You are on page 1of 20

U T EO F ARCHITECTURE

PIADS

Saa1s
*iavAa 1994

PIADS
PRIYaDaRSMINI INSTITUTE of ARCMITICTURI AND OISIGN STUGIUS

PRACTICAL TRAINING PRESENTATION-2


9TH SEMISTER B.ARCH ICBs

NAME OF STUDENT TRUPTI MANDOKAR


ACADEMIC SESSION - SUMMER 2022
NAME OF INSTITUTE PRIYADARSHANI INSTITUTE OF ARCHITECTURE 8 DESIGN STUDIES, NAGPUR.
NAME OF FIRM- SYNECTICS ARCHITECTs, NASHIK.
CONTENT
No. NAME OF THE PROJECT DESCRIPTION OF WORK SHEET NO.

01. PROPOSED INTERNATIONAL STADIUM PLANS, EVACUATION PLAN, 5


COMPLEX FOR NMC SECTIONS, SITE REPORT

02. PROPOSED RESIDENCE OF PLOT LAYOUT


MR. AMIT MALHOTRA

03. PROPOSsED RESIDENCE OF SEPTIC TANK & WATER TANK DETAILS 1


MR. BHARINDWAL

04. PROPOSED REsIDENCE OF FARM HoUSE PRESENTATION 1


MR. LoKESH GAWAI DRAWINGS

05. PROPOSED RESIDENCE OF MR. AMoL CEILING AND ELECTRICAL LAYOUT


TOPE

05. PROPOSED PHC AT PANJU. WORKING DRAWINGS 2

06. PROPOSED SCHOOL FOR DHULE PRESENTATION DRAWINGS

07. PROPOSED GRAND BANQUET OF MR. PRESENTATION DRAWING, FLOORING 4


KUNALPATIL QUANTITY, SITE REPORT

08. PROPOSED FASHION INSTITuTE & WORKING DRAWINGS 2


RESIDENCE OF MR. KUMAVAT
OWER SIDE SECTION FOR
CUTTING AND FILLING

UPPER SIDE SECTION FOR


CUTTING AND FILLING

SECTION FOR CUTTING AND


FILLING

T PARKI TADIU OLET ANCA


HoBT

E
SECTION AA

FEFEreees

NJAP
SITE PLAN Likepes No
T9TAL ELUET UP AREALS7263.30 SgM616382,16 SQFT

SYNECTICS ARCHITECTS PROPOSED STADIUM COMPLEX FOR NASHIk MUNICIPAL CORPORATION. A


SCALE- NTSASH
ARCHITECTURE, INTERIOR,LANDSCAPE P.M.C.
wEo siTE YNEtGTICSARCHTECTS.cOM DATE 1 5/04/2022
CMAIL HFD@SYNECTICSARCHITECTS.cOM AR.DHANANJAY PAWAR, INT. DESIGNER.PRIYANKA PAWAR DEALT TRUPTI
REG. ADDRESS D-01,BHARGAV APT; BEHIND AKABHVANI TOwER, GANGAPUR ROAD, NASHIK.
SECTION A-A

KEY PLANS

GROUND FLOOR PLAN FIRST FLOOR PLAN

www AYB
SEATING PLAN

Licence NG
C A a a 7 S

SECOND FLOOR PLAN THIRD FLOOR PLAN


$29345

SYNECTICS ARCHITECTS PROPDSED STADIUM COMPLEX FOR NASHIK MUNICIPAL CORPDRATION.


NA
RCHITECTURE,INTERIDR, LANDSCAPE P.M.C.
N SCALE- NTS
EB SITE SYNECTICSARCHITECTS.COM DATE- 23/04/20222
MAIL INFO@SYNECTICSARCHITECTS.cOM AR.DHANANJAY PAWAR, INT. DESIGNER. PRIYANKA PAWAR
DEALT-TRUPTI
REG. ADDRESS D-O1,BHARBAV APT; BEHIND AKASHVANI TOWER, GANGAPUR
RDAD, NASHIK.
-
GROUND FLDOR PLAN

FIRST FLDOR PLAN

SEATING PLAN

EMERSENCY EVACUATION
PLAN INDEXX

ENTRY DT
ENTRY E

ASE

CNTR

BATE

SECOND FLOOR PLAN THIRD FLOOR PLAN aTAIRCAE


FOURTH FLOOR PLAN

Liter
SYNECTICS ARCHITECTS PROPOSED STADIUM COMPLEX FOR NASHIK MUNICIPAL CORPORATION dA/2011/33
N SCALE NTS
ARDHITECTURE,INTERIDR,LAN DsCAPE P.M.C. 52934
wEB SITE SYNECTICSARCHITECTS.COM
DATE 27/04/222
EMAILINFO@SYNECTICSARCHITECTS.cOM AR.DHANANJAY PAWAR, INT. DESIGNER.PRIYANKA PAWAR DEALT TRUPTI ASH
REB. ADDRESS D-D1,BHARGAV APT; BEHIND AKASHVANI TOwER, GANGAPUR
ROAD,NASHIK.
30.D0
.Do
7.50 o 0 7.50
15.00
9.00 M. WIDE ROAD
0.28 9.50 950
18.50
9.00 M.WIDE ROAD
t
49.08
9.00 M. WIDE ROAD 9.00 M. WIDE ROAD 9.00 M. WIDE ROAD
16:50
21.58
15.57
gvod adIM 1L I W 00 T
SEPTIC TANK C2 c3
C1 C4 NOTES
SROUND LVL 230X450 230X450
230X450 300x300
AMEIA 1E

OUTLET- INTLET
nusiH COCR WER LAMRGAIE

G D
1.05 -165M
truktbaio FLOOR LVL SUNK WINDOW SCHEDULE
RAFT FOUN EV
1 59
sOLING L

A SECTIONN A 0.2
RECORD ROGM
1o7x 104
230X45 C7
230X450 300XB00
1.05
g5
PL
230X450
NOTE:
HIGHLIGHT COLUMN ARE ECCENTRIC
SEPTIC TANK AND WATER TANK START FROM
FOOTING LEVEL
BIN

SEPTIC TANK
6000 L

PLAN WAITING AREA


Dece

UNDERGROUND WATER TANK a11


15 0.75 230X450 LIeRAR 230X450 C12 DRAWING

300XB00 GROUND FLOOR PLAN WORKING DRAWING

TCTO NDHANiANAY wo-cs

WATERT
WATER TANK
230X450 ROJ
JECT
NK
10,800 Li. BHARINDWALAT GHOTI
SAN
NTA
2.00

WATER TANK
10,800 L A Lieence Ne
SECTION BB PARKIN CAT201
SECTION AA
.00
AENS ARCLENfEC
40
ESIGNERS
REGISTERED ADDRESS:
DOT SHARGAVAL BEHIND ARASHVANI
0.75
OM
E-MAIL: INFO@SYNECTICSARCHITECTs.cOM
cONTACT NO: G253-2346050

WATER TANK
raTRCTURE
10,800 Lit CT3 NIERIOR
230X530 230X530 230X450 CAPE

TOP LEVEL PLAN


GROUND FLOOR PLAN
PLAN
T
4.15 (13-9
R D
i
w5

UUDDODL

In

PLAZA

IL

6M WIDE ROAD

PARKING AREA

GROUND FLOOR PLAN


GROUND FLOOR BUILT-UP AREA: 5521.01 sgFT (512.91s0.MT
TOTAL BuILT-UP AREA: 5521.01 sqFT (512.91sp.MT]
SCALE NTS
SYNECTICS ARCHITECTS PROPOSED RESIDENTIALFOR MR. GAWALI
TECTURE, INTEAIOR, LANDscAPE DATE-1/07/2022
AR.DHANANJAY PAWAR, INT. DESIGNER.PRIYANKA PAWAR DEALT BY TRUPTI
EMAL Nro@svnECrcBARGHITEGTB.cOM Eo. ADDRESS D-O1,BHAROAV APT: BEHIND AKABHVANI TOWER, GANGAPUR ROAD, NASHIK
LEGEND

DROP CEILING AREA

MAIN POP AREA

MAIN CEILING IN ACP

CURTAIN TRAGK

- PROFILE LIGHT

PLAN FOR DINING & LIVING AT GROUND FLOOR


Legend

UGHT
NALL
JaHT PONNT

N aARD

HANGRG PONT

wITOHHD
50

(2W
PEWA

es a/2WAY

AlLED Should Be Warm while wifh 8 MMihick Pronie

.All Exhaust Fan ShouldBe Afombero Studio150 MM


A l l Wall Light Points Should Be 180 M From Ground Level
Allceiling Lights Should Be Natural Whitfe
Room's Celing Lights-12W COB
Washrooms Cellng ughts- WcoB

Drawing9
Celing and Electrical Layout For Living, Dining Area A
Gr
OrOund Floor.

ELECTRICAL LAYOUT PLAN FOR DINING & LIVING AT GROUND FLODR Orawing no
Scale Date Deal North CheckedBy
NIS 02/05/2022 TRUPTI DHANANJAY WD-0

PROJECT
1.22
Proposec.Rasidence's Interior For Mr. Amol Tope At Pune.

ANJAP
VwwH
ain an Licente Ne
1.16 1.16
CA/2011
52934
Reciever's Sign
VASIT2 &Date

Architects
SYNECTICS ARCHITECTS
REG. ADDREBS
D-O1,BHARGAV APT
NOARAHVAN TOWR
WER sITE- Www.aYNECTICBARCHITECTS COM
E-MAIL INFO@aYNECTICBARCHITECT8.cOM
PHONE 0 2 5 3 - 2 3 4 6 0 5 0

SERVICE
.w CTURE
LANDsCAPE

ELECTRICAL LAYOUT PLAN FORDINING & LIVING AT GRauND


FLOoR
NOTES

DOOR SCHEDULE

DOORTYPE sQE NOS REMARK


D 120x240 FUuSHDOORIH LARATE
DI
150240 7 FuHDOORWITH LAMBAIE
O.01240 1DFLUSHDOORWIEH LAMBIATE
x210 13 FLHDOORS
WiINDOW SCHEDULE
TYPE OS PEMARE
120%140 28 SUDuG
180 140 sG 24M
0.40 X0.40 2 LOUvERED 21 M

GROUND FLOOR
ErnTH
O O

PROJECT
PROPOSED PHO & STAFF OUARTERS FOR NHM AT
PANJU.

IT Lcence
CA/R0
52934

RECEIVER'S SIGN
SITAMP & DATE
TERRACPE
DRAWING

LEITI
GROUND FLODR AND FIRST FLoOR wORKING DRAWING
NOnn Checked By DraWnG
25/08/22 TRUPT DHANANJAY
WD-O

ARCH ITECT
SYNECTICS ARCHITECTS
ARCHITECTuRE.INTERIGR, LANDECAPE
CHI CTS.COM

EMAIL-INTD@sYNECTICSARCHITECTS.coM
aMAMJAY PAWAR. InT. DEssGHER PaVasIKA FPAwA
Res. ADDaess-0-O1.BnArAv APT: Bet AraavaNG TowER, Oaapun Roan.a

SERVICES
FIRST FLOOR "ARCHITECTURE INTERIOR LANDSCAPE PMC
NOTES
DOOR SCHEDULE
REMARK
DOOK ITE SZE NOS
LAMINATE
D 1.20 X 240 4 FLUSH DOOR WITH
2 FUSH DOOR WITH LAMINATE
1.50 X 24
D2 090X240 5 FLUSH DOOR WITH LAMINATE
D3 075X2.10 7 FLUSH DOORS
WINDOW SCHEDULE
SILL L CL
TYPE SZE NOS REMARK 4 M
1.20 X 140 14 suDNG
2.4 M
180X140 3SUDIG
0.60 X0.60 7 LOUVERED

NORTH SIDE ELEVATION

PROJECT
PROPOSED PRIMARY HEALTH UNIT AT PANJU, FOR
NATIONAL HEALTH MISSION PALGHAR.

NJ

34

4SI
RECEVER'S SIGN
STAMP
& DATE

DRAWING
SOUTH SIDE ELEVATION GROUD FLOOR PLAN
Date Dealt North Checked By Drawing no.

27/08/22 TRUPTI DHANANJAY

ARCH ITECT
SYNECTICS ARCHITECTS
ARCHITECTURE, INTERIOR, LANOSCAPE
aro M
wEB SITESNETcsARCHOTECT
EMAIL INFO@SYNECTICSARCHTECTS.cOM
R- C O
Re AKARHVANI TOWER, GANGAPUR ROAD NASHIK
SERVICES5
ARCHITECTURE INTERIOR *LANDSCAPE PM

WEST SIDE ELEVATION EAST SIDE ELEVATION


w
KIEONKOHCI

M WOE CO

KOIRORONO

DADHIHIHTD UD
URINUEJR
IRIRORO 8ORDEOETDAD JRDHOR

8EBEDETEE3 JHUIRIEIEJRTU
E
UE

aNOUND ELaD8.PLA
0aDuND Faon OuTUP AREA 65.646.73 SR.

HLBL

HLALHCHLHLN

LDLDLILDL

II-1IL DHORCRCRCRC
RCRRRCHCH NCROBOHRR
LBLRCRLACHCR LBLLALBLHLH NLHL

LHCHLHLBLHLH LHLALBHLHLH LHLBU

uaruru CROHCRCRCROR CRCRCCCRCH


CRORCRCNRCR CRORCRICRCRCH OORCHCKCRCB
RCHCHCHCHC HCBCH

FiRST FLO0H PLA


T. FLO0.uIETu ANEAL 72303. 1BB S9.
-
LHHO LHCHLHLE LBORD
LBDYLHLH LHCH eLLNL

LBLALILh

U HCHCBENCBCH LHCRCHCHCRCH HLHCHCHCRCH CHCNCHCR


CRCRCHDHOHLH HLHLHUSLU LHLHLHLHL
ERCHDHLBCHCH BOHCRCHCBC CHCHCHCHCR
HOBCRC 9DILHLNCA DHEHENERCHU HLLRLHLHCH

LHLE

SrooNO FLaoR BLAN


StROND FLgon guLTUe AREA 72a03.198 aRAT
SQALE
SYNECTICS ARCHITECTS PROPOSED SCHOOL FOR DHULE DATEOka2934
AR.DHANANJAY PAWAR, INT. DESIONER.PRIYANKA PAWAR DEALT
wEs prtE- gVNECHiaBARGHmeoTa.aoM
EMASL INPOG/YNECTICGARCHITEDTR.coM REG. ADORESDD-01,BHARGAV APTI BEHIND AKABHVANI TOWER, 0ANGAPUR ROAD,NABHIK
NASI
sero

NOTES
DOOR SCHEDULE
DOOR IYE NOS REMARK
WIIH LAMINATE
1.36X2.10 U
DOOR

0.90 x 2.10 FLUSH DOOR WITH LAMINATE


LAMINATE
1.05 X2.10 FLUSH DOOR WITH
0.75 X210 FLUSHDOOR WITH LAMINATE
DS
120 *2.10 0 LUSH DOOR WITH LAMINATE
FDI 180x2.10 FOLDING DOORS -M5.COLLARSIBLEDOOR
FD2 1.36 X2.10 0 FOLDING DOORS-M5. COLLAPSIBLE DOOR
FD3 2.00 x2.10 0 FOLDING DOORS-M.S,COLLAPSIBLE DOOR

WINDOW SCHEDULE
SIZE NOS REMARK SILL UNTEL
1.00X1.20 SLDING O.0M 2.10M
WT
0.90 M 2.1O M
1.80 X1.20 SuDING
W2 0.45 M 2.10 M
2.50 X1.65 SLIDING
w3 20X1
2.10 M
0.45 X0.60 LOUvERS T0M 2.10 M

1.30 M 2.10 M
0.60 X0.60 LOUVERS
1.75 X0.60 1.50 M 2.10 M
LOUVER
2.16 X0.60 0LOUVERS 1.50 M 2.10 M
EAST SIDE ELEVATION NORTH SiDE ELEVATION NOTE
All Hatch like thistZRepresent brick work. For thickness of brickwork refer Working
Drawings.
ALL Hatch ike thisepresent Sunk for toilet areas
TTOM L
PROJECT

PROPOSED FASHION INSTITUTE & RESIDENCE FOR MR.


mer AT NASHIK KUMAVAT|

STAMP RECEIVER'S SIGN


--- & DATE

DRAWING
ELEVATIONS
Dale Ded North Checked By Drawing no.

22/03/22 rupti DHANANJAY WD-02

ARCH ITECT
SYNECTICS ARGHITECTS
ARCHITECTURE, INTERIOR, LANDSCAPE
WEB SITE SYNECTICSARCHITECTS.cOM

EMAIL INFOSYNECTICSARCHITECTS.cOM
AR.OHANANJAY PAWAR,
ADoRERS D-O1.8HARGAV APT: BEHNO AKABHvAM TOWe
PUR ROAD, NaBH
SERVICES
WEST SIDE ELEVATION SOUTH SIDE ELEVATION *ARCHITECTURE INTERIOR *LANDSCAPE PMC
on NOTES
DOOR SCHEDULE

DOOR TYPE SIZE NOS REMARK


LAMINAIE
D 1.36 X2.10 1 FLUSH DOOR WIH
0.90 X 2.10 2 FLUSH
DOOR WTH LAMINATE
0 5 XZ10 FUUSH DOORWITH LAMINATE
0.75 X 2.10
FLUSH DOOR WITH LAMNATE
1 . 2 0 X210 0 FLUSH DOOR WTH LAMINATE

180 X2.10 FOLDNG DOORS-MS. COLLAPSIBLE DOOR


136 X 2.10 FOLDNG DOORS-MS. COLLAPSBLE DOCOR

2.00 X2.10 OLDING DoORS-MS. COLAPSIBLE DOOR

wNT
aun

WINDOW SCHEDUULE
TYPE SIZE NOS REMARK UINTEL
0.90 M 210 M
1.00 X1.20 SuIDING O.70 M 210M
owu 180x1.20 SLDING
2.10M
250 * \69
1.20 XI.
150 M
D.45 X0.60 LOvE
O.60X0.60 LOUVERS
ARRINO

175X0.60 LOUvE
2.16 X0.60 LOUVERS

NOTE:
SECTION AA SECTION CC All Hatch like this Represent brick work. For thickness of brickwork refer Workin9

ALL Hatch ike thisrepresent Sunk for toilet areas

PROJECT

PROPOSED FASHION INSTITUTE & RESIDENCE FOR MR. KUMAVAT


AT NASHIK

RECEIVER'S SIGN
STAMP

E DRAWING
& DATE

SECTIONS
Date Dealt
neckeOY DrCwR9 no.

CE
22/03/22 Trupti DHANANJAY WD-02

T
ARCH ITECT
SYNECTICS ARCHITECTS
ARCHITECTURE, INTERIOR, LANOsCAPE
WEB SiTE *

EMAIL
8YNECTICSARCHITECTS.cOM
INFOGSYNECTICSARCHITECTS.coM

A N A AWARNT DESaiGNER.FRIYANKA PAWAR TOwER, GANaAPuR ROAD,NABHIK


e AYa
SERVICES
KEY PLANS *ARCHITECTURE *INTERIOR *LANDsCAPE *PMG
SECTION BB
0009000000 G000000000
888800008e 0860000080

B800000

EBSTa

ERD

EBe

EB
EDEI

ANA
jeenee No
CA/2011/
52934
VASH
SYNECTICS ARCHITECTS PROPoSED MARRIAGE LAWNS, BANOUET HALL, LODGING FOR MR.KUNAL PATIL AT DHULEE
SCALE-NTS
DATE-03/06/22
ARCHITECTURE, INTERIOR, LANDSCAPE AR. DHANANJAY PAWAR, INT. DESIGNER. PRIYANKA PAWAR
NAME -TRUPTI

wEB SITE SYNECTIcSARCHITECTS.COM REG. ADORESS #3,4,RAM PLAZA, NAVSHAKTI CHOWK, BHABHA NABAR, NASHIK
EMAIL INFO@SYNECTICSARCHITECTS.coM
Mr KUNAL PATIL FLOORING QUANTITY
VALUE
ADD VALUE IN
MAIN ENTRANCE AREA (AREA 10.76 VALUE 15% MAIN MARRIAGE LAWN
(sq.ft)
sq.ft)
STEPS RISER 17.33 186.S4012 27.981018 214.521138 STEPS RISER 1557 167.59548 25.139322 192.734802

STEPS TREAD 38.91 418.82724 62.824086 481.651326 STEPS TREAD 3492 375.87888 S6381832 432.260712

ENTRANCE PASSAGE 54.32 S84.70048 87.705072 672 405552 PASSAGE 25.43 273.72852 41.059278 314787798

PEDESTRIAN WALK 303.38 3265.S8232 89.8373488 3755.419668 MAIN STAGE 968.76 145.314 I114.074

MAIN STAGE STEPS RISER 19.3752 290628 22.28148

ENTRANCE LOBBY MAIN STAGE STEPS TREAD 29.0628 435942 33.42222

STEPSRRISER 16.64 179.11296 26.866944 205.979904 STAGE 1 10.8 1162512 17.43768 133.58888

STEPS TREAD 41.6 447.7824 57.16736 514.94976 STAGE 1 STEPS RISER 9 9.5876 L45314 11.14074

ENTRANCE PASSAGE 103.3344 792.2304 STAGE 1 STEPS TREAD 135 145314 217971 16.71111
688.896
STAGE 2 10.8 1152512 1743768 1335885

coVERED MULTIPURPOSE HALL STAGE 2 STEPS RISER S.5875 L45314 1114074

MULIPURPOSE HALL 1024.43 11026.96452 654.044678 12681.0


1.0092 STAGE 2 STEPS TREAD 35 145314 217971 16.71111

STAGE 89.75 966.069 144.91035 1110.97935 STORE 1 20.82 224.10648 3.515972 257.722452

STAGE STEPS RISER 8 19.3752 90628 22.281483 STORE 1 STEPS RISER 0s4 5.81256 O871554 S.S84

STAGE STEPS TREAD 29.0628 4.35942 33.42222 STORE 1 STEPS TREAD 7.7508 1152512 8S12532

11.48 123.57072 18.535608 142.106328 STORE2 25 29 0.833234 13.0547


MAKEUP ROOM1 272.22156

11.48 123.57072 STORE 2 STEPS RISER s4 5.81256 6S84444


MAKEUP ROOM 2 18.535608 142.106328
PASSAGE CONNECTING DINING & 80.213328 614.96884S STORE 2 STEPS TREAD 7.75008 115512 8S2582
49.68 534.75552
MULTIPURPOSE HALL

MAKEUP ROOM 2 2395 257.7978 86e967 64547

MAKEUP ROOM 1 STEPS RISER a.652 7.018128 LS72


DINING HALL

899.3322 6894.8802 MAKEUP ROOM 1 STEPS TREAD a.ss8 s343152 L400472S 2a.7as
DINING HALL 557 5995.548

2437.34634 MAKEUP ROOM 1 LANDING S 1442375 2153564 16S87324


KITCHEN 1s6.9 2119.4316 31791474

73.281312 MAKEUP ROOM 2 2395 237SS 8.S63e7 2964547


STEPS RISER 5.92 63.72288 9.558432

MAKEUP ROOM 2 STEPS RISE 7.018128 10S27182 sS472


21.86 235.30104 35.295155 270.59619
STEPS TREAD

MAKEUP ROOM 2 STEPS TREAD a.88 s343152 LA472S

VALUE ADD VALUE IN


MAKEUP ROOM 2 LANDING 14237
coVERED MULTIPURPOSE HALL TOILET AREA (sq.m) (AREA 10.76 VALUE 10%
(sqft)
sq.r

3.57 38.42748 3.842748 42.270228


MAKEUP ROOM 1 TOILET FLOORING

MAIN MARRIAGE LAWN


AREA (sm AREA 307S
178.25184 17.825184 196.077024
MAKEUP ROOM 1 TOLET DADO TILES 1656

3.84274S 42.270228S MAKEUP ROOM 1 TOILETRCORING


MAKEUP ROOM 2 TOILET FLOORING 38.4274

MAKEUP ROOM 1 TOILET DADo TLES 1344 0SESINS 30.17732S


16.56 178.25184 17.825184 196.077024
MAKEUP ROOM 2 TOILET DADO TILES

MAKEUP RoOM 2 TOILET LOORING S3S

MAKEUP ROOM 2 TOILET DADO TILES 1944 208.25216

CA/201Y
52934
ASH
mrcIO - - < m4-u
- I 0 Z 1OIHm 1 H - - < m--
SITE REPORT

PROJECT- THE GRAND BANQUET, MR. KUNAL PATIL


LOCATION- DHULE
VISIT 1 JULY 15TH
M.S FABRICATION OF BANQUET WAS DONE
M.S FABRICATION WAS PARTIALLY COVERED BY STAINLESS STEEL METAL SHEET
PREFABRICATED M.S FRAME WORK WAS DONE AND IT IS KEPT CAREFULLY UNDER THE
SHADE TO PREVENT RUSTING AND CORROsION.
WORKING OF FIXING STAINLESS STEEL METAL SHEET WAS ON GOING ON SITE, THE
SHEET WAS FIXED BY J BOLT.

PROJECT - INTERNATIONAL CRICKET STADIUM AT PETH ROAD, NASHIK


LoCATION- NASHIK

VisIT 1 - JUNE 30TH


WE HAVE METTING WITH DEPUTY ENGINEER, JUNIOR ENGINEER AND STRUCTURAL
ENGINEER REGARDING PHASE 3 CUTTING ANF FILLING AND RETAINING WALL.
IN PHASsE 3 LEVELING WAS ON GOING OF STADIUM cOMPLEX.
ALSO THEY WAS STARTED PHASE 4 LEVELING.

LicenoeN

A26T1/
2 9 3 4

WASH

You might also like