Building maintenance must also be carried out on campus buildings,
P-ISSN: 2301-8437 because every day they are used by the academic community in their
E-ISSN: 2623-1085 activities in large numbers. For that we need buildings that are safe,
comfortable, and decent. Building maintenance in Indonesia is regulated
ARTICLE HISTORY
in the Regulation of the Minister of Public Works No.24/PRT/M/2008
Accepted:
31 Maret 2023
concerning Building Maintenance. This arrangement was updated with
Revision: the passing of Law number 11 of 2020 concerning Job Creation. Based
29 Mei 2023 on this, it is also necessary to know the best building maintenance
Published: methods that must be applied based on the right approach. This study
30 Mei 2023 aims to plan a maintenance method for the L5 building on the UNJ
ARTICLE DOI: Campus based on the Work Breakdown Structure (WBS) using Building
10.21009/jpensil.v12i2.34701 Information Modeling (BIM). Based on a series of studies on the UNJ
Campus L5 building that is integrated with BIM, it will improve the
process of maintaining and repairing buildings. The results of this early
stage research are expected to provide an overview and
recommendations on how to maintain the UNJ Campus building.
Introduction
Buildings that have been standing for functional (Ensafi et al., 2022; Omar et al.,
decades will experience a decrease in quality, 2018; Pishdad-Bozorgi et al., 2018).
both structural and non-structural. If the Building maintenance must also be
building can be used functionally, then the carried out on campus buildings because
building requires maintenance to minimize every day they are used by the academic
the risk of building users (Acampa et al., community in their activities in large
2021a; Charef, 2022; Handayaniputri et al., numbers (Geng et al., 2019; Huo et al., 2019;
2019). Strategies in building maintenance are Marenjak, 2012; Uddin et al., 2021). For that,
very important to control and prevent we need buildings that are safe, comfortable,
damage to building elements (Gao & and decent. Jakarta State University (UNJ),
Pishdad-Bozorgi, 2019; Huang et al., 2019; with the initial name of the Jakarta Teaching
Q. Li et al., 2020) The selection of this and Education Institute (IKIP) and
strategy can also save the budget and costs established on May 16, 1964, is one of the
allocated to the maintenance sector of a many state universities in Indonesia which
building (Gao & Pishdad-Bozorgi, 2019; has several high-rise buildings. As is the case
Mydin, 2015). (Flores-Colen & de Brito, with other high-rise buildings anywhere,
2010) in his article stated that the appearance building maintenance at UNJ is needed to
of buildings, constantly, will always be keep the building fit.
affected by climate, pollution and In terms of building maintenance
environmental conditions. This will worsen costs, buildings that are used routinely
and have a serious impact on the building together must be carefully planned for
which will affect the safety and comfort in the maintenance and become a requirement from
use of the building (Fu, 2018; Kwong, 2020; the planning of the building(Kim et al., 2012;
Weerasinghe & Ramachandra, 2018). Further Masood et al., 2017; Mejía et al., 2020). Apart
described, building maintenance actions are from planning good building maintenance
based on an assessment to avoid failure and methods, to avoid frequent damage to
damage to buildings, through cleaning, buildings which lead to increased repair costs,
repairs, local replacement, and prevention of and to maintain the safety and comfort of
damage (Bucoń & Czarnigowska, 2021; buildings, the UNJ Campus as an educational
Gouda Mohamed et al., 2020; Morgado et al., campus must involve building users as part of
2017). the maintenance of its buildings.
Regarding aspects of building Building maintenance methods can be
maintenance, the Government of the done by way of WBS(Al-Kasasbeh et al.,
Republic of Indonesia in this case 2021a; Fournier et al., 2023; Park & Cai,
represented by the Ministry of Ministry of 2017). Creating a WBS is a process of
Public Works and Public Housing (PUPR) depicting the results of work and projects in
has stipulated Regulation of the Minister of the form of individual components in the
Public Works No.24/PRT/M/2008. This form of a top-down list and the depiction of
regulation contains Guidelines for Building work components in a hierarchical manner
Maintenance which explains that building (Al-Kasasbeh et al., 2021b; Kenley &
maintenance is an activity to maintain the Harfield, 2014; Y. Li & Zhang, 2013). Based
reliability of the building and its on this, then integrated with BIM which aims
infrastructure and facilities so that the to improve the process of building
building is always fit for function (preventive maintenance and repair (Bucoń &
maintenance)(Acampa et al., 2021b; Hosseini Czarnigowska, 2021; C. Z. Li et al., 2022;
& Maghrebi, 2021; Ismail, 2021). While Loeh et al., 2021; Marmo et al., 2020).
building maintenance is an activity to repair From all the descriptions above, it can
and/or replace building parts, components, be concluded that there is a need for a
building materials, and/or infrastructure and maintenance planning method for the L5
facilities so that the building remains building on the UNJ Campus that uses a
Development of Work … − 255
Yasinta, RB, et al.
Jurnal Pensil : Pendidikan Teknik Sipil
BIM-based WBS. This aims to create the the results show that it is able to improve the
feasibility of the building as well as safety and performance of building maintenance and
comfort in carrying out the educational repairs (D’Orazio et al., 2022).
process at the UNJ Campus in general. The development of an information
system (E-maintenance) based on WBS and
Research Methodology integrated with BIM is expected to improve
the performance of maintenance and repair
This research was conducted at of WBS-based government buildings using
Building L5 Campus of Jakarta State BIM (Matos et al., 2021). In this research, it
University, Jalan Rawamangun Muka, East is intended to develop maintenance work
Jakarta. The research was carried out from based on WBS using Building Information
March to November 2022. The method used Modeling (BIM) in the Revit application
in this study is to conduct a literature review through four stages:
and research and development. At this stage, 1. Build a building model using the Revit
collecting journals or scientific papers related app.
to the research topic. After that, an initial 2. Build WBS parts of the building that
scanning of the journal is carried out, namely will be maintained.
a review of the journal which aims to find out 3. Arrange a maintenance schedule for
the outline of the research. The stages of the each part of the building.
research procedure use the research and 4. Collaborate on modeling and
development method, including analysis, maintenance schedules for each part of
design, development, implementation, and the building.
evaluation. The data collection technique
used in this study was field observation to
determine the initial conditions of the
research site and to determine further field
procedures, documentation, and interviews.
Rolling door
References https://doi.org/10.1016/j.clet.2022.1
Acampa, G., Diana, L., Marino, G., & 00414
Marmo, R. (2021a). Assessing the D’Orazio, M., Di Giuseppe, E., &
transformability of public housing Bernardini, G. (2022). Occupant
through bim. Sustainability (Switzerland), density impact on building
13(10). maintenance: Data-driven approach
https://doi.org/10.3390/su13105431 for university buildings. Automation in
Construction, 141, 104451.
Acampa, G., Diana, L., Marino, G., &
https://doi.org/10.1016/j.autcon.202
Marmo, R. (2021b). Assessing the
transformability of public housing 2.104451
through bim. Sustainability (Switzerland), Ensafi, M., Harode, A., & Thabet, W. (2022).
13(10). Developing systems-centric as-built
https://doi.org/10.3390/su13105431 BIMs to support facility emergency
management: A case study approach.
Al-Kasasbeh, M., Abudayyeh, O., & Liu, H.
Automation in Construction, 133.
(2021a). An integrated decision
https://doi.org/10.1016/j.autcon.202
support system for building asset
1.104003
management based on BIM and Work
Breakdown Structure. Journal of Flores-Colen, I., & de Brito, J. (2010). A
Building Engineering, 34, 101959. systematic approach for maintenance
https://doi.org/https://doi.org/10.1 budgeting of buildings façades based
016/j.jobe.2020.101959 on predictive and preventive
strategies. Construction and Building
Al-Kasasbeh, M., Abudayyeh, O., & Liu, H.
Materials, 24(9), 1718–1729.
(2021b). An integrated decision
https://doi.org/10.1016/j.conbuildm
support system for building asset
at.2010.02.017
management based on BIM and Work
Breakdown Structure. Journal of Fournier, E. D., Federico, F., Cudd, R., &
Building Engineering, 34. Pincetl, S. (2023). Building an
https://doi.org/10.1016/j.jobe.2020. interactive web mapping tool to
101959 support distributed energy resource
planning using public participation
Azhar, S., Khalfan, M., & Maqsood, T.
GIS. Applied Geography, 152, 102877.
(2015). Building information
https://doi.org/https://doi.org/10.1
modelling (BIM): now and beyond.
016/j.apgeog.2023.102877
Construction Economics and Building,
12(4), 15–28. Fu, F. (2018). Design and Analysis of Tall
https://doi.org/10.5130/AJCEB.v12 and Complex Structures. In Design and
i4.3032 Analysis of Tall and Complex Structures.
Elsevier.
Bucoń, R., & Czarnigowska, A. (2021). A
https://doi.org/10.1016/c2015-0-
model to support long-term building
06071-3
maintenance planning for multifamily
housing. Journal of Building Engineering, Gao, X., & Pishdad-Bozorgi, P. (2019).
44. BIM-enabled facilities operation and
https://doi.org/10.1016/j.jobe.2021. maintenance: A review. In Advanced
103000 Engineering Informatics (Vol. 39, pp.
227–247). Elsevier Ltd.
Charef, R. (2022). The use of Building
https://doi.org/10.1016/j.aei.2019.01
Information Modelling in the circular
economy context: Several models and .005
a new dimension of BIM (8D). Cleaner Geng, Y., Ji, W., Wang, Z., Lin, B., & Zhu,
Engineering and Technology, 7. Y. (2019). A review of operating