You are on page 1of 6
N Gaal ai tS Jalal cv Lay! die ike ch ode . «aed eB all DIA alge Gye (9+) EWBIL ge OS fig UB Glas ol t Aa beall oly a la Sol la OL te Gy ad fae py ke © pb Ges Sl At ll Gell a co LDN ab pe Ge (2+) EUG os GS is UB Laas eld eld VEY T/V CVE: eUaall Ng lI AEYG Quel I Quagetall gle LoL OLA) Aig Last og paall edipe Gee gba Lie cL) 8 509 ye Abad ol tS any Sill ded ola! CYLosYI die deal yo Soria Geshe git ally eal Lead) pps Gunlanes 53 fhaue pe Li (V2) Mags AS 52) Ge ai OS Lge Eyes BB gall La YN pgp Lane dental (69 +) Rel ge bey cleat dodged 0) BB gall EDEN oye Ge Lygls QA (VE 6+) 4 ella 300 Qe ekg PNT e/Ve gee 3M Beall plot elt) Ve VT 1/1 £ Felall Lo (Gubandie lay ph Gane) pda GLI Uaatyy Clad! as Game pth Col Ley Bh pay (TH YT/V N/V 2) Gil gall oY 9 92 Oe Lye Ant (V0) oe Laaile Ss (Gages pee cle Gen) dingy ell GLY Lal) ya (161) Ras Racin SS 5 Ley play Yg Deg a plnad Cpe SET Mal peal asd gh glad Cua Le Gh pe Meehial a ly Gad i deel DEY 22g Ge phelall CYLaI dis gle oT (2109) V0) sit (019698) oti https:// Sce.jaf.mil.jo/ E-mail: supplyi@scc.org.jo fina Cus 5 i 5 ls (gall eb 5 Cl) 5 of 2Page aS lly ly Ail AS ty of le pall ge GY SLD Ege Se (30a ¢ 2 di TB ge pe Gs (32.03 40.71 36 1707.42 )cidall ee.! (3132.09.27 37 0429.58 ) goal cn (3132.09.26 37 04 29.57) gp yall eaial Jala Gonadal spall GIS a Eat ake aK iy laa ae DBAS al oy LES al dy gael cor le ape yall DLLs ain (ph Che a alee cal w wv 4; Qoats VL ASY! din 235 3 apsall ad yall Satins OI pide gl Ai Gand dee AGB al inal yall anny yall cll (yl Ls) Heal Aa yall os 565 Gf gle Apa VI Aa Lil Gul Gye Shelly Jy a ane eI a dee 6 $i yl China yal Guay ys gael (Cable Tray) a8 5 pe Malad Ces She gig Sell ad alll pl yd! Ge (Cable Tray)ul i 10 Joly ase ges 555) geen: (Compliance List): otal! Aasiiall GIS p23) gen Go bg 5B ry Ly Gel pee dalle iS 5 N quill ola! oe ode giplal shoal ¥ol 9 Aayell Gy pally gh lly Lavell Leslie Ale Bakey Cpl ol ally Quel pay gle coe hill cue Hille 10 isl Gadd Les ak aS ly iN LS tL Ig pl ola on oe gla ll Melall ce ides 5g ppatleyetlensl Ca Qe Ml dads 5 Gp Aales gol He ie GV lee ez sof 53 ala aL lel ya] AHS AS glo SL 13 AAdkall Gilel yal pladiial p2ed I pal 4 debe eStiy Al geady ¢ pel Jay Gl liao go Gas ny al Haslet A Cuaasigall AG cys Aa side y days Sains BS 5 Jl Ys (Design sheet+Calculation sheet)“Uabsalt aM Reade liad AI jlo al yap sel ll J joy oLlaal Aas CAS 2) y oust I MLAS isa Gl Bl Candy oll By y Saall go lg! das GS yo lye plainly 20 ll eal) Dee .15, auelat SA San Yg,uS sly Silly tl ae lee 16 Gil glly ely Ae iy MALE Jee Ah hdl al Maley He 17 | Sof aPage 1. EXCAVATION ua. 12. 13, 14. All excavation works shall conform to relevant Jordanian codes. ‘The contractor shall assure that each foundation excavation is accurately located, sized and plumbed as specified on the drawings. Al topsoll shall be separately removed and stockpiled for later use in the final Backfilling process. No ‘waste from excavations shall be spread on the property without the approval of the SCC. Excavated material, unsuitable or not required for Back-filling shall be removed from the site and disposed of by ‘the Contractor in local authorities specified dump areas. [Any excavation that must be left open overnight shall be adequately barricaded or covered to prevent children or animals from falling into them. 2. FOUNDATION 2a. 22. 23, 24, 25. 26. 27. 28. 28. 2.10. 2ai. 2.13. All materials, cement, fine agnregate, coarse aggregate, water and admixtures shall conform to relevant Jordanian codes. Foundation designs shall be based upon the soil characteristics and parameters listed in the site ‘geotechnical report supplied by SCC Foundation shall be designed for maximum structure reaction resulting from the specific loads, Foundation drawings shall indicate structure reactions, material strengths, dimensions, reinforcing stee! and embedded anchorage material type, size and location. Foundation shall use ready-mix concrete, concrete shall conform to standards and codes adopted in Jordan. For the bearing capacity test three sample should be taken in a triangular shape and should cover the whole footprint of the tower. All concrete construction methods shall conform to the standards practiced and adopted in Jordan or equivalent international standard. ‘The contractor shall submit a detailed report of material specifications used in Concrete Mix Design. ‘To ensure uniform production of concrete, representative samples will be taken at the request of and under the supervision of the SCC engineer and contractor assigned engineer for the purpose of making cubes for strength tests. All tests shall conform to standards and codes adopted in Jordan. In case the concrete placed by the contractor is determined, by testing, to be defective in any way, the contractor shall be responsible and at his exoense for one of the following courses of action which shall be determined by SCC; 2.10.1, The removal and replacement ofall defective concrete, 2.10.2. The cost of design and construction changes necessary to incorporate the inferior concrete. [All reinforcement shall conform to relevant Jordanian codes. All reinforcement (cages, anchor bolts, anchor rods, etc.) shall be accurately positioned and secured while concrete is being poured and vibrated. Exposed portions of anchor bolts shall be coated with tape or heavy grease prior to pouring concrete. The contractor shall supply all bar supports, ties, spacers and other materials required to keep fine reinforcing in its proper pusivion. The portion of concrete surfaces exposed above grade shall be fair faced concrete. XE & Ph 5 of page 3. BACKFILL aa. 32 33, 34, Al backfill works shall conform to relevant Jordanian specifications, ‘Material for backfill shall be furnished by the Contractor from the excavated site material o the extent available. Additional backfil, similar to the site material, shall be furnished by the Contractor where required. If excavated material is not sultable as backfil, Contractor will replace It with acceptable material Fill materials shall be placed in horizontal layers of 25 em lfts and each layer compacted with vibrating ‘compactors such as tampers, rammers, or vibro plates to 95% modified proctor density. ‘The finished grade at backfilled and other disturbed areas shall conform to the lines and grades of the site. Areas around buildings and towers shall be graded so as to cause surface water to flow away from them 4. TOWER LIGHTNG 4a. 42. 43, 44, 4s. 46. 47. 48. Obstruction lighting systems shall be supplied with the towers and installed as required by CAA. ‘Okstruction lighting system shall consists of 42:1 Double obstruction ight at top of tower. 42.2 Twosingle obstruction ight at opposite sides and at 60% of tower height A solid-state electronic device equipped with 2 photoelectric cell that turns tower lights on and off ‘automatically and provide alarms indicating beacon or/and power failure. ‘Obstruction lighting system shall be capable of indicating when light is turned on or off. Obstruction lighting system shall provide NO and NC alarm contacts. Obstruction lighting system shall operate on -48 VOC, DC power will be supplied from SCC communications shelter. Contractor shall submit schemate, Installation drawing and specifications of the obstruction light system he is providing. Contractor shall provide SCC the life time and power consumption of obstruction lighting system bulbs. 5. GROUNDING AND LIGHTNING PROTECTION 8.4, 52. 53. 54. Tower shall have a complete grounding system which conforms to the minimum requirements of EIA RS-222-6, "Protective Grounding.” The grounding system of tower shall achieve a resistance to earth less than 5 ohm. The grounding system of tower will be interconnected with shelter grounding system to provide a ‘common ground potential to the communications site, This shall include lightning protection, electric service and antenna system ground. ‘The grounding system may consist of, but is not limited to, the following components: 5.4.1. Tower ground ring 5.4.2, Ground radials 4.3. Grounding electrodes 344, Tower ground bus bar 5.45, External ground bus bar 2g pkey Sof sPage 55. 56 57. 58 53, 5.10. sat. ‘Tower ground ring shall be buried and encircles the tower structure and provide a means of bonding ground rods together and bonding other grounding electrode system components together. The tower ground bus bar shall be an Integral part of the tower construction or vertical waveguide ladder it should be large enough to accommodate all coaxial cable connections and connection to the {grounding electrode system. The tower ground bus bar shall be physically and electrically connected to ‘the tower, it shall be installed below the transmission line ground kits, near the area of the tower at the point where the antenna transmission lines transition from the tower to the shelter. External ground bus bar shall be installed at the point where the antenna transmission lines enter the bullding, and shall be connected to the external ground ring using the straightest possible downward run of 35 mm2 csa (#2 AWG) or larger bare solid or stranded tinned copper conductor, it should be large enough to accommodate all coaxial connections and connection to the grounding electrode system, Each leg of the towers shall be bonded to the tower ground ring using grounding conductors of 35 mm2 a (#2 AWG) minimum, bare tinned solid or stranded copper conductor. Tower grounding system shall be connection ready to be interconnected with shelter ground, Exothermically welding shall be used for connecting grounding system elements, other methods of connection shall not be used. Each tower must be equipped with a lightning rod fastened at the extreme top of the tower, the lightning rod shall be made of copper material, with minimum dimensions of 1.6 em diameter by 1.2 ‘meter long, shall be attached so as to extend a minimum of 45 cm above the highest point of the tower, including all attachments.

You might also like