Dated: 08/11/23
TO.
With reference to letter of even no. dated 13.09.2023 for addressing the issues
being faced in field in maintenance of TWS turnouts. Even after retro-fitment of existing
TWS turnouts has been carried out to mitigate frequent failures of Thick Web Switches
and after retro-fitment the problem of gauge holding doesn’t get resolved (i.e. gauge is
not holding well) even after implementing measures like provision of metal liner or ERC
Mark V and tie plates for holding sleepers etc.
List of TWS points giving freq failures are attached with this letter.
(Vipul Gupta)
Sr. DSTE (Co.) BRC