Terrape Energy DRILLING CHOICES

Well ID# AB1 AB2 AB3 AB4-JV BC1 BC2-JV BC3 SK1 SK2-JV SK3 SK4
Est. Recoverable barrels (000,000's) 5.5 7.5 7.7 6.8 9.8 8.3 6.4 9.9 8.8 8.6 7.2
Budgeted Cost ($ millions) $30 $45 $40 $25 $50 $35 $45 $80 $40 $50 $35
Proceed with well site? (0-No, 1-Yes) 0 1 1 1 1 0 0 1 0 0 0

Total Recoverable Barrels (000,000's) 41.7

CONSTRAINTS Total Available


Total # of wells drilled 0 1 1 1 1 0 0 1 0 0 0 5 = 5
No more than 2 in Sask 1 0 0 0 2 ≤ 2
At least One Joint Venture well 1 0 0 1 ≥ 1
At least 3 in Alberta 0 1 1 1 3 ≥ 3
Total Budget ($ million) $0 $45 $40 $25 $50 $0 $0 $80 $0 $0 $0 $240 ≤ $250