You are on page 1of 1

E 585000

E 584900

E 585400

E 585500
Note 1: Depth of the 22 nos boreholes (provided as per SGS BH-2B.2-2 SHAFT 3

E 585900

E 586000

E 586000

E 586000

E 586100

E 586200
E 584400

E 584500

E 584600

E 584700

E 585600

E 585700

E 585800
E 584800

E 585100
requirements) and additional 9 nos boreholes (which are Cancled 1+100
1+150

1+200
1+050

incorporated as per Herrenknecht's proposed standards) has been L2B.2-NC-BH-04-HK 0


1+25
0

E 585200
1+00

designed to be extended up to 5 meters below the invert level.


0+
95
0
1+30
0
EL
-2
RS3-NC-PZ-04-SGS
N 2370900 1+35
0

N 2370900 LAUNCHING SHAFT LINE


1+36
1+367
7
0+00
0+ 0000 2B.2 AND LINE 4
0
0+
90
20.00 X 15.00M

L4-NC-BH-07-HK

99
1515
.2

5.5.
2626
2B

1+1+
0+05
0

0
1+25
NE
SH3-NC-PZ-07-SGS
0+100

LI
0
85
0+
0+150

0+200
LIN
E4
PZ-TU-02

0
1+20
0+25
0

N 2370800 N 2370800
SH3-OC-BH-07-SGS

0
RS3-OC-BH-04-SGS

0+80
0+
30
0

0
1+15
0+
35
0

0
0+75

0
1+10

0+
40
0
N 2370700 N 2370700

0
0+70

0+
0
1+05

450
0
0+65
PZ-TU-01

0
00

0+50
1+

0
3
NE
LI
BH-TU-08

0
L4-NC-BH-08-HK

0+60
N 2370600 N 2370600

0
95
0+

0+550
CSH2-OC-BH-13-SGS BH-TU-02

0
55
0+

0
90
0+
L4-NC-BH-09-HK

0+600
0

0
-5

50

85
0+

0+
AD
RO 0+150 TO BE CONNECTED TO
ICE
0+
JARWAL SUBSTATION 00

N 2370500 N 2370500
0

RV CONNECTION
SE LI
NE 0+
SHAFT 2 LINE 3
ND
02
5 0+
0
CONNECTION SHAFT 2

0+650
0+20 0

HA 3.
45
RS3-NC-PZ-04-SGS
04
2.41
0+
1 13.00 X 23.00 M
FT

0
LE

80
0+
RS1A-OC-BH-09-SGS
0+10

BH-2B.2-1
0

BH-TU-08
0+25

0
40
0+
0

0
75
RS1A-OC-BH-09-SGS

0+
LINE 2B.1

0+700
BH-1A-1

CSH1-NC-PZ-12-SGS
SHAMIYAH-2 SUBSTATION
RS1A-NC-PZ-09-SGS

BH-1B-1
L1A-NC-BH-01-HK
0
35
0+05

0+
0
0+30

0+30

LIN
0

N 2370400 N 2370400
BH-TU-13
3

700
MLS-IC-01
E

MLS1-OC-BH-01-SGS

9D
E

0+
2B

MLS1-NC-PZ-01-SGS

10
.1

TO BE CONNECTED TO
MLS-IC-02
0
30

0
0+75
0+
CUC SUBSTATION
P-B
N RAM
0+00

BIBA
0

650
0
.2

25
2B

0+

0+
E
N

TO MATAF
LI

0
0+80
N 2370300
L3-NC-BH-06-HK
0

RS1A-NC-PZ-09-SGS
20

600
0+

0+
N 2370300

8.27

0
0+85

0+85
0+ 0+000
00
0
E 2B
0
0+15

550
LIN

0+
0+
CSH1-NC-PZ-12-SGS
B.2

05
0 0+050
0+100
Key Plan
E2

DESIGNED TO MEET SGS REQUIREMENTS 0+104


LIN

LI
TCESS
0+

500
10
0
NE

0+
CONNECTION SHAFT1
1A List of Normal and Oriented Coring Boreholes
N 2370200 SHAMIYAH-2 SUBSTATION LEGEND
BH-1A-1 0+
15
0

ICS-NC-PZ-03-SGS
To meet SGS - REQUIREMENTS
12 Nos.Oriented Oriented Borehole
CSH1-OC-BH-12-SGS
450

Coring Boreholes
0+

ICS-NC-PZ-03-SGS and
0+050

BH NO.
0+
20
0

BH-1B-1 Remaining BH-1B-1


Required Depth(m) Easting(m)
(See Note:1 Above)
Northing(m) Completed Boreholes
met together and they REQUIRED FOR PREPARATION OF THE GBR (Geotechnical Baseline
MLS2-OC-BH-02-SGS 59.00 584982.5517 2369708.8571
are the same borehole.
L1A-NC-BH-01-HK 0+
Report) to enable TBMs Selection / Production.
0
0+40

25
0

ICS-OC-BH-03-SGS 43.600 584614.9940 2370105.1300


0+000

0+000
TCESS
0+
30
0+050
RS3-OC-BH-04-SGS 33.50 585505.7143 2370882.2716 As Built Oriented Coring Boreholes As of 18.10.2018
0 INTE
3

RC
26.00 ONNECT 0+100

N 2370100 X 46 IN
.00 M G SHAFT
Depth of the
LINE

INTERCONNECTING P1 SH3-OC-BH-07-SGS 28.50 585315.808 2370968.032 Oriented Borehole


0+350

SHAFT 0+
00
AS BUILT DEPTH Portion below the
BH NO.
P2

26.00 X 46.00 M 0

RS1A-OC-BH-09-SGS 31.50 584346.4930 2370288.6710 invert Level Easting(m) Northing(m)


(m)
0+000
0+200

(m)
ICS-OC-BH-03-SGS 0+
TO BE CONNECTED
MEKKAH BSP
L3-NC-BH-05-HK CSH1-OC-BH-12-SGS 47.000 585089.9840 2370208.6120
MLS-IC-01 56.00 4.774 584979.026 2369799.262
0

05
0+15

0
2A.2

0+050

CSH2-OC-BH-13-SGS 41.00 585254.9090 2370482.3200


L1B-NC-BH-02-HK MLS-IC-02 56.00 2.330 585013.266 2369702.813
0+300

UPVC Pipe
REMOVABLE COVER
EL- 0+1
LINE

0+175. 75
45 (45mm min. inner diameter)
1
0+150

MLS1-OC-BH-01-SGS 53.00 5.120 584991.8280 2369754.8837


0+

10 Nos.Normal Normal Borehole Bolts


10
0

P4
BH NO. Coring Boreholes
N 2370000 Required Depth(m) Easting(m) Northing(m)
LIN

0+100 P3

(See Note:1 Above)


TCESS
E

Concrete Base
0+250

As Built Normal Coring Boreholes As of 18.10.2018


2A

L1B-NC-BH-03-HK
0+150
0+160.80 SEAL
MLS2-NC-PZ-02-SGS 59.00 584973.5771 2369721.0260
0+
0
0+10

(Clayey Material)
15
0

Depth of the Normal Borehole


ICS-NC-PZ-03-SGS
LIN

44.00 584597.4996 2370107.5334 AS BUILT DEPTH Portion below the


BH NO.
E

Easting(m) Northing(m)
2A

(m) invert Level BACKFILL


(Graded Mix)
SH3-NC-PZ-07-SGS 30.00 585322.2804 2370966.8433 (m)
0+200
0+20
0

BH-TU-08 40.00 3.584 584888.278 2370563.504


05

CSH1-NC-PZ-12-SGS 585087.1149 2370216.4003


0+

47.00

CSH2-NC-PZ-13-SGS 41.00 585255.8272? 2370474.0710 BH-TU-13 40.00 5.362 584655.329 2369903.942 SEAL
(Clayey Material)

N 2369900 PZ-TU-03 40.00 9.720 584348.660 2370280.068

MLS1-OC-BH-01-SGS
0
00

0+

0+150
0+

ADDITIONAL BOREHOLES AS PER STANDARDS PROVIDED BY


25
0

BH-TU-13
0

BH-1A-1 40.00 12.618 584378.1263 2370265.843


00
0+

HERRENKNECHT (HK) WHICH ARE REQUIRED FOR PREPARATION


G.W.L.
OF THE GBR (Geotechnical Baseline Report) BH-1B-1 44.00 5.563 584597.4996 2370107.5334 FILTER ZONE

MLS1-NC-PZ-01-SGS to enable TBMs Selection / Production. (Sand and Gravel Mix)


0+
30
0

0+053
MLS1-NC-PZ-01-SGS 56.00 8.120 585010.2419 2369748.4666
0+100

0+05
0

0
9 Nos.Additional
0+15
6 Boreholes RS3-NC-PZ-04-SGS 34.00 5.088 585518.8355 2370889.6024
0+
35
0
0+15
2.4
BH NO. Required Depth(m) Easting(m) Northing(m)
TO BE CONNECTED TO 11C (See Note:1 Above) RS1A-NC-PZ-09-SGS 31.50 5.540 584347.5721 2370274.2112
SHAMIYAH-1 SUBSTATION
N 2369800 L1A-NC-BH-01-HK 41.00 584496.1047 2370180.7046 SEAL
0

0+
10

400
0+

(Clayey Material)
TCESS
L1B-NC-BH-02-HK 49.10 584717.5647 2369996.3623
0+45
0 0+020
.39
29.00
Remaining Boreholes Requested By Dar E-mail
.007

6
MAIN LAUNCHING SHAFT 1
L1B-NC-BH-03-HK 584791.5298 2369868.5647 BUILDING BACKFILL

MLS-IC-02 58.00
0+499

SERVICE Dated 19.02.2018 (06 Nos)


29.00

29mX29m (Cement Greut)


0+000

End of Borehole
Depth of the Oriented Borehole
0

L2B.2-NC-BH-04-HK 32.50 585107.7177 2370909.4973


0+05

0+00 0+519
0 2+05 .403
7.680
REQUESTED Portion below the
0+

0
0+05
10

BH NO. Easting(m) Northing(m)


0

L3-NC-BH-05-HK 50.50 585031.9700 2370020.3602 DEPTH (m) invert Level SCHEMATIC DIAGRAM OF PIEZOMETER
(m)
L3-NC-BH-06-HK 50.50
N 2369700 MLS2-NC-PZ-02-SGS 585130.6792 2370281.1650
PZ-TU-01 40.00 6.573 585328.1339 2370593.0841
0
0+00

L4-NC-BH-07-HK
0+

38.10 585706.7443 2370829.1881


15

11

BH-2B.2-1 2.157 584825.5609 2370464.4137


0

40.00
0
2+00

L4-NC-BH-08-HK 34.50 585941.1344 2370573.3649


BH-2B.2-2 ( 0.80) ( Cancled) 14.922 585252.7268 2370961.9254
MLS2-OC-BH-02-SGS B
L4-NC-BH-09-HK 35.75 585931.1074 2370449.0976
PZ-TU-02 40.00 7.657 584995.1466 2370763.029
0+

12
20
0
0
1+95

Drawing No. : Revision:

MINISTRY OF FINANCE SCALE DRAWN DESIGNED


DATE

CHECKED APPROVED 01.01.2020

You might also like