Professional Documents
Culture Documents
SCE5461
Assignment 2
Conceptual Design
Submitted by
Hong Kong needs additional space and facilities to align with the current and future development.
Vertical urbanization seems the possible solution for the demand of land supply in Hong Kong. The
proposed Mount Bulter Palace development is targeted to construct a new complex on Mount
Bulter, composed of residential project occupy 10,000 people, five 12-storeys commerical
buildings, two exhibition halls, a pedstrian walking system access from Causeway Bay to the new
development. The design will focus on creating a sustainable infrastructure project that meets
requirement while considering the realistic constraints. The design will also be justified by
Project Overview
The development project aims to develop an eco-friendly transportation system within an urban
area. The goal is to reduce traffic congestion, promote mobility of population, hence to enhance
overall transportation efficiency of Eastern District. However, there are several constraints during
1. Environmental Impact
Land acquisition is required in this project. The site located nearby the Red Incense Burner
Summit where encompass natural trails. One of the highlight about Hong Kong is natural
landscape, once if the project is implemented, the Braemar Hill Observation deck amd part
of the Wilson Trail are sacrificed. There are one spot less to enjoy the view of Hong Kong,
the side-effects of the project on the ecosystem will even be unprecedented. Declared
monument is also part of environmental component. The Haw Par Mansion, Lin Fa Kung
etc., should be awared in terms of conservation. Therefore, the design should minimize the
project's environmental footprint. Especially in exploration stage and construction stage, the
of electric vehicles, solar-powered infrastructure, and green spaces can contribute to reduce
2. Social Considerations
Social aspect composed of people's livelihood. In case of residents nearby the development
area, the living of residents are unwilling to be disturbed. There are schools also nearby the
development area, the teaching will also be affected. The noise and air pollution discharge
during the constrution stage should be awared. Furthermore, there must be road blocks
during constrution stage, which may affect the accessibility of residents and students. The
design should prioritize the community. The accessibility, safety and convenience of the
access to the public transportation system. On the other hand, conservation of the Haw Par
Mansion and Lin Fa Kung is also a part of social aspect. These two heritages are cultural
icons, public are also accounted for the issue of stay-or-leave of heritages, public opinion
should take the majority in conservation. Therefore, engaging with the community such as
Buildability
Buildability can be realize as how a construction project could complete effectively and effeciently.
Greenery space is a factor to enhance the liviability of population. Part of country park would be
accounted for the development project, contributing to one leisure spot less. Besides, there are no
planning for open space and green belt in the community according to proposal, which is unhealthy
to continuting sustainability of the community. If we take a scope on the proposal, the development
composed of residental building, commerical building and exhibition complex. Lack of integrative
planning, shortage of open space and lack of greenery shows the incompatibility of land use, which
commerical building is an unhealty phenomenon. Private living of residents mixed up with public
activities are bluring to invasion of privacy, along with poor air quailty as well as ventilation, and
The high density of skyscrapers in Hong Kong aggravate the urban heat effect. The apparent
temperature is hotter gradually due to this effect. Intense land use and high density of human
activity are expected in vertical urbanization, contributing to lack of natural ventilation, which may
Achieving health and safety in terms of technical issue is significant indicator to a community. After
went through SARS and COVID-19 epidemic, high population along with poor ventilation system
had casused the situation even tougher. Therefore an ideal ventilation piping design is expected in
enhancing natural ventilation and prevention of diseas. An appropriate fire control system should be
adopted since rescution is more diffcult along with height of building and the landscape.
Implementation planning
Collaboration is key elemnt in this project. Long-term public consultation is essential, the
interaction with general public, stakeholders enusre the perspective of the public and foster
minimize the effects on residents nearby site should be prioritized. Therefore, temporary
construction such as noise barriers is necessary. Furthermore, the development project is able to
stimulate local employment, by promoting local employment and the use of local suppliers and
contractors.
Recommendation
First of all, planning of greenery space is essential in terms of livability. The location is able to
incorporate with the country park area, where show the possibilty of planning a featured greenery
The government seems to put the direction of development towards East side of Hong Kong, the
site particuarly located at East Hong Kong Island, there is a huge potential to explore the future
development at Southern-East of Hong Kong. The ideal plan could be reservation for a public