Professional Documents
Culture Documents
Figure 1-4 Contour for the 5x100 MW Plots IL&FS Solar Park
1.4 Soil Investigation Report
As per the soil investigation report of the site, litho logically comprises of dune sand and
alluvium of recent geological age followed by rocks of permo-carboniferous and Jurassic
periods.
As visited from the nearby existing/under execution plants it is studied that pile depth may
vary from 2.7 m to 3.5 m as the strata of the soil is much sandy. (Refer below image for soil
strata).
Figure 2-1 Power Evacuation Scheme for 500 MW IL&FS Solar Park
The Power is to be evacuated from the Solar Power Plant at 33 kV and to be connected to
the 33/220 kV Substation.
Metering as per the CEA norms to be installed at the 33/220 kV Substation.
Expected
Completion: October
2017
Tower Tower
Foundation foundation for
in 33/220 the 33/220 kV
kV transmission
Substation line.