You are on page 1of 12
| 1 4) write omy three VA Solid shaft A oom diomelor transmits | powet ag Iso RPM. Taking modulus & igidity C20 BOARD DIPLOMA EKAMINATION EE-YoG GENERAL MECHANICAL ENGiNeeeIN DEEE - uth Somnester - 24 year CIN) he - PART-— DL “Define 54 108 N lm Gr = 0825 — Jomau® = +8210" [asta Tam = 11S Tan Ls 8m 5 < Tx rad = owirusrad 130 P = 2KNTy 60 P = 2KNTwtm > Tram ® PRG oo 2KN = 4294).83N-% 2M K100 i a when aanimwm Aluat stres is taken jako Comsicler oe Tan = ST Z 1S KY 2QHBS = UayIaeN-1g whim siffnts 1 taken anto Comideration wor = en? = oxi i = 154 Hong < A (oseis) (o> D = oisim = Gt vsing Ts ap Fenton = HS50KIO° RED yp eth, yquit$e3 = hoseg yo GB 82x Jo! & OY © scanned with OKEN Scanner But tor a folid = Civeulovt bhafk, ye Dt Be ho36x? = xD" > Dz 080m = Bom, Ae h ich Aad. sty + te A att which vould eiectoaaee et Eee the qreates # “the two | poth He Conditions 9 valu - therefore, he fuitabl diawmetur,D = [80mm 4a) - Lamoumt Boiler : SS we / TOM Lamont boiler is & lagh pressure, forced civculation, water tube boiler. TE was first tmtroduced by Lamont lin Iqas. Thats is ove d te wodern high ~ prewure uakes tube ype team boilers working om forced Civculatin, boiles Comuists of Om @tomomic boiler dum, Lamont Juput Inakerr, evoporaley , air prehentes etc. | | | air pobvare A Feed pump Asi Econowisey Super hare Combustion ——* — prehaated oi y Chamber © scanned with OKEN Scanner Lomont boiler js a - Givtuloki or boiler: a fee reid He puget pomp which is driven by & steam duabind. a deals with Aemalleryr qoute f wabut o& high prewute eal ae high coke ot beak ramwission Cam be achiened by increasing th. velocity & woatur the Feed wotet pases through etonows Ateom “ftovwge amd eposrading drum from st is drawn -to he Craculation pump: “The pump ddivys the feed wabes 0 -ite evaporator Lubes. Waku Circulation 1 about ten somes the beam qemraed.

You might also like