to a conference where the investigator may propound clarificatory and other relevant questions. (Section 16, 2nd
paragraph
**Pursuantofto2017 Rules
Section 16 on Administrative
of the Cases
2017 Rules on in the Civil Service)
Administrative Cases in the Civil Service, the person complained of has 5 days to submit an answer/counter-affidavit

207
2. Review of Contracts and Policies and Rendering of Legal Opinion

This service is part of the Legal and Advisory Services of the Legal Division and is being rendered to ensure that all contracts
entered into by the Bureau, all policies formulated and all actions are in accordance with existing laws and regulations.

Office or Division BFAR- Legal Division

Classification Complex

Type of Transaction G2G- Government to Government; G2C- Government to Citizen

Who may avail: Internal and External

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Endorsement letter of the document (1 original


Client/Requesting Party
copy)

2. Contracts (ex. MOA/MOU) Client/Requesting Party

3. Policy (ex. FAO/JAO) or any document that need


Client/Requesting Party
legal opinion
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit letter request 1. Receive the
or endorsement letter request/endorsement letter Administrative Assistant/
with attached documents and the attachments None 5 Minutes Receiving Personnel
thereto, if any BFAR-Legal Division

1.1 Forward to the Policy


Head of Litigation
Section or Lawyer assigned
None None 5 Minutes Section BFAR-
for appropriate action
Legal Division
1.3 Research and Attorney/Law Reform
None coordinate with technical None 3 Days Specialists - Legal
divisions BFAR-Legal Division
2nd/Flr., Fisheries Bldg.
1.4 Review and prepare
Complex, BPI
draft legal opinion/letter
None None 7 Days Compound, Brgy. Vasra,
reply
Visayas Ave., Quezon
1.5 Forward draft legal City
Attorney/Law Reform
None opinion/reply to Section None 5 Minutes Specialists - Legal
Head for review BFAR-Legal Division
1.6 Review legal Head of Policy Section
None opinion/reply None 1 Day
BFAR-Legal Division
2. Receive copy of Legal 2. Forward to Records
Opinion from the BFAR Section for release of Legal Administrative Assistant
Records Section Opinion (electronically, None 5 Minutes BFAR-Legal Division
through email) (Second Floor)

TOTAL: None 11 days, and 20 minutes

208
3. Drafting of COA Replies, Appeals and Petitions

This service is rendered to comply with the 2009 Revised Rules of Procedure of the Commission on Audit and to render legal
assistance to the Bureau in the filing of the necessary pleadings.

Office or Division BFAR- Legal Division

Classification Complex

Type of Transaction G2G- Government to Government

Who may avail: Internal- Employees and officials of the Bureau, COA

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Endorsement or Request for Legal Assistance (1


Requesting employee/s or official/s
original)

2. Notice of Disallowance and its attachments, if any


Requesting employee or official
(1 original or certified true copy)

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit the 1. Receive endorsement or
endorsement or request request and the
for legal assistance attachments thereto and Administrative Assistant/
together with the submit the same to Division None 5 Minutes Receiving Personnel
documents Chief for evaluation BFAR-Legal Division

1.1 Evaluate and forward to


assigned lawyer for Division Chief
None appropriate action None 30 Minutes
BFAR-Legal Division

1.2 Conduct research and


None preparation None 5 Days

1.3 Draft necessary


None pleading None 2 Days Attorney
BFAR-Legal Division
1.4 Forward draft pleading
to Division Chief for final
None None 15 Minutes
review and initials

2. Receive, sign and file 2. Forward pleading to the


the necessary pleading to requesting party for
the concerned office (ex. signature Administrative Assistant
None 15 Minutes
COA Central Office, BFAR-Legal Division
Supreme Court)
3. Receive updated copy 3. Update and forward the
of pleadings receiving copy of pleadings Administrative Assistant
None 5 Minutes
to requesting party BFAR-Legal Division

7 days,
TOTAL: None 1 Hour, and
10 minutes

209
4. Legal Assistance to the Prosecution of Criminal Cases

This service is rendered pursuant to Section 65 (z) of the RA10654.

Office or Division BFAR- Legal Division

Classification Simple

Type of Transaction G2G- Government to Government

Who may avail: Law Enforcement Agencies (Internal and External)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Request for Assistance (1 original) Client/Requesting party


2. Complete Case File (1 photocopy) Client/Requesting party
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit to the Legal 1. Receive request and the
Division the request for attachments thereto, if any Administrative Assistant/
legal assistance None 5 Minutes Receiving Personnel
BFAR-Legal Division

1.1 Forward to the


Litigation Section or to
Administrative Assistant
None assigned lawyer for None 5 Minutes
BFAR-Legal Division
appropriate action

1.2 Review and evaluate


case file Attorney
None None 2 Days
BFAR-Legal Division

2. Receive 2. Notify client on the


Order/notification on the scheduled of hearing
Administrative Assistant
schedule of hearing None 5 Minutes
BFAR-Legal Division

3. Attend hearing 3. Attend hearing


Attorney
None 1 Day
BFAR-Legal Division

3 Days and
TOTAL: None
15 Minutes

210
5. Adjudication of Administrative Cases

This service is rendered to comply with the 2017 Rules on Administrative Cases in the Civil Service by resolving administrative
complaints against employees of the Bureau.

Office or Division BFAR- Legal Division

Classification Highly Technical

Type of Transaction G2G- Government to Government; G2C- Government to Citizen

Who may avail: Internal and External

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter Complaint (1 original) Complainant

2. 1 Certified True Copy of Documentary Evidence Complainant

3. Sworn Statement of Witnesses, if any. Complainant

Bureau Director (BFAR), 3rd Flr., Fisheries Bldg., BPI Compound,


4. Formal Charge/Notice of Charge (1 original)
Visayas Ave., Q.C.

BFAR-Legal Division, 2nd flr., Fisheries Bidg. complex, ,BPI Cmpd.,


5. Fact-finding Investigation Report (1 original)
Visayas Ave. Q.C.

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. File formal charge to 1. Receive the formal
the Legal Division with charge and the
the complete attachments attachments thereto, if any Administrative Assistant/
None 5 Minutes Receiving Personnel
BFAR-Legal Division

1.1 Forward to the


Adjudication Section and/or
assigned lawyer for
appropriate action Administrative Assistant
None None 5 Minutes
BFAR-Legal Division

1.2 Draft Notice of Charge


together with a copy of the
Formal Charge and
attachments and a directive
to answer the charge(s) in
writing, under oath in not Attorney
None less than seventy-two None 1 Hour
BFAR-Legal Division
(72) hours from receipt
thereof

211
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1.1 Receive Notice of 1.3 Send Notice of Charge
Charge to respondent through
registered mail 30 Minutes (includes travel
None
time)

2. Filing of answer by the 2. Wait for the Answer of


respondent not less than the respondent and receive
3 days but not more than the same Administrative Assistant
10 days from receipt of None 3 days BFAR-Legal Division
charge

2.1 Forward answer to the


assigned lawyer
None None 5 minutes

3. Conduct formal
investigation
None None *30 Days

3. Attend hearing, if 3.1 Conduct hearing, if Attorney


applicable necessary BFAR-Legal Division
None 4 Hours

3.2 Draft Formal


None Investigation Report None 15 Days

4. Forward Formal
Investigation Report to the
Administrative Assistant
None Director for review Receive None 5 Minutes
BFAR-Legal Division
the formal

5. Investigation Report
None None 5 Minutes

5.1 Decide on
the case within thirty (30) BFAR- Director's Office
None days from receipt of the None 30 days
Formal Investigation Report

6. Forward the Order to


Records Section for Administrative Assistant
None release None 5 Minutes
BFAR-Director's Office

7. Release/Send Order to
the Client through
1 Hour (includes travel
5. Receive Order registered mail None BFAR- Records Section
time)
(Complainant and
Respondent)
TOTAL: None 78 Days and 7 Hours

This service is rendered in accordance with the 2017 Rules on Administrative Cases in the Civil Service (RACCS)
*Rule 8 Section 30 of RACCS - said period may be extended by the disciplining authority in meritorious cases

212
6. Drafting a Recommendation to the Secretary of Agriculture for the Cancellation of a Fishpond
Lease Agreement (FLA) due to the non-compliance of the terms and conditions of the FLA
This service is rendered as part of the legal and advisory function of the Legal Division to draft Recommendations involving
cancellation of FLA in accordance with Fisheries Administrative Order No. 197-1, series of 2012.

Office or Division BFAR- Legal Division

Classification Highly Technical

Type of Transaction G2G - Government to Government; G2C - Government to Transacting Public

Who may avail: BFAR, Concerned Citizen

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Inspection / Monitoring Report Regional Fisheries Office

2. Notice of Violation Regional Director / National Director

3. Certified Report Hearing Officer

3. Case Carpeta (1 original) BFAR-Records Section

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

1. Receive the Notice of 1. Issue a Notice of


Violation on FLA form Violation to the FLA holder
BFAR and submit and appointment of a
Inspection Report / Hearing Office.
BFAR Regional Fisheries
Monitoring Report or None 3 days
Office
Written Petition of the
DENR, LGU, MFARMC,
or resident of the area.

1.1 Wait and receive the


verified Answer
accompanied by all
supporting documents and FLA Focal
affidavits of witnesses by Person/Hearing Officer -
None the FLA holder in response None 10 days
BFAR Regional Fisheries
to the Notice of Violation Office
issued.

2. Conduct ocular
inspection and submit a FLA Focal
certified report to the Person/Hearing Officer -
None None 15 days
Regional Director. BFAR Regional Fisheries
Office

213
3. Issue an order
dismissing the case or
endorse the case before Regional Director -
None the Director recommending None 15 days BFAR Regional Fisheries
the cancellation thereof. Office

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
4. Review the case and
subsequent endorsement National Director through
to the Secretary for the Legal Division
None None
Cancellation of the FLA if (Attorney BFAR-
warranted. Legal Division)

4.1 Review and assign the


Section Head -
case to a lawyer
None None Adjudication Section of
the BFAR Legal Division
4.2 Study the case and
pertinent laws, rules, Attorney - BFAR Legal
None None
regulations and cases Division
related thereto.
4.3 Draft Order for the
dismissal of the case or a
Recommendation to the
Secretary of Agriculture for Attorney - BFAR Legal
None None
Cancellation, Reversion or Division
Termination of the FLA.

4.4 Forward the draft Order 30 days*


or Recommendation to the
Section Head for review Attorney - BFAR Legal
None None
and initials Division

4.5 Review the Order or


Recommendation and affix Section Head,
None initials thereto. None Adjudication Section -
BFAR Legal Division

4.6 Forward the Order or


Recommendation to the Administrative Assistant -
None Division Chief for review None
BFAR Legal Division
and initials.
4.7 Forward the Order or
Recommendation to the Administrative Assistant -
None None
Director for review and BFAR Legal Division
signature.
4.8 Review and sign the
Order or Recommendation. Buerau Director -
None None Director's Office Third
Floor, BFAR

214
5. Receive the Sign 5. Forward the signed
Order or Order or Recommendation
Recommendation for the to the Records Section for Administrative Assistant -
Cancellation, release. None 15 minutes
BFAR Legal Division
Termination, or
Reversion of the FLA.

TOTAL: 73 Days and 15 Minutes

*Based on Section 31 (A) (11) of Fisheries Administrative Order No. 197-1, series of 2012

215
7. Drafting a Recommendation to the Secretary of Agriculture for the Cancellation of Abandoned or
Underdeveloped FLA areas.
This service is rendered as part of the legal and advisory function of the Legal Division to draft Recommendations involving
cancellation of FLA in accordance with Fisheries Administrative Order No. 197-1, series of 2012.

Office or Division BFAR-Legal Division

Classification Highly Technical

Type of Transaction G2G - Government to Government; G2C - Government to Transacting Public

Who may avail: BFAR, Concerned Citizen

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Inspection / Monitoring Report Regional Fisheries Office

2. Notice of Violation Regional Director / National Director

3. Certified Report Hearing Officer

3. Case Carpeta (1 original) BFAR-Records Section

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Inspection Report / 1.1 Issue a Notice of
Monitoring Report or Violation to the FLA holder
Written Petition of the and appointment of a BFAR - Regional
DENR, LGU, MFARMC, Hearing Office. None 3 days
Regional Fisheries Office
or resident of the area.

1.2 Wait and receive the


verified Answer
accompanied by all
supporting documents and FLA Focal
affidavits of witnesses by Person/Hearing Officer -
None None 10 days*
the FLA holder in response BFAR Regional Fisheries
to the Notice of Violation Office
issued.

1.3 Convene a composite FLA Focal


team for the conduct of joint Person/Hearing Officer -
None ocular inspection. None 10 days*
BFAR Regional Fisheries
Office
2. Receive Notice of Joint 2. Send Notice to FLA
FLA Focal
Ocular Inspection Holder within 10 days prior
Person/Hearing Officer -
to the conduct of joint None 10 days*
BFAR Regional Fisheries
ocular inspection
Office
2.1 Conduct Joint Ocular Composite Team
Inspection within 10 days composed of the BFAR
from receipt of Notice to Provincial Fisheries
None Conduct Joint Ocular None 10 days* Officer, CENRO,
Inspection MENRO, NFARMC
Chairman, BFAR Hearing
Officer

216
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
2.2 Prepare report of the
Joint Ocular Inspection Hearing Officer - BFAR
None None
Regional Office
15 days**
2.3 Forward the draft report
to the Composite Team for Hearing Officer - BFAR
None None
signature Regional Office

2.4 Forward the signed


inspection report to the Hearing Officer - BFAR
None None 5 minutes
Regional Director Regional Office

2.5 Study inspection report


and Prepare Order
dismissing the case or
endorsing the case to the Regional Director - BFAR
None None 10 days
National Director Regional Office
recommending the
cancellation thereof.
3. Forward Order or
endorsement with
recommendation to the
BFAR National Director
with the corresponding
attachments via email and
registered mail (Note: Regional Director - BFAR
None None 15 minutes
Additional period of 10-15 days Regional Office
waiting time for the registered
mail to be received from
Regional Office to Central
Office)

4. Review and forward the


case to the Legal Division
for Legal review and Administrative Assistant -
None recommendation None 2 days
Director's Office

4.1 Receive the


endorsement with the
attachments for proper
legal action Administrative Assistant -
None None 5 minutes
BFAR Legal Division

4.2 Review and forward the


endorsement and its
attachment to the
Adjudication Section of the Division Chief - BFAR
None None 15 minutes
Legal Division Legal Division

217
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
5. Review the case and
subsequent endorsement
to the Secretary for
Cancellation of the FLA if Attorney BFAR-
None None
warranted. Legal Division)

5.1 Review and assign the Section Head -


None case to a lawyer None Adjudication Section of
the BFAR Legal Division
5.2 Study the case and
pertinent laws, rules, Attorney - BFAR Legal
None regulations and cases None
Division
related thereto.
5.3 Draft Order for the
dismissal of the case or a
Recommendation to the
Attorney - BFAR Legal
None Secretary of Agriculture for None
Division
Cancellation, Reversion or
Termination of the FLA.
30 days

5.4 Forward the draft Order


or Recommendation to the
Section Head for review Attorney - BFAR Legal
None None
Division
and initials

5.5 Review the Order or Section Head,


None Recommendation and affix None Adjudication Section -
initials thereto. BFAR Legal Division
5.6 Forward the Order or
Recommendation to the Administrative Assistant -
None None
Division Chief for review BFAR Legal Division
and initials. the Order or
5.7 Forward
Recommendation to the Administrative Assistant -
None Director for review and None
BFAR Legal Division
signature.

5.8 Review and sign the Buerau Director -


None Order or Recommendation. None Director's Office Third
Floor, BFAR
3. Receive the Sign 6. Forward the signed
Order or Order or Recommendation
Recommendation for the to the Records Section for
Administrative Assistant -
Cancellation, release. None 15 minutes
BFAR Legal Division
Termination, or
Reversion of the FLA.

TOTAL: 100 days and 55 minutes

* timeline based on Section 31 of Fisheries Administrative Order No. 197-1, series of 2012
** in accordance with Section 31 (B) (4) of Fisheries Administrative Order No. 197-1, series of 2012

218
BFAR- ADJUDICATION COMMITTEE

1. Approval of Settlement Offers


Persons accused of violating the fisheries laws may offer to settle by paying the settlement amount prescribed by law and
approved by the Committee.

Office or Division BFAR- Adjudication Committee

Classification Highly Technical


G2C - Government to Citizen
Type of Transaction
G2B - Government to Business Entity
Who may avail: Alleged Violators

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

Letter of Offer to Settle Alleged violator/offeror

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. File a letter of Offer to 1. Accept and evaluate the
Settle validity of the offer. Hearing Officer
None 15 Minutes
BFAR-Adjudication
Committee
2. Receive notification on 2. Notify client on the G/Flr., Fisheries Bldg.
the approval or denial of approval or denial of the Complex, BPI
the offer to settle offer to settle 15 Days* (upon Compound, Brgy. Vasra,
None
receipt) Visayas Ave., Quezon
City

TOTAL: None 15 Days and 15 Minutes

*This service is covered under Rule 12 of the Rules of Procedure on Adjudication of Fisheries Law Cases (RPAC).

219
2. Resolution of Fisheries Adjudicative Cases

The Adjudication Committee renders judgment on cases filed involving the determination of rights and privileges and/ or the
grant of reliefs under fisheries laws.

Office or Division BFAR- Adjudication Committee

Classification Highly Technical

Type of Transaction G2C - Government to Citizen

Who may avail: Any citizen whose rights and privileges under the fisheries laws were violated.

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Verified Complaint (1 Original copy, 3 Signed


copies)
Complainant
2. Filing Fee of PHP 300

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

1. Proceed to BFAR- 1. Receive payment


Cashier for the payment
BFAR-Cashier, 4th Floor
of filling fee at BFAR-
Filling Fee Php Fisheries Bldg., BPI
Cashier, 4th Floor, 15 Minutes
300.00 Compound, Visayas
Fisheries Bldg., BPI
Ave., Q.C.
Compound

2. Filing of Verified 2. Receive and Review the


Complaint to the office of complaint
the BFAR- Adjudication
Committee located at Administrative Assistant
Ground Flr., Fisheries None 15 Minutes BFAR-Adjudication
Bldg., BPI Compound, Committee

3. Summon the
respondent to file a Verified Hearing Officer
None Answer None 15 Days** BFAR-Adjudication
Committee

3.1. Receive Verified


Answer from respondent
within the prescribed period Administrative Assistant
None of filing (15 days from None 15 Minutes BFAR-Adjudication
receipt of summons) Committee

3. Schedule clarificatory
Conference
Hearing Officer
None None 5 Minutes BFAR-Adjudication
Committee

220
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
3. Receive Notice of 3.1 Notify both parties
clarificatory conference (complainant & respondent)
to attend clarificatory Administrative Assistant
conference None 10 Minutes BFAR-Adjudication
Committee

4. Attend clarificatory 3.2 Conduct clarificatory


conference conference Hearing Officer
None 2 Hours BFAR-Adjudication
Committee

5. Filing of Verified 4. Receive the Verified


Position Papers by the Position Papers
complainant and Administrative Assistant
respondent within 15 None 15 Days** BFAR-Adjudication
days after the last
Committee
clarificatory conference

5. Forward the records of


the case to the head of the
Adjudication Committee Administrative Assistant
15 Days (from receipt of
None Secretariat None BFAR-Adjudication
the position papers)
Committee

5.1 Assign the case to


Head
Hearing Officer
BFAR-Adjudication
Committee
G/Flr., Fisheries Bldg.
None None 1 Hour
Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City
6. Draft decision for
approval of the BFAR- Hearing Officer
60 Days** (from
None Adjudication Committee None BFAR-Adjudication
receipt of case records)
Committee

7. Send the decision to the


BFAR-Records Section Administrative Assistant
None None 5 Minutes BFAR-Adjudication
Committee

6. Receive decision from 7.1 Send the decision to BFAR-Records Section


the BFAR-Records both parties G/Flr., Fisheries Bldg.
Section Complex, BPI
None 5 Minutes
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City

TOTAL: PHP 300 105 Days and 4 Hours

**This service is covered under Rule 15 of the Rules of Procedure on Adjudication of Fisheries Law Cases (RPAC).

221
3. Resolution of Fisheries Administrative Cases

The Adjudication Committee renders judgement on cases involving the determination of violations of Fisheries Laws filed by
Fisheries Resources Protection Group and/ or any law enforcement group deputized by law.

Office or Division BFAR- Adjudication Committee

Classification Highly Technical

Type of Transaction G2G - Government to Government

Who may avail: BFAR and/or any law enforcement group deputized by law to enforce the Fisheries Laws

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

Verified Complaint ( 1 Original copy and 3 signed


Complainant
copies)

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Filing of Verified 1. Receive and review the
Complaint at the National complaint
Secretariat at the Administrative Assistant
National Adjudication None 15 Minutes BFAR-Adjudication
Committee Secretariat Committee

1.1 Summon the


respondent to file a Verified
Answer Hearing Officer
None None 15 Days*** BFAR-Adjudication
Committee

2. Filing of Verified 2. Receive the Verified


Answer by the Answer from respondent
Administrative Assistant
respondent within 15
None 15 Minutes BFAR-Adjudication
days from receipt of
summon Committee

3. Schedule clarificatory
conference
Hearing Officer
None None 5 Minutes BFAR-Adjudication
Committee

3. Receive notice of 3.1 Notify parties of the


conference scheduled clarificatory
conference
Administrative Assistant
None 10 Minutes BFAR-Adjudication
Committee

222
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
4. Attend clarificatory 3.2 Conduct clarificatory
conference conference
None 2 Hours
Hearing Officer
4. Draft decision for BFAR-Adjudication
approval of the Committee
None Adjudication Committee None 60 Days***

5. Send the decision to


Administrative Assistant
BFAR-Records Section
None None 5 Minutes BFAR-Adjudication
Committee
5. Receive decision from 6. Send the decision to the
the BFAR-Records parties None 5 Minutes BFAR-Records Section
Section

75 Days, 2
TOTAL: None Hours, and
55 Minutes

***This service is covered under Rule 10 of the Rules of Procedure on Adjudication of Fisheries Law Cases (RPAC).

223
BFAR- Fisheries Protection and Law Enforcement Group (FLEG)

1. Technical Assistance for Fisheries Administrative Cases with Probable Cause


Investigation proceeding and issuance of Notice of Violation/s received from other Law Enforcement Agencies in relation to
Fisheries Code.

Office or Division BFAR- Fisheries Protection and Law Enforcement Group (FPLEG)

Classification Complex
Type of Transaction G2G - services whose client is another government agency, government employee or official
Who may avail: Government Law Enforcement Agencies/ LGU

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. letter of request Requesting party


FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit Endorsement 1. Receive and record the Director's Office
Letter Endorsement Letter in 3rd Floor, Fisheries Bldg.
logbook and forward to Complex, BPI
FPLEG for appropriate none 10 mins
Compound, Brgy. Vasra,
action Visayas Ave., Quezon
City
2. Receive Endorsement
Head
Letter from Director's
BFAR-FPLEG
Office.
2nd/Flr., Annex,
None none 5 mins Fisheries Bldg. Complex,
BPI Compound, Brgy.
Vasra, Visayas Ave.,
Quezon City
3. Evaluate the case
None none 16 days

BFAR-FPLEG-
4. Conduct Preliminary Investigation Unit
Investigation 2nd/Flr., Annex,
Fisheries Bldg. Complex,
None 4.1 If with probable cause none 1 Day
BPI Compound, Brgy.
Vasra, Visayas Ave.,
Quezon City
5. Prepare Notice of
None Violation/s none 1 hour

2. Received Notice of 6. Serve Notice of


Violation/s Violation/s to violator, FPLEG-Investigation
copy furnished to Unit
complainant/s. 3rd Floor Anex,
none 3 Days Fisheries Bldg.,
Complex, BPI Compd.,
Visayas Ave., Quezon
City

224
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
7.Transmit Notice of
FPLEG-Investigation
Violation and documentary
Unit
attachements to
3rd Floor Anex,
Adjudication Committee
None none 4 hrs Fisheries Bldg.,
Secretariat for availment of
Complex, BPI Compd.,
the remedy of settlement.
Visayas Ave., Quezon
City

20 days, 3 hours, and 15


TOTAL: None
minutes

225
2. Technical Assistance for Fisheries Administrative Cases without Probable Cause
Investigation proceeding and issuance without probable cause received from other Law Enforcement Agencies in relation to
Fisheries Code

Office or Division BFAR- Fisheries Protection and Law Enforcement Group (FPLEG)

Classification Complex
G2G - services whose client is another government agency, government employee or official
Type of Transaction

Who may avail: Government Law Enforcement Agencies/ LGU

CHECKLIST OF REQUIREMENTS WHERE TO SECURE


1.Letter of Request Requesting party

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit Endorsement 1. Receive and record the Director's Office
Letter Endorsement Letter in 3rd Floor, Fisheries Bldg.
logbook and forward to none 10 mins BPI Compound, Brgy.
FPLEG for appropriate Vasra, Visayas Ave.,
action Q.C.
Head-FPLEG
2nd/Flr., Annex,
2. Receive Endorsement
Fisheries Bldg. Complex,
None Letter from Director's none 5 mins
BPI Compound, Brgy.
Office.
Vasra, Visayas Ave.,
Quezon City

None 3. Evaluate the case. none 16 days

4. Conduct Preliminary
None Investigation
none 1 Day
4.1. If Without probable
None FPLEG-Investigation
cause
Unit
2nd/Flr., Annex,
5. Prepare investigation Fisheries Bldg. Complex,
None findings, for signature by none 4 hours BPI Compound, Brgy.
immediate supervisor Vasra, Visayas Ave.,
Quezon City
2. Received investigation 6. Provide copy ot
findings report (without complainant re: the
probable cause during approved Investigation
investigation) findings none 3 days

20 days, 1 Hour, and


TOTAL: None
15 mins.

226
Deliberation of the proposed Fisheries Administrative Orders (FAOs) and other fisheries policies

To recommend the Fisheries Administrative Orders (FAOs) and other fisheries policies to ensure the proper implementation of
the provisions of the Republic Act No. 8550 as amended by RA 10654 through the National Fisheries and Aquatic Resources
Management Council (NFARMC)

Office or Division BFAR- National FARMC Program Management Center (NFARMC-PMC)

Classification Complex
G2G- Government to Government; G2C- Government to Citizen; G2B- Government to Business
Type of Transaction
Entity
INTERNAL: BFAR Central Office (Technical Divisions/Units/Sections), BFAR National Centers, and
BFAR Regional Offices
Who may avail:
EXTERNAL: Department of the Interior and Local Government (DILG) and NFARMC
Members/Stakeholders (Municipal Fisherfolks, Commercial Fisheries, Fish Processing Sector,
Aquaculture Sector and Academe)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter request/endorsement letter BFAR Technical Divisions

2. Draft/Proposed Fisheries Administrative Orders


BFAR Technical Divisions
(FAOs) and other fisheries policies

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit letter request 1. Receive the letter
or endorsement letter request or endorsement Administrative Assistant;
with attached documents letter and the attachments Receiving Personnel
thereto, if any BFAR-NFARMC-PMC
2nd/Flr. Annex, Fisheries
None 5 minutes
Bldg. Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City

1.1 Forward to the Head,


NFARMC PMC for NFARMC Secretariat
None None 5 minutes
information and appropriate BFAR-NFARMC
action
1.2. Coordinate and confirm
the schedule of NFARMC
meeting with the Office of
Undersecretary of
Fisheries/Chairman,
NFARMC NFARMC Secretariat
None *(meeting will be conducted None 4 hours
BFAR-NFARMC
10 days after confirmation
of the Office of USec for
Fisheries)

227
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

1.3 Prepare the


memorandum, invitations
None and program on the None
schedule meeting
NFARMC Secretariat
1.4 Forward the BFAR-NFARMC
memorandum, invitations
None and program to Head, None
NFARMC-PMC for review
and initial
1.5 Review the Head
memorandum, invitations BFAR-NFARMC PMC
and program and placed 4th/Flr., Fisheries Bldg.
None inicials None Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
1.6 Forward the City
memorandum, invitations
and program to
None Undersecratary of None 10 days
Fisheries/Chairman,
NFARMC for review and
signature/approval
1.7 Review and approve
None the memorandum, None
invitations and program
1.8 Dessiminate the
NFARMC Secretariat
approved memorandum,
BFAR-NFARMC
invitations and program to
None NFARMC Members and None
proponents (BFAR
technical divisions)

2. Confirm attendance to 2. Coordinate the


attend on the scheduled confirmation of attendance
NFARMC meeting of the proponent/s including
None
other concerned
participants/attendees

3. Attend NFARMC 3. Conduct of NFARMC Undersecretary for


Meeting Meeting; Presentation and Fisheries/Chairman ,
deliberation of the agenda NFARMC Members,
(Proposed FAOs and other None
Head NFARMC-PMC,
proposed fisheries policies)
NFARMC Secretariat
and Proponent/s
3.1 Prepare the draft Attorney
None NFARMC Resolution/s None 1 day BFAR-Legal Division
during the meeting 2nd/Flr., Fisheries Bldg.
3.2 Present the draft Complex, BPI
NFARMC Resolution/s to Compound, Brgy. Vasra,
None None Visayas Ave., Quezon
the Council for comments
City
3.3 Approve the drafted
None None NFARMC Members
NFARMC Resolution/s

228
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
4. Prepare the
None endorsement letter of None 10 minutes NFARMC Secretariat
NFARMC Resolution/s BFAR-NFARMC
4.1 Forward the 2nd/Flr. Annex, Fisheries
endorsement letter with the Bldg. Complex, BPI
attached approved Compound, Brgy. Vasra,
None NFARMC Resolution/s to None 5 minutes Visayas Ave., Quezon
the Head of NFARMC-PMC City
for review
4.2 Review the Undersecretary for
endorsement letter with the Fisheries/Chairman
attached approved BFAR-NFARMC
NFARMC resolution/s 4th/Flr., Annex, Fisheries
None None 10 minutes
Bldg. Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City
4.3 Forward the
endorsement letter with the
attached approved
NFARMC Resolution/s to NFARMC Secretariat
None None 5 minutes
Undersecratary of BFAR-NFARMC
Fisheries/Chairman,
NFARMC for review and
approval
4.4 Review and approve
the endorsement letter with
the attached approved Undersecretary for
None NFARMC Resolution/s and None 3 days Fisheries/Chairman
forward to NFARMC BFAR-NFARMC
Secretariat for
dissemination
4. Receive the approved 5. Disseminate the
Resolution/s NFARMC Resolution/s to
the concerned
offices/individual such as
BFAR and NFARMC
Members/Stakeholders NFARMC Secretariat
None 10 minutes
(DILG, Municipal BFAR-NFARMC
Fisherfolks, Commercial
Fisheries, Fish Processing
Sector, Aquaculture Sector
and Academe)

14 days, 4 hours, and 50


TOTAL: None
minutes

229
BFAR- Information and Fisherfolk Coordination Unit (IFCU)

1. Provision of Information, Education and Communication (IEC) materials


The Information and Fisherfolk Coordination Unit (Information and Public Relations Group) produces various information,
education and communication (IEC) materials such as brochures, magazines, flyers and posters which are available for
distribution. These IEC materials feature the various programs and projects of the BFAR, as well as other fisheries-related
information. (IFCU)
BFAR- Information and Fisherfolk Coordination Unit (IFCU)- Information and Public Relations
Office or Division
Group
Classification Simple
G2C – Government to Citizen; G2B – Government to Business Entity;
Type of Transaction G2G – Government to Government
Who may avail: ALL

CHECKLIST OF REQUIREMENTS WHERE TO SECURE


IFCU (4th Flr., BFAR Fisheries Building Complex, BPI Compound,
IEC Materials Distribution Form (DOIFCU-F-07)
Visayas Ave, Quezon City)
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Request for 1. Discuss with the client
IFCU/IPRG Staff 4th Flr.,
Information, Education the needed IEC materials.
BFAR Fisheries Building
and Communication
None 5 Minutes Complex, BPI
(IEC) materials.
Compound, Visayas
Ave, Quezon City
1. 1 Check the availability
of the requested IEC IFCU/IPRG Staff 4th Flr.,
materials. Prepare, if BFAR Fisheries Building
available. Complex, BPI
None 15 Minutes Compound, Visayas
(*Refer to appropriate Ave, Quezon City
division if the requested
IEC materials are currently *Appropriate Division
not available.)

2. Receive the 2. Provide the IEC


Information, Education materials Requested and IFCU/IPRG Staff 4th Flr.,
and Communication request to accomplish the BFAR Fisheries Building
(IEC) materials and IEC Materials Distribution None 5 Minutes Complex, BPI
accomplished the IEC Form. Compound, Visayas
Materials Distribution Ave, Quezon City
Form.

3. Submit the 3. Receive the


IFCU/IPRG Staff 4th Flr.,
accomplished IEC accomplished IEC
BFAR Fisheries Building
Materials Distribution Materials Distribution Form.
None 5 Minutes Complex, BPI
Form.
Compound, Visayas
Ave, Quezon City

TOTAL: None 30 Minutes

230
2. Responding to Inquiries (Walk-in)
IFCU, as the Bureau’s information hub, ensures that clients who walk in for information are well attended to. IFCU either directly
responds to inquiries or immediately refers the client to the appropriate division or focal person.

BFAR- Information and Fisherfolk Coordination Unit (IFCU)- Information and Public
Office or Division
Relations Group

Classification Simple

G2C – Government to Citizen; G2B – Government to Business Entity; G2G – Government to


Type of Transaction Government

Who may avail: ALL

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

None

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Sign on the Visitor’s 1. Let the client log in to the IFCU/IPRG Staff 4th Flr.,
Log. Visitor's Log book. BFAR Fisheries Building
None 5 Minutes Complex, BPI
Compound, Visayas
Ave, Quezon City
2. Discuss the inquiry. 2. Respond to the client's
inquiry/ needed information IFCU/IPRG Staff 4th Flr.,
BFAR Fisheries Building
(*Refer to the appropriate Complex, BPI
division(s), if necessary.) None 25 Minutes Compound, Visayas
Ave, Quezon City

*Appropriate division(s)

TOTAL: None 30 Minutes

231
3. Responding to Inquiries through Internet

IFCU, as the Bureau’s information hub, ensures that clients who inquire for information online are well attended to. IFCU either
directly responds to the online inquiries or immediately refers the client to the appropriate division or focal person.

BFAR- Information and Fisherfolk Coordination Unit (IFCU)- Information and Public Relations
Office or Division
Group

Classification Simple

G2C – Government to Citizen; G2B – Government to Business Entity;


Type of Transaction G2G – Government to Government

Who may avail: ALL

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

None
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit the inquiry 1. Acknowledge the IFCU/IPRG Staff 4th Flr.,
through email or social submitted inquiry. BFAR Fisheries Building
media platform. None Complex, BPI
Compound, Visayas
Ave, Quezon City
2. Acknowledge the 2. Respond to the inquiry
response. via email or social media IFCU/IPRG Staff 4th Flr.,
5 Minutes BFAR Fisheries Building
inbox. (platform)
Complex, BPI
(*Refer to the appropriate Compound, Visayas
None
division(s), if applicable.) Ave, Quezon City

*Appropriate division(s)

TOTAL: None 5 Minutes

232
4. Facilitating Interview Request through Internet
The IFCU ensures and maintains good relations with the public and the press. Among the office’s services is the facilitation of
requests for interviews with the Head of the Agency or appropriate resource persons on specific topics relevant to the agency's
mandates.

BFAR- Information and Fisherfolk Coordination Unit (IFCU)- Information and Public Relations
Office or Division
Group

Classification Complex

G2B – Government to Business Entity; G2C – Government to Citizen


Type of Transaction

Media (TV, Radio, Print and Social media correspondents and reporters); Academe (Students,
Who may avail:
Researchers)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

Letter of Request Client/Requesting Party/ies

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit the letter of 1. Receive and record the
IFCU/IPRG Staff 4th Flr.,
request. letter of request.
BFAR Fisheries Building
None 5 Minutes Complex, BPI
Compound, Visayas
Ave, Quezon City
2. Forward the request IFCU/IPRG Staff 4th Flr.,
letter to the Director's BFAR Fisheries Building
None Office. None 10 Minutes Complex, BPI
Compound, Visayas
Ave, Quezon City
3. Approve the request
letter.

None (Authorize and notify None 3 Hours Bureau Director


appropriate resource Director’s Office
person if the Director is not
available.)
2. Acknowledge the 4. Notify the client if the
notification. request is approved or IFCU/IPRG Staff 4th Flr.,
disapproved. BFAR Fisheries Building
None 5 Minutes Complex, BPI
Compound, Visayas
Ave, Quezon City

3. Coordinate the details 5. Coordinate with the client


or coverage of the about the details or IFCU/IPRG Staff 4th Flr.,
interview. coverage of the interview. BFAR Fisheries Building
None 2 Hours Complex, BPI
Compound, Visayas
Ave, Quezon City

233
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
6. Gather relevant and
accurate information.
IFCU/IPRG Staff 4th Flr.,
6.1 Coordinate with the BFAR Fisheries Building
appropriate division(s) for Complex, BPI
technical inputs. None 5 Days Compound, Visayas
Ave, Quezon City
6.2 Prepare talkpoints and
Technical Division(s)
reference materials.

4. Conduct the interview. 7. Attend the interview. BFAR Director


None 1 Hour
Authorized BFAR
personnel

5 Days, 6 Hours, and 20


TOTAL: None
Minutes

234
5. Facilitating Interview Request (Walk-in)
The IFCU ensures and maintains good relations with the public and the press. Among the office’s services is the facilitation of
requests for interviews with the Head of the Agency or appropriate resource persons on specific topics relevant to the agency's
mandates.
BFAR- Information and Fisherfolk Coordination Unit (IFCU)- Information and Public Relations
Office or Division Group

Classification Complex
G2B – Government to Business Entity; G2C – Government to Citizen
Type of Transaction
Media (TV, Radio, Print and Social media correspondents and reporters); Academe (Students,
Who may avail:
Researchers)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

IFCU (4th Flr., BFAR Fisheries Building Complex, BPI Compound,


Request Form (to be coded)
Visayas Ave, Quezon City)

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Sign the Request 1. Receive and record the
Form. request. IFCU/IPRG Staff 4th Flr.,
BFAR Fisheries Building
None 5 Minutes Complex, BPI
Compound, Visayas
Ave, Quezon City

2. Forward the request to IFCU/IPRG Staff 4th Flr.,


the Director's Office. BFAR Fisheries Building
Complex, BPI
None None 10 Minutes
Compound, Visayas
Ave, Quezon City

3. Approve or disapprove
the request. Director’s Office

(Authorize and notify


None None 20 Minutes
appropriate resource
person if the Director is not
available)

2. Acknowledge the 4. Notify the client if the


IFCU/IPRG Staff 4th Flr.,
notification. request is approved or
BFAR Fisheries Building
disapproved.
None 5 Minutes Complex, BPI
Compound, Visayas
Ave, Quezon City
3. Coordinate the details 5. Coordinate with the client
or coverage of the about the details or IFCU/IPRG Staff 4th Flr.,
interview. coverage of the interview. BFAR Fisheries Building
None 30 Minutes Complex, BPI
Compound, Visayas
Ave, Quezon City

235
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

6. Gather relevant and


None accurate information.
IFCU/IPRG Staff 4th Flr.,
6.1 Coordinate with the BFAR Fisheries Building
appropriate division(s) for Complex, BPI
None
technical inputs. None 1 Hour Compound, Visayas
Ave, Quezon City
6.2 Prepare talkpoints and
reference materials. Technical Division(s)
None

4. Conduct the interview. 7. Attend the interview. BFAR Director


None 1 Hour
Authorized BFAR
personnel

TOTAL: None 3 Hours, 10 Minutes

236
6. Provision of Message/Speech/Presentation of BFAR Key Official(s)

IFCU sees to it that BFAR key officials, especially the Bureau Director, are provided with well-researched messages, speeches,
and presentations. Through these, BFAR’s mandate and programs are communicated to the gathered audience.

BFAR- Information and Fisherfolk Coordination Unit (IFCU)- Information and Public Relations
Office or Division
Group
Classification Complex

Type of Transaction G2G – Government to Government

Who may avail: BFAR Key Officials; BFAR Divisions/Units/Sections

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

Letter of Request or Request in Memo form Client/Requesting Party/ies

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Present the letter of 1. Receive and record the IFCU/IPRG Staff 4th Flr.,
request or request in the letter of request or request BFAR Fisheries Building
form of a memo. in memo form. None 5 Minutes Complex, BPI
Compound, Visayas
Ave, Quezon City
2. Forward the request IFCU/IPRG Staff 4th Flr.,
letter or request in memo BFAR Fisheries Building
form to the Director's Office Complex, BPI
None for approval None 10 Minutes
Compound, Visayas
Ave, Quezon City

3. Approve or disapprove
the letter of request or
None request in memo form. None 3 Hours
Director’s Office

2. Coordinate the details 4. Coordinate the specific


of report details with the requesting IFCU/IPRG Staff 4th Flr.,
party. BFAR Fisheries Building
None 4 Hours Complex, BPI
Compound, Visayas
Ave, Quezon City

5. Gather relevant and


None accurate information.
IFCU/IPRG Staff 4th Flr.,
. BFAR Fisheries Building
5.1 Coordinate with the None 2 days Complex, BPI
appropriate division(s) for Compound, Visayas
None the technical inputs Ave, Quezon City

6. Prepare the draft


materials. IFCU/IPRG Staff 4th Flr.,
BFAR Fisheries Building
None None 1 Day Complex, BPI
Compound, Visayas
Ave, Quezon City

237
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
7. Coordinate with
Technical Office to vetify IFCU/IPRG Staff
None the content and finalize the None 5 Days
materials. Technical Division(s)

8. Approve the materials


request
None None 2 Hours Director’s Office

3. Receive the requested 9. Send the approved


materials. materials to the requesting
party. None 5 Minutes IFCU/IPRG Staff

4 Days, 5 Hours, 20
TOTAL:
Minutes

238
BFAR- Information and Fisherfolk Coordination Unit (IFCU)-LIBRARY

1. Borrowing of Books and other Reference Materials


The BFAR Library provides the users the right information at the right time. The charging and discharging transaction involve
routines which must be systematically followed. Discharging removes the charged status for reference materials that are
charged to client's record when they return books and other reference materials.

Office or Division BFAR- Information and Fisherfolk Coordination Unit (IFCU) / Library

Classification Simple
G2C- Government to Citizen; G2B- Government to Business Entity; G2G- Government to
Type of Transaction
Government
BFAR Employees, Fishery Extension Workers, Different organization, Local Government Units
Who may avail:
(LGUs), Students and General Public

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Valid ID (not expired)


Client/Requesting Party/ies
2. Shool ID (for student)
BFAR- Library Section, Ground Floor, Floor, Fisheries Building
3. Clientele Register Form (IFCULIB-F-09) Complex, BPI Compound, Barangay Vasra, Visayas Avenue, Quezon
City
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Log in the Clientele 1. Ask the client to log in
Register form (IFCULIB-F- the clientele Register Form
09) upon entering the library
premises None 2 Minutes
Librarian;
Library Assistant;
Library Aide BFAR-
2. Request for reference 2. Assist the client in using IFCU-Library Section
materials the card catalogue for the Ground Floor, Fisheries
desired books / materials None 3 Minutes Bldg. Complex,
needed. BPI Compound, Brgy.
Vasra, Visayas Avenue,
2.1 Locate and prepare the Quezon City
requested reference
materials needed by the None 5 Minutes
client
3. Submit valid ID upon 3. Secure valid ID upon
signing the borrowers borrowing the reference
card. materials. Ask the client to
accomplish the needed Librarian;
information on the Library Assistant;
borrowers card. Library Aide BFAR-
a. Book Card for book IFCU-Library Section
(IFCULIB-F-03) or None 5 Minutes Ground Floor, Fisheries
b. Book Card for Serial Bldg. Complex,
Collection such as BPI Compound, Brgy.
magazine, journals, Vasra, Visayas Avenue,
periodicals, etc. (IFCULIB- Quezon City
F-04)

239
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
4. Return the borrowed 4. Secure the returned
reference materials after reference materials from Librarian;
use and claim the valid ID the client and returned the Library Assistant;
submitted valid ID submitted. Library Aide BFAR-
IFCU-Library Section
None 5 Minutes Ground Floor, Fisheries
Bldg. Complex,
BPI Compound, Brgy.
Vasra, Visayas Avenue,
Quezon City

TOTAL: None 20 Minutes

240
2. Inter-Library Loan Services
Inter-Library is the cooperative arrangement among libraries that allows books and other reference materials from one library to
another. Documents delivery in the provision of published and unpublished documents, generally electronically and sometimes
for free. The BFAR Library extend assistance to the requesting clients from different private and government agencies to
access our library collection in conducting their reasearch work.

Office or Division BFAR- Information and Fisherfolk Coordination Unit (IFCU) / Library

Classification Simple
G2C- Government to Citizen; G2B- Government to Business Entity; G2G- Government to
Type of Transaction
Government
BFAR Employees, Fishery Extension Workers, Different Organization, Local Government Units
Who may avail: (LGUs), Students and General Public
CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Referral Letter Request / Endorsemen Letter Client/Requesting Party/ies

2. Valid ID (not expired)


Client/Requesting Party/ies
3. School ID (for student)
BFAR- Library Section, Ground Floor, Fisheries Building, BPI
4. Clientele Register Form (IFCULIB-F-09)
Compound, Barangay Vasra, Visayas Avenue, Quezon City

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Log in the Clientele 1. Ask the client to log in Librarian; Library
Register Form (IFCULIB- the Clientele Register Form Assistant; Library
F-09) upon entering the library None 2 Minutes
Aide BFAR-IFCU-
premises Library Section
2. Present Referral Letter 2. Receive and record the
Request / Endorsement Referral Letter Request /
Letter Endorsement Letter for None 3 Minutes
record purposes
3. Access of library 3.1 Allow access on the
Librarian; Library
reference materials books and other reference
Assistant; Library
materials
Aide BFAR-IFCU-
3.2 Locate, prepare and Library Section
lend books and other None 10 Minutes
reference material relevant
to the client's need in their
research work

4. Submit valid ID for 4. Ask the client to


borrowed reference accomplish needed
materials and information in the
accomplished the needed borrowers card,
information in the a. Book Card for Books
borrowers card provided (IFCULIB-F-03) or Librarian; Library
b. Book Card for Serial Assistant; Library
None 5 Minutes
Collection such as Aide BFAR-IFCU-
magazines, journals, Library Section
newspapers, periodicals
etc. (IFCULIB -F-04).
Secure valid ID upon
borrowing of books and
other reference materials

241
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
5. Return library 5. Return the valid ID
reference materials after submitted upon returning Librarian;
use and claim submitted the books and other Library Assistant;
None 5 Minutes
valid ID reference materials Library Aide BFAR-
IFCU-Library Section

TOTAL: None 25 Minutes

3. Inquiry Assistance through Telephone Calls, E-mails and Registered mail


The BFAR Library answered inquiries through telephone, e-mails and registered mails regarding reference materials on
fisheries, aquaculture and related topics

Office or Division BFAR- Information and Fisherfolk Coordination Unit (IFCU) / Library

Classification Simple
G2C – Government to Citizen; G2B – Government to Business Entity;
Type of Transaction
G2G- Government to Government

BFAR Employees, Fishery Extension Workers, Different Organization, Local Government Units
Who may avail:
(LGUs), Students and the General Public

CHECKLIST OF REQUIREMENTS WHERE TO SECURE


1. Telephone calls / inquiry Client/Requesting Party/ies
2. Email Client/Requesting Party/ies

3. Registered Mail Client/Requesting Party/ies

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Inquire on the 1.Confirm on the availability
availability of the of the reference materials.
reference materials thru e- 1.2. Advise the clients to
mail / telephone calls / visit the library to avail the None 5 Minutes
registered mails reference materials needed
Librarian;
Library Assistant;
2. Ask technical question 2. Refer the clients to the
Library Aide BFAR-
on fisheries, Aquaculture technical personnel who
IFCU-Library Section
and related subject are expert and more
knowledgeable on
None 10 Minutes
Fisheries , Aquaculture and
related subject

242
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
3. Request to be included 3. Notify the clients thru
in the listings of BFAR telephone call, e-mail,
recipient of future registered mail on the
publication arrangement in the delivery None 10 Minutes
of requested reading
materials
3.1 Include client request
as recipients of our
publication for future None 5 Minutes
Librarian;
reference Library Assistant;
4. Accomplish the 4. Remind/Advice the client Library Aide BFAR-
needed information on to accomplished the IFCU-Library Section
the Acknowledgement needed information in the
Receipt / Returned Card acknowledgement receipt /
(IFCULIB-F-07) as part of Return Card (IFCULIB-F-
recipient of our 07) and return to the library None 5 Minutes
publication upon receiving the copy of
BFAR Publication for library
record purposes

TOTAL: None 35 Minutes

243
4. Provide Request of BFAR Technology Publication for Information Dissemination for walk in client

The BFAR Library provides Technology Publication for Information Dissemination.

Office or Division BFAR- Information and Fisherfolk Coordination Unit (IFCU) / Library

Classification Simple
G2C- Government to Citizen; G2G - Government to Government; G2B - Government to Business
Type of Transaction
Entity
BFAR Employees, Fishery Extension Workers, Different Organization, Local Government Units
Who may avail:
(LGUs), Students and the General Public

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

BFAR- Library Section, Ground Floor, Main, Fisheries Bldg. Complex,


1. Clientele Registry Form (IFCULIB-f09)
BPI Compound, Brgy. Vasra, Visayas Avenue, Quezon City

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Log in the Clientele 1. Ask the client to log in
Register Form (IFCULIB- the Clientele Register Form
F-09) upon entering the library None 2 Minutes
premises

2. Ask to avail for free 2. Provide available BFAR


BFAR Technology Technology publication for Librarian;
publication such as free distribution Library Assistant;
None 15 Minutes Library Aide BFAR-
pamphlets, brochures,
posters, and etc. IFCU-Library Section

3. Sign in the receiving 3. Ask the client to sign in


log book to the receiving log book for
record purposes. None 3 Minutes

TOTAL: None 20 Minutes

244
5. Request for Photocopying / Reproduction of Reference Materials

The library client are allowed to photocopy the reference materials except Thesis and Dissertation. As stated in the BFAR
Library policy, only 10 pages below of the needed information from the reference materials are allowed for photocopying for
free inside the library with the assistance of the library staff. if photocopying of more than 10 pages the client is allowed to bring
out the books and other reference materials and return within the day. Photo capturing from the reference materials is also
allowed with the permission of the library staff.

Office or Division BFAR- Information and Fisherfolk Coordination Unit (IFCU) / Library

Classification Simple
G2C- Government to Citizen; G2B- Government to Business Entity; G2G- Government to
Type of Transaction
Government
BFAR Employees, Fishery Extension Workers, Differtent Organization, Local Government Units
Who may avail:
(LGUs), Students and the General Public

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Valid ID's (not expired) Client/Requesting Party/ies

BFAR- Library Section, Ground Floor, Fisheries Building, BPI


2. Clientele Register Form (IFCULIB-F-09)
Compound, Barangay Vasra, Visayas Avenue, Quezon City

3. Request Form for Borrowers Charge Slip (IFCULIB- BFAR- Library Section, Ground Floor, Fisheries Building, BPI
F-08) Compound, Barangay Vasra, Visayas Avenue, Quezon City

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

1. Log in the Clientele 1. Ask the Client to log in


Register Form (IFCULIB- the Clientele Register Form
F-09) upon entering the Library Librarian;
premises Library Assistant;
None 2 Minutes
Library Aide BFAR-
IFCU-Library Section

2. Submit valid ID. 2. Secure valid ID and


a. Accomplish the instruct the client to fill-out
Borrower's Card. all the information of the
b. Book Card for Books borrower in the Slip.
(IFCULIB-F-03) or
c. Book Card for Serial
Collection such as Librarian;
magazines, jornals, Library Assistant;
None 10 Minutes
newspaper, periodicals, Library Aide BFAR-
etc.(IFCULIB-F-04) IFCU-Library Section
d. Request Form for Slip
(IFCULIB-F-08)

245
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

2.1 Lend the books and


other reference materials
for reproduction and inform
the client that for every 10
pages is free to reproduce Librarian;
inside the library. If more Library Assistant;
than 10 pages they are None 3 Minutes
Library Aide BFAR-
allowed to bring out the IFCU-Library Section
books and returned with in
the day

3. Return the reference 3. Receive the returned


materials after reference materials from
photocopying and secure the client and check the
ID submitted pages of the photocopied Librarian;
books and other reference Library Assistant;
None 5 Minutes
materials and return the Library Aide BFAR-
valid ID submitted IFCU-Library Section

TOTAL: None 20 Minutes

246
6. Request for Signing of Clearance for Leave, Retirement, Transfer of Office / Work

The BFAR Library issues Clearance for all BFAR Regular Employees only to clear their accountabilities borrowed in the library
for the purpose of applying their leave of absences, transfer of office / work, retirement.

Office or Division BFAR - Information and Fisherfolk Coordination Unit (IFCU)/ Library

Classification Simple

Type of Transaction G2G - Government to Government

Who may avail: All BFAR Regular Employees only

CHECKLISTS OF REQUIREMENTS WHERE TO SECURE

BFAR - Admin - HRMS, 3rd Floor, Fisheries Building Complex, BPI


Accomplished Clerance Form(CS Form No. 7)
Compound, Barangay Vasra, Visayas Avenue, Quezon City

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Present the 1. Review the borrowers
accomplished Clearance profile for the books
Form (CS Form No.7) borrowed before signing of 5 minutes (for no
To the Librarian-In- Clearance Form (CS Form none Librarian-In-Charge only.
accountabilities)
Charge No.7) BFAR-IFCU-Library
Section
Ground Floor, Fisheries
2. Agreement to settle 2. Continue review of the Bldg. Complex, BPI
accountabilities to the borrowers profile. Signing Compound, Brgy. Vasra,
Librarian-In-Charge of clearance pending until 10 minutes Visayas Ave., Quezon
the books return by the none (for employees with City
borrowers accountabilities)

TOTAL: NONE 15 MINUTES

Note: (Please see Memorandum Circular No.059 series of 2015 on the Guidelines for Clearing Library Book Accountability for Officials and
Employees.

247
7. Issuance of Official Receipt for Payment of Fishpond Rentals, Application, License, Cash Bond
Deposits for Fishing Vessels, Certificates, Permits from the clients of FRLD.
The BFAR Library provides assistance to the clients of FRLD by accepting payments for Fishpond rentals, application, license,
cash bond deposits for fishing vessels, certificates and permits. As part of BFAR QMS, this service is provided for efficient and
fast service to the public.

Office or Division BFAR - Information and Fisherfolk Coordination Unit / Library

Classification Simple

Type of Transaction G2C - Government to Citizen; G2B - Government to Business Entity

Who may avail: Fishpond Owner; Fishing Vessels Owner; Businessman and the general public

CHECKLISTS OF REQUIREMENTS WHERE TO SECURE

BFAR-FRLD, Ground Floor, Right wing, Fisheries Building Complex,


1. Order of Payment
BPI Compound, Barangay Vasra, Visayas Avenue, Quezon City

BFAR-Library, Right wing, Ground Floor, Fisheries Building Complex,


2. Official Receipt
BPI Compound, Barangay Vasra, Visayas Avenue, Quezon City

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit Order of 1. Receive the Order of
Payment issued by the Payment for review / Collecting Officer (c/o
FRLD Staff for a required validation none 3 minutes Librarian)
fees BFAR- IFCU - Library
Section
2. Pay the required 2. Accept payment for the Ground Floor, Main,
amount in cash or in required fees in cash or in Fisheries Bldg. Complex,
check based on Order of check and issue official As indicated in
BPI Compound, Brgy.
Payment issued and receipt the Order of 7 minutes
Vasra, Visayas Avenue,
secure Official Receipt Payment
Quezon City

TOTAL: 10 MINUTES

248
ADMINISTRATIVE DIVISION:

HUMAN RESOURCE MANAGEMENT SECTION (HRMS)

1. BFAR Employees Scholarship Program and Civil Service Commission (CSC)

Pursuant to CSC MC No. 20, s. 2011, which aims to equip government employees with competencies in advancing their
personal and career growth as well as engaging themselves in pursuing national development goals.

Office or Division BFAR- Human Resource Management Section (HRMS)

Classification Highly Technical

Type of Transaction G2G- Government to Government

Who may avail: BFAR Central and Regional Offices (Permanent Employee)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Application Letter Applicant

2. Recommendation Letter from the Inmmediate


Applicant
Supervisor / Division Chiefs / Regional Director

3. Updated Personal Data Sheet (PDS) CSC Website/Applicant Personal File

4. Transcript of Records (Photocopy) Applicant/College School Graduated


5. Diploma (Photocopy) Applicant/College School Graduated
6. Performance for the last 2 years (IPCR) HRMS/Internal or other Government Agency

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Prepare Invitation memo,
to invite employee to apply
for Scholarship and
None forward to the office of None 1 Hour
Director for approval Administrative Assistant
V, Designated Personnel
Development Committee
1.1 Forward to Records (PDC) Secretariat
Section for Circulation/ BFAR-HRMS Office
dessimination
None None 5 Minutes

1. Submit Letter of 2. Receive and review the


Application and complete requirements Administrative Assistant
Recommendation Letter V, Designated Personnel
None 10 Minutes Development Committee
(PDC) Secretariat
BFAR-HRMS Office

3.Schedule meeting/
Administrative Assistant
deliberation of the PDC
V, Designated Personnel
None None 1 Hour Development Committee
(PDC) Secretariat
BFAR-HRMS Office

249
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
2. Acknowledge and 5. Notify applicants for the
confirm notice of scheduled of exam and Administrative Assistant
scheduled exam and interview V, Designated Personnel
interview None 30 Minutes Development Committee
(PDC) Secretariat
BFAR-HRMS Office

3. Attend exam and 5. Conduct exam and


interview interview by the Personal Administrative Assistant
Development Committee V, Designated Personnel
(PDC) None 3 Hours Development Committee
(PDC) Secretariat
BFAR-HRMS Office

6. Prepare comparative
assessment of the result of Administrative Assistant
the deliberation V, Designated Personnel
None None 4 Hours Development Committee
(PDC) Secretariat
BFAR-HRMS Office

7. Prepare
Recommendation Letter of Administrative Assistant
the Personal Development V, Designated Personnel
None Committee (PDC) for None 5 Minutes Development Committee
approval (PDC) Secretariat
BFAR-HRMS Office

8. Forward
Recommendation Letter to Administrative Assistant
the Office of the Director for V, Designated Personnel
None approval None 5 Minutes Development Committee
(PDC) Secretariat
BFAR-HRMS Office

4. Receive/ Acknowledge 9. Notify applicant through


through email/text letter/email/text message of Administrative Assistant
message their acceptance to the V, Designated Personnel
program None 10 Minutes Development Committee
(PDC) Secretariat
BFAR-HRMS Office

10. Prepare scholarship


contract for signature of the Administrative Assistant
parties (applicant and the V, Designated Personnel
None Personal Development None 1 Hour Development Committee
Committee (PDC) Member) (PDC) Secretariat
BFAR-HRMS Office

5. Receive Scholarship 11. Provide copy of


Contract Signature scholarship contract for Administrative Assistant
signature of the applicant V, Designated Personnel
None 5 Minutes Development Committee
(PDC) Secretariat
BFAR-HRMS Office

250
12. Receive and process
Contract for the Signature Administrative Assistant
of the PDC Chairman/ V, Designated Personnel
None ADAS None 1 Day Development Committee
(PDC) Secretariat
BFAR-HRMS Office

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
6. Recied Scholarship 13. Receive Notarize
Contract for notarial Contaract for filling Administrative Assistant
purposes and forward to purposes V, Designated Personnel
tha HRMS None 1 Days Development Committee
(PDC) Secretariat
BFAR-HRMS Office

7. Process enrollement to 14. Receive copy of


the desired state registration of enrollement Administrative Assistant
University for process of transfer of V, Designated Personnel
funds
None 3 Days Development Committee
(PDC) Secretariat
BFAR-HRMS Office

10 Days, 4 Hours, 35
TOTAL: None
Minutes

251
2. BFAR Learning and Development ( L & D) In-house Training (Phase 1- IDP Analysis)
This component aims to develop the skills, competence, knowledge and attitudes of the personnel through provision of
trainings/workshops and other learning and development programs.The trainings that will be provided will be based from the
Individual Development Plan form submitted by the employees. A training program/calendar for each calendar year will be
provided. All these trainings will have proper documentation which include training outline, training evaluation, training certificate
and training report, among others.

Office or Division BFAR-Human Resource Management Section (HRMS)

Classification Complex

Type of Transaction G2G-Gov't to Gov't, Gov't to Official/Employee (internal)

Who may avail: BFAR employee/official ( internal client) - Central Office, National Centers and Regional Offices

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Individual Development Plan Form


BFAR-Human Resource Management Section, 3rd Flr., Fisheries Bldg.,
(AHRMS-F-05)
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Receive Memorandum 1. Prepare Memorandum to
accomplish the Individual
Development Plan (IDP)
from and forward toADAS None 2 Hours
for approval

2. Submit accomplished 2. Receive, Evaluate and


IDP Encode IDP
None 16 Hours

3. Analyze Consolidated
IDP and Identify Learning
None and Development None 8 Hours L & D In-Charge/
Interventions Community
Development Officer
4. Prepare Training I/HRMS Staff
Calendar BFAR-HRMS Office
None None 4 Hours

5. Prepare Authority to
Conduct and forward to
None Director's office for None 1 Hour
Approval

6. Forward the approved


Authority to Conduct to
None Records Section for None 5 Minutes
Dissemination.

3 Days, 7 hors and 5


TOTAL: None
minutes

252
3. BFAR Learning and Development ( L & D) In-house Training (Phase 2- Conduct of Training)
This component aims to develop the skills, competence, knowledge and attitudes of the personnel through provision of
trainings/workshops and other learning and development programs.The trainings that will be provided will be based from the
Individual Development Plan form submitted by the employees. A training program/calendar for each calendar year will be
provided. All these trainings will have proper documentation which include training outline, training evaluation, training certificate
and training report, among others.

Office or Division BFAR-Human Resource Management Section (HRMS)

Classification Complex

Type of Transaction G2G-Gov't to Gov't, Gov't to Official/Employee (internal)

Who may avail: BFAR employee/official ( internal client) - Central Office, National Centers and Regional Offices

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Pre-test and Post-Test BFAR-Human Resource Management Section, 3rd Flr., Fisheries Bldg.,

2. Attendance Sheet BFAR-Human Resource Management Section, 3rd Flr., Fisheries Bldg.,
3. Overall Training Evaluation Form BFAR-Human Resource Management Section, 3rd Flr., Fisheries Bldg.,
4. Resource Person Evalution Form BFAR-Human Resource Management Section, 3rd Flr., Fisheries Bldg.,
5. Training Worksheet (optional) BFAR-Human Resource Management Section, 3rd Flr., Fisheries Bldg.,
6.Training Certificate BFAR-Human Resource Management Section, 3rd Flr., Fisheries Bldg.,
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Receive 1. Conduct final pre-training
FOO/Memorandum re: arrangements/ coordination L & D In-Charge/
Authority to Attend with the participants, Community
resource speakers & None 5 Days Development Officer
training venue I/HRMS Staff
BFAR-HRMS Office

2. Attend Training 2. Conduct Training HRMS Chief, L&D In-


Charge/ Community
Development Officer
None I/HRMS Staff and
Resource Person/
Speacker
5 Days BFAR-HRMS Office
2.1 Fill-out/ Accomplish 2.1 Facilitate Training
the Training Evaluation Evaluation and Resource L & D In-Charge/
Form and Resource Person Evaluation Community
Person Evaluation Form None Development Officer
I/HRMS Staff
BFAR-HRMS Office

2.2 Receive Training 2.2 Award Training HRMS Chief, L&D In-
Certificate Evaluation and Resource Charge/ Community
Person Evaluation None 5mins Development Officer
I/HRMS Staff and
Resource Person/
Speacker
TOTAL: None 10 Days & 5mins

253
4. Processing of Daily Time Record (DTR)
Monitoring and updating of Daily Time Record (DTR).

Office or Division BFAR- Human Resource Management Section (HRMS)

Classification Simple
Type of Transaction G2G- Government to Government
Who may avail: BFAR Employee (permanent, casual and contract of service personnel )

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Duly accomplished and signed DTR BFAR-Human Resource Management Section, 3rd Flr., Fisheries Bldg.,

2. Duly Signed Pass slip BFAR-Human Resource Management Section, 3rd Flr., Fisheries Bldg.,

3. Certificate of Appearance BFAR-Human Resource Management Section, 3rd Flr., Fisheries Bldg.,

4. Approved Travel Order BFAR-Human Resource Management Section, 3rd Flr., Fisheries Bldg.,

5. Approved Travel Authority BFAR-Human Resource Management Section, 3rd Flr., Fisheries Bldg.,

6.approved Trip Tikets BFAR-Human Resource Management Section, 3rd Flr., Fisheries Bldg.,

7. Approved application for leave (if applicable) BFAR-Human Resource Management Section, 3rd Flr., Fisheries Bldg.,

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit pass slips, 1. Receive and review the
certificates of appearance submitted pass slips,
(CA), approved travel certificates of
orders, approved travel apperance,travel orders,
authority, approved trip travel authority trip tickets Administrative Assistant
tickets and approved and approved application None 35 Minutes (per employee) VI
application for leave for leave if it was approved BFAR-HRMS Office
signed by the immediate or signed by the immediate
supervisor or the director supervisor.

1.1 Verify and encode pass


slips, certificates of
appearance, approved
travel orders, approved trip
tickets, approved travel
Administrative Assistant
authority, approved
None None 1 Minute (per employee) VI
application for leave signed
BFAR-HRMS Office
by the immediate
supervisor or the Director in
the Time and Attendance
Monitoring System (TAMS)

1.2 Print daily time record


(DTR) per employee
(permanent, casual, Administrative Assistant
None contarct of service None 1 minute VI
personel) BFAR-HRMS Office

254
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
2. Receive copy of 2. Release updated Daily
generated Daily Time Ttime Record (DTR) per
Record (DTR) division
Administrative Assistant
A. Permanent- monthly
None 5 Minutes VI
B. Casual- twice a month
BFAR-HRMS Office
C. COS- twice a month

3. Submit Daily Time 3. Reconcile/ update


Record (DTR) for entries with submitted Administrative Assistant
reconciliation of Ducuments per employee None 5 Minutes VI
inconsistent entries BFAR-HRMS Office

4. Submit copy of 4. Receive copy of


reconciled DTR for reconciled DTR for payroll Administrative Assistant
payroll processing for processing for COS 1 Minutes VI
COS employees employee BFAR-HRMS Office

TOTAL: None 18 Minutes

255
5. Local and International Scholarship/ Training

Foreign and scholarships/training are part of the career development program of the Bureau for the employees professional and
personal growth.

Office or Division Human Resource Management Section (HRMS)

Classification Highly Technical

Type of Transaction G2G- Government to Government

Who may avail: BFAR Central and Regional Offices (Permanent Employee)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Application Letter Applicant

2. Recommendation Letter from the Inmmediate


Applicant
Supervisor / Division Chiefs / Regional Director
3. Updated Personal Data Sheet (PDS) CSC Website/Applicant Personal File
BFAR-Human Resource Management Section (HRMS), 3rd Flr.,
4. Duties and Responsibilities
Fisheries Bldg., BPI Compound, Visayas Avenue, Q.C.
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Prepare memorandum
for the Regional Director/
Administrative Assistant
National Center
V, Designated Personnel
Chiefs/Division
None None 5 Minutes Development Committee
Chiefs/Section Chiefs/Unit
Heads to nominate for the (PDC) Secretariat
participant of the program BFAR-HRMS Office

1. Submit Letter of 2. Receive and review for


Application and the complete requirements Administrative Assistant
Recommendation Letter (per applicant) V, Designated Personnel
from immendiate None 10 Minutes Development Committee
Supervisor/ Division/ (PDC) Secretariat
Regional Director BFAR-HRMS Office

2.1 Prepare Comparative


Assessment per applicants Administrative Assistant
V, Designated Personnel
None None 1 Hour Development Committee
(PDC) Secretariat
BFAR-HRMS Office

3. Schedule meeting/ Administrative Assistant


deliberation of the PDC V, Designated Personnel
None None 1 Hour Development Committee
(PDC) Secretariat
BFAR-HRMS Office
2. Acknowledge and 4. Notify applicants for the
Administrative Assistant
confirm notice of schedule of deliberation
V, Designated Personnel
scheduled deliberation
None 1 Hours Development Committee
(PDC) Secretariat
BFAR-HRMS Office

256
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
3. Attend deliberation 5. Conduct deliberation by Administrative Assistant
the PDC V, Designated Personnel
None 3 Hours
Development Committee
(PDC) Secretariat
6. Evaluate the result of the BFAR-HRMS Office
deliberation Administrative Assistant
V, Designated Personnel
None None 24 Hours Development Committee
(PDC) Secretariat
BFAR-HRMS Office

7. Prepare
Recommendation Letter of Administrative Assistant
the PDC to the Office of the V, Designated Personnel
None Director None 5 Minutes Development Committee
(PDC) Secretariat
BFAR-HRMS Office

8. Forward
Recommendation Letter to Administrative Assistant
the Office of the Director for V, Designated Personnel
None approval None 5 Minutes Development Committee
(PDC) Secretariat
BFAR-HRMS Office

4. Receive/ Acknowledge 9. Notify applicant through


through email/ text letter/ email/ text messege Administrative Assistant
messege of their acceptance to the V, Designated Personnel
program None 10 Minutes Development Committee
(PDC) Secretariat
BFAR-HRMS Office

10. Prepare Nomination


Letter and forward to the Administrative Assistant
Office of the Director for V, Designated Personnel
None approval None 4 Hours Development Committee
(PDC) Secretariat
BFAR-HRMS Office

5. Receive Copy of the 11. Forward Approved


approved Nomination Nomination Letter to the Administrative Assistant
Letter Host Agency and Furnished V, Designated Personnel
copy to the applicant None 10 Minutes Development Committee
(PDC) Secretariat
BFAR-HRMS Office

4 Days, 2 hours and 45


TOTAL: None
minutes

257
6. Processing of Terminal Leave Benefits for Retirees in the Central Office (CO)

Preparation of terminal leave application and individual leave of Retired personel/ employees in support to the processing of
terminal leave benefits (TLB) Claim for Retirees in the Central Office

Office or Division BFAR- Human Resource Management Section (HRMS)

Classification Highly Technical

Type of Transaction G2G-Government to Government


Who may avail: BFAR Central Office Personnel and BFAR National Centers

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

Note: One (1) Original and Two (2) Photocopies - required attachments
1. Office Clearance- CSC Form No. 7 Series of 2018
BFAR-Human Resource Management Section, 3rd Flr., Fisheries Bldg.,

2. Leave Application Form- CSC Form 6 Revised


BFAR-Human Resource Management Section, 3rd Flr., Fisheries Bldg.,
2020
3. GSIS Retirement Form
GSIS c/o BFAR- HRMS
4. GSIS Cash Surrender Value (CSV) Form 8291 BFAR-Human Resource Management Section, 3rd Flr., Fisheries Bldg.,
5. Ombudsman Form Ombudsman c/o BFAR- HRMS
6. Pagibig Form Pagibig c/o BFAR- HRMS
7. Philhealth Form Philhealth c/o BFAR- HRMS
8. Letter Request Client/ Requesting Party
9. NOSI/ NOSA BFAR-Human Resource Management Section, 3rd Flr., Fisheries Bldg.,
10. Service Record BFAR-Human Resource Management Section, 3rd Flr., Fisheries Bldg.,
11. Certification of no pending administrative case
(BFAR and DA) BFAR-Human Resource Management Section, 3rd Flr., Fisheries Bldg.,

12. SALN BFAR-Human Resource Management Section, 3rd Flr., Fisheries Bldg.,
13. Appointment BFAR- Finance Division, 4th Flr., Fisheries Bldg., BPI Compound
14. Landbank of the Philippines (LBP ATM Card)
(Photocopy with specimen signature) Clients

15. Subsidary Ledger


BFAR- Finance Division, 4th Flr., Fisheries Bldg., BPI Compound

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Accomplish Office 1. Receive and review the
Clearance Form and duly accomplished office
submit to BFAR=HRMS, clearance Form Administrative Officer II
None 3 Minutes
3rd Flr., Fisheries Bldg., BFAR-HRMS Office

1.1 Forward to the Chief,


Human Resource
Management Section for Administrative Officer II
None None 5 Minutes
Signature BFAR-HRMS Office

258
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1.2 Forward to the Chief,
Chief, Administrative
Administrative division for
None None 5 Minutes Officer Administrative
Initial
Division
1.3 Forward to the OIC,
Office of the Assistant
None Director for Administrative None 1 Day OIC ADAS BFAR
Services for initial

1.4 Forward to the Bureau Director IV/ Bureau


None Director for approval None 1 Day Director BFAR-
Directors's Office
1.5 Attach/ File the
approved Office Clearance
Administrative Officer II
None for Terminal Leave Benefits None 1 Minute
claim BFAR-HRMS Office

2. Accomplish GSIS 2. Receive and review the


Retirement Form/CSV accomplished GSIS
Form 8291 Retirement and CSV Form
8291 and check the Administrative Officer II
completeness of the None 5 Minutes
BFAR-HRMS Office
application. (Type the name
of the HRMO, name of
agency and date)
2.1 Forward to the Chief,
Human Resource Supervising
None Management Section for None 5 Minutes Administrative Officer
signature BFAR-HRMS Office

2.3 Submit/file the


accomplished form to GSIS Administrative Aide IV
None None 4 Hours
BFAR-HRMS Office

2.4 Claim the Notice of


Approval from GSIS for Administrative Aide IV
None attachment of TLB claim None 25 Day
BFAR-HRMS Office

3. Accomplish 3. Receive and review the


Ombudsman Clearance accomplished Ombudsman
Form Clearance Form and check
the completeness of the Administrative Officer II
application. None 5 Minutes
BFAR-HRMS Office

3.1 Submit/file the


accomplished form to
Ombudsman and claim the Administrative Aide IV
None None 7 Days
Clearance for TLB claim BFAR-HRMS Office

259
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
4. Accomplish Pagibig 4. Receive and review the
Retirement Form accomplished Pagibig
Senior Administrative
Form and check the
None 5 Minutes Assistant III
completeness of the
BFAR-HRMS Office
application.

4.1 Submit/file the


accomplished form to
Pagibig Office Administrative Aide IV
None None 7 Days
BFAR-HRMS Office

5. Sign the Leave 5. Prepare, Compute and


Application Form- CSC check the leave Application
Form 6 Revised 2020 for Form- CSC Form 6 Administrative Officer II
Terminal Leave Benefits Revised 2020 None 5 Minutes
BFAR-HRMS Office
claim

5.1 Update, prepare, check


and print the Statement of
Absences and Undertime
leave on Leave Card
Ledger and Human Administrative Officer II
None None 5 Days
Resource Management BFAR-HRMS Office
Information System
(HRMIS) on Leave

5.2 Forward to the Chief,


Human Resoyrce Supervising
None Management Section for None 10 Minutes Administrative Officer
signature BFAR-HRMS Office

5.3 Forward to the Chief,


Administrative Division for Chief, Administrative
None Initial None 5 Minutes Officer Administrative
Division
5.4 Forward to the OIC,
Office of the Assistant
None Director for Administrative None 1Day OIC ADAS Office
Services for initial

5.5 Forward to the bureau


Director for approval Director IV/ Bureau
None None 2 Days Director BFAR-
Directors's Office

5.6 Prepare Indorsment for Admin Officer II/ V


DA cleance on no pending Supervising
None administrative case None 30 Minutes
Administrative Officer/
Chief Admin Officer
5.7 Forward to the Office of
the Assistant Director for
None Admin Services Signature None 10 Minutes Admin Officer II

260
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
5.8 Submit to the DA Office
of the Legal Service
None None 30 Minutes Admin assistant II (COS)

Note: wait until the release of the approved DA Clearance

5.9 Received the approved


None DA Clearance None 10 Minutes Admin assistant II (COS)

5.10 Record the name of


the retiree positon, date of
retiremant and mode of
None None 10 Minutes Admin assistant II (COS)
retirement in the log book
for retirees.

5.11 Submit the Complete


requirement for the terminal
Administrative Officer II
None leave benefit claim to the None 10 Minutes
BFAR-HRMS Office
Finance and Management
Division for processing.
49 Days, 6 Hours and 40
TOTAL: None
Minutes

7. Processing of Terminal Leave Benefits for Retirees in the Regional Offices

Preparation of Terminal Leave Application and Individual Leave of Retired personnel/employee for processing of Terminal
Leave Benefits (TLB) Claim in the Regional Office/s

Office or Division BFAR-Human Resource Management Section (HRMS)

Classification Highly Technical

Type of Transaction G2G-Government to Government

Who may avail: BFAR Regional Office Personnel

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1.Letter Request/ Endorsement Letter BFAR- Regional Office


2. Terminal Leave Computaion Certified by the
BFAR- Regional Office
Accountant
3. NOSI/ NOSA BFAR- Regional Office
4. Approval Notice form GSIS GSIS c/o BFAR- Regional Office
5. Terminal Leave Application BFAR- Regional Office
6. Statement of Absences and Undertime BFAR- Regional Office
7. Duly Accomplished Form (GSIS Restirement
BFAR- Regional Office
Application- Photocopy only)

8. Service Record BFAR- Regional Office

261
9. Approved Office Clearance- CS Form No. 7 Series
BFAR- Regional Office
of 2018

10. NOSI/ NOSA BFAR- Regional Office

11. Service of Record BFAR- Regional Office


12. DA- Clearance BFAR- Regional Office
13.Certification of no pending administrative case BFAR- Regional Office and Centarl Office
14. SALN BFAR- Regional Office
15. Appointment BFAR- Regional Office
16. LBP ATM Card (Photocopy with specimen
BFAR- Regional Office
signature)

17. Subsidiary Ledger BFAR- Regional Office

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit the 4 folders 1. Receive and review the
with cmplete folder and check
requirements attached completeness of the Administrative Officer II
None 4 Hours
application. (Refer to the BFAR-HRMS Office
checklist)

1.1 Check and review if the


leave credit are the audited/
verified by Chief, HRMS- Administrative Officer II
None None 5 Minutes
Regional Office BFAR-HRMS Office

1.2 Check and Review if all


documents submitted
should be certified Administrative Officer II
None photocopies only 1 set for None 5 Minutes
BFAR-HRMS Office
HRMS and 3 set for
Finance Division

1.3 Prepare memorandum


for the Regional Office to Administrative Officer II,
comply lacking documents Supervising Admin
None if any through email None 40 Minutes
Officer BFAR-HRMS
Office

1.4 Forward to the Chief, Administrative Officer II,


Human Resource Supervising Admin
None Management Section for None 10 Minutes
Officer BFAR-HRMS
signature Office
1.5 Prepare Indorsment for Administrative Officer II/
DA Clearance on no v Supervising
None pending administrative None 30 Minute Administrative Officer/
case Chief BFAR-HRMS
Office
1.6 Forward to the Office of
the Assistant Director for
None Administrative Services for None 10 Minutes Admin Officer II
Signature

262
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1.7 Submit to the DA Office
of the Legal Services
None None 30 Minutes Admin Assistant II (COS)

Note: Until release of the appoval of DA Clearance


1.8 Received the approved
None DA Clearance None 10 Minutes Admin Assistant II (COS)

1.9 Record the name of the


retiree, position, date of
retirement and the mode of Administrative Officer II
None None 10 Minutes
retirement in the logbook BFAR-HRMS Office
for retirees
1.10 Submit the compete
requirement for the terminal
leave benefit claim to the Administrative Officer II
None Finance and Management None 10 Minutes
BFAR-HRMS Office
Division for Processing

Total: None 5 Hours and 30 minutes

263
8. Processing of Salary (Permanent and Casual)
Preparation of Payroll of the Permanent and Casual Employee by process of conducting the necessary adjustment of salary
rate, various dedication adjustment based on the bill statements received.

Office or Division BFAR- Human Resource Management Section (HRMS)

Classification Simple

Type of Transaction G2G - Government to Government


Who may avail: BFAR-Central Office Personnel

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Genaral Payroll Sheet BFAR-Human Resource Management Section, 3rd Flr., Fisheries Bldg.,

2. Official Receipt from GSIS, Pagibig Fund &


BFAR-Human Resource Management Section, 3rd Flr., Fisheries Bldg.,
Philhealth

3. Index of Salary BFAR-Human Resource Management Section, 3rd Flr., Fisheries Bldg.,

4. Remittance List BFAR-Human Resource Management Section, 3rd Flr., Fisheries Bldg.,

5. Print out of Payslip BFAR-Human Resource Management Section, 3rd Flr., Fisheries Bldg.,
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
Request on the following personnel requirements:
1. Adjustment of salary 1. Preparation of
and loan deductions Adjustment Sheet every
25th of the Month based on Administrative Aide III
the billing statement Human Resource
None 5 Minutes
received from various Management Section
agency (GSIS, HDMF, (HRMS)
Philhealth, etc.
2. Update the monthly
deduction of every Administrative Aide III
employee to the adjustment Human Resource
None None 10 Minutes
Management Section
(HRMS)

3. Adjust of Salary upon Administrative Aide III


receipt of Notice of Salary Human Resource
None Adjustment None 10 Minutes
Management Section
(HRMS)
2. Leave without Pay 4. Compute LWOP /NOSI
Administrative Aide III
(LWOP) and Notice of of employees from receipt
Human Resource
Step Increment of the list of employees with None 10 Minutes
Management Section
LWOP
(HRMS)
3. GSIS-Conso-loan plus, 5. Make the necessary Administrative Aide III
Emergency Loan & Policy adjustments/deduction on Human Resource
loan the Adjustment sheet every None 15 Minutes
Management Section
month (HRMS)
4. HDMF/MPL and 6. Make the necessary Administrative Aide III
Calamity Loan adjustments/deduction on Human Resource
None 10 Minutes
the Adjustment sheet every Management Section
month (HRMS)

264
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
5. LBP Mobile/MPL Loan 7. Make the necessary
adjustments/deduction on Administrative Aide III
the Adjustment sheet every Human Resource
None 5 Minutes
month Management Section
(HRMS)

6. ISDA Savings & Loan 8. Make the necessary Administrative Aide III
Association adjustments/deduction on Human Resource
the Adjustment sheet every None 5 Minutes
Management Section
month (HRMS)
9. Prepare general payroll
every month (payroll salary Administrative Aide III
of permanent employee per Human Resource
None division/center and casual) None 1 Hour
Management Section
(HRMS)

10. Check General Payroll Administrative Aide III


against adjustment sheet Human Resource
None None 30 Minutes
Management Section
(HRMS)
8. LBP Employees 11. Encode and review of
Computation Matrix employees matrix Administrative Aide III
computation every (7th, Human Resource
None 30 Minutes
15th & 21st day of the Management Section
month for the weekly salary (HRMS)

12. Encode and review of


Administrative Aide III
employees matrix
Human Resource
None computation every 30th day None 30 Minutes
Management Section
of the month for the last
(HRMS)
week salary
13. Print/Submit of
consolidated monthly salary
Administrative Aide III
employees computation
Human Resource
None matrix to Cashier Section None 1 Hour
Management Section
for the final Submission to
(HRMS)
the LBP

9. Remittance List 14. Submit/Record of


monthly remittance list of
employees mandatory Administrative Aide III
deduction to the Finance Human Resource
None 2 Hours
Division (philhealth, GSIS, Management Section
HDMF and Withholding (HRMS)
Tax) every 27th of the
month
15. Submit of monthly
remittance list of
Administrative Aide III
employees loans deduction
Human Resource
None (isda, LBP, GSIS loans, None 1 hour
Management Section
HDMF loans,)
(HRMS)

10. Index of Individual 16. Index of individual Administrative Aide III


Employees Payment employees payments every Human Resource
None 1 Day
30th day of the month Management Section
(HRMS)

265
PREPARATION OF D.VOUCHERS
11. New Entrant/Promotion17. Prepare and compute
the salary of the new Administrative Aide III
entrant employee upon Human Resource
None 20 Minutes
receipt of it's validated Management Section
appointment (HRMS)

12. Step Increment 18. Prepare and Compute Administrative Aide III
of Salary Differential upon Human Resource
receipt of the NOSI None 30 Minutes
Management Section
(HRMS)
13. Retirees 19. Prepare and compute Administrative Aide III
of salary for after of Human Resource
retirement None 20 Minutes
Management Section
(HRMS)
14. Refund of Loans 20. Prepare and computed
of voucher for refund of
overpayment of loans upon Administrative Aide III
receipt of the notice of Human Resource
None 30 Minutes
overpayment from the PAG- Management Section
IBIG and GSIS. (HRMS)

SPECIAL PAYROLL

15. Uniform and Clothing 21. Prepare of payroll for Administrative Aide III
Allowance Uniform and clothing Human Resource
allowance on 28th of None 1 Day
Management Section
February (HRMS)
16. Midyear or 13th 22. Prepare of payroll for Administrative Aide III
Month Pay Mid Year or 13th Month Human Resource
Pay on 10 of May None 1 Day
Management Section
(HRMS)
17. Year End or 13th 23. Prepare of payroll for Administrative Aide III
Month Pay and Cash Gift Year end and Cash Gift Human Resource
Bonus Bonus on 10th of None 1 Day
Management Section
November (HRMS)
18. CNA Incentive 24. Prepared of payroll for
Administrative Aide III
CNA INCENTIVE on 10th
Human Resource
of December None 1 Day
Management Section
(HRMS)
19. Productivity 25. Prepared of payroll for Administrative Aide III
Enhancement Incentive CNA INCENTIVE on 10th Human Resource
of December None 1 Day
Management Section
(HRMS)
20. Loyalty Cash Award 26. prepared of payroll for Administrative Aide III
Loyalty Cash award on 25th Human Resource
of November None 4 Hours
Management Section
(HRMS)
6 Days, 13 Hours, 20
TOTAL: None
Minutes

266
9. Processing of Request for Official Travel Authority (Abroad)
The approved Travel Authority will be presented to the Bureau of Immigration and to validate that the employee is authorized to
travel abroad with the approval of the Department Secretary.

Office or Division BFAR- ADMIN- Human Resource Management Section (HRMS)

Classification Highly Technical

Type of Transaction G2G- Government to Governtment employee/ official

Who may avail: Nominated and Qualified Employee


CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. Updated Personal Data Sheet (PDS) Client/Requesting Party
2. Service Record (Updated) BFAR-Human Resource Management Section, 3rd Flr., Fisheries Bldg.,
3. Certificate of No Pending Admin Case BFAR-Human Resource Management Section, 3rd Flr., Fisheries Bldg.,
4. Certificate of No Unliquidated Finance Division, 4th Flr., Fisheries Bldg.,
5. List of Foreign Travel for the past 3 years /
Client/Requesting Party
Certificate of No Foreign Travel)
6. Latest Travel Report Client/Requesting Party

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Receive Invitaion to 1. Circulate memorandum
Director's Office (DO) for to nominate/recommend
Director's Officer, Chief,
Nomination of Participant/s via action slip
Supervising
participant/s from Directors Office to
None 2 Days Administrative Officer
Admin Division- Human
BFAR-Director's Office
Resource Management
and HRMS Office
Section(HRMS)

2. Submit requirements in 2. Prepare Request Travel


support to travel authority Authority (TA), attached
required documents and
requirements and endorse
to OSEC to secure OSEC Chief, Supervising
document trading slip with None 5 Days Administrative Officer
limited of the Chief, HRMS BFAR-HRMS Office

3. Initial of endorsement
letter by the Chief, Chief, Administrative
None Administrative Division None 10 Minutes Division
Administrative Division

4. Initial of the OIC- Chief


OIC, Assistant Director
Assistant Director for
None None 10 Minutes for Administrative
Administrative Services
Services Legal Office
5. Signature and approval
of the BFAR Director Bureau Director
None None 14 Days
Director's Office

267
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
6. Forward/submit the
signed Request Travel
Authority to Department of Chief, Supervising
None Agriculture (DA) with the None 1 Hour Administrative Officer
attached supporting BFAR-HRMS Office
requirements/ documents
7. For Approval/ Signature Department of
of the Secretary of Agriculture Secretary
None Department of Agriculture None 21 Days
Department of
Agriculture
3. Receive the 8. Release the
signed/approved Travel signed/approved Travel
Authority and required Authority and required
documents for accounting documents to concerned Administrative Assistant
process of payments official/employee from None 7 Days
BFAR-HRMS Office
BFAR Central and Regional
Office

39 Days, 1 Hour, 20
TOTAL: None
Minutes

268
10. Recruitment, Selection and Placement Process

The selection of employees for appointment to position in the career and non-career service in all levels shall be based on the
competency-based job description and relative qualification while adhering to the proces of recruitment, selection and
placement.

Office or Division BFAR- Human Resource Management Section (HRMS)

Classification Highly Technical

G2C-Government to Client transacting public (external applicant); G2G-Government to other


Type of Transaction
government agency, government employee/official (internal)

Internal: BFAR COS, BFAR Regional Employees and PFO/TOS Employees


Who may avail:
External: Applicant outside

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Application Letter starting the Position and Item


Applicant (Internal/External)
Number applied for
2. Personal Data Sheet (PDS) with Attached Work
CSC Website / BFAR- HRMS Office
Experience Sheet (CSC Form No. 212) Revised 2017
3. Education Credentials:
Applicant (Internal/External)
- Transcript of Records (TOR) (Certified True
Copy)
4. Individual Performance Commitment Review (If
Agency where the applicant is engaged
applicable)
5. Service Record or Certificate of Employment stating
Agency where the applicant is engaged
the position assumed and corresponding duties and
responsibilities
6. Authenticated(Ifand
applicable)
Certified Copy of Appropriate Applicant (Internal/External)
Eligibility (BAR, Board of Rating and PRC ID, CSC Civil Service Commission / PRC
Certificate of Eligibility)
7. Certified Photocopy of Trainings / Seminar
Applicant (Internal/External)
Certificates

8. Potential Rating from their respective Divition Chief Applicant (for Government eployees only)

9. Statement duly signed by the applicant as to any


Applicant (Internal/External)
relatives within the fourth degree of consanguinity of
affinity with BFAR FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1.Publish Vacant Positions
at the CSC Bulletin /
Internet / BFAR Website
(Minimum of 10 days of Administrative Officer/
None None Publication and Posting, as Assistant/ Aide
1.1 Post vacant positions in
per RA 7014) BFAR-HRMS Office
BFAR Website/ Bulletin
and Conspicous
places/office premises
1. Access/ View/ Inquire 2 Annswer querries on the
on CSC Bulletin of posted vacant positions per
Vacant position and inquiry Administrative Officer/
BFAR Bulletin/ None 2 Minutes Assistant/ Aide
Conspicous places BFAR-HRMS Office

269
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
2. Submit application 3. Receive and check
letter and requirements submitted application letter
and complete documents Administrative Officer/
per application None 5 Minutes Assistant/ Aide
BFAR-HRMS Office

4. Conduct initial
assessment per application Administrative Officer/
None None 30 Minutes Assistant/ Aide
BFAR-HRMS Office

5. Prepare pre-evaluation Administrative Officer/


None list of applicants per vacant None 1 Hour Assistant/ Aide
position BFAR-HRMS Office
3. Acknowledge receipt of 6. Notify applicants who are
notice excluded in the short-list of
applicants through mail/ e- Administrative Officer/
mail/ mobile messeges per None 1 Hours Assistant/ Aide
applicant BFAR-HRMS Office

7. Conduct Backgroud
investigation of shortlisted
applicants (per application) Administrative Officer/
None initial interview of None 1 Hour Assistant/ Aide
shortlisted vacant position BFAR-HRMS Office

4. Acknowledge receipt of 8. Notify qualified


notice and confirm applicants for the
attendance to the scheduled interview and Administrative Officer/
scheduled interview and examination per application None 1 Hour Assistant/ Aide
examination BFAR-HRMS Office

9. Conduct of interview of
shortlisted applicants per
vacant position HRMPSB and
None None 3 Hours Secretariat
BFAR-HRMS Office

10. Prepare Comparative


Assessment Form HRMPSB Technical
None (per position) None 2 Day Support Staff
BFAR-HRMS Office

11. Comparative
Assessment to be signed
by the Human Resource HRMPSB Secretariat
Merit, Promotion and and Technical Support
None None 1 Day
Selection Board (HRMPSB) Staff BFAR-
per position HRMS Office

270
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
12. Submit/ Present
Comparative Assessment HRMPSB Secretariat
to the Office of the Director and Technical Support
None None 1 Day
for recommendation Staff BFAR-
HRMS Office

13. Prepare and forward


endorsment letter and
complete required HRMS Designated
None documents of appointee/s None 1 Day Liaison Officer
to DA Personnel Division BFAR-HRMS Office
for DA Clearance

14. Notify applicant who are


not selected in the vacant
position through mail/ e- Administrative Officer/
None mail/ mabile messages None 1 Hour Assistant/ Aide
BFAR-HRMS Office

5. Acknowledge receipt of 15. Notify new employee to


notice submit the required
documents for the Administrative Officer/
1 Hour
processing of Appointment None Assistant/ Aide
BFAR-HRMS Office

16. Prepare Appointments,


Oath of Office and position
Description Form per Administrative Officer/
None appointee for signature of None 1 Day Assistant/ Aide
the Director BFAR-HRMS Office

6. Acknowledge receipt of 17. Notify new eployee on


notice on the oath taking the scheduled Oath taking
Administrative Officer/
and assumption to duty and assumption to duty
None 1 Hour Assistant/ Aide
BFAR-HRMS Office

18. Prepare Report on


Appointment issued (RAI)
along with the signed
Administrative Officer/
Appointment paper for
None None 4 Hours Assistant/ Aide
signature of the director
BFAR-HRMS Office

19. Forward signed


appointment with the
required documents of the Administrative Officer/
appointee to the CSC Field 1 Hour
None None Assistant/ Aide
Office for Validation (per applicant)
BFAR-HRMS Office

271
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
20. Notify application to
submit additionl
documents/ requirements
None for appontment

HRMS Designated
Liaison Officer BFAR-
None 1 Hour
HRMS
7. Submit additional 20.1 Received additional
Office
documents for documents submitted by
appointment the Newly appointed
personel (SALN, NBI, and
Medical Certificate)

21. Receive approved and


validated appointment from HRMS Designated
CSC Field Office Liaison Officer BFAR-
None None 1 Hour
HRMS
Office

22. Include the name of the


new appointee in the Administrative Officer/
1 Hour
None PSIPOP and GMIS for None Assistant/ Aide
(per applicant)
DBM requirements BFAR-HRMS Office

22 Days, 1 Hour, 37
TOTAL None
Minutes

272
11. Rewards and Recognition of Qualified Employees and Officials

1.Rewards and Recogntion of qualified employees and Officials to ensure and continue to promote programs that will recognize
employees, contributions to the overall objectives and efficient operations of the Bureau that will emphasized the organizational
mission and produce a positive effect on the work unit or agency.

Office or Division BFAR- Human Resource Management Section (HRMS)

Classification Simple

Type of Transaction G2G-Gov't to Government Employee and Official

Who may avail: BFAR Central Office, Officials and Employees

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Nomination Form BFAR-Human Resource Management Section, 3rd Flr., Fisheries Bldg.,

2. Invitation Letter BFAR-Human Resource Management Section, 3rd Flr., Fisheries Bldg.,

3. Memorandum Letter on the submission of


BFAR-Human Resource Management Section, 3rd Flr., Fisheries Bldg.,
OPCR/IPCR

4. Monitoring and Coaching Form BFAR-Human Resource Management Section, 3rd Flr., Fisheries Bldg.,

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Receive Memorandum 1. Circulate Memo Letter to
Letter for nomination/ all BFAR Officials and
invitation for outstanding Employees for
employees on Honor nomination/invitation for Praise Secretariat
None Every first week of January
Awards Honor Awards BFAR-HRMS Office

2. Submit accomplished 2. Receive accomplished


Nomination form and Nomination form and letter
supporting docs of recommendations its
supporting docs for Praise Secretariat
None On or before March 31
evaluation BFAR-HRMS Office

2.1 Conduct further Review


and Evaluation for the
submitted supporting
documents for nomination

2.2 Schedule meeting with Praise Secretariat


None None April 1 to 15 of the Month
the PRAISE committee for BFAR-HRMS Office
further evaluation and
recommendations

273
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
2.3 Conduct initial
deliberation of the PRAISE
Committee for the shortlist
None of nominees with the
submitted documents
Praise Committee
None April 1 to 15 of the Month
BFAR-HRMS Office
2.4 Prepare list of qualified
nominees and send letter to
None nominees who did not pass
the deliberation

2.5 Conduct field


validation/inspections on
None the submitted documents None April 16 to May 31

2.6 Conduct final


deliberation of the PRAISE
None Committee on the
validated/collated
documents
Praise Committee
2.7 Committee prepare and BFAR-HRMS Office
submit recommendation
letter to the Director to the None First week of June
None winning individual or group

2.8 Signature and approval


of the Director on the
Bureau Director BFAR-
None recommendation letter of
Director's Office
the awardees

3. Receive notification of 3. Schedule awarding


awarding program and program for the winning
confirmed attendance awardees and notify the
concerned awardees
Praise Committee and
15 Days before the
None Praise Secretariat
3.1 Prepare endorsement Awarding
BFAR-HRMS Office
letter signed by the Director
to the CSC Honor Awards
Program

4. Attend the awarding Bureau Directors and


ceremonies Head of Praise
None
Committee
Event Venue
None First week of July
5. Furnish a receiving 5. Mark the receiving copy
copy to HR and Retained for proper document retrival Praise Secretariat
a copy for personal file BFAR-HRMS Office
for future references

Time may vary according


TOTAL: None
to transactions

274
12. Strategic Performance Management System (SPMS) Process
1.Strategic Performance Management System (SPMS) is a mechanism to ensure that each employee contribute to the
attainment of or helps achieve the objectives et by the organizations and, on the other hand, the organization achieves that it
has set itself to achieve in its strategic plan.

Office or Division BFAR- Human Resource Management Section (HRMS)

Classification Simple

Type of Transaction G2G-Gov't to government employee & official

Who may avail: BFAR Central Office Officials and Employees, BFAR Regional Office officials and employees

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Latest Accomplished and rated IPCR for Individuals


BFAR-Human Resource Management Section, 3rd Flr., Fisheries Bldg.,
(2 Original Copies for 2 Rating Periods)

2. Latest Accomplished and rated OPCR for Divisions


BFAR- Section/Planning (FPED), 4th Flr., Fisheries Bldg.,
(2 Original Copies for 2 Rating Periods)

3. Memorandum Letter on the submission of


BFAR-Human Resource Management Section, 3rd Flr., Fisheries Bldg.,
OPCR/IPCR

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1.1 Prepare Memorandum
Administrative Assistant
to submit IPCR and OPCR
None None 30 Minutes V (COS) BFAR-
HRMS Office
1.2 Forward to the Office of
the Assistant Director for Administrative Assistant
None Administrative Service for None 5 Minutes V (COS) BFAR-
approval HRMS Office

2. Forward the approved


Memorandum to Records
Section for Dissemination Administrative Assistant
None to Central Office and None 5 Minute V (COS) BFAR-
National Centers HRMS Office

1. Submit two copies of 3. Receive accomplished


accomplished and reated and signed OPCR/IPCR for Administrative Assistant
OPCR/IPCR to the Performance Monitoring None 5 Minutes V (COS) BFAR-
HRMS HRMS Office

4. Conduct performance
Administrative Assistant
Review and Evaluation
V (COS) Performance
Rating of the OPCR and 2 Hourse (per IPCR)
None None Management Team
IPCR 6 hours (per OPCR)
Secretariat
BFAR-HRMS Office
Note: if with comments/corrections on the submission, return for proper revision/s (maximum of 3 Days)

275
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
2. Received the copy of 4.1 Return the reviewed
IPCR/OPCR with IPCR and OPCR to
attached comments/ concerned employee for
corrections for proper revision based on the Administrative Assistant
revision/s attached comments/ None 5 Minutes V (COS) BFAR-
correction based on the HRMS Office
deliberation of the PMT

Note: Until receipt of the corrected IPCR/OPCR (maximum of 3 days)

3. Submit original copy of 5. Received original


IPCR/OPCR to HR corrected/ signed Administrative Assistant
OPCR/IPCR for filling None 5 Minutes V (COS) BFAR-
HRMS Office

TOTAL: None 1 Day and 55 Minutes

276
13. Processing of Leave Application
Processing of leave application and individual leave of casual and permanent employees.

Office or Division BFAR-ADMIN- Human Resource Management Section- (HRMS)

Classification Simple

Type of Transaction G2G- Government to Government

Who may avail: BFAR Central Official Personnel and BFAR National Centers

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

BFAR-Human Resource Management Section, 3rd Flr., Fisheries Bldg.,


1. Leave Application Form-CSC Form 6 Revised 1998
BFAR-Human Resource Management Section, 3rd Flr., Fisheries Bldg.,
2. For 5 days sickleave, attach medical certificate
BFAR-Human Resource Management Section, 3rd Flr., Fisheries Bldg.,
3. For Maternity Leave, attach clearance
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

1. Receive the
Administrative Aide IV,
1. Accomplish Leave accomplished Leave
Senior Administrative
Application Form- CSC Application Form (Duly None 15 Minutes
Assisstant III BFAR-
Form 6 Revised 1998 signed by immediate
HRMS Office
supervisor)
1.1 On time-Record on
Attendance sheet and Administrative Aide IV,
encodeon Time and Senior Administrative
None None 5 Minutes
Attendance, Monitoring Assisstant III BFAR-
System (TAMS) HRMS Office

1.2 If beyond the


prescribed period submit
written explaination- Administrative Aide IV,
Record on Attendance Senior Administrative
None None 5 Minutes
Sheet and encode on Time Assisstant III BFAR-
and Attendance, HRMS Office
Monotoring System
(TAMS)
1.3 Process the filled up
leave application form and
updated Leave Card Senior Administrative
None Ledger and Human None 5 Minutes Assisstant III BFAR-
Resource Management HRMS Office
Information System
(HRMIS)
1.4 Forward to the Chief,
Human Resource Supervisinng
Management Section for Administrative Assisstant
None None 5 Minutes
signature III BFAR-HRMS
Office

1.5 Forward to the Chief,


Administrative Division for Chief, Administrative
None initial None 5 Minutes Officer Administrative
Division

277
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1.6 Forward to the OIC,
Office of the Assistant Attorney IV/OIC ADAS
None Director for Administrative None 1 Day BFAR-ADOTECH
Services for signature Office

1.7 Forward to BFAR


Director for Approval Director IV BFAR-
None None 1 Day
Director's Office

2. Received notification 1.8 Received and notify the Administrative Aide


on the approved leave approved leave to VI BFAR-
concerned employee's None 5 Minutes
HRMS
Fileb 201 Office

TOTAL: None 2 Days snd 45 Minutes

278
HRMS- PUBLIC ASSISTANCE COUNTER /ARTU

1. Technical Assistance for Walk-in Clients


To cater an efficient service to clients who conduct research, inquiries about fishing vessel, indentification/specification of
species, application for importation and exportation of fishery products, or planning a business for establishment of
fishpond/hatchary, renew license and issuance of certification and other concerns. And forward the clients to appropriate
Division/Section/Unit.
Office or Division BFAR - HR- Anti Red Tape Unit (ARTU)

Classification Simple
G2C - Government to Citizen; G2B - Government to Business; G2G- Government to Government
Type of Transaction

Who may avail: All (General Public and Gov't/Private organization)


CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. Letter Request /Verbal Request Client/Requesting Party/ies

2. Client Feedback Form BFAR - Admin-HRMS-Public Assistance & Complaint Counter /ARTU

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Discuss the concern to 1. Accept/ Acknowledge/
Public Assistance Assist the concern/ inquiry
Officer/Staff assigned at of walk-in clients.
Anti-Red Tape Unit, None 15 Minutes
Fisheries Bldg, Ground
Floor, Left wing
Administrative Assistant
II/ Administrative
1.1 Let the client sign up in
the log sheet for their basic Assistant III BFAR-HR-
None information and purpose. None 5 Minutes ARTU, G/Flr., Fisheries
Bldg., BPI Compound,
Visayas Ave., Q.C.
2. Present the Letter 2. Render the appropriate
Request of it's concern assistance for endorsement
for proper assistance if to the concern
None 15 Minutes
necessary/ applicable Division/Section

2.1 Provide the necessary


information needed/ Administrative Assistant
requested by the client. II/ Administrative
Assistant III BFAR-HR-
None None 20 Minutes
2.2 Provide Client Survey ARTU, G/Flr., Fisheries
Form to be filled out by the Bldg., BPI Compound,
client and the officer who Visayas Ave., Q.C.
rendered service.
3. Return the 3. Receive the
Administrative Assistant
accomplished Client accomplished Client
II/ Administrative
Feedback Form to the Feedback Form. Double
Assistant III BFAR-HR-
assisting personnel/staff check if it's filled out None 5 Minutes
ARTU, G/Flr., Fisheries
completely.
Bldg., BPI Compound,
Visayas Ave., Q.C.

TOTAL: None 1 Hour

279
2. Procedure in Handling Complaints or Negative Feedback
The monitoring mechanisms established in handling/addressing the negative feedback or complaints in rendering service by the
frontline office. Processing of complaint in accordance with the Revised Rules on Administrative Cases involving against civil
service officials or employee. The public assistance and complaints officer shall conduct investigation whenever necessary in
accordance with the Act.

Office or Division BFAR - HR- Anti Red Tape Unit (ARTU)


Classification Simple

Type of Transaction G2C - Government to Citizen; G2B - Government to Business; G2G- Government to Government

All (General Public, Stakeholders, other Gov't agencies, BFAR Central office, National centers,
Who may avail:
Regional/Provincial offices

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Accomplished Complaint Form BFAR - Public Assistance & Complaint Counter (PACC)/ARTU
2. Photo Copy of valid ID of Complainant for reference
BFAR - Anti-Red Tape Unit (ARTU)
purposes
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit accomplished 1. Receive and check the
Complaint Form with the accomplished Complaint Administrative Assistant
complete details of form II/ Administrative
personal info and Assistant III BFAR-HR-
complaint None 5 Minutes
ARTU, G/Flr., Fisheries
Bldg., BPI Compound,
Visayas Ave., Q.C.

2. Discuss the details of 2. Talk/Discuss with


Administrative Assistant
complaint to the Public Client/Complainant the
II/ Administrative
Assistant Officer in- details of complaints and
Assistant III BFAR-HR-
charge check it's validity None 20 Minutes
ARTU, G/Flr., Fisheries
Bldg., BPI Compound,
Visayas Ave., Q.C.
2.1 Render the appropriate
action/assistance to the
issue/concerns
raised/brought out by the Administrative Assistant
complainant by conducting II/ Administrative
an investigation/inquiry to Assistant III BFAR-HR-
None None 15 Minutes
the corcerned office being ARTU, G/Flr., Fisheries
complaint to know if the Bldg., BPI Compound,
complaint is valid and act Visayas Ave., Q.C.

3. Request for a dialogue 3. Coordinate by notifying


and/or investigation with the concerned Administrative Assistant
the concerned Office/Employee for the II/ Administrative
complaints/issues schedule dialogue with the Assistant III BFAR-HR-
Complainant None 15 Minutes
ARTU, G/Flr., Fisheries
Bldg., BPI Compound,
Visayas Ave., Q.C.

280
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
4. Receive notification on 4. Conduct dialogue and
the scheduled dialogue investigation with the
and Attend the concerned parties
scheduled dialogue with (Complainant and
the one being complained concerned personnel or
with the necessary office). The public Administrative Assistant
documents like assistant Officer acts as the II/ Administrative
photocopy of valid mediator to both parties Assistant III BFAR-HR-
3hrs
identifications and letter and will referred to the ARTU, G/Flr., Fisheries
of complaints or copy of Supervisor if the Bldg., BPI Compound,
complaints form concerned/issues cannot Visayas Ave., Q.C.
be resolve. If the
case/concern is resolved
prepare a report for
documentation purposes

4.1. Evaluate and prepare


a written report for the
action taken on the Administrative Assistant
matter/issues for both II/ Administrative
parties, provide the Assistant III BFAR-HR-
None complainant of the action None 4hours
ARTU, G/Flr., Fisheries
undertaken on the Bldg., BPI Compound,
complaints for proper Visayas Ave., Q.C.
disposition

5. Receive in writing thru 5. Inform/Notify the


e-mail or hard copy, if Client/Complainant in
requested, the action writing thru e-mail or hard
taken by the copy the action taken by
management and it's the PACC office and the Administrative Assistant
status or results of the management and it's status II/ Administrative
investigation and/or or results of the Assistant III BFAR-HR-
None 15mins
deliberation investigation/deliberation, ARTU, G/Flr., Fisheries
also furnish the the Bldg., BPI Compound,
aggrieved party the Visayas Ave., Q.C.
necessary documents to
satisfy

6. Accomplish and Return 6. Receive the


the provided Client accomplished Client
Feedback Form to the Feedback Form. Double Administrative Assistant
assisting personnel/staff check if it's filled out II/ Administrative
completely. Assistant III BFAR-HR-
None 5 Minutes
ARTU, G/Flr., Fisheries
Bldg., BPI Compound,
Visayas Ave., Q.C.

TOTAL: None 3 hrs and 38 Minutes

281
BFAR MEDICAL CLINIC

1. Evaluation of Health status and COVID-19 risk daily


Under the Health and wellness program of the Administrative Division- Human Resource Management Sectio, identification of
employee and transacting external clients who are safe to proceed with their normal work duties and enter the premises of the
office respectively shall be conducted by a licensed medical professional.
Office or Division BFAR-ADMIN- HRMS- Medical Clinic

Classification Simple
Type of Transaction G2G- Service whose client is another government agency, government employee of official

Who may avail: Internal and External clients

CHECKLIST OF REQUIREMENTS WHERE TO SECURE


BFAR Medical Clinic, Ground Floor Lobby, Fisheries Bldg., BPI
COVID-19 Health Assessment Form (AHRMS)
Compound, Visayas Avenue, Q.C.
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Temperature Check 1. Take temperature of the
employee/ transacting Administrative Aide IV
None 2 Minutes
external clients. Medical Clinic

2. Received and fill-out 2. Provide the COVID-19


the COVID-19 Health Health Assessment Form
Assessment form Administrative Aide IV
None 2 Minutes
Medical Clinic

3. Submit the Filled-out 3. Received and Assess


COVID-19 Health the submitted COVID-19 Administrative Aide IV
Assessment Form. Health Asessment form. None 3 Minutes
Medical Clinic

3.1 Advise the employee/


external transacting client
to take covid-19 Administrative Aide IV
None precautionary measures if None 10 Minutes
Medical Clinic
experiencing

3.2 Advise to proceed to


the concerned office or
work station if no symptoms Administrative Aide IV
None None 1 Minute
Medical Clinic

TOTAL: 18 Minutes

282
2. Administrative of First Aid Treatment to Internal and External Clients
Under the Health and wellness program of the Administrative Division- Human Resource Management Section, first aid
treatment to internal and external clients who are not in optimum health condition will be administered by a licensed medical
professional with enough medical.

Office or Division BFAR-ADMIN- HRMS - Medical Clinic

Classification Simple
G2G- Service whose client is another government agency, government employee of official , G2G-
Type of Transaction
Service whose clients is the transactiong public.

Who may avail: Internal and External clients

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Answer series of 1. Assess clients well-being


assessment questions (Check medical history,
Administrative Aide IV
allergies, pain scale None 10 Minutes
Medical Clinic
assessment ect.)

2. Cooperate in the 2. Checking Vital signs


process of vital signs Administrative Aide IV
None 5 Minutes
taking Medical Clinic

3. Administer simple
medical treatment to
relieve/ reduce discomfort
feeling of internal and Administrative Aide IV
None None 30 Minutes
external clients (e.g. Medical Clinic
Nebulize Wound Care, etc.)

3. Fill-out the Medical 4. Received filled-out


Clinic Request Form Medical Clinic Form Administrative Aide IV
(AHRMS-F-16) Request form (AHRMS-F- None 5 Minutes
Medical Clinic
16)
5. Tranfer and Endorse to
the nearest hospital or any
other medical facilities if Administrative Aide IV
None None 1 Hour
necessary Medical Clinic

TOTAL: 1 Hour and 50 Minutes

283
BFAR - RECORDS SECTION

1. Disposal of Valueless Records


Disposal of valueless records of the Bureau shall be authorized by the Executive Director of the National Archives of the
Philippines using the General Records Disposition Schedule and the approved Agency Records Disposition Schedule as basis
for disposal.Inventory and appraisal of records shall be done regularly by the records custodian and disposal of valueless
records shall be conducted at least once a year.

Office or Division BFAR- ADMIN- Records Section

Classification Highly Technical


Type of Transaction G2G- Government to Government
Who may avail: BFAR Division, Units, National Centers

CHECKLIST OF REQUIREMENTS WHERE TO SECURE


1. Request for Disposal of Valueless Records Records Section/BFAR Intranet
2. Request for Authority to Dispose Form - NAP Form Download from National Archives of the Philippines website or BFAR
No. 3 (3 copies) Records Section/intranet
3. Records Inventory and Appraisal - NAP Form No.1 Download from National Archives of the Philippines website or BFAR
( 3 copies) Records Section/intranet

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit filled out 1. Receive request form
request for disposal of and check/review the Administrative Staff ,
valueless records submittted NAP forms and Administrative Officer II
including the duly identified records series for and Administarive Officer
accomplished NAP forms disposal complies with the IV BFAR-
no. 1& 3 retention period indicated in Records Section
None 2 hours
the GRDS and ARDS Ground Floor, Fisheries
Building Complex, BPI
Compound, Visayas
Avenue, Vasra, Quezon
City

2. Prepare Letter request


addressed to NAP Administrative Officer II,
Executive Director and . Administrative Officer IV
BFAR-Records Section
None None
G/Floor, Fisheries Bldg.,
BPI Compound, Visayas
2 hours Ave., Q.C.

2.1 Forward the Letter to


the office of the Assistant Office of the
None Director for Administrative None Asst.Director for
Services for approval Administrative Services

3. Deliver signed request


letter to the National
Archives of the Philippines
office Administrative
None *inclusive of estimated time None *2 hours staff/Liaison officer
of travel from Visayas BFAR Records Section
Avenue, Quezon City to
San Marcelino St., Manila

284
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
4. Review and approve
request and issue reply to
the request with attached Records Analyst-NAP-
None Records Management
Records Management
Anaysis Report and
Services Division 1st
Authority to Dispose
& 6th Floor, PPL
None 23 days
Building, 1000, U.N.
41 Notify requesting Avenue, corner, San
agency that the request has Marcelino St, Manila,
None been approved and is Metro Manila
ready for pick-up

5 Claim reply letter,


Analysis report and
authority to dispose at the
NAP office * inclusive of Administrative
None estimated travel time from None *2 hours staff/Liaison officer
Visayas Avenue to San BFAR Records Section
Marcelino St., Manila

2. Receive the file copy of 2. Provide copy of the


approved letter reply, approved letter reply, Administrative Officer II,
Analysis Report and analysis report and None 30 minutes Administrative Officer IV
Authority to Dispose from Authority to dispose to BFAR-Records Section
NAP concerned clients/offices

2.1 Coordinate with


accredited buyer of NAP
Administrative Officer II,
and set date for the actual
None None Administrative Officer IV
disposal of records
BFAR-Records Section

3. Prepare and ready the 3. Inform the concerned


packed documents for client/office of the
disposal scheduled date of actual Administrative Officer II
disposal and advice them None Administrative Officer IV
to prepare their documents BFAR-Records Section
for disposal.
15 days
3.1 Prepare a letter request
*subject to the availability
for COA inviting a
of the buyer Administrative Officer II,
representative from their
Administrative Officer IV
office to witness the actual
BFAR-Records Section,
disposal of records and
None None Chief Administrative
Certificate of Compliance
Division and Assistant
for approval of the
Director for
Assistant Director for
Administrative Services
Administrative Services

3.2 Release signed letter


Administrative Staff-
request and certification to
BFAR Records Section
None COA and NAP respectively None
and representative from
COA and NAP

285
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
4. Attend the actual 4. Conduct actual disposal Administrative Officer V,
disposal of records in the presence of the COA Administrative Officer IV,
and NAP representatives Administrative Staff-
None BFAR Records Section,
representatives from
COA,NAP and NAP
Accredited buyer
4.1 Assist the buyer in
paying the total sale value
BFAR Records Section
None of the disposed records to None
Staff
the Cashier Section

4.2. Receive payment from BFAR-Cashier staff


buyer and issue Official 4th floor Main Building,
Receipt Fisheries Building
Complex, BPI
None None Compound, Visayas
Avenue, Vasra, Quezon
same as above the City
processing time representative of NAP
accredited buyer
5. Sign Certificate of 5. Issue Certificate of
Disposal issued by the Disposal for signature of
NAP the requesting client/office,
COA, NAP Representative, None Representative of NAP
and NAP accredited buyer

6. Secure gate pass from


Administrative Staff-
the Property Section and
Records Section,
None present to the guard on None
Property Staff and
duty the item for disposal
Security Guard on duty
5. Receive and file copy 7. Distribute the
Administrative Officer II,
of signed Certificate of photocopy of the signed
Administrative Office IV,
Disposal and Official Certificate of Disposal and
None representatives of
Receipt Official Receipt to
requesting party,NAP,
concerned parties
NAP buyer and COA

TOTAL None 39 days 35 minutes

286
2.Lending of Fishpond Lease Agreement (FLA) and Commercial Fishing Vessel and Gear Licenses
(CFVGL) Records
Fishpond Lease Agreement (FLA) and Commercial Fishing Vessels and Gear Licenses CFVGL) records is made available to
the different action officers of the above records. However, to ensure accountability, documentation is being observed in
lending these records to the different offices.

Office or Division BFAR- ADMIN- Records Section


Classification Simple
Type of Transaction G2G- Government to Government
Legal Division, Fisheries Regulatory and Licensing Division, Adjudication Committee, Regional
Who may avail: Directors/Offices

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

Request for Retrieval Form - ARS-F-02 ( 1 original Records Section/intranet - Ground Floor Main Building, Fisheries
copy) Building Complex, BPI Compound, Visayas Avenue, Vasra, Quezon City

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit filled-out 1. Receive form and check
Administrative Staff
Retrieval form if the records being
requested is on BFAR-Records Section
file/available Ground Floor Main
None 3 Minutes Building, Fisheries
Building Complex, BPI
Compound, Visayas
Avenue, Vasra, Q.C.
1.1 Retrieve the records 2 Minutes Administrative staff
None None BFAR-Records Section

2.Sign the charge out 2. Ask client to sign the


card/ logsheet and charge out card/logsheet
Administrative staff
receive the requested and release the records None 5 Minutes
BFAR-Records Section
records

2.1 File charge-out card Administrative Staff


None None 1 Minute
BFAR-Records Section

TOTAL None 11 minutes

287
3. Issuance of Certified Photocopy of Fishpond Lease Agreement (FLA) and Commercial Fishing
Vessel and Gear Licenses (CFVGL) Records
The issuance of certified photocopy is limited only to the FLA and CFVGL records deposited at the Records Section. Likewise,
no records shall be certified without securing or retrieval of the original file copy of the same.

Office or Division BFAR- ADMIN- Records Section

Classification Simple

Type of Transaction G2C - Government to Business Entity


Who may avail: FLA Lessee/applicants and Fishing Vessel Operators/owners/representive

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

Principal:
1. Request letter Client/requesting party
BIR. Post Office, DFA, SSS, GSIS, Pag-IBIG, LTO, Comelec, LGU,
2. Government Issued Identification Card
PRC, PSA

3.Request for Certification Form - ARS-F-02 Form (1 Records Section/intranet - Ground Floor Main Building, Fisheries
original copy) Building Complex, BPI Compound, Visayas Avenue, Vasra, Quezon City

Representative:
1. Request letter Person being represented
2. Special Power of Attorney/Authorization Letter Person being represented

3. Government issued Identification Card of the BIR. Post Office, DFA, SSS, GSIS, Pag-IBIG, LTO, Comelec, LGU,
person being represented (1 original and 1 photocopy) PRC, PSA

4. Government issued Identification Card of the BIR. Post Office, DFA, SSS, GSIS, Pag-IBIG, LTO, Comelec, LGU,
Representative PRC, PSA

5. Request for Certification Form - ARS-F-02 Form (1 Records Section/intranet - Ground Floor Main Building, Fisheries
original copy) Building Complex, BPI Compound, Visayas Avenue, Vasra, Quezon City

Records Section/intranet - Ground Floor Main Building, Fisheries


6. Certification fee per page - P10.00
Building Complex, BPI Compound, Visayas Avenue, Vasra, Quezon City

Records Section/intranet - Ground Floor Main Building, Fisheries


7. Order of Payment
Building Complex, BPI Compound, Visayas Avenue, Vasra, Quezon City

BFAR-Cashier Section - 4th Floor Main Building, Fisheries Building


8. Official Receipt
Complex, BPI Compound, Visayas Avenue, Vasra, Quezon City

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit request letter to 1. Accept and review the
the Records Section and request letter and issue
fill-out ARS-F-02 Form ARS- F-02 Form
None 5 Minutes Administrative staff
BFAR-Records Section

288
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1.1 Retrieve the records Action Officers of Legal
and refer for approval to Division 2nd Floor
the following divisions: Main Building, Fisheries
*Legal Division – for FLA Building Complex, BPI
None None 20 minutes
with case Compound, Visayas
*FRLD - for FLA with no Avenue, Vasra, Quezon
case City
or
2. Secure Order of 2. Issue Order of Payment 10 Minutes (depending on Administrative Officer IV
Payment at the BFAR- and prepare requested the number of requested or
Records Section located documents records to be certified) Administrative Officer II,
at G/Flr., Fisheries Bldg., None Administrative Staff-
BPI Compound BFAR-Records Section

3. Submit Order of 3.Accept payment and


Payment and pay the issue Official Receipt
required fees and secure
Official Receipts at the Certification fee BFAR-Cashier Section -
BFAR-Cashier Section, is P10.00 5 minutes 4th Floor Fisheries Main
4th Flr., Fisheries Bldg., (per page) Building
BPI Compound,

4. Present Official 4.Photocopy the OR and


Administrative Officer IV
Receipt (OR) and release the certified
or
receive requested records to the client
None 5 Minutes Administrative Officer II,
certified records
Administrative staff
BFAR-Records Section

TOTAL: P10/page 45 Minutes

Note: The requesting party shall be directed to pay P10.00 per certified copy if the number of certified copies being requested is
more than two (2).

289
4. Mailing of Official Document

Centralized mailing of documents is observed in the Central office for efficient control and dispatch of documents.

Office or Division BFAR- ADMIN- Records Section

Classification Simple
Type of Transaction G2G- Government to Government
Who may avail: BFAR Division, Units, Sections

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

Request for Postal Service Form - ARS-F-01 Form -


(1 original copy) Records Section/intranet - Ground Floor Main Building, Fisheries
Building Complex, BPI Compound, Visayas Avenue, Vasra, Quezon City

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit filled-out 1. Receive request and Administrative staff
Request for Postal record in the logbook BFAR-Records Section
Service Form together Ground Floor Main
with the document for None 5 Minutes Building, Fisheries
mailing
Building Complex, BPI
Compound, Visayas
Avenue, Vasra, Q. C.
1.1 Read, release and
photocopy received *10 Minutes
document/s depending on the number Administrative staff
None None
of pages to be reproduced BFAR-Records Section
and number of recipients

1.2. Classify according to


destination and postal Administrative Assistant
service requested and IV, Administrative
None record in corresponding None 3 Minutes
Assistant II
logbook BFAR-Records Section

1.3 Prepare mailing


envelope, provide control Administrative Assistant
number, attach tracking IV, Administrative
None None 10 Minutes
sticker and stamp envelope Assistant II
accordingly BFAR-Records Section

1.4 Weigh and seal


envelope to determine the Administrative Assistant
cost of mailing and have it IV, Administrative
None metered stamped None 2 Minutes
Assistant II
BFAR-Records Section

1.5 Prepare the Transmittal


Form/Registry Return
Administrative Assistant
Receipt Cards and attach
IV, Administrative
None tracking stickers None 5 Minutes
Assistant II
BFAR-Records Section

290
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1.6 Prepare mailing list,
Daily Statement reading Administrative Assistant
Reports of Mail Posted IV, Administrative
None None 5 Minutes
Through Postage Stamp Assistant II
Machine Form BFAR-Records Section

1.7 Mail the document at


the Quezon City Post Office Administrative Assistant
20 minutes *inclusiveof III, Administrative
None None
estimated travel time Assistant IV
BFAR-Records Section

2. Receive and file the 2. Release a copy of the


copy of the ARS F-01 ARS F-01 form to the Administrative Assistant
Form together with the requesting party III, Administrative
None 5 Minutes
basic documents/ Assistant IV
communications BFAR-Records Section

TOTAL None 1 hour and 5 minutes

291
5. Releasing of documents through Messengerial Service

Delivery of documents that are urgent in nature and requires immediate action shall be delivered by the designated messenger
within one (1) day from receipt.

Office or Division BFAR- ADMIN- Records Section


Classification Simple

Type of Transaction G2G- Government to Government

Who may avail: BFAR Division, Units, Sections

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

ARS-F-02 Form - Delivery Form (1 original copy) BFAR-Records Section/intranet - Ground Floor Main Building,
Fisheries Building Complex, BPI Compound, Visayas Avenue, Vasra,
Quezon City
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit filled-out 1. Receive request and
Administrative staff
delivery form and record in the logbook
BFAR-Records Section
document for delivery
Ground Floor Main
Building, Fisheries
None 5 Minutes
Building Complex, BPI
Compound, Visayas
Avenue, Vasra, Quezon
City
1.1 Read, release and Administrative Officer II,
photocopy received Administrative Officer IV,
None document/s None 10 Minutes Administrative staff
BFAR-Records Section

1.2 Deliver the document to


concerned office/agency Administrative Officer II,
Administrative Officer IV,
Administrative Assistant
III, Administrative
2 hours 30 Minutes Assistant II,
None None * inclusive of estimated Administrative Assistant
travel time IV, Administrative Assist.
I BFAR-
Records Section,
Receiving Clerk/staff of
concern office

2. Receive and file the 2. Release a copy of the Administrative Assistant


copy of the stamped stamped "received" ARS-F- III, Administrative
"received" ARS-F-02 02 Form to the requesting Assistant II,
Form together with the party and file duplicate for Administrative Assistant
basic communication/ record/reference purposes IV, Administrative
documents None 5 Minute Assistant I
BFAR-Records Section

292
TOTAL None 2 hours 50 minutes

6. Issuance of Certified Photocopy of Fishpond Lease Agreement (FLA), Commercial Fishing Vessel
and Gear Licenses (CFVGL) Records and Approved issuances (FAO, FGMO and FMO)

The issuance of certified photocopy is limited only to the FLA,CFVGL and approved issuances such as Fisheries Administrative
Order, Fisheries General Memorandum Order and Fisheries Memorandum Order deposited at the Records Section. Likewise,
no records shall be certified without securing or retrieval of the original file copy of the same.

Office or Division BFAR- ADMIN- Records Section

Classification Simple

Type of Transaction G2G - Government to Government

Who may avail: BFAR Officials and action officers

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

Principal
BFAR Records Section/intranet - Ground Floor Main Building,
1. Request for Certification Form - ARS-F-02 Form (1
Fisheries Building Complex, BPI Compound, Visayas Avenue, Vasra,
original copy)
Quezon City

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit filled-out ARS- 1. Receive ARS- F-02
F-02 Form Form Administrative staff
BFAR-Records Section
*Ground Floor Main
Building, Fisheries
Building Complex, BPI
Compound, Visayas
Avenue, Vasra, Q.C.
1.1 Retrieve the record/s
and reproduce according to None 14 minutes
the number of copies Administrative Staff-
none
requested to be certified BFAR Records Section

1.2 Stamp and sign (as


Administrative Officer IV,
certified copies) records
Administrative Officer II,
none
Administrative Staff-
BFAR Records Section
2. Check and receive 2. Issue/release copies of none 1 minute Administrative Staff
requested certified copies certified records BFAR-Records Section
of records

TOTAL: 15 minutes

293
BFAR - PROPERTY SECTION

1. Issuance of Approved Purchase Order for Commercial Suppliers ensures that only those
complying with BFAR's requirements/specifications are delivered and paid

Office or Division BFAR-ADMIN-Property Section

Classification Highly Technical

Type of Transaction G2C- Gov't to Citizen, G2B-Gov't to Business Entity, G2G-Gov't to Gov't

Who may avail: Suppliers, BFAR Employees

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Project Procurement Management Plan


(PPMP)/Annual Procurement Plan (APP)
2. Purchase Request (PR) with Bids and Awards
Committee (BAC) recommendation
3. Request for Quotation (RFQ) Bids and Awards Committee (BAC), 2nd Flr, Fisheries Main Bldg.,
BPI Compound
4. Abstract/Summary of Quotation
5. Properly filled-up Purchase Order (PO)
Note: Make sure that the winning bidder is included in
BFAR's suppliers' registry and had submitted all
required documents
6. Warranty Certificate Supplier End
7. Document Tracking System (DTS)
8. Sales Invoice (SI)
9. Delivery Receipt (DR) BFAR- Property Section, 2nd Flr., Fisheries Annex Bldg., BPI
10. Inventory Custodian Slip (ICS) Compound
11. Property Acknowledgment Receipt (PAR)
12. Inspection and Acceptance Report (IAR)

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit to BAC the 1. Receive (PO) Purchase
proposed specifications Order
for the delivery of 10 minutes Property Staff
supplies, materials, and
equipment (Supplier)
2. Submit to BAC 1.1 Stamp PO, log, and
None
approved PO with the assign control number
5 minutes Property Staff
required complete
attachments (BAC)
1.2 Enter in DTS
3 minutes Property Staff

2. Check, scrutinize PO
and encode in database Property Staff
None None 5 minutes
Note: If the PO has
discrepancy, proceed to Property Staff
Step 3. Otherwise, proceed

294
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
3. Attach note/checklist to
BAC/end-user for
None compliance None 3 minutes Property Staff

4. Contact/ Coordinate
supplier to accept
None None 10 minutes Property Staff
PO/contract

3. Sign in the 'Conforme' 5. Receive signed PO and


portion of the PO if all give a copy to supplier
terms are acceptable 3 minutes Property Staff

None
5.1 Forward copy to COA
1 day Property Staff

4. Deliver requested 6. Sign 'Received' portion


item/property of Delivery Receipt Property Staff

6.1 Attach original DR to None 3 minutes


file and return 2nd copy to Property Staff
supplier

7. Prepare Inspection &


Acceptance Report (IAR) in
Property Staff
3 copies
None None 3 minutes
7.1 Forward to Property
Inspector for inspection of Property Staff
delivery
8. Review completeness
and correctness of Property Staff
documents
8.1 Sign in 'Acceptance'
None None 15 minutes
column; check if 'complete'
or 'partial'; indicate date of Property Staff
receipt and remarks, if any

9. Store delivered items in


Storeroom for safekeeping
None None 2 Days Property Staff

10. Assign stock number


None for ICS items None 3 minutes Property Staff

11. Prepare stock card


None None 3 minutes Property Staff

12. Log and assign


None ICS/PAR number; fill up None 3 minutes Property Staff
details
13. Encode in inventory of
PPE/inventory items
None None 3 minutes Property Staff

295
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
14. Release ICS/PAR
None copies None 3 minutes Property Staff

15. Prepare Disbursement


Voucher (DV); attach IAR Property Staff
and PO
None None 3 minutes
15.1 Encode in Document
Tracking System (DTS) Property Staff

16. Check completeness of


documents for
processing/payment with
None complete attachments None 3 minutes Property Staff

17. Conduct post-delivery


inspection of items at the
None filed together with the None 2 Days Property Staff
TWG/Inspection Team

18. Release the DV and PO


to Accounting for
None processing/payment with None 3 minutes Property Staff
complete attachments

Total: 6 days, 1 hr. & 26 mins.

296
2. Stability, orderliness, proper stacking of supplies, materials, and equipment ensures protection
against theft, fire, deterioration, and are readily accessible to requesting offices
Office or Division BFAR-ADMIN-Property Section
Classification Simple
Type of Transaction G2G - Gov't to Gov't
Who may avail: BFAR Employees

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. PPMP/APP Bids and Awards Committee (BAC), 2nd Flr, Fisheries Main Bldg.,
2. Purchase Request (PR) BPI Compound

3. Agency Purchase Request (APR)


DBM-Procurement Service
4. Delivery Receipt (DR)
5. Requisition and Issue Slip (RIS)
6. Property Acknowledgment Receipt (PAR) BFAR-Property Section, 2nd Floor, Fisheries Annex Bldg., BPI
Compound, Visayas Ave., Q.C.
7. Inventory Custodian Slip (ICS)

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Prepare PR based on 1. Receive approved PR
None 3 minutes
approved PPMP
2. Check availability at
PhilGEPS
Note: If available,
proceed to 2.2.
Otherwise, proceed to
Step 7 Admin. Aide VI/Admin.
2.1 Prepare RIS; request Asst. IV
None None 10 minutes
employee to sign
'Requested by' portion
2.2 Review and verify RIS;
fill up details, place initial
on 'Approved by' portion,
and record
3. Sign 'Approved by'
None portion None 3 minutes Property Officer

4. Prepare ICS/PAR; fill up


None details None 3 minutes Admin. Asst. IV/V

5. Sign 'Received from'


None portion None 3 minutes Property Officer

2. Receive supplies, sign 6. Sign 'Issuance' portion,


'Received by' portion in issue supplies to employee
None 3 minutes
ICS/PAR and RIS
Admin. Aide VI/Admin.
7. Prepare 'Certificate of Asst. IV
Non-Availability of
3 minutes
Supplies', If not available
None None
7.1 Sign certificate; return
3 minutes Property Officer
to Staff

297
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
3 Receive certificate; 8. Issue signed certificate Admin. Aide VI/Admin.
purchase from other to employee and record Asst. IV
source None 3 minutes

Total: 34 minutes

298
3. Purchase, storage, and issuance of common-use supplies and materials from DBM-Procurement
Service ensures compliance to RA 9184, also known as the Government Procurement Reform Act.

Office or Division BFAR-ADMIN-Property Section


Classification Simple
Type of Transaction G2G - Gov't to Gov't
Who may avail: BFAR Employees
CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. PPMP/APP Bids and Awards Committee (BAC), 2nd Flr, Fisheries Main Bldg.,
2. Purchase Request (PR) BPI Compound, Visayas Ave., Q.C.

3. Agency Purchase Request (APR)


DBM-Procurement Service
4. Delivery Receipt (DR)

5. Requisition and Issue Slip (RIS)


BFAR- Property Section, 2nd Flr., Fisheries Annex Bldg., BPI
6. Property Acknowledgment Receipt (PAR)
Compound, Visayas Ave., Q.C.
7. Inventory Custodian Slip (ICS)

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Prepare PR based on 1. Receive approved PR
approved PPMP
Note: If supplies are
available at DBM-PS, None 3 minutes
proceed to Step 5.
Otherwise, proceed to
Step 2

2. Prepare Certificate of
Admin. Aide VI/Admin.
None Non-Availability of Supplies None 3 minutes Asst. IV
(CNAS)
2. Receive CNAS 3. Release original CNAS
None 3 minutes

4. Forward PR and CNAS


None (copy 2) to BAC None 3 minutes

5. Prepare Agency
None None 3 minutes
Purchase Request
6. Sign APR
None None 3 minutes Property Officer

7. Forward signed APR to


Accounting Section for
None None 3 minutes
processing

8. Get the check from the Admin. Aide VI/Admin.


Cashier Section Asst. IV
None None 3 minutes

9. Bring check to DBM-PS;


None choose mode of delivery None 2 Hours (1 - 2 hours)
(pick up or deliver)

299
10. Receive supplies from
PS Admin. Aide VI/Admin.
1 hour
Asst. IV

10.1 Enter details of


None received item in Bin Card None 3 minutes

10.2 Issue to requesting


end-users 3 minutes

Total: None 3 hours, 30 minutes

4. The issuance of the Waste Material Report ensures that all waste materials previously taken up in the books of
accounts as assets or in the custody of the accountable officer are reported so that they may be properly disposed of
and derecognized from the books.
Office or Division: BFAR-ADMIN-Property Section
Classification: Simple
Type of Transaction: G2G - Gov't to Gov't
Who may avail: BFAR Employees
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. Filled-up and approved Waste Material Report
(WMR) BFAR- Property Section, 2nd Flr., Fisheries Annex Bldg., BPI
Compound, Visayas Ave., Q.C.
2. Photocopy of PAR/ICS
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit WMR with 1. Receive items, check
attached PAR/ICS for the correctness of article and 30 minutes
Turn-over unserviceable specifications
Admin. Aide VI/Admin.
supplies and materials; None
1.1 Secure copy of WMR 3 minutes Asst. IV

1.2 Issue return slip to


3 minutes
accountable officer
2. Cancel from ICS/PAR of
None accountable officer None 3 minutes Admin. Asst. IV/V

3. Temporarily store items Admin. Aide VI/Admin.


None at the Storeroom None 6 Months
Asst. IV
4. Log WMR with note
{Above waste materials Admin. Aide II/Sr. Admin.
None temporarily stored at None 5 Minutes (3-5 minutes)
Asst
(designated area)}
5. Indicate "For disposal' in Administrative Assistant
None the Property Card None 3 minutes IV
6. Sign WMR
None None 3 minutes Property Officer

2. Receive approved 7. Release WMR together


Admin. Aide II/Sr. Admin.
WMR with attachments None 3 minutes
Asst

Total: 6 Months and 53 minutes

300
5. The issuance of Clearance from Property Accountability/ies ensures compliance to COA Circular No. 92-391 which
requires the settlement of and clearance from accountabilities of accountable officer prior to transfer, retiretirement, or
acceptance of resignation.
Office or Division: BFAR-ADMIN-Property Section
Classification: Simple
Type of Transaction: G2G - Gov't to Gov't
Who may avail: BFAR Employees

CHECKLIST OF REQUIREMENTS WHERE TO SECURE


1. Original copy of Clearance
2. Property Acknowledgment Receipt (PAR) - for
BFAR- Property Section, 2nd Flr., Fisheries Annex Bldg., BPI
transfer of property accountability of equipment
Compound, Visayas Ave., Q.C.
3. Inventory Custodian Slip (ICS) - for transfer of
inventories
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit four (4) copies 1. Receive clearance and
of clearance For initial of check for property
Property Office accountability/ies of
employee
Note: If the employee has
3 minutes (3-5
property accountability/ies, None Admin. Asst. IV/V
minutes)
proceed to Step 2.
Otherwise, proceed to Step
4.

2. Receive the list of 2. Print and provide the list


property of property
None 3 minutes Admin. Asst. IV/V
accountability/ies accountability/ies.

3. Verify the property


accountability/ies, if any
None None 1 Day Admin. Asst. IV/V

4. Countersign the
None clearance form None 3 minutes Admin. Asst. IV/V

5. Reconcile from the


inventory records to update Admin. Assistant IV/Sr.
None employee's None 5 minutes
Admin. Assistant
accountability/ies

6. Sign the clearance form


None None 3 minutes Property Officer

3. Receive the approved 7. Release the approved


application for clearance application for clearance None 3 minutes Admin. Asst. IV/V

Total: 1 Day and 20 minutes

301
6. The issuance of Property Acknowledgment Receipt (PAR) for Newly-Acquired Property, Plant, and
Equipment (PPE) ensures that accountability, responsibility, and liability of accountable or
responsible officers shall be established which may arise from loss, misuse, damage, or
deterioration of government property due to fault or negligence in safekeeping.

Office or Division: BFAR-ADMIN-Property Section


Classification: Simple
Type of Transaction: G2G - Gov't to Gov't
Who may avail: BFAR Employees

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Purchase Order (PO)


2. Sales Invoice/Official Receipt BFAR- Property Section, 2nd Flr., Fisheries Annex Bldg., BPI
3. Inspection and Acceptance Report Compound, Visayas Ave., Q.C.

4. Warranty Certificate

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit documents 1. Receive the
documentary requirements None

5 minutes Admin. Asst. IV/V


2. Log and assign property
None number; encode in None
inventory of PPE
3. Sign 'Received from'
None portion of PAR None 3 minutes Property Officer

2. Receive duplicate PAR 4. Release duplicate PAR


for newly-acquired PPE for newly-acquired PPE None 3 minutes

5. File original copy per


Admin. Asst. IV/V
document
None None 3 minutes

Total: 12 minutes

302
7. The issuance of Property Acknowledgment Receipt (PAR) for Transferred PPE ensures that the
receiving employee shall be made accountable, responsible, and liable for the subsequent loss,
misuse, damage, or deterioration of government property while the previous accountable employee
shall be freed from such.
Office or Division: BFAR-ADMIN-Property Section
Classification: Simple
Type of Transaction: G2G - Gov't to Gov't
Who may avail: BFAR Employees

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Old Property Acknowledgment Receipt (PAR) BFAR- Property Section, 2nd Flr., Fisheries Annex Bldg., BPI
signed by original end-user Compound, Visayas Ave., Q.C.

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit photocopy of 1. Receive the
PAR signed by original documentary requirements
None
end-user

2. Log and assign property 5 minutes Admin. Asst. IV/V


None number None

3. Stamp duplicate copy


None None

4. Encode information in
Admin. Assistant IV/Sr.
None the database None 5 minutes
Admin. Assistant
5. Sign 'Received from'
None portion of PAR None 3 minutes Property Officer

2. Receive duplicate PAR 6. Release duplicate PAR


for transferred PPE for transferred PPE None 3 minutes

7. File original copy Admin. Asst. IV/V

None None 2 minutes

Total: 16 minutes

303
8. The issuance of Inventory Custodian Slip (ICS) for Newly-Acquired and Transferred Inventories ensures
accountability of end-users over the issued tangible items.

Office or Division: BFAR-ADMIN-Property Section

Classification: Simple

Type of Transaction: G2G - Gov't to Gov't


Who may avail: BFAR Employees

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Official receipts (OR) or Sales Invoice (SI) - for


newly-acquired inventories
BFAR- Property Section, 2nd Flr., Fisheries Annex Bldg., BPI
2. Old PAR/ICS signed by original end-user (for Compound, Visayas Ave., Q.C.
transferred inventories amounting to less than
P15,000.00

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit documents 1. Receive the
documentary requirements None

2. Log and assign ICS


number 5 minutes Admin. Asst. IV/V
None None

3. Detach original copy


None None

4. Encode information in
the database Admin. Assistant IV/Sr.
None None 5 minutes
Admin. Assistant

5. Sign 'Received from'


None portion of ICS None 3 minutes Property Officer

2. Receive duplicate ICS 6. Release duplicate ICS


None 3 minutes
Admin. Asst. IV/V
7. File original copy
None None 2 minutes

Total: 18 minutes

304
9. The issuance of Request for Dropping from Books of Account Due to Loss of Property ensures that lost properties
will no longer be recorded/dropped in the PPE account

Office or Division: BFAR-ADMIN-Property Section

Classification: Simple

Type of Transaction: G2G - Gov't to Gov't


Who may avail: BFAR Employees

CHECKLIST OF REQUIREMENTS WHERE TO SECURE


1. PAR signed by accountable officer
2. Inventory Report
3. Approved request for relief from accountability BFAR- Property Section, 2nd Flr., Fisheries Annex Bldg., BPI
Compound, Visayas Ave., Q.C.
4. Copy of investigation report
5. Affidavit or sworn statement of accountable officer

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1 Submit approved 1. Receive the
request for relief from documentary requirements
accountability together None
with supporting
documents
2. Prepare the request for 10 minutes Admin. Asst. V
dropping
None None

3. Log and update


None database None

4. Affix initials on document Admin. Asst. V &


None None 3 minutes Property Officer

5. Release original request


for signature of the
None 3 minutes
Administrative Officer

None 5.1 Release signed request Admin. Assistant I


to Accounting Section
None 3 minutes

2. Receive cancelled 6. Release cancelled PAR


PAR
None 2 minutes
Admin. Asst. V
7. File triplicate copy
None None 2 minutes

Total: 23 minutes

305
10. The issuance of Request for Dropping from Books of Account Due to Transfer of Property ensures that the
property is duly recognized in the books of the receiving entity while derecognized in that of the granting entity.

Office or Division: BFAR-ADMIN-Property Section


Classification: Simple
Type of Transaction: G2G - Gov't to Gov't
Who may avail: BFAR Employees

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. PAR signed by accountable officer


BFAR- Property Section, 2nd Flr., Fisheries Annex Bldg., BPI
2. Inventory Report Compound, Visayas Ave., Q.C.
3. Property Transfer Receipt (PTR)

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit approved 1. Receive the
Property Transfer documentary requirements
None
Receipt (PTR)

2. Prepare the request for


10 minutes Admin. Asst. V
None dropping None

3. Log and update


None database None

4. Affix initials on document Admin. Asst. V &


None None 3 minutes Property Officer

5. Release original request


for signature of the
Administrative Officer None 3 minutes

None Admin. Assistant I


5.1 Release signed request
to Accounting Section None 3 minutes

2. Receive cancelled 6. Release cancelled PAR


PAR
None 2 minutes

Admin. Asst. V
7. File original copy
None None 2 minutes

Total: 23 minutes

306
11. The issuance of the Request for Booking to Books of Account Due to Donation or Transfer by another entity (BFAR
as the recipient) ensures that the property is duly received by BFAR and that an accountable officer has been
identified.

Office or Division: BFAR-ADMIN-Property Section

Classification: Simple
Type of Transaction: G2G - Gov't to Gov't
Who may avail: BFAR Employees

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. PAR signed by accountable officer


BFAR- Property Section, 2nd Flr., Fisheries Annex Bldg., BPI
2. Deed of Donation, if donated property Compound, Visayas Ave., Q.C.

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit photocopy of 1. Receive the
PAR and Deed of documentary requirements
Donation (If donated None
property)

3 minutes
1.1 Log and assign control
number Admin. Asst. V
None None

2. Stamp duplicate copy


None None 3 minutes

3. Encode information in
None the database None 5 minutes Sr. Admin. Assistant

4. Affix initials on document


Admin. Asst. V &
None None 3 minutes
Property Officer
5. Release original request
for signature of the
None Administrative Officer None 3 minutes

Admin. Assistant I
5.1 Release signed request
to Accounting Section
None None 3 minutes

2. Receive duplicate PAR 6. Release duplicate PAR


None minutes
Admin. Asst. V
7. File original copy
None None 2 minutes

Total: 24 minutes

307
12. The issuance of Gate Pass for Bringing Out Property ensures that the property is properly tracked thus preventing
difficulty in tracking its location, or even loss

Office or Division: BFAR-ADMIN-Property Section

Classification: Simple
Type of Transaction: G2G - Gov't to Gov't
Who may avail: BFAR Employees

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

BFAR- Property Section, 2nd Flr., Fisheries Annex Bldg., BPI


1. Filled up and duly signed Gate Pass
Compound, Visayas Ave., Q.C.

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Secure gate pass form 1. Receive filled up form
None 3 minutes
Admin. Aide VI/Admin.
None 2. Check completeness and Asst. IV
accuracy of details None 3 minutes

None 3. Sign form Property Officer


None 3 minutes

2. Receive signed form 4. Release signed form Admin. Aide VI/Admin.


None 2 minutes
Asst. IV
3. Surrender to guard on 5. File duplicate copy
duty None 2 minutes Admin. Aide II

Total: 13 minutes

308
BFAR - GENERAL SERVICE SECTION (GSS)
1. Maintenance and Repair of Vehicles
The General Services Section ensures that all vehicles are properly maintained and in good roadworthy condition not only for
safety, but also to avoid unexpected breakdowns and repair during travel time. As such, periodic and preventive maintenance
are implemented/observed.

Office or Division BFAR Admin. -General Services Section (GSS)


Classification Simple
Type of Transaction G2G-Government to Government
Who may avail: BFAR Employees

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Duly accomplished request form (1 Original Copy) Respective Office

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1.Submit accomplished 1. Receive duly
request form for vehicle accomplished request form Procurement Officer
repair/maintenance for repair/maintenance BFAR-General Services
None 1 Minute
Section(1st Flr., FBC
Annex Bldg.)

1.1 Approve the request


based on scheduled OIC,GSS
maintenance and repairs BFAR-General Services
None None 5 Minutes
for breakdown on Section(1st Flr., FBC
emergency cases Annex Bldg.)

1.2 Conduct
initials/preliminary
inspection and determine Inspector and
the scope of work/damage Maintenace Personnel
None to be undertaken and parts None 8 Hours BFAR-General Services
to be replaced after the Section(1st Flr., FBC
initial diagnosis/check-up Annex Bldg.)
vehicle/s

2. Prepare/Process of the 2.Prepare Purchase


sign Purchase Request Request with the attached
Procurement Officer
and other pertinent inspection report and
BFAR-General Services
documents in relation to recommendation of the None 10 Minutes
Section(1st Flr., FBC
the request of repair maintenance staff
Annex Bldg.)

3. Conduct the repair on Inspector and


the reported/requested Maintenace Personnel
particular vehicle/s None 8 Hours BFAR-General Services
Section(1st Flr., FBC
Annex Bldg.)
3. Accept the endorse 3.1 Endorse the repaired OIC,GSS
repaired vehicle/s vehicle to the assigned BFAR-General Services
None 5 Minutes
office/requested office Section(1st Flr., FBC
Annex Bldg.)
TOTAL: None 2 Days, 21 Minutes

309
2. Maintenance of Utilities and Equipment
The General Services Section ensures that utilities and equipment are always in good order and functional hence regular
monitoring and maintenance is being observed.

Office or Division BFAR Admin.-General Services Section (GSS)

Classification Simple
Type of Transaction G2G-Government to Government
Who may avail: BFAR Employees

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Request Form (1 original copy) Respective Office

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Inform/Report to the 1. Receive the
GSS through telephone report/information and
call, verbal/letter request record the same in the Administrative
on the identified request form Assistant
equipment to be repair BFAR-General Services
None 1 Minute
like aircon, ligthnings, Section (1st Flr., FBC
cabinets/chairs, etc. Annex Bldg.)(1st Flr.,
FBC Annex Bldg.)

1.1 Check the


requested/reported Maintenance BFAR-
equipment or utilities for General Services
None repair/s and render the None 30 Minutes
Section(1st Flr., FBC
appropriate action on the Annex Bldg.)
requested
2. Receive the requetesd 2. Inform/Notify the
repair equipment or requesting party on the
Maintenance BFAR-
utilities finished job/repaired
General Services
equipment or utilities None 20 Minutes
Section(1st Flr., FBC
Annex Bldg.)

TOTAL: None 51 Minutes

310
3. Processing of Payment for Utilities/Fuel Consumption

The General Services Section assists in the processing of payment of utilities such as electric bill, waterbill and telephone bills
and fuel consumption.

Office or Division BFAR Admin.-General Services Section (GSS)

Classification Simple

Type of Transaction G2B-Government to Business Entity


Who may avail: Business/Commercial Entity
CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Duly signed Billing Statement (1 original copy) Respective Office

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1.Submit Billing 1. Receive original copy of Administrative
Statement, Invoice billing statement due for Assistant
Receipt and other related payment None 1 Minute BFAR-General Services
documents due for Section (1st Flr., FBC
payment Annex Bldg.)
1.1 Check/Verify/ Review
and prepare payment with
the necessary document Administrative
attached for payment,sign Assistant
None or affix initials on the None 15 Minutes BFAR-General Services
corresponding documents/ Section (1st Flr., FBC
attachments Annex Bldg.)

1.2 Facilitate the process


for payment purposes and
enroll/encode in DTS and Dispatcher/
forwarded to the concerned Administrative Aide
None office, the accounting for None 2 Days BFAR-General Services
processing purposes. Section(1st Flr., FBC
Annex Bldg.)

2. Coordinate payment 2. Inform the client on the


and receive confirmation approved ADA for payment.
of ADA from concerned Administrative Assistant
office. VI BFAR-
None 1 Minute
Cashier Section(1st Flr.,
FBC Annex Bldg.)

TOTAL: None 2 Days, 17 Minutes

311
4. Provision of Accommodation at BFAR Dormitory

BFAR Central Office has a dormitory for temporary accommodation of its personnel from field offices who have to attend to
official business at the Central Office.

Office or Division BFAR Admin.-General Services Section (GSS)

Classification Simple

Type of Transaction G2G-Government to Government

Who may avail: BFAR Employees, Regional Field Offices and Natonal Centers

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Accomplished Dorm Reservation Form (1 original


Respective Office
copy)

2. Letter request Respective Office

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit letter request 1. Receive letter request
and accomplished and accomplished Dormitory
reservation form reservation form Aide/AdministrativeAide
None 1 Minute BFAR-General Services
Section(1st Flr., FBC
Annex Bldg.)

1.1 Check the availability of


beds for specific number of
Dormitory Aide
guest requesting and
BFAR-General Services
None inform the requesting party None 2 Minutes
Section (1st Flr., FBC
for its availability
Annex Bldg.)

2. Receive confirmation 2. Notify for the confirmed


of the reservation reservation to the
Dormitory Aide
requesting personnel/party.
BFAR-General Services
None 5 Minutes
Section (1st Flr., FBC
Annex Bldg.)

TOTAL: None 8 Minutes

312
5. Vehicle Dispatching

Proper dispatching of vehicles in response to requests of operating units is done through effective scheduling of drivers and
vehicles, use of trip tickets and regular monitoring of vehicle utilization.

Office or Division BFAR Admin.-General Services Section (GSS)

Classification Simple

Type of Transaction G2G-Government to Government


Who may avail: BFAR Employees

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Duly accomplished Request Form (1 original copy) Respective Office

2. Approved Travel Order (1 photocopy) if necessary Respective Office

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1.Submit the 1.Receive request form
Dispatching Officer
accomplished request and/or approved Travel
BFAR-General Services
form and photocopy of Order Authority None 1 Minute
Section (1st Flr., FBC
approved travel authority
Annex Bldg.)
to the GSS
1.1 Approve the request, if
the request is denied we
will inform/notify the
requested party in these Officer-in-Charge BFAR-
matter. And their request General Services Section
None None 5 Minutes
form marks no service (1st Flr., FBC Annex
vehicle available then, give Bldg.)
a certification in case they
need it.
1.2 Assign vehicle and
inform the driver on the Dispatcher/
schedule of travel. Administrative Assistant
None None 5 Minutes BFAR-General Services
Section (1st Flr., FBC
Annex Bldg.)

1.3 Prepare trip ticket and


Administrative
give it to the driver
Assistant
assigned for the travel.
None None 5 Minutes BFAR-General Services
Noitify the requesting party
Section (1st Flr., FBC
on the approved request
Annex Bldg.)
2. Receive notification 2. Confirm the travel with Administrative
and confirmation of the the requesting Assistant
schedule of travel personnel/office None 2 Minutes BFAR-General Services
Section (1st Flr., FBC
Annex Bldg.)

TOTAL: None 18 Minutes

313
BFAR - CASHIER SECTION

1. Issuance of Official Receipt


Office or Division BFAR- Administrative Division - Cashier Section

Classification Simple

Type of Transaction G2G (Government to Government); G2B (Government to Business Entity)


Who may avail: All

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Order of Payment BFAR FMD-Accounting Section, 4th Flr., Fisheries Bldg., BPI
Compound, Visayas Avenue, Q.C.

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit Order of Receive and accept
Administrative Assistant
Payment and Pay the payment based on the
– Cashier Section
required fees Order of payment
4th floor, Fisheries
Building Complex,
None 2 Minutes Bureau of Plant Industry
Compound,
Visayas Ave., Diliman,
Quezon City

2. Receive the Official Issue Official Receipt


Administrative Assistant
Receipt
– Cashier Section
4th floor, Fisheries
Building Complex,
None 1 Minute Bureau of Plant Industry
Compound,
Visayas Ave., Diliman,
Quezon City

TOTAL: 3 minutes

314
2. Issuance of Check Re: Payment for External Providers
All payment disbursement for External Providers that cannot be accommodate by LDDAP-ADA will be paid
through checks.

Office or Division BFAR- Administrative Division - Cashier Section

Classification Simple

Type of Transaction G2G (Government to Government); G2B (Government to Business Entity)

Who may avail: Internal and External Clients

CHECKLIST OF REQUIREMENTS WHERE TO SECURE


1. Disbursement Voucher BFAR FMD-Accounting Section, 4th Flr., Fisheries Bldg., BPI
Compound, Visayas Avenue, Q.C.

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Prepare Check and Administrative Assistant
Advice of Checks Issued – Cashier Section
4th floor, Fisheries
Building Complex,
None None 30 Minutes Bureau of Plant Industry
Compound,
Visayas Ave., Diliman,
Quezon City
2. Forward to the office Authorized Signatory
concerned and to the 3rd floor, Fisheries
Authorized Signatory Building Complex,
Bureau of Plant Industry
None None 30 minutes
Compound,
Visayas Ave., Diliman,
Quezon City

3. Submit Advice of Checks


Issued in Land Bank of the
None Philippines None 30 minutes

4. Approve Advice of Administrative Assistant


Checks Issued through – Cashier Section
None LBP-EMDS None 1 hour 4th floor, Fisheries
Building Complex,
5. Control Cash Balance in Bureau of Plant Industry
Log Book Compound,
None None 15 minutes Visayas Ave., Diliman,
Quezon City

5. Ready for Check Pick-up

None None 15 minutes

TOTAL: 3 hours

315
3. Releasing of Checks

Office or Division BFAR- Administrative Division - Cashier Section

Classification Simple
Type of Transaction G2G (Government to Government); G2B (Government to Business Entity)
Who may avail: Internal and External Clients

CHECKLIST OF REQUIREMENTS WHERE TO SECURE


1. Disbursement Voucher BFAR FMD-Accounting Section, 4th Flr., Fisheries Bldg., BPI
2. Valid Identification Card Compound, Visayas Avenue, Q.C.
3. Authorization Letter of representative
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Provide copy of 1. Receive and Check
Identification Card or Identification Card and
Authorization letter if Authorization Letter
applicable for its validity
and hand-over the None 2 minutes Administrative Assistant
Disbursement Voucher – Cashier Section
for signature 4th floor, Fisheries
Building Complex,
Bureau of Plant Industry
2. Sign the Disbursement 2. Ask the person or Compound,
Voucher as a proof of representative to sign Visayas Ave., Diliman,
receipt of payment of Disbursement Voucher as a Quezon City
claims proof of receipt.
None 3 minutes

3. Issue Official Receipt 3. Record official receipt


and attached to
Disbursement Voucher
None 5 minutes Administrative Assistant
– Cashier Section
4th floor, Fisheries
Building Complex,
4. Receive Check(s) and 4. Log the date of release Bureau of Plant Industry
Sign the Log Book in Log Book for monitoring Compound,
purposes Visayas Ave., Diliman,
Quezon City
None 3 minutes

TOTAL: 13 minutes

316
4. Payment of Salary for Permanent Employees and other remuneration.
Office or Division BFAR-Administrative Division - Cashier Section

Classification Simple
Type of Transaction G2G (Government to Government)
Who may avail: BFAR Permanent Employees

CHECKLIST OF REQUIREMENTS WHERE TO SECURE


1. Payroll Register BFAR - Human Resource Management Section (HRMS), 3rd Flr,
Fisheries Bldg., BPI Compound, Visayas Ave., Q.C.

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Prepare the List of Due
Administrative Assistant
and Demandable Accounts
– Cashier Section
Payable - Advice to Debit
4th floor, Fisheries
Accounts (LDDAP-ADA)
Building Complex,
None None 30 Minutes Bureau of Plant Industry
Compound,
Visayas Ave., Diliman,
Quezon City

2. Forward to the office Authorized Signatory


concerned and to the 3rd floor, Fisheries
Authorized Signatory Building Complex,
Bureau of Plant Industry
None None 30 Minutes
Compound,
Visayas Ave., Diliman,
Quezon City

3. Submit Advice of Checks


Administrative Assistant
Issued in Land Bank of the
– Cashier Section
Philippines
4th floor, Fisheries
Building Complex,
None None 30 Minutes Bureau of Plant Industry
Compound,
Visayas Ave., Diliman,
Quezon City

4. Payment of Salary to
respective personnel by Land Bank of the
None crediting to their account None 6 hours, 30 minutes Philippines – Quezon
City Circle Branch

TOTAL: 8 hours

317
5. Payment of Salary for Contract Of Service Personnel

Office or Division BFAR-Administrative Division - Cashier Section

Classification Simple

Type of Transaction G2G (Government to Government)

Who may avail: BFAR Contract Of Service Personnel

CHECKLIST OF REQUIREMENTS WHERE TO SECURE


1. Payroll Register BFAR - Human Resource Management Section (HRMS), 3rd Flr,
Fisheries Bldg., BPI Compound, Visayas Ave., Q.C.

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Encode JO Salary thru Administrative Assistant
LBP we-access – Cashier Section
4th floor, Fisheries
Building Complex,
None None 5 Minutes Bureau of Plant Industry
Compound,
Visayas Ave., Diliman,
Quezon City
2. Sign Payroll Register by Authorized Signatory
Authorized Signatory 3rd floor, Fisheries
Building Complex,
Bureau of Plant Industry
None None 30 minutes
Compound,
Visayas Ave., Diliman,
Quezon City

3. Approve JO Salary thru Administrative Officer V –


LBP we-access Cashier Section
4th floor, Fisheries
Building Complex,
None None 5 Minutes Bureau of Plant Industry
Compound,
Visayas Ave., Diliman,
Quezon City

4. Payment of Salary to
Land Bank of the
respective personnel by
None None 10 Minutes Philippines – Quezon
crediting to their account
City Circle Branch

TOTAL: 2 hours and 40 minutes

318
BFAR - FINANCE AND MANAGEMENT DIVISION (FMD)

1. Transfer of Cash Allocation to Regional Offices (Notice of Transfer Allocation)

Office or Division BFAR-Finance and Management Division (FMD)

Classification Simple

Type of Transaction G2G - Government to Government

Who may avail: Government officials, employees and other government agencies (Regional Offices)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Request Letter Requesting Regional Office

2. Other supporting documents

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit the request 1. Receives request letter Receiving/ Releasing
letter from Regional Offices None 2 Minutes Officer
BFAR-FMD Office

2. Analyzes available cash


with consideration to DVs
Chief Accountant /
for payment. Prepares and
None None 4 Minutes Accountant II
initials the Notice of
BFAR-FMD Office
Transfer Allocation.

Chief Accountant /
3. Signs the Notice of
None None 2 Minutes Accountant II
Transfer Allocation (NTA).
BFAR-FMD Office

Chief Accountant /
4. Initials on the Head of
None None 2 Minutes Accountant II
Agency
BFAR-FMD Office

Chief Accountant /
5. Approves the Notice of
None None 2 Minutes Accountant II
Transfer Allocation (NTA).
BFAR-FMD Office

2. Receive/Retrieve
through their email 6. Send copies of the
Notice of Transfer Accounting Staff
None 2 Minutes
Allocation (NTA) to the BFAR-FMD Office
Regional Offices

TOTAL: None 14 Minutes

319
2. Recognition of Obligations

Office or Division BFAR-Finance and Management Division (FMD)


Classification Simple

Type of Transaction G2G - Government to Government;

Who may avail: Government officials, employees and other government agencies
CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. At least two (2) copies of ORS FMD- Budget Section, 4th Flr., Fisheries Bldg., BPI Compound
FMD- Accounting, 4th Flr., Fisheries Bldg., or Property Section, 1st
2. Disbursement Voucher (DV)
Flr., Fisheries Annex Bldg., BPI Compound
Bids and Awards Committee (BAC), 2nd Flr., Fisheries Bldg., BPI
3. Signed PO/JO/Contract
Cmpnd
4. Other Supporting documents attached to DV
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit to
receiving/Releasing
1. Receives the ORS, duly
signed by the Head of the
Requesting Office,
including copies of
Receiving/ Releasing
DV/Payroll, Contract/PO
None 2 Minutes Officer
and other SDs from
BFAR-FMD Office
office/personnel concerned.
Enters in the DTS the
details. Forwards these to
the Accounting Section.

2. Reviews the
completeness and propriety
Accounting Staff
None of the documents None 6 Minutes
BFAR-FMD Office

3. Certifies to the Accounting Staff


None None 3 Minutes
availability of funds. BFAR-FMD Office

4. Receives the ORS and


its SDs from the Staff
concerned. Verifies Accounting Staff
None None 2 Minutes
availability of allotment BFAR-FMD Office
based on the appropriated
RAOD.
2. Receive/Retrieve 5. Reviews the ORS and
Vouchers/Payrolls with SDs. If in order, signs the
Receiving/ Releasing
ORS to sign by the certification in Section B of
None 2 Minutes Officer
Designated the ORS. Forwards the
BFAR-FMD Office
Division/Section Chief ORS and SDs to the
Budget Staff.

TOTAL: None 15 Minutes

320
3. Issuance of Order of Payment for Collections and Deposits

Issuance of Order of Payment for various clients

Office or Division BFAR-Finance and Management Division (FMD)

Classification Simple
Type of Transaction G2C- Government to Citizen; G2B Government to Business Entity

Who may avail: Public and business owners

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

BFAR-Cashier Section, 4th Flr., Fisheries Bldg., BPI Compound,


1. Payment Bill
Visayas Ave., Q.C.

2. Other supporting documents

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

1. Receives the payment


1. Submit the Bill to Receiving/ Releasing
bill from the payor.
Receiving/Releasing None 2 Minutes Officer BFAR-FMD
Forwards to the Designated
Officer Office
Staff.

2. Accomplishes the Order


of Payment (O.P.) Initials
below the name of the
Authorized Signatory. Accounting Staff
None Forwards to the head of the None 5 Minutes
BFAR-FMD Office
Accounting Section.

3. Reviews the Order of


Payment (O.P.) and signs Chief Accountant /
None it. None 6 Minutes Accountant II
BFAR-FMD Office

2. Receive/Retrieve 4. Releases the Order of


Order of Payment (O.P.) Payment (O.P.) to the Receiving/ Releasing
from Releasing Officer payor. None 2 Minutes Officer BFAR-FMD
Office

TOTAL: None 8 Minutes

321
4. Transfer of Allotment to Regional Offices (Advice of Sub-Allotment)

Office or Division BFAR-Finance and Management Division (FMD)

Classification Simple

Type of Transaction G2G - Government to Government


Who may avail: Public and Government officials, employees and other government agencies

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Request Letter Requesting Regional Office

2. Other supporting documents

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit the request 1. Receives request letter
letter to the from Regional Offices Receiving/ Releasing
receiving/releasing officer None 2 Minutes Officer BFAR-FMD
Office

2. Preparation of Advice of
Sub-Allotment (ASA) for
Signature and Approval of
Chief Accountant /
the Head of
None None 10 Minutes Accountant II
Agency/Authorized
BFAR-FMD Office
Representative

3. Initials on the Head of


Agency
Chief Accountant /
None None 2 Minutes Accountant II
BFAR-FMD Office

Chief Accountant /
4. Sign the Advice of Sub-
None None 2 Minutes Accountant II
Allotment (ASA)
BFAR-FMD Office

5. Sends copies of the


2. Receive/Retrieve from Advice of Sub-Allotment Accounting Staff
None 4 Minutes
their E-Mails (ASA) to the Regional BFAR-FMD Office
offices through E-mail

TOTAL: None 19 Minutes

322
5. Issuance of Certificate of Payment for Remittances

Office or Division BFAR-Finance and Management Division (FMD)

Classification Simple

Type of Transaction G2B Government to Business Entity

Who may avail: Government officials and employees

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Request Letter Requesting Party

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

1. Receives request letter Receiving/ Releasing


1. Submit request letter from the government None 2 Minutes Officer BFAR-FMD
officials/employees Office

Chief Accountant /
2. Prepares Certificate of
None None 3 Minutes Accountant II
Payment of Remittance
BFAR-FMD Office

Chief Accountant /
3. Signs the Certificate of
None None 2 Minutes Accountant II
Payment of Remittance
BFAR-FMD Office

2. Receive/Retrieve 4. Release of Issuance of Receiving/ Releasing


certificate from releasing Remittance Certificate of None 1 minute Officer BFAR-FMD
officer Payment Office

TOTAL: None 8 Minutes

323
BFAR - FISHERIES PLANNING & ECONOMIC DIVISION (FPED)

1. Consolidation, Analysis and Reporting of CFLC Project


As one of the major projects of BFAR, the established Community Fish Landing Centers are being monitored by the CFLC
Focal Person. The status of CFLC in the Regions are consolidated and analyzed, finally reports are prepared on the
operationalization of the infrastructure according to its purpose.

Office or Division BFAR- Fisheries Planning and Economic Division (FPED)

Classification Highly Technical

Type of Transaction G2G - Government to Government

Who may avail: (External) Government Agencies; Local Government Units (LGUs)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter Request Client/ Requesting Party/ Proponent

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Request the data 1. Issue memorandum to
through filing of letter of Regional Directors on the
request stating the timeline and coordinate
purpose submission of Physical and
Financial Accomplishments
with List of Beneficiaries
among others and FPED FPED Staff
staff shall evaluate, None 3 days FPED Staff
analyze, consolidate and FPED Staff, OIC
review submitted
accomplishments together
with FPED the Chief of
FPED

2.Refer back to
concerned Regional Focal
Person for additional data
and/or clarification and FPED Staff, OIC
None submit to Assistant Director 1 day BFAR Director/Asst.
or BFAR Director for Director
information and reference

2. Received the 3. Release of the None


document and the other approved document and
Government Agencies shall also submit
requested accomplishment report to
oversight agencies – DA, Officer In-Charge BFAR-
1 day
DBM, NEDA, COA, FPED
Legislative Body and other
partner agencies and
stakeholders such as
NAPC and PFDA
TOTAL: None 5 days

324
2. Provision of Technical Assistance to Walk-in Clients and Telephone Inquiries
The BFAR provides technical information among various clients and stakeholders including agencies at national, regional and
local levels, as well as for public needs in fisheries data and information. The information includes fisheries plans, programs and
activities, profiles and other relevant issues and concerns.

Office or Division: BFAR- Fisheries Planning and Economic Division (FPED)

Classification: Simple, Complex or Highly Technical Transactions

Type of Transaction: G2C - Gov't to Client, G2G-Gov't to Gov't


Who may avail: All Researchers, Students, and other Government Agencies
CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter Request for Technical Assistance


Requesting Party/
2. Phone Call Request
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTIONS PROCESSING TIME
PAID RESPONSIBLE
1. Client Request 1. Receipt of
information/technical requests/inquiries from
assistance to the BFAR walk in clients
Director though letter or (stakeholders, students and
via phone calls other interested parties); Directors Office
Receive phone calls/ Receiving Officer
inquiries from stakeholders, FPED Staff/Receiving
students and other Clerk
interested parties; Receive None 2 days FPED Staff
and record in the Document Receiving Clerk
Tracking System (DTS) FPED OIC
before forwarding to the
Division Chief; and Refer to FPED Staff
concerned FPED Staff/s for
appropriate action

2. Fill up list of 2.Do the required task FPED Staff


beneficiaries form immediately and provide FPED Staff
requested document/data FPED Admin Staff
(if there is any) or Respond
to phone inquiries and/or
prepare communication
with the attached
data/information (if there’s
any requested for initial of
None 2 days
the Division chief, Ask
client to fill up the list of
beneficiaries form

325
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTIONS PROCESSING TIME
PAID RESPONSIBLE

3.Forward the document FPED Staff


to the Office of ADAS for FPED Staff
initial and If urgent, send FPED Admin Staff
and advance copy through
None email None 2 days

3. Client shall receive a 4.Secure signed copy of


copy of their requested the document and send to
information through a client and file the FPED Staff
letter document for future None 1 day FPED Staff
reference FPED Admin Staff

TOTAL: None 7 days

326
3. Evaluation, Analysis and Consolidation of BFAR Accomplishments

Upon approval of the PAPs according the GAA, the BFAR evaluates and analyze the status of implementation of its plans, and
programs. The PMES constantly monitors the status the BFAR accomplishment through its monitoring and evaluation
mechanism. The BFAR Regional Offices, Central Office Divisions and Units and submitting the Form B and eventually
consolidated, evaluated and analyzed for transmittal to Oversight Committees from the Department of Agriculture, Department
of Budget and Management, NEDA and other concerned Agencies

BFAR-Fisheries Planning and Economic Division (FPED)- Program Monitoring and Evaluation
Office or Division
Section

Classification Highly Technical Transaction


Type of Transaction G2G - Government to Government
(External) Department of Agriculture, Department of Budget and Management (DBM), NEDA and
Who may avail: other Oversight Committees

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Memorandum Issuance on Submission of BFAR DA, DBM


Accomplishment
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Request for the 1. Receive request for the
submission of submission and Issue
Accomplishment Report routing slip to assure Directors Office
by DA and other compliance None 1 day
Receiving Officer
concerned agencies

2.Issue memorandum to FPED Staff


Regional Directors, Center FPED Staff
Chiefs, and Division Chiefs FPED Admin Staff
on the timeline and
None coordinate submission of None 2 days
Physical and Financial
Accomplishments with List
of Beneficiaries

3.Evaluate, analyze, Division Chiefs


reviewa and finalize FPED
submitted consolidated FPED Admin Staff
None accomplishments by None 5 days
Section Heads and Division
Chief of FPED
4.Refer back to action FPED Staff
officers for additional data FPED Staff
and/or clarification and FPED Admin Staff
prepare accomplishment
None report based on prescribed None 2 days
monitoring formats by
oversight agencies (e.g.
QPRO, URS)

5.Submit to Assistant FPED Staff


Director or BFAR Director FPED Staff
None for comments and None 2 days FPED Admin Staff
additional inputs and/ or
signature

327
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
6.Refer Back to FPED for
finalization Bureau Director
None None 1 day
Asst. Director

2. Received the 7. Submit accomplishment FPED Staff


requested documents by report to the oversight FPED Staff
Concerned agencies to Agencies (DA, NEDA, COA FPED Admin Staff
Receive like the and DBM)
accomplishment report, 30mins
etc.
(DA/NEDA/COA/DBM)

TOTAL None 13 days and 30 mins

328
4. Gathering, Preparation and Processing of Fisheries Data/Statistics
Timely fisheries data and statistics are regularly collected through various sources such as the Philippine Statistics Authority.
The data are being processed in order to be transformed in useful fisheries information, eventually packaged as the annual
Fisheries Profile publication.

Office or Division BFAR- Fisheries Planning and Economic Division (FPED)

Classification Highly Technical

Type of Transaction G2G - Government to Government; G2C - Government to Citizen

Who may avail: (Internal) All Researchers, Students and other Clients; BFAR Management, Divisions/Units

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter Request for data / information on fisheries Proponent/Requesting Party


profile

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

1. DA and other agencies 1.Download available


to request of information fisheries data (e.g.
through letter production, price) from
Philippine Statistics
Authority and Food and
Agriculture Organization None 2 days FPED Staff
websites

2.Request other important


data from PSA and Bangko
Sentral ng Pilipinas through
None phone call and/ or email None 3 days FPED Staff

3.Process or compute
gathered data then Provide
appropriate charts/graphs
of necessary and print and
submit copies to the
Division Chiefs for
None information and appropriate None 15 days FPED Staff
action

329
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

2. DA and other 4. Provide the gathered


concerned agencies to data / information
secure electronic and requested/needed from the
printed copies from the concerned agencies, like
Fisheries and Economics printed out copies thru None 30mins FPED Staff
Section electronic

TOTAL None 20 days & 30mins

330
5. Receiving, Recording, Processing and Sending-Out of Travel Orders, Purchase Requests and other
Documents
The travel orders, purchase requests and other documents are being received recorded, reviewed and processed to ensure that
the activities and project are implemented in line with the submitted Project and Activity Proposals for initial by the OIC and
Chief, FPED prior to transmittal to the Finance and Management Division and approval by the ADAS and Director.

Office or Division BFAR- Fisheries Planning and Economic Division (FPED)

Classification Highly Technical

Type of Transaction G2G - Government to Government


Who may avail: (Internal) BFAR- Divisions/ Sections/Units

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

Travel Order, Purchase Request and Activity/Project Division/Units Concerned


Proposals for initial by FPED OIC/Chief

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit 1.Receipt of Travel
letter/memorandum / Order/Purchase
endorsement/notice of Request/Authority to
Meeting from BFAR RFO Conduct/Transfer of
and other government Funds/Authority to Hire
agencies, partner Laborer from National
institutions and Technology Centers and
organizations BFAR Divisions, Receive
Directors Office
and record in the Document
Receiving Officer
Tracking System (DTS) None 1 day
FPED Receiving Staff
before forwarding to the
FPED OIC
Division Chief and Refer to
Concerned FPED Staff/s
for review and appropriate
action

2.Prepare response to
Letter/Memorandum/Endor
sement/ Notice of Meeting
for initial of the Division
Chief and return to
Concerned Office if there
are inquiries / corrections
on the document, OR FPED Staff
2 days
FPED Staff

331
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
3. Initial for
Letter/Memorandum/Endor
sement/Notice of Meeting
upon initial of the Division
Chief the said documents
will be forwarded to the FPED admin/Receiving
Office of the Director for Officer
None 1 day
signature and for the Travel FPED admin/Receiving
Order and it will be Officer
forwarded to the Finance
Division for earmark.

2. Receive from the 4. Release upon signing of


Office of the Director the the Office of the Director of
pertinent documents the said
upon initial of the Director Letter/Memorandum/Endor
and Finance Division to sement/Notice of Meeting FPED Staff, OIC
None 1 day
receive the Travel Order. the same shall be DO
forwarded to the planning
Division

BFAR Divisions
5 days

TOTAL None 8 days

332
6. Procurement Requests (PR) Evaluation
The purchase requests which are being evaluated prior to procurement and implementation of the activities of the Division and
Units within the Central Office. The FPED Focal Persons are ensuring that the procurement requests are aligned in the
submitted project proposals including the Project Procurement and Management Plan for the current year.

Office or Division BFAR- Fisheries Planning and Economic Division (FPED)

Classification Complex

Type of Transaction G2G - Government to Government


Who may avail: (Internal) BFAR Divisions/Sections/ Units

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Purchase Request for initial

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Send procurement 1.Evaluate PR then Refer
Division/Units/Centers
requests (PR) for it back to proponents if
PMES Staff, PMES
evaluation there are corrections and
1 day Head, OIC, FPED
clarification.
PMES Staff, PMES
Head, OIC, FPED
2. Receive by the 2.To review the additional
proponent Division for inputs and comments and
additional information and there no clarification and
requirements corrections of the PMES None
Head the said documents PMES Staff, PMES
shall be submitted to the Head, OIC, FPED
Division Chief for signature PMES Staff, PMES
then endorse initialed PRs Head, OIC, FPED
to Finance Division PMES Staff, PMES
Head, OIC, FPED
1 day

3. Accept initialed PR by 3. Release the documents,


Finance Division and like PR / TO after initials by
eventually approved by the Chief or authorized
None Division/Units/Centers
ADAS or the National signatory
Director

TOTAL None 2 days

333
FPED - FISHERIES INFORMATION MANAGEMENT SECTION (FIMS)

Technical Assistance for Clients ( Internal )


To support and provide the needs of the clients.

Office or Division BFAR- FPED- Fisheries Information Management Section (FIMS)

Classification Simple

Type of Transaction G2B - Government to Business, G2G - Government to Government

Who may avail: Internal ( BFAR- Divisions, Sections and Units)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

Phone Call Request/Letter or Memorandum Request Client/ Requesting Party/ies

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit all necessary 1. Receive documents,
documents to support the record, and attached
request for assistance. routing slip for action and
updating on the DTS and none 5 minutes Secretariat
incoming logbook

1.1 Forward documents to


None FIMS Head for review and none 5 minutes FIMS Head
approriate action

1.2 Route the request to


None the head of the assigned none 5 minutes Secretariat
unit:

Web Dev't Unit


1.3 Receive the request
Team,BFAR-FIMS
None and processed/prepared none 1 hour
Office, 2nd floor
the approved request
Fisheries Bldg.

1.4. Receive and provide


technical concerns and Technical Support and
None none 30 minutes
assistance from BFAR System Admin
Employees.

1.5. Receive and process


the request: System developer,
System administrator,
None none 5 minutes
Project Owner (BFAR
divisions involve)

334
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

1.6. Develop or Re-


engineer the BFAR System developer,
system, (will take a series System administrator,
None none 6 months
of system testing and Project Owner (BFAR
refining the system divisions involve)
created/re-engineered)

1.7. Receive and provide


Network administrator
technical concerns and
None none 30 minutes Network Administration
assistance from BFAR
Unit
Employees.

1.8. Daily Backup of


Databases,check the
None none 30 minutes Database
connection of all API to the
databases .

1.9. Process request Geographic Information


None none 1 month
related to mapping Unit

2. Review and evaluated


2. Submit an email at email request and forward
info@bfar.da.gov.ph for to appropriate division in
request and other charge none 5 minutes Secretariat
communication.
(Assistance thru EMAIL)

4. Receive filled out


4. Fill out Service
Service Request Form and
Request Form for Secretariat/Unit Head In-
assess for endorsement to none 10 minutes
technical service Charge
the appropriate staff/official
assistance
in charge.

5. Receive the 5. Render the appropritate


appropriate assistance Technical Assistance
requested none 5 minutes Secretariat

Varies: 3 Hours and 20


TOTAL None
Minutes to 7 Mos.

335
BIDS AND AWARDS COMMITTEE (BAC)

I. PROCUREMENT UNDER PUBLIC BIDDING

A. EXTERNAL SERVICES:
1. Procurement under Public Bidding for Goods
Purchase Requests (PR) with an Approved Budget of the Contract (ABC) amounting to Php 1 Million and above.

The End-user unit or the duly authorized official or personnel shall submit an approved PR together with the required
attachments to the Bids and Awards Committee (BAC) relative to the goods and services to be procured.

Office or Division BFAR- Bids and Awards Committee (BAC)

Classification Highly Technical ( under Special Law of R.A. 9184)

Type of Transaction G2B- Government to Business/G2C – Government-to-Citizen

Who may avail (External) Bidder/s

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Invitation to Bid and Bidding Documents BFAR- Bids and Awards Committee (BAC) Office
2. Supplemental bid bulletin (if any) BFAR- Bids and Awards Committee (BAC) Office
3. Request Form for Payment, if applicable BFAR- Bids and Awards Committee (BAC) Office
4. Order of Payment, if applicable BFAR- Accounting Section

5. Official Receipt for Bidding Documents, if applicable BFAR- Cashier Section

6. Bidding Documents BFAR - End-user and Bidder/s


TECHNICAL AND FINANCIAL COMPONENT
ENVELOPE
Bidder/s
FOR GOODS Documents
a. Technical
b. Financial Documents
7. Post-qualification documents Bidder/s

8. Notice of Award BFAR- Bids and Awards Committee (BAC) Office and Bidder/s

9. Performance Bond Bidder/s

10. Contract Agreement BFAR- Bids and Awards Committee (BAC) Office and Bidder/s

11. Notice to Proceed BFAR- Bids and Awards Committee (BAC) Office and Bidder/s

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Prepare and forward
through email the Pre-
negotiation Notice of BAC, End-user, TWG
None Meeting to the BAC, End- none 30 minutes and BAC Secretariat
user and Technical (BFAR office)
Working Group (TWG).

336
1.1. Schedule and invite the
BAC, End-user and
Technical Working Group BAC, End-user, TWG
None (TWG) to the Pre- none 30 minutes
and BAC Secretariat
negotiation conference. 2nd Flr., Fisheries Bldg.
Complex, BPI
1.2.Conduct scheduled Pre- Compound, Brgy. Vasra,
negotiation conference. Visayas Ave., Quezon
None none 1 hour City

1.3.Post the Invitation to


Bid and Bidding Document
to the PhilGEPS website, BAC Secretariat
BFAR website and and FIMS
conspicuous place at the 2nd Flr., Fisheries Bldg.
None BFAR premises with the none 1 hour Complex, BPI
assistance from FIMS the Compound, Brgy. Vasra,
IT unit Visayas Ave., Quezon
City

1. Notice/View the 1. Advertise the Invitation to


advertisement Bid (ITB) and Bidding
Document to the PhilGEPS,
BFAR website, and
conspicuous place at the BAC Secretariat
BFAR's premises for 7 2nd Flr., Fisheries Bldg.
calendar days (starting on Complex, BPI
none 7 calendar days
date of advertisement). Compound, Brgy. Vasra,
*2016 Revised IRR of RA Visayas Ave., Quezon
9184 (updated as of 31 City
December 2021), Section
21.2.1, (a)

2. Attend the Pre-Bid 5. Conduct Pre-Bid


conference. Conference with BAC
members, BFAR End-user,
BFAR TWG and Observers
(BFAR COA, PCCI and
NAPC). (Not earlier than
seven (7) calendar days BAC Secretariat
from advertisement/posting 2nd Flr., Fisheries Bldg.,
and at least twelve (12) Complex, BPI
none 1 hour
calendar days before the Compound, Brgy. Vasra,
deadline for the submission Visayas Ave., Quezon
and receipt of the bids.) City
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021, Section
22.2

337
3. Send additional 3. Entertain/receive written
inquiry/clarificatory request for clarifications on
question/ request within any part of the Bidding
three (3) calendar days Documents within three (3)
BAC Secretariat
after Pre-Bid Conference calendar days after Pre-Bid
2nd Flr., Fisheries Bldg.,
to the email address of Conference and forward to
Complex, BPI
the BFAR BAC the End-user. none 5 minutes
Compound, Brgy. Vasra,
(bac.eps@bfar.da.gov.ph *2016 Revised IRR of RA
Visayas Ave., Quezon
) 9184 (updated as of 31
City
December 2021, Section
22.5.1

3.1. Prepare BAC Secretariat


Supplemental/Bid Bulletin BFAR-BAC Office 2nd
for approval of the BAC Flr., Fisheries Bldg.,
None members and End-user, if none 2 hours Complex, BPI
any. Compound, Brgy. Vasra,
Visayas Ave., Quezon
City
5. Notice/Receive the 4. Post the
Supplemental/Bid Bulletin Supplemental/Bid Bulletin
in PhilGEPS and BFAR
website, and conspicuous
place at the BFAR
premises at least seven (7)
calendar days before the BAC Secretariat
deadline for the submission BFAR-BAC Office 2nd
and receipt of the bids. Flr., Fisheries Bldg.,
Email the same to the email none 1 hour Complex, BPI
address of the bidder/s who Compound, Brgy. Vasra,
bought the Bidding Visayas Ave., Quezon
Document. City
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021), Section
22.5.2

5. Fill-out the Bid Docs 5. Issue Bid Docs Receipt


Receipt Form and get the form and Payment slip form
Payment slip. for the payment of Bidding None 5 minutes
Documenst fee.

5.1. Proceed to Finance 5.1. Accounting Section to BFAR Accounting


Division, Acctg located at Issue Order of payment. Section
4/F, BFAR Building, 3rd Flr., Fisheries Bldg.,
Quezon City to secure None 5 minutes
Complex, BPI
Order of payment. Compound, Brgy. Vasra,
Visayas Ave., Q.C.
5.2. Proceed to Cashier 5.2. Cashier Section to
Section located at 4/F, receive payment and issue BFAR Cashier Section
BFAR Building, Quezon an Official Receipt (O.R.) 4th Flr., Fisheries Bldg.,
City to pay bidding Complex, BPI
documents and secure None 5 minutes
Compound, Brgy. Vasra,
Official Receipt (O.R.) Visayas Ave., Quezon
City

338
5.3. Present the O.R. to 5.3. Receive and
BAC Office or email the photocopy the Original
scan copy/picture to the Receipt (O.R.)/
email address of the acknowledge receipt of the
none 5 minutes
BFAR BAC email containing the scan
(bac.eps@bfar.da.gov.ph copy/picture of the the
). Original Receipt from the
interested Bidder.
6. Submit sealed Bid 6. Receive sealed Bid
envelope containing one envelope from the
(1) original and two (2) Interested Bidder/s and
printed copies of the first email the Bid Opening
(Eligibility and Technical Zoom link to the bidder.
documents) and second
(Financial documents)
components of its bid, for
manually-filed bid
submission. For e-
submission of bids,
none 5 minutes BAC Secretariat
submit to BAC Google
BFAR BAC office 2nd
Form via BFAR BAC
Flr., Fisheries Bldg.,
Online Bidding Procedure
Complex, BPI
that can be seen in the
Compound, Brgy. Vasra,
latter part of the Bidding
Visayas Ave., Quezon
document.
City
Receive the Bid Opening
Zoom link.

7. Attend the Bid Opening 7. Conduct of the Bid


Opening with BAC
members, BFAR End-user,
BFAR TWG and Observers
(BFAR COA, PCCI and none 1 hour
NAPC) at least 12 calendar
days from Pre-Bid
Conference.

8. Forward the submitted


Bids to the Technical
None Working Group (TWG) for none 15 minutes
review, evaluation and
validation.

339
8.1. Conduct Bid Evaluation
and prepare Bid Evaluation
report, Summary Result of
Eligibility Check Screening,
Abstract of Bids and Notice
to Lowest/Single Calculated
bidder to be signed by the
BAC members, BAC TWG BAC members
and End-user within seven BAC Secretariat
None (7) calendar days from the none 7 calendar days BFAR BAC office BFAR
deadline for receipt of TWG
proposals. BFAR End-user
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021), Section
32.4

8.2 Receive the Bid


Evaluation Report from the BAC Secretariat
None Technical Working Group. none 2 minutes BFAR BAC office
BFAR TWG

10. Receive Notice to 9. Email the Notice to


Conduct Post Conduct Post Qualification
Qualification through to the Lowest/Single none 2 minutes
email. Calculated bidder.

11. Submit Post 10. Receive the Post


Qualification documents Qualification documents (3
(3 copies) to the BAC. copies) from the Bidder.
*Bidder must submit the *Bidder must submit the
Post Qualification Post Qualification
BAC Secretariat
documents within five (5) documents within five (5)
calendar days from calendar days from receipt BFAR-BAC Office 2nd
receipt of notice to of the notice from the BAC. Flr., Fisheries Bldg.,
none 5 minutes Complex, BPI
Conduct Post
Qualification from the Compound, Brgy. Vasra,
BAC. *2016 Visayas Ave., Quezon
Revised IRR of RA 9184 City
(updated as of 31
December 2021), Section
34.2

10.1. Forward the


submitted Post
Qualification documents
None none 5 minutes
(copy 1) of the bidder to the
Technical Working Group.

10.2. Conduct Post


Qualification to the
BAC Chairperson or his
LCB/HRB.
duly authorized
*If the Lowest Calculated
represenattive
None Bidder failed the criteria for none 7 calendar days
BAC Secretariat
post-qualification, BAC
shall immediately issue BFAR BAC office
Notice of Post- BFAR TWG
disqualification to be signed
by the BAC Chairperson/his
340
***it shall be completed in
not more than twelve (12)
calendar days from the
determination of the Lowest
Calculated Bid
(LCB)/Highest Rated Bid
(HRB). In exceptional
cases, may be extended by BAC Chairperson or his
BFAR, but in no case shall duly authorized
the aggregate period represenattive
None none 7 calendar days
exceed forty-five (45) BAC Secretariat
calendar days for Goods BFAR BAC office
and Infrastructure projects BFAR TWG
or thirty (30) calendar days
in Consulting Services.
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021, Section
34.8

10.3. Receive the Post


BFAR TWG
Qualification report from
None none 5 minutes BAC Secretariat
the Technical Working
BFAR BAC office
Group.
11. Prepare the BAC
Resolution declaring the
Lowest Calculated and
Responsive Bidder
(LCRB)/Single Calculated
and Responsive Bidder
(SCRB), Notice of Award
(NOA) to be signed by the
Director.
*Within a period not
exceeding fifteen (15)
Director
calendar days from the
(BFAR Director's Office)
determination by the BAC
BAC members
of the bidder with the
BAC Secretariat
LCRB, HRRB, SCRB, or
BFAR BAC office
SRRB, and the
BFAR End-user
recommendation to award
the contract, the Director or
his duly authorized
representative shall
approve/ disapprove the
said recommendation.
None **In case of approval, none 15 calendar days
immediately issue the NOA
to the bidder.
***In the event of
disapproval, BAC will notify

341
None none 15 calendar days

HoPE shall resolve with


finality the said request w/in
seven (7) calendar days
from the filing thereof and
furnish the bidder a copy of
the resolution.
*In no case shall the said Director
request stay/delay the (BFAR Director's Office)
bidding process. However, BAC members
said request must be first BAC Secretariat
resolved before any award
BFAR BAC office
is made.
BFAR End-user
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021), Section
37.1.2 and 37.1.3

12. Receive NOA (3 11.1 Issue NOA (3 original


original copies) copies) to the successful none 5 minutes
bidder.
13. Submit signed NOA(2 11.2 Receive signed NOA
original copies) (2 original copies) from the
**If the LCRB failed to post successful bidder.
Performance Security within BAC Secretariat
the prescribed period, the bid BFAR BAC office
security shall be forfeited and 2nd Flr., Fisheries Bldg.,
the BAC shall disqualify the
bidder and complete the post-
Complex, BPI
qualification process on the Compound, Brgy. Vasra,
none 3 minutes
second LCB. Visayas Ave., Quezon
*** If the SCRB failed to post City
Performance Security within
the prescribed period, the bid
security shall be forfeited and
the BAC shall disqualify the
said bidder, and declare
failure of bidding and conduct
a re-negotiation.
11.3. Secure Obligation BAC Secretariat
Request to Budget Officer BFAR BAC office
and Prepare Certificate of Budget Officer
Availability of Funds (CAF)
BFAR Finance Section
None to be signed by the Chief none 1 calendar day
Chief Accountant
Accountant
BFAR Accounting
Section
BFAR End-user
11.4. Receive the signed
None CAF and OBR. none 5 minutes

14. Submit Performance 11.5. Receive Performance


Security Security from the
*Successful bidder must successful bidder.
post Performance
Security within 10
calendar days from none 5 minutes
receipt of the NOA.
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021), Section
37.2.1

342
11.6. Prepare Contract and
Notice to Proceed (NTP) to
be initialed by the BAC
Chairperson, BAC Vice-
Chairperson, Head BAC
None Secretariat and signed by none 2 calendar days
the Director, End-user and
one witness (End-user's
authorized representative).

15. Receive Contract (3 11.7. Issue Contract (3


original copies) original copies) to the
successful bidder.

none 5 minutes

BAC Secretariat
BFAR BAC office 2nd
Flr., Fisheries Bldg.,
16. Submit notarized 11.8. Receive notarized Complex, BPI
Contract (2 original Contract (2 original copies) Compound, Brgy. Vasra,
copies) from the successful bidder. Visayas Ave., Quezon
*Successful bidder shall City
enter into contract within
the same ten (10) day
period provided that all
the documentary none 3 minutes
requirements are
complied with.
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021), Section
37.2.2

17. Receive NTP (3 11.9. Issue NTP (3 original


original copies) copies) to the successful
bidder within seven (7)
calendar days from the
approval of the contract.
*2016 Revised IRR of RA none 5 minutes
9184 (updated as of 31
December 2021), Section
37.4.1

18. Submit signed NTP (2 11.10. Receive signed NTP


original copies) (2 original copies) from the
successful bidder. none 3 minutes

11.11. Scan, organize and


file three (3) sets of Bidding
None Documents. (1) COA copy, none 2 hours
(2) Finance copy and (3)
BAC copy.

39 days, 11 hours, & 38


TOTAL none
mins.

343
Reference: Republic Act 9184 (Government Procurement Reform Act) and its 2016 Revised Implementing Rules and Regulations
* pg. 54, Rule VII , Section 21 Advertising and Contents of the Invitation to Bid/Request for Expression of Interest, Sub-section 21.2.1 letter (a)
*pg.55, Rule VII, Section 22 Pre-Bid Conference, Sub-section 22.2
*pg. 56, Rule VII, Section 22.5 Supplemental/Bid Bulletins, Sub-section 22.5.1
*pg.56, Rule VII, Section 22.5 Supplemental/Bid Bulletins, Sub-section 22.5.2
*pg. 76, Rule IX, Section 32 Bid Evaluation for the Procurement of Goods and Infrastructure Projects, Sub-section 32.4
*Ipg.79 Rule X, Section 34 Objective and Process of Post-Qualification,34.2
*pg. 82, Rule X, Section 34 Objective and Process of Post-Qualification,34.8
*pg.84, Rule XI , Section 37.2 Contract Signing, Sub-section 37.1.2 to 37.1.3
*pg. 85, Rule XI, Section 37.2 Contract Signing, Sub-section 37.2.1
*pg. 85, Rule XI, Section 37.2 Contract Signing, Sub-section 37.2.2
*pg.86, Rule XI, Section 37.4 Notice to Proceed, Sub-section 37.4.1

2. Procurement under Public Bidding for Infrastructure


Purchase Requests (PR) with an Approved Budget of the Contract (ABC) amounting to Php 1 Million and above.

The End-user unit or the duly authorized official or personnel shall submit an approved PR together with the required
attachments to the Bids and Awards Committee (BAC) relative to the goods and services to be procured.

Office or Division BFAR- Bids and Awards Committee (BAC)

Classification Highly Technical ( under Special Law of R.A. 9184)


G2B- Government to Business/
Type of Transaction
G2C – Government-to-Citizen
Who may avail (External) Bidder/s

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Invitation to Bid and Bidding Documents BFAR- Bids and Awards Committee (BAC) Office
2. Supplemental bid bulletin (if any) BFAR- Bids and Awards Committee (BAC) Office
3. Request Form for Payment, if applicable BFAR- Bids and Awards Committee (BAC) Office
4. Order of Payment, if applicable BFAR- Accounting Section
5. Official Receipt for Bidding Documents, if applicable BFAR- Cashier Section

6. Bidding Documents BFAR - End-user and Bidder/s

344
FOR INFRASTRUCTURE
I. TECHNICAL COMPONENT
Class “A” Documents
Legal Documents
⬜(a) Valid PhilGEPS Registration Certificate (Platinum
Membership) (all pages) in accordance with Section
8.5.2 of the IRR; Technical Documents
⬜(b) Statement of the prospective bidder of all its
ongoing government and private contracts, including
contracts awarded but not yet started, if any, whether
similar or not similar in nature and complexity to the
contract to be bid; and
⬜(c) Statement of the bidder’s Single Largest
Completed Contract (SLCC) similar to the contract to
be bid, except under conditions provided under the
rules; and
⬜(d) Special PCAB License in case of Joint Ventures;
and registration for the type and cost of the contract to
be bid; and
⬜(e) Original copy of Bid Security. If in the form of a
Surety Bond, submit also a certification issued by the
⬜(f) Project Requirements, which shall include the
following:
i. Organizational chart for the contract to be bid;
ii. List of contractor’s key personnel to be
assigned to the contract to be bid, with their complete
qualification and experience data;
iii. List of contractor’s major equipment units,
which are owned, leased, and/or under purchase
agreements, supported by proof of ownership or
Bidder/s
certification of availability of equipment from the
equipment lessor/vendor for the duration of the
project, as the case may be;
iv. Construction Schedule and S-curve
v. Manpower Schedule
vi. Construction Method g. Equipment Utilization
Schedule
vii. Pert-CPM
viii. Construction Safety and health program
approved by the DOLE
⬜(g) Original duly signed Omnibus Sworn Statement
(OSS);
or
duly notarized statements from all the potential joint
venture partners stating that they will enter into and
abide by the provisions of the JVA in the instance that
the bid is successful.
II. FINANCIAL COMPONENT ENVELOPE
⬜(j) Original of duly signed and accomplished Financial
Bid Form; and
Other documentary requirements under RA No.
9184
⬜(k) Original of duly signed Bid Prices in the Bill of
Quantities; and
⬜(l) Duly accomplished Detailed Estimates Form,
including a summary sheet indicating the unit prices of
construction materials, labor rates, and equipment
rentals used in coming up with the Bid; and
⬜(m) Cash Flow by Quarter.

345
7. Post-qualification documents Bidder/s
8. Notice of Award BFAR- Bids and Awards Committee (BAC) Office and Bidder/s

9. Performance Bond Bidder/s


10. Contract Agreement BFAR- Bids and Awards Committee (BAC) Office and Bidder/s
11. Notice to Proceed BFAR- Bids and Awards Committee (BAC) Office and Bidder/s

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Prepare and forward
through email the Pre-
negotiation Notice of BAC, End-user, TWG
None Meeting to the BAC, End- none 30 minutes and BAC Secretariat
user and Technical BFAR office
Working Group (TWG).

1.1. Schedule and invite the


BAC, End-user and
None Technical Working Group none 30 minutes
(TWG) to the Pre- BAC, End-user, TWG
negotiation conference. and BAC Secretariat
1.2.Conduct scheduled Pre- BFAR office
None negotiation conference. none 1 hour

1.3.Post the Invitation to


Bid and Bidding Document
to the PhilGEPS website, BAC Secretariat and
None BFAR website and none 1 hour FIMS
conspicuous place at the BFAR office
BFAR premises.

1. Notice the 1. Advertise the Invitation to


advertisement Bid (ITB) and Bidding
Document to the PhilGEPS,
BFAR website, and
conspicuous place at the
BFAR's premises for 7
calendar days (starting on none 7 calendar days
date of advertisement).
*2016 Revised IRR of RA 9184
(updated as of 31 December
2021), Section 21.2.1, (a)
BAC Secretariat
BFAR BAC office
2nd Flr., Fisheries Bldg.,
Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City

346
BAC Secretariat
BFAR BAC office
2. Attend the Pre-Bid 5. Conduct Pre-Bid 2nd Flr., Fisheries Bldg.,
conference. Conference with BAC Complex, BPI
members, BFAR End-user, Compound, Brgy. Vasra,
BFAR TWG and Observers Visayas Ave., Quezon
(BFAR COA, PCCI and City
NAPC). (Not earlier than
seven (7) calendar days
from advertisement/posting
and at least twelve (12) none 1 hour
calendar days before the
deadline for the submission
and receipt of the bids.)
*2016 Revised IRR of RA 9184
(updated as of 31 December
2021, Section 22.2

3. Send additional 3. Entertain/receive written


inquiry/clarificatory request for clarifications on
question/ request within any part of the Bidding
three (3) calendar days Documents within three (3)
after Pre-Bid Conference calendar days after Pre-Bid BAC members
to the email address of Conference and forward to
none 5 minutes BAC Secretariat
the BFAR BAC the End-user.
BFAR BAC office
(bac.eps@bfar.da.gov.ph *2016 Revised IRR of RA
) 9184 (updated as of 31
December 2021, Section
22.5.1

3.1. Prepare
Supplemental/Bid Bulletin
for approval of the BAC none 2 hours
members and End-user, if
any.
5. Notice/Receive the 4. Post the
Supplemental/Bid Bulletin Supplemental/Bid Bulletin
in PhilGEPS and BFAR
website, and conspicuous
place at the BFAR
premises at least seven (7)
calendar days before the BAC Secretariat
deadline for the submission BFAR BAC office 2nd
and receipt of the bids. Flr., Fisheries Bldg.,
none 1 hour
Email the same to the email Complex, BPI
address of the bidder/s who Compound, Brgy. Vasra,
bought the Bidding Visayas Ave., Quezon
Document. City
*2016 Revised IRR of RA 9184
(updated as of 31 December
2021), Section 22.5.2

5. Fill-out the Bid Docs 5. Issue Bid Docs Receipt


Receipt Form and get the form and Payment slip form
Payment slip. for the payment of Bidding
None 5 minutes
Documenst fee.
.

347
5.1. Proceed to Finance 5.1. Accounting Section to
Division located at 4/F, Issue Order of payment. BFAR Accounting
BFAR Building, Quezon None 5 minutes
Section
City to secure Order of
payment.
5.2. Proceed to Cashier 5.2. Cashier Section to
Section located at 4/F, receive payment and issue BFAR Cashier Section
BFAR Building, Quezon an Official Receipt (O.R.) 4th Flr., Fisheries Bldg.,
City to pay bidding Complex, BPI
None 5 minutes
documents and secure Compound, Brgy. Vasra,
Official Receipt (O.R.) Visayas Ave., Quezon
City

5.3. Present the O.R. to 5.3. Receive and


BAC Office or email the photocopy the Original
scan copy/picture to the Receipt (O.R.)/
email address of the acknowledge receipt of the BAC Secretariat
none 5 minutes
BFAR BAC email containing the scan BFAR BAC office
(bac.eps@bfar.da.gov.ph copy/picture of the the
). Original Receipt from the
interested Bidder.
6. Submit sealed Bid 6. Receive sealed Bid
envelope containing one envelope from the
(1) original and two (2) Interested Bidder/s and
printed copies of the first email the Bid Opening
(Eligibility and Technical Zoom link to the bidder.
documents) and second
(Financial documents)
components of its bid, for BAC Secretariat
manually-filed bid BFAR BAC office
submission. For e- 2nd Flr., Fisheries Bldg.,
submission of bids, none 5 minutes Complex, BPI
submit to BAC Google Compound, Brgy. Vasra,
Form via BFAR BAC Visayas Ave., Quezon
Online Bidding Procedure City
that can be seen in the
latter part of the Bidding
document.
Receive the Bid Opening
Zoom link.

7. Attend the Bid Opening 7. Conduct of the Bid


Opening with BAC
members, BFAR End-user,
BFAR TWG and Observers
(BFAR COA, PCCI and
NAPC) at least 12 calendar none 1 hour BAC Secretariat
days from Pre-Bid BFAR BAC office
Conference. 2nd Flr., Fisheries Bldg.,
Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
8. Forward the submitted City
Bids to the Technical
Working Group (TWG) for
None none 15 minutes
review, evaluation and
validation.

348
8.1. Conduct Bid Evaluation
and prepare Bid Evaluation
report, Summary Result of
Eligibility Check Screening,
Abstract of Bids and Notice
to Lowest/Single Calculated
bidder to be signed by the
BAC members, BAC TWG BAC members
and End-user within seven BAC Secretariat
None (7) calendar days from the none 7 calendar days BFAR BAC office
deadline for receipt of BFAR TWG
proposals. BFAR End-user
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021), Section
32.4

8.2 Receive the Bid


Evaluation Report from the
Technical Working Group. BAC Secretariat
None none 2 minutes (BFAR BAC office)
BFAR TWG

10. Receive Notice to 9. Email the Notice to


Conduct Post Conduct Post Qualification
Qualification through to the Lowest/Single none 2 minutes
email. Calculated bidder.

11. Submit Post 10. Receive the Post


Qualification documents Qualification documents (3
(3 copies) to the BAC. copies) from the Bidder.
*Bidder must submit the *Bidder must submit the
Post Qualification Post Qualification
documents within five (5) documents within five (5)
calendar days from calendar days from receipt BAC Secretariat
receipt of notice to of the notice from the BAC. none 5 minutes BFAR BAC office
Conduct Post 2nd Flr., Fisheries Bldg.,
Qualification from the Complex, BPI
BAC. Compound, Brgy. Vasra,
*2016 Revised IRR of RA Visayas Ave., Quezon
9184 (updated as of 31 City
December 2021), Section 34.2

10.1. Forward the


submitted Post
Qualification documents
(copy 1) of the bidder to the
None Technical Working Group. none 5 minutes

349
10.2. Conduct Post
Qualification to the
LCB/HRB.
*If the Lowest Calculated
Bidder failed the criteria for
post-qualification, BAC
shall immediately issue
Notice of Post-
disqualification to be signed
by the BAC Chairperson/his
duly authorized
BAC Chairperson or his
representative. Immediately
duly authorized
after, the BAC will notify the
represenattive
None bidder in writing of its post- none 7 calendar days
BAC Secretariat
disqualification and
BFAR BAC office
grounds for it. Thereafter,
BFAR TWG
the BAC shall conduct
same post-qualification
process on the second
Lowest Calculated Bidder.
** The BAC shall be given
the same fresh period to
conduct the post-
qualification of the next
lowest calculated
bid/highest rated bid until a
bidder is post-qualified.
In exceptional cases, may
be extended by BFAR, but
in no case shall the
aggregate period exceed
forty-five (45) calendar
days for Goods and
Infrastructure projects or
thirty (30) calendar days in
Consulting Services.
***it shall be completed in
not more than twelve (12)
calendar days from the
determination of the Lowest
None Calculated Bid
(LCB)/Highest Rated Bid
(HRB). In exceptional
cases, may be extended by
BFAR, but in no case shall
the aggregate period
exceed forty-five (45)
calendar days for Goods
and Infrastructure projects
or thirty (30) calendar days
in Consulting Services.
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021, Section
10.3. Receive the Post
BFAR TWG
Qualification report from
None none 5 minutes BAC Secretariat
the Technical Working
BFAR BAC office
Group.

350
11. Prepare the BAC
Resolution declaring the
Lowest Calculated and
Responsive Bidder
(LCRB)/Single Calculated
and Responsive Bidder
(SCRB), Notice of Award
(NOA) to be signed by the
Director.
*Within a period not
exceeding fifteen (15)
calendar days from the
determination by the BAC
of the bidder with the
LCRB, HRRB, SCRB, or
SRRB, and the
recommendation to award
the contract, the Director or
his duly authorized
representative shall
approve/ disapprove the Director
said recommendation. BFAR Director's Office
**In case of approval, BAC members
None none 15 calendar days
immediately issue the NOA BAC Secretariat
to the bidder. BFAR BAC office
***In the event of BFAR End-user
disapproval, BAC will notify
HoPE shall resolve with
finality the said request w/in
seven (7) calendar days
from the filing thereof and
furnish the bidder a copy of
the resolution.
*In no case shall the said
request stay/delay the
bidding process. However,
said request must be first
resolved before any award
is made.
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021), Section
37.1.2 and 37.1.3

12. Receive NOA (3 11.1 Issue NOA (3 original


original copies) copies) to the successful none 5 minutes
bidder.

BAC Secretariat
BFAR BAC office
2nd Flr., Fisheries Bldg.,
Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
351
City
13. Submit signed NOA(2 11.2 Receive signed NOA
original copies) (2 original copies) from the
**If the LCRB failed to successful bidder.
post Performance
Security within the
prescribed period, the bid
security shall be forfeited
and the BAC shall BAC Secretariat
disqualify the bidder and BFAR BAC office
complete the post- 2nd Flr., Fisheries Bldg.,
qualification process on Complex, BPI
the second LCB. Compound, Brgy. Vasra,
none 3 minutes
*** If the SCRB failed to Visayas Ave., Quezon
post Performance City
Security within the
prescribed period, the bid
security shall be forfeited
and the BAC shall
disqualify the said bidder,
and declare failure of
bidding and conduct a re-
negotiation.

11.3. Secure Obligation


BAC Secretariat
Request to Budget Officer
BFAR BAC office
and Prepare Certificate of
Budget Officer
Availability of Funds (CAF)
BFAR Finance Section
None to be signed by the Chief none 1 calendar day
Accountant Chief Accountant
BFAR Accounting
Section
BFAR End-user
11.4. Receive the signed
None none 5 minutes
CAF and OBR.
14. Submit Performance 11.5. Receive Performance
Security Security from the
*Successful bidder must successful bidder.
post Performance
Security within 10
calendar days from none 5 minutes
receipt of the NOA.
*2016 Revised IRR of RA
9184 (updated as of 31 BAC Secretariat
December 2021), Section BFAR BAC office
37.2.1 2nd Flr., Fisheries Bldg.,
11.6. Prepare Contract and Complex, BPI
Notice to Proceed (NTP) to Compound, Brgy. Vasra,
be initialed by the BAC Visayas Ave., Quezon
Chairperson, BAC Vice- City
Chairperson, Head BAC
None Secretariat and signed by none 2 calendar days
the Director, End-user and
one witness (End-user's
authorized representative).

15. Receive Contract (3 11.7. Issue Contract (3


original copies) original copies) to the none 5 minutes
successful bidder.

352
16. Submit notarized 11.8. Receive notarized
Contract (2 original Contract (2 original copies)
copies) from the successful bidder.
*Successful bidder shall
enter into contract within BAC Secretariat
the same ten (10) day BFAR BAC office
period provided that all 2nd Flr., Fisheries Bldg.,
the documentary none 3 minutes Complex, BPI
requirements are Compound, Brgy. Vasra,
complied with. Visayas Ave., Quezon
*2016 Revised IRR of RA City
9184 (updated as of 31
December 2021), Section
37.2.2

17. Receive NTP (3 11.9. Issue NTP (3 original


original copies) copies) to the successful
bidder within seven (7)
calendar days from the
approval of the contract.
none 5 minutes
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021), Section BAC Secretariat
37.4.1 BFAR BAC office
2nd Flr., Fisheries Bldg.,
18. Submit signed NTP (2 11.10. Receive signed NTP Complex, BPI
original copies) (2 original copies) from the Compound, Brgy. Vasra,
none 3 minutes
successful bidder. Visayas Ave., Quezon
City
11.11. Scan, organize and
file three (3) sets of Bidding
None Documents. (1) COA copy, none 2 hours
(2) Finance copy and (3)
BAC copy.
39 days, 11 hours &
TOTAL
38 mins.
Reference: Republic Act 9184 (Government Procurement Reform Act) and its 2016 Revised Implementing Rules and Regulations
* pg. 54, Rule VII , Section 21 Advertising and Contents of the Invitation to Bid/Request for Expression of Interest, Sub-section 21.2.1
*pg.55, Rule VII, Section 22 Pre-Bid Conference, Sub-section 22.2
*pg. 56, Rule VII, Section 22.5 Supplemental/Bid Bulletins, Sub-section 22.5.1
*pg.56, Rule VII, Section 22.5 Supplemental/Bid Bulletins, Sub-section 22.5.2
*pg. 76, Rule IX, Section 32 Bid Evaluation for the Procurement of Goods and Infrastructure Projects, Sub-section 32.4
*Ipg.79 Rule X, Section 34 Objective and Process of Post-Qualification,34.2
*pg. 82, Rule X, Section 34 Objective and Process of Post-Qualification,34.8
*pg.84, Rule XI , Section 37.2 Contract Signing, Sub-section 37.1.2 to 37.1.3
*pg. 85, Rule XI, Section 37.2 Contract Signing, Sub-section 37.2.1
*pg. 85, Rule XI, Section 37.2 Contract Signing, Sub-section 37.2.2
*pg.86, Rule XI, Section 37.4 Notice to Proceed, Sub-section 37.4.1

353
3. Consultanty Services under Public Bidding

Republic Act (RA) 9184 "Government Procurement Reform Act"(Section 53.7)


Purchase Requests (PR) with an Approved Budget of the Contract (ABC) amounting to Php 1 Million and above. The End-user
unit or the duly authorized official or personnel shall submit an approved PR together with the required attachments to the Bids
and Awards Committee (BAC) relative to the consultance services to be procured.

Office or Division BFAR- Bids and Awards Committee (BAC)

Classification Highly Technical


G2B- Government to Business/
Type of Transaction
G2C – Government-to-Citizen
Who may avail (External) Bidder/s

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. BAC Request Form for Payment and Order of


BFAR- Bids and Awards Committee (BAC) Office
Payment
2. Accounting Order of Payment, BFAR- Accounting Section
3. Official Receipt for Bidding Documents, BFAR- Cashier Section
4. Bidding Document:
Bidder/s
ELIGIBILITY, TECHNICAL AND FINANCIAL
COMPONENT
2. ENVELOPE
Eligibility Requirements
2.1. The following eligibility requirements, together
with the Eligibility Documents Submission Form, shall
be submitted on or before the date of the eligibility
check specified in the Request for Expression of
Interest and Clause 5 for purposes of determining
eligibility of prospective bidders:
Class “A” Documents
Legal Documents
(i) PhilGEPS Certificate of Registration and
Membership in accordance with Section 8.5.2 of the
IRR, except for foreign bidders participating in the
procurement by a Philippine Foreign Service Office or
Post, which shall submit their eligibility documents
under Section 24.1 of the IRR, provided, that the
winning Consultant shall register with PhilGEPS in
accordance with Section 37.1.4 of the IRR;

Technical Documents

(ii) Statement of the prospective bidder of all its


ongoing and completed government and private
contracts, including contracts awarded but not yet
started, if any, whether similar or not similar in nature
and complexity to the contract to be bid, within the
relevant period provided in the EDS. The statement
shall include, for each contract, the following:
(ii.1) the name and location of the contract;
(ii.2) date of award of the contract;
(ii.3) type and brief description of consulting services;
(ii.4) consultant’s role (whether main consultant,
subconsultant, or partner in a JV)

354
CHECKLIST OF REQUIREMENTS WHERE TO SECURE

Class “B” Documents


If applicable, the Joint Venture Agreement (JVA) in
case the joint venture is already in existence, or duly
notarized statements from all the potential joint
venture partners in accordance with Section 24.1(b) of
the IRR of RA 9184.
2.2. The eligibility requirements or statements, the
bids, and all other documents to be submitted to the
BAC must be in English. If the eligibility requirements
or statements, the bids, and all other documents
submitted to the BAC are in foreign language other
than English, it must be accompanied by a translation
of the documents in English. The documents shall be
translated by the relevant foreign government agency,
the foreign government agency authorized to translate
documents, or a registered translator in the foreign
bidder’s country; and shall be authenticated by the
appropriate Philippine foreign service
establishment/post or the equivalent office having
jurisdiction over the foreign bidder’s affairs in the
Philippines. The English translation shall govern, for
purposes of interpretation of the bid.
2.3. Prospective bidders may obtain a full range of
expertise by associating with individual consultant(s)
and/or other consultants or entities through a JV or
subcontracting arrangements, as appropriate.
However, subconsultants may only participate in the
bid of one short listed consultant. Foreign Consultants
shall seek the participation of Filipino Consultants by
Financial Component
Envelop
The following summarizes the content of the Financial
Proposal.

355
Financial Documents
⬜(g) The prospective bidder’s computation of Net
Financial Contracting Capacity (NFCC); or
A committed Line of Credit from a Universal or
Commercial Bank in lieu of its NFCC computation.
Class “B” Documents
⬜(h) If applicable, a duly signed joint venture
agreement (JVA) in case the joint venture is already in
existence; or
duly notarized statements from all the potential joint
venture partners stating that they will enter into and
abide by the provisions of the JVA in the instance that
the bid is successful.

Other documentary requirements under RA No.


9184 (as applicable)
⬜(i) [For foreign bidders claiming by reason of their
country’s extension of reciprocal rights to Filipinos]
Certification from the relevant government office of
their country stating that Filipinos are allowed to
participate in government procurement activities for
the same item or product.
⬜(j) Certification from the DTI if the Bidder claims
preference as a Domestic Bidder or Domestic Entity.

5. Post-qualification Documents Bidder/s


6. Performance Bond Bidder/s
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Notice the 1. Advertise the Request
advertisement from the for Expression of Interest
PhilGEPS website, BFAR and Bidding Document to
website the PhilGEPS and BFAR
(www.bfar.da.gov.ph) website, and conspicuous
and BFAR BAC Bulletin place at the BFAR's
board (2F, BAC office, premises for
BAC Secretariat
Fisheries Bldg. Complex, 7 calendar days (starting on
(BFAR BAC office)
Brgy Vasra, Quezon date of advertisement). none 7 calendar days
BFAR FIMS
City). *2016 Revised IRR of RA
PhilGEPS
9184 (updated as of 31
December 2021), Section
21.2.1, (a)

2. Receive the Notice of 2. Prepare and forward the None 15 minutes


Meeting for the Notice of Meeting for the
procurement activities ( procurement activities
Eligibility Check and (Eligibility Check and
shortlisting, Pre-Bid & Bid shortlisting, Pre-Bid & Bid
Opening) through email. Opening) to the BAC
members, BAC-Technical
Working Group (TWG),
End-user and Observers
(COA, PCCI and NAPC).

356
3. Attend the Eligibility 3. Conduct the Eligibility
Check and shortlisting Check and shortlisting
within seven (8) calendar
days from posting of
Advertisement with the
BAC members, BFAR End- BAC Secretariat
None 1 hour
user, BFAR TWG, BFAR BAC office
Observers (BFAR COA, 2nd Flr., Fisheries Bldg.,
PCCI and NAPC) and Complex, BPI
interested bidders Compound, Brgy. Vasra,
Visayas Ave., Quezon
City
3.1 Prepare the Minutes of
Eligibility Check and
shortlisting None

3.2. Prepared transmittal


letter and transmit the
Eligibility Documents to
Office of the Technical
Working Group (TWG) for
None 3 calendar days
bid evaluation within three
(3) calendar days from
Eligibility Check and
shortlisting.

3.3. Conduct Shortlisting


Evaluation Report for 3 BFAR TWG
None
days. BFAR-TWG office

3.4. Receive Shortlisting


Evaluation
Report/Shortlisting Criteria
of the Technical Working BAC Secretariat
Group within three (3) None 5 mins BFAR BAC office
calendar days from Bid BFAR TWG
Opening.

4. Receive Notice of 4. Prepare Notice of


Shorlisting Criteria Shortlisting Criteria and
email to the passed none 30 mins.
bidder/s

357
BAC Secretariat
(BFAR BAC office)
5.Attend the Pre-Bid 5. Conduct Pre-Bid
Conference Conference with the BAC
members, BFAR End-user,
BFAR TWG, Observers
(BFAR COA, PCCI and
NAPC) and interested
bidders.
*at least twelve (12)
calendar days before the
deadline for the submission
and receipt of the bids but
not earlier than seven (7)
calendar days from the
PhilGEPS and BFAR None 1 hour
website posting of the
Invitation to Bid and
Bidding Documents.
*For complicated contract
or if international BAC Secretariat
participation is needed, at (BFAR BAC office)
least thirty (30) calendar 2nd Flr., Fisheries Bldg.,
days before the deadline Complex, BPI
for the submission and Compound, Brgy. Vasra,
receipt of the bids.In case Visayas Ave., Quezon
of Consulting services, City
from the determination of
shortlisted Consultants.
6. .Send additional 6. Entertain written request
inquiry/clarificatory for clarifications on any part
question/ request to the of the Bidding Documents
email address of the and forward the same to
BFAR BAC the End-user,if any, at least
(bac.eps@bfar.da.gov.ph ten (10) calendar days
) before the deadline for the
none 2 calendar days
submission and receipt of
the bids.
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021), Section
22.5.1

6.1 Prepare
Supplemental/Bid Bulletin
for approval of the End-
none 2 hours
user and signature of the
BAC Chairperson, if any.

358
7. Notice/Receive the 7. Post the
Supplemental/Bid Bulletin Supplemental/Bid Bulletin
in PhilGEPS and BFAR
website, and conspicuous
place at the BFAR
premises at least seven (7)
calendar days before the
deadline for the submission
and receipt of the bids. BAC Secretariat
Email the same to the email none 1 hour (BFAR BAC office)
address of the bidder/s who BFAR FIMS
bought the Bidding
Document.
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021), Section
22.5.2

8.Fill-out the Bid Docs 8. Issue Bid Docs Receipt


Receipt Form and get the form and Order of Payment
Order of payment at the form for the payment of a
BAC Office located at non refundable Bidding BAC Secretariat
2/F BFAR Building, Document fee. (BFAR BAC office)
Quezon City and present . 2nd Flr., Fisheries Bldg.,
the O.R. or email the none 5 minutes Complex, BPI
scan copy/picture of the Compound, Brgy. Vasra,
O.R. to the email address Visayas Ave., Quezon
of the BFAR BAC City
(bac.eps@bfar.da.gov.ph
).

9. Proceed to Accounting 9. Issue Accounting Order


Section, located at 4/F, of Payment form for the
BFAR Building, Quezon payment of a non- BFAR- Accounting
none 3 minutes
City and get the refundable Bidding Section
Accounting Order of Documents
Payment.
10. Proceed to Cashier 10. Cashier Section to 5 minutes
Section located at 4/F, receive payment and issue
BFAR Building, Quezon an Official Receipt (O.R.)
City and pay the Bidding
Document fee,
Afterwards, return to BAC BFAR Cashier Section
office located at 2/F 4th Flr., Fisheries Bldg.,
BFAR Building, Quezon Complex, BPI
City and present the O.R. Compound, Brgy. Vasra,
or email the scan Visayas Ave., Quezon
copy/picture of the O.R. City
to the email address of
the BFAR BAC
(bac.eps@bfar.da.gov.ph
).

359
11. Return to BAC office 11. Receive and photocopy
receive bidding the Original Receipt (O.R.)/
documents acknowledge receipt of the
email containing the scan
copy/picture of the the
none 15 minutes
Original Receipt from the
interested Bidder, and
issue bidding documents.

12. Submit sealed Bid 12. Receive sealed Bid


envelope containing one envelope from the BAC Secretariat
(1) original and two (2) Interested Bidder/s and BFAR BAC office
printed copies of the first email the Bid Opening 2nd Flr., Fisheries Bldg.,
Technical documents) Zoom link to the bidder. Complex, BPI
and second (Financial Compound, Brgy. Vasra,
documents) components Visayas Ave., Quezon
of its bid, for manually- City
filed bid submission. For
e-submission of bids, none 5 minutes
please refer to BFAR
BAC Online Bidding
Procedure that can be
seen in the latter part of
the Bidding document.
Receive the Bid Opening
Zoom link.

13 Attend the Bid 13. Conduct of the Bid


Opening conducted by Opening with the BAC
the BFAR BAC members, BFAR End-user,
BAC Secretariat
BFAR TWG, Observers
(BFAR COA, PCCI and BFAR BAC office
NAPC) and bidders. 2nd Flr., Fisheries Bldg.,
none 1 hour Complex, BPI
(1 hour or more depending
on the number of bidders Compound, Brgy. Vasra,
who participated in the Visayas Ave., Quezon
project) City

13.1 Forward the submitted


Bids (copy 1) of the bidders
to the Technical Working
BAC Secretariat
Group (TWG) for review,
None none 15 minutes (BFAR BAC office)
evaluation and validation.
BFAR TWG

360
13.2 Conduct Bid
Evaluation and prepare Bid
Evaluation report,
Summary Result of
Eligibility Check Screening,
Abstract of Bids and Notice
to Lowest/Single Calculated
bidder to be signed by the
BAC members, BAC TWG
None and End-user within seven none BFAR TWG
(7) calendar days from the
deadline for receipt of
proposals.
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021), Section
32.4

7 calendar days
13.3 Receive the Bid
Evaluation Report from the BAC Secretariat
None Technical Working Group. none (BFAR BAC office)
BFAR TWG

13.4 Prepare Summary


Result of Eligibility Check
Screening, Abstract of Bids
as Read and Calculated
and Notice to Conduct Post
Qualification to the
None Lowest/Single Calculated none
bidder. Print out and route
the said documents to the
End-user and BAC
members for signature.

14. Receive Notice to 14 Email the Notice to


BAC Secretariat
Conduct Post Conduct Post Qualification
(BFAR BAC office)
Qualification through to the Lowest/Single
none 2 minutes 2nd Flr., Fisheries Bldg.,
email. Calculated bidder.
Complex, BPI
Compound, Brgy. Vasra,
15. Submit Post 15. Receive the Post Visayas Ave., Quezon
Qualification documents Qualification documents (3 City
(3 copies) to the BAC. copies) from the Bidder.
*Bidder must submit the *Bidder must submit the
Post Qualification Post Qualification
documents within five (5) documents within five (5)
calendar days from calendar days from receipt
receipt of notice to of the notice from the BAC. none 5 minutes
Conduct Post
Qualification from the
BAC.
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021), Section
34.2

361
15.1.Prepare Contract and
Notice to Proceed (NTP) to
be initialed by the BAC
Chairperson, BAC Vice-
Chairperson, Head BAC
BAC Secretariat
Secretariat and
None none 5 minutes (BFAR BAC office)
signed/approval by the
BFAR TWG
Director, and one witness
(End-user's authorized
representative).

15.2 Conduct Post


Qualification to the
LCB/HRB.
*If the Lowest Calculated
Bidder failed the criteria for
post-qualification, BAC
shall immediately issue
Notice of Post-
disqualification to be signed
by the BAC Chairperson/his
duly authorized
representative. Immediately
after, the BAC will notify the
None bidder in writing of its post- none 7 calendar days BFAR TWG
disqualification and
grounds for it. Thereafter,
the BAC shall conduct
same post-qualification
process on the second
Lowest Calculated Bidder.
** The BAC shall be given
the same fresh period to
conduct the post-
qualification of the next
lowest calculated
bid/highest rated bid until a
bidder is post-qualified.
15.3 Receive the Post
Qualification report from BFAR TWG
None the Technical Working none 5 minutes BAC Secretariat
Group. BFAR BAC office

16. Receive Notice to 16. Prepare and email BAC Secretariat


conduct Negotiation Notice to conduct BFAR-BAC Office
Negotiation 2nd Flr., Fisheries Bldg.,
None 30 mins Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City
17. Attend Contract 17. Conduct Negotiation BAC Members,
Negotiation End-user, Technical
None 30 mins Working Group and BAC
Secretariart
BFAR-BAC Office

362
17.1. Prepare the BAC
Resolution declaring the
Lowest Calculated and
Responsive Bidder
(LCRB)/Single Calculated
and Responsive Bidder
(SCRB), Notice of Award
(NOA) to be signed by the
Director.
*Within a period not
exceeding fifteen (15)
calendar days from the
determination by the BAC
None of the bidder with the
LCRB, HRRB, SCRB, or
SRRB, and the
recommendation to award
the contract, the Director or
his duly authorized
representative shall Director
approve/ disapprove the BFAR Director's Office
said recommendation. BAC members
**In case of approval, BAC Secretariat
immediately issue the NOA none
BFAR BAC office
to the bidder.
BFAR End-user
***In the event of
BAC Secretariat
disapproval, BAC will notify
BFAR BAC office
HoPE shall resolve with
finality the said request w/in 15calendar days
seven (7) calendar days
from the filing thereof and
furnish the bidder a copy of
the resolution.
*In no case shall the said
request stay/delay the
bidding process. However,
None said request must be first
resolved before any award
is made.
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021), Section
37.1.2 and 37.1.3

17.2. Prepare Notice of


Award (NOA) to be initialed
by the BAC Chairperson,
BAC Vice Chairperson, BAC Secretariat
Head BAC Secretariat and BFAR BAC office
None none
to be signed by the BFAR 2nd Flr., Fisheries Bldg.,
Director. Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City
18. Receive NOA (3 18. Issue NOA (3 original none 5 minutes
original copies) copies) to the successful
bidder.

363
190. Submit signed
NOA(2 original copies)
**If the LCRB failed to
post Performance
Security within the
prescribed period, the bid
security shall be forfeited
and the BAC shall
disqualify the bidder and BAC Secretariat
complete the post- BFAR BAC office
qualification process on 19. Receive signed NOA 2nd Flr., Fisheries Bldg.,
the second LCB. (2 original copies) from the none 2 minutes Complex, BPI
*** If the SCRB failed to successful bidder. Compound, Brgy. Vasra,
post Performance Visayas Ave., Quezon
Security within the City
prescribed period, the bid
security shall be forfeited
and the BAC shall
disqualify the said bidder,
and declare failure of
bidding and conduct a re-
negotiation.

BAC Secretariat
19.1 Secure Obligation BFAR BAC office
Request to Budget Officer Budget Officer
and Prepare Certificate of BFAR Finance Section
None none 1 calendar
Availability of Funds (CAF) Chief Accountant
to be signed by the Chief BFAR Accounting
Accountant Section
BFAR End-user
BAC Secretariat
BFAR BAC office
2nd Flr., Fisheries Bldg.,
19.2 Receive signed CAF
None None 2 mins Complex, BPI
and OBR
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City
20. Submit Performance
Security
*Successful bidder must
post Performance
Security within 10 20. Receive Performance BAC Secretariat
calendar days from Security from the 5 minutes BFAR BAC office
receipt of the NOA. successful bidder. Bidder
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021), Section
37.2.1

364
20.1 Prepare Contract and
Notice to Proceed (NTP) to
be initialed by the BAC
Chairperson, BAC Vice-
Chairperson, Head BAC Secretariat
None Secretariat and signed by none 2 calendar days BAC Secretariat
the Director, End-user and BFAR BAC office
one witness (End-user's
authorized representative).

21. Receive Contract (3 21. Issue Contract (3


original copies) original copies) to the none 5 minutes
successful bidder.
22. Submit notarized 22. Receive notarized
Contract (2 original Contract (2 original copies)
copies) from the successful bidder.
*Successful bidder shall
enter into contract within
the same ten (10) day
period provided that all
the documentary none 5 minutes
requirements are
complied with.
*2016 Revised IRR of RA
9184 (updated as of 31 BAC Secretariat
December 2021), Section BFAR BAC office
37.2.2 2nd Flr., Fisheries Bldg.,
Complex, BPI
23. Receive NTP (3 23. Issue NTP (3 original Compound, Brgy. Vasra,
original copies) copies) to the successful Visayas Ave., Quezon
bidder within seven (7) City
calendar days from the
approval of the contract. none 5 minutes
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021), Section
37.4.1
24. Submit signed NTP (2 24. Receive signed NTP (2
original copies) original copies) from the none 2 minutes
successful bidder.
24.1 . Scan, organize and
file three (3) sets of Bidding
None Documents. (1) COA copy, none 2 hours
(2) Finance copy and (3)
BAC copy.
44 days, 3 hours and 34
TOTAL
minutes
Reference: Republic Act 9184 (Government Procurement Reform Act) and its 2016 Revised Implementing Rules and
Regulations
*Item 1 - pg. 54, Rule VII , Section 21 Advertising and Contents of the Invitation to Bid/Request for Expression of Interest, Sub-
*Item 65pg.55, Rule VII, Section 22 Pre-Bid Conference, Sub-section 22.2
*Item 7 - pg. 56, Rule VII, Section 22.5 Supplemental/Bid Bulletins, Sub-section 22.5.1
*Item 13.2- pg. 76, Rule IX, Section 32 Bid Evaluation for the Procurement of Goods and Infrastructure Projects, Sub-section 32.4

*Item 22 - pg. 85, Rule XI, Section 37.2 Contract Signing, Sub-section 37.2.1
*Item 23 - pg.86, Rule XI, Section 37.4 Notice to Proceed, Sub-section 37.4.1

365
4. Procurement under Repeat Order
Purchase Requests (PR) the ABC shall not exceed twenty five percent (25%) of the Original ABC.

The End-user unit or the duly authorized official or personnel shall submit an approved PR together with the required
attachments to the Bids and Awards Committee (BAC) relative to the goods and services to be procured.

Office or Division BFAR- Bids and Awards Committee (BAC)

Classification Highly Technical ( under Special Law of R.A. 9184)


Type of Transaction G2B- Government to Business/

Who may avail (External) Bidder/s

CHECKLIST OF REQUIREMENTS WHERE TO SECURE


1. Request for Quotation BFAR - End-user and Bidder/s
2. Notice of Award BFAR- Bids and Awards Committee (BAC) Office and Bidder/s
3. Contract Agreement BFAR- Bids and Awards Committee (BAC) Office and Bidder/s
4. Notice to Proceed BFAR- Bids and Awards Committee (BAC) Office and Bidder/s
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Prepare and forward
through email the Pre-
negotiation Notice of
None Meeting to the BAC, End- none 30 minutes
user and Technical
Working Group (TWG).

BAC, End-user, TWG


1.1. Schedule and invite the
and BAC Secretariat
BAC, End-user and
Technical Working Group BFAR BAC office
None none 30 minutes
(TWG) to the Pre-
negotiation conference.
1.2.Conduct scheduled Pre-
negotiation conference.
None none 1 hour

1.3.Post the Invitation to


Bid and Bidding Document
to the PhilGEPS website,
BFAR website and BAC Secretariat and
None conspicuous place at the none 1 hour FIMS
BFAR premises. BFAR office

1. Submit the Request for 1. Send the Request for


BAC Secretariat
Quotation. Quotation
BFAR BAC office
2nd Flr., Fisheries Bldg.,
none 2 calendar days Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City

366
2. Receive NOA (3 2 Issue NOA (3 original
original copies) copies) to the successful
bidder. none 5 minutes

2.1. Submit signed 2.1. Receive signed NOA


NOA(2 original copies) (2 original copies) from the
**If the LCRB failed to successful bidder.
post Performance
Security within the
prescribed period, the bid
security shall be forfeited
and the BAC shall
disqualify the bidder and
complete the post-
qualification process on
the second LCB. none 3 minutes
*** If the SCRB failed to
post Performance
Security within the
prescribed period, the bid
security shall be forfeited
and the BAC shall
disqualify the said bidder,
and declare failure of
bidding and conduct a re-
negotiation.

2.2. Secure Obligation


BAC Secretariat
Request to Budget Officer
BFAR BAC office
and Prepare Certificate of
Budget Officer
Availability of Funds (CAF)
to be signed by the Chief BFAR Finance Section
None none 1 calendar day
Accountant Chief Accountant
BFAR Accounting
Section
BFAR End-user
2.3. Receive the signed
None none 5 minutes
CAF and OBR.
2.4. Prepare Contract and
Notice to Proceed (NTP) to
be initialed by the BAC
Chairperson, BAC Vice-
Chairperson, Head BAC BAC Secretariat
None Secretariat and signed by none 2 calendar days BFAR BAC office
the Director, End-user and 2nd Flr., Fisheries Bldg.,
one witness (End-user's Complex, BPI
authorized representative). Compound, Brgy. Vasra,
Visayas Ave., Quezon
City
2.5. Receive Contract (3 2.5. Issue Contract (3
original copies) original copies) to the
successful bidder. none 5 minutes

367
2.6. Submit notarized 2.6. Receive notarized
Contract (2 original Contract (2 original copies)
copies) from the successful bidder.
*Successful bidder shall
enter into contract within
the same ten (10) day
period provided that all
the documentary none 3 minutes
requirements are
complied with.
*2016 Revised IRR of RA
9184 (updated as of 31
BAC Secretariat
December 2021), Section
BFAR BAC office
37.2.2
2nd Flr., Fisheries Bldg.,
2.7. Receive NTP (3 2.7. Issue NTP (3 original Complex, BPI
original copies) copies) to the successful Compound, Brgy. Vasra,
bidder within seven (7) Visayas Ave., Quezon
calendar days from the City
approval of the contract.
*2016 Revised IRR of RA none 5 minutes
9184 (updated as of 31
December 2021), Section
37.4.1

2.8. Submit signed NTP 2.8. Receive signed NTP (2


(2 original copies) original copies) from the
successful bidder. none 3 minutes

2.9. Scan, organize and file


three (3) sets of Bidding
Documents. (1) COA copy,
None (2) Finance copy and (3) none 2 hours
BAC copy.

5 days, 5 hours & 29


TOTAL
mins.

Reference: Republic Act 9184 (Government Procurement Reform Act) and its 2016 Revised Implementing Rules and Regulations
Section 51. Repeat Order

368
5. Procurement under Negotiated Procurement (Two-Failed Biddings)

Purchase Requests (PR) with an Approved Budget of the Contract (ABC) amounting to Php 1 Million and above.

The End-user unit or the duly authorized official or personnel shall submit an approved PR together with the required
attachments to the Bids and Awards Committee (BAC) relative to the goods and services to be procured.

Office or Division BFAR- Bids and Awards Committee (BAC)

Classification Highly Technical ( under Special Law of R.A. 9184)


G2B- Government to Business/
Type of Transaction
G2C – Government-to-Citizen

Who may avail (External) Bidder/s

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Approved BAC Resolution to conduct Negotiated


BFAR- Bids and Awards Committee (BAC) Office and BFAR End-user
Procurement
1. Request Form for Payment, if applicable BFAR- Bids and Awards Committee (BAC) Office
2. Order of Payment, if applicable BFAR- Accounting Section
3. Official Receipt for Bidding Documents (photocopy), BFAR- Cashier Section
4. Bidding Documents which includes a complete set BFAR - Bids and Awards Committee (BAC) Office and Bidder/s
5. TECHNICAL AND FINANCIAL COMPONENT
ENVELOPE
Technical Documents
Financial Documents
⬜(j) Certification from the DTI if the Bidder claims Bidder/s
preference as a Domestic Bidder or Domestic Entity.

II. FINANCIAL COMPONENT


FOR INFRASTRUCTURE
I. TECHNICAL COMPONENT
CHECKLIST OF REQUIREMENTS WHERE TO SECURE

⬜(f) Project Requirements, which shall include the


following:
a. Organizational chart for the contract to be bid;
b. List of contractor’s key personnel (e.g., Project
Manager,
or Project Engineers,
duly notarized statements from all the potential joint
venture partners stating that they will enter into and
abide by the provisions of the JVA in the instance that
the bid is successful.
6. Supplemental Bid Bulletin, if any BFAR- Bids and Awards Committee (BAC) Office and Bidder/s

7. Bid Evaluation Report BFAR - TWG


8. Post Qualification Documents
a) Latest Income Tax Returns (Previous 6 months) Bidder/s
*must be certified true copies;
9. Post Qualification Report BFAR - TWG
10. Abstract of Bid as Read and Calculated BFAR- Bids and Awards Committee (BAC) Office and Bidder/s
11. OBR BFAR - Budget Section

369
12. Performance Bond Bidder/s

13. Notice of Award (NOA) - 3 original copies BFAR- Bids and Awards Committee (BAC) Office and Bidder/s

14. Contract Agreement - 3 original copies BFAR- Bids and Awards Committee (BAC) Office and Bidder/s

15. Notice to Proceed (NTP) - 3 original copies BFAR- Bids and Awards Committee (BAC) Office and Bidder/s

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Notice the 1. Advertise the Invitation to
advertisement from the Bid (ITB) and Bidding
PhilGEPS website, BFAR Document to the PhilGEPS
website and BFAR website, and
(www.bfar.da.gov.ph) conspicuous place at the
and BFAR BAC Bulletin BFAR's premises for 7
board (2F, BAC office, calendar days (starting on
Fisheries Bldg. Complex, date of advertisement). none
Brgy Vasra, Quezon *2016 Revised IRR of RA
City). 9184 (updated as of 31 BAC Secretariat
December 2021), Section BFAR BAC office
21.2.1, (a) 2nd Flr., Fisheries Bldg.,
7 calendar days Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
2. Notice/Receive the 2. Invite at least three (3) City
invite through the email suppliers/contractors/
adresses of the consultants of good
prospective bidders. standing to negotiate the
contract.
none
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021), Annex
"H", D. Negotiated
Procurement

370
3. Attend the Pre-Bid 3. Conduct Pre-Bid
Conference conducted by Conference with the BAC
the BFAR BAC. members, BFAR End-user,
BFAR TWG, Observers
(BFAR COA, PCCI and
NAPC) and interested
bidders.
*at least twelve (12)
calendar days before the
deadline for the submission
and receipt of the bids but BAC Secretariat
not earlier than seven (7) BFAR BAC office
calendar days from the 2nd Flr., Fisheries Bldg.,
PhilGEPS and BFAR none 1 hour Complex, BPI
website posting of the Compound, Brgy. Vasra,
Invitation to Bid and Visayas Ave., Quezon
Bidding Documents. City
*For complicated contract
or if international
participation is needed, at
least thirty (30) calendar
days before the deadline
for the submission and
receipt of the bids.In case
of Consulting services,
from the determination of
shortlisted Consultants.
4. Send additional 4. Entertain written request
inquiry/clarificatory for clarifications on any part
question/ request to the of the Bidding Documents
email address of the and forward the same to
BFAR BAC the End-user,if any, at least
(bac.eps@bfar.da.gov.ph ten (10) calendar days
) before the deadline for the BAC Secretariat
none 2 calendar days
submission and receipt of BFAR BAC office
the bids. 2nd Flr., Fisheries Bldg.,
*2016 Revised IRR of RA Complex, BPI
9184 (updated as of 31 Compound, Brgy. Vasra,
December 2021), Section Visayas Ave., Quezon
22.5.1 City
4.1. Prepare
Supplemental/Bid Bulletin
for approval of the End-
none 2 hours
user and signature of the
BAC Chairperson, if any.

371
5. Notice/Receive the 5. Post the
Supplemental/Bid Bulletin Supplemental/Bid Bulletin
in PhilGEPS and BFAR
website, and conspicuous
place at the BFAR
premises at least seven (7)
calendar days before the
deadline for the submission
and receipt of the bids. none 1 hour
Email the same to the email
address of the bidder/s who
bought the Bidding
Document.
*2016 Revised IRR of RA
9184 (updated as of 31 BAC Secretariat
December 2021), Section BFAR BAC office
22.5.2 2nd Flr., Fisheries Bldg.,
Complex, BPI
6. Fill-out the Bid Docs 6. Issue Bid Docs Receipt
Compound, Brgy. Vasra,
Receipt Form and the form and Order of Payment
Visayas Ave., Quezon
Order of payment given form for the payment of a
City
by the BFAR BAC office non refundable Bidding
(2F, BAC Office, Document fee.
Fisheries Bldg. Complex, .
BPI Compound, Brgy.
Vasra, Quezon City).
*Bidders who have 5 minutes
already bought the
bidding documents during
the last failed biddings
need not pay the amount
of non refundable bidding
document fee for the
Negotiated Document.

372
7. (a) Proceed to 7. Receive and photocopy
Accounting Section the Original Receipt (O.R.)/
located at 4/F, Fisheries acknowledge receipt of the
Bldg. Complex, BPI email containing the scan
Compound, Brgy. Vasra, copy/picture of the the
Quezon City to get an Original Receipt from the
Accounting Order of interested Bidder.
payment; (b) Go to the
Cashier Section located
at the same floor to pay
the Bidding Document
fee, if applicable.
Afterwards, return to BAC
office located at 2/F none 5 minutes
Fisheries Bldg.
Complex,BPI Compound,
Brgy. Vasra, Quezon City
and present the O.R. or
email the scan
copy/picture of the O.R.
to the email address of
the BFAR BAC
(bac.eps@bfar.da.gov.ph
).

8. Submit sealed Bid 8. Receive sealed Bid


envelope containing one envelope from the
(1) original and two (2) Interested Bidder/s and
printed copies of the first email the Bid Opening
component (Eligibility and Zoom link to the bidder.
Technical documents)
and second component
(Financial documents) of
its bid, for manually-filed
bid submission at the
BFAR BAC Office. For e- BAC Secretariat
submission of bids, none 5 minutes BFAR BAC office
please refer to BFAR Bidder
BAC Online Bidding
Procedure that can be
seen in the latter part of
the Bidding document.
Receive the email of the
BFAR BAC containing
the Bid Opening Zoom
link.

373
9. Conduct of the Bid
Opening with the BAC
members, BFAR End-user,
BFAR TWG, Observers
9. Attend the Bid Opening
(BFAR COA, PCCI and
conducted by the BFAR none 1 hour BAC Secretariat
NAPC) and bidders.
BAC. BFAR BAC office
(1 hour or more depending
2nd Flr., Fisheries Bldg.,
on the number of bidders
Complex, BPI
who participated in the
Compound, Brgy. Vasra,
project)
Visayas Ave., Quezon
City
9.1. Forward the submitted
Bids (copy 1) of the bidders
None to the Technical Working none 15 minutes
Group (TWG) for review,
evaluation and validation.
9.2. Conduct Bid Evaluation
and prepare Bid Evaluation
report within seven (7)
calendar days from the
deadline for receipt of
None none BFAR TWG
proposals.
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021), Section
32.4 7 calendar days
9.3 Receive the Bid
None Evaluation Report from the none
Technical Working Group.
BAC Secretariat
9.3 Prepare Summary BFAR BAC office
Result of Eligibility Check 2nd Flr., Fisheries Bldg.,
None Screening, Abstract of Bids none
Complex, BPI
as Read and Calculated Compound, Brgy. Vasra,
and Notice to Conduct Post Visayas Ave., Quezon
10. Receive Notice to 10. Email the Notice to City
Conduct Post Conduct Post Qualification
none 2 minutes
Qualification through to the Lowest/Single
email. Calculated bidder.
11. Submit Post
Qualification documents
(3 copies) to the BFAR
BAC. 11. Receive the Post
*Bidder must submit the Qualification documents (3
Post Qualification copies) from the Bidder.
documents within five (5) *Bidder must submit the
calendar days from none 5 minutes BAC Secretariat
Post Qualification
receipt of notice to BFAR BAC office
documents within five (5)
Conduct Post 2nd Flr., Fisheries Bldg.,
calendar days from receipt
Qualification from the Complex, BPI
of the notice from the BAC.
BAC. Compound, Brgy. Vasra,
*2016 Revised IRR of RA Visayas Ave., Quezon
9184 (updated as of 31 City
December 2021)

374
BAC Secretariat
BFAR BAC office
2nd Flr., Fisheries Bldg.,
Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City

11.1. Forward the


submitted Post
None Qualification documents none 5 minutes
(copy 1) of the bidder to the
Technical Working Group.
11.2. Conduct Post
Qualification to the
LCB/HRB.
*If the Lowest Calculated
Bidder failed the criteria for
post-qualification, BAC
shall immediately issue
Notice of Post-
disqualification to be signed
by the BAC Chairperson/his
duly authorized
representative. Immediately
after, the BAC will notify the
None bidder in writing of its post- none 7 calendar days BFAR TWG
disqualification and
grounds for it. Thereafter,
the BAC shall conduct
same post-qualification
process on the second
Lowest Calculated Bidder.
** The BAC shall be given
the same fresh period to
conduct the post-
qualification of the next
lowest calculated
bid/highest rated bid until a
bidder is post-qualified.
***it shall be completed in
not more than twelve (12)
calendar days from the
determination of the Lowest
Calculated Bid
(LCB)/Highest Rated Bid
(HRB). In exceptional
cases, may be extended by
BFAR, but in no case shall
None the aggregate period none
exceed forty-five (45)
calendar days for Goods 7 calendar days BFAR TWG
and Infrastructure projects
or thirty (30) calendar days
in Consulting Services.
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021, Section
34.8

11.3. Prepare and submit


the Post Qualification report
None none
to BFAR BAC Secretariat

375
11.3. Receive the Post
Qualification report from
None none 5 minutes
the Technical Working
Group.
11.4. Prepare the BAC
Resolution declaring the
Lowest Calculated and
Responsive Bidder
(LCRB)/Single Calculated
and Responsive Bidder
(SCRB) for the approval
and signature of the BAC
members, BFAR End-user
and BFAR Director.
*Within a period not
exceeding fifteen (15)
calendar days from the
None determination by the BAC
of the bidder with the
LCRB, HRRB, SCRB, or
SRRB, and the
recommendation to award
the contract, the Director or
his duly authorized
representative shall
approve/ disapprove the
said recommendation.
**In case of approval,
immediately issue the NOA
to the bidder. none
***In the event of BAC Secretariat
****Disqualified bidder may BFAR BAC office
file a request for 2nd Flr., Fisheries Bldg.,
reconsideration w/in three Complex, BPI
None 7 calendar days
(3) calendar days from Compound, Brgy. Vasra,
receipt of Notice of Visayas Ave., Quezon
Disqualification. City
HoPE shall resolve with
finality the said request w/in
seven (7) calendar days
from the filing thereof and
furnish the bidder a copy of
the resolution.
*In no case shall the said
request stay/delay the
bidding process. However,
None said request must be first
resolved before any award
is made.
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021), Section
37.1.2 and 37.1.3

376
11.5. Prepare Notice of
Award (NOA) to be initialed
by the BAC Chairperson,
BAC Vice Chairperson,
none
Head BAC Secretariat and
to be signed by the BFAR
Director.

12. Receive NOA (3 12. Issue NOA (3 copies) to


copies) from BFAR BAC. the successful bidder. none 5 minutes

13. Submit signed NOA 13. Receive signed NOA (2


(2 copies) to BFAR BAC. original copies) from the
**If the LCRB failed to successful bidder.
post Performance
Security within the
prescribed period, the bid
security shall be forfeited
and the BAC shall
disqualify the bidder and
complete the post-
qualification process on
the second LCB.
*** If the SCRB failed to none 2 minutes
post Performance
Security within the
prescribed period, the bid
security shall be forfeited
and the BAC shall
disqualify the said bidder, BAC Secretariat
and declare failure of BFAR BAC office
bidding and conduct a re- 2nd Flr., Fisheries Bldg.,
negotiation. Complex, BPI
Compound, Brgy. Vasra,
Visayas Ave., Quezon
City
14. Prepare Certificate of
Availability of Funds (CAF)
None none 1 calendar
to be signed by the Chief
Accountant.
14.1.Receive signed CAF
and OBR from the
None Accounting Section. none 2 minutes

14.2.Prepare Contract and


None Notice to Proceed (NTP) to none 2 calendar days
be initialed by the BAC
Chairperson, BAC Vice-
15. Receive Contract (3 15. Issue Contract (3
copies) from BFAR BAC. copies) to the successful
bidder. none 5 minutes

16. Submit notarized 16. Receive notarized


Contract (2 original Contract (2 copies) from
none 5 minutes
copies) the successful bidder.
*Successful bidder shall
enter into contract within

377
17. Submit Performance 17. Receive Performance
Security to the BFAR Security from the
BAC. successful bidder.
*Successful bidder must
post Performance
Security within 10
none 5 minutes
calendar days from
receipt of the NOA.
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021), Section
37.2.1
18. Receive NTP (3 18. Issue NTP (3 copies) to
copies) from BFAR BAC. the successful bidder within
seven (7) calendar days
from the approval of the BAC Secretariat
contract. none 5 minutes BFAR BAC office
*2016 Revised IRR of RA 2nd Flr., Fisheries Bldg.,
9184 (updated as of 31 Complex, BPI
December 2021), Section Compound, Brgy. Vasra,
37.4.1 Visayas Ave., Quezon
19. Submit signed NTP (2 19. Receive signed NTP (2 City
copies) copies) from the successful none 2 minutes
bidder.
20. Scan, organize and file
three (3) sets of Bidding
Documents (1) COA copy,
(2) Finance copy and (3)
None BAC copy. none 2 hours
COA copy - submit to
BFAR COA
Finance copy - submit to
BFAR Property Section
20.1. Scan NOA, Contract,
NTP and BAC Resolution ,
post the same to the
PhilGEPS website and
None email the files to the BFAR none 20 minutes
FIMS for posting of the said
documents to the BFAR
website.

TOTAL 34 days, 38 minutes


Reference: Republic Act 9184 (Government Procurement Reform Act) and its 2016 Revised Implementing Rules and Regulations
* pg. 54, Rule VII , Section 21 Advertising and Contents of the Invitation to Bid/Request for Expression of
*pg.55, Rule VII, Section 22 Pre-Bid Conference, Sub-section 22.2
*pg. 56, Rule VII, Section 22.5 Supplemental/Bid Bulletins, Sub-section 22.5.1
*pg.56, Rule VII, Section 22.5 Supplemental/Bid Bulletins, Sub-section 22.5.2

*pg. 76, Rule IX, Section 32 Bid Evaluation for the Procurement of Goods and Infrastructure Projects, Sub-section 32.4

*Ipg.79 Rule X, Section 34 Objective and Process of Post-Qualification,34.2


*pg. 82, Rule X, Section 34 Objective and Process of Post-Qualification,34.8
*pg.84, Rule XI , Section 37.2 Contract Signing, Sub-section 37.1.2 to 37.1.3
*pg. 85, Rule XI, Section 37.2 Contract Signing, Sub-section 37.2.1
*pg. 85, Rule XI, Section 37.2 Contract Signing, Sub-section 37.2.2
*pg.86, Rule XI, Section 37.4 Notice to Proceed, Sub-section 37.4.1

378
PROCUREMENT UNDER PUBLIC BIDDING

A. INTERNAL SERVICES:

1. Procurement under Public Bidding for Goods


Purchase Requests (PR) with an Approved Budget of the Contract (ABC) amounting to Php 1 Million and above.

The End-user unit or the duly authorized official or personnel shall submit an approved PR together with the required
attachments to the Bids and Awards Committee (BAC) relative to the goods and services to be procured.

Office or Division BFAR- Bids and Awards Committee (BAC)

Classification Highly Technical ( under Special Law of R.A. 9184)

Type of Transaction G2G – Government to Government

Who may avail End-user/s (BFAR personnel)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Approved Purchased Request (PR) with complete


requirements:
Annual Procurement Plan (APP) or Supplemental End-user
Terms of Reference (TOR)
Authority to Conduct Procurement Activity for P.R.
2. Invitation to Bid (ITB) & Bidding Documents BFAR- Bids and Awards Committee (BAC) Office
3. Supplemental bid bulletin/s if any. BFAR- Bids and Awards Committee (BAC) Office
4. Abstract as Read and Abstract as Calculated BFAR- Bids and Awards Committee (BAC) Office
5. BAC Resolution for Award BFAR- Bids and Awards Committee (BAC) Office
6. Notice of Award BFAR- Bids and Awards Committee (BAC) Office
7. Obligation Request (OBR) BFAR- Budget Section
7. Contract Agreement BFAR- Bids and Awards Committee (BAC) Office
8. Notice to Proceed BFAR- Bids and Awards Committee (BAC) Office
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit Approved 1. Received Approved
Purchase Request with Purchased Request (PR)
complete requirements. with complete
requirements:
Annual Procurement Plan
(APP) or Supplemental
Project Procurement
Management Plan BAC Secretariat
none 5 minutes
BFAR BAC office

Terms of Reference
(TOR)

Authority to Conduct
Procurement Activity for
P.R. with an ABC of 50
Million Above

379
2. Receive the Notice of2. Schedule, prepare and
Meeting for the Pre- forward the Pre-
Procurement through Procurement conference
email and invite throughNotice of Meeting to the none 30 minutes
the Google calendar. BAC, End-user and
Technical Working Group
(TWG) through email.
3. Attend the Pre- 3. Conduct Pre-
Procurement conference. Procurement conference
with the BFAR End-user, none 1 hour
BFAR TWG and BAC
members.
4. Review Bidding 4. Prepare the Invitation to
BAC Secretariat
Documents and Invite Bid and Bidding Documents
Bidders/Suppliers. and advertise to the BFAR BAC office
PhilGEPS, BFAR website,
and conspicuous place at
the BFAR's premises for 7
calendar days starting on
date of advertisement. none 4 hours
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021, Section
21.2.1, (a)

4.1. Receive the Notice of 4.1. Prepare and forward


Meeting for the the Notice of Meeting for
procurement activities the procurement activities
(Pre-Bid & Bid Opening) (Pre-Bid & Bid Opening) to
through email and invite the BAC members, BAC- BAC Secretariat
none 30 minutes
through Google calendar. Technical Working Group BFAR BAC office
(TWG), End-user and
Observers (COA, PCCI and
NAPC).

5. Attend the Pre-Bid 5. Conduct Pre-Bid


conference. Conference with BAC
members, BFAR End-user,
BFAR TWG, Observers
(BFAR COA, PCCI and
NAPC) and Bidder/s. (Not
earlier than seven (7)
calendar days from
advertisement/posting and BAC Secretariat
at least twelve (12) none 1 hour
BFAR BAC office
calendar days before the
deadline for the submission
and receipt of the bids.)
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021, Section
22.2

380
6. Respond to the 6. Entertain/receive written
submitted inquiries and request for clarifications on
clarifications of the any part of the Bidding
prospective bidder/s, if Documents within three (3)
any, within three (3) calendar days after Pre-Bid
calendar days. Conference and forward to BAC Secretariat
the End-user. none 5 minutes
BFAR BAC office
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021, Section
22.5.1

6.1 Approves the created 6.1 Prepare and Post the


Supplemental/Bid Bulletin Supplemental/Bid Bulletin
in PhilGEPS, BFAR
website, and conspicuous
place at the BFAR
premises at least seven (7)
calendar days before the
deadline for the submission
and receipt of the bids. BAC Secretariat
none 30 minutes
Email the same to the email BFAR BAC office
address of the bidder/s who
bought the Bidding
Document.
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021, Section
22.5.2

7. Attend the Bid 7. Conduct of the Bid


Opening. Opening with BAC
members, BFAR End-user,
BFAR TWG, Observers
(BFAR COA, PCCI and none 1 hour
NAPC) and Bidder/s at
least 12 calendar days from
BAC Secretariat
Pre-Bid Conference.
BFAR BAC office
7.1. Forward the submitted
Bids to the Technical
Working Group (TWG) for
None review, evaluation and none 15 minutes
validation.

7.2. Conduct Bid Evaluation


and prepare Bid Evaluation
report within seven (7)
calendar days from the
deadline for receipt of bid
None proposals. none 5 calendar days BFAR TWG
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021, Section
32.4

381
7.3. Receive the Bid
Evaluation Report from the
None none 2 minutes
Technical Working Group
(TWG).
8. Signed the Abstract of 8. Prepare (1) Summary
Bids as Read and as Result of Eligibility Check
Calculated Screening, (2) Abstract of
Bids as Read and as BAC Secretariat
Calculated and (3) Notice BFAR BAC office
to Conduct Post-
Qualification to the none 1 calendar day
Lowest/Single Calculated
bidder to be signed by the
BAC members and End-
user.

8.1. Email the Notice to


Conduct Post Qualification
None to the Lowest/Single none 5 minutes
Calculated bidder.

8.2. Receive the Post


Qualification documents (3
copies) from the Bidder.
*Bidder must submit the
Post Qualification
documents within five (5)
calendar days from receipt
None none 5 calendar days BAC Secretariat
of the notice from the BAC.
*2016 Revised IRR of RA BFAR BAC office
9184 (updated as of 31
December 2021, Section
34.2

8.3. Forward the submitted


Post-qualification
documents (copy 1) of the
None bidder to the Technical none 5 minutes
Working Group.

8.4. Conduct Post


Qualification to the
LCB/HRB.
*If the Lowest Calculated
None none 7 calendar days BFAR TWG
Bidder failed the criteria for
post-qualification, BAC
shall immediately issue
Notice of Post-
disqualification to be signed

382
***it shall be completed in
not more than twelve (12)
calendar days from the
determination of the Lowest
Calculated Bid
(LCB)/Highest Rated Bid
(HRB). In exceptional
cases, may be extended by
BFAR, but in no case shall
the aggregate period
exceed forty-five (45)
calendar days for Goods BFAR TWG
and Infrastructure projects
or thirty (30) calendar days
in Consulting Services.
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021, Section
34.8

8.5. Receive the Post


Qualification report from
the Technical Working BAC Secretariat
None none 5 minutes
Group. BFAR BAC office

9. Sign the BAC 9. Prepare the BAC


Resolution Resolution declaring the
Lowest Calculated and
Responsive Bidder
(LCRB)/Single Calculated
and Responsive Bidder
(SCRB) for the approval
and signature of the BAC
members and Director.
*Within a period not
exceeding fifteen (15)
calendar days from the
determination by the BAC
of the bidder with the
LCRB, HRRB, SCRB, or
SRRB, and the
recommendation to award
the contract, the Director or
his duly authorized
representative shall
approve/ disapprove the
said recommendation.
****Disqualified bidder may none 7 calendar days
file a request for
reconsideration w/in three
(3) calendar days from
receipt of Notice of
BAC Secretariat
BFAR BAC office

383
none 7 calendar days

HoPE shall resolve with BAC Secretariat


finality the said request w/in BFAR BAC office
seven (7) calendar days
from the filing thereof and
furnish the bidder a copy of
the resolution.
*In no case shall the said
request stay/delay the
bidding process. However,
said request must be first
resolved before any award
is made.
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021), Section
37.1.2 and 37.1.3

9.1. Initial the Notice of 9.1.Prepare Notice of


Award (NOA) Award (NOA) to be initialed
by the BAC Chairperson,
BAC Vice Chairperson, none 30 minutes
Head BAC Secretariat and
signed by the BFAR
Director.
9.2. Issue NOA (3 original
None copies) to the successful none 5 minutes
bidder.
9.3. Receive signed NOA
(2 copies) from the
successful bidder.
**If the LCRB failed to post
Performance Security
within the prescribed
period, the bid security
shall be forfeited and the
BAC shall disqualify the
bidder and complete the
post-qualification process
None on the second LCB. none 3 minutes
*** If the SCRB failed to
post Performance Security
within the prescribed
period, the bid security
shall be forfeited and the
BAC shall disqualify the
said bidder, and declare
failure of bidding and
conduct a re-negotiation.

9.4 Sign the Obligation 9.4. Secure Obligation


Request Request to Budget Officer
and Prepare Certificate of
Availability of Funds (CAF) none 1 calendar day
to be signed by the Chief
Accountant

384
9.5. Receive the signed
None CAF together with the none 5 minutes
signed OBR.
9.6. Sign the Contract 9.6. Prepare Contract and
Agreement and Initial the Notice to Proceed (NTP) to
Notice to Proceed (NTP) be initialed by the BAC
Chairperson, BAC Vice-
Chairperson, Head BAC none 2 calendar days
Secretariat and signed by
the Director, and one
witness of the End-user.
BAC Secretariat
9.7. Issue Contract (3 BFAR BAC office
None copies) to the successful none 5 minutes
bidder.
9.8. Receive notarized
Contract (2 copies) from
the successful bidder.
*Successful bidder shall
enter into contract within
the same ten (10) day
None period provided that all the none 3 minutes
documentary requirements
are complied with.
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021), Section
37.2.2

9.9. Receive Performance


Security from the
successful bidder.
*Successful bidder must
post Performance Security
within 10 calendar days
None from receipt of the NOA. none 5 minutes
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021), Section
37.2.1

9.10. Issue NTP (3 copies)


to the successful bidder
within seven (7) calendar
days from the approval of
None the contract. none 5 minutes
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021), Section
37.4.1
9.11. Receive signed NTP
None (2 copies) from the none 3 minutes
successful bidder.

385
9.12. Scan, organize and
file three (3) sets of Bidding
Documents (1) COA copy,
(2) Finance copy and (3)
BAC Secretariat
None BAC copy. none 2 hours
BFAR BAC office
COA copy - submit to
BFAR COA
Finance copy - submit to
BFAR Property Section
9.13. Scan and post NOA,
Contract, NTP and BAC
Resolution at the PhilGEPS
website and email the BAC Secretariat
None none 20 minutes
same to BFAR FIMS for BFAR BAC office
posting of the said
documents to the BFAR
website.
9.14 Acknowledge the
BAC Secretariat
receipt of email. none 5 minutes
BFAR BAC office

28 days, 12
TOTAL hours & 41
minutes
Reference: Republic Act 9184 (Government Procurement Reform Act) and its 2016 Revised Implementing Rules and Regulations
* pg. 54, Rule VII , Section 21 Advertising and Contents of the Invitation to Bid/Request for Expression of Interest, Sub-section 21.2.1 letter (a)
*pg.55, Rule VII, Section 22 Pre-Bid Conference, Sub-section 22.2
*pg. 56, Rule VII, Section 22.5 Supplemental/Bid Bulletins, Sub-section 22.5.1
*pg.56, Rule VII, Section 22.5 Supplemental/Bid Bulletins, Sub-section 22.5.2
*pg. 76, Rule IX, Section 32 Bid Evaluation for the Procurement of Goods and Infrastructure Projects, Sub-section 32.4
*Ipg.79 Rule X, Section 34 Objective and Process of Post-Qualification,34.2
*pg. 82, Rule X, Section 34 Objective and Process of Post-Qualification,34.8
*pg.84, Rule XI , Section 37.2 Contract Signing, Sub-section 37.1.2 to 37.1.3
*pg. 85, Rule XI, Section 37.2 Contract Signing, Sub-section 37.2.1
*pg. 85, Rule XI, Section 37.2 Contract Signing, Sub-section 37.2.2
*pg.86, Rule XI, Section 37.4 Notice to Proceed, Sub-section 37.4.1

386
2. Procurement under Public Bidding for Infrastructure
Purchase Requests (PR) with an Approved Budget of the Contract (ABC) amounting to Php 1 Million and above.

The End-user unit or the duly authorized official or personnel shall submit an approved PR together with the required
attachments to the Bids and Awards Committee (BAC) relative to the goods and services to be procured.

Office or Division BFAR- Bids and Awards Committee (BAC)

Classification Highly Technical ( under Special Law of R.A. 9184)

Type of Transaction G2G – Government to Government

Who may avail End-user/s (BFAR personnel)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Approved Purchased Request (PR) with complete


Annual Procurement Plan (APP) or
Program of Work
Bill of Quantity End-user
Drawings and Plans
Authority to Conduct Procurement Activity for
P.R. with an ABC of 50 Million Above
2. Invitation to Bid (ITB) & Bidding Documents BFAR- Bids and Awards Committee (BAC) Office
3. Supplemental bid bulletin/s if any. BFAR- Bids and Awards Committee (BAC) Office
4. Abstract as Read and Abstract as Calculated BFAR- Bids and Awards Committee (BAC) Office
5. BAC Resolution for Award BFAR- Bids and Awards Committee (BAC) Office
6. Notice of Award BFAR- Bids and Awards Committee (BAC) Office
7. Obligation Request (OBR) BFAR- Budget Section
7. Contract Agreement BFAR- Bids and Awards Committee (BAC) Office
8. Notice to Proceed BFAR- Bids and Awards Committee (BAC) Office
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit Approved 1. Received Approved
Purchase Request with Purchased Request (PR)
complete requirements. with complete
requirements:
Annual Procurement Plan
(APP) or Supplemental
Project Procurement
Management Plan
BAC Secretariat
none 5 minutes
BFAR BAC office
Program of Work

Bill of Quantity
Drawings and Plans
Authority to Conduct
Procurement Activity for
P.R. with an ABC of 50
Million Above

387
2. Receive the Notice of 2. Schedule, prepare and
Meeting for the Pre- forward the Pre-
Procurement through Procurement conference
email and invite through Notice of Meeting to the BAC Secretariat
the Google calendar. BAC, End-user and none 30 minutes
BFAR BAC office
Technical Working Group
(TWG) through email.

3. Attend the Pre- 3. Conduct Pre-


Procurement conference. Procurement conference
with the BFAR End-user, BAC Secretariat
BFAR TWG and BAC none 1 hour
BFAR BAC office
members.

4. Review Bidding 4. Prepare the Invitation to


Documents and Invite Bid and Bidding Documents
Bidders/Suppliers. and advertise to the
PhilGEPS, BFAR website,
and conspicuous place at
the BFAR's premises for 7
calendar days starting on BAC Secretariat
none 4 hours
date of advertisement. BFAR BAC office
*2016 Revised IRR of RA 9184
(updated as of 31 December
2021, Section 21.2.1, (a)

4.1. Receive the Notice of 4.1. Prepare and forward


Meeting for the the Notice of Meeting for
procurement activities the procurement activities
(Pre-Bid & Bid Opening) (Pre-Bid & Bid Opening) to
through email and invite the BAC members, BAC- BAC Secretariat
through Google calendar. Technical Working Group none 30 minutes
BFAR BAC office
(TWG), End-user and
Observers (COA, PCCI and
NAPC).

5. Attend the Pre-Bid 5. Conduct Pre-Bid


conference. Conference with BAC
members, BFAR End-user,
BFAR TWG, Observers
(BFAR COA, PCCI and
NAPC) and Bidder/s. (Not
earlier than seven (7)
calendar days from
advertisement/posting and BAC Secretariat
at least twelve (12) none 1 hour
BFAR BAC office
calendar days before the
deadline for the submission
and receipt of the bids.)
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021, Section
22.2

388
6. Respond to the 6. Entertain/receive written
submitted inquiries and request for clarifications on
clarifications of the any part of the Bidding
prospective bidder/s, if Documents within three (3)
any, within three (3) calendar days after Pre-Bid BAC Secretariat
calendar days. Conference and forward to none 5 minutes
BFAR BAC office
the End-user.
*2016 Revised IRR of RA 9184
(updated as of 31 December
2021, Section 22.5.1

6.1 Approves the created 6.1 Prepare and Post the


Supplemental/Bid Bulletin Supplemental/Bid Bulletin
in PhilGEPS, BFAR
website, and conspicuous
place at the BFAR
premises at least seven (7)
calendar days before the
deadline for the submission
and receipt of the bids. BAC Secretariat
none 30 minutes
Email the same to the email BFAR BAC office
address of the bidder/s who
bought the Bidding
Document.
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021, Section
22.5.2

7. Attend the Bid 7. Conduct of the Bid


Opening. Opening with BAC
members, BFAR End-user,
BFAR TWG, Observers
BAC Secretariat
(BFAR COA, PCCI and none 1 hour
BFAR BAC office
NAPC) and Bidder/s at
least 12 calendar days from
Pre-Bid Conference.

7.1. Forward the submitted


Bids to the Technical
Working Group (TWG) for BAC Secretariat
None none 15 minutes
review, evaluation and BFAR BAC office
validation.

7.2. Conduct Bid Evaluation


and prepare Bid Evaluation
report within seven (7)
calendar days from the
deadline for receipt of bid
None proposals. none 5 calendar days BFAR TWG
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021, Section
32.4

7.3. Receive the Bid


Evaluation Report from the BAC Secretariat
None none 2 minutes
Technical Working Group BFAR BAC office
(TWG).

389
8. Signed the Abstract of 8. Prepare (1) Summary
Bids as Read and as Result of Eligibility Check
Calculated Screening, (2) Abstract of
Bids as Read and as
Calculated and (3) Notice
to Conduct Post- BAC Secretariat
none 1 calendar day
Qualification to the BFAR BAC office
Lowest/Single Calculated
bidder to be signed by the
BAC members and End-
user.

8.1. Email the Notice to


Conduct Post Qualification
BAC Secretariat
None to the Lowest/Single none 5 minutes
Calculated bidder. BFAR BAC office

8.2. Receive the Post


Qualification documents (3
copies) from the Bidder.
*Bidder must submit the
Post Qualification
documents within five (5)
calendar days from receipt BAC Secretariat
None none 5 calendar days
of the notice from the BAC. BFAR BAC office
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021, Section
34.2

8.3. Forward the submitted


Post-qualification
documents (copy 1) of the BAC Secretariat
None none 5 minutes
bidder to the Technical BFAR BAC office
Working Group.

390
8.4. Conduct Post
Qualification to the
LCB/HRB.
*If the Lowest Calculated
Bidder failed the criteria for
post-qualification, BAC
shall immediately issue
Notice of Post-
disqualification to be signed
by the BAC Chairperson/his
duly authorized
representative. Immediately
after, the BAC will notify the
bidder in writing of its post-
disqualification and
grounds for it. Thereafter,
the BAC shall conduct
same post-qualification
process on the second
Lowest Calculated Bidder.
** The BAC shall be given
the same fresh period to
conduct the post-
None qualification of the next none 7 calendar days BFAR TWG
lowest calculated
bid/highest rated bid until a
bidder is post-qualified.
***it shall be completed in
not more than twelve (12)
calendar days from the
determination of the Lowest
Calculated Bid
(LCB)/Highest Rated Bid
(HRB). In exceptional
cases, may be extended by
BFAR, but in no case shall
the aggregate period
exceed forty-five (45)
calendar days for Goods
and Infrastructure projects
or thirty (30) calendar days
in Consulting Services.
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021, Section
34.8

8.5. Receive the Post


Qualification report from BAC Secretariat
None none 5 minutes
the Technical Working BFAR BAC office
Group.

391
9. Sign the BAC 9. Prepare the BAC
Resolution Resolution declaring the
Lowest Calculated and
Responsive Bidder
(LCRB)/Single Calculated
and Responsive Bidder
(SCRB) for the approval
and signature of the BAC
members and Director.
*Within a period not
exceeding fifteen (15)
calendar days from the
determination by the BAC
BAC Secretariat
of the bidder with the
BFAR BAC office
LCRB, HRRB, SCRB, or
SRRB, and the
recommendation to award
the contract, the Director or
his duly authorized
representative shall
approve/ disapprove the
said recommendation.
****Disqualified bidder may none 7 calendar days
file a request for
reconsideration w/in three
(3) calendar days from
receipt of Notice of
HoPE shall resolve with
finality the said request w/in
seven (7) calendar days
from the filing thereof and
furnish the bidder a copy of
the resolution.
*In no case shall the said
request stay/delay the
bidding process. However,
None said request must be first
resolved before any award
is made.
*2016 Revised IRR of RA BAC Secretariat
9184 (updated as of 31 BFAR BAC office
December 2021), Section
37.1.2 and 37.1.3

9.1. Initial the Notice of 9.1.Prepare Notice of


Award (NOA) Award (NOA) to be initialed
by the BAC Chairperson,
BAC Vice Chairperson, none 30 minutes
Head BAC Secretariat and
signed by the BFAR
Director.
None 9.2. Issue NOA (3 original
copies) to the successful none 5 minutes
bidder.

392
9.3. Receive signed NOA
(2 copies) from the
successful bidder.
**If the LCRB failed to post
Performance Security
within the prescribed
period, the bid security
shall be forfeited and the
BAC shall disqualify the
bidder and complete the
post-qualification process
None on the second LCB. none 3 minutes
*** If the SCRB failed to
post Performance Security
within the prescribed
period, the bid security
shall be forfeited and the
BAC shall disqualify the
said bidder, and declare
failure of bidding and
conduct a re-negotiation.

9.4 Sign the Obligation 9.4. Secure Obligation


Request Request to Budget Officer
and Prepare Certificate of
Availability of Funds (CAF) none 1 calendar day
to be signed by the Chief
Accountant

9.5. Receive the signed


None CAF together with the none 5 minutes
signed OBR.
9.6. Sign the Contract 9.6. Prepare Contract and
Agreement and Initial the Notice to Proceed (NTP) to
Notice to Proceed (NTP) be initialed by the BAC BAC Secretariat
Chairperson, BAC Vice- BFAR BAC office
Chairperson, Head BAC none 2 calendar days
Secretariat and signed by
the Director, and one
witness of the End-user.

9.7. Issue Contract (3


None copies) to the successful none 5 minutes
bidder.
9.8. Receive notarized
Contract (2 copies) from
the successful bidder.
*Successful bidder shall
enter into contract within
the same ten (10) day
None period provided that all the none 3 minutes
documentary requirements
are complied with.
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021), Section
37.2.2

393
9.9. Receive Performance
Security from the
successful bidder.
*Successful bidder must
post Performance Security
within 10 calendar days
None from receipt of the NOA. none 5 minutes
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021), Section
37.2.1

9.10. Issue NTP (3 copies)


to the successful bidder
within seven (7) calendar
days from the approval of
None the contract. none 5 minutes
*2016 Revised IRR of RA
BAC Secretariat
9184 (updated as of 31
BFAR BAC office
December 2021), Section
37.4.1
9.11. Receive signed NTP
(2 copies) from the
None successful bidder. none 3 minutes

9.12. Scan, organize and


file three (3) sets of Bidding
Documents (1) COA copy,
(2) Finance copy and (3)
None BAC copy. none 2 hours
COA copy - submit to
BFAR COA
Finance copy - submit to
BFAR Property Section
9.13. Scan and post NOA,
Contract, NTP and BAC
Resolution at the PhilGEPS
website and email the BAC Secretariat
None none 20 minutes
same to BFAR FIMS for
BFAR BAC office
posting of the said
documents to the BFAR
website.
9.14 Acknowledge the 9.14. Email scan copy of
receipt of email. Purchase request, BAC
Resolution recommending
the Award of Contract,
NOA, Obligation request
none 5 minutes
(OBR), Certificate of
Availability of Funds (CAF),
Contract, NTP to the End-
user.

28 days, 17 hours & 36


TOTAL
minutes
Reference: Republic Act 9184 (Government Procurement Reform Act) and its 2016 Revised Implementing Rules and Regulations
* pg. 54, Rule VII , Section 21 Advertising and Contents of the Invitation to Bid/Request for Expression of Interest, Sub-section 21.2.1 letter (a)
*pg.55, Rule VII, Section 22 Pre-Bid Conference, Sub-section 22.2
*pg. 56, Rule VII, Section 22.5 Supplemental/Bid Bulletins, Sub-section 22.5.1
*pg.56, Rule VII, Section 22.5 Supplemental/Bid Bulletins, Sub-section 22.5.2

394
*pg. 76, Rule IX, Section 32 Bid Evaluation for the Procurement of Goods and Infrastructure Projects, Sub-section 32.4
*Ipg.79 Rule X, Section 34 Objective and Process of Post-Qualification,34.2
*pg. 82, Rule X, Section 34 Objective and Process of Post-Qualification,34.8
*pg.84, Rule XI , Section 37.2 Contract Signing, Sub-section 37.1.2 to 37.1.3
*pg. 85, Rule XI, Section 37.2 Contract Signing, Sub-section 37.2.1
*pg. 85, Rule XI, Section 37.2 Contract Signing, Sub-section 37.2.2
*pg.86, Rule XI, Section 37.4 Notice to Proceed, Sub-section 37.4.1

3. Consultancy Services under Public Bidding


Republic Act (RA) 9184 "Government Procurement Reform Act"(Section 53.7)
Purchase Requests (PR) with an Approved Budget of the Contract (ABC) amounting to Php 1 Million and above. The End-user
unit or the duly authorized official or personnel shall submit an approved PR together with the required attachments to the Bids
and Awards Committee (BAC) relative to the consultance services to be procured.

Office or Division BFAR- Bids and Awards Committee (BAC)

Classification Highly Technical


Type of Transaction G2G- Government to Government
Who may avail: End-user/s (BFAR personnel)
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. Approved Purchased Request (PR) , Approved
Annual Procurement Plan (APP) or Supplemental
Project Procurement Management Plan (PPMP),
Submitted by the End-user
Terms of Reference (TOR), Authority to Conduct
Procurement Activity for P.R. with an ABC of 50
Million Above.
2. Invitation to Bid (ITB) & Bidding Documents BFAR- Bids and Awards Committee (BAC) Office
3. Supplemental bid bulletin/s if any. BFAR- Bids and Awards Committee (BAC) Office
4. Abstract as Read and Abstract as Calculated BFAR- Bids and Awards Committee (BAC) Office
5. BAC Resolution for Award BFAR- Bids and Awards Committee (BAC) Office
6. Notice of Award BFAR- Bids and Awards Committee (BAC) Office
7. Obligation Request (OBR) BFAR- Budget Section
7. Contract Agreement BFAR- Bids and Awards Committee (BAC) Office
8. Notice to Proceed BFAR- Bids and Awards Committee (BAC) Office
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit Approved 1. Received Approved
Purchase Request with Purchased Request (PR)
complete requirement to with complete
BAC Secretariat at 2nd requirements:
Flr. Fisheries Building
a. Annual Procurement
Complex, Bureau of Plant
Plan (APP) or
Industry Compound,
Supplemental Project
Visayas Ave., Diliman,
Procurement Management BAC Secretariat
Quezon City None 5 minutes
Plan BFAR BAC office
b. Terms of Reference
(TOR)

c. Authority to Conduct
Procurement Activity for
P.R. with an ABC of 50
Million Above

395
2. Receive Notice of 2. Schedule, prepare and
Meeting of Pre- forward the Pre-
Procurement and Procurement conference
Schedule to google Notice of Meeting to the BAC Secretariat
calendar of BAC, BAC, End-user and None 30 minutes
BFAR BAC office
Secretariat, TWG, and Technical Working Group
End-user (TWG) through email.

3. Attend the Pre- 3. Conduct Pre-


Procurement Conference. Procurement conference
with the BFAR End-user,
BFAR TWG and BAC None 1 hour
members.

3.1 Prepare Request for


Expression of Interest &
None None 2 hours
Bidding Documents.

3.2 Post the Expression of


Interest & Bidding
Documents. to the
None PhilGEPS and BFAR None 20 minutes
website, and conspicuous
place at the BFAR
premises.
3.4 Advertise the Request
for Expression of Interest
and Bidding Document to
the PhilGEPS and BFAR
website, and conspicuous
place at the BFAR's
BAC Secretariat
premises for 7 calendar
None None 7 calendar days BFAR BAC office
days starting on date of
advertisement. BFAR FIMS
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021, Section
21.2.1, (a)

4. Receive the Notice of 4. Coordinate schedule,


Meeting for the prepare and forward the
procurement activities Notice of Meeting for the
(Opening of Eligibility procurement ( Eligibility
None
Documents, Pre-Bid & Check and shortlisting, Pre-
Bid Opening) through Bid & Bid Opening) to
email. BAC members and BFAR
End-user
5. Attend the Eligibility 5. Conduct the Eligibility
Check and shortlisting Check and shortlisting
(via zoom) within seven (8) calendar
days from posting of
Advertisement with the
None 1 hour
BAC members, BFAR End-
user, BFAR TWG,
Observers (BFAR COA,
PCCI and NAPC) and
interested bidders

396
5.1 Prepare transmittal
letter and transmit the copy
2 of Eligibility Documents to
Office of the Technical
Working Group for the
None
short listing evaluation BAC Secretariat
report within three (3) BFAR BAC office
calendar days from
Opening. Of Eligibility 3 calendar days
Docs.
5.2Prepare the Minutes of
Opening of Eligibility None
Documents
5.3. Conduct Shortlisting
None Evaluation
BFAR -TWG
Report/Shorlisting Criteria None
BFAR End-user
for 3 days and submit the
evaluation
5.4. Receive Shortlisting
Evaluation
Report/Shortlisting Criteria
BAC Secretariat
of the Technical Working None 5 mins
BFAR BAC office
Group within three (3)
calendar days from Bid
Opening.
5.5. Prepare Notice of
BAC Secretariat
Shortlisting Criteria and
none 30 mins. BFAR BAC office
email to the passed
Bidder/s
bidder/s
6. Attend the Pre-Bid 6. Conduct Pre-Bid
Conference Conferencewith the BAC
BAC members
members, BFAR End-user,
BAC Secretariat
BFAR TWG, Observers None 1 hour
BFAR BAC office
(BFAR COA, PCCI and
BFAR End-user
NAPC) and prospective
bidders
7. Respond to the 7. Receive from interested
submitted inquiries and bidder/s written request for
clarifications of the clarifications on any part of
prospective bidder/s, if the Bidding Documents and
any within 3 calendar forward the same to the
days End-user,if any,2 days after
the conduct of PRe-Bid
none
Conference BAC members
*2016 Revised IRR of RA BAC Secretariat
9184 (updated as of 31 12 calendar days
BFAR BAC office
December 2021, Section BFAR End-user
22.5.1

7.1 Prepare
Supplemental/Bid Bulletin
None for approval of the BAC none
members, if any.

397
7.2. Post the
Supplemental/Bid Bulletin
in PhilGEPS and BFAR
website, and conspicuous
place at the BFAR
premises at least seven (7)
calendar days before the
deadline for the submission BAC Secretariat
and receipt of the bids. Continuation above (12
None none BFAR BAC office
Email the same to the email days)
BFAR FIMS
address of the bidder/s who
bought the Bidding
Document.
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021, Section
22.5.2

7.3 Email to prospective


bidders/suppliers who BAC Secretariat
None None
attended Prebid BFAR BAC office
Conference.
8. Attend the Bid Opening 8. Conduct of the Bid
Conference (via zoom) Opening with BAC
members, BFAR End-user,
BFAR TWG, Observers
BAC Secretariat
(BFAR COA, PCCI and None 1 hour
BFAR BAC office
NAPC) and Bidder/s at
least 12 calendar days from
Pre-Bid Conference.

8.1.Forward the submitted


Bids to the Technical
BAC Secretariat
none Working Group (TWG) for None 15 minutes
BFAR BAC office
review, evaluation and
validation.
8.2. Conduct Bid
Evaluation and prepare Bid
Evaluation report,
Summary Result of
Eligibility Check Screening,
Abstract of Bids and Notice
to Lowest/Single Calculated
bidder to be signed by the
BAC members, BAC TWG BFAR TWG
none and End-user within seven None 7 calendar days
BFAR End-user
(7) calendar days from the
deadline for receipt of
proposals.
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021, Section
32.4

8.3. Receive the Bid BAC Secretariat


Evaluation Report from the BFAR BAC office
none None 2 minutes
Technical Working Group BFAR TWG
(TWG).

398
9.Receive Notice to 9. Prepare and Email 30 mins.
Conduct Negotiation Notice to conduct
Negotiation to, BAC
None
members, BFAR End-user,
BFAR TWG and and BAC Secretariat
prospective Bidder/s BFAR BAC office
10. Attend Negotiation 10.Conduct Negotiation 30 mins
with the BAC members,
BFAR End-user, BFAR None
TWG and and prospective
Bidder/s
10.1. Email the Notice to 2 minutes
Conduct Post Qualification BAC Secretariat
none to the Lowest/Single None BFAR BAC office
Calculated bidder. Bidder

10.2 . Receive the Post


Qualification documents (3
copies) from the Bidder.
*Bidder must submit the
Post Qualification
documents within five (5) BAC Secretariat
calendar days from receipt
none None BFAR BAC office
of the notice from the BAC. 5 calendar days
Bidder
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021, Section
34.2

10.3. Forward the


submitted Post-qualification
BAC Secretariat
documents (copy 1) of the
none none 5 minutes BFAR BAC office
bidder to the Technical
Bidder
Working Group.

399
10.4. Conduct Post
Qualification to the
LCB/HRB.
*If the Lowest Calculated
Bidder failed the criteria for
post-qualification, BAC
shall immediately issue
Notice of Post-
disqualification to be signed
by the BAC Chairperson/his
duly authorized
representative. Immediately
after, the BAC will notify the BAC Secretariat
none bidder in writing of its post- None 7 calendar days BFAR BAC office
disqualification and Bidder
grounds for it. Thereafter,
the BAC shall conduct
same post-qualification
process on the second
Lowest Calculated Bidder.
** The BAC shall be given
the same fresh period to
conduct the post-
qualification of the next
lowest calculated
bid/highest rated bid until a
bidder is post-qualified.
10.5. Receive the Post None 5 minutes
BAC Secretariat
Qualification report from
none BFAR BAC office
the Technical Working
Bidder
Group.
11. Sign the BAC 11. Prepare the BAC 7 calendar days
Resolution Resolution declaring the
Lowest Calculated and
Responsive Bidder
(LCRB)/Single Calculated
and Responsive Bidder
(SCRB), Notice of Award
(NOA) to be signed by the
Director.
*Within a period not
exceeding fifteen (15)
calendar days from the
determination by the BAC
of the bidder with the
LCRB, HRRB, SCRB, or
SRRB, and the
recommendation to award
the contract, the Director or
his duly authorized
representative shall
approve/ disapprove the Director
said recommendation. BFAR Director's Office
**In case of approval, BAC members
None
immediately issue the NOA BAC Secretariat
to the bidder. BFAR BAC office
***In the event of BFAR End-user
disapproval, BAC will notify

400
Director
BFAR Director's Office
BAC members
None
BAC Secretariat
BFAR BAC office
BFAR End-user

HoPE shall resolve with


finality the said request w/in
seven (7) calendar days
from the filing thereof and
furnish the bidder a copy of
the resolution.
*In no case shall the said
request stay/delay the
bidding process. However,
none said request must be first
resolved before any award
is made.
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021), Section
37.1.2 and 37.1.3

12. Initial the Notice of 12. Prepare Notice of none


Award (NOA) Award (NOA) to be initialed
by the BAC Chairperson,
BAC Secretariat
BAC Vice Chairperson, 30 minutes
BFAR BAC office
Head BAC Secretariat and
signed by the BFAR
Director.
12.1. Issue NOA (3 original BAC Secretariat
copies) to the successful BFAR BAC office
bidder. Bidder

none None 5 minutes

12.2. Receive signed NOA BAC Secretariat


(2 original copies) from the BFAR BAC office
successful bidder. Bidder
**If the LCRB failed to post
Performance Security
within the prescribed
period, the bid security
shall be forfeited and the
BAC shall disqualify the
bidder and complete the
post-qualification process
none on the second LCB. 2 minutes
*** If the SCRB failed to
post Performance Security
within the prescribed
period, the bid security
shall be forfeited and the
BAC shall disqualify the
said bidder, and declare
failure of bidding and
conduct a re-negotiation.

401
13.Sign the Obligation 13. Secure Obligation
Request Request to Budget Officer
and Prepare Certificate of
Availability of Funds (CAF)
to be signed by the Chief
Accountant

none 1 calendar day


BAC Secretariat
BFAR BAC office

None 13.1 . Receive the signed


CAF together with the none 5 minutes
signed OBR.
14. Sign Contract 14.Prepare Contract and Director
Agreement Notice to Proceed (NTP) to BFAR Director's Office
be initialed by the BAC BAC Chairperson
none 2 calendar days
Chairperson, BAC Vice- BAC Vice-Chairperson
Chairperson, Head BAC Head BAC Secretariat
Secretariat and BAC Secretariat
signed/approval
14.2. by the
Issue Contract (3
copies) to the successful BAC Secretariat
None bidder. none 5 minutes
BFAR BAC office

14.3. Receive notarized


Contract (2 copies) from
the successful bidder. BAC Secretariat
None none 3 minutes
*Successful bidder shall BFAR BAC office
enter into contract within
the same ten (10) day
period provided
14.4 Receive that all the
Performance
Security from the
successful bidder.
*Successful bidder must
post Performance Security
within 10 calendar days BAC Secretariat
None from receipt of the NOA. none 5 minutes
BFAR BAC office
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021), Section
37.2.1

402
14.5. Issue NTP (3 copies)
to the successful bidder
within seven (7) calendar
days from the approval of
the contract.
None none 5 minutes
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021), Section
37.4.1

14.6. Receive signed NTP


(2 copies) from the
None none 3 minutes
successful bidder.

14.7 Scan, organize and


file three (3) sets of Bidding
Documents (1) COA copy,
(2) Finance copy and (3)
None BAC copy. none 2 hours
COA copy - submit to BAC Secretariat
BFAR COA BFAR BAC office
Finance copy - submit to
BFAR Property Section
14.8. Scan and post NOA,
Contract, NTP and BAC
Resolution at the PhilGEPS
website and email the
None none 20 minutes
same to BFAR FIMS for
posting of the said
documents to the BFAR
website.
15.Acknowledge the 15. Email scan copy of
receipt of email. Purchase request, BAC
Resolution recommending
the Award of Contract,
NOA, Obligation request
none 5 minutes
(OBR), Certificate of
Availability of Funds (CAF),
Contract, NTP to the End-
user.

57days, 4 hours and


TOTAL:
27 mins
Reference: Republic Act 9184 (Government Procurement Reform Act) and its 2016 Revised Implementing Rules and Regulations
*Item 3.4 - pg. 54, Rule VII , Section 21 Advertising and Contents of the Invitation to Bid/Request for Expression of Interest, Sub-section 21.2.1 letter
(a)
*Item 6 - pg.55, Rule VII, Section 22 Pre-Bid Conference, Sub-section 22.2
*Item 7.2 - pg. 56, Rule VII, Section 22.5 Supplemental/Bid Bulletins, Sub-section 22.5.1
*Item 8.2 - pg. 76, Rule IX, Section 32 Bid Evaluation for the Procurement of Goods and Infrastructure Projects, Sub-section 32.4
*Item 10.3 - pg.79 Rule X, Section 34 Objective and Process of Post-Qualification,34.2
*Item 10.4 - pg. 82, Rule X, Section 34 Objective and Process of Post-Qualification,34.8
*Item 14.2- pg.84, Rule XI , Section 37.2 Contract Signing, Sub-section 37.1.2 to 37.1.3

403
4. Procurement under Repeat Order

Purchase Requests (PR) the ABC shall not exceed twenty five percent (25%) of the Original ABC.

The End-user unit or the duly authorized official or personnel shall submit an approved PR together with the required
attachments to the Bids and Awards Committee (BAC) relative to the goods and services to be procured.

Office or Division BFAR- Bids and Awards Committee (BAC)

Classification Highly Technical ( under Special Law of R.A. 9184)


Type of Transaction G2G – Government to Government
Who may avail End-user/s (BFAR personnel)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Approved Purchased Request (PR). End-user


2. Supplemental Project Procurement Management BFAR- Bids and Awards Committee (BAC) Office
3. Justification why re-ordering is being pursued BFAR- Bids and Awards Committee (BAC) Office
4. Documents Pertaining to the previously awarded End-user / Bidder/s
5. BAC Resolution recommending the conduct of BFAR- Bids and Awards Committee (BAC) Office
6. Notice of Award BFAR- Bids and Awards Committee (BAC) Office and Bidder/s
7. Contract Agreement BFAR- Bids and Awards Committee (BAC) Office and Bidder/s
8. Notice to Proceed BFAR- Bids and Awards Committee (BAC) Office and Bidder/s
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit Approved 1. Receive Purchased
Purchase Request with Request (PR) with
complete requirements: complete requirements *PR
Supplemental Project shall not exceed twenty five
Procurement percent (25%) of the
Management Plan quantity of each item in the
none 5 minutes
Justification why re- original contract, within six
(6) months from the date of
ordering is being pursued
the Notice to Proceed.
Documents Pertaining to *2016 Revised IRR of RA
the previously awarded 9184 (updated as of 31
contract December 2021), Section
2. Sign the BAC 2. Prepare the BAC
Resolution Resolution recommending
the conduct of Alternative
Method of Procurement - BAC Secretariat
Repeat Order for approval none 2 calendar days BFAR BAC office
and signature of the BAC
members and Director.

3. Initial the Notice of 3.Prepare Notice of Award


Award (NOA) (NOA) to be initialed by the
BAC Chairperson, BAC
Vice Chairperson, Head none 30 minutes
BAC Secretariat and signed
by the BFAR Director.

404
3.1. Issue NOA (3 original
None copies) to the successful none 5 minutes
bidder.
3.2. Receive signed NOA
(2 copies) from the
successful bidder.
**If the LCRB failed to post
Performance Security
within the prescribed
period, the bid security
shall be forfeited and the
BAC shall disqualify the
bidder and complete the
post-qualification process
None on the second LCB. none 3 minutes
*** If the SCRB failed to
post Performance Security
within the prescribed
period, the bid security
shall be forfeited and the
BAC shall disqualify the
said bidder, and declare
failure of bidding and
conduct a re-negotiation.

3.3. Sign the Obligation 3.3. Secure Obligation


Request Request to Budget Officer
and Prepare Certificate of
Availability of Funds (CAF) none 1 calendar day
to be signed by the Chief
Accountant BAC Secretariat
BFAR BAC office
3.4. Receive the signed
None CAF together with the none 5 minutes
signed OBR.
3.5. Sign the Contract 3.5. Prepare Contract and
Agreement and Initial the Notice to Proceed (NTP) to
Notice to Proceed (NTP) be initialed by the BAC
Chairperson, BAC Vice-
Chairperson, Head BAC none 2 calendar days
Secretariat and signed by
the Director, and one
witness of the End-user.

3.6. Issue Contract (3


None copies) to the successful none 5 minutes
bidder.

405
3.7. Receive notarized
Contract (2 copies) from
the successful bidder.
*Successful bidder shall
enter into contract within
the same ten (10) day
period provided that all the
None none 3 minutes
documentary requirements
are complied with.
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021), Section
37.2.2

3.8. Receive Performance


Security from the
successful bidder.
*Successful bidder must
post Performance Security
within 10 calendar days BAC Secretariat
None from receipt of the NOA. none 5 minutes
BFAR BAC office
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021), Section
37.2.1

3.9. Issue NTP (3 copies)


to the successful bidder
within seven (7) calendar
days from the approval of
None the contract. none 5 minutes
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021), Section
37.4.1
3.10. Receive signed NTP
None (2 copies) from the none 3 minutes
successful bidder.
3.11. Scan, organize and
file three (3) sets of Bidding
Documents (1) COA copy,
(2) Finance copy and (3)
None BAC copy. none 2 hours
COA copy - submit to
BFAR COA BAC Secretariat
Finance copy - submit to BFAR BAC office
BFAR Property Section
3.12. Scan and post NOA,
Contract, NTP and BAC
Resolution at the PhilGEPS
website and email the
None none 20 minutes
same to BFAR FIMS for
posting of the said
documents to the BFAR
website.

406
3.13 Acknowledge the 3.13. Email scan copy of
receipt of email. Purchase request, BAC
Resolution recommending
the Award of Contract,
NOA, Obligation request
none 5 minutes
(OBR), Certificate of
Availability of Funds (CAF),
Contract, NTP to the End-
user.

5 days, 3 hours &


TOTAL
34 minutes

Reference: Republic Act 9184 (Government Procurement Reform Act) and its 2016 Revised Implementing Rules and Regulations
Section 51. Repeat Order

5. Public Bidding under Negotiated Procurement (Two-Failed Biddings)


(Republic Act (RA) 9184 "Government Procurement Reform Act"(Section 53.1))

Purchase Requests (PR) with an Approved Budget of the Contract (ABC) amounting to Php 1 Million and above.

The End-user unit or the duly authorized official or personnel shall submit an approved PR together with the required
attachments to the Bids and Awards Committee (BAC) relative to the goods and services to be procured.

Office or Division BFAR- Bids and Awards Committee (BAC)

Classification Highly Technical

Type of Transaction G2G – Government to Government

Who may avail End-user/s (BFAR personnel)


CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. Approved BAC Resolution to conduct Negotiated BFAR- Bids and Awards Committee (BAC) Office, 2nd Flr., Fisheries
Procurement Bldg.,
2. Invitation to Bid (ITB) & Bidding Documents which BFAR- Bids and Awards Committee (BAC) Office, 2nd Flr., Fisheries
includes a complete set of Technical Specifications Bldg.,
BFAR- Bids and Awards Committee (BAC) Office, 2nd Flr., Fisheries
3. Supplemental Bid Bulletin, if any.
Bldg.,
BFAR- Bids and Awards Committee (BAC) Office, 2nd Flr., Fisheries
4. Abstract of Bid as Read & Calculated
Bldg.,
5. BAC Resolution recommending Award of the BFAR- Bids and Awards Committee (BAC) Office, 2nd Flr., Fisheries
contract to the winning bidder Bldg.,
BFAR- Bids and Awards Committee (BAC) Office, 2nd Flr., Fisheries
6. Notice of Award (NOA) - 3 original copies
Bldg.,

7. OBR BFAR - Finance Division-Budget Section, 4th Flr., Fisheries Bldg.,

BFAR- Bids and Awards Committee (BAC) Office, 2nd Flr., Fisheries
8. Contract Agreement - 3 original copies
Bldg.,
BFAR- Bids and Awards Committee (BAC) Office, 2nd Flr., Fisheries
9. Notice to Proceed (NTP) - 3 original copies
Bldg.,

407
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Receive the Notice of 1. Schedule, prepare and
Meeting for the Pre- forward the Pre-negotiation
Negotiation through email Notice of Meeting to the
and invite through the BAC, End-user and none 25 minutes
Google calendar. Technical Working Group
(TWG) through email.
BAC Secretariat
BFAR BAC office
2. Attend the Pre- 2. Conduct Pre-negotiation
negotiation conference. conference with the BFAR
End-user, BFAR TWG and none 30 minutes
BAC members..

3. Review, revise and 3.Prepare the Invitation to


approve the Invitation to Bid and Bidding Document
Bid and Bidding and forward the same to
Document. the End-user for final
review. Thereafter, route
the printed copy of the none 1 calendar day
latter to the End-user and
BAC members to affix their
initials to the said
document..

3.1. Post the Invitation to


Bid and Bidding Document
to the PhilGEPS and BFAR
website, and conspicuous
none none 20 minutes
place at the BFAR BAC Secretariat
premises. BFAR BAC office

3.2. Advertise the Invitation


to Bid (ITB) and Bidding
Document to the PhilGEPS
and BFAR website, and
conspicuous place at the
BFAR's premises for 7
calendar days starting on
none none 7 calendar days
date of advertisement.
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021, Section
21.2.1, (a)

3.3. Invite at least three (3)


suppliers/contractors/
consultants of good
none standing to negotiate the none
contract.

BAC Secretariat
BFAR BAC office

408
4. Receive the Notice of 4. Schedule, prepare and
Meeting for the forward the Notice of BAC Secretariat
procurement activities Meeting for the BFAR BAC office
(Pre-Bid & Bid Opening) procurement activities (Pre-
through email and invite Bid & Bid Opening) to the
through the Google BAC members, BAC- none 15 minutes
calendar. Technical Working Group
(TWG), End-user and
Observers (COA, PCCI and
NAPC).
5. Attend the Pre-Bid 5. Conduct Pre-Bid
conference. Conference with BAC
members, BFAR End-user,
BFAR TWG, Observers
(BFAR COA, PCCI and
NAPC) and Bidder/s.
*at least twelve (12)
calendar days before the
deadline for the submission
and receipt of the bids but
not earlier than seven (7)
calendar days from the
PhilGEPS and BFAR
BAC Secretariat
website posting of the none 1 hour
BFAR BAC office
Invitation to Bid and
Bidding Documents.

*For complicated contract


or if international
participation is needed, at
least thirty (30) calendar
days before the deadline
for the submission and
receipt of the bids.In case
of Consulting services,
from the determination of
shortlisted Consultants.
6. Respond to the 6. Entertain written request
submitted inquiries and for clarifications on any part
clarifications of the of the Bidding Documents
prospective bidder/s, if and forward the same to
any. (three (3) calendar the End-user,if any. at least
days) ten (10) calendar days
before the deadline for the BAC members
submission and receipt of none 12 calendar days BAC Secretariat
the bids. BFAR BAC office
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021, Section
22.5.1

7. Approves the created 7. Prepare


Supplemental/Bid Bulletin Supplemental/Bid Bulletin
for approval of the End-
user and signature of the BAC Secretariat
none
BAC Chairperson, if any. BFAR BAC office

409
7.1. Post the
Supplemental/Bid Bulletin
in PhilGEPS and BFAR
website, and conspicuous
place at the BFAR
premises at least seven (7)
calendar days before the
deadline for the submission
and receipt of the bids.
none none
Email the same to the email
address of the bidder/s who
bought the Bidding
Document.
*2016 Revised IRR of RA 9184
(updated as of 31 December
2021, Section 22.5.2

8. Receive Bid Docs to 7.2. Issue Bid Docs Receipt


Secure the Order of form and Order of Payment BAC Secretariat
payment at the Acctg., form for the payment of a BFAR BAC office
Office located at 4th Flr., non refundable Bidding
Fisheries Bldg., Complex Document fee and instruct
bidder to proceed to the
Accounting Division (4/F
Accounting Division, BFAR
Building, BPI Compound,
Brgy. Vasra,Quezon City)
to pay the said fee.
*Bidders who have already
bought the bidding
documents during the last
failed biddings need not pay
the amount of non refundable
bidding document fee for the
Negotiated Document.

8. Secure the Order of 7.3 Issue Order of payment


payment for the required form and instruct the
payment at the Acctg., bidder to proceed to the
Office located at 4th Flr., Cashier Section (4/F BFAR Accounting
Fisheries Bldg., Complex Accounting Division, BFAR Section, 4th Floor,
Building, BPI Compound, Fisheries Bldg., BPI
Brgy. Vasra,Quezon City) Compound,
for the payment.

9. Pay the required fees 7.4 Issue Original Receipt


and Secure the Official once payment is received.
Receipt at the BFAR-
BFAR Cashier Section,
Cashier Office located at
4th Floor., Fisheries
4th Flr., Fisheries Bldg.,
Bldg., BPI Compound
Complex

410
7.5. Photocopy the Original
Receipt/ acknowledge
receipt of the email
containing the scan
copy/picture of the the BAC Secretariat
none none
Original Receipt from the BFAR BAC office
interested Bidder.

7.6. Receive sealed Bid


envelope from the
Interested Bidder/s and
email the Bid Opening
none none
Zoom link to the bidder.

8. Conduct of the Bid


Opening with BAC
members, BFAR End-user,
BFAR TWG, Observers
(BFAR COA, PCCI and
NAPC) and Bidder/s.
(1 hour or more depending
none on the number of bidders none 1 hour
who participated in the
project)

BAC Secretariat
BFAR BAC office

8.1. Forward the submitted


Bids to the Technical
Working Group (TWG) for
review, evaluation and
none validation. none 15 minutes

8.2. Conduct Bid Evaluation


and prepare Bid Evaluation
report within seven (7)
calendar days from the
deadline for receipt of bid
proposals.
none *2016 Revised IRR of RA none 5 calendar days BFAR TWG
9184 (updated as of 31
December 2021, Section
32.4

411
8.3. Receive the Bid
Evaluation Report from the
none Technical Working Group none 2 minutes
(TWG).

9. Signed the Abstract of 9. Prepare (1) Summary


Bids as Read and as Result of Eligibility Check
Calculated Screening, (2) Abstract of
Bids as Read and as
Calculated and (3) Notice
to Conduct Post-
Qualification to the none 1 calendar day BAC Secretariat
Lowest/Single Calculated BFAR BAC office
bidder to be signed by the
BAC members and End-
user.

9.1. Email the Notice to


Conduct Post Qualification
none to the Lowest/Single none 2 minutes
Calculated bidder.

9.2. Receive the Post


Qualification documents (3
copies) from the Bidder.
*Bidder must submit the
Post Qualification
documents within five (5)
calendar days from receipt
none of the notice from the BAC. none 5 calendar days
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021, Section BAC Secretariat
34.2 BFAR BAC office

9.3. Forward the submitted


Post-qualification
documents (copy 1) of the
none bidder to the Technical none 5 minutes
Working Group.

412
9.4. Conduct Post BFAR TWG
Qualification to the
LCB/HRB.
*If the Lowest Calculated
Bidder failed the criteria for
post-qualification, BAC
shall immediately issue
Notice of Post-
disqualification to be signed
by the BAC Chairperson/his
duly authorized
representative. Immediately
after, the BAC will notify the
none bidder in writing of its post-
disqualification and
grounds for it. Thereafter,
the BAC shall conduct
same post-qualification
process on the second
Lowest Calculated Bidder.
** The BAC shall be given
the same fresh period to
conduct the post-
qualification of the next
lowest calculated none 7 calendar days
bid/highest rated bid until a
bidder is post-qualified.
***it shall be completed in
not more than twelve (12)
calendar days from the
determination of the Lowest
Calculated Bid
(LCB)/Highest Rated Bid
(HRB). In exceptional
cases, may be extended by
BFAR, but in no case shall
the aggregate period
exceed forty-five (45)
none calendar days for Goods
and Infrastructure projects
or thirty (30) calendar days
in Consulting Services.
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021, Section
34.8

9.5. Receive the Post


Qualification report from BAC Secretariat
none the Technical Working none 5 minutes
BFAR BAC office
Group.

413
10. Prepare the BAC
Resolution declaring the
Lowest Calculated and
Responsive Bidder
(LCRB)/Single Calculated
and Responsive Bidder
(SCRB) for the approval
and signature of the BAC
members, BFAR End-user
and BFAR Director.
*Within a period not
exceeding fifteen (15)
calendar days from the
BAC Secretariat
determination by the BAC none 7 calendar days
BFAR BAC office
of the bidder with the
LCRB, HRRB, SCRB, or
SRRB, and the
recommendation to award
the contract, the Director or
his duly authorized
representative shall
approve/ disapprove the
said recommendation.
**In case of approval,
immediately issue the NOA
to the bidder.

***In the event of


disapproval, BAC will notify
the bidder in writing of such
decision and grounds for
the disapproval.
****Disqualified bidder may
file a request for
reconsideration w/in three
(3) calendar days from
receipt of Notice of
Disqualification. HoPE shall
resolve with finality the said
request w/in seven (7)
BAC Secretariat
none calendar days from the none 7 calendar days
BFAR BAC office
filing thereof and furnish
the bidder a copy of the
resolution.
*In no case shall the said
request stay/delay the
bidding process. However,
said request must be first
resolved before any award
is made.
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021), Section
37.1.2 and 37.1.3

414
10.1.Prepare Notice of
Award (NOA) to be initialed
by the BAC Chairperson,
BAC Vice Chairperson, BAC Secretariat
none none 30 minutes
Head BAC Secretariat and BFAR BAC office
signed by the BFAR
Director.

10.2. Issue NOA (3 original


none copies) to the successful none 5 minutes
bidder.

10.3. Receive signed NOA


(2 copies) from the
successful bidder.
**If the LCRB failed to post
Performance Security
within the prescribed
period, the bid security
shall be forfeited and the
BAC shall disqualify the
bidder and complete the
post-qualification process
on the second LCB.
none *** If the SCRB failed to none 2 minutes
post Performance Security
within the prescribed
period, the bid security
shall be forfeited and the
BAC shall disqualify the
said bidder, and declare
failure of bidding and
conduct a re-negotiation. BAC Secretariat
BFAR BAC office

11. Sign the OBR. 11. Prepare Certificate of


Availability of Funds (CAF)
to be signed by the Chief none 1 calendar day
Accountant.
12. Receive the signed
CAF together with the
none none 5 minutes
signed OBR.

12.1. Prepare Contract and


Notice to Proceed (NTP) to
be initialed by the BAC
Chairperson, BAC Vice-
Chairperson, Head BAC
Secretariat and signed by
none none 2 calendar days
the Director, End-user and
one witness (End-user's
authorized representative).

415
12.2. Issue Contract (3
none copies) to the successful none 5 minutes
bidder.

12.3. Receive notarized


Contract (2 copies) from
the successful bidder.
*Successful bidder shall
enter into contract within
the same ten (10) day
period provided that all the
none documentary requirements none 5 minutes
are complied with.
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021), Section BAC Secretariat
37.2.2 BFAR BAC office

12.4. Receive Performance


Security from the
successful bidder.
*Successful bidder must
post Performance Security
within 10 calendar days
none from receipt of the NOA. 5 minutes
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021), Section
37.2.1

12.5. Issue NTP (3 copies)


to the successful bidder
within seven (7) calendar
days from the approval of
the contract.
none *2016 Revised IRR of RA none 5 minutes
9184 (updated as of 31 BAC Secretariat
December 2021), Section BFAR BAC office
37.4.1

12.6. Receive signed NTP


(2 copies) from the
none none 2 minutes
successful bidder.

12.7. Scan, organize and


file three (3) sets of Bidding
Documents (1) COA copy,
(2) Finance copy and (3)
BAC copy. BAC Secretariat
none none 2 hours
COA copy - submit to BFAR BAC office
BFAR COA
Finance copy - submit to
BFAR Property Section

416
12.8. Scan NOA, Contract,
NTP and BAC Resolution ,
post the same to the
PhilGEPS website and
email the files to the BFAR BAC Secretariat
none none 20 minutes
FIMS for posting of the said BFAR BAC office
documents to the BFAR
website.

48 days, 6 hours &


TOTAL
23 minutes
Reference: Republic Act 9184 (Government Procurement Reform Act) and its 2016 Revised Implementing Rules and Regulations
* pg. 54, Rule VII , Section 21 Advertising and Contents of the Invitation to Bid/Request for Expression of Interest, Sub-section 21.2.1 letter (a)
*pg.55, Rule VII, Section 22 Pre-Bid Conference, Sub-section 22.2
*pg. 56, Rule VII, Section 22.5 Supplemental/Bid Bulletins, Sub-section 22.5.1
*pg.56, Rule VII, Section 22.5 Supplemental/Bid Bulletins, Sub-section 22.5.2
*pg. 76, Rule IX, Section 32 Bid Evaluation for the Procurement of Goods and Infrastructure Projects, Sub-section 32.4
*Ipg.79 Rule X, Section 34 Objective and Process of Post-Qualification,34.2
*pg. 82, Rule X, Section 34 Objective and Process of Post-Qualification,34.8
*pg.84, Rule XI , Section 37.2 Contract Signing, Sub-section 37.1.2 to 37.1.3
*pg. 85, Rule XI, Section 37.2 Contract Signing, Sub-section 37.2.1
*pg. 85, Rule XI, Section 37.2 Contract Signing, Sub-section 37.2.2
*pg.86, Rule XI, Section 37.4 Notice to Proceed, Sub-section 37.4.1

417
ALTERNATIVE MODE OF PROCUMENT

A. INTERNAL SERVICE:

1. Alternative Mode of Procurement Under Small Value

- Procurement of (a) goods not covered by Shopping under Section 52 of the IRR of RA 9184, (b) infrastructure projects, and
(c) consulting services.
(Section 53.9, IRR of R.A. No. 9184)

Office or Division BFAR- Bids and Awards Committee (BAC)

Classification Highly Technical under Special Law of RA 9184

Type of Transaction G2G- Government to Government

Who may avail: End-user (Internal)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE


1. Approved Purchase Request (PR) with complete
Submitted by the End-user
attachments
2. Approved Annual Procurement Plan (APP) or
Submitted by the End-user
Supplemental Project Procurement Management Plan
(PPMP)
3. Justification for SPPMP Submitted by the End-user

4. Authority to Conduct (For


Submitted by the End-user
Events/Training/Workshop)

5. Pre-Inspection Report (For repair/maintenance of


Submitted by the End-user
BFAR facility/building and BFAR service vehicle)

6. Blueprint (For repair/maintenance of BFAR


Submitted by the End-user
facility/building)
7. Bill of Quantities (For repair/maintenance of BFAR
Submitted by the End-user
facility/building)
8. Terms of Reference (For repair/maintenance of
Submitted by the End-user
BFAR facility/building)
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit approved 1.1 Receive and review the
Purchase Request (PR) submitted approved
with complete Purchase Request (PR) None 20 Minutes
attachments with complete attachments
BAC Secretariat
1.2 Assign PR number and BFAR-BAC Office 2nd
Encode PR for monitoring Floor, Fisheries Building
None None 10 Minutes
purposes Complex, BPI
Compound, Brgy Vasra,
1.3 Endorse PR to Visayas Ave., Quezon
concerned BAC Secretariat City
(Alternative Mode of
None None 5 Minutes
Procurement) for creation
of Request for Quotation
(RFQ)

418
1.4 Prepare RFQ and Post
in PhilGEPS/ BFAR
None Website None 1 Hour

2. Receive RFQ 2. Send copy of RFQ to BAC Secretariat


Procurement Officer/End- BFAR-BAC Office 2nd
user None 5 Minutes Floor, Fisheries Building
Complex, BPI
Compound, Brgy Vasra,
3. Receive Notice of 3.1 Schedule and send Visayas Ave., Quezon
Meeting for Bid Notice of Meeting to BAC City
Members, Secretariat and
Procurement officers for None 10 Minutes
Bid opening

3.2 Canvass from


prospective supplier/bidder

*2016 Revised IRR of RA BFAR Procurement


None 9184 (updated as of 31 Officer /End-user
December 2021), Section Bidder/Supplier
21.2.1 None 10 Working Days

4. Submit Sealed 4.1 Receive sealed


Canvass canvass BAC Secretariat
(10mins per transaction) BFAR-BAC Office

5. Attend Bid Opening 5.1 Conduct Bid Opening


Conference (via Zoom) for Alternative Mode of BAC Secretariat
Procurement via Zoom and BAC Head-Secretariat
None 1 Hour
review submitted sealed BAC Member
canvass BFAR-BAC Office

5.2 Consolidate result of


None Bid opening None 1 Hour

6. Receive AOQ for 6.1 Prepare Abstract of BAC Secretariat


evaluation Quotation (AOQ) and BFAR-BAC Office
forward to Procurement None 1 hour
officer/End-user for
evaluation.
6.2 Evaluate AOQ by the BFAR Procurement
None End-user Officer /End-user
7. Return evaluated AOQ 7.1 Receive evaluated None 5 Working Days
BAC Secretariat
to BAC Office Abstract from End-user
BFAR-BAC Office
7.2 Review and for
BAC Secretariat
signature of AOQ by BAC
BAC Head-Secretariat
None Members and BAC Head- None
BAC Member
Secretariat
BFAR-BAC Office
3 Working Days
7.3 Receive signed AOQ
from BAC Members and BAC Secretariat
None BAC Head-Secretariat None
BFAR-BAC Office

419
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

7.4 Prepare Purchase


Order (PO) and encode PO
to the Documentary
None None 30 Minutes
Tracking System (DTS)
BAC Secretariat
BFAR-BAC Office
7.5 Release PO to Finance
Division for funding
None None 15 Minutes

18 Days, 5 Hours, and


TOTAL: None
35 Minutes

Reference: Republic Act 9184 (Government Procurement Reform Act) and its 2016 Revised Implementing Rules and Regulations
* Rule VII , Section 21 Advertising and Contents of the Invitation to Bid/Request for Expression of Interest, Sub-section 21.2.1 letter (a)

420
2. Alternative Mode of Procurement Under Lease of Real Property/Venue
- Procurement covering lease of real property and venue for official use

(Section 53.10, IRR of R.A. No. 9184)

Office or Division BFAR- Bids and Awards Committee (BAC)

Classification Highly Technical under Special Law of RA 9184

Type of Transaction G2G- Government to Government

Who may avail: End-user ( Internal)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE


1. Approved Purchased Request (PR) with complete
Submitted by the End-user
attachments
2. Approved Annual Procurement Plan (APP) or
Supplemental Project Procurement Management Plan Submitted by the End-user
(PPMP)
3. Justification for SPPMP (If Applicable) Submitted by the End-user

4. Cost Benefit Analysis Submitted by the End-user


5. Market Analysis Submitted by the End-user
6. Table Rating Factors Submitted by the End-user
7. Project Proposal Submitted by the End-user

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit approved 1.1 Receive and review the
Purchase Request (PR) submitted approved
with complete Purchase Request (PR) None 20 Minutes
attachments with complete attachments

1.2 Assign PR number and


None Encode PR for monitoring None 10 Minutes

1.3 Endorse PR to
concerned BAC Secretariat
(Alternative Mode of
None None 5 Minutes
Procurement) for creation
of Request for Quotation
BAC Secretariat
(RFQ)
BFAR-BAC Office
1.4 Prepare RFQ and Post
None in PhilGEPS/ BFAR None 1 Hour
Website
2. Receive copy of RFQ 2. Send copy of RFQ to
Procurement Officer/End-
None 5 Minutes
user

3. Receive Notice of 3.1 Schedule and send


Meeting for Bid Opening Notice of Meeting to BAC
Members, Secretariat and
None 10 Minutes
Procurement officers for
Bid opening

421
3.2 Canvass from
prospective
supplier/bidder/end-user BFAR Procurement
Officer /
None
*2016 Revised IRR of RA End-user
9184 (updated as of 31 Bidder/Supplier
December 2021), Section None 10 Working Days
21.2.1
4. Submit Sealed 4.1 Receive sealed
Canvass canvass
BAC Secretariat
BFAR-BAC Office
(10 mins per transaction )

5. Attend Bid Opening 5.1 Conduct Bid Opening


Conference (via Zoom) for Alternative Mode of BAC Secretariat
Procurement via Zoom and BAC Head-Secretariat
None 1 Hour
review submitted sealed BAC Member
canvass BFAR-BAC Office

5.2 Consolidate result of


None None 1 Hour
Bid opening
6. Receive AOQ for 6.1 Prepare Abstract of BAC Secretariat
evaluation Quotation (AOQ) and BFAR-BAC Office
forward to Procurement None 1 Hour
officer/End-user for
evaluation.
6.2 Evaluate AOQ by the BFAR Procurement
None End-user Officer/ End-
user
7. Return evaluated AOQ 7.1 Receive evaluated None 5 Working Days
to BAC Office Abstract from End-user BAC Secretariat
BFAR-BAC Office

7.2 Review and for BAC Secretariat


signature of AOQ by BAC BAC Head-Secretariat
None Members and BAC Head- None
BAC Member
Secretariat BFAR-BAC Office
7.3 Receive signed AOQ 3 Working Days
from BAC Members and
None BAC Head-Secretariat None

7.4 Prepare Purchase


Order (PO) and encode PO BAC Secretariat
None to the Documentary None 30 Minutes BFAR-BAC Office
Tracking System (DTS)

7.5 Release PO to Finance


None None 15 Minutes
Division for funding

18 Days, 5 Hours, and 35


TOTAL: None
Minutes
Reference: Republic Act 9184 (Government Procurement Reform Act) and its 2016 Revised Implementing Rules and Regulations
* Rule VII , Section 21 Advertising and Contents of the Invitation to Bid/Request for Expression of Interest, Sub-section 21.2.1 letter (a)

422
3. Alternative Mode of Procurement Under Shopping
- A method of procurement of goods whereby the Procuring Entity simply requests for the submission of price quotations for
readily available off-the-shelf goods or ordinary/regular equipment to be procured directly from suppliers of known qualifications.

Office or Division BFAR- Bids and Awards Committee (BAC)

Classification Highly Technical under Special Law of RA 9184

Type of Transaction G2G- Government to Government


Who may avail: End-user ( Internal)
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
1. Approved Purchase Request (PR) with complete
Submitted by the End-user
attachments
2. Approved Annual Procurement Plan (APP) or
Submitted by the End-user
Supplemental Project Procurement Management Plan
(PPMP)
3. Justification for SPPMP Submitted by the End-user
4. Certificate of Non-Available Supplies (CNAS) Submitted by the End-user

5. Stock Position Sheet (For Ink, Cartridge, Toner etc.) Submitted by the End-user
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit approved 1.1 Receive and review the
Purchase Request (PR) submitted approved
with complete Purchase Request (PR) None 20 Minutes
attachments with complete attachments

1.2 Assign PR number and


Encode PR for monitoring BAC Secretariat
None None 10 Minutes
BFAR-BAC Office
1.3 Endorse PR to
concerned BAC Secretariat
(Alternative Mode of
None Procurement) for creation None 5 Minutes
of Request for Quotation
(RFQ)
1.4 Prepare RFQ and Post
None in PhilGEPS/ BFAR None 1 Hour
Website

2. Receive RFQ 2. Send copy of RFQ to


Procurement Officer/End- None 5 Minutes
user
BAC Secretariat
3. Receive Notice of 3. Schedule and send BFAR-BAC Office
Meeting for Bid Notice of Meeting to BAC
Members, Secretariat and
Procurement officers for None 10 Minutes
Bid opening

423
3.1 Canvass from
prospective
supplier/bidder/end-user
BFAR Procurement
None *2016 Revised IRR of RA Officer/End-user
9184 (updated as of 31 Bidder/Supplier
December 2021), Section
None 10 Working Days
21.2.1

4. Submit Sealed 4.1 Receive sealed


Canvass canvass
BAC Secretariat
BFAR-BAC Office
(10 mins per transaction )

5. Attend Bid Opening 5.1 Conduct Bid Opening


Conference (via Zoom) for Alternative Mode of BAC Secretariat
Procurement via Zoom and BAC Head-Secretariat
None 1 Hour
review submitted sealed BAC Member
canvass BFAR-BAC Office

5.2 Consolidate result of


None None 1 Hour
Bid opening
6. Receive AOQ for 6.1 Prepare Abstract of
BAC Secretariat
evaluation Quotation (AOQ) and
BFAR-BAC Office
forward to Procurement
None 1 Hour
officer/End-user for
evaluation.

6.2 Evaluate AOQ by the


End-user
BFAR Procurement
None
Officer/End-user
None 5 Working Days

7. Return evaluated AOQ 7.1 Receive evaluated


BAC Secretariat
to BAC Office Abstract from End-user
BFAR-BAC Office
7.2 Review and for BAC Secretariat
signature of AOQ by BAC BAC Head-Secretariat
None Members and BAC Head- None
BAC Member
Secretariat BFAR-BAC Office
3 Working Days
7.3 Receive signed AOQ
from BAC Members and
None BAC Head-Secretariat None

7.4 Prepare Purchase


Order (PO) and encode PO BAC Secretariat
None to the Documentary None 30 Minutes BFAR-BAC Office
Tracking System (DTS)
7.5 Release PO to Finance
None Division for funding None 15 Minutes

18 Days, 5 Hours, and 35


TOTAL: None
Minutes
Reference: Republic Act 9184 (Government Procurement Reform Act) and its 2016 Revised Implementing Rules and Regulations
* Rule VII , Section 21 Advertising and Contents of the Invitation to Bid/Request for Expression of Interest, Sub-section 21.2.1 letter (a)
* Annex H, 136 Section 54.2, IRR of R.A. No. 9184 Advertisement and Posting of Procurement Opportunity

424
4. Alternative Mode of Procurement Under Direct Contracting
- Direct Contracting or single source procurement is a method of procurement of Goods that does not require elaborate Bidding
Documents. The supplier is simply asked to submit a price quotation or a pro-forma invoice together with the conditions of sale.
The offer may be accepted immediately or after some negotiations.
Office or Division BFAR- Bids and Awards Committee (BAC)
Classification Highly Technical under Special Law of RA 9184
Type of Transaction G2G- Government to Government
Who may avail: Procurement Officer/End-user ( Internal)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Approved Purchase Request (PR) with complete


Submitted by the End-user
attachments
2. Approved Annual Procurement Plan (APP) or
Supplemental Project Procurement Management Plan Submitted by the End-user
(PPMP)
3. Justification for SPPMP (If Applicable) Submitted by the End-user

4. Justification to udergo Direct Contracting Submitted by the End-user


5. Certification of Exclusive Distributorship issued by
Submitted by the End-user
the exclusive dealer or manufacturer

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

1. Submit approved 1.1 Receive and review the


Purchase Request (PR) submitted approved
with complete Purchase Request (PR)
attachments with complete attachments None 20 Minutes

1.2 Assign PR number and


Encode PR for monitoring
None None 10 Minutes BAC Secretariat
BFAR-BAC Office

1.3 Endorse PR to
concerned BAC Secretariat
(Alternative Mode of
Procurement) for creation
None None 5 Minutes
of Request for Quotation
(RFQ)

2. Receive RFQ 2. Prepare and send RFQ


to Procurement Officer/End-
user BAC Secretariat
None 1 Hour
BFAR-BAC Office

3. Receive Notice of 3. Schedule and send


Meeting for Bid Notice of Meeting for Bid
BAC Secretariat
opening None 20 Minutes
BFAR-BAC Office

425
4. Canvass from
prospective BFAR Procurement
None supplier/bidder/end-user Officer/End-user
Bidder/Supplier

4. Submit Sealed *2016 Revised


5. Receive IRRcanvass
sealed of RA
Canvass
None 3 Working Days
(10 mins per transaction )
BAC Secretariat
BFAR-BAC Office

5. Attend Bid Opening 5. Conduct Bid Opening for


Conference (via Zoom) Alternative Mode of
Procurement via Zoom and BAC Secretariat BAC
review submitted canvass None 1 Hour Member
BFAR-BAC Office

5.1 Consolidate result of


Bid opening
None None 1 Hour

5.2 Prepare BAC


Resolution recommending
for award
None None
BAC Secretariat
BFAR-BAC Office
5.3 Transmit BAC
Resolution recommending
award of Procurement
Project to BAC members
None None
and Director for review/
approval/ signature

5 Working Days
5.4 Review and sign the
BAC Resolution
recommending Award
BAC Member
*2016 Revised IRR of RA BFAR-BAC Office
None None
9184 (updated as of 31 Director
December 2021), Section BFAR-Director's Office
54.3

5.5 Receive signed BAC


Resolution
None None

5.6 Prepare Purchase BAC Secretariat


Order (PO) and encode PO BFAR-BAC Office
to the Documentary
None Tracking System (DTS) None 30 Minutes

426
5.7 Scan all documents for
None filing None 1 Hour
BAC Secretariat
5.8 Release documents of
BFAR-BAC Office
awarded project to Finance
None None 30 Minutes
Division

8 Days 5 Hours and 55


TOTAL: None
Minutes

Reference: Republic Act 9184 (Government Procurement Reform Act) and its 2016 Revised Implementing Rules and
Regulations
* Rule VII , Section 21 Advertising and Contents of the Invitation to Bid/Request for Expression of Interest, Sub-section 21.2.1
* Annex H, 136 Section 54.2, IRR of R.A. No. 9184 Advertisement and Posting of Procurement Opportunity
* Annex H, 143 Section 54.3, IRR of R.A. No. 9184 Notice of Award; Contact Approval; Notice to Proceed.

5. Alternative Mode of Procurement Under Agency to Agency


- Procurement from another agency of the government (i.e., Servicing Agency) that has the mandate to deliver goods or
services or to undertake infrastructure projects or consultancy services as required by the Procuring Entity.
(Section 53.5, IRR of R.A. No. 9184)

Office or Division BFAR- Bids and Awards Committee (BAC)

Classification Highly Technical under Special Law of RA 9184

Type of Transaction G2G- Government to Government


Who may avail: Procurement Officer/End-user ( Internal)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Approved Purchase Request (PR) with complete


Submitted by the End-user
attachments
2. Approved Annual Procurement Plan (APP) or
Submitted by the End-user
Supplemental Project Procurement Management Plan
(PPMP)
3. Justification for SPPMP (If Applicable) Submitted by the End-user

4. Justification to undergo Agency to Agency Submitted by the End-user

Submitted by the End-user


5. Certificate of Compliance issued by the Servicing Agency

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit approved 1.1 Receive and review the
Purchase Request (PR) submitted approved
with complete Purchase Request (PR)
attachments with complete attachments None 20 Minutes
BAC Secretariat
BFAR-BAC Office

1.2 Assign PR number and


None Encode PR for monitoring None 10 Minutes

427
1.3 Endorse PR to
concerned BAC Secretariat
(Alternative Mode of
None Procurement) for creation None 5 Minutes
of Request for Quotation
(RFQ)

1.4 Prepare RFQ


None None 30 minutes BAC Secretariat
BFAR-BAC Office
2. Receive RFQ 2. Prepare and send RFQ
to Procurement Officer/End-
None 1 Hour
user

3. Receive Notice of 3. Schedule and send


Meeting for Bid Notice of Meeting for Bid
opening None 20 Minutes

4. Canvass from
prospective
supplier/bidder/end-user
BFAR Procurement
None *2016 Revised IRR of RA Officer/End-user
9184 (updated as of 31 Bidder/Supplier
December 2021), Section
None 3 Working Days
21.2.1

4. Submit Sealed 5. Receive sealed canvass


Canvass
BAC Secretariat
(10 mins per transaction )
BFAR-BAC Office

5. Attend Bid Opening 5. Conduct Bid Opening for


Conference (via Zoom) Alternative Mode of
BAC Secretariat BAC
Procurement via Zoom and
None 1 Hour Member
review submitted canvass
(BFAR-BAC Office)

5.1 Consolidate result of


None Bid opening None 1 Hour

BAC Secretariat
5.2 Prepare BAC BFAR-BAC Office
None Resolution recommending None
for award

5.3 Transmit BAC


Resolution recommending 5 Working Days
award of Procurement BAC Secretariat
Project to BAC members BAC Member
None None
and Director for review/ (BFAR-BAC Office)
approval/signature

428
5.4 Review and sign the
BAC Resolution
recommending Award BAC Member
(BFAR-BAC Office)
None *2016 Revised IRR of RA None same as above
Director
9184 (updated as of 31 (BFAR-Director's Office)
December 2021), Section
54.3

5.5 Receive signed BAC


None Resolution None

5.6 Prepare Purchase


Order (PO) and encode PO
None to the Documentary None 30 Minutes
Tracking System (DTS)
BAC Secretariat
5.7 Scan all documents for BFAR-BAC Office
None filing None 1 Hour

5.8 Release documents of


awarded project to Finance
None Division None 30 Minutes

8 Days 5 Hours and 55


TOTAL: None
Minutes

Reference: Republic Act 9184 (Government Procurement Reform Act) and its 2016 Revised Implementing Rules and
Regulations
* Rule VII , Section 21 Advertising and Contents of the Invitation to Bid/Request for Expression of Interest, Sub-section 21.2.1
* Annex H, 136 Section 54.2, IRR of R.A. No. 9184 Advertisement and Posting of Procurement Opportunity
* Annex H, 143 Section 54.3, IRR of R.A. No. 9184 Notice of Award; Contact Approval; Notice to Proceed.

429
6. Alternative Mode of Procurement Under Emergency Cases
- Instances or situations where the foregoing conditions may be applied include the provision of immediate response and initial
recovery steps to avoid loss of life, injury, disease and other negative effects on human, physical, mental and social well-being,
together with damage to property, destruction of assets, loss of services, social and economic disruption and environmental
degradation.
(Section 53.2, IRR of R.A. No. 9184)

Office or Division BFAR- Bids and Awards Committee (BAC)

Classification Complex

Type of Transaction G2G- Government to Government


Who may avail: Procurement Officer/End-user ( Internal)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Approved Purchased Request (PR) with complete


Submitted by the End-user
attachments
2. Approved Annual Procurement Plan (APP) or
Submitted by the End-user
Supplemental Project Procurement Management Plan
(PPMP)
3.Justification to undergo Emergency Cases Submitted by the End-user
4. Terms of Reference (TOR) Submitted by the End-user

5. Authority to Conduct Submitted by the End-user

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

1. Submit approved 1.1 Receive and review the


Purchase Request (PR) submitted approved
with complete Purchase Request (PR) None 20 Minutes
attachments with complete attachments

1.2 Assign PR number and


Encode PR for monitoring
None None 10 Minutes

1.3 Endorse PR to
concerned BAC Secretariat BAC Secretariat
(Alternative Mode of BFAR-BAC Office
None Procurement) for creation None 5 Minutes
of Request for Quotation
(RFQ)
2. Receive RFQ 2. Prepare and send RFQ
to Procurement Officer/End-
None 1 Hour
user

3. Receive Notice of 3. Schedule and send


Meeting for Bid Notice of Meeting for Bid None 20 Minutes
opening

430
4. Canvass from
prospective
supplier/bidder/end-user
BFAR Procurement
None *2016 Revised IRR of RA Officer/End-user
9184 (updated as of 31 Bidder/Supplier
December 2021), Section
21.2.1 None 3 Working Days

4. Submit Sealed
Canvass 5. Receive sealed canvass
BAC Secretariat
BFAR-BAC Office
(10 mins per transaction )

5. Attend Bid Opening


Conference (via Zoom) 5. Conduct Bid Opening for
BAC Secretariat
Alternative Mode of
None 1 Hour BAC Member
Procurement via Zoom and
(BFAR-BAC Office)
review submitted canvass

5.1 Consolidate result of BAC Secretariat


None None 1 Hour
Bid opening (BFAR-BAC Office)

5.2 Prepare BAC


BAC Secretariat
None Resolution recommending None
(BFAR-BAC Office)
for award

5.3 Transmit BAC


Resolution recommending
award of Procurement
Project to BAC members BAC Secretariat
None and Director for review and None
(BFAR-BAC Office)
signature
3 Working Days

5.4 Review and sign the


BAC Resolution
recommending Award
BAC Member
(BFAR-BAC Office)
None *2016 Revised IRR of RA None
Director
9184 (updated as of 31
(BFAR-Director's Office)
December 2021), Section
54.3

5.5 Receive signed BAC


Resolution BAC Secretariat
None None
(BFAR-BAC Office)

5.6 Prepare Purchase


Order (PO) and encode PO
to the Documentary BAC Secretariat
None None 30 Minutes
Tracking System (DTS) (BFAR-BAC Office)

431
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
5.7 Scan all documents for
filing BAC Secretariat
None None 1 Hour
(BFAR-BAC Office)

5.8 Release documents of


awarded project to Finance BAC Secretariat
None None 30 Minutes
Division (BFAR-BAC Office)

3 Days 5 Hours and 55


TOTAL: None
Minutes
Reference: Republic Act 9184 (Government Procurement Reform Act) and its 2016 Revised Implementing Rules and
Regulations
* Rule VII , Section 21 Advertising and Contents of the Invitation to Bid/Request for Expression of Interest, Sub-section 21.2.1
letter (a)
* Annex H, 136 Section 54.2, IRR of R.A. No. 9184 Advertisement and Posting of Procurement Opportunity
* Annex H, 143 Section 54.3, IRR of R.A. No. 9184 Notice of Award; Contact Approval; Notice to Proceed.

432
7. Alternative Mode of Procurement Under Scientific, Scholarly or Artistic Work, Exclusive
Technology and Media Services
- Where Goods, Infrastructure Projects and Consulting Services can be contracted to a particular supplier, contractor or
consultant and as determined by the HoPE, for any of the following:
1. The requirement is for:
a. Work of art; commissioned work or services of an artist for a specific artist skills (e.g., Singer, poet, writer, painter, sculptor,
etc.);
b. Scientific, academic, scholarly work or research, or legal services;
c. Highly-specialized life-saving medical equipment, as certified by the Department of Health (DOH);
d. Scientific, technical, economic, business, trade or legal journal, magazine, paper, subscription, or other exclusive statistical
publications and references; or
e. Media documentation, advertisement, or announcement through television, radio, newspaper, internet, and other
communication media.
(Section 53.6, IRR of R.A. No. 9184)

Office or Division BFAR- Bids and Awards Committee (BAC)

Classification Highly Technical under Special Law of RA 9184

Type of Transaction G2G- Government to Government


Who may avail: Procurement Officer/End-user ( Internal)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Approved Purchase Request (PR) with complete


Submitted by the End-user
attachments
2. Approved Annual Procurement Plan (APP) or
Submitted by the End-user
Supplemental Project Procurement Management Plan
3. Justification to undergo NPSSAEM Submitted by the End-user
4. Terms of Reference (TOR) Submitted by the End-user
5. Scope of Reference Submitted by the End-user
6. Project Proposal Submitted by the End-user

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit approved 1.1 Receive and review the
Purchase Request (PR) submitted approved
with complete Purchase Request (PR) BAC Secretariat
None 20 Minutes
attachments with complete attachments (BFAR-BAC Office)

1.2 Assign PR number and


Encode PR for monitoring BAC Secretariat
None None 10 Minutes
(BFAR-BAC Office)

1.3 Endorse PR to
concerned BAC Secretariat
(Alternative Mode of BAC Secretariat
None None 5 Minutes
Procurement) for creation (BFAR-BAC Office)
of Request for Quotation
(RFQ)

433
2. Receive RFQ 2. Prepare and send RFQ
to Procurement Officer/End- BAC Secretariat
user None 1 Hour
(BFAR-BAC Office)

3. Receive Notice of 3. Schedule and send


Meeting for Bid Notice of Meeting for Bid BAC Secretariat
None 20 Minutes
opening (BFAR-BAC Office)

4. Canvass from
prospective BFAR Procurement
None supplier/bidder/end-user Officer/End-user
Bidder/Supplier
None 3 Working Days
4. Submit Sealed
Canvass 5. Receive sealed canvass
BAC Secretariat
(BFAR-BAC Office)
(10 mins per transaction )

5. Attend Bid Opening 5. Conduct Bid Opening for


Conference (via Zoom) Alternative Mode of
Procurement via Zoom and BAC Secretariat BAC
review submitted canvass None 1 Hour Member
(BFAR-BAC Office)

5.1 Consolidate result of


Bid opening BAC Secretariat
None None 1 Hour
(BFAR-BAC Office)

5.2 Prepare BAC


BAC Secretariat
None Resolution recommending None
(BFAR-BAC Office)
for award
5.3 Transmit BAC
Resolution recommending
award of Procurement
Project to BAC members BAC Secretariat
None None
and Director for (BFAR-BAC Office)
review/approval/signature

5.4 Review and sign the


BAC Resolution 5 Working Days
recommending Award
BAC Member
*2016 Revised IRR of RA (BFAR-BAC Office)
None None
9184 (updated as of 31 Director
December 2021), Section (BFAR-Director's Office)
54.3

5.5 Receive signed BAC


Resolution BAC Secretariat
None None
(BFAR-BAC Office)

5.6 Prepare Purchase


Order (PO) and encode PO
to the Documentary BAC Secretariat
None None 30 Minutes
Tracking System (DTS) (BFAR-BAC Office)

434
5.7 Scan all documents for
filing BAC Secretariat
None None 1 Hour
(BFAR-BAC Office)

5.8 Release documents of


BAC Secretariat
None awarded project to Finance None 30 Minutes
(BFAR-BAC Office)
Division

8 Days 6 Hours and 50


TOTAL: None
Minutes

Reference: Republic Act 9184 (Government Procurement Reform Act) and its 2016 Revised Implementing Rules and
Regulations
* Rule VII , Section 21 Advertising and Contents of the Invitation to Bid/Request for Expression of Interest, Sub-section 21.2.1
* Annex H, 136 Section 54.2, IRR of R.A. No. 9184 Advertisement and Posting of Procurement Opportunity
* Annex H, 143 Section 54.3, IRR of R.A. No. 9184 Notice of Award; Contact Approval; Notice to Proceed.

8. Alternative Mode of Procurement Under Consultancy Services

- Procurement of consultancy contract involving an individual consultant, subject to the following conditions: The individual
consultant will be hired to do work that is either:
a) Highly technical or proprietary; or
b) Primarily confidential or policy determining, where trust and confidence are the primary consideration.
- The term of the individual consultant shall, at the most, be on a six (6) month basis, renewable at the option of the appointing
HOPE, but in no case shall exceed the term of the latter.

(Section 53.7, IRR of R.A. No. 9184)

Office or Division BFAR- Bids and Awards Committee (BAC)

Classification Complex

Type of Transaction G2G- Government to Government

Who may avail: End-user (Internal)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Approved Purchase Request (PR) with complete


Submitted by the End-user
attachments

2. Approved Annual Procurement Plan (APP) or


Supplemental Project Procurement Management Plan Submitted by the End-user
(SPPMP)

3. Justification of SPPMP (If Applicable) Submitted by the End-user

4. Authority to Hire Consultancy Submitted by the End-user

5. Terms of Reference Submitted by the End-user

6. Project Propoasal Submitted by the End-user

7. Curriculm Vitae Submitted by the End-user

435
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

1. Submit approve 1.1 Receive and review the


Purchase Request (PR) submitted approved
with complete Purchase Request (PR)
requirements (request for with complete attachments BAC Secretariat
expression of interest, None 20 Minutes
(BFAR-BAC Office)
letter of intent, curriculum
vitae)

1.2 Assign PR number and


Encode PR for monitoring BAC Secretariat
None None 10 Minutes
(BFAR-BAC Office)

1.3 Endorse PR to
concerned BAC Secretariat
(Alternative Mode of
Procurement) for creation BAC Secretariat
None None 5 Minutes
of Request for Quotation (BFAR-BAC Office)
(RFQ)

2. Receive Notice of 2. Prepare and send Notice


Meeting for Bid of Meeting for bid opening BAC Secretariat
None 15 Minutes
(BFAR-BAC Office)

3. Attend the Evaluation 3. Conduct Evaluation


Review conducted via Review for Consultancy BAC Secretariat
Zoom Services via Zoom None 1 Hour
(BFAR-BAC Office)

3.1 Prepare BAC


Resolution, Contract,
BAC Secretariat
None Notice of Award, and None 2 working days
(BFAR-BAC Office)
Notice to Proceed
recommending for award

5.3 Transmit BAC


Resolution, Contract,
Notice of Award, and
Notice to Proceed
BAC Secretariat
None recommending award of None
(BFAR-BAC Office)
Procurement Project to
BAC members and Director
for
review/approval/signature

3 working days

436
5.4 Evaluate and for
signature of BAC
Resolution, Contract,
Notice of Proceed, and
3 working days
Notice of Award by BAC BAC Secretariat
Secretariat/BAC BAC Member
None Member/Director None (BFAR-BAC Office)
Director
*2016 Revised IRR of RA (BFAR-Director's Office)
9184 (updated as of 31
December 2021), Section
54.3

3.3 Receive signed BAC


Resolution, Notice of BAC Secretariat
None Award, and Notice to None
(BFAR-BAC Office)
Proceed

3.4 File documents (COA,


HR, BAC, & End-User BAC Secretariat
None None 2 Working Days
Copy) (BFAR-BAC Office)

4. Receive filed 4. Forward Filed


documents for processing documents to Procurement
and forward to Finance Officer BAC Secretariat
None 30 Minutes
Management Division (BFAR-BAC Office)

7 Days 2 Hours and 20


TOTAL: None
Minutes

Reference: Republic Act 9184 (Government Procurement Reform Act) and its 2016 Revised Implementing Rules and
Regulations
* Annex H, 143 Section 54.3, IRR of R.A. No. 9184 Notice of Award; Contract Approval; Notice to Proceed.

437
ALTERNATIVE MODE OF PROCUREMENT

B. EXTERNAL

1. Alternative Mode of Procurement under Small Value


- Procurement of (a) goods not covered by Shopping under Section 52 of the IRR of RA 9184, (b) infrastructure projects, and
consulting services.
(Section 53.9, IRR of R.A. No. 9184)

Office or Division BFAR- Bids and Awards Committee (BAC)

Classification Highly Technical under Special Law of RA 9184


Type of Transaction G2B- Government to Business
Who may avail: Bidder (External)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Request for Quotation/Sealed Canvass BFAR- Bids and Awards Committee (BAC) Office
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Post RFQ (Request for
BAC Secretariat
None Quotation) in PhilGEPS None 20 Minutes
(BFAR-BAC Office)
website
1. Receive Request for 2. Send copy of RFQ
Quotation or download it BAC Secretariat
None 10 Minutes
in PhilGEPS website (BFAR-BAC Office)

2. Submit Sealed 3. Canvass from


Canvass prospective
supplier/bidder/end-user
(Receive sealed canvass
10 mins per transaction
within 10 calendar days of
canvass period)
None 10 Working Days Bidder/Supplier
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021), Section
21.2.1

3. Attend Bid opening 4. Conduct Bid Opening for BAC Secretariat


(Optional) Alternative Mode of BAC Member
Procurement via Zoom and (BFAR-BAC Office)
None 1 Hour
review submitted canvass BFAR-Procurement
Officer/End-user
Bidder
5. Forward result of Bidding
to End-user, BAC Member,
Finance, and Property BAC Secretariat
None Section for further review None 5 Minutes
(BFAR-BAC Office)
and signature.

438
Note:
Result of Bidding can be viewed at the PhilGEPS/BFAR website. Winning Bidder will be notified by the BFAR's
Property Section.
10 Days 1 Hour and 35
TOTAL NONE
Minutes
Reference: Republic Act 9184 (Government Procurement Reform Act) and its 2016 Revised Implementing Rules and
Regulations
* Rule VII , Section 21 Advertising and Contents of the Invitation to Bid/Request for Expression of Interest, Sub-section 21.2.1
letter (a)

2. Alternative Mode of Procurement under Lease of Real Property/Venue


- Procurement covering lease of real property and venue for official use

(Section 53.10, IRR of R.A. No. 9184)

Office or Division BFAR- Bids and Awards Committee (BAC)

Classification Highly Technical under Special Law of RA 9184


Type of Transaction G2B- Government to Business
Who may avail: Bidder (External)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Request for Quotation/Sealed Canvass BFAR- Bids and Awards Committee (BAC) Office

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Post RFQ (Request for
Quotation) in PhilGEPS BAC Secretariat
None None 20 Minutes
website (BFAR-BAC Office)

1. Receive Request for 2. Send copy of RFQ


Quotation or download it
BAC Secretariat
in PhilGEPS website None 10 Minutes
(BFAR-BAC Office)

2. Submit Sealed 3. Canvass from


Canvass prospective
supplier/bidder/end-user
(Receive sealed canvass
10 mins per transaction None 10 Working Days Bidder/Supplier
within 10 calendar days of
canvass period)

*2016 Revised IRR of RA

439
3. Attend Bid opening 4. Conduct Bid Opening for BAC Secretariat
(Optional) Alternative Mode of BAC Member
Procurement via Zoom and (BFAR-BAC Office)
None 1 Hour
review submitted canvass BFAR-Procurement
Officer/End-user
Bidder
5. Forward result of Bidding
to End-user, BAC Member,
Finance, and Property BAC Secretariat
None None 5 Minutes
Section for further review (BFAR-BAC Office)
and signature.

Note:
Result of Bidding can be viewed at the PhilGEPS/BFAR website. Winning Bidder will be notified by the BFAR's
Property Section.

10 Days 1 Hour and 35


TOTAL NONE
Minutes

Reference: Republic Act 9184 (Government Procurement Reform Act) and its 2016 Revised Implementing Rules and
* Rule VII , Section 21 Advertising and Contents of the Invitation to Bid/Request for Expression of Interest, Sub-section 21.2.1

440
3. Alternative Mode of Procurement under Shopping

- A method of procurement of goods whereby the Procuring Entity simply requests for the submission of price quotations for
readily available off-the-shelf goods or ordinary/regular equipment to be procured directly from suppliers of known qualifications.

- Ordinary or regular office supplies include those supplies, commodities, or materials which are necessary in the transaction of
its official businesses, and consumed in the day-to-day office operations. However, office supplies shall not include services
such as repair and maintenance of equipment and furniture, as well as trucking, hauling, janitorial, security, and related or
analogous services.

Office or Division BFAR- Bids and Awards Committee (BAC)

Classification Highly Technical under Special Law of RA 9184

Type of Transaction G2B- Government to Business

Who may avail: Bidder (External)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Request for Quotation/Sealed Canvass BFAR- Bids and Awards Committee (BAC) Office

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Post RFQ (Request for
Quotation) in PhilGEPS BAC Secretariat
None None 20 Minutes
website (BFAR-BAC Office)

1. Receive Request for 2. Send copy of RFQ


Quotation or download it BAC Secretariat
in PhilGEPS website None 10 Minutes
(BFAR-BAC Office)

2. Submit Sealed 3. Canvass from


Canvass prospective
supplier/bidder/end-user
(Receive sealed canvass
10 mins per transaction
within 10 calendar days of
canvass period) None 10 Working Days Bidder/Supplier
*2016 Revised IRR of RA
9184 (updated as of 31
December 2021), Section
21.2.1

3. Attend Bid opening 4. Conduct Bid Opening for


(Optional) Alternative Mode of
Procurement via Zoom and
review submitted canvass BAC Secretariat
BAC Member
(BFAR-BAC Office)
None 1 Hour
BFAR-Procurement
Officer/End-user
Bidder

441
5. Forward result of Bidding
to End-user, BAC Member,
BAC Secretariat
None Finance, and Property None 5 Minutes
(BFAR-BAC Office)
Section for further review
and signature.
Note:
Result of Bidding can be viewed at the PhilGEPS/BFAR website. Winning Bidder will be notified by the BFAR's
Property Section.

10 Days 1 Hour and 35


TOTAL NONE
Minutes

Reference: Republic Act 9184 (Government Procurement Reform Act) and its 2016 Revised Implementing Rules and
Regulations
* Rule VII , Section 21 Advertising and Contents of the Invitation to Bid/Request for Expression of Interest, Sub-section 21.2.1
letter (a)

442
BUREAU OF FISHERIES AND AQUATIC RESOURCES

BFAR NATIONAL CENTERS


EXTERNAL SERVICES
(FRONTLINE)

PART III

CITIZEN'S CHARTER
2022 (2nd Edition)

443
Page Number

LIST OF SERVICES
I. Marine Fisheries Development and Vessels Operation Center (NMFD&VOC) - Sangley Point

1. Application for Apprenticeship On-board M/V DA-BFAR 448


2. Fisheries Observer Deployment To High Seas Pocket 1 450
3. Fisheries Observer Deployment to Philippines Exclusive
Economic Zone (EEZ) and Fish Agregating Device (FAD) Closure 452
4. Provision of Training On-the-Job Training for Students 453
5. Request For the Conduct Of Collaborative Research On-board
M/V DA-BFAR 455
6. Request For the Use of BFAR Vessels 458
7. Specialized Training as Requested by Clients 460
8. Technical Assistance for On-Site Visit / Inspection 461
9. Technical Assistance for Walk-in Clients 462
10. Training assistance for Regular Training 463

Feedback and Complaint Mechanism


465
List of Offices

II. National Brackishwater Fisheries Technology Center (NBFTC) - Pagbilao, Quezon

A. Fisheries Production And Distribution


1. Distribution of Fish Seed (Milkfish fingerling) For Free 466
B. Provision of Extension Support, Education and Training Services
1. Technical Assistance for Distribution of Information, Education
and Communication materials 468
2. Technical Assistance for Regular Training
3. Technical Assistance for Walk-in Clients 469
4. Technical Assistance On-site Visit / Inspection 471
5. Technical Assistance thru Social Media (E-mail, Facebook,
Messenger and Text) 472
6. Technical Assistance thru Telephone Inquiry 474
7. Training Assistance As Requested by Clients 476
8. Training Assistance (On-the-Job Trainee Students) 478

Feedback and Complaint Mechanism 479


List of Offices 480

444
Page Number

III. National Freshwater Fisheries Technology Center (NFFTC) - Muñoz, Nueva Ecija

A. Extension Support, Education and Training Services


1. Technical Assistance for Distribution of Information, Education
and Communication (IEC) Materials 481
2. Technical Assistance For Regular Training 482
3. Technical Assistance For Walk-in Clients 484
4. Technical Assistance On-site Visit / Inspection 485
5. Technical Assistance Thru Social Media (E-mail, Facebook,
Messenger and Text) 487
6. Technical Assistance Thru Telephone Inquiry 488
7. Training Assistance (On-the-Job Trainee Students) 489
8. Training Assistance As Requested by Clients 490
B. Fisheries Production and Distribution
1. Distribution of Fish Seed (Fry, Fingerlings, Post-larvae) For Free 492
2. Distribution of Fish Seed (Fry, Fingerlings, Post-larvae) For Purchase 493
3. Free Distribution of Organic Inputs (Duckweed, Azolla, Vermicast)
as per Request 495

Feedback and Complaint Mechanism 496


List of Offices 497

IV. National Inland Fisheries Technology Center (NIFTC) - Tanay, Rizal

A. Fisheries Production and Distribution


1. Distribution of Fish Seed (Fry, Fingerlings, Spats, Post-Larvae)
For Free 498
2. Distribution of Fish Seed (Fry, Fingerlings, Spats, Post-Larvae)
with Payment 500
B. Provision of Extension Support, Education and Training Services
1. Technical Assistance Distribution of Information, Education
and Communication (IEC) Materials 502
2. Technical Assistance For Regular Training 503
3. Technical Assistance For Walk-in Clients 505
4. Technical Assistance Thru Social Media (E-mail, Facebook,
Messenger and Text) 506
5. Technical Assistance Thru Telephone Inquiry 507
6. Technical Assistance Visit/Inspection On-site 508
7. Training Assistance As Requested by Clients 510
8. Training Assistance (On-the-Job Trainee Students) 512

Feedback and Complaint Mechanism 513


List of Offices 514

445
Page Number

V. National Integrated Fisheries Technology Development Center (NIFTDC) - Bonuan Binloc, Dagupan

A. Environmental Assessment Services 515


B. Environmental Laboratory Services 518
C. Fisheries Production And Distribution
1. Free Distribution of Broodstock, Eggs, Fry and Fingerlings, Postlarvae,
Spat (Milkfish, Saline Tilapia (Molobicus), Freshwater Shrimp, Oyster & Mussel 521
2. Payment of Broodstock, Eggs, Fry and Fingerlings, Postlarvae,
Spat (Milkfish, Saline Tilapia (Molobicus), Freshwater Shrimp, Oyster & Mussel 523
D. Microbiology, Fish Health and Molecular Pathology Laboratory Services 525
E. Provision Of Extension Support, Education And Training Services
1. Distribution of Information, Education and Communication (IEC) Materials 528
2. Technical Assistance Center On-the-Job Training and Immersion 529
3. Technical Assistance For Walk-in Clients 531
4. Technical Assistance Thru Social Media (E-mail, Facebook,
Messenger and Text (SMS) 532
5. Technical Assistance On-site Visit/Inspection and Sampling Collections 533
6. Technical Assistance On the Regular Training 535
7. Technical Assistance Thru Telephone Inquiry 537
8. Training Assistance As Requested by Clients 538

F. Request Distribution of Fry, Fingerlings, PL and Spat Via Airport/ Seaport


1. Free Distribution of Fry, Fingerlings, Postlarvae,
Spat (Saline Tilapia Molobicus, Freshwater Shrimp, Oyster and Mussel) 540
2. Sold/Purchased Distribution of Fry, Fingerlings, Postlarvae, Spat (Saline Tilapia
(Molobicus), Freshwater Shrimp, Oyster and Mussel) 545
G. Distribution of Natural Food
1. Free Distribution of Primary, Secondary and Mass Culture of Natural
Food Organisms (Microalgae, Daphnia and Rotifer) 549
2. Sold/Purchased Distribution of Primary, Secondary and Mass Culture of
Natural Food Organisms (Microalgae, Daphnia and Rotifer) 551
H. Toll Processing of Frozen Milkfish 553

Feedback and Complaint Mechanism 557


List of Offices 558

446
Page Number

VI. National Seaweed Technology Development Center (NSTDC) - Cabid-an, Sorsogon

A. Provision Of Extension Support, Education and Training Services


1. Conduct of Assessment on Seaweed Production-
National Certificate II (Regular) 559
2. Conduct of Assessment on Seaweed Production-
National Certificate II (Scholarship) 561
3. Dispersal of Seaweed Propagules and Raw Dried Seaweeds 562
4. Issuance of Seaweed Quality Analysis Report (Moisture Content (MC) 563
5. Seaweed Quality Analysis (Gel Strength/Yield/Viscosity 564

B. Fisheries Production and Distribution


1. Technical Assistance For Distribution of Information, Education
and Communication (IEC) Materials 565
2. Technical Assistance For Regular Training 566
3. Technical Assistance For Walk-in Clients 567
4. Technical Assistance On-site Visit/ Inspection 568
5. Technical Assistance thru Social Media (E-mail, Facebook,
Messenger and Text (SMS)) 570
6. Technical Assistance thru Telephone Inquiry 571
7. Training Assistance (On-the-Job Trainee Students) 572
8. Training Assistance As Requested by Clients 573

Feedback and Complaint Mechanism 575


List of Offices 576

VII. National Mariculture Center (NMC) - Panabo, Davao Del Norte

Provision Of Extension Support, Education and Training Services


1. Technical Assistance for Distribution of Information, Education
and Communication (IEC) Materials 577
2. Technical Assistance For Regular Training 578
3. Technical Assistance For Walk-in Clients 580
4. Technical Assistance Thru Social Media (E-mail, Facebook,
Messenger and Text) 581
5. Technical Assistance Thru Telephone Inquiry 582
6. Technical Assistance Visit/Inspection On- site 583
7. Training Assistance (On-the-Job Trainee Students) 585
8. Training Assistance Program as per Requested by Clients 587

Feedback and Complaint Mechanism 589


List of Offices 590

BFAR CENTRAL OFFICE MAIN LIST OF OFFICES 592

447
I. National Marine Fisheries Development and Vessels Operation Center -(NMFD&VOC) - Sangley
Point Cavite City

1. Application for Apprenticeship On-board M/V DA-BFAR

Maritime students taking BS Marine Transportation and BS Marine Engineering applied to undergo a 1-year apprenticeship
onboard M/V DA-BFAR. Apprentice Mates will be taught and experience actual deck and engine works such as navigation,
maneuvering of the vessel, deck and engine watchkeeping, utilization of navigational, communication and engineering
machineries onboard, maintenance and trouble-shooting. They will also experience the actual life at sea for one year.

BFAR - Marine Fisheries Development and Vessels Operation Center (NMFD&VOC) - Sangley
Office or Division
Point, Cavite City

Classification Highly Technical

Type of Transaction G2C - Government to Citizen

Who may avail External - Graduating Marine Students (Deck & Engineering)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Application Letter Applicants


2. Seaman's Book MARINA
3. Medical Records Hospitals or any medical institution
4. Certificate of Training University, training agencies accredited by MARINA
5. Transcript of Records (TOR) University (where the applicant enrolled)
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit Application 1. Receive and review
Letter and the Application Letter; initial
requirements (Medical interview on the graduating
Records, Transcript of maritime student
Records (TOR), Administrative Aide VI
None 15 Minutes
Certificate of Training, BFAR D irector's Office
Seaman's Book) and
attend initial interview

2. Receive notification of 2. Preparation/ Process


approval of application and approval of authority to
conduct apprenticeship; if
approved, notification for
Administrative Officer
the approval of application
None 1 Day BFAR-VOC, Director's
for apprenticeship of
Office
student

3. Notify for scheduled 3. Notify approved student


embarkation and attend for the scheduled
briefing embarkation and conduct Vessel Officer/M/V
briefing then give room None 3 Hours
DA-BFAR
assignment

448
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
4. Onboard and performs 4. Provide/ Discuss
apprentice duties guidelines for duties and
responsibilities of the
students while onboard Vessel Officer/M/V
None 12 Months (1 Year)
DA-BFAR
4.1 Conduct/ Facilitate the
apprentice training

5. Request for 5. Preparation and approval


disemabarkation of disembarkation Vessel Officer, Vessel
Certificate Certificate Administrative Aide
M/V DA-BFAR

5.1 Preparation/ Process None 1 Day


the approval of Sea Service Administrative Officer
Certificate BFAR-VOC Director's
Office

6. Receive signed Sea 6. Issue an approved and


Service Certificate signed Sea Service Administrative Officer
Certificate None 1 Day BFAR-VOC Director's
Office

1 Year, 3 Days, 3 Hours,


TOTAL: None
15 Minutes

449
2. Fisheries Observer Deployment To High Seas Pocket 1
All catcher vessels operating in HSP1 are required to have 100% fisheries observer coverage as compliance with the
requirement of FAOs 245 and 261. Also as compliance with the Conservation and Management Measure (CMM) of the Western
and Central Pacific Fisheries Commission (WCPFC). Fisheries Observers are tasked to record and collect various fisheries
information in relation to the fishing operation of the fishing vessels.

BFAR - Marine Fisheries Development and Vessels Operation Center (NMFD&VOC) - Sangley
Office or Division
Point Cavite City

Classification Highly Technical

Type of Transaction G2B - Government to Business Entity


Who may avail (External) Commercial Fishing Vessel, Fishing Companies

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Formal Letter Request Fishing Company/Owner/Operator

2. Observer Contracts Fisheries Observer Management Office

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submission of Formal 1. Receive Letter Request
Letter Request to the
Office of the Director, 3rd Administrative Aide VI
Flr., Fisheries Bldg., None 5 Minutes BFAR Director's
Office

1.1 Review letter request;


Coordinate the request to
Fisheries Observer
the Western and Central
Program National
Pacific Fisheries
Coordinator
Commission (WCPFC) for
None None 15 Minutes BFAR MFD&VOC -
Fisheries Observers from
Philippine Fisheries
other Fisheries Observer
Observer Program
Programme
Management Office

1.2 WCPFC will inform


BFAR for availability of
Observers from the Administrative Aide VI
None Regional Observer None 7 Days
BFAR- Director's Office
Programme

1.3 BFAR to notify fishing


company if an observer will Fisheries Observer
be from other Fisheries Program National
Observer Programmes or Coordinator
None BFAR Fisheries Observer None 15 Minutes BFAR MFD&VOC -
Program Philippine Fisheries
Observer Program
Management Office

450
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
2. Signing of contract 2. Allocate/Assign fisheries
between BFAR, Fishing observer to fishing vessel
Company (Owner) and and required to sign the Fisheries Observer
Fisheries Observer Observer Contracts Program National
stipulating their duties and Coordinator
responsibilities of the None 2 Days BFAR MFD&VOC -
parties and conditions for Philippine Fisheries
the duration of the Observer Program
Observer Trip Management Office

3. Attend briefing session 3. Conducts briefing


Fisheries Observer
prior to embarkation procedure to fisheries
Program National
observers before
embarkation to fishing Coordinator
None 1 Day BFAR MFD&VOC -
vessels
Philippine Fisheries
Observer Program
Management Office
4. Accept / Receive copy 4. Actual deployment of
of deployment of Fisheries Observers Fisheries Observer
Fisheries Observers onboard fishing vessel in Program National
HSP1 Coordinator
None 1 Day BFAR MFD&VOC -
Philippine Fisheries
Observer Program
Management Office

TOTAL: 11 Days, 35 Minutes

451
3. Fisheries Observer Deployment to Philippines EXCLUSIVE ECONOMIC ZONE (EEZ) and FISH
AGREGATING DEVICE (FAD) Closure
All catcher vessels operating in HSP1 are required to have 100% fisheries observer coverage as compliance with the
requirement of FAOs 245 and 261. Also as compliance with the Conservation and Management Measure (CMM) of the Western
and Central Pacific Fisheries Commission (WCPFC). Fisheries Observers are tasked to record and collect various fisheries
information in relation to the fishing operation of the fishing vessels.

BFAR - Marine Fisheries Development and Vessels Operation Center (NMFD&VOC) - Sangley
Office or Division Point Cavite City

Classification Complex

Type of Transaction G2B - Government to Business Entity


(External) Commercial Fishing Vessel, Fishing Companies
Who may avail

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Formal Letter Request Fishing Company/Owner/Operator

2. Observer Contracts Fisheries Observer Management Office

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submission of Formal 1. Receive Formal Letter
Letter Request to the Request Administrative Aide VI
Office of the Director None 5 Minutes
BFAR Director's Office

1.1 Review request;


prepare a reply letter Fisheries Observer
Program National
Coordinator
None None 1 Day BFAR MFD&VOC -
Philippine Fisheries
Observer Program
Management Office

2. Sign contract between 2. Allocate/Assign fisheries


BFAR and Fish observer observer to fishing vessel Fisheries Observer
and required to sign Program National
Observer Contracts Coordinator
None 2 Days BFAR MFD&VOC -
Philippine Fisheries
Observer Program
Management Office

3. Attend briefing session 3. Conducts briefing


prior to embarkation procedure to fisheries
observers before Fisheries Observer
embarkation to fishing Program National
vessels Coordinator
None 1 Day BFAR MFD&VOC -
Philippine Fisheries
Observer Program
Management Office

452
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
4. Accepts required 4. Actual deployment of
fisheries observer Fisheries Observers Fisheries Observer
deployment of every onboard fishing vessel Program National
Fishing Company within the Philippine waters Coordinator
None 1 Day BFAR MFD&VOC -
Philippine Fisheries
Observer Program
Management Office

TOTAL: None 5 Days, 5 Minutes

4. Provision of On-the-Job Training for Students

The On-the-Job Training on Responsible Fishing Technology is designed for the Bachelor of Science in Fisheries (BSFi)
students to upgrade their knowledge on existing and recent technologies available as well as to equip them with the necessary
skills through actual exposure on gear construction and shipboard training. Likewise, this training program is part of BFAR’s
commitment with the Department of Education and the Commission on Higher Education to extend technical assistance
urgently needed by the graduating marine fisheries students from the different schools/colleges of the country.

BFAR - Marine Fisheries Development and Vessels Operation Center (NMFD&VOC) - Sangley
Office or Division Point Cavite City

Classification Highly Technical


G2C - Government to Citizen; G2G - Government to Government; G2B - Government to Business
Type of Transaction Entity
1. Internal - BFAR Regional Offices and Centers, Provincial Fisheries Offices, Regional Fishery
Officers
2. External - Academe (students, professors, researchers)
Who may avail
Other government agencies (Non- Government Organization, Local Government Units), Private
Institutions; Fisherfolk organization/association. Women’s associations, Housewives, Senior Citizens,
Indigenous People

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter Request Requesting School/Colleges/Universities


2. Memorandum of Agreement BFAR-NMFDC Training Section
3. Waiver BFAR-NMFDC Training Section
4. Naval Base Entry Requirements BFAR-NMFDC Training Section
5. Training Evaluation Form BFAR-NMFDC Training Section

453
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit Letter Request 1. Receive Letter Request
Center, Chief/ Head,
None 5 Minutes Training Section
MFD&VOC
2. Sign Memorandum of 2. Accept OJT request of
Agreement & Waiver of students and required to Center, Chief/ Head,
the Students sign the MOA/ Waiver. None 5 Minutes Training Section
MFD&VOC

3. Provide list of OJTs 3. Require to comply with


and comply with the entry the Naval Base Entry
Head of Training Section
Clearance of the Naval Clearance/ requirements None 1 Day
MFD&VOC
Base

3.1 Submit requirements


for the clearance to Naval
Base Intelligence Office Head of Training Section
None None 2 Hours
MFD&VOC

4. Attend Orientation & 4. Conduct orientation and


Take Note of the House discuss House Rules
Rules Head of Training Section
None 1 Hour
MFD&VOC

5. Attend and participate 5. Conduct actual training


actively on the On-the-
Training Instructors
Job training activities None 30 Days
MFD&VOC

6. Accomplish Training 6. Receive accomplished


Evaluation Form Training Evaluation Form Head of Training Section
None 5 Minutes
MFD&VOC

7. Receive signed 7. Issue an approved and


Certificate of Training signed Certificate of
Training Center, Chief
None 2 Minutes
MFD&VOC

30 Days, 3 Hours, 17
TOTAL: None
Minutes

454
5. Request For the Conduct Of Collaborative Research On-board M/V DA-BFAR
M/V DA-BFAR to be used as platform for the conduct of collaborative researches within the Philippine waters by any
government agencies and institutions. Included in the collaboration is the participation of onboard researchers and experties of
onboard crew to assist collaborators in the collection of scientific data and operation of machineries for the success of the
research activities.

BFAR - Marine Fisheries Development and Vessels Operation Center (NMFD&VOC) - Sangley
Office or Division
Point Cavite City

Classification Highly Technical

Type of Transaction G2G - Government to Government; G2C - Government to Citizen

1. Internal - BFAR Regional Offices


Who may avail 2. External - Academic Institutions, Non-Government Organizations (NGOs), Local Government
Units (LGUs) and other Government Agencies

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Request Letter Agency/Intitution who intends to collaborate

2. Research Proposal Agency/Intitution who intends to collaborate

3. Memorandum of Agreement/ Memorandum of Drafted and aggreed by the collaborators, NMFD&VOC


Understanding

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit Request Letter 1. Receive Request Letter
and research proposal and research proposal Administrative Aide VI
None 3 Minutes BFAR Director's
Office

1.1 Evaluate request and


review proposal Center Chief; BFAR
None None 1 Day Director
BFAR MFD&VOC

2. Receive letter reply 2. Send reply letter and


and the scheduled scheduled a meeting
meeting
Administrative Aide
None 10 Minutes
BFAR-VOC

3. Attend the scheduled 3. Conducts consultative


consultative meeting and meeting with the client Center Chief;
receive draft of MOA / Administrative Aide;
MOU for comments/ Researchers;
revision None 4 Hours Vessel Captain
Representatives
Collaborating Agency or
Institution

455
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
3.1 Drafting of
Center Chief;
Memorandum of
Administrative Aide;
Aggreement/
Researchers; Legal
None Understanding None 3 Days
Officer
BFAR-VOC Legal
Section
4. Submission of final 4. Accept, review and
Memorandum of finalize Memorandum of
Center Chief; BFAR
Aggreement/ Aggreement/
None 1 Day Director BFAR
Understanding Understanding
MFD&VOC

5. Accept/ Agree on the 5. Signing of Memorandum


signed MOA/MOU of Aggreement/
BFAR Director; Head of
Understanding on the part
Collaborating Agency;
of the government None 2 Hours
Chief Scientist
BFAR MFD&VOC

5.1 Preparation of Sailing


Orders, Vessel availability,
logistical requirements,
Administrative Aide;
provisioning, rewatering.
Vessel Officers;
None None 3 Days
Researchers BFAR-
VOC

6. Receive notification on 6. Notify client on the


the scheduled scheduled embarkation
Administrative Aide;
embarkation
Vessel Officers;
None 5 Minutes
Researchers BFAR-
VOC

7. Loading of research 7. Briefing/ Orientation for


equipment/materials and the accommodation, house
embarkation of rules, vessel departure at
researchers/scientist port and scientific briefing Vessel Officers;
None 1 Day Researchers M/V
DA-BFAR

8. Collection of scientific 8. Assists/ Accompany in


data/samples the collection of scientific
data/samples
Onboard Researchers;
None 15 Days M/V Crew
DA-BFAR

456
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
9. Arrival at port area and 9. Arrival at port area,
preparation for disembarkation of
disembarkation and researchers/scientist and Onboard Researchers;
unloading of research unloading of research None 1 Day M/V Crew
equipment/materials equipment/ materials and DA-BFAR
samples

9.1 Preparation and


submission of travel Vessel Administrative
report/cruise report Assistant; Captain
None None 3 Days
DA-BFAR and
Collaborating Agency

9.2 Processing and


analysis of data/samples
BFAR Researchers
None None 3 Months
M/V DA-BFAR

10. Preparation of 10. Preparation of progress


progress report and final report on the part of BFAR.
technical payment as BFAR Researchers
None 20 Days
required by BFAR. M/V DA-BFAR

10.1 Finalization of
technical report
BFAR Researchers
None 20 Days
M/V DA-BFAR

11. Submission of 11. Receive Progress


BFAR Researchers,
Progress Report Report
None 15 Minutes Collaborating Agency/
M/V DA-BFAR
12. Submission of Final 12. Receive Final Technical
Technical Report Report BFAR Researchers,
None 15 Minutes Collaborating Agenc/
M/V DA-BFAR

68 Days, 6 Hours 48
TOTAL:
Minutes

457
6. Request for the use of BFAR Vessels
The Vessels Operations Center (VOC) manages and operates the 2-units Multi-Mission Offshore vessels; 14 units of combined
30-meter and 11-meter Monitoring Control and Surveillance (MCS) Patrol Vessel and other small crafts deployed nationwide.
Due to limited numbers of vessels, other BFAR Regional Offices and other agencies requests for availability of vessels to de
deployed in their areas for a period of time.

BFAR - Marine Fisheries Development and Vessels Operation Center (NMFD&VOC) - Sangley
Office or Division
Point Cavite City

Classification Highly Technical

Type of Transaction G2C - Government to Citizen; G2G - Government to Government

1. Internal - BFAR Regional Offices, Centers and Central Office


Who may avail: 2. External - Other Government Agencies, Local Government Units (LGUs), Academe (Students,
Professors, Researchers)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Formal Letter Request Client/Requesting Party/ies

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submission of Formal 1. Receive Letter Request
Letter Request to the Administrative Aide VI
Office of the Director None 5 Minutes BFAR Director's
Office

1.2 Review request.


Prepare a reply letter and
schedule deployment if the Aquaculturist II
None request has been granted. None 30 Minutes Vessels Operations
Center (VOC) Section

2. Receive notification for 2. If request has been


the grant of request granted, notification to the
identified BFAR vessel
through the Commanding
VOC Center Chief;
Officer, the activities to be
None 15 Minutes Aquaculturist II
undertaken. Notify the
Vessels Operations
client and schedule sailing
Center (VOC) Section

2.1 Preparation of Voyage


Plan
Commanding Officer;
Crew of the Identified
None None 1 Hour Vessel
Vessel Operations
Center (VOC)

458
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

2.2 Preparation of the


sailing order approved by VOC Center Chief;
None the Director None 30 Minutes
Aquaculturist II
Operation Section
2.3 Preparation of logistical
requirements (water and Engineer IV;
None fuel) None 2 Days Administratvie Aide III
VOC - Logistics Section

2.4 Coordination with BFAR


Regional FPLEG personnel
to board the vessel during
Monitoring Control and Aquaculturist II
None None 15 Minutes
Surveilance (MCS) VOC - Operation Section
activities.

2.5 Provide a copy of


approved Sailing Order to
Aquaculturist II
None respective vessel None 5 Minutes
VOC - Operation Section

3. Receive notification on 3. Notify the client on the


the schedule of sailing schedule of sailing
and coordinate with the
deployment procedures Aquaculturist II
None 5 Minutes
VOC - Operation Section

4. Proceed to Areas of 4. Deployment of the vessel


Deployment and to Areas of Responsibility
Coordinate with (AOR). Aquaculturist II VOC -
None 20 Days
Respective BFAR Operation Section
Regional Office

22 Days, 2 Hours, 45
TOTAL:
Minutes

459
7. Specialized Training as Requested by Clients
The BFAR- Marine Fisheries Development & Vessels Operation Center also conducts other specialized training programs as
requested by the interested clientele. These may either be a live-in training or on-site training as the case maybe. The duration
of the training will depend on its nature and the expected output.

BFAR - Marine Fisheries Development and Vessels Operation Center (NMFD&VOC) - Sangley
Office or Division Point Cavite City

Classification Highly Technical


G2C - Government to Citizen; G2G - Government to Government; G2B - Government to Business
Type of Transaction Entity

1. Internal - BFAR Regional Offices and Centers, Provincial Fisheries Offices, Regional Fishery
Officers
2. External - Academe (students, professors, researchers)
Who may avail Other government agencies (Non- Government Organization (NGOs), Local Government Units
(LGUs), Private Institutions; Fisherfolk organization/association. Women’s associations, Housewives,
Senior Citizens, Indigenous People

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter Request Client/Requesting Party/ies

2. Accomplished Evaluation form BFAR-NMFDC Training Section

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit Letter Request 1. Receive Letter Request
and evaluate request Head of Training Section
None 5 Minutes
MFD&VOC

1.1 Prepare Schedule of


training Head of Training Section
None None 5 Minutes
MFD&VOC

2. Accept notification and 2. Notify client,


confirmed attendance on stakeholders/ trainees on Center, Chief/ Head,
scheduled training the scheduled training None 30 Minutes Training Section
MFD&VOC

3. Attend/ Participate 3. Conduct training and


actively on the training facilitate/ supervise
Head of Training Section
conducted activities None 35 Days
MFD&VOC

4. Fill-out training 4. Receive accomplished


Evaluation Form training Evaluation Form Head of Training Section
None 5 Minutes
MFD&VOC

5. Receive signed 5. Issue an approved and


Certificate of Training signed Certificate of Center, Chief
None 2 Minutes
Training MFD&VOC

TOTAL: None 35 Days, 47 Minutes

460
8. Technical Assistance for On-Site Visit / Inspection
The BFAR- Marine Fisheries Development & Vessels Operation Center, provides technical assistance to various on-site clients
to cater the needs in the field of marine/capture fisheries and marine engineering such as; fishing technology, navigation and
seamanship, marine engineering, fisheries management, fiberglass boat construction and maintenance etc.

BFAR - Marine Fisheries Development and Vessels Operation Center (NMFD&VOC) - Sangley
Office or Division
Point Cavite City

Classification Complex

G2C - Government to Citizen; G2B - Government to Business Entity; G2G - Government to


Type of Transaction Government
1. Internal - BFAR Regional Offices and Centers
2. External - Academe (students, professors, researchers)
Who may avail
Other government agencies (Non- Government Organizations (NGOs), Local Government Units
(LGUs), Private Institutions; Fisherfolk organization/association

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter Request Form Client/Requesting Party/ies

2. Feedback Evaluation Form BFAR-MFD&VOC

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit Letter Request 1. Receive and record the
to the Director’s Office or Letter Request Liaison Officer
Center Chief None 5 Minutes MFD&VOC Directors
Office

1.1 Forward to the


responsible section/person
for appropriate action Liaison Officer
None None 5 Minutes
MFDC&VOC

1.2 Review/ Evaluate for


appropriate action
Administrative Assistant
None None 1 Hour
V
MFDC&VOC
2. Receive letter reply for 2. Prepare reply letter with
scheduled activity final schedule of activity Training Staff
None 3 Hours
MFDC&VOC

3. Actively participate in 3. Conduct Lecture/


the activity demonstration/ and Head; Instructor
supervise activities None 5 Days MFDC&VOC Training
Section

461
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

4. Accomplish Feedback/ 4. Provide and receive


Evaluation form and accomplished Feedback/
Receive Certificate Evaluation Form and Training Staff
None 1 Hour
Issue a Certificate MFDC&VOC

5 Days, 5 Hours, 15
TOTAL: None
Minutes

9. Technical Assistance for Walk-in Clients


The BFAR- Marine Fisheries Development & Vessels Operation Center, provides technical assistance to different walk-in
clients on various technology transfer and on the field of marine/capture fisheries and marine engineering such as; fishing
technology, navigation and seamanship, marine engineering, fisheries management, fiberglass boat construction and
maintenance etc.

BFAR - Marine Fisheries Development and Vessels Operation Center (NMFD&VOC) - Sangley
Office or Division Point Cavite City

Classification Simple

Type of Transaction G2C - Government to Citizen; G2B - Government to Business Entity


External - Academe (students, professors, researchers)
Who may avail Other government agencies (Non- Government Organizations (NGOs), Local Government Units
(LGUs), Private Institutions

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Client Inquiry Form BFAR-MFD&VOC

2. Client Feedback Form BFAR-MFD&VOC

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Accomplish Client 1. Receive the Administrative Assistant
Inquiry form accomplished Client Inquiry None 5 Minutes V
Form MFD&VOC
1.1 Endorse to appropriate
staff and render needed Center Chief
None assistance / information None 5 Minutes
MFD&VOC

2. Discuss 2. Render the appropriate


inquiry/concerns technical assistance Technical Staff
None 2 Hours
MFD&VOC

3. Fill-out Client 3. Receive the Admin Asst. V


Feedback Form accomplished Client None 5 Minutes MFD&VOC
Feedback Form

TOTAL: 2 Hours, 15 Minutes

462
10. Training Assistance for Regular Training
The BFAR- Marine Fisheries Development & Vessels Operation Center, is task to conduct various marine fisheries technology
training, navigation and seamanship and livelihood and development programs to develop, hasten and upgrade technical skills
and competencies of prospective clientele from BFAR Regional Offices, Local Government Units, Fishery Schools/Colleges
Universities, Private Fishing Companies, Fishing Associations, FARMCs and other Fishery Organizations.

BFAR - Marine Fisheries Development and Vessels Operation Center (NMFD&VOC) - Sangley
Office or Division Point Cavite City

Classification Highly Technical

G2C - Government to Citizen; G2G - Government to Government; G2B - Government to Business


Type of Transaction
Entity
1. Internal - BFAR Regional Offices and Centers, Provincial Fisheries Offices, Regional Fishery
Officers

Who may avail 2. External - Academe (students, professors, researchers) Women’s associations, Housewives,
Senior Citizens, Indigenous People Other government agencies (Non- Government Organizations
(NGOs), Local Government Units (LGUs), Private Institutions; Fisherfolk Organization/Association

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Nomination Letter BFAR-MFD&VOC

2. Participant Profile Form BFAR-MFD&VOC

3. Training Evaluation Form BFAR-MFD&VOC

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Receive Nomination 1. Send invitation/
Letter Nomination Letter Center Chief
None 5 Minutes
MFD&VOC

2. Receive approved 2. Confirmation of


confirmation letter. attendance of the
Confirmed trainees trainees/client via email or Center Chief
attendance via email or phone call None 5 Minutes
MFD&VOC
phone call

3. Provide list of 3. Advice participants to


participants and comply comply Naval Base Entry
with clearance on the Clearance/ Requesting
Naval Base requirements None 1 Day Office/Regions/ Training
Section

4. Fill out Participants 4. Provide Participants


Profile/ information Profile Form to be filled out
by the client/ participants Head, Training Section
None 2 Minutes
MFD&VOC

463
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
5. Attend/ Participate 5. Conduct training.
actively on the training Supervise/ Facilitate the
Head; Instructors
conducted activities
None 35 Days BFAR- MFD&VOC
Training Section

6. Fill-out training 6. Receive accomplished


Evaluation Form training Evaluation Form Training Staff
None 5 Minutes
MFD&VOC

7. Receive signed 7. Issue an approved and


Certificate of Training signed Certificate of Center, Chief
Training None 2 Minutes
MFD&VOC

TOTAL: None 35 Days, 19 Minutes

464
FEEDBACK AND COMPLAINTS MECHANISMS

A feedback form is prepared and handed to the clientele. The form(s) can be sent to the concerned
office either thru mails or submitted directly to the assigned staff

Feedbacks are also obtained during the conduct of monitoring and evaluation of programs and
How to send a feedback
trainings implemented;

Feedbacks can also be sent via text messages at numbers provided by the office

The collected feedback forms from the clientele are evaluated by this office. If the feedback is
deemed urgent or if it concerns the improvement on the effective and timely delivey of the services of
this office, immediate action is take
How feedback is
processed If the feedback concerns an individual or personnel of this office, commendation is given to that staff
if the feedback is positive and admonishment if the feedback is negative or undesirable. A
memorandum shall be issued against the concerned personnel or staff who warranted a negative
feedback.

A formal complaint is filed using a complaint form issued upon request by the agrieved party

How to file a complaint


The complaint form is placed in a locked "drop box". The said drop box is only opened on mondays
during the Offices General Assembly

Once the complaints has been reviewed, the officer in charge will summon those who are concerned
and conduct an investigation. Depending on the gravity of the offense(s), a verbal warning will be
How complaints are
dispensed on the first offense, a suspension on the second offense and recommendation for
processed
termination in the third offense. If the complaint concerns the operation or the delivery of services of
the office, immediate action shall be taken to address and correct the said issue(s) or complaints.

operations.mcsvessels2@gmail.com

Pierre Easter L. Velasco


National Focal Person, F/B Pagbabago LDP
dabfar.fbpagbabago@gmail.com
O9998847632

LIST OF OFFICE

OFFICE ADDRESS CONTACT PERSON

BFAR-NMFDC, FRP Training Facility and


Pierre Easter L. Velasco
BFAR-NMFDC MCS Station and Fishing Technology
09998847632
Laboratory, Navotas City

465
II. National Brackishwater Fisheries Technology Center (NBFTC) - Pagbilao, Quezon

A. Fisheries Production And Distribution

1. Distribution of Fish Seed (Milkfish fingerling) For Free

Distribution of milkfish fingerlings for aquaculture production intended for aquaculture livelihood project of fisherfolk and other
organizations for free of charge.

Office or Division BFAR - National Brackishwater Fisheries Technology Center (NBFTC) - Pagbilao, Quezon

Classification Simple

Type of Transaction G2C- Government to Citizen; G2G - Government to Government; G2B - Government to Business

1. Internal - Provincial Fishing Offices, Regional Fishery Officers, BFAR Central Office Personnel,
and other BFAR Centers Personnel

2. External - Private Fish Farmers/Fishpond Operators, Fisherfolk Organizations/ Associations/


Who may avail: People’s Organizations/ Cooperatives/ Women’s Associations, Senior Citizens, Indigenous People,
and Out of School Youth, Academe (Students, Professors, Research)
Other Government Agencies: (National Government Agencies (NGAs), Local Government Units
(LGUs), House of Representatives)
Non-Government Organizations (NGOs)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter request Client/ Requesting Party

2. Client Request Form (Individual) Client/ Requesting Party


3. Letter request and list of beneficiaries (Group)
Client/ Requesting Party

4. Sketch Map or Farm Lay-out Client/ Requesting Party

5. Client Satisfaction Form BFAR-NBFTC

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit Letter Request 1. Receive Letter Request
with requirements or with requirements or
accomplish Client accomplished Client
Request Form Request Form and process Administrative Assistant
request None 30 Minutes IV Administrative
Section

466
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

1.1 Approval of Center


Chief on the request
Center Chief
None 15 Minutes
Office of the Chief

1.2 Schedule the


distribution and notify client
on the scheduled of Aquaculturist II Technical
None 5 Minutes
distribution Section

2. Receive notification on 2. Notify client on the


the scheduled distribution scheduled distribution of
Fish Seed Aquaculturist II Technical
None 5 Minutes
Section

3. Receive fish seed 3. Actual distribution


(milkfish fingerlings) (loading and packing)
Farm Worker Technical
None 1 Hour
Section

4. Fill-out Client 4. Receive accomplished


Satisfaction Form Client Satisfaction Form
Administrative Officer IV
None 5 Minutes
Administrative Section

TOTAL: None 1 Hour, 55 Minutes

467
B. Provision of Extension Support, Education and Training Services
1. Technical Assistance for Distribution of Information, Education and Communication Materials

Provision of advisory services thru the distribution of IEC reading materials on brackishwater technologies such as
Aquasilviculture for crab culture and fattening, Marine Finfish cage culture, Soft shell crab production, Polyculture method
(Milkfish, Siganid, Grouper and Mangrove crab), Milkfish fry nursery management and other related technologies.

Office or Division BFAR - National Brackishwater Fisheries Technology Center (NBFTC) - Pagbilao, Quezon

Classification Simple
G2C- Government to Citizen; G2G - Government to Government; G2B - Government to Business
Type of Transaction Entity
INTERNAL - Provincial Fishing Offices, Regional Fishery Officers, BFAR Central Office Personnel,
and other BFAR Centers Personnel.
EXTERNAL - Private Fish Farmers/Fishpond Operators, Fisherfolk Organizations/ Associations/
People’s Organizations/ Cooperatives/ Women’s Associations, Senior Citizens, Indigenous People,
Who may avail: and Out of School Youth, Academe (Students, Professors, Research)
Other Government Agencies: (National Government Agencies (NGAs), Local Government Units
(LGUs), House of Representatives)
Non-Government Organizations (NGOs)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter Request BFAR-NBFTC, Pagbilao, Quezon

2. Client Request Form for Information, Education and


BFAR-NBFTC, Pagbilao, Quezon
Communication (IEC) materials

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit Letter Request 1. Receive Letter Request
or accomplish Client or accomplished Client
Request Form for IEC Request Form Administrative Officer IV
None 5 Minutes
materials Administrative Section

2. Receive IEC materials 2. Provide the IEC


materials Administrative Officer IV
needed/requested None 5 Minutes
Administrative Section

TOTAL: None 10 Minutes

468
2. Technical Assistance for Regular Training

Office or Division BFAR - National Brackishwater Fisheries Technology Center (NBFTC) - Pagbilao, Quezon

Classification Complex

G2C- Government to Client; G2G - Government to Government; G2B - Government to Business


Type of Transaction
Entity
1. Internal - Provincial Fishing Offices, Regional Fishery Officers, BFAR Central Office Personnel,
and other BFAR Centers Personnel

2. External - Private Fish Farmers/Fishpond Operators, Fisherfolk Organizations/ Associations/


People’s Organizations/ Cooperatives/ Women’s Associations, Senior Citizens, Indigenous People,
Who may avail: and Out of School Youth, Academe (Students, Professors, Research)
Other Government Agencies: (National Government Agencies (NGAs), Local Government Units
(LGUs), House of Representatives)
Non-Government Organizations (NGOs)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Invitation Letter BFAR-NBFTC, Pagbilao, Quezon

2. Personal Information Sheet BFAR-NBFTC, Pagbilao, Quezon

3. Fill-out Training Evaluation Form BFAR-NBFTC, Pagbilao, Quezon

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Receive invitation 1. Send invitation letter for
letter the Regular trainings Administrative Assistant
conducted None 5 Minutes IV Administrative
Section

2. Receive training 2. Schedule training and


schedule and confirmed notify the client about the
Aquaculturist I/
attendance schedule of training and
Aquaculturist II/ Senior
ask confirmation of None 5 Minutes
attendance Aquaculturist Training
Section

3. Attend training 3. Conduct/ Facilitate


training Aquaculturist I/
Aquaculturist II/ Senior
None 6 Days
Aquaculturist Training
Section

4. Fill-out Training 4. Receive accomplished


Evaluation Form Training Evaluation Form
Administrative Officer IV
None 5 Minutes
Administrative Section

469
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
5. Receive signed 5. Issue an approved and
Certificate of Training signed Certificate of Center Chief
Training None 2 Minutes
Office of the Center Chief

TOTAL: None 6 Days, 17 Minutes

Provision of training on Brackishwater Technologies are as follows:

1. Soft shell crab production and management


2. Aquasilviculture emphasis on crab culture and fattening
3. Milkfish fry nursery management
4. Marine finfish cage culture and management
5. Brackishwater aquaculture emphasis on polyculture method
6. Brackishwater fishpond engineering and construction
7. Fisheries extension and leadership development

470
3. Technical Assistance for Walk-in Clients

Provision of advisory services on brackishwater technologies such as Aquasilviculture for crab culture and fattening, Marine
Finfish cage culture, Soft shell crab production, Polyculture method (Milkfish, Siganid, Grouper and Mangrove crab), Milkfish fry
nursery management and other related technologies.

Office or Division BFAR - National Brackishwater Fisheries Technology Center (NBFTC) - Pagbilao, Quezon

Classification Simple

Type of Transaction G2C- Government to Citizen; G2G- Government to Government

1. Internal - Provincial Fishing Offices, Regional Fishery Officers, BFAR Central Office Personnel,
and other BFAR Centers Personnel.
2. External - Private Fish Farmers/Fishpond Operators, Fisherfolk Organizations/ Associations/
People’s Organizations/ Cooperatives/ Women’s Associations, Senior Citizens, Indigenous People,
Who may avail: and Out of School Youth, Academe (Students, Professors, Research)
Other Government Agencies: (National Government Agency (NGA), Local Government Units
(LGUs), House of Representatives)
Non-Government Organizations (NGOs)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Client Request Form BFAR-NBFTC - Pagbilao, Quezon

2. Client Feedback Form BFAR-NBFTC - Pagbilao, Quezon

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Sign Client logbook 1. Give logbook to client
Accomplish Client receive the accomplished Administrative Assistant
Request Form Client Request Form None 5 Minutes IV Administrative
Section/Lobby

1.1 Endorse to appropriate


staff and provide needed
Aquaculturist I Technical
assistance/ information None 5 Minutes
Section

2. Discuss 2. Render the appropriate


inquiry/concerns technical assistance Aquaculturist I;
Aquaculturist II; Senior
None 2 Hours
Aquaculturist Technical
Section
3. Fill-out Client 3.Receive the
Feedback Form accomplished Client
Administrative Officer IV
Feedback Form None 5 Minutes
Administrative Section

TOTAL: None 2 Hours, 15 Minutes

471
4. Technical Assistance On-site Visit / Inspection
Provision of advisory services on brackishwater technologies to clients who wish to invite technical staff to visit their project on-
site re: Site selection/preliminary survey, pond development/ improvement, fishfarm lay-out and design, fishfarm rehabilitation
management and others.
BFAR - National Brackishwater Fisheries Technology Center (NBFTC) - Pagbilao, Quezon
Office or Division

Classification Simple

G2C- Government to Citizen; G2G - Government to Government; G2B - Government to


Type of Transaction Business Entity
1. (Internal) Provincial Fishing Offices, Regional Fishery Officers, BFAR Central Office Personnel,
and other BFAR Centers Personnel.

2. (External) Private Fish Farmers/Fishpond Operators, Fisherfolk Organizations/ Associations/


People’s Organizations/ Cooperatives/ Women’s Associations, Senior Citizens, Indigenous People,
Who may avail: and Out of School Youth, Academe (Students, Professors, Research)
Other Government Agencies: (National Government Agencies (NGAs), Local Government Units
(LGUs), House of Representatives)
Non-Government Organizations (NGOs)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter Request BFAR-NBFTC - Pagbilao, Quezon

2. Client Request Form BFAR-NBFTC - Pagbilao, Quezon

3. Client Satisfaction Form BFAR-NBFTC - Pagbilao, Quezon

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1.Submit Letter Request 1. Receive Letter Request
or accomplish Client or accomplished Client Administrative Assistant
Request Form Request Form None 5 Minutes IV Administrative
Section

1.1 Forward to the Center


Chief for appropriate
action. To assign technical
Administrative Assistant
staff and render technical
None None 5 Minutes IV Administrative
assistance
Section

1.2 Assign technical staff to


render technical assistance
Center Chief
None None 5 Minutes BFAR-NBFTC
Office of the Center Chief

472
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

2. Receive notification on 2. Schedule site Aquaculturist I;


the schedule of On-site visit/inspection and notify
Aquaculturist II; Senior
visit/inspection. clients on the None 5 Minutes
Aquaculturist Technical
visit/inspection
Section
3. Allow to conduct site 3. Conduct actual site visit/
visit/ inspections inspection/ sampling Aquaculturist I;
Aquaculturist II; Senior
None 1 Day
Aquaculturist Technical
Section

3.1 Prepare report of Aquaculturist I;


inspection and its Aquaculturist II; Senior
None None 1 Hour
recommendation Aquaculturist Technical
Section
4. Receive inspection 4. Release inspection Aquaculturist I;
report and its report and its Aquaculturist II; Senior
recommendation recommendation None 5 Minutes
Aquaculturist Technical
Section
5. Accomplish Client 5. Receive accomplished
Satisfaction Form Client Satisfaction Form
Administrative Officer IV
None 5 Minutes
Administrative Section

TOTAL: None 1 Day, 1 Hour, 30 Minutes

473
5. Technical Assistance thru Social Media (E-mail, Facebook, Messenger and Text)

Provision of advisory services on brackishwater technologies such as Aquasilviculture for crab culture and fattening, Marine
Finfish cage culture, Soft shell crab production, Polyculture method (Milkfish, Siganid, Grouper and Mangrove crab), Milkfish fry
nursery management and other related technologies for thru clients who inquire e-mail, facebook, messenger and text).

Office or Division BFAR - National Brackishwater Fisheries Technology Center (NBFTC) - Pagbilao, Quezon

Classification Simple
G2C- Government to Citizen; G2G - Government to Government; G2B - Government to
Type of Transaction Business Entity

1. Internal - Provincial Fishing Offices, Regional Fishery Officers, BFAR Central Office Personnel,
and other BFAR Centers Personnel.
2. External - Private Fish Farmers/Fishpond Operators, Fisherfolk Organizations/ Associations/
People’s Organizations/ Cooperatives/ Women’s Associations, Senior Citizens, Indigenous People,
Who may avail: and Out of School Youth, Academe (Students, Professors, Research)
Other Government Agencies: (National Government Agency (NGA), Local Government Units
(LGUs), House of Representatives)
Non-Government Organizations (NGOs)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Email, SMS BFAR-NBFTC - Pagbilao, Quezon

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Send messages 1. Receive and reply to E-
through E-mail, SMS, mail, SMS, other types of
other types of message message channel thru Aquaculturist I;
channel thru Social Social Media Aquaculturist II; Senior
None 5 Minutes
Media Aquaculturist Technical
Section

TOTAL: None 5 Minutes

474
6. Technical Assistance thru Telephone Inquiry

Provision of advisory services on brackishwater technologies such as Aquasilviculture for crab culture and fattening, Marine
Finfish cage culture, Soft shell crab production, Polyculture method (Milkfish, Siganid, Grouper and Mangrove crab), Milkfish fry
nursery management and other related technologies for clients who inquire thru phone call.

Office or Division BFAR - National Brackishwater Fisheries Technology Center (NBFTC) - Pagbilao, Quezon

Classification Simple
G2C- Government to Citizen; G2G - Government to Government; G2B - Government to Business
Type of Transaction Entity

1. Internal - Provincial Fishing Offices, Regional Fishery Officers, BFAR Central Office Personnel,
and other BFAR Centers Personnel.
2. External - Private Fish Farmers/Fishpond Operators, Fisherfolk Organizations/ Associations/
People’s Organizations/ Cooperatives/ Women’s Associations, Senior Citizens, Indigenous People,
Who may avail: and Out of School Youth, Academe (Students, Professors, Research)
Other Government Agencies: (National Government Agency (NGA), Local Government Units
(LGUs), House of Representatives)
Non-Government Organizations (NGOs)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Phone Call BFAR-NBFTC - Pagbilao, Quezon

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Telephone call for 1. Answer/ Attend to
inquiry/concern telephone call and ask for Aquaculturist I;
necessary information to be Aquaculturist II; Senior
None 5 Minutes
written in the inquiry form Aquaculturist Technical
Section

2. Discuss inquiry 2. Provide needed


concerns information or refer to Aquaculturist I;
concern technical staff Aquaculturist II; Senior
None 30 Minutes
Aquaculturist Technical
Section

TOTAL: None 35 Minutes

475
7. Training Assistance as Requested by Clients
Provision of advisory services on brackishwater technologies as requested by clients (NBFTC staff serve as lecturer/resource
speakers)

Office or Division BFAR - National Brackishwater Fisheries Technology Center (NBFTC) - Pagbilao, Quezon

Classification Complex

G2C- Government to Citizen; G2G - Government to Government; G2B - Government to


Type of Transaction Business Entity

1. Internal - Provincial Fishing Offices, Regional Fishery Officers, BFAR Central Office Personnel,
and other BFAR Centers Personnel.

2. External - Private Fish Farmers/Fishpond Operators, Fisherfolk Organizations/ Associations/


People’s Organizations/ Cooperatives/ Women’s Associations, Senior Citizens, Indigenous People,
Who may avail: and Out of School Youth, Academe (Students, Professors, Research)
Other Government Agencies (National Government Agencies (NGAs), Local Government Units
(LGUs), House of Representatives)
Non-Government Organizations (NGOs)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter Request Client/ Requesting Party/ies

2. Client Request Form BFAR-NBFTC - Pagbilao, Quezon

3. Training Evaluation Form BFAR-NBFTC - Pagbilao, Quezon

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit Letter Request 1. Receive letter request or
or accomplish Client accomplished Client Administrative Assistant
Request Form Request Form None 5 Minutes IV Administrative
Section

1.1 Schedule requested


training Aquaculturist I;
Aquaculturist II; Senior
None None 5 Minutes
Aquaculturist Training
Section

2. Receive training 2. Notify client, trainees and


schedule and confirmed stakeholders for the training Aquaculturist I;
attendance to the training schedule and ask Aquaculturist II; Senior
confirmation of attendance None 30 Minutes
Aquaculturist Training
Section

3. Attend appropriate 3. Conduct/ Facilitate


training training Aquaculturist I;
Aquaculturist II; Senior
None 5 Days
Aquaculturist Training
Section

476
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
4. Accomplish training 4. Receive accomplished
Evaluation Form training Evaluation Form
Administrative Officer IV
None 5 Minutes
Administrative Section

5. Receive signed 5. Issue an approved and


Certificate of training signed Certificate of
training Center Chief
None 2 Minutes
Office of the Center Chief

TOTAL: None 5 Days, 47 Minutes

477
8. Training Assistance (On-the-Job Trainee Students)

Provision of training on brackishwater technologies to OJT students. The student undergo fieldwork on actual on-site technology
demonstration projects implemented at the center.

Office or Division BFAR - National Brackishwater Fisheries Technology Center (NBFTC) - Pagbilao, Quezon

Classification Highly Technical

Type of Transaction G2C- Government to Citizen

Who may avail: External - On-the-Training Students, Fish farmers

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter request School/University/College (SUC)

2. Memorandum of Agreement (MOA) School/University/College (SUC)

3. Waiver BFAR-NBFTC - Pagbilao, Quezon

4. Accomplished Evaluation Form BFAR-NBFTC - Pagbilao, Quezon

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit letter request 1. Receive letter request
with requirements with its requirements Administrative Assistant
None 5 Minutes IV Administrative
Section

2. Report for On-the-Job 2. Conduct client's initial


training briefing/interview interview/ briefing of
Aquaculturist I Training
trainees None 5 Minutes
Section

3. Attend On-the-Job 3. Conduct orientation and


Orientation and sign ask to sign Waiver Aquaculturist I Training
None 30 Minutes
Waiver Section

4. Attend On-the-Job 4. Conduct/ Facilitate Aquaculturist I;


training training Aquaculturist II;
None 20 Days
Senior Aquaculturist
Training Section
5. Fill-out evaluation form 5. Receive accomplished
after completion of On- Evaluation Form upon
Administrative Officer IV
the- Job Training completion of training None 5 Minutes
Administrative Section

6. Receive signed 6. Issue an approved and


Certificate of Training signed Certificate of Center Chief
Training None 5 Minutes
Office of the Center Chief

TOTAL: None 20 Days, 50 Minutes

478
FEEDBACK AND COMPLAINTS MECHANISMS

Answer the client feedback form and drop it at the designated drop box in front of the Administrative
section
How to send a feedback
bfarnbftc@gmail.com

Every Friday the Administrative Assistant IV opens the drop box, compiles and records all feedback
submitted.

Feedback requiring answers are forwarded to the relevant sections and they are required to answer
within three (3) days upon the receipt of the feedback.
How feedback is
processed
The answer of the NBFTC center is then relayed to the client

bfarnbftc@gmail.com

Answer the Client Complaint Form and drop it at the designated drop box in front of the
Administrative section.
Complaints can also be filed via email address. Make sure to provide the following information:

Name of person being complained


How to file a complaint
Incident

Evidence

bfarnbftc@gmail.com

The Administrative Assistant IV opens the complaints drop box every Friday and evaluates each
complaint.

Upon evaluation, the Administrative Officer IV shall start the investigation and forward the complaint
to the relevant section for their explanation.

How complaints are The Administrative Officer IV will create a report after the investigation and shall submit it to the
processed Center Chief for appropriate action.

The Administrative Assistant IV will give the feedback to the client.

bfarnbftc@gmail.com

Contact Information of
bfarnbftc@gmail.com
NBFTC Pagbilao

479
LIST OF OFFICE

Office Address Contact Information

BFAR- National
Sitio Iringan, Brgy. Palsabangon, Pagbilao,
Brackishwater Fisheries bfarnbftc@gmail.com
Quezon
Technology Center

Sitio Iringan, Brgy. Palsabangon, Pagbilao,


Administrative Section 0918 230 9425
Quezon
Sitio Iringan, Brgy. Palsabangon, Pagbilao,
Technical Section 0909 332 9933
Quezon

Sitio Iringan, Brgy. Palsabangon, Pagbilao,


Training Section 0917 480 6050
Quezon

Sitio Iringan, Brgy. Palsabangon, Pagbilao,


Office of OIC 0908 892 8442
Quezon

480
III. National Freshwater Fisheries Technology Center (NFFTC) - Muñoz, Nueva Ecija

A. Extension Support, Education and Training Services

1. Technical Assistance for Distribution of Information, Education and Communication (IEC)


Materials

Technical assistance for distribution of IEC materials is a service to client who wants to avail copies of IEC materials. The client
will simply fill out IEC inquiry form and submit it to Front desk Officer. The IEC materials requested will be given free of charge
to the client.

BFAR-National Freshwater Fisheries Technology Center (BFAR-NFFTC) - Muñoz, Nueva Ecija


Office or Division

Classification Simple

G2C- Government to Client; G2B Government to Business; G2G- Government to Government


Type of Transaction

1. Internal - BFAR Regional Offices, Provincial Fishery Offices (PFOs), BFAR Central Office
Personnel and other BFAR National Centers
2. External - Academe (Students, Professors, On-the-Job Trainees, Researches); Operators and
Who may avail: Potential Operators (Fishpond/Fish Cage); Fisherfolk Organizations/Asssociations/People’s
Organization/Cooperatives; Other Government Agencies; National Government Agencies (NGAs);
Local Government Units(LGUs); Senior Citizens; Indigenous People

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. IEC Inquiry Form Aquaculture Advisory Training and Information (AATIS) Office

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Accomplish 1. Receive the
Information, Education accomplished Information,
and Communication Education and Senior Aquaculturist
(IEC) Inquiry Form Communication (IEC) None 5 Minutes
AATIS Office
Inquiry Form

2. Receive Information, 2. Provide Information,


Education and Education and
Communication (IEC) Communication (IEC) Senior Aquaculturist
None 2 Minutes
materials materials AATIS Office

TOTAL: None 7 Minutes

481
2. Technical Assistance for Regular Training

Training assistance (regular) is a service to client invited by the Center for attendance in a scheduled training program of the
Center. Invitation is sent by the training staff/facilitator to Regional offices/Local government Unit/private individual or group. The
client received and confirmed their attendance on a scheduled date. The Training methodologies are; lectures, demonstrations,
practicum, field visit and discussions. Conduct of trainings are one of the targeted activities of the Center. After each training
period, participants are asked to fill out training Evaluation form. Certificate of Training are issued to participants.

Office or Division BFAR-National Freshwater Fisheries Technology Center (BFAR-NFFTC) - Muñoz, Nueva Ecija

Classification Complex
G2C- Government to Client; G2B Government to Business; G2G- Government to Government
Type of Transaction

1. Internal - BFAR Regional Offices, Provincial Fishery Offices (PFOs), BFAR Central Office
Personnel and other BFAR National Centers

2. External - Academe (Students, Professors, On-the-Job Trainees, Researches); Operators and


Who may avail: Potential Operators (Fishpond/Fish Cage); Fisherfolk Organizations/Asssociations/People’s
Organization/Cooperatives; Other Government Agencies; National Government Agencies (NGAs);
Local Government Units(LGUs); Senior Citizens; Indigenous People

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Request Form Aquaculture Advisory Training & Information (AATIS) Office

2. Invitation Letter Aquaculture Advisory Training & Information (AATIS) Office

3. Personal Information Sheet Aquaculture Advisory Training & Information (AATIS) Office

4. Training Evaluation Form Aquaculture AdvisoryTraining &Information (AATIS) Office

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Receive Invitation 1. Send Invitation Letter or
Letter or accomplish receive accomplished
Request Form and Request Form and
Personal Information Personal Information Sheet Administrative Assistant
None 5 Minutes
Sheet AATIS Office

2. Receive training 2. Send training schedule


schedule and confirmed and receive confirmation of
attendance attendance from client
Administrative Assistant
None 5 Minutes
AATIS Office

482
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
3. Attend proper training 3. Conduct/ Facilitate
training Head, Training Section
None 6 Days Training assistant
AATIS Office

4. Accomplish Training 4. Distribute and Receive Administrative Assistant


Evaluation Form accomplished Training AATIS Office
Evaluation Form None 15 Minutes

5. Receive Certificate of 5. Issue an approved and Center Chief,


Training signed Certificate of Head, Training Section
Training None 2 Minutes BFAR- NFFTC

TOTAL: None 6 Days, 17 Minutes

483
3. Technical Assistance for Walk-in Clients

Technical assistance to walk-in client is a service to client who personally visited the Center to ask for a technical assistance
regarding his/her aquaculture project. The NFFTC technical staff provide the technical assistance needed by the client. The
service rendered depends on the subject matter requested by the client.
BFAR-National Freshwater Fisheries Technology Center (BFAR-NFFTC) - Muñoz, Nueva Ecija
Office or Division

Classification Simple

Type of Transaction G2C- Government to Client; G2G- Government to Government; G2B - Government to Business

1. Internal - BFAR Regional Offices, Provincial Fishery Offices (PFOs), BFAR Central Office
Personnel and other BFAR National Centers

2. External - Academe (Students, Professors, On-the-Job Trainees, Researches); Operators and


Who may avail: Potential Operators (Fishpond/Fish Cage); Fisherfolk Organizations/Asssociations/People’s
Organization/Cooperatives; Other Government Agencies; National Government Agencies (NGAs);
Local Government Units(LGUs); Senior Citizens; Indigenous People

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Client Inquiry Form Malasakit Help Desk- Administrative Office

1. Accomplish Client 1. Receive the


Inquiry Form accomplished Client Inquiry Senior Aquaculturist
Form None 5 Minutes
Administrative Office

1.1 Endorse to appropriate


technical official/staff and
render needed technical Senior Aquaculturist
None assistance/ information None 5 Minutes
Administrative Office

2. Discuss 2. Render the appropriate


inquiry/concerns technical assistance Supervising
needed Aquaculturist;
None 2 Hours Senior Aquaculturists
Aquaculturist I, II
Administrative Office

TOTAL: None 2 Hours, 10 Minutes

484
4. Technical Assistance On-site Visit / Inspection
Technical assistance on-site is a service to client who requested to personally visit or inspect their project by the NFFTC
technical Staff. The request may be done thru phone call, send a letter request via postage mail or social media. Based on the
needs of the client, the Center Chief will assign technical staff who will provide the necessary technical assistance. The client
and technical staff will discuss and schedule the visit. A client feedback form will be given to the client for him to fill up after the
technical assistance.

Office or Division BFAR-National Freshwater Fisheries Technology Center (BFAR-NFFTC) - Muñoz, Nueva Ecija

Classification Simple

Type of Transaction G2C- Government to Client; G2B Government to Business; G2G- Government to Government

1. Internal - BFAR Regional Offices, Provincial Fishery Offices (PFOs), BFAR Central Office
Personnel and other BFAR National Centers

2. External - Academe (Students, Professors, On-the-Job Trainees, Researches); Operators and


Who may avail: Potential Operators (Fishpond/Fish Cage); Fisherfolk Organizations/Asssociations/People’s
Organization/Cooperatives; Other Government Agencies; National Government Agencies (NGAs);
Local Government Units(LGUs); Senior Citizens; Indigenous People

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Client Request Form Malasakit Help Desk- Admin Office

2. Letter Request Client/ Requesting Party/ies


FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit Letter Request 1. Receive Letter Request
or accomplish Client or accomplished Client
Senior Aquaculturist
Request Form Request Form None 5 Minutes
BFAR- NFFTC

1.1. Forward request/


document to the Center Senior Aquaculturist
None Chief for appropriate action None 5 Minutes
BFAR- NFFTC

1.2. Assign technical staff


to assist the client Center Chief
None None 5 Minutes
BFAR- NFFTC

2. Receive notification 2. Schedule site Supervising


and confirmed visit/inspection and notify Aquaculturist,
attendance for scheduled client on scheduled visit Senior Aquaculturists
visit None 5 Minutes
Aquaculturist II,
Aquaculturist I
BFAR- NFFTC
1.2. Assign technical staff Center Chief
to assist the client BFAR- NFFTC
None None 5 Minutes

485
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

3.1. Prepare inspection Supervising


report and its Aquaculturist,
recommendation Senior Aquaculturists
None None 1 Hour
Aquaculturist II,
Aquaculturist I
BFAR- NFFTC
4. Receive inspection 4. Release inspection
Supervising
report and its report and its
Aquaculturist,
recommendation recommendation
Senior Aquaculturists
None 5 Minutes
Aquaculturist II,
Aquaculturist I
BFAR- NFFTC

TOTAL: 1 Day, 1 Hour, 25 Minutes

486
5. Technical Assistance thru Social Media (E-mail, Facebook, Messenger and Text)

Technical assistance thru Social media is a service to client who asked technical assistance via email, facebook, messenger
and text. The staff who directly received the inquiry by social media will immediately reply to the client regarding the assistance
needed.

BFAR-National Freshwater Fisheries Technology Center (BFAR-NFFTC) - Muñoz, Nueva Ecija


Office or Division

Classification Simple

Type of Transaction G2C- Government to Client; G2B Government to Business; G2G- Government to Government

1. Internal - BFAR Regonal Offices, Provincial Fishery Offices (PFOs), BFAR Central Office
Personnel and other BFAR National Centers

2. External - Academe (Students, Professors, On-the-Job Trainees, Researches); Operators and


Who may avail: Potential Operators (Fishpond/Fish Cage); Fisherfolk Organizations/Asssociations/People’s
Organization/Cooperatives; Other Government Agencies; National Government Agencies (NGAs);
Local Government Units(LGUs); Senior Citizens; Indigenous People

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Email, SMS BFAR- NFFTC Administrative Office

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Send messages 1. Receive and reply to E- Supervising
through E-mail, SMS, mail, SMS, other types of Aquaculturist,
other types of message message channel thru Senior Aquaculturists
channel thru Social Social Media None 5 Minutes Aquaculturist II,
Media Aquaculturist I
BFAR- NFFTC
Administrative Office

TOTAL: None 5 Minutes

487
6. Technical Assistance thru Telephone Inquiry

Technical assistance thru telephone inquiry is a service for client who inquire and ask for technical assistance thru telephone
call. The Front Desk Officer will answer the call and give technical assistance or information right away if he/she knows the
information being asked by the client. If the inquiry needs the service of a subject matter specialist, the call will be referred to
concerned technical staff to answer the inquiry of the client.

Office or Division BFAR-National Freshwater Fisheries Technology Center (BFAR-NFFTC) - Muñoz, Nueva Ecija

Classification Simple

Type of Transaction G2C- Government to Client; G2B Government to Business; G2G- Government to Government

1. Internal - BFAR Regional Offices, Provincial Fishery Offices (PFOs), BFAR Central Office
Personnel and other BFAR National Centers

2. External - Academe (Students, Professors, On-the-Job Trainees, Researches); Operators and


Who may avail: Potential Operators (Fishpond/Fish Cage); Fisherfolk Organizations/Asssociations/People’s
Organization/Cooperatives; Other Government Agencies; National Government Agencies (NGAs);
Local Government Units(LGUs); Senior Citizens; Indigenous People

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Phone Call BFAR- NFFTC, Administrative Office

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Telephone call 1. Answer telephone call
and ask for necessary
information to be written in Senior Aquaculturist
the inquiry form None 5 Minutes
BFAR- NFFTC
Administrative Office

2. Discuss 2. Provide needed


Supervising
inquiry/concerns information or refer to
Aquaculturist,
concern technical staff
Senior Aquaculturists
None 30 Minutes Aquaculturist II,
Aquaculturist I
BFAR-NFFTC
Administrative Office

TOTAL: None 35 Minutes

488
7. Training Assistance (On-the-Job Trainee Students)

Training assistance (OJT students) is a service to students who are interested to conduct their on-the-job training at the Center.
A letter request should be submitted by the Adviser/facilitator to the Training Staff. A Memorandum of Agreement between the
School and the Center is signed by the Center Chief and the respective School. The program of activities for the students is
prepared by the Training facilitator wherein the students have the chance to have experience on all programmed activities of the
Center.

Office or Division BFAR-National Freshwater Fisheries Technology Center (BFAR-NFFTC) - Muñoz, Nueva Ecija

Classification Highly Technical

G2C- Government to Client


Type of Transaction

Who may Avail? EXTERNAL - On-the-Job Training Students

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter Request Respective School (where student enrolled)


2. Memorandum of Agreement Respective School (where student enrolled)

3. Waiver Aquaculture Advisory Training and Information Section (AATIS) Office

4. Evaluation Form Aquaculture Advisory Training and Information Section (AATIS) Office

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit Letter Request 1. Receive Letter Request
Administrative Assistant
None 5 Minutes
AATIS Office

2. Report for On-the-Job 2. Accept trainees, conduct


Training initial interview initial interview and briefing Head, Training Section
None 5 Minutes
and briefing AATI S Office

3. Attend On-the-Job 3. Conduct orientation and


orientation and sign ask to sign the Waiver
Administrative Assistant
Waiver None 30 Minutes
AATIS Office

4. Attend On-the-Job 4. Conduct/ Facilitate OJT


Training training Head, Training Section
None 20 Days
AATIS Office

5. Accomplish Evaluation 5. Receive accomplished


Form after completion of Evaluation Form of On-the- Administrative Asssitant
On-the-Job Training Job Training None 5 Minutes
AATIS Office

6. Receive signed 6. Issue an approved and


Certificate of Training signed Certificate of Center Chief
Training None 2 Minutes Head, Training Section
BFAR- NFFTC

TOTAL: None 20 Days, 47 Minutes

489
8. Training Assistance as Requested by Clients

Training assistance as requested by client is a service to client requesting for a training. The client should send a letter request
or fill our client request form. Based on the subject matter requested, the training staff will prepare a course design and notify
the client of the schedule. Training duration is dependent on the needs of the client. Regular training duration is five days. After
the training the participants should fill out Training Evaluation form. Certificate is issued by the office after the training.

Office or Division BFAR-National Freshwater Fisheries Technology Center (BFAR-NFFTC) - Muñoz, Nueva Ecija

Classification Complex

Type of Transaction G2C- Government to Client; G2B Government to Business; G2G- Government to Government

1. Internal - BFAR Regonal Offices, Provincial Fishery Offices (PFOs), BFAR Central Office
Personnel and other BFAR National Centers

2. External - Academe (Students, Professors, On-the-Job Trainees, Researches); Operators and


Who may avail: Potential Operators (Fishpond/Fish Cage); Fisherfolk Organizations/Asssociations/People’s
Organization/Cooperatives; Other Government Agencies; National Government Agencies (NGAs);
Local Government Units(LGUs); Senior Citizens; Indigenous People

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter Request Form Client/ Requeting Party/ies

2. Client Request Form Aquaculture AdvisoryTraining & Information (AATIS) Office

3. Training Evaluation Form Aquaculture AdvisoryTraining & Information (AATIS) Office

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit Letter Request 1. Receive Letter Request
or accomplish Client or accomplished Client Administrative Assistant
Feedback Form Request Form None 5 Minutes
AATIS Office

1.1 Schedule training


requested
Head, Training Section
None None 5 Minutes
AATIS Office

2. Receive notification of 2. Notify client,


schedule of training and stakeholders, trainees for
confirmed attendance training schedule Administrative Assistant
None 30 Minutes
AATIS Office

490
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
3. Attend the training 3. Conduct/ Facilitate
training Head, Training Section
None 5 Days
AATIS Office

4. Accomplish Training 4. Receive accomplished


Evaluation Form Training Evaluation Form
Administrative Assistant
None 5 Minutes
BFAR- NFFTC

5. Receive signed 5. Issue an approved and


Certificate of Training signed Certificate of Center Chief,
Training None 2 Minutes Head, Training Section
BFAR- NFFTC

TOTAL: None 5 Days, 47 Minutes

491
B. Fisheries Production and Distribution

1. Distribution of Fish Seed (Fry, Fingerlings, Post-larvae) For Free


Distribution of Fish Seed (Fry, fingerlings and post larvae) for free is a service to individual or group requesting for fish
seedstock free of charge. The individual or group must submit letter request attached with pond layout/sketch map of the project
to be stocked. For group request, a list of beneficiaries is a requirement. Once the letter request is approved by the Center
Chief, schedule of distribution will be done. The client will be asked to fill out client request form and should also fill out client
feedback form after receiving the fry/fingerlings/post larvae.

BFAR-National Freshwater Fisheries Technology Center (BFAR-NFFTC) - Muñoz, Nueva Ecija


Office or Division

Classification Simple

Type of Transaction G2C- Government to Client; G2B Government to Business; G2G- Government to Government

1. Internal - BFAR Regonal Offices, Provincial Fishery Offices (PFOs), BFAR Central Office
Personnel and other BFAR National Centers
2. External - Academe (Students, Professors, On-the-Job Trainees, Researches); Operators and
Who may avail: Potential Operators (Fishpond/Fish Cage); Fisherfolk Organizations/Asssociations/People’s
Organization/Cooperatives; Other Government Agencies; National Government Agencies (NGAs);
Local Government Units(LGUs); Senior Citizens; Indigenous People

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter request and pond-layout (Individual) Client/ Requesting Party


2. Letter request, list of beneficiaries and pond-
layout/sketch map (Group) Client/ Requesting Party

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit Letter Request 1. Receive Letter Request
with attachments or with attachments or
accomplish Client accomplished Client
Request Form Request Form and process Senior Aquaculturist
None 10 Minutes
the request for approval BFAR- NFFTC

1.1 Approval of Center


Chief Center Chief
None 15 Minutes
BFAR- NFFTC

2. Receive schedule of 2. Schedule the distribution


distribution and confirmed and notify client on the
pick-up date schedule pick up date Senior Aquaculturist
None 5 Minutes
BFAR- NFFTC

3. Receive fry or 3. Actual distribution


fingerlings (loading and packing) Dispersal Aide
None 1 Hour
BFAR- NFFTC

TOTAL: None 1 Hour, 30 Minutes

492
2. Distribution of Fish Seed (Fry, Fingerlings, Post-larvae) For Purchase

Distribution of Fish Seed (Fry, Fingerlings, post larvae) Purchase is a service to client individual and group client who are willing
to purchase fish seed stock . The client must fill out client request form and submit it to the Dispersal Officer.He/she will be
notified by the Dispersal Officer of the schedule of pick up once already approved by the Center Chief. However, in the case of
request wherein the quantity is available on that day, the client may pick up right away the request.The payment will be collected
by the cashier. A client feedback form shall be fill out by the clientele before lieaving the office.

BFAR-National Freshwater Fisheries Technology Center (BFAR-NFFTC) - Muñoz, Nueva Ecija


Office or Division

Classification Simple

Type of Transaction G2C- Government to Client; G2B Government to Business; G2G- Government to Government

1. Internal - BFAR Regonal Offices, Provincial Fishery Offices (PFOs), BFAR Central Office
Personnel and other BFAR National Centers
2. External - Academe (Students, Professors, On-the-Job Trainees, Researches); Operators and
Who may avail: Potential Operators (Fishpond/Fish Cage); Fisherfolk Organizations/Asssociations/People’s
Organization/Cooperatives; Other Government Agencies; National Government Agencies (NGAs);
Local Government Units(LGUs); Senior Citizens; Indigenous People

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Client Request Form BFAR- NFFTC- Administrative Office

2. Order of Payment BFAR- NFFTC- Administrative Office

3. Official Receipts BFAR- NFFTC- Administrative Office

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Accomplish Client 1. Receive accomplished
Request Form Client Request Form and
process request for Senior Aquaculturist
None 10 Minutes
approval BFAR- NFFTC

1.1. Approval of Center


Chief in the request Center Chief BFAR-
None 10 Minutes
NFFTC

2. Receive schedule of 2. Schedule the distribution


distribution and confirmed and notify client on the
pick- up date schedule pick up date Senior Aquaculturist
None 5 Minutes
BFAR- NFFTC

493
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
3. Receive fish seed 3. Actual distribution
(loading and packing)
Dispersal Aide
None 1 Hour
BFAR- NFFTC

4. Secure Order of 4. Issue Order of Payment


Payment
Senior Aquaculturist
None 5 Minutes
BFAR- NFFTC

5. Pay the necessary 5. Receive/ Accept


fees for fry or fingerlings payment and issue Official refer to table Clerk Personnel Cashier
Receipt 5 Minutes
below Section

refer to table
TOTAL: 1 Hour, 35 Minutes
below

Required Fees:

PRICE LIST OF TILAPIA FRY, FINGERLINGS AND BREEDERS FOR SALE BY THE BFAR BASED ON FOO NO. 133

PRICE
MESH SIZE WEIGHT RANGE (in g.)
(per piece)

a. Tilapia fry/ fingerlings (for grow out purposes

Fry/ Post fry 0.07

Size 32 0.02 - 0.06 0.1


Size 24 0.07 – 0.20 0.2
Size 22 0.21 – 0.40 0.3

Size 20 0.41 – 0.60 0.35


Size 17 0.61 – 1.0 0.4
Size 14 1.1 – 2.0 0.5
Size 12 2.1 – 3.0 0.75
Size 10 3.1 – 4.0 1
b. Tilapia Broodstock 0.02 – 3.2 2
(for hatchery purposes)

494
3. Free Distribution of Organic Inputs (Duckweed, Azolla, Vermicast) as per Request

Distribution of Organic Inputs (Duckweed, Azolla, Vermicast) is a service for client who would like to avail organic inputs for
free. The client must fill out client request form indicating the particular organic inputs requested. The request will be approved
by the Center Chief. If the input is available, the client may pick up the request on the same day, However, if not ye available
he/she will be notified by the Dispesal Officer in another day. The client will likewise be rquired to fill out client feedback form
after the transaction.
BFAR-National Freshwater Fisheries Technology Center (BFAR-NFFTC) - Muñoz, Nueva Ecija
Office or Division

Classification Simple

Type of Transaction G2C- Government to Client; G2B Government to Business; G2G- Government to Government

1. Internal - BFAR Regonal Offices, Provincial Fishery Offices (PFOs), BFAR Central Office
Personnel and other BFAR National Centers
2. External - Academe (Students, Professors, On-the-Job Trainees, Researches); Operators and
Who may avail: Potential Operators (Fishpond/Fish Cage); Fisherfolk Organizations/Asssociations/People’s
Organization/Cooperatives; Other Government Agencies; National Government Agencies (NGAs);
Local Government Units(LGUs); Senior Citizens; Indigenous People

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Client Request Form FPDS Office Client Malasakit Desk

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

1. Accomplish Client 1. Receive accomplished


Request Form Client Request Form and Senior Aquaculturist;
process request for None 10 Minutes Aquaculturist I
approval BFAR - NFFTC

1.1. Approval of request


Center Chief
Center Chief
None None 5 Minutes
BFAR- NFFTC

2. Receive notification in 2. Schedule the distribution


the schedule of and notify client on the
distribution and confirmed schedule
Aquaculturist BFAR-
pick-up date. None 5 Minutes
NFFTC

3. Receive organic inputs 3. Actual packing/


distribution Dispersal Aide
None 5 Minutes
BFAR- NFFTC

TOTAL: None 20 Minutes

495
FEEDBACK AND COMPLAINTS MECHANISMS

Fill out the client feedback form and drop it at the drop box located at Malasakit desk in the lobby of
Administrative Building
How to send a feedback
Send on the e-mail address: nfftc@yahoo.com

Every Friday the Officer of the Day opens the drop box, compiles and records all feedback submitted.

Feedback requiring reply are forwarded to the concerned sections and they are required to answer
within three (3) days upon the receipt of the feedback.

How feedback is
The reply will be forwarded to the center Chief together with the feedback to check and approve if the
processed
reply of the concerned section/staff is valid and answers the feedback

The reply of NFFTC center is then send to the client

Send on the e-mail address: nfftc@yahoo.com

Fill out the Client Complaint Form and drop it at the drop box located in the Malaskit Desk at the
lobby of Administrative Building
Complaints can also be filed via email address. Make sure to provide the following information:

Name of person being complained


How to file a complaint

Incident

Evidence

Send on the e-mail address: nfftc@yahoo.com

The Officer of the the Day opens the complaints drop box every Friday and submit to the Action
Officer for evaluation of each complaint.

Upon evaluation, the Action Officer shall start the investigation and forward the complaint to the
relevant section for their explanation.
How complaints are
The Action Officer will prepare report after the investigation and shall submit it to the Center Chief for
processed
appropriate action.

The Action Officer will send the reply to the client.

Send on the e-mail address: nfftc@yahoo.com

Contact Information of
nfftc@yahoo.com
NFFTC Munoz

496
LIST OF OFFICE

Office Address Contact Information

BFAR- National
BFAR-NFFTC, CLSU Cpd., Science City of
Freshwater Fisheries (044) 4560 670
Munoz
Technology Center
BFAR-NFFTC, CLSU Cpd., Science City of
Support Services Section 0922 532 6317
Munoz

Fingerligs Production and BFAR-NFFTC, CLSU Cpd., Science City of


0917 894 1866
Dispersal Section Munoz

Aquaculture Advisory
Training & Information BFAR-NFFTC, CLSU Cpd., Science City of
0916 708 9026
Section Munoz

Fish Health Management


Section BFAR-NFFTC, CLSU Cpd., Science City of
0922 897 2080
Munoz

Tilapia Broodstock
Production Section BFAR-NFFTC, CLSU Cpd., Science City of
0922 376 7246
Munoz

Tilapia Broodstock
Development Section BFAR-NFFTC, CLSU Cpd., Science City of
Munoz
0956 442 2766
Organic Unit
BFAR-NFFTC, CLSU Cpd., Science City of
Munoz
0945 583 2987
Fisheries Biotechnology
Center BFAR-NFFTC, CLSU Cpd., Science City of
(044) 9407 157
Munoz

497
IV. National Inland Fisheries Technology Center (NIFTC) - Tanay, Rizal

A. Fisheries Production and Distribution


1. Free Distribution of Fish Seed (Fry, Fingerlings, Spats, Post-Larvae) for Free

Distribution of fish seed for free will be conducted to clients with letter request depending on the availabiltiy of fingerlings. If
there are no available fingerling during the time of request, the dispersal will be scheduled on the first come, first serve basis.

Office or Division BFAR- National Inland Fisheries Technology Center (NIFTC) - Tanay, Rizal

Classification Simple

G2C - Government to Citizen; G2G - Government to Government; G2B - Government to Business


Type of Transaction
Entity

1. Internal - Provincial Fishery Offices (PFOs), Regional Fishery Officers, BFAR Central Office
Personnel, BFAR National Centers
2. External - Academe (Students, Faculties, On-the-Training, Researchers); Fisherfolk
Who may avail:
Organizations, Associations, People’s Organizations, Cooperatives, Women’s Associations,
Housewives, Senior Citizens, People with Disability, Indigenous People; Other Government Agencies
(National Government Agencies (NGA), Local Government Units (LGUs), House of
Representatives); Non-Government Organizations (NGOs).

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter Request Client/ Requesting Party/ies

2. Client Request Form (Individual) BFAR-NIFTC Administrative Office

3. Letter Request and List of Beneficiaries (Group) Client/ Requesting Party/ies

4. Sketch Map or Farm Lay-out Client/ Requesting Party/ies

5. Client Satisfaction/Feedback Form BFAR-NIFTC Administrative Office

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit Letter Request 1. Receive Letter Request
with requirements and/or with requirements and/or
Administrative Assistant
accomplish Client accomplished Client
II; Administrative
Request Form Request Form and process
None 30 Minutes Assistant IV; Information
the request for approval
Officer
BFAR-NIFTC

1.1 Approval and signature


to allow the distribution Center Chief
None None 15 Minutes
BFAR-NIFTC

498
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
2. Receive notice of 2. Schedule the distribution
schedule of distribution and notify client on the Administrative Assistant/
scheduled distribution None 5 Minutes Production Head
BFAR-NIFTC

3. Receive the fish seed 3. Actual distribution


requested (loading and packing) Farm Worker/ Dispersal
None 1 Hour
Aide BFAR-NIFTC

4. Fill-out Client 4. Receive accomplished


Satisfaction/ Feedback Client Satisfaction/ Administrative Assistant
Form Feedback Form II; Administrative
None 5 Minutes Assistant IV; Information
Officer
BFAR-NIFTC

TOTAL: None 1 Hour, 55 Minutes

499
2. Distribution of Fish Seed (Fry, Fingerlings, Spats, Post-Larvae) with Payment

Distribution of fish seed thru purchase will be conducted on a first come-fist serve basis. Fry/fingerling purchased will be pick-
up by the clients at the Center.

Office or Division BFAR- National Inland Fisheries Technology Center (NIFTC) - Tanay, Rizal

Classification Simple

G2C - Government to Citizen; G2G - Government to Government; G2B - Government to


Type of Transaction
Business Entity

1. Internal - Provincial Fishery Offices (PFOs), Regional Fishery Officers, BFAR Central Office
Personnel, BFAR National Centers

2. External - Academe (Students, Faculties, On-the-Training, Researchers); Fisherfolk


Who may avail: Organizations, Associations, People’s Organizations, Cooperatives, Women’s Associations,
Housewives, Senior Citizens, People with Disability, Indigenous People; Other Government Agencies
(National Government Agencies (NGA), Local Government Units (LGUs), House of
Representatives); Non-Government Organizations (NGOs).

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Client Request Form Client/Requesting Party/ies

2. Client Satisfaction Feedback Form BFAR-NIFTC Administrative Office

3. Order of Payment BFAR-NIFTC Administrative Office

4. Official of Payment BFAR-NIFTC Administrative Office

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

1. Fill-out Client Request 1. Receive Client Request


Form Form and process request Administrative Assistant
for approval II; Administrative
None 30 Minutes Assistant IV; Information
Officer
BFAR-NIFTC

1.1 Approve request by the


Center Chief
Center Chief BFAR-
None 15 Minutes
NIFTC

2. Receive the notice of 2. Notify client on the


schedule of distribution schedule of distribution. Administrative Assistant/
None 5 Minutes Production Head
BFAR-NIFTC

500
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

3. Receive fish seed 3. Actual distribution


(loading and packing) Farm Worker/ Dispersal
None 1 Hour
Aide BFAR-NIFTC

4. Secure Order of 4. Issue Order of Payment


Payment Aquaculturist II/
None 5 Minutes Collecting Officer
BFAR-NIFTC

5. Pay the necessary 5. Receive payment and


fees for fingerlings/fry issue official receipt
Refer to the fees Collecting Officer
and secure official receipt 5 Minutes
below BFAR-NIFTC

6. Fill-out Client 6. Receive accomplished


Satisfaction/ Feedback Client Satisfaction/ Administrative Assistant
Form Feedback Form II; Administrative
None 5 Minutes Assistant IV; Information
Officer
BFAR-NIFTC

Refer to the fees


TOTAL: 2 Hours, 5 Minutes
below

Fees:

Tilapia-0.15-0.45/pc Common Carps-0.17-0.50/pc


Major Carps-0.26-1.00/pc

501
B. Provision of Extension Support, Education and Training Services

1. Technical Assistance Distribution of Information, Education and Communication (IEC) Materials

Technical assistance thru the distribution of IEC materials will be conducted to assist/guide participants on the proper
operational procedure on aquaculture (hatchery and culture systems) management, inland resource management and
information on invasive fishes in the Philippines.

Office or Division BFAR- National Inland Fisheries Technology Center (NIFTC) - Tanay, Rizal

Classification Simple

G2C - Government to Citizen; G2G - Government to Government; G2B - Government to Business


Type of Transaction
Entity

1. Internal - Provincial Fishery Offices (PFOs), Regional Fishery Officers, BFAR Central Office
Personnel, BFAR National Centers

2. External - Academe (Students, Faculties, On-the-Training, Researchers); Fisherfolk


Who may avail: Organizations, Associations, People’s Organizations, Cooperatives, Women’s Associations,
Housewives, Senior Citizens, People with Disability, Indigenous People; Other Government Agencies
(National Government Agencies (NGA), Local Government Units (LGUs), House of
Representatives); Non-Government Organizations (NGOs).

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter request Client/Requesting Party

2. Client Request Form for Information, Education and


BFAR-NIFTC Administrative Office
Communication materials

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

1. Submit Letter Request 1. Receive letter request


and/or accomplished and/or accomplished Client Administrative Assistant
Client Request Form Request Form II; Administrative
None 5 Minutes Assistant IV; Information
Officer BFAR-
NIFTC

2. Receive IEC materials 2. Provide the IEC


requested/ needed materials requested Administrative Assistant
II; Administrative
None 5 Minutes Assistant IV; Information
Officer BFAR-
NIFTC

TOTAL: None 10 Minutes

502
2. Technical Assistance for Regular Training
Conducts of National Training Courses on Aquaculture (breeding and culture systems) Management and Inland Resource
Management. The Regular Training conducted is based on the mandates of the Center.

Office or Division BFAR- National Inland Fisheries Technology Center (NIFTC) - Tanay, Rizal

Classification Complex

Type of Transaction G2C - Government to Citizen; G2G - Government to Government

1. Internal - Provincial Fishery Offices (PFOs), Regional Fishery Officers, BFAR Central Office
Personnel, BFAR National Centers

2. External - Academe (Students, Faculties, On-the-Training, Researchers); Fisherfolk


Who may avail:
Organizations, Associations, People’s Organizations, Cooperatives, Women’s Associations,
Housewives, Senior Citizens, People with Disability, Indigenous People; Other Government Agencies
(National Government Agencies (NGA), Local Government Units (LGUs), (House of
Representatives); Non-Government Organizations (NGOs).

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Request Form BFAR-NIFTC Administrative Office

2. Invitation Letter BFAR-NIFTC Administrative Office

3. Training Evaluation form/Invitation letter from BFAR-


BFAR-NIFTC Administrative Office
NIFTC

4. Personal Information Sheet BFAR-NIFTC Administrative Office

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Receive invitation 1. Send invitation letter or
letter or fill-out Request received accomplished
Form Request Form and process Administrative Assistant
the request by endorsing to II; Administrative
technical staff for None 5 Minutes Assistant IV; Information
appropriate action Officer
BFAR-NIFTC

2. Receive training 2. Notify to the training


schedule and confirmed schedule and receive a
Administrative Assistant
attendance confirmation of attendance
II; Administrative
to the training
None 5 Minutes Assistant IV; Information
Officer
BFAR-NIFTC

503
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
3. Attend appropriate 3. Conduct appropriate
Senior Aquaculture;
Central training training
Aquaculture II;
None 6 Days Aquaculture I; Technical
Staff
BFAR-NIFTC
4. Fill-out Training 4. Receive filled-out
Evaluation Form Training Evaluation Form
Administrative Assistant
II; Administrative
None 5 Minutes Assistant IV; Information
Officer
BFAR-NIFTC

5. Receive signed 5. Issue an approved and


Certificate of Training for signed Certificate of Administrative Assistant
the completion of the Training II; Administrative
training None 2 Minutes Assistant IV; Information
Officer
BFAR-NIFTC

TOTAL: None 6 Days, 17 Minutes

504
3. Technical Assistance for Walk-in Clients

Technical assistance from walk-in clients regarding issues & constrainst on Aquaculture (Hatchery and Grow-Out Culture
Systems) Management. These involves the operational procedures on breeding and culture of freshwater fishes, materials &
supplies needed for the operation and the budget cost for the operation.

Office or Division BFAR- National Inland Fisheries Technology Center (NIFTC) - Tanay, Rizal

Classification Simple

G2C - Government to Citizen; G2G - Government to Government; G2B - Government to Business


Type of Transaction
Entity
1. Internal - Provincial Fishery Offices (PFOs), Regional Fishery Officers, BFAR Central Office
Personnel, BFAR National Centers
2. External - Academe (Students, Faculties, On-the-Training, Researchers); Fisherfolk
Who may avail: Organizations, Associations, People’s Organizations, Cooperatives, Women’s Associations,
Housewives, Senior Citizens, People with Disability, Indigenous People; Other Government Agencies
(National Government Agencies (NGA), Local Government Units (LGUs), (House of
Representatives); Non-Government Organizations (NGOs).

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Client Inquiry Form BFAR-NIFTC Administrative Office

2. Client Feedback Form BFAR-NIFTC Administrative Office

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Accomplish Client 1. Receive the
Administrative Assistant
Inquiry Form for inquiries accomplished Client Inquiry
Form None 5 Minutes IV/ Information Officer
BFAR-NIFTC
1.1 Endorse to appropriate
technical staff/official and Senior Aquaculturist;
render needed assistance Aquaculturist II;
Aquaculturist I;
None 5 Minutes
Administrative Assistant
IV; Information Officer
BFAR-NIFTC

2. Discuss 2. Render the appropriate Senior Aquaculture;


inquiry/concerns technical assistance Aquaculture II;
None 2 Hours
Aquaculture I
BFAR-NIFTC
3. Fill-out Client 3. Receive the
Feedback Form accomplished Client Administrative Assistant
Feedback Form II; Administrative
None 5 Minutes Assistant IV Information
Officer BFAR-
NIFTC

TOTAL: None 2 Hours, 15 Minutes

505
4. Technical Assistance thru Social Media (E-mail, Facebook, Messenger and Text)
Technical assistance thru social media will be conducted to render advisory services to aquaculture (hatchery & culture
systems) management. These involves inquiry on the breeding & culture of freshwater fishes, its cost & return analysis and
other related experiment & studies conducted by the Center.

Office or Division BFAR- National Inland Fisheries Technology Center (NIFTC) - Tanay, Rizal

Classification Simple

G2C - Government to Citizen; G2G - Government to Government; G2B - Government to Business


Type of Transaction
Entity

1. Internal - Provincial Fishery Offices (PFOs), Regional Fishery Officers, BFAR Central Office
Personnel, BFAR National Centers

2. External - Academe (Students, Faculties, On-the-Training, Researchers); Fisherfolk


Who may avail: Organizations, Associations, People’s Organizations, Cooperatives, Women’s Associations,
Housewives, Senior Citizens, People with Disability, Indigenous People; Other Government Agencies
(National Government Agencies (NGA), Local Government Units (LGUs), (House of
Representatives); Non-Government Organizations (NGOs).

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Email, SMS BFA-NIFTC Administrative Office

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

1. Send messages 1. Receive and reply to E-


through E-mail, SMS, mail, SMS, other types of
Administrative Assistant
other types of message message channel thru
II; Administrative
channel thru Social Social Media
None 5 Minutes Assistant IV; Information
Media
Officer
BFAR-NIFTC

TOTAL: None 5 Minutes

506
5. Technical Assistance thru Telephone Inquiry

Technical assistance thru telephone inquiry will be conducted to assist/guide clients by advisory assistance through phone re:
Aquaculture (Hatchery and Culture Systems) Managgement. These involves telephone inquiries on the price of fingerlings,
available technology, date & time of seminar/training and other operational procedures on pond management.

Office or Division BFAR- National Inland Fisheries Technology Center (NIFTC) - Tanay, Rizal

Classification Simple
G2C - Government to Citizen; G2G - Government to Government; G2B - Government to Business
Type of Transaction Entity

1. Internal - Provincial Fishery Offices (PFOs), Regional Fishery Officers, BFAR Central Office
Personnel, BFAR National Centers

2. External - Academe (Students, Faculties, On-the-Training, Researchers); Fisherfolk


Who may avail: Organizations, Associations, People’s Organizations, Cooperatives, Women’s Associations,
Housewives, Senior Citizens, People with Disability, Indigenous People; Other Government Agencies
(National Government Agencies (NGA), Local Government Units (LGUs), (House of
Representatives); Non-Government Organizations (NGOs).

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Phone Call BFAR-NIFTC Administrative Office

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Telephone call for 1. Answer /Attend to
inquiry/concern telephone call and ask for Administrative Assistant
the necessary information II; Administrative
to be written in the Inquiry None 5 Minutes Assistant IV; Information
Form Officer BFAR-
NIFTC

2. Discuss Inquiry/ 2. Provide needed


concerns information or refer to Administrative Assistant
concern technical staff to II; Administrative
answer the inquiry or its None 30 Minutes Assistant IV; Information
concern Officer
BFAR-NIFTC

TOTAL: None 35 Minutes

507
6. Technical Assistance Visit/Inspection On-site

Technical Assistance on site will be conducted on the actual site where the particular aquaculture operators are situated.
Among the activities to be conducted are: ocular inspection of the area (water source, types of soil, water quality &
facilties/equipment present, etc.) and conduct lecture & hands-on practicum.

Office or Division BFAR- National Inland Fisheries Technology Center (NIFTC) - Tanay, Rizal

Classification Simple

G2C - Government to Citizen; G2G - Government to Government; G2B - Government to


Type of Transaction
Business Entity

1. Internal - Provincial Fishery Offices (PFOs), Regional Fishery Officers, BFAR Central Office
Personnel, BFAR National Centers
2. External - Academe (Students, Faculties, On-the-Training, Researchers); Fisherfolk
Who may avail: Organizations, Associations, People’s Organizations, Cooperatives, Women’s Associations,
Housewives, Senior Citizens, People with Disability, Indigenous People; Other Government Agencies
(National Government Agencies (NGA), Local Government Units (LGUs), (House of
Representatives); Non-Government Organizations (NGOs).

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter Request Client/Requesting Party

2. Client Request Form BFAR-NIFTC Administrative Office

3. Client Feedback Form BFAR-NIFTC Administrative Office

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

1. Submit Letter Request 1. Receive letter request or


or accomplished Client accomplished Client Administrative Assistant
Request Form Request Form II; Administrative
None 5 Minutes Assistant IV; Information
Officer BFAR-
NIFTC

1.1 Forward document


Senior Aquaculture;
received to the Center
Aquaculture II;
None Chief for appropriate action None 5 Minutes
Aquaculture I
BFAR-NIFTC
1.2 Assign technical staff
to assist the client's request
Center Chief
None None 5 Minutes
BFAR-NIFTC

2. Receive notification 2. Schedule site


and confirmed visit/inspection and notify Senior Aquaculturist;
attendance for the clients on schedule of visit Aquaculturist II;
None 5 Minutes
scheduled visit Aquaculturist I
BFAR-NIFTC

508
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
3. Allow to conduct site 3. Conduct actual site
visit/inspection/ sampling visit/inspection/ sampling Center Chief; Senior
Aquaculture; Aquacultre
None 1 Day
II; Aquaculture I
BFAR-NIFTC

3.1 Prepare report of


inspection and its Center Chief; Senior
recommendation Aquaculture; Aquaculture
None None 1 Hour
II; Aquaculture I
BFAR-NIFTC

4. Receive inspection 4. Release inspection


report and its report and its Senior Aquaculture;
recommendation recommendation Aquaculture II;
None 5 Minutes
Aquaculture I
BFAR-NIFTC

5. Fill-out Client 5. Receive accomplished


Feedback Form Client Feedback Form Administrative Assistant
II; Administrative
None 5 Minutes Assistant IV; Information
Officer
BFAR-NIFTC

TOTAL: None 1 Day, 1 Hour, 30 Minutes

509
7. Training Assistance as Requested by Clients

Training assistance as requested by clients can be availed inside/outside the training Center depending on the availabiltiy of the
training staff and lecture room. These involves aquaculture (breeding and culture systems) management and inland resource
management.

Office or Division BFAR- National Inland Fisheries Technology Center (NIFTC) - Tanay, Rizal

Classification Complex

G2C - Government to Citizen; G2G - Government to Government; G2B - Government to Business


Type of Transaction Entity

1. Internal - Provincial Fishery Offices (PFOs), Regional Fishery Officers, BFAR Central Office
Personnel, BFAR National Centers
2. External - Academe (Students, Faculties, On-the-Training, Researchers); Fisherfolk
Who may avail: Organizations, Associations, People’s Organizations, Cooperatives, Women’s Associations,
Housewives, Senior Citizens, People with Disability, Indigenous People; Other Government Agencies
(National Government Agencies (NGA), Local Government Units (LGUs), (House of
Representatives); Non-Government Organizations (NGOs).

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter request Client/Requesting Party

2. Accomplished Client Form BFAR-NIFTC Adminstrative Office

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit letter request 1. Receive letter request or
or accomplished Client accomplished Client Administrative Assistant
Request Form Request Form II; Administrative
None 15 Minutes Assistant IV; Information
Officer
BFAR-NIFTC

1.1 Review the request and


schedule training Senior Aquaculture;
Aquaculture II;
None 5 Minutes
Aquaculture I
BFAR-NIFTC

2. Receive notification on 2. Notify client, trainees,


the schedule of training stakeholders for the training Administrative Assistant
and confirmed schedule and receive II; Administrative
attendance of training confirmation of attendance None 30 Minutes Assistant IV; Information
Officer BFAR-
NIFTC

510
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

3. Attend the appropriate 3. Conduct appropriate


training training Senior Aquaculturist;
Aquaculturist II;
None 5 Days Aquaculturist I; Technical
Staff JO
BFAR-NIFTC

4. Fill-out Training 4. Receive accomplished


Evaluation Form Training Evaluation Form Administrative Assistant
II; Administrative
None 5 Minutes Assistant IV; Information
Officer BFAR-
NIFTC

5. Receive signed 5. Issue an approved and


Certificate of Training signed Certificate of Administrative Assistant
Training II; Administrative
None 2 Minutes Assistant IV; Information
Officer BFAR-
NIFTC

TOTAL: None 5 Days, 57 Minutes

511
8. Training Assistance (On-the-Job Trainee Students)
OJT Students will be trained on Freshwater Aquaculture Management. These includes theoretical courses and hands-on
practices in connection to the breeding and culture of freshwater fishes.

Office or Division BFAR- National Inland Fisheries Technology Center (NIFTC) - Tanay, Rizal

Highly Technical
Classification
G2C - Government to Citizen
Type of Transaction

Who may avail: External - On-the-Job Trainee (OJT) Students, Fish farmers

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter Request Client/Requesting Party

2. Waiver BFAR-NIFTC Adminstrative Office


3. Accomplished Training Evaluation Form BFAR-NIFTC Adminstrative Office

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

1. Submit Letter Request 1. Receive letter request Administrative Assistant


with its requirements with its requirements II; Administrative
None 5 Minutes Assistant IV; Information
Officer
BFAR-NIFTC
2. Report On-the-Job 2. Accept trainee, conduct
Administrative Assistant
training briefing/interview initial interview and briefing
II; Administrative
None 5 Minutes Assistant IV; Information
Officer
BFAR-NIFTC
3. Attend On-the-Job 3. Conduct orientation and
orientation and signed ask to sign the Waiver
None 30 Minutes Senior Aquaculture;
Waiver
Aquaculture II;
Aquaculture I
4. Attend On-the-Job 4. Conduct/ Facilitate
BFAR-NIFTC
training training None 20 Days

5. Accomplish Training 5. Receive accomplished


Evaluation Form after Training Evaluation Form Administrative Assistant
completion of On-the-Job upon completion of training II; Administrative
Training None 5 Minutes Assistant IV; Information
Officer
BFAR-NIFTC

6. Receive signed 6. Issue an approved and


Certificate of Training for signed Certificate of Administrative Assistant
the completion of the Training II; Administrative
training None 5 Minutes Assistant IV; Information
Officer BFAR-
NIFTC

TOTAL: None 20 Days, 50 Minutes

512
FEEDBACK AND COMPLAINTS MECHANISMS

How to send a feedback Send Email to: bfarniftccomplaint@gmail.com

Call directly to: 0917-133-9451

Feedback are received and validated by Malasakit Help Desk


officer/focal person.

How feedback is processed

Validated feedback are relayed during regular meeting and or depending


in the level of urgency

Send email directly to bfarniftccomplaint@gmail.com with the following


information:

Type of Complaint:
How to file a Complaint
Date and Time of Transaction:

Person Responsible:

Complaints will be received and validated by a designated Malasakit


How complaints are processed Help Desk officer/focal person and shall be forwarded/endorsed to the
Center Chief for proper action

Send Email to: bfarniftccomplaint@gmail.com

Contact us: 0917-133-9451


Contact Information of CCB, PCC, ARTA,
Malasakit Help Desk

513
LIST OF OFFICE

Office Address Contact Information

BFAR- National Inland


#51 KM Manila East Road, Sauyoc, Tanay
Fisheries Technology (02) 806-4323/ 666-9518 (fax)
Rizal
Center

514
V. National Integrated Fisheries Technology Development Center (NIFTDC) - Bonuan Binloc, Dagupan
City

A. Environmental Assessment Services

Environmental assessment services are provided through bathymetric, current and physico-chemical profiling of water

BFAR- National Integrated Fisheries Technology Development Center (NIFTDC)-Bonuan


Office or Division Binloc, Dagupan City

Classification Highly Technical

Type of Transaction G2G - Government to Government; G2B - Government to Business Entity


1. Internal - BFAR Provincial Fishery Officers, BFAR Regional Fishery Officers
Who may avail: 2. External - Local Government Units (LGUs), Private hatchery owners, Private fish pond owners

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter request (1 original) Client/ Requesting Party/ies


2. Client Request Form (1 original)
BFAR NIFTDC, Environmental Laboratory
3. Billing Form (1 original)
BFAR NIFTDC, Environmental Laboratory
4. Order of Payment (1 original)
BFAR NIFTDC, Environmental Laboratory
5. Official Receipt (1 original) BFAR NIFTDC, Administrative Unit

6. Laboratory Analysis Report (1 original) BFAR NIFTDC, Environmental Laboratory


7. Survey Report (1 original)
BFAR NIFTDC, Environmental Laboratory
8. Client Satisfaction/Feedback Form (1 original)
BFAR NIFTDC, Environmental Laboratory

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit Letter Request 1.Receive and approve
or fill-out Client Request request for environmental
Form assessment None 5 Minutes

1.1 Coordinate and/or


schedule environmental Laboratory Technical
None assessment None 5 Minutes staff
Environmental
Laboratory BFAR
1.2 Preparation of survey NIFTDC Main Building
equipment and other
survey paraphernalia
None None 8 Hours

515
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1.3 Conduct assessment
Laboratory Technical
survey and collect samples
staff
if needed
None None 15 Days Environmental
Laboratory BFAR
NIFTDC Main Building
1.4. Prepare Billing Form Laboratory Technical
and Order of Payment staff
None Refer to Table 1. 5 Minutes Environmental
Laboratory BFAR
NIFTDC Main Building
2. Pay laboratory fees 2. Collect payment and
depending on number of issue Official Receipt
sampes and type of Collection Officer
analyses requested or Administrative Unit
Refer to Table 1. 5 minutes
done and receive Official BFAR NIFTDC Main
Receipt Building

2.1 Analysis of sample/s


Laboratory Technical
staff
None None 10 Days Environmental
Laboratory BFAR
NIFTDC Main Building
2.2 Processing of survey
data and preparation of Laboratory Technical
survey and laboratory staff
None analysis reports None 8 Days Environmental
Laboratory BFAR
NIFTDC Main Building

2.3 Approval of Survey and Laboratory Technical


Laboratory Analysis Staff Environmental
Reports Laboratory and Center
None None 3 Days Chief Office of the
Center Chief BFAR
NIFTDC Main Building
3. Present official receipt 3. Give Survey and
and receive Survey and Laboratory Analysis Laboratory Technical
Laboratory Analysis Reports to Client upon staff
Reports presenting the official None 5 Minutes Environmental
receipt Laboratory BFAR
NIFTDC Main Building

4. Fill out Client 4. Receive accomplished


Satisfaction/ Feedback Client Satisfaction/ Laboratory Technical
Form Feedback Form staff
None 5 Minutes Environmental
Laboratory BFAR
NIFTDC Main Building

TOTAL Refer to Table 1. 37 Days, 30 Minutes

516
TABLE 1. List of Laboratory Analysis and Corresponding Number of Days/Duration and
Laboratory Fees

Required Fees: Will depend on the type of analysis requested and number of samples.

PARAMETERS DAYS/DURATIO FEE PER SAMPLE


N
Determination of salinity PHP 30.00
5 min
Determination of water pH 5 min PHP 30.00

Determination of soil pH 2 hrs PHP 30.00

Determination of total suspended solids 1 day, 2 hours PHP 200.00

Determination of total ammonia 4 hrs PHP 180.00


Determination of chlorophyl-a/phaeopigment PHP 150.00
3 days
Determination of phosphate PHP 300.00
4 hrs
Determination of nitrite
PHP 180.00
4 hrs
DAYS/
PARAMETERS FEE PER SAMPLE
DURATION

Determination of nitrate PHP 180.00


4 hrs
Determination of total hardness/alkalinity PHP 200.00
2 hrs

Determination of hydrogen sulphide 1 day, 3 hours PHP 300.00

Determination of organic matter 2 days, 1 hour PHP 300.00

Determination of inorganic matter 2 days, 1 hour PHP 300.00

Determination of Ignition Loss 3 days PHP 200.00

Biochemical Oxygen Demand 6 days PHP 900.00

("Environmental Assessment Services) qualified for multi-stage processing."

Conduct of on-site assessment/monitoring

Bathymetric profiling

Current profiling

Physico-chemical profiling

517
B. Environmental Laboratory Services

Samples such as soil and water from coastal areas, river systems, seawater and other aquaculture areas are submitted to the
laboratory for analyses of various physico-chemical and hydrological parameters, as requested by clients. Laboratory fees are
paid by the client depending on the analyses done.

BFAR- National Integrated Fisheries Technology Development Center (NIFTDC)-Bonuan


Office or Division
Binloc, Dagupan City

Classification Highly Technical


G2G - Government to Government; G2C - Government to Citizen; G2B - Government to Business
Type of Transaction Entity

1. Internal - BFAR Provincial Fishery Officers, BFAR Regional Fishery Officers

Who may avail:


2. External - Local Government Units (LGUs), Private hatchery owners, Private fish pond owners

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter request (1 original) Client/Requesting Party/ies

2. Client Request Form (1 original) BFAR NIFTDC, Environmental Laboratory

3. Technical Service Request Form (1 original) BFAR NIFTDC, Environmental Laboratory

4. Billing Form (1 original) BFAR NIFTDC, Environmental Laboratory

5. Order of Payment (1 original) BFAR NIFTDC, Environmental Laboratory

6. Official Receipt (1 original) BFAR NIFTDC, Administrative Unit

7. Laboratory Analysis Report (1 original) BFAR NIFTDC, Environmental Laboratory

8. Client Satisfaction/Feedback Form (1 original) BFAR NIFTDC, Environmental Laboratory

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit Letter Request 1. Receive Letter Request Laboratory Technical
or accomplish Client or accomplished Client staff
Request Form Request Form Environmental
None 5 Minutes
Laboratory
BFAR NIFTDC Main
Building
1.1 Approve request for Laboratory Technical
Analysis staff
Environmental
None None 15 Minutes
Laboratory
BFAR NIFTDC Main
Building

518
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
2. Fill out Technical 2. Receive filled out Laboratory Technical
Service Form and submit Technical Service Form staff
samples and receive samples Environmental
None 5 Minutes
Laboratory
BFAR NIFTDC Main
Building
2.1 Check samples Laboratory Technical
condition, container and staff
labelling; Log in samples Environmental
None None 10 Minutes
Laboratory
BFAR NIFTDC Main
Building
2.2 Prepare Billing Form Laboratory Technical
and Order of Payment staff
Environmental
None Refer to Table 2 5 Minutes
Laboratory
BFAR NIFTDC Main
Building
3. Pay for laboratory 3. Collect payment and
analysis fee and secure issue Official Receipt Collection Officer
Official Receipt. Administrative Unit
None 5 minutes
BFAR NIFTDC Main
Building

3.1 Sample preparation


Laboratory Technical
staff
Environmental
None None 30 Minutes
Laboratory
BFAR NIFTDC Main
Building
3.2 Analysis of sample/s
Laboratory Technical
staff
Environmental
None None 5 Days
Laboratory
BFAR NIFTDC Main
Building

3.3 Preparation of
Laboratory Analysis Report Laboratory Technical
staff
Environmental
None None 30 Minutes
Laboratory
BFAR NIFTDC Main
Building

3.4 Approval of Result of


Analysis Laboratory Technical
staff
Environmental
None None 5 Minutes
Laboratory
BFAR NIFTDC Main
Building

519
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
4. Present Official 4. Give a copy of Laboratory Technical
Receipt and receive Laboratory Analysis Report staff
Laboratory Analysis to client upon presenting Environmental
Report the Official Receipt None 5 Minutes
Laboratory
BFAR NIFTDC Main
Building
5. Fill out Client 5. Receive accomplished Laboratory Technical
Satisfaction Feedback Client Satisfaction staff
Form Feedback Form Environmental
None 5 Minutes
Laboratory
BFAR NIFTDC Main
Building

TOTAL Refer to Table 2. 5 Days, 2 Hours

Table 2. List of Laboratory Analysis and Corresponding Number of Days/Duration and Laboratory
Fees

Required Fees to be paid will depend on the analysis requested and number of samples.

DAYS/
PARAMETERS FEE PER SAMPLE
DURATION
Determination of salinity 5 min PHP 30.00

Determination of water pH 5 min PHP 30.00

Determination of soil pH 20 min PHP 30.00

Determination of total suspended solids 1 day, 2 hours PHP 200.00

Determination of total ammonia 4 hrs PHP 180.00

Determination of chlorophyl-a/phaeopigment 3 days PHP 150.00

Determination of phosphate 4 hrs PHP 300.00

Determination of nitrite 4 hrs PHP 180.00

DAYS/
PARAMETERS FEE PER SAMPLE
DURATION
Determination of nitrate 4 hrs PHP 180.00

Determination of total hardness/alkalinity 2 hrs PHP 200.00

Determination of hydrogen sulphide 1 day, 3 hours PHP 300.00

Determination of organic matter 2 days, 1 hour PHP 300.00

Determination of inorganic matter 2 days, 1 hour PHP 300.00

Determination of Ignition Loss 3 days PHP 200.00

Biochemical Oxygen Demand 6 days PHP 900.00

520
C. Fisheries Production And Distribution

1. Free Distribution of Broodstock, Eggs, Fry and Fingerlings, Postlarvae, Spat (Milkfish, Saline
Tilapia (Molobicus), Freshwater Shrimp, Oyster and Mussel)

Broodstock, Eggs, Fry and Fingerlings, Postlarvae, Spats (Milkfish, Saline Tilapia Molobicus, Freshwater Shrimp, Oyster and
Mussel), are distributed for free and are picked up at the Center by the clients.

BFAR- National Integrated Fisheries Technology Development Center (NIFTDC) Bonuan


Office or Division
Binloc, Dagupan City

Classification Simple

G2G - Government to Government; G2C - Government to Citizen; G2B - Government to Business


Type of Transaction Entity

1. Internal -Provincial Fisheries Offices (PFOs), Regional Fishery Officers, Central Office
Personnel, other Centers
2. External - Academe (students, professors, OJTs, researchers); Fisherfolk organizations/
Who may avail: associations/ people’s organizations/ cooperatives/ Women’s associations. Other government
agencies, National Government Agencies (NGAs); Local Government Units (LGUs); Non-
Government Organizations (NGOs); Private hatchery owners; Private fish pond/fish pen owners

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter Request (1 original) Client/ Requesting Party/ies

2. Client Request Form (Individual and Group) (1


original) BFAR NIFTDC Hatchery

3. Payment for packing/transport materials


Client/ Requesting Party/ies

4. Client Satisfaction/ Feedback Form (1 original) BFAR NIFTDC Hatchery

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit Letter Request 1. Receive Letter Request Aquaculturist II
and process request for Malasakit Help Desk
approval None 30 Minutes BFAR NIFTDC Main
Building Lobby
1.1 Review and approval of Center Chief
request by the Center Chief Office of the Center Chief
None None 15 Minutes BFAR NIFTDC Main
Building

2. Receive schedule of 2. Inform/Notify client of the


distribution schedule of distribution
Aquaculturist II
None 5 Minutes
BFAR NIFTDC Hatchery

521
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
3. Pay for the 3. Receive payment for
packing/transport packing/ transport materials
materials Aquaculturist
Refer to Table 3. 5 Minutes
BFAR NIFTDC Hatchery

4. Receive broodstock, 4. Actual distribution


eggs, fry, fingerlings, (loading and packing)
postlarvae, spat Aquaculturist
None 1 Hour
BFAR NIFTDC Hatchery

5. Fill out Client 5. Receive filled out Client


Satisfaction/ Feedback Satisfaction/ Feedback
Aquaculturist
Form Form None 5 Minutes
BFAR NIFTDC Hatchery

TOTAL Refer to Table 3 2 Hours

Table 3.
Schedule Fees:

Payment for transport materials (plastic bags) - PHP 10.00 per piece

522
2. Payment of Broodstock, Eggs, Fry and Fingerlings, Postlarvae, Spat (Milkfish, Saline Tilapia
Molobicus, Freshwater Shrimp, Oyster and Mussel)
Broodstock, eggs, fry, fingerlings, postlarvae and spat (Milkfish, Saline Tilapia Molobicus, Freshwater Shrimp, Oyster and
Mussel), are distributed and picked up at the Center by the clients for a certain fee.

BFAR- National Integrated Fisheries Technology Development Center (NIFTDC) Bonuan Binloc,
Office or Division
Dagupan City

Classification Simple
G2G - Government to Government; G2C - Government to Citizen; G2B - Government to Business
Type of Transaction Entity
1. Internal - BFAR Regional Fishery Officers

2. External - MSMEs, Academe (students, professors, OJTs, researchers); Fisherfolk organizations/


associations/ people’s organizations/ cooperatives/ Women’s associations, Housewives, Senior
Who may avail: Citizens, IPs
Other government agencies: National Government Agencies (NGAs), Local Government Units
(LGUs); Non-Government Organizations (NGOs); Private hatchery owners; Private fish pond/pen
owners

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter request (1 original) Client/ Requesting Party/ies


2. Client Request Form (Individual and Group) (1
BFAR NIFTDC hatchery
original)

3. Billing Form (1 original) BFAR NIFTDC Hatchery

4. Order of Payment (1 original) BFAR NIFTDC Hatchery

5. Official Receipt (1 original) BFAR NIFTDC Administrative Unit

6. Client Satisfaction/ Feedback Form (1 original) BFAR NIFTDC Hatchery

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit Letter Request 1. Receive Letter Request Aquaculturist II
and process request Malasakit Help Desk
None 30 Minutes Main Building Lobby
BFAR NIFTDC
1.1 Approve request to buy Center Chief
fry or fingerlings Office of the Center
None None 15 Minutes Chief, Main Building
BFAR NIFTDC
2. Receive the notification 2. Schedule the distribution
on the scheduled and notify client on the
Aquaculturist II
distribution scheduled distribution None 5 Minutes
BFAR NIFTDC Hatchery

3. Receive fry or 3. Actual distribution


fingerlings (loading and packing)
Aquaculturist
None 1 Hour
BFAR NIFTDC Hatchery

523
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
4. Prepare billing form and
order of payment Aquaculturist
None None 5 Minutes
BFAR NIFTDC Hatchery

5. Pay for the 5. Receive payment and


Collecting Officer
fingerlings/fry requested issue official receipt
Administrative Unit
Refer to Table 4 5 Minutes
BFAR NIFTDC Main
Building
6. Fill out Client 6. Receive accomplished
Satisfaction Feedback Client Satisfaction Aquaculturist
Form Feedback Form None 5 Minutes
BFAR NIFTDC Hatchery

TOTAL Refer to Table 4 2 Hours, 5 Minutes

Table 4:
Payment for transport materials (plastic bags), fry, fingerlings, spat, post larvae, eggs, or broodstock (Total fees will depend on
purchased species or commodities).
Transport Materials - (plastic bags) - PHP 10.00 per piece
Milkfish Fry - PHP 0.23 per piece
Milkfish Breeder - PHP1,000.00 per kilogram

Milkfish Eggs - PHP 8,000.00 per 1M eggs


Freshwater Shrimp Post Larvae- PHP 1.00 per piece

Spats: seeded collectors (plastic strings) - PHP40.00 per string

Oyster/Mussel Seedlings:
PHP 0.30 per piece
4-5 inches - PHP 5.00 per piece

Saline Tilapia Fingerlings:

size 22 -PHP 0.35 per piece


size 17 - PHP 0.45 per piece
size 14 -PHP 0.55 per piece
size 12- PHP 0.65 per piece

524
D. Microbiology, Fish Health and Molecular Pathology Laboratory Services
Samples of water, fish, shrimps and fishery products are examined for various microbiological food pathogens. Aquatic animal
health examination and disease diagnosis are also done during fish mortalities. Specific viral analyses can also be done on
shrimps and crustaceans for disease diagnosis. Laboratory fees are paid by clients depending on the analyses done or
requested.

BFAR- National Integrated Fisheries Technology Development Center (NIFTDC)-Bonuan


Office or Division
Binloc, Dagupan City

Classification Highly Technical


G2G - Government to Government; G2C - Government to Citizen; G2B - Government to Business
Type of Transaction Entity

1. Internal - Regional Fishery Officers


2. External - Exporters/fish processors; Potential fish processors, exporters; Academe (students,
professors, OJTs, researchers); Fisherfolk organizations/ associations/ people’s organizations/
Who may avail:
cooperatives/ Women’s associations, Housewives, Senior Citizens, IPs; Other government agencies:
National Government Agencies (NGAs), Local Government Units (LGUs); Non-Government
Organizations (NGOs); Private hatchery owners; Private fish pond/fish pen owners; Water Refilling
Station Owners; Private Individuals; Private Institutions

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter request (1 original) Client or Requesting Party/ies

2. Client Information Form (1 original) BFAR NIFTDC Malasakit Help Desk, Main Building Lobby

3. Technical Service Request Form (1 original) BFAR NIFTDC Main Building Microbiology Laboratory

4. Billing Form (1 original) BFAR NIFTDC Main Building Microbiology Laboratory

5. Order of Payment (1 original) BFAR NIFTDC Main Building Microbiology Laboratory

6. Official Receipt (1 original) BFAR NIFTDC Administrative Unit

7. Laboratory Analysis Report (1 original) BFAR NIFTDC Main Building Microbiology Laboratory

8. Client Satisfaction/Feedback Form (1 original) BFAR NIFTDC Main Building Microbiology Laboratory

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit Letter Request 1. Receive accomplished
and accomplish Client Letter Request and Client Aquaculturist II
Information Form Information Form and Malasakit Help Desk
None 5 Minutes
endorse letter request to BFAR NIFTDC Main
the Office of the Center Building Lobby
Chief for approval
2. Receive approved 1.1 Process approved Center Chief and
letter request and poceed request and endorse to the Aquaculturist II
to Microbiology laboratory Microbiology Laboratory None 5 Minutes Office of the Center Chief
BFAR NIFTDC Main
Building
3. Submit samples to the 1.2 Receive and check Laboratory Technical
Microbiology Laboratory submitted samples for Staff Microbiology
numbering and logging None 5 Minutes Laboratory
BFAR NIFTDC Main
Building

525
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1.3 Provide technical Laboratory Technical
assistance and Staff Microbiology
None recommendation None 20 Minutes Laboratory
BFAR NIFTDC Main
Building
2. Fill out Technical 2. Receive Technical Laboratory Technical
Service Request Form Service Request Form Staff Microbiology
None 10 Minutes Laboratory
BFAR NIFTDC Main
Building
2.1 Approve Technical
Service Request Form Head, Microbiology
Laboratoy
None None 5 Minutes
BFAR NIFTDC
Main Building
3. Prepare Billing and Laboratory Technical
Order of Payment Form Staff Microbiology
None Refer to Table 5 5 Minutes Laboratory
BFAR NIFTDC Main
Building
4. Pay the required 4. Receive payment for
Collection Officer
laboratory fees and laboratory fees and issue
Administrative Unit
receive Official Receipt Official Receipt Refer to Table 5 5 minutes
BFAR NIFTDC Main
Building
5. Prepare culture media, Laboratory Technical
reagents, chemicals and Staff
None laboratory paraphernalia for None 4 Hours Microbiology Laboratory
laboratory analysis BFAR NIFTDC Main
Building
6. Conduct analysis, read Laboratory Technical
and interpret results of Staff
None analyses None 10 Days Microbiology Laboratory
BFAR NIFTDC Main
Building
7. Prepare Laboratory Laboratory Technical
Analysis Report and have it Staff and Head,
None checked by the Head of the None 30 Minutes Microbiology Laboratory
Microbiology Laboratory Center Chief
and approved by the BFAR NIFTDC Main
8. Present Official Center
8. Give Chief/OIC
Laboratory Building
Laboratory Technical
Receipt as Proof of Analysis Report to client
Staff Microbiology
Payment and Receive None 10 Minutes
Laboratory BFAR
Laboratory Analysis
NIFTDC Main Building
Report
9. Accomplish Client 9. Receive accomplished
Laboratory
Satisfaction/ Feedback Client Satisfaction/
Technical Staff
Form Feedback Form
None 5 Minutes Microbiology Laboratory
BFAR NIFTDC Main
Building

10 Days, 5 Hours, 45
TOTAL Refer to Table 5
Minutes

526
Table 5. List of Microbiology Laboratory Analysis and Corresponding Fees
Required fees for Laboratory Analysis will depend on number of samples and type of analysis requested

TYPE OF ANALYSIS FEES PER SAMPLE

Standard Plate Count /Aerobic Plate Count/Total


PHP 200.00
Bacterial Count

Yeast/Mold Count PHP 250.00

PHP 105.00
Total Vibrio Count -
Total Coliform (MPN) PHP 250.00

Fecal Coliform (MPN) PHP 250.00

Test for Escherichia coli PHP 350.00

Test for Salmonella spp. PHP 400.00

Test for Vibrio sp PHP 450.00

Test for Staphylococcus aureus PHP 300.00


Gross External and Internal Examination of Aquatic
PHP 100.00
Animals

Parasite Examination PHP 75.00

White Spot Syndrome Virus Detection PHP 700.00

Infectious Hypodermal and Hematopietic Necrosis


PHP 400.00
Virus Detection

527
E. Provision Of Extension Support, Education And Training Services

1. Distribution of Information, Education and Communication (IEC) Materials

Information, Education and Communication (IEC) materials on various aquaculture and post harvest technologies, such as
technical brochures, manuals, posters and others are provided for free to interested clients and beneficiaries.

BFAR- National Integrated Fisheries Technology Development Center (NIFTDC) Bonuan


Office or Division Binloc, Dagupan City

Classification Simple
G2G - Government to Government; G2C - Government to Citizen; G2B - Government to Business
Type of Transaction Entity
1. Internal - BFAR Provincial Fishery Officers, BFAR Regional Fishery Officers, Central Office
Personnel, other BFAR National Centers
2. External - MSMEs, Exporters/fish processors, Potential fish processors and exporters, Academe
(students, professors, OJTs, researchers), Fisherfolk organizations/ associations/ people’s
Who may avail:
organizations/ cooperatives/ Women’s associations, Housewives, Senior Citizens, IPs, Other
government agencies, National Government Agencies (NGAs), Local Government Units (LGUs),
House of Representatives, Non-Government Organizations (NGOs), Private hatchery owners,
Private fish pond/fish pen owners, Private Individuals, Private Institutions

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter Request (1original) Client or Requesting Party/ies

2. Client Request Form (1 original) BFAR NIFTDC Asian Fisheries Academy


FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit Letter Request 1. Receive Letter Request
and accomplish Client or accomplished Client
Request Form Request Form for Aquaculturist II
Information, Education and None 5 Minutes Asian Fisheries Academy
Communication (IEC) BFAR NIFTDC
materials Compound

2. Receive Information, 2. Provide the Information, Aquaculturist II


Education and Education and Office of the Center Chief
Communication (IEC) Communication (IEC) BFAR NIFTDC Main
materials materials Building or Aquaculturist
None 5 Minutes II
Asian Fisheries
Academy, BFAR NIFTDC
Compound

TOTAL None 10 Minutes

528
2. Technical Assistance Center On-the-Job Training and Immersion
On-the-Job trainings for College and University students and immersion for high school students, using lectures and hands-on
activities on various Aquaculture and Post Harvest Technologies and laboratory techniques and instrumentation of the Center
are provided.

BFAR- National Integrated Fisheries Technology Development Center (NIFTDC)-Bonuan


Office or Division
Binloc, Dagupan City

Classification Highly Technical


G2C - Government to Citizen
Type of Transaction
External - College Students, High School Students
Who may avail

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter request (1 original) School/College /University

2. Memorandum of Agreement (1 original) School/College /University

3. Waiver (1 original) School/College /University

4. Medical Certificate (for College and University


Clinic/Hospital
students only) (1 original)
BFAR- NIFTDC Unit/Project
5. Log Book for students' daily attendance

BFAR- NIFTDC Unit/Project


6. Daily Time Record (DTR) (1 original)

BFAR- NIFTDC Asian Fisheries Academy


7. Student's Evaluation Form (1 original)

BFAR- NIFTDC Unit/Project


8. Client Satisfaction/Feedback Form (1 original)
BFAR- NIFTDC Asian Fisheries Academy
9. Certificate of Training (1 original)

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

1. Submit Letter Request 1. Receive Letter Request


and other requirements with requirements (Waiver,
(Waiver, Memorandum of Memorandum of Aquaculturist II/Training
Agreement, Medical Agreement, Medical Staff of Training
None 5 Minutes
Certificate) Certificate) Coordinator
BFAR NIFTDC

2. Report for On-the-Job 2. Conduct On-the Job


Training/ Immersion Training/ Immersion Aquaculturist II/Training
Orientation Orientation Staff of Training
Coordinator
None 30 Minutes
Conference Room
BFAR NIFTDC Main
Building

529
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
3. Attend On-the-Job 3. Conduct actual training,
training in the specific lectures and hands-on Aquaculturists/Technical
Unit or Project assigned activities High School:5 - 40 days Saff
and record daily None
College: 25 - 40 days BFAR NIFTDC
attendance on a Log Unit/Projects
Book

4. Take an exam and/or 4. Give an exam for


prepare powerpoint students and/or evaluate
Aquaculturists/Technical
presentations on new students' powerpoint
technical skills acquired presentations Saff
None 1 Hour
from lectures and hands- BFAR NIFTDC
on activities Unit/Projects

4.1 Receive evaluation 4.1 Prepare the students'


and grades evaluation and provide Aquaculturists/Technical
grades for overall Saff
None 30 Minutes
performance of student BFAR NIFTDC
Unit/Projects

4.2 Prepare Daily Time 4.2 Receive, check and


Record based on entries sign Daily Time Record Aquaculturists/Technical
in the log book, as proof Saff and Head
of attendance for the None 15 minutes
BFAR NIFTDC
entire period of training Unit/Projects

4.3 Submit Student's


Evaluation Form and Daily
Time Record with attached Aquaculturists/Technical
results of exam to training Saff
None None 5 minutes
staff for signature of BFAR NIFTDC
Training Coordinator Unit/Projects

5. Fill out Client 5. Receive accomplished


Satisfaction/Feedback Client Aquaculturists/Technical
Form Satisfaction/Feedback Saff
None 5 Minutes
Form BFAR NIFTDC
Unit/Projects

6. Receive signed 6. Issue an approved and


Aquaculturist II (Training
Certificate of Training signed Certificate of
Staff of Training
Training None 5 Minutes
Coordinator)
BFAR NIFTDC

High School: 5 - 40
Days, 2 hours, 35
TOTAL None minutes College:
25 - 40 days, 2 hours, 35
minutes

High School: 5 - 40 Days, 2 hours, 35 minutes College:


25 - 40 days, 2 hours, 35 minutes

530
3. Technical Assistance for Walk-in Clients
Walk-in clients are provided with technical assistance and advisory services needed.

BFAR- National Integrated Fisheries Technology Development Center (NIFTDC)- Bonuan


Office or Division
Binloc, Dagupan City
Classification Simple
G2G - Government to Government; G2C - Government to Citizen; G2B - Government to Business
Type of Transaction
Entity
1. Internal - BFAR Provincial Fishery Officers (PFOs), BFAR Regional Fishery Officers, BFAR
Central Office Personnel, other BFAR National Centers
2. External - MSMEs, Exporters/Fish Processors; Potential Fish Processors and Exporters;
Who may avail: Academe (Students, Professors, OJTs, Researchers); Fisherfolk organizations/ associations/
people’s organizations/ cooperatives/ Women’s associations, Housewives, Senior Citizens, IPs;
Other government agencies; National Government Agencies (NGAs); Local Government Units
(LGUs) and Non- Government Organizations (NGOs); Private hatchery owners; Private fish pond/
fish pen owners; Private Individuals; Private Institutions

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter Request (1 original) Client/Requesting Party/ies

2. Client Information Form (1 original) BFAR- NIFTDC Main Building Lobby

3. Client Satisfaction/Feedback Form (1 original) BFAR- NIFTDC Unit/Project

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

1. Accomplish Client 1. Receive the Aquaculturist II


Information Form accomplished Client Malasakit Help Desk
Information Form None 5 Minutes
BFAR NIFTDC Main
Building Lobby
1.1 Endorse to appropriate
Aquaculturist II
technical staff
Malasakit Help Desk
None None 5 Minutes
BFAR NIFTDC Main
Building Lobby
2. Discuss 2. Render the appropriate
inquiry/concerns technical assistance Aquaculturists/Technical
Staff of Concerned Unit/
None 2 Hours
Project
BFAR NIFTDC

3. Fill out Client 3. Receive the


Feedback Form accomplished Client Aquaculturists/Technical
Feedback Form Staff of Concerned Unit/
None 5 Minutes
Project
BFAR NIFTDC

TOTAL: None 2 Hours, 15 Minutes

531
4. Technical Assistance thru Social Media (E-mail, Facebook, Messenger and Text (SMS)

Technical advisory services on Fisheries and Aquaculture are provided and inquiries are answered through social media.

BFAR- National Integrated Fisheries Technology Development Center (NIFTDC) Bonuan


Office or Division
Binloc, Dagupan City

Classification Simple

G2G - Government to Government; G2C - Government to Citizen; G2B - Government to Business


Type of Transaction
Entity

1. Internal - BFAR Provincial Fishery Officers, BFAR Regional Fishery Officers, Central Office
Personnel, other BFAR National Centers
2. External - MSMEs, Exporters/fish processors, Potential fish processors, exporter, Academe
Who may avail: (students, professors, OJTs, researchers), Fisherfolk organizations/ associations/ people’s
organizations/ cooperatives/ Women’s associations, Housewives, Senior Citizens, IPs, Other
government agencies, National Government Agencies (NGAs), Local Government Units (LGUs),
House of Representatives, Non-Government Organizations (NGOs), Private hatchery owners,
Private fish pond/fish pen owners, Private Individuals, Private Institutions

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Email, SMS, MMS Client/or Requesting Party/ies

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

1. Send E-mail, SMS,


1. Reply via E-mail, SMS, Technical staff
MMS through internet,
MMS through internet, cell None 5 Minutes Asian Fisheries Academy
cell phone and social
phone and social media BFAR NIFTDC
media accounts

TOTAL None 5 Minutes

532
5. Technical Assistance On-site Visit/Inspection and Sampling Collections

Technical advisory services on fisheries and aquaculture are provided during on-site visits and inspection. Sampling or
colllection of samples is done, if needed or necessary.

BFAR- National Integrated Fisheries Technology Development Center (NIFTDC)- Bonuan


Office or Division
Binloc, Dagupan City

Classification Simple

G2G - Government to Government; G2C - Government to Citizen; G2B - Government to Business


Type of Transaction
Entity
1. Internal - BFAR Provincial Fishery Officers, BFAR Regional Fishery Officers, Central Office
Personnel, other BFAR National Centers
2. External - MSMEs, Exporters/fish processors, Potential fish processors, exporter, Academe
Who may avail: (students, professors, OJT, researchers), Fisherfolk organizations/ associations/ people’s
organizations/ cooperatives/ Women’s associations, Housewives, Senior Citizens, IPs, Other
government agencies, National Government Agencies (NGAs), Local Government Units (LGUs),
House of Representatives, Non-Government Organizations (NGOs), Private Hatchery owners,
Private fish pond/fish pen owners, Private Individuals, Private Institutions

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter Request (1 original) Requesting Party Individual/Group or Office/Agency or Private Entity

2. Client Request Form (1 original) BFAR-NIFTDC Unit/ Project

3. Inspection On-Site Report (1 original) BFAR-NIFTDC Unit/ Project

3. Client Satisfaction/Feedback Form BFAR-NIFTDC Unit/ Project

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit Letter Request 1. Receive Letter Request
Aquaculturist II
Malasakit Help Desk
None 5 Minutes
Main Building Lobby
BFAR NIFTDC

1.1 Forward/ Endorse to


the Center Chief for Aquaculturist II
appropriate action Malasakit Help Desk
None None 5 Minutes
Main Building Lobby
BFAR NIFTDC

1.2 Assign technical staff


for appropriate action
Center Chief
Office of the Center Chief
None None 5 Minutes
BFAR NIFTDC Main
Building

533
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
2. Receive notification of 2. Schedule site
Aquaculturist/Laboratory
scheduled visit/inspection/ sampling
Technical Staff
visit/inspection/ and notify client on None 5 Minutes
BFAR NIFTDC
sampling scheduled visit
Unit/Poject
3. Allow visit/inspection of 3. Conduct actual site
facilities and sampling visit/inspection/ sampling Aquaculturist/Laboratory
Analyst
None 1 Day
BFAR NIFTDC
Unit/Poject

4. Receive inspection on- 4. Prepare inspection on-


site report and site report and Aquaculturist/Laboratory
recommendation recommendation after the Analyst
None 1 Hour
site visit/inspection/ BFAR NIFTDC
sampling Unit/Poject

5. Fill out Client 5. Receive accomplished


Satisfaction Form Client Satisfaction Form Aquaculturist/Laboratory
Analyst
None 5 Minutes
BFAR NIFTDC
Unit/Poject

TOTAL: None 1 Day, 1 Hour, 25 Minutes

534
6. Technical Assistance on the Regular Training

Regular trainings on various Aquaculture and Post Harvest Technologies of the Center, BFAR National Programs and other
relevant topics pertaining to the fisheries and aquaculture industry, are provided for invited participants, such as BFAR staff
from the provincial and regional offices, central office and other Centers, and other individual and group stakeholders.

BFAR- National Integrated Fisheries Technology Development Center (NIFTDC) Bonuan


Office or Division Binloc, Dagupan City

Classification Complex

G2G - Government to Government; G2C - Government to Citizen; G2B - Government to Business


Type of Transaction
Entity
1. Internal - Provincial Fisheries Offices (PFOs), BFAR Regional Fishery Officers, BFAR Central
Office Personnel, other BFAR National Centers
2. External - MSMEs, Exporters/Fish Processors; Potential Fish Processors, Exporters; Academe
Who may avail: (Students, Professors, OJTs, Researchers); Fisherfolk organizations/ associations/ people’s
organizations/ cooperatives/ Women’s associations, Housewives, Senior Citizens, IPs; Other
government agencies, National Government Agencies (NGAs), Local Government Units (LGUs), Non-
Government Organizations (NGOs); Private hatchery owners; Private fish pond owners

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Invitation Letter (1 original) BFAR- NIFTDC Asian Fisheries Academy

2. Attendance Sheet BFAR- NIFTDC Asian Fisheries Academy

3. Participant's Profile (1 original) BFAR- NIFTDC Asian Fisheries Academy


4.Training Evaluation Form (1 original) BFAR- NIFTDC Asian Fisheries Academy
5. Certificate of Training (1 original) BFAR- NIFTDC Asian Fisheries Academy
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Receive Invitation 1. Send Invitation Letter Aquaculturist II
Letter None 5 Minutes
BFAR-NIFTDC
2. Receive notification of 2. Notify client on the
schedule and confirm schedule of training and Aquaculturist II
attendance to scheduled receive confirmation of None 5 Minutes
BFAR-NIFTDC
training attendance

3.Fill out attendance 3. Receive attendance


sheet to register sheet Aquaculturists II/
None 5 minutes Aquaculturists
Asian Fisheries Academy

3.1 Fill out Participant's 3.1 Receive Participant's


Profile Profile Aquaculturists II/
None 15 minutes Aquaculturists
Asian Fisheries Academy

4. Attend Training proper 4. Conduct training on


various Aquaculture and Aquaculturists II/
Post Harvest Technologies. Aquaculturists
None 3 Days Asian Fisheries Academy
BFAR NIFTDC Unit/s or
Project/s

535
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
5. Accomplish Training 5. Receive accomplished
Evaluation Form Training Evaluation Form Aquaculturist II
None 5 Minutes
Asian Fisheries Academy

6. Receive signed 6. Issue an approved and


Certificate of Training signed Certificate of Aquaculturist II
None 2 Minutes
Training Asian Fisheries Academy

TOTAL None 3 Days, 37 Minutes

536
7. Technical Assistance thru Telephone Inquiry

Technical advisory services on Fisheries and Aquaculture are provided and inquiries are answered through telephone.

BFAR- National Integrated Fisheries Technology Development Center (NIFTDC)- Bonuan


Office or Division
Binloc, Dagupan City

Classification Simple
G2G - Government to Government; G2C - Government to Citizen; G2B - Government to Business
Type of Transaction Entity

1. Internal - Provincial Fisheries Offices (PFOs), BFAR Regional Fishery Officers, BFAR Central
Office Personnel, other BFAR National Centers
2. External - MSMEs, Exporters/fish processors, Potential fish processors, exporter, Academe
Who may avail: (students, professors, OJTs, researchers), Fisherfolk organizations/ associations/ people’s
organizations/ cooperatives/ Women’s associations, Housewives, Senior Citizens, IPs, Other
government agencies, National Government Agencies (NGAs), Local Government Units (LGUs),
House of Representatives, Non-Government Organizations (NGOs), Private hatchery owners,
Private fish pond/fish pen owners, Private Individuals, Private Institutions

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

None None

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1.Telephone call 1. Answer telephone call
and give necessary Aquaculturists
information for the queries None 5 Minutes BFAR- NIFTDC
Unit/Project

2. Discuss inquiry/ 2. Provide needed


concerns information or refer client to Aquaculturists
concerned technical staff None 30 Minutes BFAR- NIFTDC
Unit/Project

TOTAL None 35 Minutes

537
8. Training Assistance as Requested by Clients

Trainings on various aquaculture and post harvest technologies of the Center as requested by students, researchers, fisherfolk,
and other interested individuals or groups are provided by NIFTDC technical staff.

BFAR- National Integrated Fisheries Technology Development Center (NIFTDC) Bonuan


Office or Division
Binloc, Dagupan City

Classification Complex
G2G - Government o Government; G2C - Government to Citizen; G2B - Government to
Type of Transaction Business Entity

1. Internal - Provincial Fisheries Offices (PFOs), BFAR Regional Fishery Officers, BFAR Central
Office Personnel, other BFAR National Centers

2. External - MSMEs, Exporters/Fish Processors; Potential Fish Processors, Exporters; Academe


Who may avail: (Students, Professors, On-the-Job Training, Research); Fisherfolk organizations/ associations/
people’s organizations/ cooperatives/ Women’s associations, Housewives, Senior Citizens, IPs;
Other government agencies, National Government Agencies (NGAs), Local Government Units
(LGUs), Non-Government Organizations (NGOs); Private hatchery owners; Private fish pond owners;
Private Individuals; Private Institutions

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter Request (1 original) Client/Requesting Party/ies

2. Training Evaluation Form (1 original) BFAR- NIFTDC Asian Fisheries Academy

3. Cerificate of Training (1 original) BFAR- NIFTDC Asian Fisheries Academy

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit Letter Request 1. Receive Letter Request Aquaculturist II
Malasakit Help Desk
None 5 Minutes
BFAR NIFTDC Main
Building Lobby
1.1 Schedule the
appropriate training request Aquaculturist II
Asian Fisheries Academy
None None 5 Minutes
BFAR NIFTDC
Compound
2. Accept/ Receive 2. Notify client,
notification of scheduled stakeholders on the Aquaculturist II
training and confirm schedule of trainings Asian Fisheries Academy
None 30 Minutes
attendance on the BFAR NIFTDC
training Compound

3. Attend the training 3. Conduct/ Facilitate


requested training
Aquaculturist II
Asian Fisheries Academy
None 5 Days
and BFAR NIFTDC
Unit/s or Project/s

538
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
4. Accomplish Training 4. Receive accomplished
Evaluation Form Training Evaluation Form Aquaculturist II
Asian Fisheries Academy
None 5 Minutes
BFAR NIFTDC
Compound

5. Receive signed 5. Issue an approved and


Certificate of Training signed Certificate of Aquaculturist II
Training Asian Fisheries Academy
None 2 Minutes
BFAR NIFTDC
Compound

TOTAL None 5 Days, 47 Minutes

539
F. Request Distribution of Fry, Fingerlings, Post Larvae and Spat Via Airport/ Seaport

1. Free Distribution of Fry, Fingerlings, Postlarvae, Spat (Saline Tilapia Molobicus, Freshwater
Shrimp, Oyster and Mussel)
Fry, Fingerlings, Postlarvae, Spat (Saline Tilapia Molobicus, Freshwater Shrimp, Oyster and Mussel respectively, are
distributed for free and transported by NIFTDC staff to the airport/seaport and sent via cargo, as requested by clients.

BFAR- National Integrated Fisheries Technology Development Center (NIFTDC)-


Office or Division BonuanBinloc, Dagupan City

Classification Simple

Type of Transaction G2G - Government to Government; G2B - Government to Business Entity; G2C-Gov't to Client

1. Internal - BFAR Regional Offices


Who may avail:
2. External - Private Individuals/Pond Owners

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter Request (1 original) Client/ Requesting Party/ies

2. Payment for transport materials and other fees Airport or Philippine Ports Authority (PPA)

3. Gate Pass (1 original) BFAR- NIFTDC

4. Shipment Form (1 original, 1 duplicate copy) Cargo/Airline or Cargo/PPA

5. Local Transport Permit (2 original, 2 duplicate BFAR Region 1 (Point of origin) and BFAR Region 4 A Quarantine
copies) Office (Last Point of Entry)

BFAR Region 1 (Point of origin) and BFAR Region 4 A Quarantine


6, Health Certificate (2 original, 2 duplicate copies)
Office (Last Point of Entry)

7. Clearance (1 original, 1 duplicate copy) Cargo/Airline


8. Checklist (1 original, 1 duplicate copy) Cargo/Airline

9. Waiver (1 original, 1 duplicate copy) Cargo/Airline

10. Official receipt (1 original, 1 duplicate copy) Cargo/Airline

11. Sticker (6 pieces) and 4-6 pieces BFAR NIFTDC and Cargo

12. Client Satisfaction/ Feedback form (1 original) BFAR NIFTDC Hatchery


13. NAIA gate pass for Quarantine Airport

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Send Letter Request 1. Receive Letter Request Aquaculturist II
thru email thru email and process the Office of the Center Chief
request for approval BFAR NIFTDC Main
None 15 Minutes Building

540
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
2. Approve letter request Center Chief
Office of the Center Chief
None None 15 Minutes BFAR NIFTDC Main
Building

3. Receive notification 3. Notify client of the


for approved request and approved request and Aquaculturist II
schedule of distribution schedule of distribution None 5 minutes BFAR NIFTDC
Hatchery

4. Send payment through 4. Receive payment for


banks/ courier for the transport materials,
needed transport expressway toll fees, van
materials, expressway toll hire, permits, courier and Aquaculturist II
fees, van hire, permits, other fees at the airport or Refer to Table:
10 Minutes BFAR NIFTDC
courier and other fees seaport 6, 7, 8.
Hatchery
required at the airport or
seaport

5. Actual distribution
(loading and packing)

Aquaculturist II
None None 1 Hour BFAR NIFTDC
Hatchery

5.1 Prepare Gate Pass for


fry/fingerlings, post larvae Aquaculturist II
or spats BFAR NIFTDC
None None 5 Minutes
Hatchery

5.2 Transport fry,


fingerlings, post larvae,
BFAR NIFTDC Technical
spat, from NIFTDC
Staff
None (Dagupan City) to airport or None 4 Hours
Airport or Philippine Ports
Philippine Ports Authority
Authority (PPA)
(PPA) if via air or sea
respectively
5.3 Proceed to cargo and
fill out Shipment Form
BFAR NIFTDC Technical
Staff
None None 3 Minutes
Airport or Philippine Ports
Authority (PPA)

5.4 Repack and re-oxygen


transport bags BFAR NIFTDC Technical
Staff
None None 3 Hours
Airport or Philippine Ports
Authority (PPA)

541
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
5.5 Weighing and checking
of cargo Cargo Personnel
None None 15 Minutes Airport or Philippine Ports
Authority (PPA)

5.6 Present secured


permits, certificates , BFAR NIFTDC Technical
clearance, checklist and Staff
None None 1 Hour
waiver Airport or Philippine Ports
Authority (PPA)

5.7 Receive items/goods 5.7 Payment of required


at airport or port of fees and secure official BFAR NIFTDC Technical
destination receipts, issuance of sticker Refer to Table: 6, Staff
and proceed to cargo for 1 Hour
7, 8. Cashier
receiving Airport or PPA

5.8 Receive Client 5.8 Send Client Satisfaction


Satisfaction Feedback Feedback blank Form,
Form, official receipts official receipts and other Aquaculturist II
and other important important documents to None 5 Minutes BFAR NIFTDC
documents client Hatchery

6. Send back 6. Receive accomplished


accomplished Client Client Satisfaction Aquaculturist II
Satisfaction Feedback Feedback Form None 5 Minutes BFAR NIFTDC
Form to NIFTDC Hatchery

Refer to Table: 1 Day, 3 Hours, 18


TOTAL
6, 7, 8. Minutes

Table 6.
Payment for transport materials, expressway toll fees, van hire, permits, certificates and other fees at the airport.
Saline Tilapia Molobicus

QUANTITY UNIT ITEM DESCRIPTION UNIT COST AMOUNT

Saline tilapia
10,000 pieces Molobicus fingerlings

styrophor box
15 pieces (20'x 24' x 32')
PHP 400.00 PHP 6,000.00

carton box
15 pieces (22' x 26' x 34')
PHP 85.00 PHP 1,275.00

polyethylene bag
90 pieces (20' x 30' x 003)
PHP 10.00 PHP 900.00

polyethylene bag
30 pieces (40" x 40" x 003)
PHP 45.00 PHP 275.00

1 piece rubber band (big) PHP 195.00 PHP 195.00

1 piece rubber band (small) PHP 185.00 PHP 185.00

542
5 pieces book sticker paper PHP 45.00 PHP 225.00

packaging tape,
5 rolls brown 2"
PHP45.00 PHP 225.00

toll fee (NLEX,


2 way TPLEX, SCTEX)
PHP 1,300.00 PHP 1,300.00

airfreight, 15 kg per
15 boxes box (NAIA terminal 1 PHP 1,200.00 PHP 18,000.00
and 3)

NAIA gate pass for


1 copy Quarantine
PHP 100.00 PHP 100.00

Local Transport
2 copies Permit
PHP 100.00 PHP 200.00

PHP 28,880.00

Table 7.
Freshwater Shrimp

QUANTITY UNIT ITEM DESCRIPTION UNIT COST AMOUNT


freshwater shrimp
10,000 pieces post larvae
refer to Table 8
styrophor box
5 pieces (20'x24' x 32')
PHP 400.00 PHP 2,000.00
carton box (22' x
15 pieces 26' x 34')
PHP 85.00 PHP 1,275.00

polyethylene bag
90 pieces (20' x 30' x 003)
PHP 10.00 PHP 900.00

polyethylene bag
30 pieces (40" x 40" x 003)
PHP 45.00 PHP 275.00

1 piece rubber band (big) PHP 195.00 PHP 195.00

1 piece rubber band (small) PHP 185.00 PHP 185.00

5 pieces book sticker paper PHP 45.00 PHP 225.00

packaging tape,
5 rolls brown 2"
PHP45.00 PHP 225.00

toll fee (NLEX,


2 way TPLEX, PHP 1,300.00 PHP 1,300.00
SCTEX)
airfreight, 15 kg per
15 boxes box (NAIA terminal PHP 1,200.00 PHP 18,000.00
1 and 3
NAIA gate pass for
1 copy Quarantine
PHP 100.00 PHP 100.00

Local Transport
2 copies Permit
PHP 100.00 PHP 200.00

PHP 24,880.00

543
Table 8.
Estimated Cost of Oyster Seedlings Transport to e.g BFAR Region XII

QUANTITY UNIT ITEM DESCRIPTION UNIT COST AMOUNT

2 rolls plastic strips PHP 160.00 PHP 320.00

1 roll P.E. Rope # 8 PHP 320.00 PHP 320.00

1 spool Nylone twine, 210/18 PHP 330.00 PHP 330.00

Plastic transport bag


1 pack (40 x 40 x 0.003,10 PHP 180.00 PHP 180.00
pieces per pack)

1 box rubber band, small PHP 50.00 PHP 50.00

styrofoam box, (56


2 boxes cm x 40 cm x 40 cm)
PHP 220.00 PHP 440.00

2 boxes carton box PHP 60.00 PHP 120.00

sticker paper, 10
1 pack sheets per pack
PHP 39.75 PHP 39.75

1 roll packaing tape, 2" PHP 40.00 PHP 40.00

airfreight, (7 kg per
2 boxes box)
PHP 2,000.00 PHP 4,000.00

Van hire (Dagupan-


1 unit Cargo-Manila)
PHP 8,000.00 PHP 8,000.00

Local Transport
2 copies Permit
PHP 30.00 PHP 60.00

PHP 13,899.75

544
2. Sold/Purchase Distribution of Fry, Fingerlings, Postlarvae, Spat (Saline Tilapia (Molobicus),
Freshwater Shrimp, Oyster and Mussel)
Fry, Fingerlings, Postlarvae, Spat (Milkfish, Saline Tilapia Molobicus, Freshwater Shrimp, Oyster and Mussel respectively, are
distributed for a certain fee and transported by NIFTDC staff to the airport or seaport, and sent via cargo as requested by the
clients.
BFAR- National Integrated Fisheries Technology Development Center (NIFTDC)-Binloc,
Office or Division Dagupan City

Classification Simple

G2G - Government to Government; G2B - Government to Business Entity; G2C - Government to


Type of Transaction
Citizen
1. Internal - BFAR Regional Fishery Offices

Who may avail: 2. External - Fisherfolk organizations/ associations/ people’s organizations/ cooperatives/ Women’s
associations, Other government agencies; Local Government Units (LGUs); Private hatchery
owners

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter Request through email Emails: bfarniftdc@yahoo.com or westlyrosario@ymail.com

2. Payment for transport materials and for fingerlings Client/Requesting Party/ies

3. Official Receipt (1 original) BFAR NIFTDC Administrative Unit

4. Gate Pass (1 original) BFAR NIFTDC

5. Shipment Form (1 original, 1 duplicate copy) Cargo/Airline

6. Local Transport Permit (2 original, 2 duplicate BFAR Region 1 (Point of origin) and BFAR Region 4 A Quarantine
copies) Office (Last Point of Entry)

BFAR Region 1 (Point of origin) and BFAR Region 4 A Quarantine


7. Health Certificate (2 original, 2 duplicate copies)
Office (Last Point of Entry)

8. Clearance (1 original, 1 duplicate copy) Cargo/Airline

9. Checklist (1 original, 1 duplicate copy) Cargo/Airline

10. Waiver (1 original, 1 duplicate copy) Cargo/Airline

11. Official receipt (1 original, 1 duplicate copy) Cargo/Airline

12. Sticker (6 pieces) and 4-6 pieces BFAR NIFTDC and Cargo

13. Client Satisfaction/ Feedback form (1 original) BFAR NIFTDC Hatchery

14. NAIA gate pass for Quarantine Airport

545
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Send Letter Request 1. Receive Letter Request Aquaculturist II
through email and process request for Office of the Center Chief
approval None 15 Minutes BFAR NIFTDC Main
Building

1.1 Approve request Center Chief


Office of the Center Chief
None None 15 Minutes BFAR NIFTDC Main
Building

2. Receive notification of 2. Inform client of approved


approved request and request and schedule of
Technical staff
schedule of distribution distribution None 5 Minutes
BFAR NIFTDC Hatchery

3. Send payment for fry 3. Receive payment for fry


or fingerlings or post or fingerlings or post
larvae, or spats, transport larvae, or spats, transport
materials, toll fees, van materials, toll fees, van
hire, permits and other hire, permits and other fees Refer to Table 6, Technical staff
10 Minutes
fees required by the required by the 7, 8 BFAR NIFTDC Hatchery
airport or seaport cargo airport/seaport cargo
to NIFTDC

3.1 Loading and packing


Technical staff
None None 1 Hour
BFAR NIFTDC Hatchery

3.2 Prepare Gate Pass


and Official Receipt for Technical staff
payment of fry, fingerlings, BFAR NIFTDC Hatchery
post larvae or spat Collection Officer
None None 10 Minutes
Administrative Unit
BFAR NIFTDC Main
Building

3.3 Transport eggs or fry or


fingerlings or post larvae,
or spat from NIFTDC to
airport or Philippine Ports Technical Staff
None None 3 Hours
Authority (PPA) if via air or BFAR NIFTDC Hatchery
sea

3.4 Proceed to cargo and


fill up Shipment Form Technical Staff
BFAR NIFTDC
None None 3 Minutes
Airport or Philippine Ports
Authority (PPA)

3.5 Repack and re-oxygen


transport bags Technical Staff
BFAR NIFTDC
None None 3 Hours
Airport or Philippine Ports
Authority (PPA)

546
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
3.6 Weighing and checking
of cargo Cargo Personnel
None None 15 Minutes Airport or Philippine Ports
Authority (PPA)

3.7 Present secured


Technical Staff
permits, certificates ,
clearance, checklist and BFAR NIFTDC
None None 1 Hour
waiver Airport or Philippine Ports
Authority (PPA)
3.8 Payment of required
fees and issuance of
sticker and proceed to Refer to Table 6, Cashier
None 1 Hour
cargo for receiving 7, 8 Airport or PPA

4. Receive official 3.9 Send Client


receipts of fees and other Satisfaction/ Feedback
documents and fill-out Form, Official Receipts of Technical Staff
Client fees and other documents None 5 Minutes BFAR NIFTDC Hatchery
Satisfaction/Feedback to client
form

5. Send accomplished 4. Receive accomplished


Client Satisfaction/ Client Satisfaction/ Technical Staff
Feedback Form to BFAR Feedback Form None 5 Minutes BFAR NIFTDC Hatchery
NIFTDC

Refer to Table 6, 1 Day, 2 Hours, 23


TOTAL
7, 8 Minutes

Table 9

Transport Materials - (plastic bags) - PHP 10.00 per piece


Freshwater Shrimp Post Larvae- PHP 1.00 per piece
Spats: seeded collectors (plastic strings) - PHP40.00 per string

Oyster/Mussel Seedlings:
PHP 0.30 per piece
4-5 inches - PHP 5.00 per piece

Saline Tilapia Fingerlings:


size 22 -PHP 0.35 per piece
size 17 - PHP 0.45 per piece
size 14 -PHP 0.55 per piece
size 12- PHP 0.65 per piece

547
Table 11
List of Algae with Corresponding Prices

Phytoplankton (Microalgae)
Nannochloropsis oculata PHP 60.00
Nannochloropsis sp PHP 60.00
Nannochlorum sp.* PHP 60.00
Teraselmis tetrahele PHP 60.00
Teraselmis batan PHP 60.00
Chlorella vulgaris (marine species) PHP 60.00
Chlorella sp. (freshwater species) PHP 60.00
Dunalleila sp. PHP 60.00
Spirulina sp. PHP 60.00
Chaetoceros calcitrans * PHP 60.00
Chaetoceros gracilis * PHP 60.00
Nitszchia sp. PHP 60.00
Isochrysis galbana * PHP 60.00
Pavlova sp. PHP 60.00
Navicula sp. PHP 60.00
Amphora sp. PHP 60.00
Thalasiosira pseudonana PHP 60.00
Zooplankton PHP 250.00
* Always available, while the rest of the microalgae are cultured in test tubes and need to be mass produced. Reservations
should be made three weeks to one month in advance.

548
G. Distribution of Natural Food

1. Free Distribution of Primary, Secondary and Mass Culture of Natural Food Organisms (Microalgae,
Daphnia and Rotifer)
Natural food organisms such as microalgae, Daphnia and rotifer are distributed for free to clients, and are picked up by the
client at the Center

BFAR- National Integrated Fisheries Technology Development Center (NIFTDC), Bonuan


Office or Division Binloc, Dagupan City

Classification Simple
G2G - Government to Government; G2B - Government to Business Entity
Type of Transaction

Who may avail: (Internal) BFAR Regional Fishery Officers, other Centers

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter Request (1 original) Client/ Requesting Party/ies

2. Client Request Form (Individual and Group) (1


BFAR NIFTDC - Biology/Phycology Laboratory, Main Building
original)
3. Payment for transport materials Client/Requesting Party/ies

3. Gate Pass (1 original) BFAR NIFTDC - Biology/Phycology Laboratory, Main Building

4. Client Satisfaction/Feedback Form (1 original) BFAR NIFTDC - Biology/Phycology Laboratory, Main Building

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit Letter Request 1. Receive Letter Request Aquaculturist II
or accomplish Client or accomplished Client Malasakit Help Desk or
Request Form Request Form and process Laboratory Technical
request for approval Staff Biology/
None 30 Minutes
Phycology Laboratory
BFAR NIFTDC Main
Building

1.1 Approve request by the


Center Chief
Center Chief
Office of the Center Chief
None None 15 Minutes
BFAR NIFTDC Main
Building

1.2 Provide technical


assistance and Laboratory Technical
recommendation Staff
Biology/Phycology
None None 15 Minutes
Laboratory
BFAR NIFTDC Main
Building

549
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1.3 Receive notification 1.3 Notify the client of the Laboratory Technical
for schedule of schedule of distribution of Staff
distribution of request request Biology/Phycology
None 5 Minutes
Laboratory
BFAR NIFTDC Main
Building
2. Receive natural food 2. Examine quality of
organisms and pay for starters under Laboratory Technical
transport materials microscope/Actual Staff
distribution (loading and Biology/Phycology
Refer to Table 9 30 Minutes
packing) and receive Laboratory
payment BFAR NIFTDC Main
Building

3. Receive gate pass 3. Prepare and issue gate Laboratory Technical


pass Staff
Biology/Phycology
None 5 Minutes
Laboratory
BFAR NIFTDC Main
Building
4. Fill out Client 4. Receive accomplished
Laboratory Technical
Satisfaction/ Feedback Client Satisfaction/
Staff
Form Feedback Form
Biology/Phycology
None 5 Minutes
Laboratory
BFAR NIFTDC Main
Building

TOTAL Refer to Table 9 1 Hour, 45 Minutes

Table 9.
Total fees will depend on the amount in liters and the microalge requested

Transport materials (plastic bags) - PHP 10.00 per piece

550
2. Sold/Purchased Distribution of Primary, Secondary and Mass Culture of Natural Food Organisms
(Microalgae, Daphnia and Rotifer)
Natural food organisms such as Microalgae, Daphnia and Rotifer are distributed and sold and picked up at the Center by the
clients.

BFAR- National Integrated Fisheries Technology Development Center (NIFTDC)-Bonuan


Office or Division
Binloc, Dagupan City
Classification Simple
Type of Transaction G2C - Government to Citizen; G2B - Government to Business Entity
External - Academe ( researchers)
Who may avail Private hatchery owners, Fisherfolk

CHECKLIST OF REQUIREMENTS WHERE TO SECURE


1. Letter request (1 original) Client/ Requesting Party/ies

2. Client Request Form (Individual and Group) (1


Biology/Phycology Laboratory, Main Building BFAR NIFTDC
original)
3. Payment for transport materials and natural food Client/ Requesting Party/ies

4. Billing Form (1 original) Biology/Phycology Laboratory, Main Building BFAR NIFTDC

5. Order of Payment (1 original) Biology/Phycology Laboratory, Main Building BFAR NIFTDC


Collection Officer Administrative Unit, BFAR NIFTDC Main Building
6. Official Receipt (1 original)

Biology/Phycology Laboratory, Main Building BFAR NIFTDC


7. Gate pass (1 original)
Biology/Phycology Laboratory, Main Building BFAR NIFTDC
8. Client Satisfaction/ Feedback Form (1 original)

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit letter request 1. Receive Letter Request
with requirements or fill- with requirements or Client Aquaculturist II
out Client Request Form Request Form and process Malasakit Help Desk
request for approval None 30 Minutes
BFAR NIFTDC Main
Building Lobby

1.1 Approval of request


Center Chief
Office of the Center Chief
None None 15 Minutes
BFAR NIFTDC Main
Building

1.2 Provide technical Laboratory Technical


recommendation staff
Biology/Phycology
None None 15 Minutes
Laboratory
BFAR NIFTDC Main
Building
2. Receive notification of 2. Schedule distribution Laboratory Technical
the scheduled distribution staff
None 5 Minutes Biology/Phycology
Laboratory BFAR
NIFTDC Main Building

551
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
3. Receive natural food 3. Examine quality of Laboratory Technical
organisms starters under staff
microscope/Actual Biology/Phycology
distribution (loading and None 30 Minutes
Laboratory
packing) BFAR NIFTDC Main
Building
4. Pay fees for natural 4. Prepare billing and order Laboratory Technical
food organisms and of payment forms, gate Staff Biology/
transport materials pass and official receipt Phycology Laboratory
Refer to Table
15 Minutes and Collecting Officer
10, 11
Administrative Unit
BFAR NIFTDC Main
Building
5. Accomplish Client 5. Receive accomplished
Satisfaction/ Feedback Client Satisfaction/ Laboratory Technical
Form Feedback Form Staff Biology/
None 5 Minutes Phycology Laboratory
BFAR NIFTDC Main
Building

Refer to Table
TOTAL 1 Hour, 55 Minutes
10, 11

Table 10.

Transport materials (plastic bags) - PHP 10.00 per piece

Table 11
List of Algae with Corresponding Prices

Phytoplankton (Microalgae)
Nannochloropsis oculata PHP 60.00
Nannochloropsis sp PHP 60.00
Nannochlorum sp.* PHP 60.00
Teraselmis tetrahele PHP 60.00
Teraselmis batan PHP 60.00
Chlorella vulgaris (marine species) PHP 60.00
Chlorella sp. (freshwater species) PHP 60.00
Dunalleila sp. PHP 60.00
Spirulina sp. PHP 60.00
Chaetoceros calcitrans * PHP 60.00
Chaetoceros gracilis * PHP 60.00
Nitszchia sp. PHP 60.00
Isochrysis galbana * PHP 60.00
Pavlova sp. PHP 60.00
Navicula sp. PHP 60.00
Amphora sp. PHP 60.00
Thalasiosira pseudonana PHP 60.00
Zooplankton PHP 250.00
* Always available, while the rest of the microalgae are cultured in test tubes and need to be mass produced. Reservations
should be made three weeks to one month in advance.

552
H. Toll Processing of Frozen Milkfish
Clients which include fish processors and exporters bring their raw materials such as fresh milkfish to the Korea-Philippines
Seafood Processing Complex for toll processing into fresh frozen whole milkfish, or fresh frozen marinated milkfish or fresh
frozen deboned milkfish for a toll processing fee.
Office or Division BFAR- National Integrated Fisheries Technology Development Center (NIFTDC)-Bonuan Binloc,
Dagupan City
Classification Complex
Type of Transaction G2G - Government to Government; G2B - Government to Business Entity

Who may avail Internal: BFAR Regional Offices

CHECKLIST OF REQUIREMENTS WHERE TO SECURE


1. Letter request (email) BFAR NIFTDC, Korea-Philippines Seafood Processing Complex, Post
Harvest Unit or email to:
bfarniftdc@yahoo.com/westlyrosario@ymail.com
2. Client Request Form (Individual or Group) (1 BFAR NIFTDC, Korea-Philippines Seafood Processing Complex, Post
original) Harvest Unit or email to:
bfarniftdc@yahoo.com/westlyrosario@ymail.com

3. Billing Form (1 original) BFAR NIFTDC Korea Philippines Seafood Processing Complex, Post
Harvest Unit

4. Order of Payment (1 original) BFAR NIFTDC Korea Philippines Seafood Processing Complex, Post
Harvest Unit

5. Official Receipt (1 original ) BFAR NIFTDC Administrative Unit

6. Transport Certificate (1 original) BFAR NIFTDC Korea Philippines Seafood Processing Complex, Post
Harvest Unit
7. Client Satisfaction/Feedback Form BFAR NIFTDC Korea Philippines Seafood Processing Complex, Post
Harvest Unit

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit letter of request 1. Approve request for toll Center Chief
for toll processing processing Office of the Center Chief
None 5 Minutes
BFAR- NIFTDC Main
Building
1.1 Process the request Technical Staff;
after approval. Plant Workers
Korea Philippines -
None None 10 Minutes Seafood Processing
Complex (KP-SPC)
Post Harvest Unit
BFAR NIFTDC
1.2 Receiving of raw
Technical Staff;
materials
Plant Workers
Korea Philippines -
None None 1 Hour Seafood Processing
Complex (KP-SPC)
Post Harvest Unit
BFAR NIFTDC

553
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1.3 Initial washing Technical Staff;
Plant Workers
None None 2 Hours KP-SPC Post
Harvest Unit
BFAR NIFTDC
1.4 Splitting
Technical Staff;
Plant Workers
None None 3 Hours KP-SPC Post
Harvest Unit
BFAR NIFTDC
1.5 Evisceration and
washing Technical Staff;
Plant Workers
None None 3 Hours KP-SPC Post
Harvest Unit
BFAR NIFTDC

1.6 Deboning of Milkfish


Technical Staff;
Plant Workers
None None 6 Hours KP-SPC Post
Harvest Unit
BFAR NIFTDC

1.7 Final washing


Technical Staff;
Plant Workers
None None 2 Hours KP-SPC Post
Harvest Unit
BFAR NIFTDC
1.8 Draining
Technical Staff;
Plant Workers
None None 30 Minutes KP-SPC Post
Harvest Unit
BFAR NIFTDC

1.9 Labelling/ Packaging/


Vacuum Packing Technical Staff;
Plant Workers
None None 1 Hour KP-SPC Post
Harvest Unit
BFAR NIFTDC

1.10 Packing

Technical Staff;
Plant Workers
None None 1 Hour KP-SPC Post
Harvest Unit
BFAR NIFTDC

554
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1.11 Layering/ Weighing
Technical Staff;
Plant Workers
None None 1 Hour KP-SPC Post
Harvest Unit
BFAR NIFTDC

1.12 Chilling
Technical Staff;
Plant Workers
None None 2 Hours KP-SPC Post
Harvest Unit
BFAR NIFTDC

1.13 Blast Freezing


Technical Staff;
Plant Workers
None None 5 Hours KP-SPC Post
Harvest Unit
BFAR NIFTDC
1.14 Packing in cartons
Technical Staff;
Plant Workers
None None 2 Hours KP-SPC Post
Harvest Unit
BFAR NIFTDC

1.15 Cold storage Technical Staff;


Plant Workers
None None 2 Days KP-SPC Post
Harvest Unit
BFAR NIFTDC
2. Prepare Billing Form and
Order of Payment
Technical Staff KP-SPC
None None 5 minutes Post Harvest Unit
BFAR NIFTDC

3.. Pay the necessary 3. Receive payment and


fees and receive Official issue an Official Receipt Technical Staff KP-
Receipt Refer to Table SPC Post Harvest
5 Minutes
13 Unit
BFAR NIFTDC

4. Receive Certificate of 4. Issue Certificate of


Transport Transport Production Head or Plant
Manager KP-SPC
None 5 minutes
Post Harvest Unit
BFAR NIFTDC

5. Fill-out Client 5. Receive filled-out Client


Satisfaction/Feedback Satisfaction/Feedback Technical Staff KP-
Form Form SPC Post Harvest
None 5 minutes
Unit
BFAR NIFTDC

555
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
6. Receive finished 6. Van loading of products
products (fresh frozen
whole milkfish, fresh Technical staff; Plant
frozen marinated milkfish, Workers
None 2 Hours
fresh frozen deboned BFAR NIFTDC- KP-SPC
milkfish) Post Harvest Unit

Refer to Table 3 Days, 8 Hours, 5


TOTAL
13 Minutes

Table 13.
Toll Processing Fee (Plant and Labor fee) will depend on the total weight in kilograms of the finished product and type of fish
and weight of raw materials
Plant fee - PHP 7.00 per kilogram of finished product
Labor Fees:
a. Support Services - Team Leader - PHP 400.00 per day (8 hours)
Members- PHP 350.00 per day (8 hours)
b. Spitters - Regular size (300 grams and above) - PHP 1.00 per piece
c. Washer - Regular size (300 grams and above) - PHP 0.75 per piece
Baby (250 grams and below) - PHP 2.50 per kilogram
d. Deboner - Regular size (300-500 grams) - PHP 2.75 per piece
Large (500 grams and above) - PHP 3.00 per piece
Baby (250 grams and below) - PHP 1.50 per kilogram

Rib bone only - PHP 5.00 per kilogram

556
FEEDBACK AND COMPLAINTS MECHANISMS

Answer the Client feedback form and send or submit it to the Office of the Center Chief

How to send a feedback Contact Info: (075) 649-6086 or bfarniftdc@yahoo.com or westlyrosario@ymail.com

Every Friday, the Complaints Officer/Administrative Officer reads all letters of complaints and
feedback, and compiles and records all feedback submitted.

Feedback requiring answers are forwarded to the relevant units/projects and they are required to
How feedback is
answer within three (3) days of the receipt of the feedback.
processed
The answer of the unit/project is then relayed to the citizen.
For inquiries and follow-ups, clients may contact the following
telephone number: (075) 649-6068

Answer the Client Complaint Form and send or submit it to the Administrative Officer/Complaints
Officer at the Administrative Unit Office. BFAR NIFTDC Bonuan Binloc, Dagupan City.

Complaints can also be filed via telephone. Make sure to provide the following - information:
How to file a complaint
Name of person being complained:
Incident:
Evidence:
For inquiries and follow-ups, clients may contact the following
telephone number: (075) 649-6068

The Complaints Officer/Administrative Officer opens the complaints email on a daily basis and
evaluates each complaint. Upon evaluation, the Complaints Officer/Administrative Officer shall start
the investigation and forward the complaint to the relevant office for their explanation. The
How complaints are
Complaints Officer/Administrative Officer will create a report after the investigation, and shall submit
processed
it to the Center Chief for appropriate action. The Complaints Officer /Administrative Officer will give
the feedback to the client. For inquiries and follow-ups, clients may contact the following contact
number: (075) 649-6068

Contact Information of
A R T A : 1c-oAmRpTlaAi n(2ts7@82a)r ta.gov.ph PCCCCB:: 80898088 -881-6565 (SMS)
CCB, PCC, ARTA

557
LIST OF OFFICES

OFFICE ADDRESS CONTACT INFORMATION

Russia St., Barangay bfarniftdc@yahoo.com or westlyrosario@ymail.com


Office of the Center Chief Bonuan Binloc, Dagupan
City (075) 648-6086

Administrative Unit admdagupan0325@yahoo.com


Russia St., Barangay
Bonuan Binloc, Dagupan
City
(075) 649-6068

Korea-Philippines
Seafood Processing Russia St., Barangay (075) 649-6084
Complex Bonuan Binloc, Dagupan
City

Asian Fisheries Academy Russia St., Barangay (075) 649-6083


Bonuan Binloc, Dagupan
City

558
VI. National Seaweed Technology Development Center (NSTDC) - Cabid-an, Sorsogon

A. Fisheries Production and Distribution


1. Conduct of Assessment on Seaweed Production- National Certificate II (Regular)

Assessment on Seaweed Production-National Certificate II (SP-NC II)

Office or Division BFAR-National Seaweed Technology Development Center (NSTDC), Cabid-an, Sorsogon

Classification Complex

Type of Transaction G2C - Government to Citizen; G2B - Government to Business; G2G - Government to Government

1. Internal - BFAR-Regional Offices Personnel, Central Office Personnel and other BFAR National
Centers
Who may avail: 2. External - Seaweed Farmers, Fisherfolk association, Seaweed Traders, Women’s group,
Academe (Students, Professors, OJTs, Researchers), Local Government Units (LGUs); Non-
Government Organizations (NGOs)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Application Form BFAR-NSTDC Administrative Office/Assessment Center Office

2. Self-Assessment Guide (SAG) Form BFAR-NSTDC Administrative Office/Assessment Center Office

3. Admission Slip BFAR-NSTDC Administrative Office/Assessment Center Office

4. Official Receipt BFAR-NSTDC Cashier Center Office


FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit Application 1. Receive Application
Form Form, assess and approve Head of the Center
request None 5 Minutes BFAR- NSTDC Center
Office

2. Pay the required 2. Receive payment and


assessment fee issue official receipt and
provide Admission Slip refer to schedule Cashier Center
1 Minute
of fees below Office

3. Secure official receipt 3. Provide official receipt


and Admission Slip and Admission Slip
Administrative Assistant
None 1 Minute
Center Office

4. Attend the actual 4. Conduct actual


assessment assessment Administrative Assistant
None 3 Days
Center Office

refer to
TOTAL schedule of fees 3 Days, 12 Minutes
below

559
Schedule of Fees:

Full Competency - Php 600.00

COC 1 - Php 560.00

COC 2 - Php 560.00


COC 3 - Php 570.00

COC 4 - Php 540.00

560
2. Conduct of Assessment on Seaweed Production- National Certificate II (Scholarship)

Assessment on Seaweed Production-National Certificate II (SP-NC II) (Scholarship)

Office or Division BFAR-National Seaweed Technology Development Center (NSTDC), Cabid-an, Sorsogon

Classification Simple
G2C - Government to Citizen; G2B - Government to Business; G2G - Government to Government
Type of Transaction
1. Internal - BFAR-Regional Offices Personnel, Central Office Personnel and other BFAR National
Centers
2. External - Seaweed Farmers, Fisherfolk association, Seaweed Traders, Women’s group,
Who may avail: Academe (Students, Professors, OJTs, Researchers), Local Government Units, National
Government Organizations, Seaweed Farmers, Fisherfolk association, Seaweed Traders, Women’s
group, Academe (Students, Professors, OJTs, Researchers), Local Government Units (LGUs); Non-
Government Organizations (NGOs).

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Application Form BFAR-NSTDC Administrative Office/Assessment Center Office

2. Self-Assessment Guide (SAG) Form BFAR-NSTDC Administrative Office/Assessment Center Office

3. Admission Slip BFAR-NSTDC Administrative Office/Assessment Center Office

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit Application 1. Receive Application
Form Form, assess and approve Head of the Center
request None 5 Minutes BFAR- NSTDC Center
Office

2. Attend the actual 2. Conduct actual


assessment assessment Administrative Assistant
None 3 Days
Center Office

TOTAL None 3 Days, 5 Minutes

561
3. Dispersal of Seaweed Propagules and Raw Dried Seaweeds

Dispersal of Seaweeds and Raw Dried Seaweeds for distribution to support and provide the needs of the clients.

Office or Division BFAR-National Seaweed Technology Development Center (NSTDC), Cabid-an, Sorsogon

Classification Simple

Type of Transaction G2C - Government to Citizen; G2G - Government to Government

1. Internal - BFAR Regional Offices Personnel


Who may avail: 2. External - Individual Seaweed Farmer, Fisherfolk Association, Academe (Students, Professors,
OJTs, Researchers), Local Government Units (LGUs)

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter Request Client/Requesting Party/ies

2. Request Form BFAR-NSTDC Administrative Office

3. Client Feedback Form BFAR-NSTDC Administrative Office

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit Letter Request 1. Receive and record the
or accomplished Request Letter Request or
Aquaculturist I BFAR-
Form accomplished Request None 2 Minutes
Form NSTDC

2. Coordinate and 2. Set the schedule of


discuss on the schedule collection and discuss/ Aquacultural Technician
of collection notify the client None 5 Minutes I; Aquaculturist I
BFAR- NSTDC

2.1 Forward the request to


Center Chief for the Aquacultural Technician
None approval None 5 Minutes I; Aquaculturist I
BFAR- NSTDC

2.2 Approval of the request


Center Chief
None None 5 Minutes
Office of the Center Chief

3. Receive/ Collect the 3. Distribution of quality


seaweed propagules or seaweed propagules or raw Aquacultural Technician
raw dried seaweed. dried seaweeds. None 5 Minutes I; Aquaculturist I BFAR-
NSTDC

4. Fill out of Client 4. Receive accomplished


Feedback Form Client Feedback Form Aquaculturist I BFAR-
None 1 Day
NSTDC

TOTAL None 1 Day, 22 Minutes

562
4. Issuance of Seaweed Quality Analysis Report (Moisture Content (MC)
To determine the quality of seaweeds moisture content submitted in the laboratory by the requesting parties.

Office or Division BFAR-National Seaweed Technology Development Center (NSTDC), Cabid-an, Sorsogon

Classification Simple

Type of Transaction G2C - Government to Citizen; G2B - Government to Business; G2G - Government to Government

1. Internal - BFAR- Regional Offices Personnel

Who may avail: 2. External - Seaweed Farmers, Fisherfolk association, Seaweed Traders, Exporters, Academe
(Students, Professors, OJTs, Researchers), Local Government Units (LGUs); Non-Government
Organizations (NGOs).

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter request Client/Requesting Party/ies

2. Request Form BFAR-NSTDC Administrative Office

3. Client Feedback Form BFAR-NSTDC Administrative Office

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit Letter Request 1. Receive and record
or accomplish Request Letter Request or
Form and submit accomplished Request
Aquaculturist I BFAR-
Seaweed sample Form and receive Seaweed None 10 Minutes
NSTDC
samples

2. Secure the result of 2. Release the result of


analysis analysis
Laboratory Assistant
None 1 Day BFAR- NSTDC
Laboratory Section

3. Fill out of Client 3. Receive filled-out Client


Feedback form Feedback Form Aquaculturist I BFAR-
None 4 Minutes
NSTDC

TOTAL None 1 Day, 14 Minutes

563
5. Seaweed Quality Analysis (Gel Strength/Yield/Viscosity

To determine the quality of seaweeds submitted in the laboratory by the requesting parties.

Office or Division BFAR-National Seaweed Technology Development Center (NSTDC), Cabid-an, Sorsogon

Classification Complex
G2C - Government to Citizen; G2B - Government to Business; G2G - Government to Government
Type of Transaction

1. Internal - BFAR- Regional Offices Personnel


Who may avail: 2. External - Seaweed Farmers, Fisherfolk association, Seaweed Traders, Exporters, Academe
(Students, Professors, OJTs, Researchers), Local Government Units (LGUs); Non-Government
Organizations (NGOs).

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter Request Client/Requesting Party/ies

2. Request Form BFAR-NSTDC Administrative Office

3. Required Sample of Seaweeds BFAR-NSTDC Administrative Office

3. Client Feedback Form BFAR-NSTDC Administrative Office

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

1. Submit Letter Request 1. Receive Letter Request


or accomplish Request or accomplished Request
Form and submit Form and record the Aquaculturist I BFAR-
Seaweed sample request and receive None 1 Minute
NSTDC
Seaweed samples

2. Secure the result of 2. Seaweed analysis of


analysis samples submitted

Aquaculturist I BFAR-
None 7 Days
NSTDC
2.1 Release the result of
analysis

3. Fill out of Client 3. Receive filled-out Client


Feedback form Feedback Form Aquaculturist I BFAR-
None 4 Minutes
NSTDC

TOTAL None 7 Days, 5 Minutes

564
B. Provision for Extension Support, Education and Training Services

1. Technical Assistance for Distribution of Information, Education and Communication (IEC)


Materials
To provide awareness and information to the clientele thru distribution of IEC materials.

Office or Division BFAR-National Seaweed Technology Development Center (NSTDC), Cabid-an, Sorsogon

Classification Simple

Type of Transaction G2C - Government to Citizen; G2B - Government to Business; G2G - Government to Government

1. Internal - Provincial Fishery Offices (PFOs), BFAR Regional Fishery Officers, BFAR Central
Office Personnel and BFAR National Centers
2. External - MSMEs; Exporters/Fish Processors; Potential Fish Processors, Exporter; Academe
(Students, Professors, On-the-Job Training, Research); Fisherfolk Organizations, Associations,
Who may avail:
People’s Organizations, Cooperatives, Women’s Associations, Housewives, Senior Citizens,
Indigenous People; Other Government Agencies; National Government Agencies (NGAs); Local
Government Units (LGUs) and House of Representatives; Non-Government Organizations (NGOs).

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter Request Client/Requesting Party/ies

2. Client Request Form for Information, Education and


Communication (IEC) materials BFAR-NSTDC Administrative Office

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit Letter Request 1. Receive Letter Request
and/or accomplished and/or accomplished Client Administrative Assistant I
Client Request Form Request Form None 5 Minutes & II; Aquaculturist I
BFAR- NSTDC

2. Receive IEC materials 2. Provide the IEC


requested/ needed materials requested
Administrative Assistant I
None 3 Minutes & II; Aquaculturist I
BFAR- NSTDC

TOTAL None 8 Minutes

565
2. Technical Assistance for Regular Training

To provide updated information and transfer the new technology to the participants.

Office or Division BFAR-National Seaweed Technology Development Center (NSTDC), Cabid-an, Sorsogon

Classification Simple

Type of Transaction G2C - Government to Citizen; G2B - Government to Business; G2G - Government to Government

1. Internal - Provincial Fishery Offices (PFOs), BFAR Regional Fishery Officers, BFAR Central
Office Personnel and BFAR National Centers
2. External - MSMEs; Exporters/Fish Processors; Potential Fish Processors, Exporter; Academe
(Students, Professors, On-the-Job Training, Research); Fisherfolk Organizations, Associations,
Who may avail:
People’s Organizations, Cooperatives, Women’s Associations, Housewives, Senior Citizens,
Indigenous People; Other Government Agencies National Government Agencies (NGAs); Local
Government Units (LGUs) and House of Representatives; Non-Government Organizations (NGOs).

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Invitation Letter BFAR-NSTDC Administrative Office

2. Client Request Form BFAR-NSTDC Administrative Office

3. Evaluation Form BFAR-NSTDC Administrative Office

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Receive Invitation 1. Send Invitation Letter or
Letter or accomplished receive accomplished Aquaculturist I BFAR-
Client Request Form Client Request Form None 5 Minutes
NSTDC

2. Receive schedule of 2. Send training schedule


training and confirmed and seek confirmation of Aquacultural Technician
attendance attendance from client None 5 Minutes I; Aquaculturist I BFAR-
NSTDC

3. Attend proper training 3. Conduct training


Aquacultural Technician
None 6 Days I; Aquaculturist I BFAR-
NSTDC
4. Fill out Training 4. Receive accomplished
Evaluation Form Training Evaluation Form Aquacultural Technician
None 5 Minutes I, Aquaculturist I BFAR-
NSTDC

5. Receive an approved 5. Issue an approved and


and signed Certificate of signed Certificate of Aquacultural Technician
Training after the Training None 2 Minutes I; Aquaculturist I BFAR-
completion of Training NSTDC

TOTAL None 6 Days, 17 Minutes

566
3. Technical Assistance for Walk-in Clients
The service involves transfer of technical information or ideas to develop or enhance the skills of Walk-in Clients on various
mariculture technologies.

Office or Division BFAR-National Seaweed Technology Development Center (NSTDC), Cabid-an, Sorsogon

Classification Simple

Type of Transaction G2C - Government to Citizen; G2B - Government to Business; G2G - Government to Government

1. Internal - Provincial Fishery Offices (PFOs), BFAR Regional Fishery Officers, BFAR Central
Office Personnel and BFAR National Centers
2. External - MSMEs; Exporters/Fish Processors; Potential Fish Processors, Exporter; Academe
(Students, Professors, On-the-Job Training, Research); Fisherfolk Organizations, Associations,
Who may avail:
People’s Organizations, Cooperatives, Women’s Associations, Housewives, Senior Citizens,
Indigenous People; Other Government Agencies National Government Agencies (NGAs); Local
Government Units (LGUs) and House of Representatives; Non-Government Organizations (NGOs).

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Client Inquiry Form BFAR-NSTDC

2. Client Feedback Form BFAR-NSTDC

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Accomplish and 1. Receive the
Submit the Client Inquiry accomplished Client Inquiry Aquaculturist I BFAR-
None 5 Minutes
Form Form NSTDC

1.1 Endorse to appropriate Center Chief; Technical


technical official/staff and Staff; Aquacultural
render needed assistance. Technician I;
None None 5 Minutes Aquaculturist I BFAR-
NSTDC

2. Discuss 2. Render the appropriate


inquiry/concerns action and addressed the Technical Staff;
concern Aquacultural Technician
None 2 Hours
I; Aquaculturist I BFAR-
NSTDC

3. Accomplish Client 3. Receive the


Feedback Form accomplished Client
Aquaculturist I BFAR-
Feedback Form None 5 Minutes
NSTDC

TOTAL None 2 Hours, 15 Minutes

567
4. Technical Assistance On-site Visit/ Inspection

Render technical assistance to the client who may request service on-site.

Office or Division BFAR-National Seaweed Technology Development Center (NSTDC), Cabid-an, Sorsogon

Classification Complex

Type of Transaction G2C - Government to Citizen; G2B - Government to Business; G2G - Government to Government

1. Internal - Provincial Fishery Offices (PFOs), BFAR Regional Fishery Officers, BFAR Central
Office Personnel and BFAR National Centers
2. External - MSMEs; Exporters/Fish Processors; Potential Fish Processors, Exporter; Academe
Who may avail: (Students, Professors, On-the-Job Training, Research); Fisherfolk Organizations, Associations,
People’s Organizations, Cooperatives, Women’s Associations, Housewives, Senior Citizens,
Indigenous People; Other Government Agencies National Government Agencies (NGAs); Local
Government Units (LGUs) and House of Representatives; Non-Government Organizations (NGOs).

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter request Client/Requesting Party/ies

2. Client Request Form BFAR-NSTDC

3. Client Feedback Form BFAR-NSTDC


FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit Letter Request 1. Receive Letter Request
or accomplish Client or accomplished Client
Request Form Request Form Aquaculturist I BFAR-
None 5 Minutes
NSTDC

1.1 Forward submitted


document to the Center
Chief for appropriate action Aquaculturist I BFAR-
None None 5 Minutes
NSTDC

1.2 Assign technical staff to


render technical assistance
Center Chief
None to the client None 5 Minutes
Office of the Center Chief

2. Receive notification 2. Schedule site


and confirmed visit/inspection and notify
attendance for the client of the scheduled visit Aquacultural Technician
scheduled visit and confirm attendance None 5 Minutes I; Aquaculturist I BFAR-
NSTDC

3. Allow to conduct 3. Conduct on-site


on-site visit/inspection/ visit/inspection/ sampling Aquacultural Technician
sampling None 3 Days I; Aquaculturist I BFAR-
NSTDC

568
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
3.1 Prepare inspection and
its recommendations Aquacultural Technician
None None 1 Hour I; Aquaculturist I BFAR-
NSTDC

4. Receive inspection 4. Release inspection


report and its report and its
recommendation recommendation Aquaculturist I BFAR-
None 5 Minutes
NSTDC

5. Accomplish Client 5. Receive accomplished


Satisfaction Form Client Satisfaction Form Aquaculturist I BFAR-
None 5 Minutes
NSTDC

3 Days, 1 Hour, 30
TOTAL None
Minutes

569
5. Technical Assistance thru Social Media (E-mail, Facebook, Messenger and Text (SMS))

Render technical assistance by giving appropriate information thru Social Media (E-mail, Facebook, Messenger and Text)

Office or Division BFAR-National Seaweed Technology Development Center (NSTDC), Cabid-an, Sorsogon

Classification Simple

Type of Transaction G2C - Government to Citizen; G2B - Government to Business; G2G - Government to Government

1. Internal - Provincial Fishery Offices (PFOs), BFAR Regional Fishery Officers, BFAR Central
Office Personnel and BFAR National Centers
2. External - MSMEs; Exporters/Fish Processors; Potential Fish Processors, Exporter; Academe
Who may avail: (Students, Professors, On-the-Job Training, Research); Fisherfolk Organizations, Associations,
People’s Organizations, Cooperatives, Women’s Associations, Housewives, Senior Citizens,
Indigenous People; Other Government Agencies National Government Agencies (NGAs); Local
Government Units (LGUs) and House of Representatives; Non-Government Organizations (NGOs).

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. E-mail, SMS BFAR-NSTDC Administrative Office

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Send messages 1. Receive and reply to E-
through E-mail, SMS, mail, SMS, other types of
other types of message message channel thru Aquacultural Technician
channel thru Social Social Media None 5 Minutes I; Aquaculturist I BFAR-
Media NSTDC

TOTAL None 5 Minutes

570
6. Technical Assistance thru Telephone Inquiry

Render technical assistance to the clients thru telephone inquiry

Office or Division BFAR-National Seaweed Technology Development Center (NSTDC), Cabid-an, Sorsogon

Classification Simple

Type of Transaction G2C - Government to Citizen; G2B - Government to Business; G2G - Government to Government

1. Internal - Provincial Fishery Offices (PFOs), BFAR Regional Fishery Officers, BFAR Central
Office Personnel and BFAR National Centers
2. External - MSMEs; Exporters/Fish Processors; Potential Fish Processors, Exporter; Academe
(Students, Professors, On-the-Job Training, Research); Fisherfolk Organizations, Associations,
Who may avail: People’s Organizations, Cooperatives, Women’s Associations, Housewives, Senior Citizens,
Indigenous People; Other Government Agencies National Government Agencies (NGAs); Local
Government Units (LGUs) and House of Representatives; Non-Government Organizations (NGOs).

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Phone Call BFAR-NSTDC Administrative Office

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Telephone call for 1. Answer/ attend to
inquiry/concern telephone call and ask for
necessary information to be Aquaculturist I BFAR-
written in the inquiry form None 5 Minutes
NSTDC

2. Discuss inquiry/ 2. Provide needed


concerns information or refer to
concerned technical staff Aquaculturist I BFAR-
None 30 Minutes
NSTDC

TOTAL None 35 Minutes

571
7. Training Assistance (On-the-Job Trainee Students)

To become more efficient and effective to their work

Office or Division BFAR-National Seaweed Technology Development Center (NSTDC), Cabid-an, Sorsogon

Classification Highly Technical

Type of Transaction G2C - Government to Citizen

Who may avail: (External) On-the-Job Training Students

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter request Client/Requesting Party/ies

2. Waiver notarized by Attorney Client/Requesting Party/ies

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit Letter request 1. Receive Letter request
Aquaculturist I
None 3 Minutes
BFAR- NSTDC

2. Attend the initial 2. Accept client and


briefing and interview conduct initial Aquacultural Technician
interview/briefing of None 15 Minutes I; Aquaculturist I BFAR-
trainees NSTDC

3. Attend On-the-Job 3. Receive signed Waiver


Orientation and sign a and conduct OJT Aquacultural Technician
Waiver orientation None 30 Minutes I; Aquaculturist I BFAR-
NSTDC

4. Attend On-the-Job 4. Conduct the actual


Training training Aquacultural Technician
None 30 Days I; Aquaculturist I BFAR-
NSTDC

5. Submit accomplished 5. Receive accomplished


Evaluation Form after Evaluation Form
Aquacultural Technician
completion of On-the-Job
None 5 Minutes I; Aquaculturist I BFAR-
Training
NSTDC

6. Receive approved and 6. Issue an approved and


signed Certificate of signed Certificate of
Project Assistant I & II;
Training after completion Training
Aquacultural Technician
of On-the-Job Training. None 5 Minutes
I; Aquaculturist I BFAR-
NSTDC

TOTAL None 30 Days, 58 Minutes

572
8. Training Assistance as Requested by Clients
To enhance and strengthen their knowledge on the requested training

Office or Division BFAR-National Seaweed Technology Development Center (NSTDC), Cabid-an, Sorsogon

Classification Complex

Type of Transaction G2C - Government to Citizen; G2B - Government to Business; G2G - Government to Government

1. Internal - Provincial Fishery Offices (PFOs), BFAR Regional Fishery Officers, BFAR Central
Office Personnel and BFAR National Centers
2. External - MSMEs; Exporters/Fish Processors; Potential Fish Processors, Exporter; Academe
Who may avail: (Students, Professors, On-the-Job Training, Research); Fisherfolk Organizations, Associations,
People’s Organizations, Cooperatives, Women’s Associations, Housewives, Senior Citizens,
Indigenous People; Other Government Agencies National Government Agencies (NGAs); Local
Government Units (LGUs) and House of Representatives; Non-Government Organizations (NGOs).

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter request (2 original copies) Client/Requesting Party/ies

2. Client Request Form (1 original copy) BFAR-NSTDC Administrative Office

2. Evaluation Form (1 original copy) BFAR-NSTDC Administrative Office

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit letter request 1. Receive letter request or
or accomplished Client accomplished Client
Aquaculturist I BFAR-
Request Form Request Form None 5 Minutes
NSTDC

1.1 Schedule the


appropriate training Aquacultural Technician
requested None 5 Minutes I; Aquaculturist I BFAR-
NSTDC

2. Receive notification on 2. Notify client, trainees,


the schedule of training stakeholders for the training
and confirmed schedule and confirmed Aquacultural Technician
attendance on the attendance None 15 Minutes I; Aquaculturist I BFAR-
scheduled training NSTDC

3. Attend the appropriate 3. Conduct/ Facilitate


training appropriate training
Aquacultural Technician
None 5 Days I; Aquaculturist I BFAR-
NSTDC

573
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
4. Accomplish Training 4. Receive accomplished
Evaluation Form Training Evaluation Form Aquacultural Technician
None 5 Minutes I; Aquaculturist I BFAR-
NSTDC

5. Receive signed 5. Issue an approved and


Certificate of Training signed Certificate of Aquacultural Technician
Training None 2 Minutes I; Aquaculturist I BFAR-
NSTDC

TOTAL None 5 Days, 32 Minutes

574
FEEDBACK AND COMPLAINTS MECHANISMS

Fill-up client feedback form available at the Public Assistance and Complaint Desk (PACD) and drop
it at the designated drop box at PACD within the Administrative Building.
How to send a
feedback?
Contact Information: NSTDC Hotline Number: 0939-125-8448 or nstdcbfar@gmail.com/
nstdcbfar@yahoo.com

Everyday at 9:00 am, the assigned staff at the Public Assistance and Complaint Desk (PACD) opens
the drop box. Submit the feedback forms to the Office of the Center Chief for review then forward to
the HR Staff to compile all the submitted feedback.

Feedback that requires an answer is forwarded to the concerned staff and a reply letter is prepared
How feedback is within two (2) days upon receipt of the feedback.
processed?
The reply from feedback is relayed to client.

For other queries, clients may contact thru NSTDC Hotline Number: 0939-125-8448 or
nstdcbfar@gmail.com/ nstdcbfar@yahoo.com

Fill up the complaint form available at the Public Assistance and Complaint Desk (PACD) and drop it
at the designated drop box located at PACD.

Complaints can also be expressed/filed via the hotline number of NSTDC with the hereunder
required information:
How to file a
complaint? Name of person being complained:
Incident
Evidence

For other queries, clients may contact thru NSTDC Hotline Number: 0939-125-8448 or
nstdcbfar@gmail.com/ nstdcbfar@yahoo.com

Everyday at 9:00 am, the assigned staff at Public Assistance and Complaint Desk (PACD) opens the
drop box. Submit to the Office of the Center Chief for review then forward to the concerned staff for
action.

The Center Chief shall assess and forward the complaint to the concerned staff for clarification/
further explanation.
How complaints are
processed? The assigned staff will then prepare a report based on the investigation for submission to theCenter
Chief for appropriate action.

The assigned staff will give feedback to the client on the action taken by the Center.

For other queries, clients may contact thru NSTDC Hotline Number: 0939-125-8448 or
nstdcbfar@gmail.com/ nstdcbfar@yahoo.com

ARTA: complaints@arta.gov.ph/ 1-ARTA (2782)

Contact Information of PCC: 8888


CCB, PCC, ARTA CCB: 0908-8816565 (SMS)

BFAR-NSTDC: nstdcbfar@gmail.com/nstdcbfar@yahoo.com
0939-125-8448

575
LIST OF OFFICES

Office Address Contact Information

Maharlika Highway Cabid-


NSTDC Office nstdcbfar@gmail.com/ nstdcbfar@yahoo.com
an, Sorsogon City

0939-125-8448

Technology
Dancalan, Bulusan,
Demonstration and nstdcbfar@gmail.com/nstdcbfar@yahoo.com
Sorsogon City
Verification Farm

576
VII. National Mariculture Center (NMC) - Panabo, Davao Del Norte

A. Provision for Extension Support, Education and Training Services

1. Technical Assistance for Distribution of Information, Education and Communication (IEC)


Materials
Information, Education and Communication (IEC) materials such as leaflets, flyers, hand-outs and videos on mariculture
technologies are available for distribution per request of clients.

Office or Division BFAR - National Mariculture Center (NMC) - Panabo, Davao del Norte

Classification Simple
G2C - Government to Citizen; G2B - Government to Business Entity; G2G - Government to
Type of Transaction Government

1. Internal - Provincial Fishery Offices (PFOs), BFAR Regional Fishery Officers, BFAR Central
Office Personnel and BFAR National Centers
2. External - MSMEs; Exporters/Fish Processors; Potential Fish Processors, Exporter; Academe
Who may avail: (Students, Professors, On-the-Job Training, Research); Fisherfolk Organizations, Associations,
People’s Organizations, Cooperatives, Women’s Associations, Housewives, Senior Citizens,
Indigenous People; Other Government Agencies (National Government Agencies (NGAs); Local
Government Units (LGUs) and House of Representatives); Non-Government Organizations (NGOs).

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter Request (1 copy; E-mail or original copy) Client/Requesting Party/ies

2. Client Request Form for Information, Education and


Communication (IEC) materials (2 copies; original BFAR-NMC Administrative Office
copy)

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit Letter 1. Receive Letter Request/
Request/Accomplish accomplished Client
Client Request Form to Request Form
BFAR-NMC Administrative Aide IV
Administrative Office None 5 Minutes BFAR-NMC
(bfarnmcpanabocity@ Administrative Office
gmail.com;
bfarrftcpanabocity@
yahoo.com)
2. Receive Information, 2. Provide the IEC
Education and materials needed/
Communication (IEC) requested
Aquaculturist I
materials needed/
BFAR-NMC Operation
requested from the office None 5 Minutes
Technical Advisory
of Technical Advisory
Services
Services
(bfarnmctrainings@gmail.
com )

TOTAL None 10 Minutes

577
2. Technical Assistance for Regular Training

The Center also has regular trainings to identified areas and participants. The training duration would last for maximum of 6
days thru illustrated lecture, guided workshop, site visitation and practicum/hands-on activities to enhace or development the
knowledge of the participants on mariculture technologies. Training materials or kits and meals and snacks for the participants
will be provided by the Center while supplies for the operation of the mariculture project are shouldered by the participants and
concerned agencies involved. Certificate of Completion will be issued by the Center to successful participants at the end of the
training.

Office or Division BFAR - National Mariculture Center (NMC) - Panabo, Davao del Norte

Classification Simple

G2C - Government to Citizen; G2B - Government to Business Entity; G2G - Government to


Type of Transaction Government

1. Internal - Provincial Fishery Offices (PFOs), BFAR Regional Fishery Officers, BFAR Central
Office Personnel and BFAR National Centers
2. External - MSMEs; Exporters/Fish Processors; Potential Fish Processors, Exporter; Academe
Who may avail: (Students, Professors, On-the-Job Training, Research); Fisherfolk Organizations, Associations,
People’s Organizations, Cooperatives, Women’s Associations, Housewives, Senior Citizens,
Indigenous People; Other Government Agencies (National Government Agencies (NGAs); Local
Government Units (LGUs) and House of Representatives); Non-Government Organizations (NGOs).

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Training Evaluation Form (1 original copy per


BFAR-NMC Operation (Technical Advisory Services)
participant)
2. Letter of Invitation (1 copy for submission to LGUs
and other concerned agencies thru email) BFAR-NMC Operation (Technical Advisory Services)

3. Client Request Form (1 copy; E-mail of original


BFAR-NMC Operation (Technical Advisory Services)
copy)
4. Personal Information Sheet (1 original copy per
BFAR-NMC Operation (Technical Advisory Services)
participant)
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Receive Invitation 1. Send Invitation letter or
Letter (if thru E-mail: receive accomplished
bfarnmctrainings@gmail. Client Request Form Senior
com) or submit Administrative Assistant I
accomplish Client None 5 Minutes BFAR-NMC Operation
Request Form (Technical Technical Advisory
Advisory Services Office) Services

2. Receive training 2. Receive confirmation of


schedule and confirmed attendance from client
attendance from the Senior
Technical Advisory Administrative Assistant I
Services Office (if thru E- None 5 Minutes BFAR-NMC Operation
mail: bfarnmctrainings@ Technical Advisory
gmail.com) Services

578
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
3. Attend training (live-in; 3. Conduct training
Aquaculturist I
BFAR-NMC Training
BFAR-NMC Operation
Hall) None 6 Days
Technical Advisory
Services
4. Accomplish Training 4. Receive accomplished
Evaluation Form to be Training Evaluation Form
distributed by the Aquaculturist I
Technical Advisory BFAR-NMC Operation
None 5 Minutes
Services Office at the Technical Advisory
end of the training Services

5. Receive Certificate of 5. Issue an approved and


Training signed by BFAR- signed Certificate of
NMC Center Chief to be Training Aquaculturist I
given by Technical BFAR-NMC Operation
None 2 Minutes
Advisory Services at the (Technical Advisory
end of the training Services)

TOTAL None 6 Days, 17 Minutes

579
3. Technical Assistance for Walk-in Clients
The service involves transfer of technical information or ideas to develop or enhance the skills of Walk-in Clients on various
mariculture technologies. Methodologies include lecture and site visitation to demonstration farms by the Center's technical
staffs. Information materials are distributed to further provide information to clients.

Office or Division BFAR - National Mariculture Center (NMC) - Panabo, Davao del Norte

Classification Simple
G2C - Government to Citizen; G2B - Government to Business Entity; G2G - Government to
Type of Transaction
Government
1. Internal - Provincial Fishery Offices (PFOs), BFAR Regional Fishery Officers, BFAR Central
Office Personnel and BFAR National Centers

2. External - MSMEs; Exporters/Fish Processors; Potential Fish Processors, Exporter; Academe


Who may avail: (Students, Professors, On-the-Job Training, Research); Fisherfolk Organizations, Associations,
People’s Organizations, Cooperatives, Women’s Associations, Housewives, Senior Citizens,
Indigenous People; Other Government Agencies (National Government Agencies (NGAs); Local
Government Units (LGUs) and House of Representatives); Non-Government Organizations (NGOs).

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Client Inquiry Form (1 copy; original) BFAR-NMC Operation (Technical Advisory Services)

2. Client Feedback Form (1 copy; original) BFAR-NMC Operation (Technical Advisory Services)

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Accomplish Client 1. Receive the
Inquiry Form at the accomplished Client Inquiry Senior
Technical Advisory Form Administrative Assistant I
Services Office None 5 Minutes BFAR-NMC Operation
Technical Advisory
Services

1.1 Endorse to appropriate


Technical Official/Staff and Senior
render needed assistance/ Administrative Assistant I
None information None 5 Minutes BFAR-NMC Operation
Technical Advisory
Services

2. Discuss 2. Render the appropriate


inquiry/concerns at the technical assistance Aquaculturist I
Technical Advisory BFAR-NMC Operation
None 2 Hours
Services Office Technical Advisory
Services

3. Fill-out Client 3. Receive the filled- out


Feedback Form available Client Feedback Form Aquaculturist I
at the Technical Advisory BFAR-NMC Operation
None 5 Minutes
Services Office Technical Advisory
Services

TOTAL None 2 Hours, 15 Minutes

580
4. Technical Assistance thru Social Media (E-mail, Facebook, Messenger and Text)

The Center extends its technical assistance thru social media platform during office hours. Scan copies of Information,
Education and Communication (IEC) materials are given per request of clients and exchange ideas are shared thru text and e-
mail messages.

Office or Division BFAR - National Mariculture Center (NMC) - Panabo, Davao del Norte

Classification Simple
G2C - Government to Citizen; G2B - Government to Business Entity; G2G - Government to
Type of Transaction
Government
1. Internal - Provincial Fishery Offices (PFOs), BFAR Regional Fishery Officers, BFAR Central
Office Personnel and BFAR National Centers
2. External - MSMEs; Exporters/Fish Processors; Potential Fish Processors, Exporter; Academe
Who may avail: (Students, Professors, On-the-Job Training, Research); Fisherfolk Organizations, Associations,
People’s Organizations, Cooperatives, Women’s Associations, Housewives, Senior Citizens,
Indigenous People; Other Government Agencies (National Government Agencies (NGAs); Local
Government Units (LGUs) and House of Representatives); Non-Government Organizations (NGOs).

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

BFAR-NMC Operation (Technical Advisory Services) or Administrative


1. E-mail, SMS Message
Office

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Send messages 1. Receive and reply to E-
through E-mail mail, SMS, other types of
(bfarnmcpanabocity@ message channel thru
gmail.com; Social Media Senior
bfarrftcpanabocity@ Administrative Assistant I
yahoo.com; BFAR-NMC Operation
bfarnmctrainings@ Technical Advisory
None 5 Minutes
gmail.com), SMS Services or
(09178718241), other Administrative Aide
types of message IV BFAR-NMC
channel thru Social Administrative Office
Media

TOTAL None 5 Minutes

581
5. Technical Assistance thru Telephone Inquiry

Clients with concerns on mariculture technologies thru telephone call are catered immediately by the Center during office hours.

Office or Division BFAR - National Mariculture Center (NMC) - Panabo, Davao del Norte

Classification Simple

G2C - Government to Citizen; G2B - Government to Business Entity; G2G - Government to


Type of Transaction Government

1. Internal - Provincial Fishery Offices (PFOs), BFAR Regional Fishery Officers, BFAR Central
Office Personnel and BFAR National Centers

2. External - MSMEs; Exporters/Fish Processors; Potential Fish Processors, Exporter; Academe


Who may avail: (Students, Professors, On-the-Job Training, Research); Fisherfolk Organizations, Associations,
People’s Organizations, Cooperatives, Women’s Associations, Housewives, Senior Citizens,
Indigenous People; Other Government Agencies (National Government Agencies (NGAs); Local
Government Units (LGUs) and House of Representatives); Non-Government Organizations (NGOs).

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Phone Call BFAR-NMC Center Chief Office or Administrative Office

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

1. Telephone call for 1. Answer/attend to


inquiry/concern (Office of telephone call and ask for Project Assistant III;
the Center Chief - 084- necessary information to be Center Chief;
823-5175; Admin Office - written in the Inquiry Form Administrative
None 5 Minutes
0917-871-8241) Aide IV BFAR-
NMC Administrative
Office

2. Discuss inquiry/ 2. Render the appropriate


concerns technical assistance
Aquaculturist I
BFAR-NMC Operation
None 30 Minutes
Technical Advisory
Services

TOTAL None 35 Minutes

582
6. Technical Assistance Visit/Inspection On- Site

Technical assistance can be rendered on-site per request of client to properly demonstrate and transfer various mariculture
technologies. The Center will communicate properly to the client on the schedule and the assigned focal person to conduct the
assistance.

Office or Division BFAR - National Mariculture Center (NMC) - Panabo, Davao del Norte

Classification Simple
G2C - Government to Citizen; G2B - Government to Business Entity; G2G - Government to
Type of Transaction Government

1. Internal - Provincial Fishery Offices (PFOs), BFAR Regional Fishery Officers, BFAR Central
Office Personnel and BFAR National Centers
2. External - MSMEs; Exporters/Fish Processors; Potential Fish Processors, Exporter; Academe
Who may avail: (Students, Professors, On-the-Job Training, Research); Fisherfolk Organizations, Associations,
People’s Organizations, Cooperatives, Women’s Associations, Housewives, Senior Citizens,
Indigenous People; Other Government Agencies (National Government Agencies (NGAs); Local
Government Units (LGUs) and House of Representatives); Non-Government Organizations (NGOs).

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter Request (1 copy; E-mail or original copy) Client/ Requesting Party/ies

2. Client Request Form (1 copy; E-mail or original


BFAR-NMC Administrative Office
copy)

3. Client Satisfaction Feedback Form (1 copy; original) BFAR-NMC Operation (Technical Advisory Services)

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit letter request 1. Receive Letter Request
(bfarnmcpanabocity@ or accomplished Client
gmail.com; Request Form
bfarrftcpanabocity@
yahoo.com) or Administrative Aide IV
accomplish Client None 5 Minutes BFAR-NMC
Request Form (BFAR- Administrative Office
NMC Administrative
Office)

1.1 Forward/ Refer to the


Center Chief for Administrative Aide IV
None appropriate action None 5 Minutes BFAR-NMC
Administrative Office

1.2 Assign technical staff to


render assistance to client Center Chief BFAR-
None None 5 Minutes NMC Center Chief
Office

583
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
2. Receive notification 2. Schedule site
and confirmed visit/inspection and notify
attendance for the client on the scheduled visit
scheduled visit from the Senior Aquaculturist
Technical Advisory BFAR-NMC Head
None 5 Minutes
Services Office (If thru E- of Operation Technical
mail: bfarnmctrainings@ Advisory Services
gmail.com)

3. Allow to conduct site 3. Conduct actual site


visit/inspection visit/inspection/ sampling
Aquaculturist I
BFAR-NMC Operation
None 1 Day
Technical Advisory
Services

3.1 Prepare inspection


report and its Aquaculturist I
recommendation BFAR-NMC Operation
None None 1 Hour
Technical Advisory
Services

4. Receive inspection 4. Release report of


report and inspection and its
recommendation from the recommendation Aquaculturist I
Technical Advisory BFAR-NMC Operation
Services Office (If thru E- None 5 Minutes
Technical Advisory
mail: bfarnmctrainings@ Services
gmail.com)

5. Accomplish Client 5. Receive accomplished


Satisfaction Form at the Client Satisfaction Form
Technical Advisory Aquaculturist I/
Services Office BFAR-NMC Operation
None 5 Minutes
Technical Advisory
Services

TOTAL None 1 Day, 1 Hour, 30 Minutes

584
7. Training Assistance (On-the-Job Trainee Students)

The Center offers On-the-Job Training to students from State Colleges and Universities (SUCs) to develop or upgrade their
skills and capabilties on mariculture technologies. The training involves illustrative lectures and hands-on/practicum activities.
Each student will be graded by the staffs according to thier performance and Certificate of Completion will be issued by the
Center to successful students at the end of the training.

Office or Division BFAR - National Mariculture Center (NMC) - Panabo, Davao del Norte

Classification Highly Technical

Type of Transaction G2C - Government to Citizen; G2B - Government to Business

Who may avail (External) On-the-Job Trainee Students, Fishfarmers

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

1. Letter Request Form (1 copy; E-mail or original) Client/Requesting Party/ies

2. Memorandum of Agreement / MOU (1 copy; original


Client/Requesting Party/ies
& notarized)

3. Waiver / PDS (1 copy per student; original) Client/Requesting Party/ies

4. Accomplished Evaluation Form (1 copy per student;


BFAR-NMC Operation (Technical Advisory Services)
original)

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE

1. Submit Letter Request 1. Receive Letter Request


with requirements to with its requirements
BFAR-NMC
Administrative Office Administrative Aide IV
(bfarnmcpanabocity@ None 5 Minutes BFAR-NMC
gmail.com; Administrative Office
bfarrftcpanabocity@
yahoo.com))

2. Report for On-the-Job 2. Accept client, initial


training briefing/interview interview/briefing of
to be conducted by the trainees
Technical Advisory Senior Aquaculturist
Services at BFAR-NMC BFAR-NMC Head
None 5 Minutes
Training Hall of Operation Technical
Advisory Services

3. Attend On-the-Job 3. Conduct orientation


orientation and sign the Aquaculturist I
Waiver at BFAR-NMC BFAR-NMC Operation
Training Hall None 30 Minutes
Technical Advisory
Services

585
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
4. Attend On-the-Job 4. Actual training
training (supervised by Aquaculturist I
Technical Advisory BFAR-NMC Operation
Services) None 20 Days
Technical Advisory
Services

5. Fill-out Evaluation 5. Receive accomplished


Form after completion of Evaluation Form
On-the-Job Training at Aquaculturist I
BFAR-NMC Training Hall BFAR-NMC Operation
None 5 Minutes
facilitated by the Technical Advisory
Technical Advisory Services
Services

6. Receive Certificate of 6. Issue an approved and


Training at BFAR-NMC signed Certificate of
Training Hall facilitated Training Aquaculturist I
by the Technical Advisory BFAR-NMC Operation
Services None 5 Minutes
Technical Advisory
Services

TOTAL None 20 Days, 50 Minutes

586
8. Training Assistance Program as per Requested by Clients

Provision of training to clients is one of the priority activities of the Center. The training duration would last for maximum of 5
days thru illustrated lecture, guided workshop, site visitation and practicum/hands-on activities to enhace or development the
knowledge of the participants on mariculture technologies. Training materials or kits will be provided by the Center while
supplies for the operation of the mariculture project are shouldered by the participants and concerned agencies involved.
Certificate of Completion will be issued by the Center to successful participants at the end of the training.

Office or Division BFAR - National Mariculture Center (NMC) - Panabo, Davao del Norte

Classification Simple
G2C - Government to Citizen; G2B - Government to Business Entity; G2G - Government to
Type of Transaction Government

1. Internal - Provincial Fishery Offices (PFOs), BFAR Regional Fishery Officers, BFAR Central
Office Personnel and BFAR National Centers
2. External - MSMEs; Exporters/Fish Processors; Potential Fish Processors, Exporter; Academe
Who may avail: (Students, Professors, On-the-Job Training, Research); Fisherfolk Organizations, Associations,
People’s Organizations, Cooperatives, Women’s Associations, Housewives, Senior Citizens,
Indigenous People; Other Government Agencies (National Government Agencies (NGAs); Local
Government Units (LGUs) and House of Representatives); Non-Government Organizations (NGOs).

CHECKLIST OF REQUIREMENTS WHERE TO SECURE

Client/Requesting Party/ies
1. Letter Request (1 copy; Email or original)

BFAR-NMC Administrative Office


2. Client Request Form (1 copy; Email or original)

BFAR-NMC Operation (Technical Advisory Services)


3. Training Evaluation Form (1 copy per participant)

FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
1. Submit Letter Request 1. Receive Letter Request
or fill out Client Request for specific training or
Form to BFAR-NMC accomplished Client
Administrative Office Request Form Administrative Aide
(bfarrftcpanabocity@ None 5 Minutes IV BFAR-NMC
yahoo.com & Administrative Office
bfarnmcpanabocity@
gmail.com)

1.1 Schedule training of


specific request and notify Senior Aquaculturist/
clients with the available BFAR-NMC Head
None None 5 Minutes
time of Operation Technical
Advisory Services

2. Receive notification of 2. Notify client,


schedule and confirmed trainees/stakeholders for Senior Aquaculturist
attendance from the the schedule of training and BFAR-NMC Head
None 30 Minutes
Technical Advisory confirm its attendance of Operation Technical
Services Office (if thru E- Advisory Services
mail: bfarnmctrainings@
gmail.com )

587
FEES TO BE PERSON
CLIENT STEPS AGENCY ACTION PROCESSING TIME
PAID RESPONSIBLE
3. Attend proper training 3. Conduct training
(live-in at BFAR-NMC Aquaculturist I
Training Hall or on-site BFAR-NMC Operation
training) None 5 Days
Technical Advisory
Services

4. Accomplish Training 4. Receive accomplished


Evaluation Form to be Training Evaluation Form
distributed by the Aquaculturist I
Technical Advisory BFAR-NMC Operation
None 5 Minutes
Services Office at the Technical Advisory
end of the training Services

5. Receive Certificate of 5. Issue an approved and


Training signed by BFAR- signed Certificate of
NMC Center Chief to be Training Aquaculturist I
given by Technical BFAR-NMC Operation
None 2 Minutes
Advisory Services at the Technical Advisory
end of the training Services

TOTAL None 5 Days, 47 Minutes

588
FEEDBACK AND COMPLAINTS MECHANISMS
Request client feedback form from any staffs and drop it at the designated drop box located at the
main entrance of the Administrative building.
How to send a
feedback? Contact Information: Human Resources Section- Administrative Services
0917-871-8241 or bfarnmcpanabocity@gmail.com / bfarrftcpanabocity@yahoo.com

Everyday at 9:00 am, the Human Resource Section opens the drop box. Compiles and records all
feedback submitted.

Feedback that requires an answer, forwards to concerned staff and they prepare a reply letter within
two (2) days upon receipt of the feedback.
How feedback is
processed?
The reply from feedback is relayed to client.

For further queries, clients may reach Human Resource Section at 0917-871-8241 or
bfarnmcpanabocity@gmail.com / bfarrftcpanabocity@yahoo.com

Fill out the Client Complaint Form available at the Human Resource Section and drop it at the
designated drop box located at the main entrance of the administrative building.

Complaints can also be filed via telephone with the required information:

Name of person being complained:


How to file a
complaint?
Incident
Evidence

For further queries, clients may reach Human Resource Section at 0917-871-8241 or e-mail at
bfarnmcpanabocity@gmail.com / bfarrftcpanabocity@yahoo.com
Everyday at 9:00 am, the Human Resource Section opens the drop box. Compiles and records all
feedback submitted.

The Complaint Officer shall start the investigation and forward the complaint to the concerned staff
for their explanation.
How complaints are
processed? The Complaint Officer will then prepare a report based on the investigation for submission to the
Head of Agency for appropriate action.

The Complaint Officer will give feedback to the client on the action taken by the Center.
For further queries, clients may reach Human Resource Section at 0917-871-8241 or
bfarnmcpanabocity@gmail.com / bfarrftcpanabocity@yahoo.com
ARTA: complaints@arta.gov.ph/ 1-ARTA (2782)

Contact Information of PCC: 8888


CCB, PCC, ARTA CCB: 0908-8816565 (SMS)
BFAR-NMC: bfarnmcpanabocity@gmail.com / 0917-871-8241

589
LIST OF OFFICES

Office Address Contact Information

bfarnmcpanabocity@gmail.com;
Center Chief Office Coastal Road, Brgy. Cagangohan,
bfarrftcpanabocity@yahoo.com

Panabo City, Davao del Norte (084)823-8175

Head of Operation Coastal Road, Brgy. Cagangohan, bfarnmctrainings@gmail.com

(Technical Advisory Panabo City, Davao del Norte (084)823-8175


Services)

Operation (Technical Coastal Road, Brgy. Cagangohan, bfarnmctrainings@gmail.com

Advisory Services) Panabo City, Davao del Norte (084)823-8175

bfarnmcpanabocity@gmail.com;
Policy, Planning and Coastal Road, Brgy. Cagangohan,
bfarrftcpanabocity@yahoo.com

Program Development Panabo City, Davao del Norte (084)823-8175


Office
bfarnmcpanabocity@gmail.com;
Supply and Property Coastal Road, Brgy. Cagangohan,
bfarrftcpanabocity@yahoo.com

Unit Panabo City, Davao del Norte 0917-128-4915

bfarnmcpanabocity@gmail.com;
Administrative Office Coastal Road, Brgy. Cagangohan,
bfarrftcpanabocity@yahoo.com

Panabo City, Davao del Norte 0917-871-8241


bfarnmcpanabocity@gmail.com;
Satellite Office Southern Davao, Brgy. Nanyo,
bfarrftcpanabocity@yahoo.com

Panabo City, Davao del Norte

590
LIST OF OFFICES

DIVISION SECTION / UNIT LOCATION CONTACT INFO

3rd Flr., Fisheries Bldg., BPI Compound, Visayas 8-9299597 /


Bureau Director's Office
Avenue, Q.C.
8-9298072(fax)
Office of Special Concern 4th Flr., Fisheries Bldg., BPI Compound, Visayas 7-4548457 /
Office of the Director (OSC) Avenue, Q.C. 8-9298390
Information & Fisherfolk 4th Flr., Fisheries Bldg., BPI Compound, Visayas
7-4545863
Coordination Unit (IFCU) Avenue, Q.C.

Ground Flr., Fisheries Bldg., BPI Compound, 8-929-6293 /


IFCU - Library Section
Visayas Avenue, Q.C. 7-4538812
4th Flr., Fisheries Bldg., BPI Compound, Visayas 7-4565793 /
Budget Section
Avenue, Q.C. 7-456-6302(fax)
Finance and
Management Division 4th Flr., Fisheries Bldg., BPI Compound, Visayas
Accounting Section 3911370
Avenue, Q.C.

Admin Section/Litigation 2nd Flr., Fisheries Bldg., BPI Compound, Visayas


8-9296184
Section/Policy Section Avenue, Q.C.
LEGAL Division
Adjudication Committee Ground Flr., Fisheries Bldg., BPI Compound,
Office Visayas Avenue, Q.C.

Human Resource
3rd Flr., Fisheries Bldg., BPI Compound, Visayas
Management
Avenue, Q.C. 8-9296484 /
Section(HRMS)
7-4548651

Ground Flr., Fisheries Bldg., BPI Compound,


Anti-Red Tape Unit 8-2943620
Visayas Avenue, Q.C.

4th Flr., Fisheries Bldg., BPI Compound, Visayas


Cashier Section 7-4264668
Avenue, Q.C.

Ground Flr., Fisheries Bldg., BPI Compound,


Administrative Division Records Section 8-9294672 / 7-
Visayas Avenue, Q.C.
4539397

Property & Inventory 2nd Flr., Fisheries Annex Bldg., BPI Compound,
Visayas Avenue, Q.C.
7-4560326 /
Section
379-7377

General Services Section 2nd Flr., Fisheries Annex Bldg., BPI Compound,
8-9296126
(GSS) Visayas Avenue, Q.C.

Bids & Awards Committee 2nd Flr., Fisheries Bldg., BPI Compound, Visayas
3324661
(BAC) Avenue, Q.C.

591
DIVISION SECTION / UNIT LOCATION CONTACT INFO

4th Flr., Fisheries Bldg., BPI Compound,


Fisheries Planning & 8-9297673
Fisheries Planning & Visayas Avenue, Q.C.
Economic Division (FPED)
Economic Division
Fisheries Information
(FPED) 2nd Flr., Fisheries Bldg., BPI Compound, Visayas
Management Center
Avenue, Q.C.
(FIMC)

Inland Fisheries &


2nd Flr., Fisheries Bldg., BPI Compound, Visayas
Aquaculture Division 8-9293439
Avenue, Q.C.
(IFAD)

Fisheries Industry Dev't


3rd Flr., Fisheries Bldg., BPI Compound, Visayas 7-4744188/
Support & Services
Avenue, Q.C. 7-453-8530
Division (FIDSSD)

Fisheries Post-Harvest
2nd Flr., Fisheries Bldg., BPI Compound, Visayas 7-4544362 /
Technology Division
Avenue, Q.C. 7-4541083
(FPHTD)

Coastal Resource 3rd Flr., Fisheries Bldg., BPI Compound, Visayas


Management Section 8-9294894
Avenue, Q.C.
Fisheries Resource (CRMS)
Management Division
Conservation &
(FRMD) 3rd Flr., Fisheries Bldg., BPI Compound, Visayas
Environmental Protection 3320210
Avenue, Q.C.
Section (CEPS)

Capture Fisheries 2nd Flr., Fisheries Bldg., BPI Compound, Visayas


8-9294296
Division (CFD) Avenue, Q.C.

Aquatic Wildlife Regulatory


7-4266532
Section (AWRS)

Fisheries Regulatory &


Capture Fisheries Ground Flr., Fisheries Complex Bldg., BPI
Licensing Division 8-9295630
Licensing Section (CFLS) Compound, Visayas Avenue, Q.C.
(FRLD)

Fishpond Lease Section 7-455-2887 /


(FLS) 7-455-1049

Fisheries Certification
7-426-6532 /
Section (FCS) / One Stop 8-834-2429->30
Center
Fisheries Inspection
Fisheries Inspection & 8-929-5630
Section (FIS) Ground Flr., Fisheries Complex Bldg., BPI
Quarantine Division
Compound, Visayas Avenue, Q.C.
(FIQD) Fisheries Audit Section 7-455-2887 /
(FAS) 7-455-1049
Fisheries Quarantine
Section (FQS)

592
DIVISION SECTION / UNIT LOCATION CONTACT INFO

860 Arcadia Bldg., 2nd Flr., Quezon Avenue,


NFLD Laboratory 373-0076
National Fisheries Q.C.
Laboratory Division
(NFLD) 860 Arcadia Bldg., Ground Flr., Quezon
Product Testing Lab 370-1679
Avenue, Q.C.

593

You might also like