You are on page 1of 3
/ PLN ai Lie Provek BERIT ACARA PENYELESAIAN PEKERIAAN PLN | Pes LuwuK 40 ONSTRUKS! (BAPPK) Kontaltor Tangial 05 Agustus 2003 PT. PLNENJINIRING No Doct: GevpuKeicasprKos | 4. Nama Peraatan ‘Bare Copper (8) 240 mm for System: Switchyard250KV Grounding InstalationSwitchyard 250kV Bay 6 (T/L Toi) ae Sold o Stranded Bare Copper (8¢) + SPUN 41-1981; SPLN 42-5:1981; 8 20,25 mm; 22 kg/km Dc Resistance 0.0755 a/k; Calculated Breaking Fores 96,685 N 2. Komentar Konstruts) a ee | 3. Pernyataan| Tim pengawa konstrus! dengan ini menyatakan bahwa pembangunan Beralatan yang telah disbutkan dats atau set telah selesa dan ti omisioning aiperbolehtan melakukan test yang rcevan, RINE rN Pe Ps aes Pa Nama M. Nama: Dui into ‘Tandatangan Tandatangan : Torso: SIyon, Toren: 0 flaso9 | re “El DGS Sie teary 17. Perse) Pe SuLTENG PT PN Perse) Ps Srits ama Nana Tandstoesn Tandon i — Enjiniring ELECTRICAL, PLN | caeckusrrornaren 2 pearl PROJECT = PLTMGLUWUK4OMW DATE 05-00-1013 - LOCATION. Suitenyrd 150KY Bay 6 (THT) REPORT NO, SUBJECT Grounding instalation Mesh Stucure DOG. REF Mesh to Equipment ‘TEST INSPECTION CHECK LIST RESULT REMARKS 1. Document Review 2. Instaltion Procedure . Grouraing Drawing Approval 2. Material Receiving Inspection Check Materia & Speccaion b. Check any Damage, Dimension & Completion {Visual Check (Tag, Name Pat, Dimersiona) 3. Insalaion Book of equipmenManval Book 4 TTP Approved {ve} a fe EXE eet et MILI) 224. 5 ES Epes. MCIL) aa jn mcooc4 5. Fie Inspection Repor (Schematec Diagram, Equipment instal, Specification) 1. Grounding and ighing ‘2 Seting Poston and Elevation b. Leveling check © Tiohingss of Lock Nuts 6, Testing 1 Grovnding & Lightning 8. Continuity Test ». Grounding Resistance Test Se (ee ee = 1 ving co 7 ting, cc (GAS ENGINE POWER PLANT LUWUK 40 MW PLN CHECK LIST FOR BAPPK ee Enjiniring ELECTRICAL PROJECT — : PLTMGLUWUK 40M DATE 08-28-7108 LOCATION: Swichyard 15OKV Bay 6 (TL Tou 1) REPORT NO. ‘SUBJECT Grounding Insalaton Mesh to Stucture DOC. REF Mesh to Equipment Special comment: = PunekLige (rau Lich OF akaclunnnt rerated > bay AV pacokes Waspeckinw texart , 06 going ~ = OCI (section Reger OEE, OF GANG Checked 8 Winassadby Prepared oy PT_PLM (Perso) PUSMANPRO PT. PLN ENJINIRING UUPMIK V-PST PLTMG LUWUK . Gone DE 4. (Viegtonben ‘GAS ENGINE POWER PLANT LUWUK 40 MW

You might also like