Professional Documents
Culture Documents
E 584900
E 585400
E 585500
Note 1: Depth of the 22 nos boreholes (provided as per SGS BH-2B.2-2 SHAFT 3
E 585900
E 586000
E 586000
E 586000
E 586100
E 586200
E 584400
E 584500
E 584600
E 584700
E 585600
E 585700
E 585800
E 584800
E 585100
requirements) and additional 9 nos boreholes (which are Cancled 1+100
1+150
1+200
1+050
E 585200
1+00
L4-NC-BH-07-HK
99
1515
.2
5.5.
2626
2B
1+1+
0+05
0
0
1+25
NE
SH3-NC-PZ-07-SGS
0+100
LI
0
85
0+
0+150
0+200
LIN
E4
PZ-TU-02
0
1+20
0+25
0
N 2370800 N 2370800
SH3-OC-BH-07-SGS
0
RS3-OC-BH-04-SGS
0+80
0+
30
0
0
1+15
0+
35
0
0
0+75
0
1+10
0+
40
0
N 2370700 N 2370700
0
0+70
0+
0
1+05
450
0
0+65
PZ-TU-01
0
00
0+50
1+
0
3
NE
LI
BH-TU-08
0
L4-NC-BH-08-HK
0+60
N 2370600 N 2370600
0
95
0+
0+550
CSH2-OC-BH-13-SGS BH-TU-02
0
55
0+
0
90
0+
L4-NC-BH-09-HK
0+600
0
0
-5
50
85
0+
0+
AD
RO 0+150 TO BE CONNECTED TO
ICE
0+
JARWAL SUBSTATION 00
N 2370500 N 2370500
0
RV CONNECTION
SE LI
NE 0+
SHAFT 2 LINE 3
ND
02
5 0+
0
CONNECTION SHAFT 2
0+650
0+20 0
HA 3.
45
RS3-NC-PZ-04-SGS
04
2.41
0+
1 13.00 X 23.00 M
FT
0
LE
80
0+
RS1A-OC-BH-09-SGS
0+10
BH-2B.2-1
0
BH-TU-08
0+25
0
40
0+
0
0
75
RS1A-OC-BH-09-SGS
0+
LINE 2B.1
0+700
BH-1A-1
CSH1-NC-PZ-12-SGS
SHAMIYAH-2 SUBSTATION
RS1A-NC-PZ-09-SGS
BH-1B-1
L1A-NC-BH-01-HK
0
35
0+05
0+
0
0+30
0+30
LIN
0
N 2370400 N 2370400
BH-TU-13
3
700
MLS-IC-01
E
MLS1-OC-BH-01-SGS
9D
E
0+
2B
MLS1-NC-PZ-01-SGS
10
.1
TO BE CONNECTED TO
MLS-IC-02
0
30
0
0+75
0+
CUC SUBSTATION
P-B
N RAM
0+00
BIBA
0
650
0
.2
25
2B
0+
0+
E
N
TO MATAF
LI
0
0+80
N 2370300
L3-NC-BH-06-HK
0
RS1A-NC-PZ-09-SGS
20
600
0+
0+
N 2370300
8.27
0
0+85
0+85
0+ 0+000
00
0
E 2B
0
0+15
550
LIN
0+
0+
CSH1-NC-PZ-12-SGS
B.2
05
0 0+050
0+100
Key Plan
E2
LI
TCESS
0+
500
10
0
NE
0+
CONNECTION SHAFT1
1A List of Normal and Oriented Coring Boreholes
N 2370200 SHAMIYAH-2 SUBSTATION LEGEND
BH-1A-1 0+
15
0
ICS-NC-PZ-03-SGS
To meet SGS - REQUIREMENTS
12 Nos.Oriented Oriented Borehole
CSH1-OC-BH-12-SGS
450
Coring Boreholes
0+
ICS-NC-PZ-03-SGS and
0+050
BH NO.
0+
20
0
25
0
0+000
TCESS
0+
30
0+050
RS3-OC-BH-04-SGS 33.50 585505.7143 2370882.2716 As Built Oriented Coring Boreholes As of 18.10.2018
0 INTE
3
RC
26.00 ONNECT 0+100
N 2370100 X 46 IN
.00 M G SHAFT
Depth of the
LINE
SHAFT 0+
00
AS BUILT DEPTH Portion below the
BH NO.
P2
26.00 X 46.00 M 0
(m)
ICS-OC-BH-03-SGS 0+
TO BE CONNECTED
MEKKAH BSP
L3-NC-BH-05-HK CSH1-OC-BH-12-SGS 47.000 585089.9840 2370208.6120
MLS-IC-01 56.00 4.774 584979.026 2369799.262
0
05
0+15
0
2A.2
0+050
UPVC Pipe
REMOVABLE COVER
EL- 0+1
LINE
0+175. 75
45 (45mm min. inner diameter)
1
0+150
P4
BH NO. Coring Boreholes
N 2370000 Required Depth(m) Easting(m) Northing(m)
LIN
0+100 P3
Concrete Base
0+250
L1B-NC-BH-03-HK
0+150
0+160.80 SEAL
MLS2-NC-PZ-02-SGS 59.00 584973.5771 2369721.0260
0+
0
0+10
(Clayey Material)
15
0
Easting(m) Northing(m)
2A
47.00
CSH2-NC-PZ-13-SGS 41.00 585255.8272? 2370474.0710 BH-TU-13 40.00 5.362 584655.329 2369903.942 SEAL
(Clayey Material)
MLS1-OC-BH-01-SGS
0
00
0+
0+150
0+
BH-TU-13
0
0+053
MLS1-NC-PZ-01-SGS 56.00 8.120 585010.2419 2369748.4666
0+100
0+05
0
0
9 Nos.Additional
0+15
6 Boreholes RS3-NC-PZ-04-SGS 34.00 5.088 585518.8355 2370889.6024
0+
35
0
0+15
2.4
BH NO. Required Depth(m) Easting(m) Northing(m)
TO BE CONNECTED TO 11C (See Note:1 Above) RS1A-NC-PZ-09-SGS 31.50 5.540 584347.5721 2370274.2112
SHAMIYAH-1 SUBSTATION
N 2369800 L1A-NC-BH-01-HK 41.00 584496.1047 2370180.7046 SEAL
0
0+
10
400
0+
(Clayey Material)
TCESS
L1B-NC-BH-02-HK 49.10 584717.5647 2369996.3623
0+45
0 0+020
.39
29.00
Remaining Boreholes Requested By Dar E-mail
.007
6
MAIN LAUNCHING SHAFT 1
L1B-NC-BH-03-HK 584791.5298 2369868.5647 BUILDING BACKFILL
MLS-IC-02 58.00
0+499
End of Borehole
Depth of the Oriented Borehole
0
0+00 0+519
0 2+05 .403
7.680
REQUESTED Portion below the
0+
0
0+05
10
L3-NC-BH-05-HK 50.50 585031.9700 2370020.3602 DEPTH (m) invert Level SCHEMATIC DIAGRAM OF PIEZOMETER
(m)
L3-NC-BH-06-HK 50.50
N 2369700 MLS2-NC-PZ-02-SGS 585130.6792 2370281.1650
PZ-TU-01 40.00 6.573 585328.1339 2370593.0841
0
0+00
L4-NC-BH-07-HK
0+
11
40.00
0
2+00
12
20
0
0
1+95