Professional Documents
Culture Documents
( Reaffirmed Pvt.
2011 ) Ltd. -
Bhopal(md.visheshlabs@gmail.com) 49.36.43.182 [for non-commercial use only].
(Reaffirmed 2016)
(Reaffirmed 2015)
(Reaffirmed 2014)
(Reaffirmed 2013)
(Reaffirmed 2012)
(Reaffirmed 2011)
(Reaffirmed 2010)
(Reaffirmed 2009)
(Reaffirmed 2008)
(Reaffirmed 2007)
(Reaffirmed 2006)
Free Standard provided by BIS via BSB Edge Private Limited to Vishesh Labs Pvt. Ltd. -
Bhopal(md.visheshlabs@gmail.com) 49.36.43.182 [for non-commercial use only].
Indian Standard
METHODS OF TEST FOR SOILS
PART 17 LABORATORY DETERMINATION
OF PERMEABILITY
( First Revision )
Members Representing
ADDITIONAL DIRECTOR (GE) Ministry of Railways ( RDSO )
JOINT DIRECTOR (GE) ( Alternate)
DR ALAM SINGH University of Jodhpur, Jodhpur
SHRI B. ANJIAH Engineering Research Laboratories, Government of
Andhra Pradesh, Hyderabad
DR R. K. BHANDARI Central Building Research Institute (CSIR), Roorkee
SHRI S. K. KANSAL ( Alternate)
CHIEF ENGINEER (lPRl) Irrigation Department, Government of Punjab,
Chandigarh
DIRECTOR (DAM) ( Alternate)
DR T. N. CHOJER Public Works Department, Government of Uttar
Pradesh, Lucknow
DEPUTY DIRECTOR (R) ( Alternate)
SHRI A. VERGHESE CHUMMAR F. S. Engineers Private Limited, Madras
SHRI C. S. DABKE Howe ( India) Private Limited, New Delhi
SHRI G. V. MURTHY ( Alternate)
SHRI A. G. DASTIDAR In personal capacity (5 Hungerford Court, 12/1.
Hungerford Street, Calcutta)
DIRECTOR ( IRI ) Irriga tion Department. Government of Uttar Pradesh,
Roorkee
SHRI A. H. DIVANJI Asia Foundations and Construction (Private)
Limited, Bombay
SHRI A. N. JANGLE ( Alternate)
DIRECTOR Central Soil and Materials Research Station, New
Delhi
DEPUTY DIRECTOR ( Alternate)
SHRI N. V. DE-SOUSA Cemindia Company Limited, Bombay
DR GOPAL RANJAN University of Roorkee, Roorkee; and Institute of
Engineers (India), Calcutta
( Continued on page 2 )
Members Representing
SHRI M. IYENGAR Engineers India Limited, New Delhi
SHRI ASHOK K. JAIN G.S. Jain and Associates, Roorkee
SHRI VUAY K. JAIN ( Alternate)
SHRI A. V. S. R. MURTY India Geotechnical Society, New Delhi
SHRI T. K. NATARAJAN Central Road Research Institute (CSIR), New Delhi
SHRI RANJIT SINGH Ministry of Defence (R & D)
SHRI V. B. GHORPADE ( Alternate)
DR G. V. RAO Indian Institute of Technology, New Delhi
DR K. K. GUPTA ( Alternate)
RESEARCH OFFICER (B & RRL) . Public Works Department, Government of Punjab,
Chandigarh
SECRETARY Central Board of Irrigation and Power, New Delhi
DIRECTOR (C) ( Alternate)
SHRI N. SIVAGURU Ministry of Shipping and Transport (Roads Wing)
SHRI U. JAYAKODI ( Alternate)
SHRI K. S. SRINIVASAN National Building Organization, New Delhi
SHRI SUNIL BERRY ( Alternate)
DR N. SOM Jadavpur University, Calcutta
SHRI N. SUBRAMANYAM Karnataka Engineering Research Station, Govern-
ment of Karnataka, Krishnarajasagar
COL R. R. SUDHINDRA Ministry of Defence (Engineer-in-Chief's Branch)
SHRI S. S. JOSHI ( Alternate)
SUPERINTENDING ENG IN EE R Public Works Department, Government of Tamil
(P & D) Nadu, Madras
EXECUTIVE ENGINEER (SMRD)
( Alternate)
SHRI H. C. VERMA· All India Instrument Manufacturers and Dealers
Association, Bombay
SHRI H. K. GUHA ( Alternate)
SHRI G. RAMAN. Director General, lSI ( Ex-officio Member)
Director (Civ Engg )
Secretary
SHRI K. M. MATHUR
Joint Director (Civ Engg ), lSI
Members
ASSISTANT RESEARCH OFFICER, IRI Irrigation Department, Government of Uttar
Pradesh, Roorkee
ASSISTANT RESEARCH OFFICER Irrigation Department, Government of Punjab,
(IPRI) Chandigarh
( Continued on page 13 )
*Shri Verma acted as Chairman in the meetini in which this Indian Standard was finalized.
2
Free Standard provided by BIS via BSB Edge Private Limited to Vishesh Labs Pvt. Ltd. -
Bhopal(md.visheshlabs@gmail.com) 49.36.43.182 [for non-commercial use only].
IS: 2720 ( Part 17) • 1986
I ndian Standard
METHODS OF TEST FOR SOILS
PART 17 LABORATORY DETERMINATION
OF PERMEABILITY
( First Revision )
o. FOR E W 0 R D
0.1 This Indian Standard (First Revision) was adopted by the Indian
Standards Institution on 30 January 1986, after the draft finalized by the
Soil Engineering Sectional Committee had been approved by the Civil
Engineering Division Council.
0.2 With a view to establishing uniform procedures for the determination
of different characteristics of soils and also for facilitating the comperative
study of the results, Indian Standards Institution is bringing out Indian
Standard method of test for soils (IS: 2720) being published in various
parts. This part (Part 17) deals with the method for the laboratory
determination of the coefficient of permeability of soils.
0.3 The knowledge of the permeability is essential in the solution of many
engineering problems involving flow of water through soils such as:
a) Dewatering and drainage of excavations, back fills and subgrades;
b) Determining yield of water bearing strata;
c) Assessing seepage through the body of earth dams; and
d) Computing losses from canals.
In addition since the soil may be used to inhibit flow of water, the
permeability of soil governs the type of soil to be used.
0.4 This Standard (Part 17) covers both constant head and falling head
tests as used for most of the soil. The laboratory determination of
permeability of granular soil by constant head method is covered in
separate part ( Part 36). This part was first published in 1966. Based on
the experience gained in the use of this test in the past 20 years by various
laboratories, this standard has been revised. The principal modifications
made are deletion of details of the equipment for testing for which separate
3
Free Standard provided by BIS via BSB Edge Private Limited to Vishesh Labs Pvt. Ltd. -
Bhopal(md.visheshlabs@gmail.com) 49.36.43.182 [for non-commercial use only].
IS;2720 ( Part 17 ) - 1986
Indian Standard has been formulated (see IS: 11209-1985* ), giving detailed
procedures for the record of the observations as well as calculations for
two types of the test and revising the proforma for the record of tests by
enlarging to cover more details.
0.5 For the purpose of deciding whether a particular requirement of this
standard is complied with, the final value, observed or calculated, express-
ing the result of a test, shall be rounded off in accordance with IS: 2-1960t.
The number of significant places retained in the rounded off value should
be the same as that of the specified value in this standard.
1. SCOPE
1.1 This standard (Part 17) covers the methods for laboratory determina-
tion of coefficient of permeability of soils using falling head and the
constant head methods. This test is recommended for soils with coefficient
of permeability in the range 10- 3 to 10- 7 cm/s and maximum particle size
of9'5 mm.
2. TERMINOLOGY
2.1 For the purpose of this standard, the definition of terms given in
IS: 2809-1972t shall apply.
3. APPARATUS
3.1 The mould assembly (including drainage base and drainage cap) shall
conform to IS: 11209-1985*.
3.2 The compaction rammer shall conform to IS: 9198-1979§.
3.3 Set of Stand Pipes - Glass stand pipes for falling head (variable
head) test arrangement, varying in diameter from 5 to 20 mm, suitably
mounted on stand or otherwise fixed on wall.
3.4 Constant Head Tank - A suitable water reservoir capable or supply-
ing water to the permeameter under constant head for constant head test
arrangement.
·Specification for mould assembly for determination of permeability.
t Rules for rounding off numerical values ( revised ).
~Glossary of terms and symbols relating to soil engineering (first revision ).
§Specification for compaction rammer for soil testing.
4
Free Standard provided by BIS via BSB Edge Private Limited to Vishesh Labs Pvt. Ltd. -
Bhopal(md.visheshlabs@gmail.com) 49.36.43.182 [for non-commercial use only].
S
Free Standard provided by BIS via BSB Edge Private Limited to Vishesh Labs Pvt. Ltd. -
Bhopal(md.visheshlabs@gmail.com) 49.36.43.182 [for non-commercial use only].
4.1.5 The mould with the specimen inside shall be assembled to the
drainage base and cap having porous discs. The porous discs shall be
saturated before assembling the mould.
4.2 Undisturbed Soil Sample - For testing undisturbed soils, undisturbed
specimen shall be trimmed in the form of a cylinder not larger than about
85 mm in diameter and having a height equal to that of the mould. The.
specimen shall be placed centrally over the porous disc of the drainage
base fixed to the mould. The annular space between the mould and the
specimen shall be filled with an impervious material such as cement slurry
or a mixture of 10 percent dry powdered bentonite and 90 percent fine
sand by weight to provide sealing between the soil specimen and the mould
against leakage from the sides. When using the cement slurry the mould
shaH be kept on a flat surface other than the porous discs. The mixture
shall be compacted using a small tamping rod. The drainage cap shall
then be fixed over the top of the mould.
4.3 Saturation - In the case of soils of medium to high permeability the
specimen shall be subjected to sufficient head, flow or immersion so as to
obtain full saturation. Soils of low permeability require flow under a high
head for periods ranging from a day to a week depending upon the
permeability and the head. Alternatively, in the case of soils of low
permeability the specimen shall be subjected to a gradually increasing
vacuum with bottom outlet closed so as to remove to form the soil voids.
The vacuum shall be increased to at least 70 cm of mercury which shall be
maintained for 15 minutes or more depending upon the soil type. The
evacuation shall be followed by a very slow saturation of the specimen
with de-aired water from the bottom upwards under full vacuum. When
the specimen is saturated both the top and bottom outlets shall be closed.
6
Free Standard provided by BIS via BSB Edge Private Limited to Vishesh Labs Pvt. Ltd. -
Bhopal(md.visheshlabs@gmail.com) 49.36.43.182 [for non-commercial use only].
k 27 --k~
T
1'27
in which
k! 7 = permeability at 27°C,
'YT = coefficient of viscosity at Toe,
')'27 - coefficient of viscosity at 27°C,
Q - quantity in cm s,
A area of speceimen in cm 11 ,
hydraulic gradient, and
= time in seconds.
5.4.2 The parameters water content, void ratio and degree of saturation
shall be calculated according to IS: 2720 (Part 2 )-1973*.
5.4.3 A data sheet with observed data, calculation and result is presented
in Appendix A.
-Methods of tests for soils: Part 2 Determination of water content ( second revision ).
7
Free Standard provided by BIS via BSB Edge Private Limited to Vishesh Labs Pvt. Ltd. -
Bhopal(md.visheshlabs@gmail.com) 49.36.43.182 [for non-commercial use only].
kT = 2'303 aL log h1
A (tr-ti) 10h;
and the permeability at 27°C is given by
k27 = kT~
1'27
8
Free Standard provided by BIS via BSB Edge Private Limited to Vishesh Labs Pvt. Ltd. -
Bhopal(md.visheshlabs@gmail.com) 49.36.43.182 [for non-commercial use only].
APPENDIX A
( Clauses 5.3 and 5.4.2 )
RECORD OF OBSERVATION WITH EXAMPLE FOR
CALCULATION OF PERMEABILITY BY
CONSTANT HEAD METHOD
9
Free Standard provided by BIS via BSB Edge Private Limited to Vishesh Labs Pvt. Ltd. -
Bhopal(md.visheshlabs@gmail.com) 49.36.43.182 [for non-commercial use only].
Gs • W _ _ _ percent
Degree of saturation S
e
Permeability at 27°C, k 27
10
Free Standard provided by BIS via BSB Edge Private Limited to Vishesh Labs Pvt. Ltd. -
Bhopal(md.visheshlabs@gmail.com) 49.36.43.182 [for non-commercial use only].
IS: 2720 ( Part 17) - 1986
APPENDIX B
( Clauses 6.2 and 6.3.2 )
RECORD OF OBSERVATION WITH EXAMPLE
FOR CALCULATION OF PERMEABILITY
BY FALLING HEAD METHOD
C = 2·303 a; = ____ cm
11
Free Standard provided by BIS via BSB Edge Private Limited to Vishesh Labs Pvt. Ltd. -
Bhopal(md.visheshlabs@gmail.com) 49.36.43.182 [for non-commercial use only].
12
Free Standard provided by BIS via BSB Edge Private Limited to Vishesh Labs Pvt. Ltd. -
Bhopal(md.visheshlabs@gmail.com) 49.36.43.182 [for non-commercial use only].
Members Representing
SHRI A. K. CHATURVEDI Ministry of Defence (Engineer-in-Chief's Branch)
SHRI P. VERDARAJAN ( Alternate)
DEPUTY DIRECTOR ( GE-III ) Ministry of Railways ( RDSO )
ARE (GE) ( Alternate )
DIRECTOR (CS & MRS) Central Soil and Materials Research Station, New
Delhi
DEPUTY DIRECTOR (CS & MRS)
( Alternate)
SHRI H. K. GUHA Geologists Syndicate Private Limited, Calcutta
SHRI N. N. BHATTACHARYA ( Alternate)
DR SHASHI K. GULHATl Indian Institute of Technology, New Delhi
SHRI M. D. NAIR Associated Instruments Manufacturers (India)
Private Limited, New Delhi
PROF T. S. NAGARAJ ( Alternate )
DR GOPAL RANJAN University of Roorkee, Roorkee
DR S. C. HANDA ( Alternate)
SHRI P. JAGANATHA RAO Central Road Research Institute (CSIR ), New Delhi
SHRI U. N. SINHA Central Building Research Institute (CSIR),
Roorkee
DR N. SOM Jadavpur University, Calcutta
DR S. C. DAS ( Alternate)