REHABILITATION &IMPROVEMENT OF BALKASSAR-MUZAFFARGARH
CONTRACT NOs.RH-N-130/135-21-22/1~10
Indus ~ Cameos ~ Karakoram (JV)
=|} 4
A E OFFICE OF THE CHIEF RESIDENT ENGINEER
L CAMEOS
No. CRE/IAC/2022/283 Oct 19, 2022
To
PM SKB
Package - 1 & 2
Al-Mehreen
Package - 3
PM KNK
PM SMC
Package- 4, 5 & 6.
M/S Sachal
Package- 7 & 9
M/S Sharukh
Package- 8 & 10.
Project: - REHABILIATION AND IMPROVEMENT OF MIANWALI -
MUZAFFARGARH ROAD N-130 & N-135.
Subject: - Correction in New X-section for road to be constructed over
virgin land.
Refer our letter No.CRE/IAC/2022/281 Dated October 19, 2022.
‘The X-section attached with above referred letter stand cancelled.
‘The corrected x-section is attached here with.
Regards,
Engr. Asmat} Ullah Siyal
Chief Residerft Engineer
Indus Associate Consultant (JV)
Mianwall.
Copy for information: -
* General Manager (Maint) NHA Mianwali.
Director Maint, (N-130 & N-135) NHA Mianwall.
All DDs Maint NHA
AIL RE’s,
Mr. Raheel Designer M/s Indus.
PC Indus Lahore.
File.
‘Address: Chief Resident En,
ineer Office, Sargodha — Mi , District Mi
connsee Gea eect Eng 9 ianwall Road, District Mianwall
99988778 Email: creindusjv@gmall.com=130_ROAI
'YPICAL X-SECTION
£
a 250 fe _ aso 080
tt sour —t RACEWAY ace + sions tt
2 <2 a pa
2 = a 2
Te =|!
ASPHALTC CONCRETE WEARING COURSE =50 mm
|WATER BOUND MACADAN See ASPHALTIC. CONCRETE WEARING COURSE. =50 mm
‘SUB-BASE 2385 rom ASPHALTC CONCRETE BASE COURSE =80 mm
WATER BOUND MACADAN BASE
‘sug-eAse
SUBGRADE (CBR > 7.5% SOAKED)
EMBANOUENT FLL
ranean = os me ce
finer orcomunarnoe |S RESNONINT Fit tee ears = wer geresgemcnn | Gra