entity departure
no. calculation time, DT
Arrival Time Service Time,
Entity No. (AT) (ST) 1
1 0.00 2.90 2
2 1.73 1.76 3
3 3.08 3.39 4
4 3.79 4.52 5
5 4.41 4.46 6
6 18.69 4.36
7 19.39 2.07
8 34.91 3.36
9 38.06 2.37
10 39.82 5.38
11 40.82
INSERT PICTURE
A system which has one or single queue, one resource (machine or worker) th
Base time
unit: minutes
Start time: 0.00
Stop time: 20.00
Entity no.
Entity no.
leaves/departs
being
Entity no. after
processed
in queue completed
Event time Event type by a
process by a
resource
resource
RESOURCE
JOIN OR NOT STATUS: 0.00 INITIAL 0 0 0
JOIN A BUSY OR
QUEUE? IDLE
Total/sum
ource (machine or worker) that allows each entity to be served one by one.
Q(t) Q* B(t)
TS = total times in system that Average total time in system Total TS/total P (at 20
have been observed so far minutes)
P = total number of entities
produced/ served so far
∫Q = the area under the Q(t) curve Time average number of total ∫Q/20 (minutes)
entity in queue
6
Q(t) = number of entities in Maximum number of entity Q* at 20 minutes
queue that have been observed so in the queue
far or at time t
7 Q*(t) = maximum of Q(t) that
has been observed so far or at
time t
∫B = the area under the B(t) curve Resource utilization ∫B/(20) or ∫B/(1x20)
so far 1 - capacity or resource unit
20 = end of time (simulated) =1
20 - the end time at 20
minutes
8
N FOR SINGLE SERVER QUEUE
Value Unit
entities
minutes per
entity
minutes
minutes per
entity
minutes
entity
entities
also can be
expressed as
percentage,
92%
entity
input data no. calculation
4 3.1 1.50 5
5 4.41 4.46 6
6 18.69 4.36 7
7 19.39 2.07
8 34.91 3.36
9 38.06 2.37
10 39.82 5.38
11 40.82
A system which has one
Event time
RESOURCE 0
Scheduled departure JOIN OR NOT JOIN A STATUS: BUSY OR
time, DT QUEUE? IDLE
NOT JOIN
2.90 IDLE
0.00
4.60
2.80
2.90
3.10
3.49
TOTAL/SUM
system which has one or single queue, two (2) resource (machine or worker) that allows each entity to be served when both or
0.00 0 0 0
1
AT(1)
1
AT(2)
1
AT(3)
3 2
3
DT(1) 1
3
AT(4) 1
4 2
3
DT(2) 1,2
4
TOTAL/SUM
served when both or one of the resource are idle/empty.
Statistical accumulators
WQ*
WQN TSP TS* (max) ∫Q ∫B
(max)
0.00 0.00 0.00 0.00
FINAL OUTPUT PERFORMANCE MEASURES FROM THE HAND SIMULATION FOR 2 SERVER SINGL
Q* at 20 minutes part
Total ∫B/(2x20) also can be
expressed as
percentage, 50%