SOUTH EAST CENTRAL RAILWAY
|CONSTRUCTION]
Dy. Chief Engineer (Com)
S.EC. Railway, Gondia
No. DCEIC /G/Bill/Stn, BuldgPTS-KPKD2S4/sBS /2 [D Date: 10.03.2023
To,
The District Collector,
Nagpur
&
Tahsitdar,
‘Saoner, Dist. Nagpur
Sub: Issue of Royalty Clearance Certificate against C.A. No. 254/ Stn. Buldg/ PTS-
KPKD/ 14-15/ 49/SBS dtd: 18.06.2015,
Dear Sir,
The contract for the work of Construction of station building service buildings,
platform circulating area, roads ete. at Patansaongi & Khaprikheda stations and passenger
halts at Malegaon, Takli Patansaongi PH, Pipla and Koradih along with allied and mise,
works in connection with CWA-NGP Gauge conversion project was awarded to M/s Sudhir
B. Srivastava, Nagpur vide C.A. No. 254/ Stn, Buldg/ PTS- KPKD/ 14-15/ 49/SBS dtd:
18.06.2015. Contractor also completed the work on 07.04.2018
During the execution of work, Contractor utilized the following minor minerals to
complete the work. After completion of work Collector, Nagpur issued Royalty Clearance
Certificate for some minerals which is also mentioned below.
St. | Type of material ‘Quantity utilized | Royalty Clearance | Balance to be
No. to complete the | Certificate issued by | issued dn
work (In CUM) _ | Collector (in CUM) | CUM) |
[TT Sand eeao242S9 0 3242.59
[2. | Aggregate ] 8160.73 6866.429 1294.301
fee : (2426.30 Brass )
(3. [ Earthwork in filling 92.77 0 S27
4) Dry random rubber 336.37 07 336.37 |
machinery ae
3. | Moorum 3702.29 3199.032 | 2503258
[sae a (130.40 Brass)
You are therefore requested to issue Royalty Clearance Certificate for balance
quantity of the minor minerals. A copy of Royalty Clearance Certificate dtd: 20.11.2020
issued by Collector , Nagpur is enclosed.
‘Thanking you.
Yours fpithfully,
Gs PEd
Dy. Chief Engineer (Con)
S.E.C. Railway, Gondia(=
X
No.Desk-XXI/MNG-3/WS 66/2020
Office of the Collector Nagpur.
Dated = 20/)\ /2020
ROYALTY CLEARANCE CERTIFICATE
This is to Certify that the necessary transit passes submitted by M/s Sudhir B
Shrivastay has been verified and it is found that the royalty paid materials was obtained
trom authorized quarries has been used for Construction of Station Buildings. S
vice
Buildings, platform circulating area, road. ete at Patansongi & Khaparkheda Station and
Passemger Halts at Malegaon Takli, Patanso ‘ith allied and
ai PHI Pipla and Koradi along)
miscellaneous work in connectin with Chhindwada-Nagpur Gauge Conversion Project
against Agreement No.254/Buldg/PTS-KPKD/14-15/49/SBS dated 18/06/2015.
| Sr. | Typeof | Total Quantity | Valid Quantity | InvalidQuantity |
No.| Material (Brass) | (Brass) (Brass) |
a ' | -
1 Murum 1130.40 1130.40 | 0.00 j
fF —-- — }
2 | Metal =| 2426.30 | 2426.30 0.00 |
Lol i .
(Approved by Hon'ble Collector, Nagpur )
~ Copy To:
D hief ingineer (Con-GC) SEC Railway Nagpur.
M/s Sudhir B Shrivastay, 209-A. Gokuldiijins hagshree Layout. Trimurti Nagar,
Nagpur. fey N Sagi
te ; i For Me