Inspection 4 Industry LLC
Home yl4l Academy
Dia you find this article useful?
Click on below Like button!
Home
I4| ACADEMY
41 Academy Courses
‘Aramco API Classroom
APLCPO Hours
APLSIFE Training
APLS10 Training
APLSTO Training
APLESS Training
APLST1 Training
-APL580 Training
[ASME Training Course
ASME DC Training
‘Quality Control Training
‘CWLEndorsement Training
Mi Academy Contact
GENERAL ARTICLES
‘Third Party Inspection
Vendor Inspection
Factory Acceptance Test
Inspection and Test Plan
‘Commodity Inspection
MdGeneral Articles y4Fix Equipment wRotary Equipment yE & | Equipment
Heat Exchanger Inspection
‘Tne Heat Exchanger Inspection article provides you with information
‘about the Inspection ofthe heat exchanger and heat exchanger testing
uring the manufectuing phase, as well as in-service inspection In
‘operating units. You may want to review shell and tubs heat exchanger
Inspection procedure and related inspection and test plan.
Shell and Tube Heat Exchanger
Inspection in Manufacturing Shop
“Tne construction code for shell and tube heat exchangers is ASME Code
Section Vill, and it covers the minimum requirements for design,
‘materials, fabrication, inspection, testing, and preparation for inal
oliver
‘Alter the 2003 addenda of ASME Code Section Vill is 1, the design of
the shell and tube neat exchanger needs to be done based on Subsection
In UHX part. The design based on TEMA, or any similar code might be
‘accepted which meeting the requirements of UHX part.
‘The heat exchanger stil Is a pressure vessel and all requirements for
[ASME pressure vessel does apply for heat exchanger as woll. We are
Going to avold to repeat those requirements for the heat exchanger. You
‘may review peussure vessel inspaction ancl for those requirements.
There are several inspection requirements that only apply to the heat
‘exchanger and not regular preseure ves:
Tube Inspection
The tube outside clameter,nsde diameter, thickness, and ovalty shal be
checked before the bulding of the tube bundle. You need to reer to
wet in Touch
Search this Site! More than 600
Articles!
Cy
Saudi Aramco API 510,
API 570, API 653, and
API 571 Classroom
LoginIndustrial Inspection
‘Aust contrl
Plant inspection
Coating Inspection
Pre-Shipment Inspection
Vendor List
FIX EQUIPMENT
Pressure Vessel
Heat Exchanger
Piping System
Industrial Vave
‘Steam Boiler
‘Storage Tank
Process Heater
ROTARY
EQUIPMENT
Ccontritugal Pump
Contritugal Compressor
Reciprocating Compressor
Gas Turbine
Steam Turbine
Fan & Blower
E&I EQUIPMENT
Electric Generator
Electric Motor
Power Transformer
Control Pane!
‘Switchgear
Power Cable
GET IN TOUCH
About Us
Contact Us
My
ASME Section II to get the acceptance tolerances.
For example, If your tube material Is SA.179, you have to refer tothe SA
4179 and that wil refer you to the SA 450 ( Specification for Genova
Roquirements for Carbon, Fert Alo, and Austenite Aloy Steel Tubes)
for acceptance tolerance. YoU have to use your caliper, machinist ruler,
‘tc, to make these measurements and make sure the vales fall within
acceptance range.
Tube Bundle Inspection
‘The bundle dimension shall be checked based on the approved drawing
The batfle diameter and distance between them shall be contolled and
‘mae the accoplance tolerances in the drawing
‘The tightness of stay bolls and spacers must be controled. The shel
cleanness 1d and make sure the inside welds are
complete and are ground as per drawing requirements
yeds to be ved
Tubesheet Inspection
‘The Tubeshest shall be inspected before weling tothe shell. The hole
iameter, grooves dimensions, dling pattem, the thickness ofthe
tubesheet ane surface fnish shall be measured and checked agins
‘acceptance tolerances in the approved drawing
‘Tye tube colin shallbe checked based on customer spectfeation, The
wall reduction (ater roling) and depth of rol shall be measured and shall
‘meet the customer specification, The wal reduction should not be less
‘han 5% and should not be more than 8% ofthe tube wal thickness,
Leak Testing of Seal Weld (Tube to
Tubesheet)
Ir seal welding considered, then the leak tet willbe a mandatory
requirement. The shell sie wil be subjected tothe air pressure, né
‘water and soap sluton wil be sprayed to the tubesheet to make sure all
seal wolds are detec ree. The buble wil be developed if there was any
welding detect such as crack, pinhole, te
Shell
le Hydrostatic Testing
‘Alter manufacturing completion, the heat exchange shell side willbe
subjected tothe hydrostatic testing. The test pressure amount shal be
consstent wih the vale indicated inthe approved drawing. The hokting
time shall be based on the supplier approved test procedure,
Tho pressure gages calloration and range shall be controlled. The
pressure gage range shal be within 1.5 thr 4 times of test prssure. The
shall body and welding seams shall be Inspected. The tubeshoet also
shall be checked, No leakage i allowes
The test pump hose shall be disconnected, and no pressure drop is
alowed. The test result willbe salstactory if no leakage being observed
and no pressure being dropped wile the shel side was under pressure,
Tubeside Hydrostatic TestingPrivacy Policy
‘We wit be updating and growing hs
se wth more and mere of indus
inspecton
1 atc.
Please subecnbe to my monthly
rnowseter so you dont miss a thing
Enter Your Fit Name(optional)
(Ol understand tat you wi use
‘After successful completion of shell side hydrostatic testing, the bonnets
are assombled, and tube sie i subjected to hydrostatetstng. Simla,
the amount of test pressure shal be as te one indicated Inthe approves
drawing. Other requirement is smlr tothe shol est. No leakage and
pressure drop shal be observed whe the tue sid is under pressure.
‘ed Party nso for Shall and Tube aa! Exchangar atte proves
Yo a procedural content for heat exchanger inspection. Review folowing
Standard nsaacon and Test Pin fr Shella Tuba Heat Exchanoar
‘You might be inerested in reviewing folowing read aris
Ha Exchanger Thasey
in Tube Haat Exchanoa asaction
‘Tied Party Inspection for Fin Tbe Heat Exchanger
Inspection and Tes ian or Fin Tube Heat Exchanger
Shell and Tube Heat Exchanger
Application
pa i
‘Shell and Tube heat exchangers are the most popular ype in the industry,
‘This type is made from 3 components as listed below:
+ Two heads (one rear head, and the other one stationary head)
+ Shall
+ Tube
(One fui isin the ube side and the other one in the shel side, The heat
transfers done through the tube wall
‘So your heat exchanger with more tubes will have mere heat transfer
surfaces, and at the same time will have a higher heat exchanger
diameter,
‘There are diferent kinds of shell and tube heat exchangers with diferent
‘applictions.The reason for the high amount of applications is that they
are easy to maintain.
Besides, the shell and tubs heat exchanger isthe only type that can be
signed and operated ai a temperature greater than 360 degrees.
centigrade, a8 wel asin pressure higher than 30 bar.
In-Service Inspection of Shell and Tube
Heat ExchangerThe In-Service Inspecton code for shell ang tube heat exchangers is APL
‘STO 510, The other API recommended practices and codes also have to
be used in with this Code,
‘Some of these Recommended Practices are API RP 572, API RP 577,
‘and API RP 571, and also construction code sections might be used, such
‘a8 ASME Cade Section Vil and ASME Code Section IX
For repair, tho roquiroment of API STD 510 or ASME-PCC-2 needs to be
The tile of ASME-PCC-2, which was fst published in 2006, is
pair of Pressure Equipment and Piping.”
Please note: f your shell and tube heat exchanger is “U" stamped ang
YoU need to do the ropa, you have to use a Repair Organization holding
{anR" Stamp from the Natonal Board Inspection Code
‘The API 510 Prossure Vossel Inspectors are qualified persons to perform
shell and tube heal Exchanger inspection. You may also review the
Industial Plan Inspection article
What are the Important Items in the Shell
and Tube Heat Exchanger Inspection in
Overhaul?
‘Shell and Tube Heat ExchangorInspectons are categorizes inthe
following way
Shell and Structure in Heat Exchanger
Inspection
+ Neutralization of Austentie Stainless Steel shell clads, line or weld
‘overlay, which contains H2S service. The process needs to be donebased on approved procedures by a corrosion engineer.
+ Noutalizaton is also required fr shell material with admiralty brass
to reduce the risk of SCC,
+ Newtalizaton of thermocouples, i necessary, and doing dye
penetration test
+ Sampling trom shell fouling and coresion products and making fab
analysis and making Interpretation by corrosion engineer i
nevescary)
+ Cutting small area of isulation sheet and removing the insulation
and doing visual inspection for any sign of corrosion under insulation
+ Thickness measurement of aifrent parts of shell and shell nozzles
and making cortosion rate and remaining
+ Inspection of shell cleaning ane approval. water jtting et.
cking inside surface for any cladding, tn failure or separation
+ Inspection of Shel lange gasket seating area for any erosion,
ddamage and cracking
+ Inspection of longitudinal and cicumferental weld joins, inlet and
outlet nozzles, reinforcement pads and small bore connections for
‘any crack, corrosion and mechanical damage and deformation
+ Dye ponetration test on wed joints that are susceptible o cracking,
austenitic Mange face, weld overlay and cladding surface and
‘exchangers exposed to amine and caustic
+ Hydragan blistering inspection in hydrogen services (hand lamp
procedure)
+ Hoat exchanger suppor, steel structure, foundation, bol and nut
Inspection
culation
Bonnet in Heat Exchanger Inspection
+ Thickness measurement and making corrosion rale and remaining
fe calculation
+ Girth lange inspection for comosion and erosion
+ Intomal surface inspection for corrosion and fouling
+ Painting inspection of external surace
+ Dye penetration or magnetic particle examination of weld jonts|
Tube Bundle in Heat Exchanger
Inspection
+ Taking care inthe pulling out of tube bundle to avid any mechanical
damage
+ Sampling trom tube side fouling and corrosion products and making
lab analysis and making itorpetaion by corrosion engineer (t
necessary)
+ Contoing of water jetting or tancing cleaning process
+ Convoling wre brushing process of nner tube edge and roling area
(preparation for ID measurement)‘+ Inside diameter measurement in tubes and tubes rolling areas:
Rate off and accordingly phigging the tubes when thelr OD reaches
to the ID plus one thickress
+ Retubing of tube bundle more tan 10% of tubes reach the above
rejection limit
+ Inspection from tube bundle components such as tubesheet, tube,
tie rods and spacers, traneter bates or support plate, Impingement
af, floating head lange and loatng head backing device
+ Inspection from intemal sutace of tubes for corrosion and fouling
+ ling outa sample tube for sectioning and corrosion anlaysis if
necessary
+ Retubing wnen sectioning result proves the thickness is hal ofthe
‘ominal value
+ Visual inspection and dye penetration test rom tube to tubes
seal or strength weld
+ Eddy curont testing itis necessary
Channel in Heat Exchanger Inspection
+ Thickness measurement and making corrosion rate and remaining
fe calculation
+ Inspection of gaskel seating area, pass parton and nubbing for
corrosion and deformation
+ Inspection of intemal surface for fouling, corrasion and soundness of
Hinings (any)
+ Balance helo inspection fr corrosion an erosion
+ Welzing joints inspection for ary possible cracks
+ Reinforcement pad inspection and doing soap testi necessary
+ Cathoie protection anodes inspection and replacement ifnecessary
+ Diaphragm and division box visual inspection and dye penetration
{est of ciaphragm for any possible cracks (for high press
exchangers)
Channel Cover in Heat Exchanger
Inspection
+ Thickness measurement and making corrosion rate and remaining
Ife calculation
+ Inspection oF gasket seating area for corrosion and deformation
+ Inspection fr internal surtace for fouling, ner, ladaing and coating
soundness
+ Soap test in channel cover with ter
+ Liting lug wel joint inspection for any possible crack
Floating Head Inspectior
+ Thickness measurement and making corrsion rate and remaining
Me calculation
+ Inspection of gaskel seating area, pass parton and nubbing for any
possible corrosion and deformation
+ Girth lange weld joint inspection for any possible crack and
+ Intomal surface inspection for corrosion and fouling ané soundness
finer, coating and cladding (any)Expansion Joint Inspection
+ The heat exchangers with expansion jolnts neato be inspected for:
+ Flange inspections for cortosion and erosion
+ Inspection from intemal surface for corrosion and erosion
+ Alctost
+ The tube and shell hydrostatic test need to be done after the above
sated inspection actives.
Did you find this article useful? Click on below Like buttont
New! Comments
Have your say about what you just read! Leave me a comment inthe box
below18 comments
‘Add a comment.
on a
sel. can know which standard has fallow for
(fore aces ad nspecton
eRe
Spor sie can gv you mare examples and intormaton it
requires
Le Ret
Bir Tucker Gta
Neca a gaat ise of eoupment tol wit heat exchange
‘ube bur ing? Go to won caryl.com.
Ce cei neon etn in
Lo-Res 1-107
Syed Raza All Zale
“Thank Yous vey Use Fal rele For Me Than again
Le Rea 1-8
Gee
Nice nermation, harks
Le Rap 1-89
Pramone Trtohamjoyo
Ine 9200 for eferncn. tis bonefiafor me, now ean get
row standard API or shel apa ibe exchanger?
“Ron 2 ty
<< ee
ko Rany> 1-10)
ao
vor eset
Leas 1-10)
Masood Joiva
Realy god tor new begine to eaming
Le Res 18
Eesti: (eee
epetartoiaaam
connart 02012209 trapeceroinstycam